    Name Of QC.:-10th PlanetName of Dept:-O&M(operation)TEAM LEADER:-MR.R.R.NAIK MEMBER:-MR.H.K. UDANMEMBER:-MR.JADUMANI SAHOO

    MEMBER:-MR.N.K.PRADHANMEMBER:-MR.SANJAY KU. SAHOOFACILITATER:- MR.M.K.JANADY.FACILITATER:MR.A.K.PASWAN

  • 8/15/2019 10th Planet (11th nov)

    3/37

    Formation & RegistrationFormation &

    Registrationof our Quality Circleof our

    Quality Circle

    Officially formed on 03/06/2003.

    Meeting on every alternateevening shift of the rota.

    Total Nos. of meeting:73

    Attendance (%) 85.96

  • 8/15/2019 10th Planet (11th nov)

    4/37

    Methodology adopted :-Brain Storming MethodMethodology adopted :-Brain Storming Method

    TEP- 1 :

    1) Boiler tube leakage.2) Low condenser vacuum in unit#1.3) Checking of ESP hopper throat due to dump formation.4) Poor evacuation of mill,jamming problem.5) Mill motor bearing temperature going high.6) Main PA dampers of mill jamming problem.7) Mill feeder jamming problem.8) LRSB not retracted.9) Water logging at cable gallery.10)Waste coal at feeder floor .

  • 8/15/2019 10th Planet (11th nov)

    5/37

    11. Hot line to ERLDC not functional.12. Power consumption in cable gallery, high (SWGR) lighting.

    13. Seal oil filter venting problem.

    14.Wastage of condenser sump pit water.

    15. Bottom ash drain pump over load.16. LRSB drain temp. not maintaining high in U # 2.

    17) Energy meters in MS SWGR not visible.

    18) Diesel tank location for DG set is out side DG set building.

    19) Air ingress through CEP suction line drain .20) VC not effective.

    21) During LRSB to HRSB C/o water particles trapped inside cancause tube leakages.

  • 8/15/2019 10th Planet (11th nov)

    6/37

  • 8/15/2019 10th Planet (11th nov)

    7/37

    36)Coal accumulation near TP area.37)tripping of compressor when DMCW pump trip.

    38)clinker grinder jamming.

    39)air coolers for GT is not temperature operated.

    40) water logging at 0mtr. ESP area.

    41) DM water wastage on D/A level high.

    42) Ash accumulation near PAPH & SAPH oil tank.

    43) Mill#1C classifier temperature low during rainy season.44)Reducing Aux. Power consumption.

    45) Reducing DM makeup water.

  • 8/15/2019 10th Planet (11th nov)

    8/37

    46)Ash water leakage from hoppers.47)flue gas leakage from ID fan inspection manhole.48)passing of fire hydrant valve.49)parking of vehicles near service building.50) noise pollution in mill area.51)service pump sunction line choking.52)valve identification problem.53)vacuums pump choking.54) Ash dyke overflow.

    55) Low line vacuum in fly ash evacuation system.56)problem in PHE change over.57)Bearing damage of series pumps.58)High vibration in FAHP pump.

  • 8/15/2019 10th Planet (11th nov)

    9/37

    AFTER BRAINSTORMING THE PROBLEMSARE CATAGORISED AS UNDER

    08

    32

    18

    TYPE-B

    TYPE-C

    TYPE-A

  • 8/15/2019 10th Planet (11th nov)

    10/37

    WE HAVE SOLVED ALLWE HAVE SOLVED ALL A TYPE PROBLEMSA TYPE PROBLEMS

    TEP- 2 :

  • 8/15/2019 10th Planet (11th nov)

    11/37

  • 8/15/2019 10th Planet (11th nov)

    12/37

    THE BCATAGORISED PROBLEMS ARE PRIORITISEDTHE BCATAGORISED PROBLEMS ARE PRIORITISEDBY NOMINAL GROUP TECHNIQUE. (NGT)BY NOMINAL GROUP TECHNIQUE. (NGT)

    WEIGHTAGE BASIS : 1. SAFETY 2. PRODUCTIVITY 3. HOUSE KEEPING4. QUALITY 5. ENVIORNMENT

    SCALE : 1 - 10

    PROBLEM NO.

    MEMBERS

    1 2 3 4 5 6 8 9 10 11 12

    R.R. NAIK 8 8 9 8 5 6 9 6 8 6 7 6

    J. SAHOO 9 7 8 7 9 9 10 5 6 5 7 5

    N.K. PRADHAN 8 9 8 8 10 6 9 7 8 7 6 7

    H.K. UDAN 9 8 7 7 9 4 8 5 7 8 9 6

    S.K. SAHOO 8 7 6 6 7 5 9 6 8 6 6 7

    TOTAL 42 39 38 36 40 30 45 29 37 32 35 31

    RANKS 2 4 5 7 3 11 1 12 6 9 8 101

    7

  • 8/15/2019 10th Planet (11th nov)

    13/37

  • 8/15/2019 10th Planet (11th nov)

    14/37

    NO. ACTIVITY TIME in weeks

    123

    4567

    89

    10

    Defining problem

    Analysing the problem

    Identifying the cause

    Finding out root cause Data analysis

    Developing solutions

    Foreseeing probableresistance

    Trial implementation andChecking performance

    Follow-up / Review

    Regular implementation

    TARGET (12WEEKS )

    1 2 3 4 5 6 7 8 9 10 1112 13

  • 8/15/2019 10th Planet (11th nov)

    15/37

    Feeder

    Bunker

    Conveyor Belt

    Mill # 1 C

    Glass Window

    Drain line

    DESIGN BYMR R.R.NAYAK

  • 8/15/2019 10th Planet (11th nov)

    16/37

  • 8/15/2019 10th Planet (11th nov)

    17/37

    FEEDER FEEDER

    To supply coal to the mill forpulverization .

    To regulate coal supply to mill . ymuch sought internationally.

  • 8/15/2019 10th Planet (11th nov)

    18/37

  • 8/15/2019 10th Planet (11th nov)

    19/37

    BUNKER FLOOR BUNKER FLOOR

    Unload the coal from conveyor .Bunker feeding .

  • 8/15/2019 10th Planet (11th nov)

    20/37

    START

    FLOW CHART FOR

    MILL#1C CLASSIFIER

    TEMPERATURE LOW

    ARRANGE PROPER

    DRAINAGE

    END

    YES

    By using Flow Diagram

    C&IPROBLE

    M

    VERY MUCH WETCOAL COMING

    YES

    NO

    NO

    MILL # 1CCLASSIFIER

    TEMP LOW

    IS HOT AIR DAMPER

    FULLY OPEN

    IT IS RAINING

    WET COAL COMINGFROM CHP

  • 8/15/2019 10th Planet (11th nov)

    21/37

    STEP- 4 :MONTH MILL#1C classifier temp lo.

    JANUARY 0FEBRUARY 0MARCH 3APRIL 4MAY 6JUNE 10JULY 7AUGUST 3SEPTEMBER 4OCTOBER 1NOVEMBER 0DECEMBER 0TOTAL 38

    DATA SHEET BASED ON OPERATION LOG SHEET

    DATA COLECTED BYMR.H.K.UDAN & MR.S.K.SAHOO

  • 8/15/2019 10th Planet (11th nov)

    22/37

  • 8/15/2019 10th Planet (11th nov)

    23/37

    VALIDATION OF ROOT CAUSES THROUGH COLLECTINGDATA FROM OPERATION LOG SHEET

    STEP- 6 :

    MALFUNCTIONOF C&I EQUIPEMENT.

    HOT PA DAMPER NOT OPENING.

    WATER INGRESS AT BUNKERFLOOR.

    VERY MUCH WET COAL.

    FREQUENCY TYPES OF CAUSE SL.NO

    55

    77

    44

    11

    11

    22

    33

    44DATA COLECTED BY

    MR.N.K.PRADHAN & MR.JADUMANI SAHOO

  • 8/15/2019 10th Planet (11th nov)

    24/37

  • 8/15/2019 10th Planet (11th nov)

    25/37

    CONTRIBUTION OF CAUSES TO THEPROBLEM ( SHOWN IN %)

    CAUSE NO-1CAUSE NO-2CAUSE NO-3

    CAUSE NO-4

    41. 2 %29. 4 %

    23. 6 %5. 8 %

  • 8/15/2019 10th Planet (11th nov)

    26/37

    PARETO ANALYSIS

    DEVELOPING SOLUTIONS

    100 %87.5%

    50 %

    F R E Q U E N C Y

    C U M I L A T I V E %

    1 2 3 4

    8.5

    6.325

    2.125

    STEP-8 :

    4.25

    17

    14.825

    12.75

    10.625

    75%

    62.5%

    37.5%

    25%

    12.5%

    CAUSE NO

    41.2

    70.6

    94.2

  • 8/15/2019 10th Planet (11th nov)

    27/37

    ( TOOLS USED BRAIN STORMING )

    OF CAUSE NO.1

  • 8/15/2019 10th Planet (11th nov)

    28/37

    TOOLS USED BRAIN STORMINGTOOLS USED BRAIN STORMINGOF CAUSE NO.1

  • 8/15/2019 10th Planet (11th nov)

    29/37

    TOOLS USED BRAINSTORMING

    OF CAUSE NO.2

  • 8/15/2019 10th Planet (11th nov)

    30/37

  • 8/15/2019 10th Planet (11th nov)

    31/37

    TOOLS USED BRAIN STORMINGTOOLS USED BRAIN STORMING

    OF CAUSE NO.4

  • 8/15/2019 10th Planet (11th nov)

    32/37

    FORSEEING THEPROBABLE RESISTANCESTEP-9 :

    Discussed about the problem, itscauses and analysis with our

    HOD (O&C)

    The proposed solution was

    conveyed to him, got verbalapproval to go ahead for trialimplementation .

  • 8/15/2019 10th Planet (11th nov)

    33/37

  • 8/15/2019 10th Planet (11th nov)

    34/37

    INTANGIBLE BENEFITS

    BY THE END, WE HAVE ASSESED THE BENEFITS TO THEMEMBERS SUCH AS:

    IMPROVEMENT OF SELF CONFIDENCE. KNOWLEDGE REGARDING QC TOOLS/TECHNIQUES SPEAKING UP AT MEETING INCREASED. CREATIVITY HAS INCREASED. IMPROVEMENT IN ABILITY, TEAM WORK AND INTERACTION WITH

    OTHERS. USING COMPUTERS . STAGE FEAR REMOVED. TIME MANAGEMENT IMPOVED.

    ABOVE ALL OUR CIRCLE HAS INSPIRED THE NON MEMBERS

    AND NEW CIRCLES ARE FORMED IN OUR DEPARTMENT.

  • 8/15/2019 10th Planet (11th nov)

    35/37

    Mill#1C classifier temperatureduring rainy Season can beadequately maintained &Feeder floor will not be dirty.

  • 8/15/2019 10th Planet (11th nov)

    36/37

    FLOW DIAGRAM

    BRAINSTORMINGDATA COLLECTION

    CHARTS & GRAPHS

    CAUSE AND EFFECT DIAGRAM

    PARETO ANALYSIS

  • 8/15/2019 10th Planet (11th nov)

    37/37