Upload
interogator5
View
218
Download
0
Embed Size (px)
Citation preview
7/25/2019 1.4 SAFA European Process - COL
1/35
1
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
Civil AviationCivil Aviation CooperationCooperation
FranceFrance COSCAP SACOSCAP SA Sri LankaSri Lanka
SAFA WorkshopSAFA WorkshopModule 4Module 4 -- SAFASAFAEuropeanEuropean ProcessProcess
ColomboColomboFebruary 6February 6thth -- 1010thth 20122012
SAFASAFAEuropeanEuropean ProcessProcess
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Tools to identify safety deficiencies regarding ICAO standards
Actions from the EU :ban / restriction
Actions from the EU :ban / restriction
SAFA programmeSAFA programme
Analyze of theUSOAP results
Analyze of theUSOAP results
Audits of the ECon-site visits
Audits of the ECon-site visits
Significant SafetyConcerns issued by
ICAO
Significant SafetyConcerns issued by
ICAO Analyze of theIASA results
Analyze of theIASA results
In the future Informationfrom the PART-TCO analysis
In the future Informationfrom the PART-TCO analysis
Information on
safety
deficiencies
7/25/2019 1.4 SAFA European Process - COL
2/35
2
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
How are the safety information gathered through
SAFASAFAEuropeanEuropean ProcessProcess
- SAFA ramp inspections,
- USOAP / IASA results,
- Visits carried out by the European Commission,
- General information on safety deficiencies,
analized and used at an European Level ?
FinalFinal aimaim :
- Identification of safety deficiencies,
- Taking relevant actions on the basis of the deficiencies identifed
Colombo February 6th - 10th 2012
3. European Safety List process
Agenda : SAFA European Process
1. Analysis of the SAFA database
2. Prioritization process
SAFASAFAEuropeanEuropean ProcessProcess
7/25/2019 1.4 SAFA European Process - COL
3/35
3
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
Number of Reports
> 90.000 (1996-2010)
> 11.750 (2010)
Database User Organisations
42 ECAC Member States
EASA, European Commission, ECAC
Number of Operators / State of Operators involved
more than 2500 Operators, 200 States of Operator
Some Figures
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
Facts
No. of Findings (F)
No. of Inspections (I)
No. of Individual Inspected Items (III)
Category & Description of Findings
Ratios F/I, F/III
(+ Operator file)
Contributing factors
Operators
State of Operators
State of Registry State of Inspection
A/C registrations
A/C type
Technical or Operational issues
related to the Inspection item(s)
Causal Relationship ?Causal Relationship ?
Basic Process
7/25/2019 1.4 SAFA European Process - COL
4/35
4
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
In Depth Expert Analysis Group
EASA analyses the results of the ramp inspections,
EASA advise the Commission/MS on immediate actions or follow-up
policy and report potential safety problems to them.
Analysis of the outcome of the SAFA ramp inspections performed
over a one year-period,
Analysis based on the ORB ratio.
IDEA meeting
Colombo February 6th - 10th 2012
Formula :
n = category of findings, 1: minor, 2: significant, 3: major
Fn = number of category n findings
I = number of inspections
Operator ratio = averaging individual ratios of Operator aircraft
State ratio = averaging individual ratios aircraft operated by Operators from State
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
ORB Ratio
I
FFF 321 2125.0 ++
7/25/2019 1.4 SAFA European Process - COL
5/35
5
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
ORB Analysis
Higher the ORB ratioHigher the ORB ratio
Higher the number ofdiscrepancies / inspection
identified
Higher the number ofdiscrepancies / inspection
identified
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
ORB Analysis
ORB Ratio
It only remains a figure,
THE magic number does not exist !
7/25/2019 1.4 SAFA European Process - COL
6/35
6
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
It needs to be analyzed thoroughly to assess the actual picture of the safety
level of operations of an airline (going back to the reports themselves),
However, it gives a pretty good hint on the safety performance of the airline.
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
ORB Analysis
ORB Ratio
It only remains a figure,
THE magic number does not exist !
Remains a hint only !
Further detailed analysis to be conducted
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
Analysis on a regular interval (4 months)
Starts with a quality review of the data reported by the Member States
Output:
top 2 ranking list In-depth analysis performed
ORB Analysis
7/25/2019 1.4 SAFA European Process - COL
7/35
7
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
Elements of the Analysis
In-depth review : back to the findings entered into the database to :
Ensure :
1. the legitimacy of the findings entered,
2. good categorization in accordance with the PDF list,
Identify :
1. the potential safety problems,
2. the areas of concerns of these operators.
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
Taking into account the trend of the operator in terms of ORB safety performance
Comparison with previous 12 months periods (T-4 months, T-8 months, T-12 months)
++ (sharply increasing), + (increasing), 0 (stable), - (decreasing), -- (sharply decreasing)
Operator Ratio 1
Operator Ratio 2
Operator Ratio 3
Operator Ratio 4
Short trend
Long trend
T-24 T-20 T-16 T-12 T-8 T-4 T
Elements of the Analysis
7/25/2019 1.4 SAFA European Process - COL
8/35
8
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
1. Analysis of the SAFA database
SAFASAFAEuropeanEuropean ProcessProcess
Aim of the Analysis
Objectives
Giving recommendations to the Commission on actions to be taken
4 Levels of recommendations :
L0 : no special action or withdrawal from the prioritization list,
L1 : include (or maintain) this operator into the prioritization list,
L2 : L1 + EC request for corrective actions to address the safety concerns, L3 : L2 + EC further investigation of the case of the operator
(in the frame of the next ASC-BL).
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Main output of the IDEA meeting :
1. Analysis of the SAFA database
Outcome of the Analysis
Update of the Prioritization List
Proposals for a review in the frame of the
next Air Safety Committee (Safety List)
Our two incoming topics !
7/25/2019 1.4 SAFA European Process - COL
9/35
9
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
3. European Safety List process
Agenda : SAFA European Process
1. Analysis of the SAFA database
2. Prioritization process
SAFASAFAEuropeanEuropean ProcessProcess
Colombo February 6th - 10th 2012
2. Prioritization Process
SAFASAFAEuropeanEuropean ProcessProcess
Allocate more resources (inspections) where it is needed : on airlines where
previous records show a high number of safety deficiencies or a safety threat,
Avoid the over-inspection effect on some airlines.
Basic Principle
Identify a good trend,
Confirm the systemic nature of the safety deficiencies previously identified.
Objectives
7/25/2019 1.4 SAFA European Process - COL
10/35
10
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
2. Prioritization Process
SAFASAFAEuropeanEuropean ProcessProcess
Mandates Prioritising Inspections of certain Operators,
Air Safety Committee identifies priority Operators through :
European regulation EC 351/2008
Operators identified by information gathered under Regulation 2111/2005,
All Operators listed in Annex B of Community List,
Operators operating under an NAA of a Community Listed airline,
Operators identified by the analysis of the EASA.
Colombo February 6th - 10th 2012
3. European Safety List process
Agenda : SAFA European Process
1. Analysis of the SAFA database
2. Prioritization process
SAFASAFAEuropeanEuropean ProcessProcess
7/25/2019 1.4 SAFA European Process - COL
11/35
11
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
3. European Safety List Process
SAFASAFAEuropeanEuropean ProcessProcess
Establishment and Publication of a Community List of Operators
that are banned (Annex A) or have an operational restriction imposed
(Annex B)
Establishment of common criteria for imposing an operating ban
Informing air passengers of the identity of the air carrier operating the
flights
Legal Basis : EC regulation 2111/2005
Colombo February 6th - 10th 2012
3. European Safety List Process
SAFASAFAEuropeanEuropean ProcessProcess
Legal Basis : EC regulation 2111/2005
Common criteria - Overview
- Serious safety deficiencies through :
1. SAFA ramp inspections : serious deficiencies or persistent failure to address deficiencies,
2. Operating ban imposed on a air carrier by a third country,
3. Accident or serious incidents showing latent systemic safety deficiencies,
- Lack of ability/ willingness of an air carrier :
1. Lack of transparency or adequate timely communication from the air carrier,
2. Inappropriate or insufficient corrective action plan presented after the identification of
serious safety deficiencies,
- Lack of ability/ willingness of the authorities responsible for the oversight of an air
carrier:
1. Insufficient ability of the competent authorities to implement safety standards,
2. Lack of cooperation of the competent authorities.
7/25/2019 1.4 SAFA European Process - COL
12/35
12
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
3. European Safety List Process
SAFASAFAEuropeanEuropean ProcessProcess
Air Safety Committee : Safety List
List is updated to include new operators or remove
operators,
List is updated to modify the conditions of a ban or
operational restriction,
Community List is published in the Official Journal of the
European Union and on http://ec.europa.eu/transport/air-ban/list_en.htm
Air Safety Committee organized every 3/4 months
Colombo February 6th - 10th 2012
3. European Safety List Process
SAFASAFAEuropeanEuropean ProcessProcess
SAFA reports
Accidents /
incidents
Experts assessment
Lack of ability
from the
authority toperform the
oversight
Lack of relevant
answer from the
authority and/or
the airline
Air Safety
Committee
Air Safety Committee : Safety List
Information considered only technical intel !
European Commission
EASA
Member States of EU
No other consideration than technical information
7/25/2019 1.4 SAFA European Process - COL
13/35
13
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
List will be updated to include new operators or remove
operators
List will be updated to modify the conditions of a ban or
operational restriction
Community List is published in the Official Journal of the
European Union and on http://ec.europa.eu/transport/air-
ban/list_en.htm
3. European Safety List Process
SAFASAFAEuropeanEuropean ProcessProcess
Air Safety Committee : Safety List
How to be removed
from the Safety List ?
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
The European Union developed tools to enable :
As a conclusion
The Identification of safety deficiencies
Actions on the basis of the deficiencies identifed
leading to
7/25/2019 1.4 SAFA European Process - COL
14/35
14
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
Agenda : SAFA European Process
SAFASAFAEuropeanEuropean ProcessProcess
Questions ?
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Special ExtraThird Country Authorisation process
Presentation of the system implemented in France,
Presentation of the results of the French TCO system.
7/25/2019 1.4 SAFA European Process - COL
15/35
15
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation process
Why has the French DGAC implemented a French Technical questionnaire ?
WHY ?
Colombo February 6th - 10th 2012
Flash Airlines Charm El Cheikh Jan 3rd 2004
148 casualties
Third Country Authorisation process
SAFASAFAEuropeanEuropean ProcessProcess
7/25/2019 1.4 SAFA European Process - COL
16/35
16
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
Tuninter Palerme 4th August 2005Helios Airways Greece 14th August 2005West Caribbean Airways Venezuela 16th August 2006
295 casualties in 10 days (6th 16th August 2005)
Third Country Authorisation process
SAFASAFAEuropeanEuropean ProcessProcess
Colombo February 6th - 10th 2012
Following the incidents and accidents of August 2005, 2 practical measures were
announced by the French Minister of Transport :
Increase significantly the oversight of the French DGAC on foreign airlines
through :
- Technical assessment previously to landing permissions being granted(Technical Questionnaire),
- Increase the quantity of ramp inspections on the whole French
territory,
- Implement the Risk Based Approach on inspections of foreign airlines
(reinforced action on critical cases, maximization of the coverage of the
French ramp inspections).
Create the Foreign Airlines Observatory (in charge of the Foreign Airlines
Oversight for the French DGAC).
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation process
7/25/2019 1.4 SAFA European Process - COL
17/35
17
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation process
Why has the French DGAC implemented a French Technical questionnaire ?
Final objective :
Collecting some safety-relevant information on the technical level of an
airline before the aircraft is coming to France,
Filtering those airlines / aircraft that are not meeting ICAO requirements on
safety-critical matters (that are unacceptable for the French DGAC),
Avoiding critical issues to be discovered on the ramp without corrective
actions possible.
WHY ?
Before landing permissions are granted to foreign airlines
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation process
Why has the French DGAC implemented a French Technical questionnaire ?
Technical
Assessment
Traffic right
departementTCO
Assessment through the technical
questionnaire (foreign airlines observatory)
Positive Technical assessment : landing permission granted
Negative Technical assessment : landing permission denied
WHY ?
If positive technical assessment, a SAFA ramp inspection will be planed
on the first flight to complement the assessment done on paper
7/25/2019 1.4 SAFA European Process - COL
18/35
18
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
Who is subject to the technical questionnaire procedure ?
Any new non-EU air carrier (which never operated to France),
Any non-EU air carrier which has not operated to France for more than
two years (calendar years),
Any non-EU air carrier, having already received traffic rights during the last
two years, fulfilling the following criteria :
- New aircraft-type : If this air carrier would like to operate flights to
the French territory with a new aircraft-type, the latest having neverbeen authorized by the French DGAC services,
- New aircraft (MSN) : If this air carrier has already satisfactorily filled-
in the technical questionnaire for some aircraft registrations and would
like to extend the previous authorizations or get new ones for new
aircraft tail numbers of the same aircraft-type,
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHO ?
Colombo February 6th - 10th 2012
What is requested by the French technical questionnaire procedure ?
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
7/25/2019 1.4 SAFA European Process - COL
19/35
19
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
General information on the airline and its oversight authority
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
Information on the authorizations / limitations granted
Check of the Air Operator Certificate,
Check of the Operations Specifications.
7/25/2019 1.4 SAFA European Process - COL
20/35
20
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
Information on the authorizations / limitations granted
Check of the Air Operator Certificate,
Check of the Operations Specifications.
Check of the compliance with the intended operations(area of operations, aircraft type, RVSM, B-RNAV, RNP, MNPS )
Check of the compliance with the intended operations(area of operations, aircraft type, RVSM, B-RNAV, RNP, MNPS )
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
Information on the aircraft wished to be operated
Check of the usual aircraft documents (CofA, CofR),
Check of the safety-relevant equipments installed on this aircraft (EGPWS,
ACAS/TCAS, ELT, Quick donning type of oxygen masks, FDR, CVR ).
Evidence of compliance will be requested(STC + maintenance act or extract of OPS Manual or
list of equipments fitted on the aircraft )
Evidence of compliance will be requested(STC + maintenance act or extract of OPS Manual or
list of equipments fitted on the aircraft )
7/25/2019 1.4 SAFA European Process - COL
21/35
21
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
Information on the aircraft wished to be operated
Check of the usual aircraft documents (CofA, CofR),
Check of the safety-relevant equipments installed on this aircraft (EGPWS,
ACAS/TCAS, ELT, Quick donning type of oxygen masks, FDR, CVR ).
Evidence of compliance will be requested
(STC + maintenance act or extract of OPS Manual orlist of equipments fitted on the aircraft )
Evidence of compliance will be requested
(STC + maintenance act or extract of OPS Manual orlist of equipments fitted on the aircraft )
A mere declaration or statement will not be considered as enoughA mere declaration or statement will not be considered as enough
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
Information on the pilots of the airline
Check of their training requirements (proficiency checks),
Check of their medical class requirements,
Check of their English language proficiency requirements.
7/25/2019 1.4 SAFA European Process - COL
22/35
22
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
Information on the OPS of the airline
Check of the approval of the MEL,
Check of the implementation of SMS or FDAP,
Check of their methods of operations (W&B, OFP, Fuel calculation).
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
Information on the maintenance management of the airline
Check of the approval of the MCM and maintenance programme,
Information on the personal at the station entitled to sign a release to service,
Other information on the maintenance practices of the airline.
7/25/2019 1.4 SAFA European Process - COL
23/35
23
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processWHAT ?
Information on the maintenance management of the airline
Information on the latest heavy maintenance (check C) carried on the aircraft
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processResults
1442010
1232009
1502011
442008
362007162006
Number of technical
questionnaires reviewed
Year
More than 500 TCO reviewed over the last 5 years
Technical objections raised around
55 times over the last 4 years
More than 10% of the application
7/25/2019 1.4 SAFA European Process - COL
24/35
24
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Third Country Authorisation processResults
Lack of installation of ICAO-compliant equipments
(EGPWS, TCAS/ACAS, ELT )
Pilots with medical class II only
Pilots with one proficiency check per year
Lack of proper authorization (B-RNAV, DG )
Lack of implementation of a FDAP
Reasons identified for raising a negative technical assessment (or restrictions)
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Questions ?
Special ExtraThird Country Authorisation process
7/25/2019 1.4 SAFA European Process - COL
25/35
25
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Special Extra
A substantial change occured with the new amendments (28&29) of
ICAO, Annex 6, Part II
SAFA ramp inspections on General Aviation Flights
Applicable since
November 2010
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Special Extra
A substantial change occured with the new amendments (28&29) of
ICAO, Annex 6, Part II
SAFA ramp inspections on General Aviation Flights
New structure in 3 Sections :
Definitions / Applicability
Standards applicable to any
GA operation
Additional Standards
applicable to certain aircraft
operated in GAMTOW > 5.7 tons and/or
turbojet aeroplanes
7/25/2019 1.4 SAFA European Process - COL
26/35
26
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
Special Extra
A substantial change occured with the new amendments (28&29) of
ICAO, Annex 6, Part II
SAFA ramp inspections on General Aviation Flights
New structure in 3 Sections :From a practical perspective
Small Aircraft
&
Large Aircraft
Only
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
MEL before
NIL
7/25/2019 1.4 SAFA European Process - COL
27/35
27
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
MEL
New Instructions
NOW
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
MEL
New Findings
NOW
7/25/2019 1.4 SAFA European Process - COL
28/35
28
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
OPS Manual before
AFM only
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
OPS Manual
New Instructions
NOW
7/25/2019 1.4 SAFA European Process - COL
29/35
29
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
OPS Manual NOW
New Findings
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
OPS Manual NOWOn the required content of the OPS Manual
7/25/2019 1.4 SAFA European Process - COL
30/35
30
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
OPS Manual NOWOn the required content of the OPS Manual
In the OPS Manual !
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
Checklist before
Nothing
7/25/2019 1.4 SAFA European Process - COL
31/35
31
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
New Instructions
NOW Checklist
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
New Findings
NOW Checklist
7/25/2019 1.4 SAFA European Process - COL
32/35
32
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
Harness before
Seat belts only
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
Harness
New Instructions
NOW
7/25/2019 1.4 SAFA European Process - COL
33/35
33
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
Harness NOW
New Findings
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
Quick donning masks before
Nothing !
7/25/2019 1.4 SAFA European Process - COL
34/35
34
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
Quick donning masks
New Instructions
NOW
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation FlightsWhats new ?
For aircraft operated in accordance with Section 2 and 3
Quick donning masks
New Findings
NOW
7/25/2019 1.4 SAFA European Process - COL
35/35
Presentation Slides SAFA Workshop
Colombo, Feb, 6th 10th 2012
Colombo February 6th - 10th 2012
Lots ofmajor changes :
- OPS Manual,
- MEL (and therefore identification/assessment of defects)
- Checklists,
- Harnesses,
- Quick donning oxygen masks
Now SAFA Inspections of GA flights become very informative especially for those aircraft operated under GA rules from time to time,
especially for those aircraft under EU prioritized airlines fleet list
the hard to catch !
As a conclusionWhats new ?
For aircraft operated in accordance with Section 2 and 3
SAFASAFAEuropeanEuropean ProcessProcess
Colombo February 6th - 10th 2012
SAFASAFAEuropeanEuropean ProcessProcess
SAFA ramp inspections on General Aviation Flights
Questions ?
Special Extra