45
IFB 4019000082 Contract No. 12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format ) SOLICITATION/CONTRACT NO. IFB 4019000082 MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante RFA NO._MRFA # 2 DATE April 26 th , 2019 SECTION_1.5.3 Capacity_ PAGE NO._24_ PARAGRAPH NO. MANUFACTURER'S REQUEST: [Complete, scaled, interior layout drawings showing seat positions, hip-to-knee room, foot room, seat height and width dimensions, aisle widths, passenger assists, floor contour, fare box location and all other pertinent interior dimensions including wheelchair maneuverability and free floor space area of the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 2).] In response to mandatory item 2, we request your approval for "Attachment M2" for interior layout drawings. We request your approval. METRO'S RESPONSE: APPROVED X DENIED APPROVED AS MODIFIED COMMENTS: APPROVED BY: DATE: Andrei Dragomir 5/6/2019 Project Manager

12 REQUEST FOR APPROVAL (RFA FORM) - ridemetroapp.org€¦  · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be

  • Upload
    vudang

  • View
    224

  • Download
    0

Embed Size (px)

Citation preview

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 2

DATE April 26th, 2019

SECTION_1.5.3 Capacity_ PAGE NO._24_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Complete, scaled, interior layout drawings showing seat positions, hip-to-knee room, foot room, seat height and width dimensions, aisle widths, passenger assists, floor contour, fare box location and all other pertinent interior dimensions including wheelchair maneuverability and free floor space area of the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 2).]

In response to mandatory item 2, we request your approval for "Attachment M2" for interior layout drawings. We request your approval.

METRO'S RESPONSE:

APPROVED X DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 3

DATE April 26th, 2019

SECTION_2.1.1.2 Finish and Color_ PAGE NO._27_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A detailed description of paint system and procedures to be used must be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 3).]

In response to mandatory item 3, please see "Attachment M3" for information on our painting procedure (same as previous order) for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 4

DATE April 26th, 2019

SECTION_2.1.2.1 Strength and Fatigue Life_ PAGE NO._32_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A detailed description of all materials and their assembly to be used in the body construction of the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 4).]

In response to mandatory item 4, please see attachment "Attachment M4" for the description of our structure for your approval. Please note that additional information is also provided in the attachment "Attachment M5".

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 5

DATE April 26th, 2019

SECTION_2.1.2.5 Corrosion_ PAGE NO._33_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Full information on the anticorrosion treatment and results of the salt spray test performed on bus model to be provided under this technical specification shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 5).]

In response to mandatory item 5, please see "Attachment M5" for information on anticorrosion treatment and salt spray test for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 6

DATE April 26th, 2019

SECTION_2.1.2.7 Towing_ PAGE NO._34_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A detailed description of the towing methods and devices required for the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 6).]

In response to mandatory item 6, please see "Attachment M6" for information on the towing methods for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

SOLICITATION/CONTRACT NO.____________4019000082 _________

MANUFACTURER____Nova Bus________________ REPRESENTATIVE_____Julie Laplante_

RFA NO.________M7_________________ DATE______2016-04-16________________________

SECTION___2.1.2.10_______ PAGE NO._____36__________ PARAGRAPH NO._____4_________

MANUFACTURER'S REQUEST:

Nova Bus kindly requests that the attached “M7 ATT” document be approved as a sample concerning item 7 of mandatory request for approval.

[Submitted by FedEx on April 19th, 2019 – Resent electronically for your convenience]

METRO'S RESPONSE:

APPROVED_________ X_______________________ DENIED_________________________

APPROVED AS MODIFIED_____________________________________________________

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 8

DATE April 26th, 2019

SECTION_2.1.2.11 Fire Extinguisher_ PAGE NO._37_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[ABC fire extinguishers location shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 8).]

In response to mandatory item 8 (ABC fire extinguisher location), please see "Attachment M8" for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 9

DATE April 26th, 2019

SECTION_2.1.2.12 Crashworthiness_ PAGE NO._38_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Independent third party certification by a recognized engineering firm to certify that roof load bearing, crash test, and exterior body panel criteria have been met for the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 9).]

In response to mandatory item 9, please see "Attachment M9" for test certifications for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 10

DATE April 26th, 2019

SECTION_2.1.3.1 Strength and Installation_ PAGE NO._38_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Installation procedures/drawings for the lower and upper exterior panels for the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 10).]

In response to mandatory item 10, please see "Attachment M10" for the description of our battery compartment door and the engine compartment doors for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

SOLICITATION/CONTRACT NO.____________4019000082 _________

MANUFACTURER____Nova Bus________________ REPRESENTATIVE_____Julie Laplante_

RFA NO.________M11_________________ DATE______2019-04-16________________________

SECTION____2.1.4.5______ PAGE NO.______42_________ PARAGRAPH NO.______________

MANUFACTURER'S REQUEST:

We sent to METRO some samples of the interior materials and color about item 11 of mandatory request for approval. We invite you to refer to the attached document “M11 ATT”. We request your approval.

[Submitted by FedEx on April 19th, 2019 – Resent electronically for your convenience]

METRO'S RESPONSE:

APPROVED_________X_______________________ DENIED_________________________

APPROVED AS MODIFIED_____________________________________________________

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

SOLICITATION/CONTRACT NO.____________4019000082 _________

MANUFACTURER____Nova Bus________________ REPRESENTATIVE_____Julie Laplante_

RFA NO.__________M12_______________ DATE_______2019-04-16_______________________

SECTION___2.1.4.7_______ PAGE NO._____43__________ PARAGRAPH NO.______3________

MANUFACTURER'S REQUEST:

Nova Bus kindly requests that the attached “M12 ATT” document be approved as a sample for “Take One” holder concerning item 12 of mandatory request for approval.

[Submitted by FedEx on April 19th, 2019 – Resent electronically for your convenience]

METRO'S RESPONSE:

APPROVED__________X______________________ DENIED_________________________

APPROVED AS MODIFIED_____________________________________________________

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

SOLICITATION/CONTRACT NO.____________4019000082 _________

MANUFACTURER____Nova Bus________________ REPRESENTATIVE_____Julie Laplante_

RFA NO._________M13________________ DATE______2019-04-16______________________

SECTION____2.1.5.2______ PAGE NO.____44___________ PARAGRAPH NO._____2_________

MANUFACTURER'S REQUEST:

Nova Bus kindly requests that a description be approved as a sample as per attached file “M13-att” with regards to item 13 of mandatory request for approval. The material of the floor proposed is the same as your last order.

[Submitted by FedEx on April 19th, 2019 – Resent electronically for your convenience]

METRO'S RESPONSE:

APPROVED___________X_____________________ DENIED_________________________

APPROVED AS MODIFIED_____________________________________________________

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 14

DATE April 26th, 2019

SECTION_2.1.9.1 Interior_ PAGE NO._49_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Retaining and fastening methods for interior doors shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 14).]

In response to mandatory item 14, please see attachment "Attachment M14" for the description of our interior doors. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 15

DATE April 26th, 2019

SECTION_2.1.9.2 Exterior_ PAGE NO._52_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Configuration of the battery compartment door and the engine compartment doors shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 15).]

In response to mandatory item 15, please see "Attachment M15" for the description of our battery and engine compartment doors". We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 16

DATE April 26th, 2019

SECTION_2.2.1.1 Control_ PAGE NO._53_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Door system configuration to include door controls, hand rails and front and rear door panels shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 16).]

In response to mandatory item 16, please see "Attachment M16" for the description of Vapor passenger door system for your approval.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED X

COMMENTS: Kneel and ramp switches shall be integrated in the electronic door controller.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 17

DATE April 26th, 2019

SECTION_2.2.1.6 Roof Ventilators_ PAGE NO._55_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description of roof ventilator system shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 17).]

In response to mandatory item 17, please see "Attachment M17" for information on the roof ventilator for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 18

DATE April 26th, 2019

SECTION_2.2.2.1 Windshield Wipers_ PAGE NO._56_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Windshield wiper and windshield washer systems shall be shall be submitted as Mandatory Request For Approval (see Section II of the Solicitation, Item 18).]

In response to mandatory item 18, please see "Attachment M18" for information on the windshield wiper and windshield washer systems. We propose a single windshield washer electric motor, we request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 19

DATE April 26th, 2019

SECTION_2.2.3.1 Exterior Lighting_ PAGE NO._59_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A detailed description of all exterior lighting of the bus proposed for bid that includes mounting methods and locations (including light dimensions) shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 19).]

In response to mandatory item 19, please see "Attachment M19" for the description of our exterior lighting of our vehicle for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 20

DATE April 26th, 2019

SECTION_2.2.3.1 Exterior Lighting_ PAGE NO._59_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Directional switch location and the exact location and operation of the rear engine door LED “STOP” sign shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 20).]

In response to mandatory item 20, please see "Attachment M20" for the description of our directional switch location and the exact location and operation of the rear engine door LED "STOP" sign for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 21

DATE April 26th, 2019

SECTION_2.2.3.3 Passenger Interior Lighting_ PAGE NO._60_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description and function of interior lighting system shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 21).]

In response to mandatory item 21, please see "Attachment M21" for the description of our proposed interior lighting systems for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 22

DATE April 26th, 2019

SECTION_2.2.3.5 Operator Controls_ PAGE NO._62_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Design of the operator’s dashboard configuration and the accelerator/brake pedal (to include angles) shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 22).]

In response to mandatory item 22, please see "Attachment M22" for the description of our proposed dashboard and pedals for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 23

DATE April 26th, 2019

SECTION_2.3 Interior Trim_ PAGE NO._67_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Type of acoustical material to be used in the headlining and the rear bulkhead and rear interior surfaces shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 23).]

In response to mandatory item 23, please see "Attachment M23" for the description of our acoustical material for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

SOLICITATION/CONTRACT NO.____________4019000082 _________

MANUFACTURER____Nova Bus________________ REPRESENTATIVE_____Julie Laplante_

RFA NO.________M25_________________ DATE____2019-04-16__________________________

SECTION____2.3.4______ PAGE NO.______73_________ PARAGRAPH NO.______________

MANUFACTURER'S REQUEST:

We sent to METRO a sample of the offered floor covering material about item 25 of mandatory request for approval. We invite you to refer to the attached document “M25 ATT”. We request your approval.

[Submitted by FedEx on April 19th, 2019 – Resent electronically for your convenience]

METRO'S RESPONSE:

APPROVED______X__________________________ DENIED_________________________

APPROVED AS MODIFIED_____________________________________________________

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 26

DATE April 26th, 2019

SECTION_2.5.2.2 Sound Insulation_ PAGE NO._79_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Test data verifying that criteria have been met for the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 26).]

In response to mandatory item 26, the test results are provided in "Attachment M26" for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 27

DATE April 26th, 2019

SECTION_2.6.1.1 Visors_ PAGE NO._80_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Type and method of sun shade installation shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 27).]

In response to mandatory item 27, please see "Attachment M27" for the proposed sun visor for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 28

DATE April 26th, 2019

SECTION_2.6.2.1 Outside Mirrors_ PAGE NO._82_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description of outside mirror type and installation for the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 28).]

In response to mandatory item 28, please see "Attachment M28" for the description of our proposed mirrors for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 29

DATE April 26th, 2019

SECTION_2.6.4 Exterior Route Information Displays_ PAGE NO._85_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All destination signs, run number sign and Operator's console mount locations and description/identification of all test methods, parameters and options shall be submitted as a Mandatory Request For Approval (see Section 2.6.4 Exterior Route Information Displays).]

In response to mandatory item 29, please see attachment "Attachment M29" for the description of our proposed destination signs for your approval.

METRO'S RESPONSE:

APPROVED X DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 30

DATE April 26th, 2019

SECTION_2.6.6 Next Stop Sign_ PAGE NO._94_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description, function methodology and location of both Next Stop Signs shall be provided as a Mandatory Request For Approval (See Section 2.6.6 Next Stop Sign).]

In response to mandatory item 30, please see attachment "Attachment M30" for the description of our proposed next stop signs for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 31

DATE April 26th, 2019

SECTION_2.7.1 Wheelchair Ramp System_ PAGE NO._96_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description and specifications of the wheelchair ramp, its slip resistant qualities, ramp control switch locations, ramp override and overall operation shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 31).]

In response to mandatory item 31, please see "Attachment M31" for a description and specifications of our ramp for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 33

DATE April 26th, 2019

SECTION_3.1.1.6 Fuel Economy (Design Operating Profile)_ PAGE NO._102_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Fuel mileage/range reports based on the “CBD segment of the Design Operating Profile” along with any other Altoona fuel economy tests applicable to the proposed bus configuration shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 33).]

In response to mandatory item 33, please see "Attachment M33" for our fuel economy and operating range for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 34

DATE April 26th, 2019

SECTION_3.1.2.2 Service_ PAGE NO._105_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description and specifications of oil lines, fuel lines and high pressure seamless shields shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 34).]

In response to mandatory item 34, please see "Attachment M34" for the description and specifications of our oil lines, fuel lines and high pressure seamless shields for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 35

DATE April 26th, 2019

SECTION_3.1.2.4 Electrically Driven Fan System_ PAGE NO._106_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description and specifications of the cooling fan system shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 35).]

In response to mandatory item 35, please see "Attachment M35" for the description of our electric cooling system for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 37

DATE April 26th, 2019

SECTION_3.1.3.1 Engine_ PAGE NO._107_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Certification that the engine offered complies with the State and Federal Emission Regulations shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 37).]

In response to mandatory item 37, please see "Attachment M37" for the engine Emission Regulations certification for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER_ Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 38

DATE April 26th, 2019

SECTION_3.3.2 Spring and Shock Absorbers_ PAGE NO._117_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description of air springs furnished along with drawings of the suspension shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 38).]

In response to mandatory item 38, please see "Attachment M38" for the description of our proposed air springs for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 39

DATE April 26th, 2019

SECTION_3.4.2 Turning Radius_ PAGE NO._118_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Turn radius and front and rear swept area dimensions for the bus proposed for bid shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 39).]

In response to mandatory item 39, please see "Attachment M39" for the turning radius information of our 40-ft buses for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 40

DATE April 26th, 2019

SECTION_3.4.3 Turning Effort_ PAGE NO._119_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The Steering Column/Wheel shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 40).]

In response to mandatory item 40, please see "Attachment M40" for information on our steering system for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 41

DATE April 26th, 2019

SECTION_3.5.1.3 Hubs_ PAGE NO._122_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description and specifications of wheel bearing seals shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 41).]

In response to mandatory item 41, please see "Attachment M41" for information on our wheel bearing seals for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 42

DATE April 26th, 2019

SECTION_3.6.4 Electrical System_ PAGE NO._130_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description of the electrical system proposed shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 42).]

In response to mandatory item 42 please see "Attachment M42" for the description of our electrical system for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 43

DATE April 26th, 2019

SECTION_3.7 Interior Climate Control_ PAGE NO._139_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A complete description of the interior climate control system (conventional and electric) being proposed by the bus manufacturer for the bus to be built for METRO shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 43).]

In response to mandatory item 43, please see "Attachment M43" for the description of our proposed interior climate control system for your approval.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS: The system proposed does not meet the specification.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._MRFA # 44

DATE April 26th, 2019

SECTION_3.9.1 Fire Suppression_ PAGE NO._168_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A detailed description of the type of Fire Sensing and Suppression (FSS) equipment of the bus proposed for bid, along with operational information and installation locations, shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 44).]

In response to mandatory item 44, please see "Attachment M44" for the description of our Fire Sensing and Suppression (FSS) equipment (Clean Diesel buses) for your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

SOLICITATION/CONTRACT NO.__________________ IFB 4019000082______________________________

MANUFACTURER____Nova Bus________________ REPRESENTATIVE___ Julie Laplante _

RFA NO._____MRFA#45____________________ DATE________April 26th, 2019______________________

SECTION_____4.1.5__ PAGE NO.______178______ PARAGRAPH NO.______________

MANUFACTURER'S REQUEST:

Please refer to “Attachment M45” for mandatory requirement # 45.

Please note that we have included more suppliers’ warranty brochures than necessary since we don’t have a final configuration at this point in time. (Ex: We are submitting both American Seating and USSC for the passenger seats). Depending on the final configuration, only one supplier per component will be included in our bid.

We request your approval.

METRO'S RESPONSE:

APPROVED____________X____________________ DENIED_________________________

APPROVED AS MODIFIED_____________________________________________________

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

SOLICITATION/CONTRACT NO.__________________ IFB 4019000082______________________________

MANUFACTURER____Nova Bus________________ REPRESENTATIVE___ Julie Laplante _

RFA NO. __RFAM#46______________ DATE________April 26 th , 2019 ______________________

SECTION__4.1.11________ PAGE NO.____180___________ PARAGRAPH NO.______________

MANUFACTURER'S REQUEST:

“The contractor shall submit an organizational chart of the service team assigned to Houston, including a description of electric/electronic and HVAC capabilities shall be submitted as a Mandatory Request For Approval (See Section 4.1.11 Contractor’s Representative).”

Prevost Parts & Service Center – Southern Texas / Houston Area11851 Cutten RoadHouston, TX 77066Toll free phone: 1-877-602-0273Tel.: 713-849-8562Fax: 281-315-1571Branch Manager: Theodore (Bubba) BruningService Manager: Michael Weil Parts Manager: Charles Scandaliato

SERVICEHouston facility provides 21,000 sq. ft., including a service area with seven bays. The service center is staffed with Prevost technicians who are certified for bumper-to-bumper maintenance and repair for all Nova Bus vehicles, and Prevost and Volvo Bus coaches, including Volvo engine and transmission. The facility is equipped with a controlled access fence, operational after hours, monitored by a security patrol and a video surveillance camera. The Houston Service Center is equipped with electrical hookups. The service center is open Monday through Thursday from 7:00 a.m. to 8:00 p.m. and Friday from 7:00am to 4:00pm. Prevost Service has emergency support that is available after business hours for any emergencies that may happen after normal business hours. Nova Bus’s Sean Hitt will continue to manage Houston Metro’s Nova Bus fleet. Sean comes to Nova Bus from Prevost Service Branch in Houston Texas and previously worked directly with Houston to maintain and service your fleet of Nova Bus’s. Sean’s hands on expertise and vast technical knowledge provide a winning platform for both Nova Bus and Houston Metro to build from with your new fleet of buses. All on-site warranty repairs will be performed by the OEM vendor (Cummins, Thermo King, MCC, etc) or local Prevost Service operating from 11851 Cutten Road, 77066, Houston, Texas. Service truck and technicians are dispatched daily according to needs.

Prevost Service Technicians are fully trained and certified by Nova Bus Training dept including a week long complete Multiplex VBEA training session covering:• Reading and understanding Nova Bus Coach Wiring Diagrams / • VBEA Multiplexing familiarization / • Logic diagrams • Hands-on troubleshooting.

Please see “Attachment M46” for Nova Bus aftermarket organizational chart.

METRO'S RESPONSE:

APPROVED___________X_____________________ DENIED_________________________

APPROVED AS MODIFIED_____________________________________________________

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager