1
The Kazakh Operator of Electric Power and Capacity Market
KOREM JSC
Republic of Kazakhstan
2
Description
of the Kazakhstan
Electric Power System
3
Power generationElectric power plants – 56.Total installed capacity - 18981 (MW),including:
thermal electric power plants – 15817 (83,3%)gas turbine units – 916 (4,8%)hydro-electric power plants– 2248 (11,9%)
Power generation:2005 г. – 67,6 bil. kW*h2006 г. - 71, 5 bil. kW*h2007 г. – 76,4 bil. kW*h
4
Transmission grid
Total length of transmission lines with voltage from 220 kV to 1150 kV is 228 100 km
5
Power consumption in 2007
Total consumption of electric power in Kazakhstan is 71, 8 bil.кW*h
6
Reforms
in the Electric Power Industry
7
The Stages of Reforms II stagestage (1994-2000) (1994-2000)
• December 1995 - Law on Electric Power Industry• The National Company (voltage from 220 kV to 1150 kV) -
“KEGOC” JSC with responsibility of System Operator was established
• All Electric Power Plants were privatized• Regional Electric Network Companies (<220 кV) were established
and privatized • The Wholesale Power Market began to function, where the free
market price on electric power appeared• State‘s Refusal of price regulation for Electric Power Plants
8
IIII stagestage ( (20002000 - present- present))• July 2000 – Kazakh Operator of Electric Power and
Capacity Market (КОREM JSC) was created• June 2004 – new Law on Electric Power Industry was
accepted• Power Supply Companies were established• January 2008 –Balancing Market started work in a
simulation routine
The Stages of Reforms
9
The Structure of Wholesale Electric Power Market
Bilateral Contract MarketCentralized Auction Market Balancing MarketSystem & Ancillary Services Market
10
Participants of Wholesale Electric Power Market
System Operator Market Operator Electric Power Producers (Plants) Electric Network Companies Power Supply Companies Consumers
11
InformationInformation on Centralized Electric on Centralized Electric Power Market Power Market in Kazakhstanin Kazakhstan
12
History of KOREM JSC
July 10, 2000 – KOREM JSC was created
February 18, 2002 - the First Spot Auctions “day ahead” took place in “KOREM” JSC.
September 28, 2004 - The First Forward Auctions took place
13
At the “KOREM” marketplace there are 2 types of auctions:
• “Day ahead” auctions
• Forward auctions
(medium-term for a week, month and long-term for a quarter, year)
14
Market Participants 65 members for “day ahead”
auctions
116 members for forward auctions
15
15% of the Wholesale Electric Power MarketTotal volumes of deals - 9 508 611 thousand
kW*h
The volumes of Centralized Market in 2007
16
The volumes of “day ahead” auctions (thousand kW*h)
17
The volumes of forward auctions (thousand kW*h)
18
Future projects
“Intra day” auctions
Clearing Center
Central Asian Power Exchange
Financial Derivatives Market
19