file:///tt/file_convert/563dba24550346aa9aa30ee2/document.xls document.xls
Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION
Project P11-b De Ruyter Production Platform Summary Sheet
Doc. No. 144-111-PI-CAL-0012 Rev. R2 System: SK-012
Page 1 of 1
System Description
Line numbers Connecting Equipment
6; 8; 12 CO 200 022 A41 Crude Oil Heater 200-HA-02 / N2
LP Separator 200-VS-03 / N1
Status Note
Design Code B 31.3
System designed for blast Yes
CII Calculation no. - blast case -
CII Calculation no. - design case SK-012A-R2
Process line list Rev. C2
Material specification Rev. C3
Support locations for AFD Yes
Support loads issued AFD Yes
Support detail drawing approved Partly
Flexibility approved Yes
Maximum Stresses Sustained Expansion Occasional Blast
70 (51%) 58 (28%) 97 (53%) -
Equipment Nozzle Loads
Tag no. Node no Approved Notes
200-HA-02 / N2 570 Yes Vendor data on G.A.
200-VS-03 / N1 10 Yes Standard Nozzle loadings (Doc.No. 144-000-ME-SPE-0004).