Route CR-12 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.020 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064319 CMAQ 5915 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2019 $120 $30 $150
100064320 CMAQ 5915 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $200 $50 $250
TOTAL COST: $320 $80 $400
Route CR-13 ProjectDescription
RESURFACING CR-13 FROM CR-52 TO THE BIBB COUNTY LINE
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064327 STPBH 5915 (253) PRELIMINARY ENGINEERING
RESURFACING
2016 $10 $2 $12
100064328 STPBH 5915 (253) CONSTRUCTION
RESURFACING
2017 $1,328 $332 $1,659
TOTAL COST: $1,337 $334 $1,671
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
1 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-1396 ProjectDescription
CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059534 ACAA59534 ATRP (015) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $3,200 $800 $4,000
TOTAL COST: $3,200 $800 $4,000
Route CR-17 ProjectDescription
ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046237 IMD-STPBH 7112 (602) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2016 $4,925 $975 $5,900
TOTAL COST: $4,925 $975 $5,900
Route CR-17 ProjectDescription
RESURFACE CR-17 FROM CR-22 TO CR-26 (KENT DAIRY ROAD)
Type of Work RESURFACING
Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059513 ACAA59513 ATRP (010) CONSTRUCTION
RESURFACING
2018 $1,136 $284 $1,420
TOTAL COST: $1,136 $284 $1,420
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
2 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-264 ProjectDescription
BRIDGE REPLACEMENT OF BIN 11015 OVER BUCK CREEK, TURN LANES, AND RESURFACING OF CR-264 (THOMPSON ROAD) FROM 1300 FEET WEST OF WARRIOR DRIVE TO SR-119.
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059499 ACBRAA59499 ATRP (006)
CONSTRUCTION
BRIDGES AND APPROACHES
2016 $2,961 $759 $3,721
TOTAL COST: $2,961 $759 $3,721
Route CR-28 ProjectDescription
RESURFACE CR-28 FROM COLUMBIANA CITY LIMITS TO SR-145
Type of Work RESURFACING
Project Length in Miles 3.310 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061025 ACAA61025 ATRP (012) CONSTRUCTION
RESURFACING
2017 $1,482 $371 $1,853
TOTAL COST: $1,482 $371 $1,853
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
3 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-29 ProjectDescription
WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 8.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100045964 STPBH 5939 (200) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $4,274 $1,069 $5,343
100007540 STPBH 5939 (200) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,589 $397 $1,986
TOTAL COST: $5,863 $1,466 $7,329
Route CR-30 ProjectDescription
RESURFACE CR-30 FROM COLUMBIANA TO SR-145
Type of Work RESURFACING
Project Length in Miles 3.144 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061026 ACAA61026 ATRP (012) CONSTRUCTION
RESURFACING
2016 $763 $191 $954
TOTAL COST: $763 $191 $954
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
4 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-441 ProjectDescription
REPLACE BRIDGE ON CR-441 OVER FOUR MILE CREEK BIN # 5369
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059506 ACBRZ59506 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $1,527 $382 $1,908
TOTAL COST: $1,527 $382 $1,908
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
5 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-52 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-52 AND CR-13
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059508 ACAA59508 ATRP (013) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2017 $492 $123 $615
TOTAL COST: $492 $123 $615
Route CR-52 ProjectDescription
BRIDGE WIDENING (BIN 003267) ON CR-52 (4TH AVENUE) OVER BUCK CREEK
Type of Work BRIDGE WIDENING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059502 ACBR59502 ATRP (009) CONSTRUCTION
BRIDGE WIDENING
2019 $1,816 $454 $2,269
TOTAL COST: $1,816 $454 $2,269
Route CR-52 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-52 OVER CAHABA RIVER (BIN 2380) FROM OLD CAHABA LANE TO OAK VIEW LANE
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059503 STPBH-ACBR59503 ATRP (012)
CONSTRUCTION
BRIDGES AND APPROACHES
2019 $3,702 $926 $4,628
TOTAL COST: $3,702 $926 $4,628
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
6 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-55 ProjectDescription
BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056309 STPBH 5914 (250) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $772 $193 $965
100056310 STPBH 5914 (250) UTILITIES
UTILITY ADJUSTMENT
2019 $200 $50 $250
100056311 STPBH 5914 () CONSTRUCTION
BRIDGES AND APPROACHES
2019 $1,000 $250 $1,250
TOTAL COST: $1,972 $493 $2,465
Route CR-99 ProjectDescription
RESURFACE CR-99 FROM CR-47 TO SR-145
Type of Work RESURFACING
Project Length in Miles 2.084 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061023 ACAA61023 ATRP (012) CONSTRUCTION
RESURFACING
2016 $298 $74 $372
TOTAL COST: $298 $74 $372
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
7 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
>VALLEYDALE RD FR CALDWELL MILL RD TO INVERNESS CENTER CITY OF HOOVER
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033067 STPBH 9802 (905) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $2,596 $649 $3,245
TOTAL COST: $2,596 $649 $3,245
Route CR-NA ProjectDescription
SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 5.206 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063241 CMAQ 5915 (250) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2018 $520 $130 $649
100063242 STPBH-CMAQ 5915 (250)
UTILITIES
INTERSECTION IMPROVEMENTS
2019 $60 $15 $75
100063243 STPBH-CMAQ 5915 (250)
CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $1,359 $340 $1,699
TOTAL COST: $1,938 $485 $2,423
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
8 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route I -65 ProjectDescription
INTERCHANGE IMPROVEMENTS I-65 AT SR-3 (US-31) EXIT 231 GRADE, DRAIN, BASE, PAVE AND BRIDGE IN THE CITY OF CALERA
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063670 STPBH I065 (404) RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2016 $2,112 $528 $2,640
TOTAL COST: $2,112 $528 $2,640
Route I -65 ProjectDescription
INTERCHANGE IMPROVEMENTS I-65 AT SR-3 (US-31) EXIT 231 GRADE, DRAIN, BASE, PAVE AND BRIDGE IN THE CITY OF CALERA
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055554 ACAA55554 ATRP (013) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2017 $17,515 $3,747 $21,263
TOTAL COST: $17,515 $3,747 $21,263
Route NA- ProjectDescription
BIKE LANES ON JOHN FINDLEY DRIVE FROM STATE PARK ROAD TO NORTH TRAIL HEAD INCLUDING TERRACE DRIVE
Type of Work UNCLASSIFIED
Project Length in Miles 5.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064227 CMAQ 5916 (252) PRELIMINARY ENGINEERING
UNCLASSIFIED 2016 $592 $148 $740
TOTAL COST: $592 $148 $740
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
9 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
SHELBY COUNTY BICYCLE/PEDESTRIAN PLAN
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064329 CMAQ NR16 (913) SPECIAL
UNCLASSIFIED 2016 $242 $61 $303
TOTAL COST: $242 $61 $303
Route NA- ProjectDescription
HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD
Type of Work UNCLASSIFIED
Project Length in Miles 3.670 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032383 CMAQ 9802 (925) CONSTRUCTION
UNCLASSIFIED 2019 $2,261 $565 $2,826
TOTAL COST: $2,261 $565 $2,826
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
10 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
SIDEWALKS ALONG INDUSTRIAL PARK DR AND BEARDEN RD FROM SR-3 (US-31) TO PELHAM HIGH SCHOOL
Type of Work SIDEWALK
Project Length in Miles 2.840 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056503 CMAQ 5916 (250) UTILITIES
SIDEWALK 2016 $448 $146 $594
100056504 CMAQ 5916 (250) CONSTRUCTION
SIDEWALK 2016 $1,971 $501 $2,472
TOTAL COST: $2,419 $647 $3,066
Route NA- ProjectDescription
RESURFACE OLD HIGHWAY 25 FROM SR-25 TO CR-47
Type of Work RESURFACING
Project Length in Miles 1.582 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061019 ACAA61019 ATRP (012) CONSTRUCTION
RESURFACING
2016 $249 $94 $343
TOTAL COST: $249 $94 $343
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
11 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES WITHIN JEFFERSON, SHELBY AND WALKER COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060174 STPAA NR13 (909) CONSTRUCTION
SIDEWALK 2019 $1,432 $358 $1,790
TOTAL COST: $1,432 $358 $1,790
Route NA- ProjectDescription
ADD BIKE/PED LANES ALONG JOHN FINDLAY DRIVE FROM THE NORTH TRAILHEAD PARKING LOT TO SR-119 PARK ENTRANCE
Type of Work UNCLASSIFIED
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063219 CMAQ 5915 (251) CONSTRUCTION
UNCLASSIFIED 2017 $1,547 $387 $1,934
TOTAL COST: $1,547 $387 $1,934
Route NA- ProjectDescription
INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK
Type of Work UNCLASSIFIED
Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054519 CMAQ 5917 (904) CONSTRUCTION
UNCLASSIFIED 2019 $1,032 $258 $1,290
TOTAL COST: $1,032 $258 $1,290
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
12 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route SR-119 ProjectDescription
ROADWAY IMPROVEMENTS ON SR-119 (MAIN STREET) FROM LITTLE CAHABA RIVER BRIDGE TO BLOCH STREET RESURFACING, SIGNALS, SIDEWALKS, LANDSCAPING, LIGHTING AND DRAINAGE IMPROVEMENTS
Type of Work RESURFACING
Project Length in Miles 0.427 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059152 STPBH 0119 (507) CONSTRUCTION
RESURFACING
2016 $3,733 $1,217 $4,950
TOTAL COST: $3,733 $1,217 $4,950
Route SR-119 ProjectDescription
ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 5.082 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061285 STPBH 0119 (510) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2016 $200 $50 $250
100061286 STPBH 0119 (510) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $426 $106 $532
100063109 STPBH 0119 (510) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $600 $150 $750
TOTAL COST: $1,226 $306 $1,532
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
13 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route SR-25 ProjectDescription
ADD TURN LANES AND TRAFFIC SIGNALS AT INTERSECTION OF SR-25 AND 10TH STREET
Type of Work TURN LANES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061018 ACAA61018 ATRP (008) CONSTRUCTION
TURN LANES 2018 $513 $183 $695
TOTAL COST: $513 $183 $695
Route SR-3 ProjectDescription
SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057649 BR 0003 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $437 $109 $546
TOTAL COST: $437 $109 $546
Route SR-3 ProjectDescription
PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.125 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039450 STPBH 7012 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $449 $112 $561
TOTAL COST: $449 $112 $561
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
14 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route SR-38 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-38 (US-280) AT OLD US-280 / WAL-MART.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061703 NH 0038 (534) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2018 $931 $233 $1,164
TOTAL COST: $931 $233 $1,164
Route SR-53 ProjectDescription
BRIDGE REPLACEMENT ON SR-53 (US-231) OVER KELLY CREEK (BIN # 2588)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.549 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003344 BR 0053 (529) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $5,760 $1,440 $7,200
TOTAL COST: $5,760 $1,440 $7,200
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
15 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065161 CMAQ 5916 (253) PRELIMINARY ENGINEERING
SIDEWALK 2017 $323 $81 $404
100065162 CMAQ 5916 (253) RIGHT OF WAY
SIDEWALK 2019 $82 $21 $103
100065163 CMAQ 5916 (253) UTILITIES
SIDEWALK 2019 $82 $21 $103
TOTAL COST: $488 $122 $610
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
16 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 1
Route SR-25 ProjectDescription
BRIDGE REPLACEMENT ON SR-25 OVER BULLEY CREEK BIN # 000769
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.022 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066531 BR 0025 (550) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2017 $80 $20 $100
100066556 BR 0025 (550) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $500 $500 $1,000
TOTAL COST: $580 $520 $1,100
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
17 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 20
Route I -65 ProjectDescription
I-65 ADD LANES FROM SR-3 (US-31) TO CR-52 (8-LN)(PHASE 2)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.531 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044672 NHF-IMF I065 (354) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2018 $71,705 $17,039
$88,744
TOTAL COST: $71,705 $17,039
$88,744
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
18 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 22
Route CR-17 ProjectDescription
RESURFACING ON CR-17 (VALLEYDALE ROAD) FROM I-65 TO CR-29 (CALDWELL MILL ROAD) AND ON CR-43 (BEAR CREEK ROAD) FROM SR-38 (US-280) TO SR-25
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067603 STPBH 5918 () PRELIMINARY ENGINEERING
RESURFACING
2019 $80 $20 $100
TOTAL COST: $80 $20 $100
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
19 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 27
Route SR-261 ProjectDescription
INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.028 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067711 CMAQ 0261 (501) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2018 $280 $70 $350
100067712 CMAQ 0261 (501) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $326 $82 $408
TOTAL COST: $606 $152 $758
Route SR-38 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-38 (US-280) AT OLD US-280 / WAL-MART.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067753 NH 0038 (534) UTILITIES
INTERSECTION IMPROVEMENTS
2018 $410 $151 $561
TOTAL COST: $410 $151 $561
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
20 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 30
Route CR-52 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-52 AND CR-93
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059509 CMAQ 5918 (250) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $760 $190 $950
TOTAL COST: $760 $190 $950
Route NA- ProjectDescription
PROPOSED BIKE LANES ALONG JOHN FINDLAY DRIVE FROM NORTH OF STATE PARK ROAD TO THE NORTH TRAILHEAD AT OAK MOUNTAIN STATE PARK
Type of Work UNCLASSIFIED
Project Length in Miles 6.008 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064282 CMAQ 5916 (252) CONSTRUCTION
UNCLASSIFIED 2018 $4,390 $1,097 $5,487
TOTAL COST: $4,390 $1,097 $5,487
Route SR-119 ProjectDescription
ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061118 ACAA61118 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $9,839 $2,460 $12,298
TOTAL COST: $9,839 $2,460 $12,298
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
21 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 33
Route NA- ProjectDescription
MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067294 TAPAA-CMAQ TA17 (904)
CONSTRUCTION
UNCLASSIFIED 2019 $1,183 $296 $1,479
TOTAL COST: $1,183 $296 $1,479
Route NA- ProjectDescription
PELHAM TRAILS AND GREENWAYS LOCATED ALONG THE SR-3 (US-31) CORRIDOR IN PELHAM ADJACENT TO BISHOP CREEK FROM CR-105 TO SR-119 AND EVENTUALLY CROSSING UNDER I-65 AND CONTINUING TO THE ENTRANCE OF OAK MOUNTAIN STATE PARK: PHASE 1 AND 2
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065519 TAPAA-CMAQ TA16 (901)
CONSTRUCTION
UNCLASSIFIED 2019 $1,159 $290 $1,448
TOTAL COST: $1,159 $290 $1,448
1/19/2019 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
22 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 38