  • ROVING QUALITY CONTROL SYSTEM

  • 2Triumph

    What is Roving Quality Control ?

    Control of in-line quality

    Random inspection

    Assurance at the needle point

    Early identification of problems

    not always the sewing operators fault

  • 3Triumph

    Why do it ?

    Reduce the amount of B grades

    Improve the quality output of sewing operators

    Find problems at the source not at end control too late

    Use the quality resource where it can be most effective

    Find out problems earlier and reduce costs

    Increase the effective time and improve productivity

  • 4Triumph

    What does this mean for Triumph

    Vietnam?

    The seventh (7th) in Triumph to have this training

    The basis for a more sophisticated system with

    PDAs later

    The opportunity to improve quality quickly with

    minimum costs

  • 5Triumph

    Schedule

    Training of key personnel (Theory) - Week 46

    Commence a pilot project on 1 line - Week 46

    Implementation of the pilot project (Practical) - Week 46

    Continue implementation, problem solving - Week 46

    Data input, control and distribution - Week 46

    Follow up - TBC

    Decision on expansion

  • 6Triumph

    What tools are needed by the Roving QC?

    Roving QC Daily SheetGreen & Red highlighters

    Roving QC Daily Sheet

    Clipboard

    PencilTape measure

    A good eye !!!!!!!!

  • 7Triumph

    What do we need at the sewing operation ?

    Operator Daily SheetOperator Daily Sheet

    Sewing Specification

    Green cone

    Red cone

    Operators Daily Sheet

    AD page or Technical

    Specification for the

    operationOperation standard

  • 8Triumph

    What documents are used ?

  • 9Triumph

    TRIUMPH ROVING QC SYSTEM ROVING QC DAILY SHEET

    ROVING QC NAME:- DATE : DAY: QC SUPERVISOR:

    LINE:

    Entered by QC Clerk

    (Office use only) Operation

    Style

    Operator No

    Qty inspected

    Result X or

    Defect qty/code rejected

    Follow up

    Remarks

    Defect code: RM = Raw Material faults / holes; SC = Stains/Contamination; MD = Molding faults; PG = Seam/stitch pucker or gather; SB = Seam breakdown (non inclusion/cracking etc); SP = Seam position incorrect (twisting/stretched); SD = Stitch density/tension; PT = Poor trimming/thread ends; ND = Needle damage; GB = Incorrect garment balance; SE = Insecure or misaligned seams/edges; M = Measurement

  • 10Triumph

    TRIUMPH ROVING QC SYSTEM OPERATOR DAILY SHEET (To be kept at the operators workstation at all times) Month: Line: Style: Operator No.: Operator:

    Date Time 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

    Morning

    Remarks:

    Roving QC:

    Line Ldr/Supvsr:

    Sen. Line Ldr/PM:

    Afternoon

    Remarks:

    Roving QC:

    Line Ldr/Supvsr:

    Sen. Line Ldr/PM:

    Night

    Remarks:

    Roving QC:

    Line Ldr/Supvsr:

    Sen. Line Ldr/PM:

    Remarks: If style changed, mark a # in the cell If leave, mark L in the cell Green = all pass Red = 1 major faults or 3 minor faults

    If Green and no rejections, no signature needed; If green & some rejection QC signs: If Red, QC & Line Leader/Supervisor sign; If Red again immediately, Senior Line Leader/Production Manager signs

    Defect code: RM = Raw Material faults / holes; SC = Stains/Contamination; MD = Molding faults; PG = Seam/stitch pucker or gather; SB = Seam breakdown (non inclusion/cracking etc); SP = Seam position incorrect (twisting/stretched); SD = Stitch density/tension; PT = Poor trimming/thread ends; ND = Needle damage; GB = Incorrect garment balance; SE = Insecure or misaligned seams/edges; M = Measurement

  • 11Triumph

    How does the system work ?

  • 12Triumph

    Production line

    Roving QC

  • 13Triumph

    TRIUMPH ROVING QC INSPECTION FLOWCHART

    Equipment: Pencil, Highlighters (Green, Red), Measuring tapeFrequency: At lease once in each shift daily (morning, afternoon, overtime)

    -Enter Month, Line, Style, Operator No, Operator-Enter Date, Line, QC Supervisor, QC

    At the start of each day, refer to the QC Supervisor to the operations in need of special attentionAt the start of each day, refer to the QC Supervisor to the operations in need of special attention

    Randomly select & check 7 samples from the finished bundle of 40 unitsRandomly select & check 7 samples from the finished bundle of 40 units

    How many faults

    How many faults

    Return the bundle to OperatorReturn the bundle to Operator

    In , colour the appropriate cell in Green

    In , colour the appropriate cell in Green

    Raise the Green coneRaise the Green cone

    In , fill the result in relevant columns ()

    In , fill the result in relevant columns ()

    Return the defective pieces to Operator for repair

    Return the defective pieces to Operator for repair

    In , enter the relevant Defect code & quantity (eg 2/PT), colour the appropriate cell in Green, and sign it off

    In , enter the relevant Defect code & quantity (eg 2/PT), colour the appropriate cell in Green, and sign it off

    In , fill the result in relevant columns ()In , fill the result in relevant columns ()

    Instantly inform and return defective pieces to Line Leader

    Instantly inform and return defective pieces to Line Leader

    Line Leader determines how to handle & request Operator to check the whole bundle & repair

    Line Leader determines how to handle & request Operator to check the whole bundle & repair

    In , enter the relevant Defect code & quantity (eg 3/PG), colour the appropriate cell in Red, & sign it off; Line Leader signs off

    In , enter the relevant Defect code & quantity (eg 3/PG), colour the appropriate cell in Red, & sign it off; Line Leader signs off

    In , fill the result in relevant columns ()In , fill the result in relevant columns ()

    No fault

    less than 3 minor faults

    Raise the Red cone & move on to next OperatorRaise the Red cone & move on to next Operator

    Once Operator finished checking & repairing, Line Leader calls QC to re-check

    Once Operator finished checking & repairing, Line Leader calls QC to re-check

    Request Line Leader to stop Operator & inform Senior Line Leader/ Production Manager

    Request Line Leader to stop Operator & inform Senior Line Leader/ Production Manager

    1st time

    Line Leader, Senior Line Leader/ Production Manager solve the problem together

    Line Leader, Senior Line Leader/ Production Manager solve the problem together

    In , enter the relevant Defect code & quantity(eg 2/GB), colour the appropriate cell in Red; Senior Line Leader/ Production Manager signs off

    In , enter the relevant Defect code & quantity(eg 2/GB), colour the appropriate cell in Red; Senior Line Leader/ Production Manager signs off

    In the column Follow-up of , fill in the relevant Defect code & quantity

    In the column Follow-up of , fill in the relevant Defect code & quantity

    Keep the Red cone & move on to next OperatorKeep the Red cone & move on to next Operator

    2nd consecutive time

    After 2 consecutive Redand problem solved, QC checks Operator again

    After 2 consecutive Redand problem solved, QC checks Operator again

    1 or more major faults/3 or more minor faults

    Move on to next Operator

    Move on to next Operator

    Revised 22/02/2007 CQA TIOL HKG

  • 14Triumph

    Roving Quality Control Procedures or Work Instructions

  • 15Triumph

    TRIUMPH ROVING QC SYSTEM

    WORK INSTRUCTION - ROVING IN-LINE QUALITY INSPECTION (Roving QC)

    Equipment: Pencil Highlighters Green, Red Measuring tape

    Reports:

    Frequency: At least once in each shift daily (i.e. once@morning, afternoon & overtime) Specific operations as frequently as directed

    Related Parties: Roving QC, Line Leader/Supervisor, QC Supervisor, Senior Line Leader, Production Manager

    Method:

    1. At the start of each day, the Roving QC refers to the QC Supervisor to determine those operations which are in the Highest 3 or in need of close attention for some other reasons.

    2. The Roving QC visits operators at random to eliminate any chance of them cheating the system.

    3. On the , the Roving QC enters Roving QC name, Month, Line, Style, Operator No. and Operator. On the , the Roving QC enters Date, Day, Line, and QC Supervisor.

    4. Roving QC randomly selects the latest 7 finished samples from the bundle of 40 still at the workstation, checks the work against the visual standard and specific requirements for: 4.1 Correct trim being used 4.2 Workmanship 4.3 General appearance 4.4 Measurement where the operation is elastication or there is a specified

    measurement controlled by the operator 4.5 According to the number of faults, QC follows Step 5, 6 or 7

    5. If no fault is found: 5.1 Roving QC returns the inspected garments to the Operator 5.2 Roving QC fills in the appropriate space on the with

    Green highlighter 5.3 Roving QC fills in each column on the :

    Operation abbreviation or code, Style, Operator No, Quantity Inspected, Result

    5.4 QC raises Green cone at the work station and moves on to the next Operator

  • 16TriumphRevised 22/02/2007 CQA TIOL HKG Page 1 of 2

    1. If less than 3 minor faults are found: (a minor fault can be defined as a fault which will not result in customer rejection or return, but one that is not within the specification or tolerances required) 1.1 Roving QC returns the defective pieces to the Operator for repair 1.2 Roving QC fills in the appropriate space on the with

    Green highlighter and enters the relevant Defect code and quantity as for example: 2/PT and sign it off

    1.3 Roving QC fills in each column on the : Operation abbreviation or code, Style, Operator No, Quantity Inspected

    Result , Defect qty/code, Remarks bundle number(if necessary) 1.4 Roving QC raises Green cone at the work station and moves on to the next

    Operator

    2. If 1 or more major faults / 3 or more minor faults are found: (a major fault can be defined as a fault that will definitely result in rejection by the customer and likely return) 2.1 Roving QC instantly informs the Line Leader/Supervisor to come to the operation

    and returns the defective pieces to the Line Leader/Supervisor 2.2 Line Leader/Supervisor shall determine how to handle the defects and request the

    Operator to check the rest of the bundle and rectify any further faults before permitting the bundle to continue down the line

    2.3 Roving QC colours the Red, and enters the relevant Quantity and Defect code, for example: 3/SD and sign it off

    2.4 Line Leader/Supervisor signs off on the 2.5 Roving QC fills in each column on the :

    Operation abbreviation or code, Style, Operator No, Quantity Inspected Result , Defect qty/code, Remarks bundle number(if necessary)

    2.6 Roving QC raises Red cone at the work station and moves on to the next Operator 2.7 Once the Operator has finished checking and repairing, the Line Leader/Supervisor

    shall call the Roving QC back to the operator 2.8 Roving QC proceeds from Step 4 for the checked and repaired bundle 2.9 If no fault is found, proceed from Step 5;

    If less than 3 minor faults are found, then proceed from Step 6; If 1 or more major faults / 3 or more minor faults are found, then proceed as follows:-

    2.10 Roving QC requests the Line Leader/Supervisor to stop the Operator and informs the Senior Line Leader / Production Manager

    2.11 Line Leader/Supervisor, Senior Line Leader / Production Manager solve the problem together

    2.12 Roving QC colours the Red, and enters the relevant quantity and Defect code, for example: 4/SD

    2.13 Senior Line Leader / Production Manager signs off on the

    2.14 Roving QC fills the Defect code and quantity in Follow up on the

    2.15 Roving QC keeps Red cone at the work station and moves on to the next Operator 2.16 Roving QC must ensure to check the Operator again after 2 consecutive Red 2.17 Once the operator has a Red, she must only be allowed to continue working

    if a Red is immediately followed by a Green.

    3. The Roving QC should particularly note the following points: 3.1 NEVER get involved with the Operator in trying to find out why the Operator is

    wrong. That is the responsibility of Line Leader/Supervisor 3.2 NEVER wait at the operation whilst the problem is being resolved 3.3 NEVER try to suggest solutions to the Operator if anything goes wrong afterwards

    you may be blamed 3.4 If you have any views about the cause or solution of a particular problem, the Line

    Leader/Supervisor & QC Supervisor should be consulted and the matter left with them.

  • 17Triumph

    WORK INSTRUCTION DAILY & WEEKLY CHECKING SUMMARY (QC Clerk)

    DAILY:

    1. At 16.00 or 2 HOURS before the end of the shift, the QC Supervisor collects the from all Roving QCs & submits them to QC Clerk.

    2. In the computer file Roving QC Analysis, QC Clerk chooses the sheet Daily Chk Sumry of the corresponding day.

    3. QC Clerk enters the Week commencing & Unit.

    4. On the , the QC Clerk ignores the entries with no fault. For those entries with faults found , QC Clerk transfers the data to the Daily Chk Sumry, including: 4.1 Line, Style, Operator No 4.2 Total handled(Exceptions) and the number of different defects

    The QC Clerk initials the box on the to indicate she has completed the entries for that sheet.

    5. At 17:30 or 30 minutes before the end of the shift, the QC Clerk issues the Roving QC Analysis with completed Daily Chk Sumry to Factory Managers, QA Manager, Production Managers, QC Senior Supervisor, etc. through E-mail.

    WEEKLY:

    At 08:30 on Monday,

    1. The QC Supervisor collects the which includes the data of the previous Saturday entered after 16:00 on Friday from all Roving QCs & submits to QC Clerk. Per the above steps, QC Clerk completes the Daily Chk Sumry of the previous Saturday.

    2. The QC Clerk chooses the sheet Analysis only of the computer file Roving QC Analysis.

    3. The QC Clerk filters the column Operator No & selects operators in the order of their number.

    4. The QC Clerk copies from row A to row G for each operator.

    5. The QC Clerk pastes into Wkly Chk Sumry by using Paste Special Values only.

    6. In Wkly Chk Sumry, QC Clerk selects from Toolbar, Data-Sort-% Reject-Descending.

    7. The QC Clerk issues the Roving QC Analysis with completed Wkly Chk Sumry to General Manager, Factory Managers, QA Manager, Production Managers, QC Senior Supervisor, etc. through E-mail.

  • 18Triumph

    What reports are generated ?

  • 19Triumph

  • 20Triumph

    QSF TRIUMPH ROVING QC SYSTEM

    Weekly Checking Summary (Exceptions) For email distribution0 Week Commencing 0

    Line Style Operator No Total Checked (Exceptions) Total Rejected (Exceptions) % Reject (Exceptions) Day

    A 1234 AS 14 8 57.14% MONA 1234 AS 14 2 14.29% TUEC 3456 BB 14 3 21.43% MONC 3456 BB 14 2 14.29% TUED 4567 CC 14 1 7.14% MOND 4567 CC 14 1 7.14% TUEA 1234 DD 14 6 42.86% MONA 1234 DD 14 1 7.14% TUEA 1234 IO 14 3 21.43% MONB 2345 DV 14 9 64.29% MONB 2345 DV 14 1 7.14% TUEA 1234 SS 14 1 7.14% MONA 1234 ER 14 1 7.14% MONA 1234 ER 14 1 7.14% TUEB 2345 GF 14 9 64.29% MONB 2345 GF 14 1 7.14% TUEB 2345 GG 14 7 50.00% MONB 2345 GG 14 1 7.14% TUEC 3456 GH 14 5 35.71% MONC 3456 GH 14 3 21.43% TUEB 2345 HH 14 1 7.14% MONB 2345 HH 14 2 14.29% TUEC 3456 HK 14 1 7.14% MONC 3456 HK 14 1 7.14% TUEB 2345 HU 14 1 7.14% MONB 2345 HU 14 2 14.29% TUEC 3456 II 14 7 50.00% MOND 4567 II 14 1 7.14% MONC 3456 II 14 1 7.14% TUED 4567 II 14 1 7.14% TUEA 1234 IK 14 9 64.29% MONA 1234 IK 14 2 14.29% TUEA 1234 IO 14 3 21.43% MONB 2345 IO 14 1 7.14% MONB 2345 IO 14 8 57.14% MONA 1234 IO 14 1 7.14% TUEB 2345 IO 14 2 14.29% TUEB 2345 IO 14 2 14.29% TUEC 3456 MM 14 1 7.14% MONB 2345 JJ 14 5 35.71% MONB 2345 JJ 14 2 14.29% TUEA 1234 JK 14 4 28.57% MONC 3456 JK 14 2 14.29% MONA 1234 JK 14 1 7.14% TUEC 3456 KJ 14 9 64.29% MONC 3456 KJ 14 1 7.14% TUEC 3456 LK 14 2 14.29% MONC 3456 LK 14 1 7.14% TUEC 3456 MM 14 1 7.14% MONC 3456 MM 14 1 7.14% TUED 4567 MY 14 1 7.14% MOND 4567 MY 14 1 7.14% TUEA 1234 OL 14 3 21.43% MONA 1234 OL 14 1 7.14% TUED 4567 PL 14 1 7.14% MON

    Unit:

  • 21Triumph

    Defect Codes

    MeasurementM

    Insecure or Misaligned Seams / EdgesSE

    Incorrect Garment BalanceGB

    Needle Damage (cuts)ND

    Poor Trimming / Thread EndsPT

    Stitch Density / TensionSD

    Seam Position incorrect (twisting / stretched)SP

    Seam Breakdown (non inclusion / cracking etc)SB

    Seam / Stitch pucker or gatherPG

    Molding FaultsMD

    Stains and ContaminationSC

    Raw Material Faults / HolesRM

  • 22Triumph

    Defect Codes Major and Minor classification.

    MAJORMissing OperationMO

    MAJORMeasurementM

    Careless Trimming

    Insecure or Misaligned Seams / Edges

    Incorrect Garment Balance

    Needle Damage (cuts)

    Poor Trimming / Thread Ends

    Stitch Density / Tension

    Seam Position incorrect (twisting /

    stretched)

    Seam Breakdown (non inclusion /

    cracking etc)

    Seam / Stitch pucker or gather

    Molding Faults

    Stains and Contamination

    Raw Material Faults / Holes

    MAJOR

    MAJOR

    MAJOR

    MAJOR

    MINOR

    MAJOR

    MAJOR

    MAJOR

    MAJOR

    MAJOR

    MINOR

    MAJOR

    CT

    SE

    GB

    ND

    PT

    SD

    SP

    SB

    PG

    MD

    SC

    RM

  • 23Triumph

    Some general rules and guidelines

    At the start of the shift, every operator must be checked at least once morning, once afternoon and once on overtime, some will require extra checks from the previous days results

    Roving QC should select the 7 most recently sewn pieces only

    Roving QC should never attempt to solve a problem only identify and report and MOVE ON

    Roving QC should never discuss the reasons for a problem with the operator

    Roving QC should not become familiar with an operator

    When faults are found, always return them to the operator for repair immediately

    Roving QC must never become predictable, must be random checks

    There must be no favourites

    Line supervisor must solve the problem before calling the Roving QC back for a second check

    Roving QC must concentrate on conducting as many checks as possible

    Roving QC should be transferred to another line 2 to 3 months

    Every red that appears on the Operators daily sheet, must be followed by a green before work re-commences

    Two reds must involve the production manager

    A red means an operation has stopped, so action is needed immediately

    A red is not always the operators fault, just means a fault at that operation, so read the results carefully

    Check the days results before the end of the shift, so that plans for the next day can be made

  • 24Triumph

    Thank you..

    Any Questions ?