ROVING QUALITY CONTROL SYSTEM
2Triumph
What is Roving Quality Control ?
Control of in-line quality
Random inspection
Assurance at the needle point
Early identification of problems
not always the sewing operators fault
3Triumph
Why do it ?
Reduce the amount of B grades
Improve the quality output of sewing operators
Find problems at the source not at end control too late
Use the quality resource where it can be most effective
Find out problems earlier and reduce costs
Increase the effective time and improve productivity
4Triumph
What does this mean for Triumph
Vietnam?
The seventh (7th) in Triumph to have this training
The basis for a more sophisticated system with
PDAs later
The opportunity to improve quality quickly with
minimum costs
5Triumph
Schedule
Training of key personnel (Theory) - Week 46
Commence a pilot project on 1 line - Week 46
Implementation of the pilot project (Practical) - Week 46
Continue implementation, problem solving - Week 46
Data input, control and distribution - Week 46
Follow up - TBC
Decision on expansion
6Triumph
What tools are needed by the Roving QC?
Roving QC Daily SheetGreen & Red highlighters
Roving QC Daily Sheet
Clipboard
PencilTape measure
A good eye !!!!!!!!
7Triumph
What do we need at the sewing operation ?
Operator Daily SheetOperator Daily Sheet
Sewing Specification
Green cone
Red cone
Operators Daily Sheet
AD page or Technical
Specification for the
operationOperation standard
8Triumph
What documents are used ?
9Triumph
TRIUMPH ROVING QC SYSTEM ROVING QC DAILY SHEET
ROVING QC NAME:- DATE : DAY: QC SUPERVISOR:
LINE:
Entered by QC Clerk
(Office use only) Operation
Style
Operator No
Qty inspected
Result X or
Defect qty/code rejected
Follow up
Remarks
Defect code: RM = Raw Material faults / holes; SC = Stains/Contamination; MD = Molding faults; PG = Seam/stitch pucker or gather; SB = Seam breakdown (non inclusion/cracking etc); SP = Seam position incorrect (twisting/stretched); SD = Stitch density/tension; PT = Poor trimming/thread ends; ND = Needle damage; GB = Incorrect garment balance; SE = Insecure or misaligned seams/edges; M = Measurement
10Triumph
TRIUMPH ROVING QC SYSTEM OPERATOR DAILY SHEET (To be kept at the operators workstation at all times) Month: Line: Style: Operator No.: Operator:
Date Time 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
Morning
Remarks:
Roving QC:
Line Ldr/Supvsr:
Sen. Line Ldr/PM:
Afternoon
Remarks:
Roving QC:
Line Ldr/Supvsr:
Sen. Line Ldr/PM:
Night
Remarks:
Roving QC:
Line Ldr/Supvsr:
Sen. Line Ldr/PM:
Remarks: If style changed, mark a # in the cell If leave, mark L in the cell Green = all pass Red = 1 major faults or 3 minor faults
If Green and no rejections, no signature needed; If green & some rejection QC signs: If Red, QC & Line Leader/Supervisor sign; If Red again immediately, Senior Line Leader/Production Manager signs
Defect code: RM = Raw Material faults / holes; SC = Stains/Contamination; MD = Molding faults; PG = Seam/stitch pucker or gather; SB = Seam breakdown (non inclusion/cracking etc); SP = Seam position incorrect (twisting/stretched); SD = Stitch density/tension; PT = Poor trimming/thread ends; ND = Needle damage; GB = Incorrect garment balance; SE = Insecure or misaligned seams/edges; M = Measurement
11Triumph
How does the system work ?
12Triumph
Production line
Roving QC
13Triumph
TRIUMPH ROVING QC INSPECTION FLOWCHART
Equipment: Pencil, Highlighters (Green, Red), Measuring tapeFrequency: At lease once in each shift daily (morning, afternoon, overtime)
-Enter Month, Line, Style, Operator No, Operator-Enter Date, Line, QC Supervisor, QC
At the start of each day, refer to the QC Supervisor to the operations in need of special attentionAt the start of each day, refer to the QC Supervisor to the operations in need of special attention
Randomly select & check 7 samples from the finished bundle of 40 unitsRandomly select & check 7 samples from the finished bundle of 40 units
How many faults
How many faults
Return the bundle to OperatorReturn the bundle to Operator
In , colour the appropriate cell in Green
In , colour the appropriate cell in Green
Raise the Green coneRaise the Green cone
In , fill the result in relevant columns ()
In , fill the result in relevant columns ()
Return the defective pieces to Operator for repair
Return the defective pieces to Operator for repair
In , enter the relevant Defect code & quantity (eg 2/PT), colour the appropriate cell in Green, and sign it off
In , enter the relevant Defect code & quantity (eg 2/PT), colour the appropriate cell in Green, and sign it off
In , fill the result in relevant columns ()In , fill the result in relevant columns ()
Instantly inform and return defective pieces to Line Leader
Instantly inform and return defective pieces to Line Leader
Line Leader determines how to handle & request Operator to check the whole bundle & repair
Line Leader determines how to handle & request Operator to check the whole bundle & repair
In , enter the relevant Defect code & quantity (eg 3/PG), colour the appropriate cell in Red, & sign it off; Line Leader signs off
In , enter the relevant Defect code & quantity (eg 3/PG), colour the appropriate cell in Red, & sign it off; Line Leader signs off
In , fill the result in relevant columns ()In , fill the result in relevant columns ()
No fault
less than 3 minor faults
Raise the Red cone & move on to next OperatorRaise the Red cone & move on to next Operator
Once Operator finished checking & repairing, Line Leader calls QC to re-check
Once Operator finished checking & repairing, Line Leader calls QC to re-check
Request Line Leader to stop Operator & inform Senior Line Leader/ Production Manager
Request Line Leader to stop Operator & inform Senior Line Leader/ Production Manager
1st time
Line Leader, Senior Line Leader/ Production Manager solve the problem together
Line Leader, Senior Line Leader/ Production Manager solve the problem together
In , enter the relevant Defect code & quantity(eg 2/GB), colour the appropriate cell in Red; Senior Line Leader/ Production Manager signs off
In , enter the relevant Defect code & quantity(eg 2/GB), colour the appropriate cell in Red; Senior Line Leader/ Production Manager signs off
In the column Follow-up of , fill in the relevant Defect code & quantity
In the column Follow-up of , fill in the relevant Defect code & quantity
Keep the Red cone & move on to next OperatorKeep the Red cone & move on to next Operator
2nd consecutive time
After 2 consecutive Redand problem solved, QC checks Operator again
After 2 consecutive Redand problem solved, QC checks Operator again
1 or more major faults/3 or more minor faults
Move on to next Operator
Move on to next Operator
Revised 22/02/2007 CQA TIOL HKG
14Triumph
Roving Quality Control Procedures or Work Instructions
15Triumph
TRIUMPH ROVING QC SYSTEM
WORK INSTRUCTION - ROVING IN-LINE QUALITY INSPECTION (Roving QC)
Equipment: Pencil Highlighters Green, Red Measuring tape
Reports:
Frequency: At least once in each shift daily (i.e. once@morning, afternoon & overtime) Specific operations as frequently as directed
Related Parties: Roving QC, Line Leader/Supervisor, QC Supervisor, Senior Line Leader, Production Manager
Method:
1. At the start of each day, the Roving QC refers to the QC Supervisor to determine those operations which are in the Highest 3 or in need of close attention for some other reasons.
2. The Roving QC visits operators at random to eliminate any chance of them cheating the system.
3. On the , the Roving QC enters Roving QC name, Month, Line, Style, Operator No. and Operator. On the , the Roving QC enters Date, Day, Line, and QC Supervisor.
4. Roving QC randomly selects the latest 7 finished samples from the bundle of 40 still at the workstation, checks the work against the visual standard and specific requirements for: 4.1 Correct trim being used 4.2 Workmanship 4.3 General appearance 4.4 Measurement where the operation is elastication or there is a specified
measurement controlled by the operator 4.5 According to the number of faults, QC follows Step 5, 6 or 7
5. If no fault is found: 5.1 Roving QC returns the inspected garments to the Operator 5.2 Roving QC fills in the appropriate space on the with
Green highlighter 5.3 Roving QC fills in each column on the :
Operation abbreviation or code, Style, Operator No, Quantity Inspected, Result
5.4 QC raises Green cone at the work station and moves on to the next Operator
16TriumphRevised 22/02/2007 CQA TIOL HKG Page 1 of 2
1. If less than 3 minor faults are found: (a minor fault can be defined as a fault which will not result in customer rejection or return, but one that is not within the specification or tolerances required) 1.1 Roving QC returns the defective pieces to the Operator for repair 1.2 Roving QC fills in the appropriate space on the with
Green highlighter and enters the relevant Defect code and quantity as for example: 2/PT and sign it off
1.3 Roving QC fills in each column on the : Operation abbreviation or code, Style, Operator No, Quantity Inspected
Result , Defect qty/code, Remarks bundle number(if necessary) 1.4 Roving QC raises Green cone at the work station and moves on to the next
Operator
2. If 1 or more major faults / 3 or more minor faults are found: (a major fault can be defined as a fault that will definitely result in rejection by the customer and likely return) 2.1 Roving QC instantly informs the Line Leader/Supervisor to come to the operation
and returns the defective pieces to the Line Leader/Supervisor 2.2 Line Leader/Supervisor shall determine how to handle the defects and request the
Operator to check the rest of the bundle and rectify any further faults before permitting the bundle to continue down the line
2.3 Roving QC colours the Red, and enters the relevant Quantity and Defect code, for example: 3/SD and sign it off
2.4 Line Leader/Supervisor signs off on the 2.5 Roving QC fills in each column on the :
Operation abbreviation or code, Style, Operator No, Quantity Inspected Result , Defect qty/code, Remarks bundle number(if necessary)
2.6 Roving QC raises Red cone at the work station and moves on to the next Operator 2.7 Once the Operator has finished checking and repairing, the Line Leader/Supervisor
shall call the Roving QC back to the operator 2.8 Roving QC proceeds from Step 4 for the checked and repaired bundle 2.9 If no fault is found, proceed from Step 5;
If less than 3 minor faults are found, then proceed from Step 6; If 1 or more major faults / 3 or more minor faults are found, then proceed as follows:-
2.10 Roving QC requests the Line Leader/Supervisor to stop the Operator and informs the Senior Line Leader / Production Manager
2.11 Line Leader/Supervisor, Senior Line Leader / Production Manager solve the problem together
2.12 Roving QC colours the Red, and enters the relevant quantity and Defect code, for example: 4/SD
2.13 Senior Line Leader / Production Manager signs off on the
2.14 Roving QC fills the Defect code and quantity in Follow up on the
2.15 Roving QC keeps Red cone at the work station and moves on to the next Operator 2.16 Roving QC must ensure to check the Operator again after 2 consecutive Red 2.17 Once the operator has a Red, she must only be allowed to continue working
if a Red is immediately followed by a Green.
3. The Roving QC should particularly note the following points: 3.1 NEVER get involved with the Operator in trying to find out why the Operator is
wrong. That is the responsibility of Line Leader/Supervisor 3.2 NEVER wait at the operation whilst the problem is being resolved 3.3 NEVER try to suggest solutions to the Operator if anything goes wrong afterwards
you may be blamed 3.4 If you have any views about the cause or solution of a particular problem, the Line
Leader/Supervisor & QC Supervisor should be consulted and the matter left with them.
17Triumph
WORK INSTRUCTION DAILY & WEEKLY CHECKING SUMMARY (QC Clerk)
DAILY:
1. At 16.00 or 2 HOURS before the end of the shift, the QC Supervisor collects the from all Roving QCs & submits them to QC Clerk.
2. In the computer file Roving QC Analysis, QC Clerk chooses the sheet Daily Chk Sumry of the corresponding day.
3. QC Clerk enters the Week commencing & Unit.
4. On the , the QC Clerk ignores the entries with no fault. For those entries with faults found , QC Clerk transfers the data to the Daily Chk Sumry, including: 4.1 Line, Style, Operator No 4.2 Total handled(Exceptions) and the number of different defects
The QC Clerk initials the box on the to indicate she has completed the entries for that sheet.
5. At 17:30 or 30 minutes before the end of the shift, the QC Clerk issues the Roving QC Analysis with completed Daily Chk Sumry to Factory Managers, QA Manager, Production Managers, QC Senior Supervisor, etc. through E-mail.
WEEKLY:
At 08:30 on Monday,
1. The QC Supervisor collects the which includes the data of the previous Saturday entered after 16:00 on Friday from all Roving QCs & submits to QC Clerk. Per the above steps, QC Clerk completes the Daily Chk Sumry of the previous Saturday.
2. The QC Clerk chooses the sheet Analysis only of the computer file Roving QC Analysis.
3. The QC Clerk filters the column Operator No & selects operators in the order of their number.
4. The QC Clerk copies from row A to row G for each operator.
5. The QC Clerk pastes into Wkly Chk Sumry by using Paste Special Values only.
6. In Wkly Chk Sumry, QC Clerk selects from Toolbar, Data-Sort-% Reject-Descending.
7. The QC Clerk issues the Roving QC Analysis with completed Wkly Chk Sumry to General Manager, Factory Managers, QA Manager, Production Managers, QC Senior Supervisor, etc. through E-mail.
18Triumph
What reports are generated ?
19Triumph
20Triumph
QSF TRIUMPH ROVING QC SYSTEM
Weekly Checking Summary (Exceptions) For email distribution0 Week Commencing 0
Line Style Operator No Total Checked (Exceptions) Total Rejected (Exceptions) % Reject (Exceptions) Day
A 1234 AS 14 8 57.14% MONA 1234 AS 14 2 14.29% TUEC 3456 BB 14 3 21.43% MONC 3456 BB 14 2 14.29% TUED 4567 CC 14 1 7.14% MOND 4567 CC 14 1 7.14% TUEA 1234 DD 14 6 42.86% MONA 1234 DD 14 1 7.14% TUEA 1234 IO 14 3 21.43% MONB 2345 DV 14 9 64.29% MONB 2345 DV 14 1 7.14% TUEA 1234 SS 14 1 7.14% MONA 1234 ER 14 1 7.14% MONA 1234 ER 14 1 7.14% TUEB 2345 GF 14 9 64.29% MONB 2345 GF 14 1 7.14% TUEB 2345 GG 14 7 50.00% MONB 2345 GG 14 1 7.14% TUEC 3456 GH 14 5 35.71% MONC 3456 GH 14 3 21.43% TUEB 2345 HH 14 1 7.14% MONB 2345 HH 14 2 14.29% TUEC 3456 HK 14 1 7.14% MONC 3456 HK 14 1 7.14% TUEB 2345 HU 14 1 7.14% MONB 2345 HU 14 2 14.29% TUEC 3456 II 14 7 50.00% MOND 4567 II 14 1 7.14% MONC 3456 II 14 1 7.14% TUED 4567 II 14 1 7.14% TUEA 1234 IK 14 9 64.29% MONA 1234 IK 14 2 14.29% TUEA 1234 IO 14 3 21.43% MONB 2345 IO 14 1 7.14% MONB 2345 IO 14 8 57.14% MONA 1234 IO 14 1 7.14% TUEB 2345 IO 14 2 14.29% TUEB 2345 IO 14 2 14.29% TUEC 3456 MM 14 1 7.14% MONB 2345 JJ 14 5 35.71% MONB 2345 JJ 14 2 14.29% TUEA 1234 JK 14 4 28.57% MONC 3456 JK 14 2 14.29% MONA 1234 JK 14 1 7.14% TUEC 3456 KJ 14 9 64.29% MONC 3456 KJ 14 1 7.14% TUEC 3456 LK 14 2 14.29% MONC 3456 LK 14 1 7.14% TUEC 3456 MM 14 1 7.14% MONC 3456 MM 14 1 7.14% TUED 4567 MY 14 1 7.14% MOND 4567 MY 14 1 7.14% TUEA 1234 OL 14 3 21.43% MONA 1234 OL 14 1 7.14% TUED 4567 PL 14 1 7.14% MON
Unit:
21Triumph
Defect Codes
MeasurementM
Insecure or Misaligned Seams / EdgesSE
Incorrect Garment BalanceGB
Needle Damage (cuts)ND
Poor Trimming / Thread EndsPT
Stitch Density / TensionSD
Seam Position incorrect (twisting / stretched)SP
Seam Breakdown (non inclusion / cracking etc)SB
Seam / Stitch pucker or gatherPG
Molding FaultsMD
Stains and ContaminationSC
Raw Material Faults / HolesRM
22Triumph
Defect Codes Major and Minor classification.
MAJORMissing OperationMO
MAJORMeasurementM
Careless Trimming
Insecure or Misaligned Seams / Edges
Incorrect Garment Balance
Needle Damage (cuts)
Poor Trimming / Thread Ends
Stitch Density / Tension
Seam Position incorrect (twisting /
stretched)
Seam Breakdown (non inclusion /
cracking etc)
Seam / Stitch pucker or gather
Molding Faults
Stains and Contamination
Raw Material Faults / Holes
MAJOR
MAJOR
MAJOR
MAJOR
MINOR
MAJOR
MAJOR
MAJOR
MAJOR
MAJOR
MINOR
MAJOR
CT
SE
GB
ND
PT
SD
SP
SB
PG
MD
SC
RM
23Triumph
Some general rules and guidelines
At the start of the shift, every operator must be checked at least once morning, once afternoon and once on overtime, some will require extra checks from the previous days results
Roving QC should select the 7 most recently sewn pieces only
Roving QC should never attempt to solve a problem only identify and report and MOVE ON
Roving QC should never discuss the reasons for a problem with the operator
Roving QC should not become familiar with an operator
When faults are found, always return them to the operator for repair immediately
Roving QC must never become predictable, must be random checks
There must be no favourites
Line supervisor must solve the problem before calling the Roving QC back for a second check
Roving QC must concentrate on conducting as many checks as possible
Roving QC should be transferred to another line 2 to 3 months
Every red that appears on the Operators daily sheet, must be followed by a green before work re-commences
Two reds must involve the production manager
A red means an operation has stopped, so action is needed immediately
A red is not always the operators fault, just means a fault at that operation, so read the results carefully
Check the days results before the end of the shift, so that plans for the next day can be made
24Triumph
Thank you..
Any Questions ?