2
07/19/2022 file:///home/website/convert/temp/convert_html/563dba24550346aa9aa30efa/document.xls document.xls Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION Project P11-b De Ruyter Production Platform Summary Sheet Doc. No. 144-111-PI-CAL-0062 Rev. R1 System: SK-062 Page 1 System Description Line numbers Line numbers cont. Connecting Equipment 6; 8 FW 730 910 A45 12 FW 730 040 A49 Fire Water Pump 730-PS-01B / 12" FW 730 007 A45 12 FW 730 041 A49 Fire Water Pump 730-PS-01A / 12" FW 730 909 A45 4 FW 730 043 A49 6; 8 FW 730 009 A45 10 FW 730 046 A49 12 FW 730 911 A45 10 FW 730 049 A49 12 FW 730 908 A49 6 FW 730 052 A49 12 FW 730 001 A49 6 FW 730 055 A49 12 FW 730 005 A45 6 FW 730 058 A49 12 FW 730 223 A49 12 FW 730 900 A49 Status Note Design Code B 31.3 System designed for blast Yes CII Calculation no. - blast case - CII Calculation no. - design case SK-062A-R1 Calc's included: 063, 081, 082 Process line list Rev. C2 Material specification Rev. C3 Support locations for AFD Yes Support loads issued AFD Yes Support detail drawing approved Partly (90% appr'd) Flexibility approved Yes Maximum Stresses Expansion Blast 39 (83%) 39 (83%) - Equipment Nozzle Loads Tag no. Node no Approved Notes 730-PS-01B / TP1 10 Yes Vendor data 730-PS-01A / TP1 740 Yes Vendor data Sustained 1) Sus+Therm+Occ 1) 192 (51%) 2) 1) Allowable Sh*0.5*F2, where F2=0.67 used for all cases. (Sh=142N/mm 2. ). 2). Allow. for A790-

144-111-PI-CAL-0062

Embed Size (px)

DESCRIPTION

ghk

Citation preview

Page 1: 144-111-PI-CAL-0062

04/18/2023 file:///tt/file_convert/563dba24550346aa9aa30efa/document.xls document.xls

Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION

Project P11-b De Ruyter Production Platform Summary Sheet

Doc. No. 144-111-PI-CAL-0062 Rev. R1 System: SK-062

Page 1 of 1

System Description

Line numbers Line numbers cont. Connecting Equipment

6; 8 FW 730 910 A45 12 FW 730 040 A49 Fire Water Pump 730-PS-01B / TP1

12" FW 730 007 A45 12 FW 730 041 A49 Fire Water Pump 730-PS-01A / TP1

12" FW 730 909 A45 4 FW 730 043 A49

6; 8 FW 730 009 A45 10 FW 730 046 A49

12 FW 730 911 A45 10 FW 730 049 A49

12 FW 730 908 A49 6 FW 730 052 A49

12 FW 730 001 A49 6 FW 730 055 A49

12 FW 730 005 A45 6 FW 730 058 A49

12 FW 730 223 A49

12 FW 730 900 A49

Status Note

Design Code B 31.3

System designed for blast Yes

CII Calculation no. - blast case -

CII Calculation no. - design case SK-062A-R1 Calc's included: 063, 081, 082

Process line list Rev. C2

Material specification Rev. C3

Support locations for AFD Yes

Support loads issued AFD Yes

Support detail drawing approved Partly (90% appr'd)

Flexibility approved Yes

Maximum Stresses Expansion Blast

39 (83%) 39 (83%) -

Equipment Nozzle Loads

Tag no. Node no Approved Notes

730-PS-01B / TP1 10 Yes Vendor data

730-PS-01A / TP1 740 Yes Vendor data

Sustained1) Sus+Therm+Occ1)

192 (51%) 2)

1) Allowable Sh*0.5*F2, where F2=0.67 used for all cases. (Sh=142N/mm2.). 2). Allow. for A790-UNS S32760.