ATC - Office OCF01
StorageF04
StairwellF02
ATC - OrderlyF03
Classroom (ACF)F05
Classroom (shared)F06
Classroom (ATC)F07
Radio RoomF08
CorridorF09
W103W102
W101
W10
8
W107 W106
W10
5W
104
02 02
03 03
04 04
05 05
01 01
B
B
C
C
D
D
E
E
A
A
A:A108
B:B108
8600
mm
130m
m
130mm
130m
m13
0mm
130m
m
100mm
C:C109
D:D109
roof
pitc
h 25
deg
rees
roof
pitc
h 25
deg
rees
RWP
RWP
250m
m25
0mm
130m
m
5322mm
E:E110
RWP
RWP
RWP
01106
South Elevation
107
Eas
t Ele
vatio
n
02
North Elevation
01107
106
Wes
t Ele
vatio
n
02
540m
m15
00m
m45
60m
m14
0mm
140mm 864mm 625mm 490mm 2250mm 1360mm 140mm
140m
m15
00m
m14
0mm
861m
m15
00m
m
140mm
140m
m
140mm510mm1500mm2210mm140mm 2260mm 1500mm
140m
m14
0mm
140mm 1890mm 1500mm
1695mm
2679
mm
42mm
2682
mm
832m
m14
93m
m
750mm
3361
mm
2432mm
LIFT
1446
mm
130m
m
1493
mm
1500mm
6600
mm
1100
mm
4221
mm
4100
mm
5720mm 5280mm 4220mm 4100mm
140m
m
140m
m54
0mm
Clear
1615mm
Void
W1
W4
W3
Date: Scale:
Drawn by: Checked by:
Drawing title:
Client:
Project:
Notes:
ChkdByDateRev Notes
Proposed FirstFloor Layout
Reserve Forces &Cadets Association
Joint Cadet CentreTottenham
File Ref: (internal use only)
Drawing no: Rev:
13010-02-104 C
Do not scale dimensions from this drawing.Dimensions marked with an asterisk thus * are open sitedimensions to be confirmed on site.All given dimensions are to be checked on site when setting out and any discrepancy reported immediately.
03.02.14 1:50@A1
sa spc
c01
A 14/3/14 Design development sa spc
General updates to layout and lift specification
B 27/3/14 sa spc
Updates for tenderC 10/6/14 spc gdw
KEY:
Proposed First Floor Layout1:50@A11
Line to indicates external face of external wall below
NOTE:Drawings to be read in conjuntion with BPR specification 13010-02-sch03
NOTE:All setting out taken from gridline to:- Centreline of concrete infill to external walls.- Face of blockwork for internal partitions.
NOTE:For door and ironmongery schedule refer to BPR document 13010-02-sch06
13010-02 Hazard NotesPlease be aware of the following Hazards have been identifed in relation to the works shown on this drawing
ID Hazard Action1 Works at Height Principle Contractor to
ensure appropriate barriers, guarding are in place and minimise heavy lifting where possible. PC to provide method statement accordingly.
2 Access to roof Provide safe access to roof. Ensure appropriate barriers, guardings are in place to work safely. Principle contractor to provide method statement accordingly
3 Roof finish vunerable to damage during works
Protect roof finish at all times
Wall Type 1A (W1A)280mm ICF external wall construction with brick slips.Spec Ref: 25-15-35/140
20-00-75/185Pitched roof structure
Blue dashed line indicates structural gridlines
Wall Type 4 (W4)158mm internal metal stud partition (to underside of roof soffit)Spec Ref: 25-15-25/135
NOTE:All metal stud partitions to first floor are W4 type.
Rainwater pipeSpec Ref: 50-10-00/110
Indicates proposed location of steel beams. Refer to SE drawings and specification for details
Wall Type 3 (W3)106mm internal metal stud partitionSpec Ref: 25-15-25/135
NOTE:For full scope of internal finishes refer to BPR document 13010-02-sch07
Dashed line to indicate proposed location of steel supporting structure. Refer to SE drawings for details