3
file:///home/website/convert/temp/convert_html/563dba24550346aa9aa30f0d/document.xls document.xls Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION Project P11-b De Ruyter Production Platform Summary Sheet Doc. No. 144-111-PI-CAL-0091 Rev. R1 System: SK-091 Page 1 System Description Line numbers Connecting Equipment 14" AG 480 006 A41 Emergency Power Gener 480-XY-01 / TP3 Status Note Design Code B 31.3 System designed for blast No CII Calculation no. - blast case - CII Calculation no. - design case SK-091A-R1 Process line list Rev. C2 Material specification Rev. C3 Support locations for AFD Yes Support loads issued AFD Yes Support detail drawing approved Yes Flexibility approved Yes Maximum Stresses Sustained Expansion Occasional Blast 4 (12%) 31 (17%) 6 (12%) - Equipment Nozzle Loads Tag no. Node no Approved Notes 480-XY-01 / TP3 10 Yes

144-111-PI-CAL-0091

Embed Size (px)

DESCRIPTION

dfgj

Citation preview

Page 1: 144-111-PI-CAL-0091

file:///tt/file_convert/563dba24550346aa9aa30f0d/document.xls document.xls

Client Petro-Canada Netherlands B.V. PIPE STRESS CALCULATION

Project P11-b De Ruyter Production Platform Summary Sheet

Doc. No. 144-111-PI-CAL-0091 Rev. R1 System: SK-091

Page 1 of 1

System Description

Line numbers Connecting Equipment

14" AG 480 006 A41 Emergency Power Generation 480-XY-01 / TP3

Status Note

Design Code B 31.3

System designed for blast No

CII Calculation no. - blast case -

CII Calculation no. - design case SK-091A-R1

Process line list Rev. C2

Material specification Rev. C3

Support locations for AFD Yes

Support loads issued AFD Yes

Support detail drawing approved Yes

Flexibility approved Yes

Maximum Stresses Sustained Expansion Occasional Blast

4 (12%) 31 (17%) 6 (12%) -

Equipment Nozzle Loads

Tag no. Node no Approved Notes

480-XY-01 / TP3 10 Yes

Page 2: 144-111-PI-CAL-0091

file:///tt/file_convert/563dba24550346aa9aa30f0d/document.xls document.xls