Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Orange County Public Schools
Rock Lake Elementary School100% Design/Construction Kick-off Community Meeting
June 6, 2016
WINNER
Orange County Public SchoolsOrange County Public Schools
Rock Lake Elementary SchoolMeeting Agenda
•Introductions – Principal
•Welcome – School Board Member – Kathleen “Kat” Gordon
•Project Update – Facilities Meeting OrganizerArchitect: BRPH Architects/Engineers, Inc.Contractor: Williams Company
•Questions and Answers
•Adjournment
2
Orange County Public Schools Existing Site
Existing Counts:Existing Car Loop Queuing: 11 CarsExisting Parking: 55 Cars
3
Orange County Public Schools Conceptual Site Plan
Student Stations: 6501st Floor: 52,467 SF2nd Floor: 23,596 SFTotal: 76,063 SFCovered Play: 3,168 SF
School Capacity: 650Total Queuing: 104 CarsPercent Stacking: 16%Total Parking: 106 CarsCommunity Parking: 18 CarsPhase 1 Parking: 76 Cars
ROCK LAKE PARK
EXISTING PROPERTY LINE374,838 SF; 8.61 ACRES
PROPOSED PROPERTY LINE374,838 SF; 8.61 ACRES
AREA ALLOCATED FOR PHASE 1 DEMO
4
Orange County Public Schools Fencing Site Plan
Student Stations: 6501st Floor: 52,467 SF2nd Floor: 23,596 SFTotal: 76,063 SFCovered Play: 3,168 SF
School Capacity: 650Total Queuing: 104 CarsPercent Stacking: 16%Total Parking: 106 CarsCommunity Parking: 18 CarsPhase 1 Parking: 76 Cars
5
Orange County Public SchoolsOrange County Public Schools Example Classrooms
New Interactive Display
Updated technology
8
Orange County Public SchoolsOrange County Public Schools
Art
Music
Skills Lab
Example Specialty Classrooms
Updated technology
Updated technology
Updated technology
9
Orange County Public SchoolsOrange County Public Schools Example Lobby & Cafeteria
10
Orange County Public SchoolsOrange County Public Schools Example Media Center
11
Orange County Public Schools Example Elevations
South
East
North
12
Orange County Public SchoolsOrange County Public Schools Example Rendering
13
Orange County Public Schools
14
Orange County Public Schools
Sustainability
Rock Lake Elementary is designed to meet Green Globes sustainable building standards
Sustainable Features Include:
Site• Native/low water plants – reduce water consumption• Low Impact Design (LID) stormwater design
Building• 10% more energy efficient than ASHRAE 90.1 standard• High Efficiency Chillers (8% energy reduction)• Light colored roof to reduce heat gain and improves energy
performance• Energy Star rated equipment• Water saving toilets, faucets, and fixtures• All general classrooms have daylighting• Thermal efficient windows/glazing• Fully automated building controls system
14
Orange County Public Schools
BRPH Prototype School Year Open
Conway ES 2008
Wetherbee ES 2011
Rock Springs ES 2013
Spring Lake ES 2014
Ocoee ES 2014
Pineloch ES 2014
Lake Weston ES 2015
Tangelo Park ES 2016
15
Orange County Public SchoolsOrange County Public Schools Schedule
June2016
June2017
August2017
Construction (12 Months) Move-In
16
Orange County Public Schools Construction Phasing
Student Stations: 6501st Floor: 52,467 SF2nd Floor: 23,596 SFTotal: 76,063 SFCovered Play: 3,168 SF
Double Layer Construction Fencing
School Capacity: 650Total Queuing: 111 CarsPercent Stacking: 17%Total Parking: 109 CarsCommunity Parking: 18 CarsPhase 1 Parking: 79 Cars
17
Orange County Public Schools Conceptual Site Plan
Student Stations: 6501st Floor: 52,467 SF2nd Floor: 23,596 SFTotal: 76,063 SFCovered Play: 3,168 SF
School Capacity: 650Total Queuing: 104 CarsPercent Stacking: 16%Total Parking: 106 CarsCommunity Parking: 18 CarsPhase 1 Parking: 76 Cars
ROCK LAKE PARK
EXISTING PROPERTY LINE374,838 SF; 8.61 ACRES
PROPOSED PROPERTY LINE374,838 SF; 8.61 ACRES
AREA ALLOCATED FOR PHASE 1 DEMO
18
Orange County Public Schools
QUESTIONS?
19