LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
W
cove
Inv
Plan
400 kV Works
1 400 kV Kirori (Hisar) 3x315
2x100
1x10/16
400/220
220/132
132/11
4N0940* 10300.00 2009-10 REC 350041
2 400 kV double circuit line from Hisar TPS
(Khedar) to proposed 400 kV substation
Kirori (Hisar) with 85C conductor design.
23 4L0874* 1250.00 2009-10 REC 350041
3 400 kV double circuit line from Hisar TPS
to 400 kV substation Fatehabad PGCIL.
90 4L0875* 4500.00 2009-10 REC 350039
4 Provision of Diesel Generating set of
suitable capacity for emergency auxiliary
services in 400 kV substation Kirori
(Hisar)
4G0877* REC 350041 Included in the cost of substati Cove
S
5 Daultabad (Gurgaon) 3x315 400/220 4N0997* 7539.68 2010-11 REC 350044
6 400 kV D/C line from Jhajjar TPS to
Daultabad (Gurgaon) with twin moose
conductor with 85 C conductor design.
140 4L0998* 7000.00 2010-11 REC 350045
7 Ceation of 400 kV D/C line from
Daultabad (Gurgaon) - 400 kV substation
Sector 72, Gurgaon (PGCIL) with quad
moose conductor in place of earlier
approval of creation of this line with twin
Moose conductor with 850C conductor
design.
48 4L1308*
4L1063A
2400.00 2010-11 REC 350045
8 Two 400 kV bays at 400 kV GIS
substation Sector-72 Gurgaon (PGCIL) byPGCIL at HVPNL cost.
4D1064* 300.00 2010-11 REC 350045
9 400 kV Nawada 2x315
2x100
1x100
1x1
400/220
220/66
220/33
33/0.4
4N1124* 8200.00 2010-11 World Bank
Remarks
8/22/2019 14_List of Works 2009-10
2/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
W
cove
Inv
Plan
Remarks
10 Provision of a Diesel Generating set of
suitable capacity for emergency auxiliary
services in 400 kV substation Nawada
4G1054* Included in cost of substation Cove
Sr
11 LILO of 400 kV Samaypur - G. Noida line
at proposed 400 kV substation Nawada
(Faridabad)
4 4L1241* 200.00 2010-11 Yet to be posed By PGCIL as deposit work of
HVPNL.
12 400 kV Nuhiyawali 2x315
2x100
1x16/20
400/220
220/132
132/11
4N1071* 7500.00 2010-11 World Bank Lower capacity 132/11 kV
transformer can also be
provided in place of 16/20MVA transformer if available
13 LILO of one circuit of 400 kV D/C Hisar
TPS- Fatehabad line at proposed 400 kV
substation Nuhiyawali.
170 4L1072* 7500.00 2010-11 World Bank
14 Provision of a Diesel Generating set of
suitable capacity for emergency auxiliary
services in 400 kV substation Nuhiyawali.
4G1073* Included in cost of substation Cove
Sr
15 Creation of two 400 kV bays at 400 kV
substation Fatehabad (PGCIL) by PGCIL
at HVPNL cost for 400 kV Hisar TPS
Fatehabad D/C line with LILO of one
circuit at Sirsa.
4B1074* 300.00 2009-10 REC 350039
16 Creation of two no. 400 kV bays at
Dhanonda (Mohindergarh) HVPNL
substation to receive Adani Power.
4B1317* 1000.00 2011-12
17 Creation of 400 kV Mohindergarh
(Dhanonda) - Daultabad quad moose
conductor D/C line.
140 4B1318* 12250.00 2011-12 Being executed
under PPP
mode
18 Creation of two no. 400 kV bays at
Daultabad HVPNL substation to receive
400 kV Mohindergarh (Dhanonda) -
Daultabad quad D/C line.
4B1319* 1000.00 2011-12 Cove
Sr
8/22/2019 14_List of Works 2009-10
3/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
W
cove
Inv
Plan
Remarks
19 Construction of Mohindergarh (Adani
HVDC) - Mohindergarh (Dhanonda)
HVPNL 400 kV D/C line with triple moose
conductor as a dedicated transmission
line to be constructed by M/s Adani Power
Ltd.
HPPC to convey to M/s Adani
Power Ltd. The decision of
26th standing committee
meeting that for the power
over and above the power to
be supplied to Haryana,
connectivity with CTU network
through LILO of one circuit of
Bhiwadi - Moga 400 kV D/C
line could be considered. For
tying-up connectivity and openaccess to CTU network, Adani
Power would need to seek
open access from CTU.HPPC
to be informed to convey the
above decision to M/s Adani.
Not r
be
u
Inv
20 Deepalpur 2x315
2x100
1x16/202x2
400/220
220/132
132/3333/0.4
4N1334* 10000.00 2011-12 Being executed
under PPP
mode
21 Provision of a Diesel Generating set of
suitable capacity for emergency auxiliary
services in 400 kV substation Deepalpur
4G1335* Cove
sr.
22 Creation of 400 kV D/C line from Jhajjar
TPS (Case 2) - Rohtak (400kV) -
Deepalpur with quad moose conductor
170 4G1336* 11900.00 2011-12 Being executed
under PPP
mode
23 LILO of one circuit of 400 kV Abdullapur -Bawana line at Deepalpur
4 4L1337* 200.00 2011-12 Being executedunder PPP
mode
24 Dhanonda 3x315 400/220 4N1338* 8000.00 2011-12 Posed to PFC
8/22/2019 14_List of Works 2009-10
4/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
W
cove
Inv
Plan
Remarks
25 Provision of a Diesel Generating set of
suitable capacity for emergency auxiliary
services in 400 kV substation Dhanonda
4G1339* Posed to PFC Cost included in substation Cove
sr.
26 Creation of Jhajjar TPS (Case-2) -
Dhanonda 400 kV D/C line with twin
moose conductor
80 4L1340* 4000.00 2011-12 Posed to PFC
27 To cancel earlier approval of LILO of one
circuit of 400 kV Moga - Bhiwadi line at
400 kV substation Dhanonda
60 4L1341A
28 Arrangement for meeting the pre-
commissioning testing & start-up power
requirement to CLP thermal power project
by LILO of one circuit of 400 kV D/C Jharli
(Aravali) - Daultabad line at CLP thermal
power plant Jharli.
4L1443* 300.00 2010-11 Yet to be posed
29 Rohtak area 2x315 400/220 4N1342* 10000.00 2011-12 Being executed
under PPP
mode
Enroute 400 kV Jhajjar -
Deepalpur quad D/C line. The
exact requirement of 220/132
kV and/ or 220/33 kVtransformers at 400 kV
substation Rohtak will be
finalised after identification of
land and underlying
transmission system.
30 Provision of a Diesel Generating set of
suitable capacity for emergency auxiliary
services in 400 kV substation in Rohtak
area.
4G1343* Cost included in substation Cove
sr.
31 400 kV D/C Bhiwani - Rohtak line withtwin moose conductor matching with
commissioning of 765 kV PGCIL
substation at Bhiwani.
80 4L1344* 4000.00 2011-12 Yet to be posed To establish connectivity with765 kV substation to be
constructed by PGCIL in
Bhiwani area.
8/22/2019 14_List of Works 2009-10
5/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
W
cover
Inve
Plan
Remarks
32 2 no. 400 kV bays at 765 kV substation
Bhiwani for 400 kV D/C Bhiwani - Rohtak
line
4B1345* 1000.00 2011-12 Yet to be posed By PGCIL as deposit work of
HVPNL on cost plus basis at
applicable consultancy fees
on the final actual executed
cost of the work alongwith the
applicable service tax on
consultancy fee.
33 400 kV D/C Kirori (Hisar) - Jind line with
twin moose conductor matching with
commissioning of 400 kV PGCILsubstation at Jind.
80 4B1346* 4000.00 2011-12 Yet to be posed
34 2 No. 400 kV bays at 400 kV substation
Kirori for 400 kV D/C Kirori - Jind line.
4B1347* 1000.00 2011-12 Yet to be posed
35 2 No. 400 kV bays at 400 kV substation
Jind PGCIL for 400 kV D/C Kirori - Jind
line
4B1348* 1000.00 2011-12 Yet to be posed By PGCIL as deposit work of
HVPNL on cost plus basis at
applicable consultancy fees
on the final actual executed
cost of the work alongwith
applicable service tax on
consultancy fee.
Total (400 kV) 1089 126639.68
8/22/2019 14_List of Works 2009-10
6/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks
c
Inv
Pla
220 kV Works
1 Bhuna 2x100
1x8
220/132
132/11
2N0448*
1N0449*
2020.12 2009-10 REC 350031 Subs ta ti on commiss ioned wi th
1x100 MVA 220/132 kV
transform er o n 14.10.2008. 1x8
MVA 132 /11 kV t rans f ormer
commissio ned on 17.10.2008.
2 Construction of YTPP - Nilokheri 220
kV D/C
140 2L0454* 2503.20 2009-10 REC 350030
3 Construction of 220 kV D/C line with
0.4 ACSR/ AAAC from 220 kV
Cheeka to 220 kV substation Durala
106 2L0742* 2385.00 2009-10 REC 350036
4 Creation of two No. 220 kV bay at 220
kV substation Cheeka for
accommodating 220 kV D/C line from
220 kV Cheeka to 220 kV substation
Durala
2B0743* 200.00 2009-10 REC 350036 C
und
5 220 kV Isharwal 1x100 220/132 2N0734* 2600.00 2009-10 REC 350033
1x20/25 132/33 1N0735*
1x10/16 132/11 1N0736*
1x20/25 132/33 1A0939* REC 350042 For meeting the auxuiliary
consumption demand of the
substation.
6 220 kV D/C line with 0.4 ACSR from400 kV substation Mayyar (Hisar) to
220 kV substation Isharwal
106 2L0737* 2385.00 REC 350033 Reqiuired two No. 220 kV emanatingbays would be provided by PGCIL
while erecting 3rd transformer. 2n d
ckt comm issioned o n 28.01.2009
Subs ta ti on commiss ioned wi th
1x100 MVA 220/132 kV
t rans f ormer on 04.03.2009.
1x 10/16 MVA 132/11 kV
t rans fo rmer commiss ioned on
05.03.2009. 1x20/25 MVA 132/33
kV T/F comm issioned on 27.05.09
8/22/2019 14_List of Works 2009-10
7/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks
c
Inv
Pla
7 Stringing of 2nd Ckt. of Badshahpur
(220 kV) - IMT Manaser (220 kV), 220
kV line on D/C towers.
11.6 2L0432* 104.05 2009-10
8 220 kV bay one number at Badshahpur 2B0433* 100.00 2009-10 For accomodating 2nd 220 kV Ckt.
between Badshahpur and IMT
Manaser
9 220 kV bay one number at IMT
Manesar substation
2B0434* 100.00 2009-10 For accomodating 2nd 220 kV Ckt.
between Badshahpur and IMT
Manaser
10 2 Nos 220 kV line bays at 400 kV
substation Bhiwadi by PGCIL.
2B0848A NCRPB Being carried our by PGCIL as a
regional work. Revised approval
conveyed vide memo No. R
600/Ch.161/HSS-152/ Bhiwadi
dated 09.03.2009.
11 220 kV Bastra (Gharaunda) 2x100
1x4
220/132
132/11
2N0837* 2880.49 2010-11 JICA through
REC 350051
HR-IC-DIS-
035-2009-100845
Suitable spare bays to be provided
for further expansion both for
transformers and lines.1x4 MVA T/F
for auxiliary supply and supply tovillage Bastra.
12 Construction of a new 220 kV D/C line
with 0.4 sq ACSR from PTPP to
proposed 220 kV substation Bastra
50 2L0838* 1250.00 2010-11 JICA through
REC 350053
HR-IC-DIS-
035-2009-
13 2 No. 220 kV bays at 220 kV PTPP
yard for PTPP-Bastra line
2B0839* 214.00 2010-11 JICA through
REC 350061
HR-IC-DIS-
035-2009-
10085514 220 kV Sampla (Upgradation of 132
kV substation Sampla)
2x100 220/132 2N0948* 2421.88 2010-11 JICA through
REC 350049
HR-IC-DIS-
035-2009-
100843
8/22/2019 14_List of Works 2009-10
8/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
15 220 kV Samalkha (Upgradation of
132 kV substation Samalkha)
2x100 220/132 2N0949* 2268.78 2010-11 JICA through
REC 350049
HR-IC-DIS-
035-2009-
100843
Additional land to be taken from
Gram Panchayat on payment.
The cost of replacement of
equipment of 5 no. 220 kV bays of
HVPNL at BBMB substation Panipat
including erection, testing &
commissioning and interconnection
with Control Room & any work
incidental thereto, shall be fully
borne by HVPNL.The cost of replacement of
equipment of 1 No. 220 kV bay of
PGCIL at BBMB substation Panipat
including erection, testing &
commissioning and interconnection
with Control Room & any work
incidental thereto, shall not be
charged to common pool. The issue
of bearing this cost shall be taken up
with PGCIL by HVPNL and in case
PGCIL does not agree to bear this
cost, the same shall be borne by
HVPNL.
8/22/2019 14_List of Works 2009-10
9/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
16 220 kV Chhajpur 2x100
1x4
220/132
132/11
2N0950* 2748.44 2010-11 JICA through
REC 350051
HR-IC-DIS-
035-2009-
100845
Land to be taken from Gram
Panchayat on DC rates. The study
for Residual Life Assessment of 220
kV breakers and associated
equipment to be replaced shall be
got done by BBMB at the cost of
HVPNL. Accordingly, HVPNL shall
pay, for the said study and for the
residual life left at present day cost
minus depreciation for the serviceperiod, to BBMB and the cost of new
equipment and interconnection with
Control Room towards this
replacement shall be charged to the
common pool.
The cost of 220 kV breakers and
associated equipment already
procured by BBMB, if any, shall be
charged to HVPNL or PGCIL/HVPNLor to the common pool as per
approval.
All the equipment and material
required for creation of proposed
bays (two no. 220 kV and one no.
400 kV substation) and for their
interconnection with Control Room
shall be supplied by HVPNL after
getting their technical specification
approved from BBMB.
8/22/2019 14_List of Works 2009-10
10/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
The expenditure on other
additions/alterations/rearrangement
etc. incidental to the construction of
the proposed bays at BBMB Sewah
shall be borne by HVPNL.
The expenditure for future
replacement and annual O&M
charges in respect of proposed baysat BBMB Sewah shall be borne by
HVPNL. BBMB shall, however, go
ahead with procurement/
replacement of equipment at
HVPNLs cost, wherever necessary
on technical grounds, the cost of
which would be borne by HVPNL.
The expenditure on account of
dismantlement/ shifting of existingstructures/ features of any bay at
BBMB Sewah, if any required to
make way for the proposed bays,
shall be borne by HVPNL.
All other related works outside
BBMB substation Panipat shall be
carried out by HVPNL at their cost.
The load shall be restricted to the
present load drawn from the BBMBsubstation Panipat.
8/22/2019 14_List of Works 2009-10
11/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Pla
After disbanding 33 kV system at
400 kV substation BBMB Panipat the
possibility to use two No. 220/66-33
kV, 60 MVA transformers alongwith
associated equipment, thus rendered
spare, in BBMB system shall be
explored by BBMB, otherwise it shall
be obligatory for HVPNL to take
them at present day cost minus
depreciation for the service period.
17 LILO of 220 kV D/C Rohtak-
Bahadurgarh line at 220 kV proposed
substation Sampla.
47 2L0951* 1175.00 2010-11 JICA through
REC 350052
HR-IC-DIS-
035-2009-
100845
18 Construction of a new 220 kV D/C line
with 0.5 Sq. inch ACSR from proposed
220 kV substation Sampla to proposed
220 kV substation Samalkha. {The line
is 220 kV Sampla - Mohana - Smalkha}
56 2L0952* 1512.00 2010-11 JICA through
REC 350052
HR-IC-DIS-
035-2009-
100846
19 220 kV Mohana (Sonepat) 1x100
1x100
2x0.2
220/132
220/33
33/0.4
2N1125* 3762.19 2010-11 JICA through
REC 350049
HR-IC-DIS-035-2009-
100843
Provision of 10 No. 33 kV bays at
220 kV substation Mohana. However
initially only 6 No. 33 kV bays will beconstructed. for auxiliary supply
8/22/2019 14_List of Works 2009-10
12/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Pla
20 Erection of 220 kV D/C line with 0.5
Sq ACSR conductor from 400 kV
substation Jajjy (PGCIL) to 220 kV
substation Mohana.
3 2L1126* 90.00 2010-11 Posed to
NCRPB
21 The already approved new 220 kV D/C
line with 0.5 Sq.ACSR from proposed
220 kV substation Sampla to proposed
220 kV substation Samalkha will be
LILOed at 220 kV substation Mohana.
2 2L1127* Covered under Sr. No. 18
22 Construction of a new 220 kV D/C line
with 0.4 Sq. inch ACSR from proposed
220 kV substation Samalkha to 220 kV
substation Chhajpur.
48 2L0953* 1200.00 2010-11 JICA through
REC 350053
HR-IC-DIS-
035-2009-
100847
23 Construction of a new 220 kV D/C line
with 0.4 Sq. inch ACSR from proposed
400 kV substation BBMB Sewah to 220
kV substation Chhajpur.
32 2L0954* 800.00 2010-11 JICA through
REC 350053
HR-IC-DIS-
035-2009-100847
24 Creation of two no. 220 kV bay at 400
kV substation BBMB Sewah to receive
220 kV D/C line from Chhajpur to be
carried out by BBMB.
2B0955* 200.00 2009-10 JICA through
REC 350061
HR-IC-DIS-
035-2009-
100885
25 220 kV Kaul (Upgradation of 132 kV
substation)
2x100 220/132 2N0975* 2540.19 2010-11 JICA through
REC 350051
HR-IC-DIS-035-2009-
100845
8/22/2019 14_List of Works 2009-10
13/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks
c
Inv
Pla
26 Construction of a new 220 kV D/C line
with 0.4 Sq. inch ACSR from 220 kV
substation Pehowa to proposed 220 kV
substation Kaul.
40 2L0976* 1000.00 2010-11 JICA through
REC 350053
HR-IC-DIS-
035-2009-
100847
27 Creation of 2 No. 220 kV bays at 220
kV substation Pehowa for Pehowa-
Kaul line.
2B0977* 200.00 2010-11 JICA through
REC 350061
HR-IC-DIS-
035-2009-
100855
28 Demolition of existing 17 Nos.
residential structures in the colony at
132 kV substation Kaul for utilizing
space to facilitate upgradation of 132
kV substation Kaul to 220 kV level.
1G0986* 2010-11 No
to b
in I
29 Demolition of existing control room at
132 kV substation Kaul after making
the new control room functional at 220
kV substation Kaul.
1G0987* 2010-11 No
to b
in I
30 Construction of a new 220 kV D/C line
with 0.4 Sq. inch ACSR from 220 kV
substation Bastra to proposed 220 kV
substation Kaul.
100 2L0978* 2500.00 2010-11 JICA through
REC 350053
HR-IC-DIS-
035-2009-
31 Creation of 2 No. 220 kV bays at 220
kV substation Bastra for Bastra - Kaul
line.
2B0979* 200.00 2010-11 JICA through
REC 350051
HR-IC-DIS-
035-2009-
C
u
32 220 kV Sector-72 Gurgaon 2x100
1x100
2x0.2
220/66
220/33
33/0.4
2N1083* 3000.00 2010-11 JICA through
REC 350059
HR-IC-DIS-
035-2009-
8/22/2019 14_List of Works 2009-10
14/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
1. Wherever needed multi circuit
towers will be used to take out 220
kV & 66 kV lines from 220 kV
substation sector-72 Gurgaon in
view of Right of Way constraints.
2. Out of six circuits equivalent to 0.5
sqACSR being provided by PGCIL
for HVPNL use, four 220 kV circuits
will directly feed 220 kV substation
sector-72 Gurgaon bus. Theremaining two circuits will be taken
from 400 kV substation PGCIL to
proposed 220 kV substation
Kankerkheri (Nuh).
Provision of 10 no. 33 kV bays at
220 kV substation sector-72
Gurgaon to enable DHBVNL to take
out 10 no. 33 kV outgoing feeders to
meet ultimate load requirement in
surrounding area
33 220 kV Kherikanker (Nuh) 1x100
1x100
2x0.2
220/66
220/33
33/0.4
2N1116* 2500.00 2011-12 Yet to be
posed
Provision of 10 No. 33 kV bays at
220 kV substation Kheri Kanker
(Nuh) to enable DHBVNL to take out
10 No. 33 kV outgoing feeders to
meet their ultimate load requirement
in surrounding area.
8/22/2019 14_List of Works 2009-10
15/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks
c
Inv
Pla
In view of scarcity of land around
Sohna a part of the land offered by
village Panchayat Kher Kanker
(Approx. 32 acre) will be used for
construction of 220 kV substation
and the remaining land will be kept
reserved for creation of a new 400
kV substation in future keeping in
view the development of load along
KMP expressway and surroundingarea.
34 220 kV Chormar 1x100
1x100
2x0.2
220/132
220/33
33/0.4
2N1130* 2500.00 2010-11 JICA through
REC 350055
HR-IC-DIS-
035-2009-
100849
7 nos. 220 kV bays, 6 nos. 132 kV
bays and 5 nos. 33 kV bays.
However, provision will be made for
10 nos. each 220 kV , 132 kV and 33
kV bays keeping the scope for future
expansion. 2x0.2 T/F for auxiliary
supply
To allow DHBVN to connect
proposed 33 kV S/Stn. Pipli (1x10
MVA) with approx. 9 Kms new 33
kV line from Chormar to Pipli &
proposed 33 kV S/S Khokhar (1x10
MVA) with approx. 16 kms new 33
kV line from Chormar to Khokhar
35 Construction of 220 kV D/C Fatehabad
(400 kV)-Chormar line with 0.5 sq. inch
ACSR
192 2L1131* 5760.00 2010-11 JICA through
REC 350057
HR-IC-DIS-035-2009-
100851
36 Construction of 220 kV D/C
Nuhiyanwali (400 kV)-Chormar line with
0.5 sq. inch ACSR
32 2L1132* 960.00 2010-11 Not Required Not to be executed .Covered under
Chormar - Rania line via Nuhiyawali.
8/22/2019 14_List of Works 2009-10
16/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
37 Construction of 2 nos. 220 kV bays at
400 kV substation Nuhiyanwali (Sirsa)
for 220 kV D/C Nuhiyanwali (400kV)-
Chormar line
2B1133* 200.00 2010-11 No separate
funds required.
Covered under
400 kV
substation
Nuhiyawali
under World
Bank project.
38 Erection of following three 220 kV lines
from proposed 220 kV substation
sector-72 Gurgaon:-
Wherever needed multi circuit
towers wil l be used to take out 220
kV & 66 kV lines from 220 kV
substation sector-72 Gurgaon in
view of Right of Way constraints.
a) 220 kV D/C sector 72 Sector 20 (0.5
Sq ACSR)
48 2L1084* 1440.00 2010-11 JICA through
REC 350048
HR-IC-DIS-
035-2009-100842
b) 220 kV D/C sector 72 Sector 56 (0.5
Sq ACSR)
21 2L1085* 630.00 2010-11 JICA through
REC 350048
HR-IC-DIS-
035-2009-
100842
c) 220 kV D/C sector 72 Sector 52 A
(0.5 Sq ACSR)
25 2L1086* 750.00 2010-11 JICA through
REC 350048HR-IC-DIS-
035-2009-
100842
8/22/2019 14_List of Works 2009-10
17/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks
c
Inv
Pla
39 Provision of two 220 kV bays at sector
56 Gurgaon
2B1089* 200.00 2010-11 JICA through
REC 350061
HR-IC-DIS-
035-2009-
100855
40 Provision of two 220 kV bays at sector
52 A Gurgaon
2B1090* 200.00 2010-11 JICA through
REC 350061
HR-IC-DIS-
035-2009-100855
41 220 kV double circuit with 0.5 ACSR
from 400 kV substation Kirori (Hisar) to
proposed 220 kV substation Hansi area
(Masudpur).
48 2L0879* 1271.00 2009-10 REC 350064 Line test charged on 19.05.09
42 220 kV A-4 Faridabad (Upgradation
of 66 kV substation) GIS
2x100 220/66 2U1056* 8500.00 2010-11 World Bank
43 Construction of a new 220 kV D/C linewith 0.5 Sq. inch ACSR from proposed
400 kV substation Nawada to 220 kV
substation A-5 Faridabad.
10 2L1057* 300.00 2010-11 World Bank
44 Creation of two 220 kV bays at A-3
Palla substation for 220 kV D/C A-3
Palla to A-5 Faridabad line.
2B1058* 200.00 2010-11 Yet to be
posed
C
und
45 Construction of a new 220 kV D/C line
with 0.5 Sq. inch ACSR from A-3 Palla
to A-5
30 2L1059*
6L0915A
900.00 2010-11 World Bank In place of already approved 66 kV
D/C A-3 Palla to A-5 line.
46 220 kV A-5 Faridabad (Upgradation
of 66 kV level)
2x100 220/66 2U1055* 2010-11 World Bank
47 LILO of one circuit of 220 kV D/C A-3
Palla to A-5 line at proposed 220 kV
substation A-4 Faridabad.
8 2L1060* 2010-11 World Bank
3000.00
8/22/2019 14_List of Works 2009-10
18/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks
c
Inv
Pla
48 Loop in of Jind - Hisar IA 220 kV
double circuit at 400 kV substation
Kirori (Hisar) making it Jind Kirori
double circuit line.
25 2L0878* 750.00 2009-10 REC 350064 Line work completed on 01.04.200
49 Construction of link between proposed
220 kV substation Hansi to the LILO
point of Jind - Hisar IA line in order to
complete Hansi - Hisar IA line.
7 2L0880* 240.00 2009-10 REC 350064 Line test charged on 19.05.09
50 Creation of 220 kV double circuit with
0.5 ACSR from 400 kV substation
Kirori (Hisar) to under construction 220
kV substation Bhuna.
50 2L0881* 1250.00 2009-10 REC 350039 Line test charged on 31.03.2009
51 Creation of two 220 kV line bays at 220
kV substation Bhuna (under
construction) to receive 220 kV D/C
line from proposed 400 kV substation
Kirori.
2B0941* 200.00 2009-10 REC 350039 C
u
52 220 kV Sector-56 Gurgaon{Upgradation from 66 kV level}
2x100 220/66 2U0903* 2803.00 2009-10 REC 350043
53 LILO of 220 kV D/C Palli-sector-52A
Gurgaon line at proposed 220 kV
substation Sector-56 Gurgaon.
2 2L0904* 45.00 2009-10 REC 350043
54 220 kV Rangala Rajpur
(Firozpurzirka)
1x100
1x100
2x0.2
220/66
220/33
33/0.4
2N1139* 3000.00 2010-11 World Bank To make provision o f 10 N os. 220 kV
bays including 3 no. spare bays, 10
nos. 66 kV bays including 5 no.
spare bays & 10 no. 33 kV baysincluding 4 no. spare bays at 220 kV
substation Rangala Rajpur (Firojpur
Zirka).
LIST OF WORKS (66 kV AND ABOVE) 2009 10
8/22/2019 14_List of Works 2009-10
19/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks
c
Inv
Pla
55 220 kV D/C Kheri Kanker (Nuh)
Rangala Rajpur (Firozpurzirka) with
0.4 Sq. ACSR conductor.
104 2L1140* 2600.00 2010-11 World Bank Out of six circuits equivalent to 0.5
sq ACSR being provided by PGCIL
for HVPNL use, four 220 kV circuits
will directly feed 220 kV substation
sector-72 Gurgaon bus. The
remaining two circuits will be taken
from 400 kV substation PGCIL to
proposed 220 kV substation
Kankerkheri (Nuh).
56 220 kV D/C Palwal Rangala Rajpur
(Firojpurzirka ) with 0.4 Sq ACSR
conductor.
110 2L1141* 2750.00 2010-11 World Bank
57 Creation of 2 no. 220 kV bays at 220
kV substation Kheri Kanker (Nuh) for
new 220 kV D/C Kheri Kanker)
Rangala Rajpur line.
2B1142* 200.00 2011-12 Yet to be
posed
C
und
58 Creation of 2 No. 220 kV bays at 220
kV substation Palwal for new 220 kVD/C Palwal Rangala Rajpur line.
2B1143* 200.00 2010-11 Yet to be
posed
C
und
1x100 220/66 2N1149* 5200.00 2010-11 2x0.2 MVA 33/0.4 kV transformer for
auxiliary supply
1x100 220/33
2x0.2 33/0.4
1x100 220/66 2A1218*
60 220 kV D/C 0.5 Sq" ACSR line from
220 kV substation Daultabad to 220 kVsubstation Mau
40 2L1150* 1000.00 2010-11 JICA through
REC 350048HR-IC-DIS-
035-2009-
100842
61 220 kV D/C 0.5 Sq" ACSR line from
proposed 220 kV substation Kheri
kanker to 220 kV substation Mau
60 2L1151* 1500.00 2011-12 Yet to be
posed
Mau (Dharuhera)
with total provision of 10 no. 33 kV
bays to provide supply to upcoming
33 kV substations of DHBVNL in
nearby area.
59 JICA through
REC 350059
HR-IC-DIS-
035-2009-
100853
LIST OF WORKS (66 kV AND ABOVE) 2009 10
8/22/2019 14_List of Works 2009-10
20/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Pla
62 LILO of one circuit of 220 kV D/C
Badshahpur-Rewari line at 220 kV
substation Mau on D/C towers.
24 2L1152* 600.00 2010-11 JICA through
REC 350057
HR-IC-DIS-
035-2009-
100851
The second circuit can be LILOed in
future.
63 Creation of 2 no. 220 kV bays at 220
kV substation Kheri Kanker to
accommodate 220 kV Mau - Kheri
Kanker line.
2B1153* 200.00 2011-12 Yet to be
posed
C
und
64 Creation of 2 no. 220 kV bays at 220
kV substation Daultabad to
accommodate 220 kV Mau
Daultabad line.
2B1154* 200.00 2010-11 JICA through
REC 350061
HR-IC-DIS-
035-2009-
100855
65 Erection of 6 no. 33 kV bays at 220 kV
substation Mau
3B1157* 2010-11 C
und
Sector-20 Gurgaon (GIS) 2x100
2x25/31.5
2x0.2
220/66
66/11
11/0.4
2N1158* 9400.00 2010-11 2x0.2 MVA 11/.4 kV transformers for
auxiliary supply.
Advising DHBVNL that proposal of
2x25/31.5 MVA 66/11 kV
transformers has been agreed
subject to condition that high
capacity connectivity is used by
DHBVNL for all 11 kV feeders so
that the number of panels is kept to a
minimum.
JICA through
REC 350062
HR-IC-DIS-
035-2009-
100856
66
LIST OF WORKS (66 kV AND ABOVE) 2009 10
8/22/2019 14_List of Works 2009-10
21/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Pla
Space will be kept reserved for
creation of a 400 kV GIS substation
at Sector-20 Gurgaon in future
depending upon the availability of
ROW for feeding 400 kV line.
220 kV substation Samain (Tohana) 2x100
1x100
2x0.2
220/33
220/132
33/0.4
2N1162* 3500.00 2010-11 World Bank 2x0.2 MVA 33/0.4 kV transformers
for auxiliary supply
One 100 MVA 220/33 kV transformer
shall be installed in the first instance
while the second shall be installed as
per load requirement in future for
which space shall be provided in the
switchyard.
To make provision of 10 nos. 220 kV
bays including 3 nos. spare bays, 5
nos. 132 kV bays including 1 no.
spare bay and 10 nos. 33 kVbays including 4 nos. spare bays at
220 kV substation Samain (Tohana).
68 220 kV D/C line from the proposed 400
kV substation Kirori to proposed 220
kV substation Samain (Tohana) with
0.5 Sq" ACSR conductor.
80 2L1163* 2000.00 2010-11 World Bank To allow DHBVNL to connect the
proposed and already approved new
33 kV substation Bithmara with the
proposed 220 kV substation Samain
(Tohana).
69 220 kV D/C line from the proposed 220
kV substation Samain (Tohana) toproposed 220 kV substation Masudpur
(Hansi) with 0.5 Sq" ACSR conductor.
100 2L1164* 2500.00 2010-11 World Bank
67
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
22/170
LIST OF WORKS (66 kV AND ABOVE) 2009-10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Pla
Lula Ahir (Rewari) 1x100
1x100
2x0.2
220/132
220/33
33/0.4
2N1165* 3500.00 2010-11 JICA through
REC 350060
HR-IC-DIS-
035-2009-
100854
2x0.2 MVA 33/0.4 kV transformers
for auxiliary supply, in the first
instance, in the 24 acre land offered
by Gram Panchayat of Lula Ahir
To allow DHBVNL to connect
existing 33 kV substations Jharoda
(16 MVA) with approx. 3 km new 33
kV line, Khushpura (9MVA) withapprox. 3 km new 33 kV line and
Bishowa (8 MVA) with approx. 10
km new 33 kV line by extending 33
kV line from Jharoda to Bishowa
respectively from proposed 220 kV
substation Lula Ahir ( Rewari).
To make provision of 10 no. 220 kV
bays including 3 no. spare bays, 10
nos. 132 kV bays including 5 nos.spare bays and 10 nos. 33 kV bays
including 4 nos. spare bays at 220
kV substation Lula Ahir.
Additional 100 MVA 220/132 kV or
220/33 kV transformer will be
installed in future as per load
requirement for which space shall be
provided in the switchyard.
71 LILO of 220 kV S/C Charkhi Dadri-
Rewari line at the proposed 220 kV
substation Lula Ahir with 0.4 sq inch
ACSR.
30 2L1166* 514.00 2010-11 JICA through
REC 350057
HR-IC-DIS-
035-2009-
100851
70
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
23/170
LIST OF WORKS (66 kV AND ABOVE) 2009 10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks
c
Inv
Pla
Dhanonda 1x100
1x100
2x0.2
220/132
220/33
33/0.4
2N1168* 3400.00 2010-11 JICA through
REC 350060
HR-IC-DIS-
035-2009-
100854
2x0.2 MVA 33/0.4 kV transformers
for auxiliary supply in the first
instance in the 34 acre land offered
by Gram Panchayat of Dhanonda.
To make provision of 10 no. 220 kV
bays including 3 no. spare bays, 10
nos. 132 kV bays including 5 nos.
spare bays and 10nos. 33 kV baysincluding 4 nos. spare bays at 220
kV substation Dhanonda
(Mohindergarh)
Additional 100 MVA 220/132 kV or
220/33 kV transformer will be
installed in future as per load
requirement for which space shall
be provided in the switchyard
73 220 kV D/C line with 0.5 Sq" ACSR
from the proposed 220 kV substation
Lula Ahir (Rewari) to the proposed 220
kV substation Dhanonda
(Mohindergarh)
40 2L1169* 1080.00 2010-11 JICA through
REC 350057
HR-IC-DIS-
035-2009-
100851
Masudpur (Hansi ) 1x100 220/132 2N1175* 3000.00 2010-11 World Bank
2N0882A
1x100
2x0.2
220/33
33/0.4
Approval revised to provide one
each transformer of 220/132 kV and
220/33 kV rating in place of both of
220/132 kV rating
72
74 2x0.2 MVA 33/0.4 kV transformers
for auxiliary supply in the first
instance, in the 17 acre land offered
by Gram Panchayat of Masudpur.
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
24/170
LIST OF WORKS (66 kV AND ABOVE) 2009 10
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Pla
Additional 100 MVA 220/132 kV or
220/33 kV transformer will be
installed in future as per load
requirement for which space shall
be provided in the switchyard
To make provision of 10 no. 220 kV
bays including 3 no. spare bays, 10
nos. 132 kV bays including 5 nos.
spare bays and 10 nos. 33 kV baysincluding 4 nos. spare bays at 220
kV substation Masudpur (Hansi) .
75 220 kV D/C Chormar-Rania line with
0.5 Sq. inch ACSR via the proposed
400 kV substation Nuhiyanwali (Sirsa).
90 2L1180* 2430.00 2010-11 JICA through
REC 350057
HR-IC-DIS-
035-2009-
100851
Sector-57 Gurgaon (GIS) 1x100
1x100
2x0.2
220/66
220/33
33/0.4
2N1197* 8500.00 2010-11 Erection of 10 no. 33 kV bays
including 4 no. spare bays for
feeding upcoming 33 kV substationsof DHBVN in sector-49, 62 and
Faridabad Road area.
2x0.2 MVA 33/0.4 kV transformers
for auxiliary supply
The third transformer whether
220/66 kV or 220/33 kV can be
decided later on as the system
develops. Space would be reserved
for installation of the same.
76 JICA through
REC 350062
HR-IC-DIS-035-2009-
100856
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
25/170
( )
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Pla
77 LILO of proposed 220 kV D/C Sector
72 (220 kV) - Sector 52A Gurgaon line
(on multi circuit towers) at 220 kV
substation Sector 57 Gurgaon using
0.5 Sq" ACSR conductor.
1 2L1198* 27.00 2010-11 JICA through
REC 350048
HR-IC-DIS-
035-2009-
100842
Gignow (Loharu) 1x100
1x100
2x0.2
220/132
220/33
33/0.4
2N1205* 3000.00 2010-11 World Bank To make provision of 15 nos. 220 kV
bays including spare, 12 nos 132 kV
bays including spare and 10 nos. 33
kV bays including spare at proposed220 kV substation Gignow.
Provision of space shall be made to
accommodate 3rd 100 MVA
transformer, if required, in future.
To allow DHBVNL to connect 33 kV
substations Singhani (10 MVA),
Baralu (10 MVA), Kari Dharni (10
MVA), Sohansara (10 MVA) and
Bishalwas (10 MVA) besides any
other existing/ proposed 33 kV
substation with proposed 220 kV
substation Gignow. The left out 33
kV substations Budhera (10 MVA)
and Chahar Kalan (10 MVA) shall be
fed from 132 kV substation Digawan
Jattan after shifting of earlier
substations Baralu and kari Dharni.
2x0.2 MVA 33/0.4 kV transformers
for auxiliary supply
78
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
26/170
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
Permission for clearance of trees at
site for 220 kV substation Gignow
shall have to be arranged from
Forest Department.
Advising DHBVNL to create new 33
kV substations matching their
completion with the commissioning
of feeding 220 kV or 132 kV
substation.
79 Construction of 220 kV D/C line with
0.5 Sq" ACSR from proposed 220 kV
substation Dhanonda (Mohindergarh)
to proposed 220 kV substation Gignow
(50 km)
100 2L1206* 2700.00 2010-11 World Bank
80 Construction of 220 kV D/C line with
0.5 Sq" ACSR from proposed 220 kV
substation Isharwal (under
construction) to proposed 220 kVsubstation Gignow (30 km)
100 2L1207* 1620.00 2010-11 World Bank
Sagwan (Near Tosham) 1x100
1x100
2x0.2
220/132
220/33
33/0.4
2N1212* 3000.00 2010-11 World Bank To make provision of 15 nos. 220 kV
bays including spare, 12 nos. 132 kV
bays including spare and 10 nos. 33
kV bays including spare at 220 kV
substation Sagwan.
Provision of space to be made to
accommodate 3rd 100 MVA
transformer, if required, in future.
81
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
27/170
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
To allow DHBVNL to connect 33 kV
substations Baliyali (10 MVA), Dhani
Mau (10 MVA), Bapora (10 MVA),
Nigana Canal (16.3 MVA) and any
other existing/ proposed 33 kV
substation with proposed 220 kV
substation Sagwan.
Advising DHBVNL to create new 33
kV substations matching their
completion with the commissioning
of feeding 220 kV or 132 kV
substation.
2x0.2 MVA 33/0.4 kV transformers
for auxiliary supply
82 LILO of both circuits of existing 220 kV
D/C Hisar (400 kV substation Mayyar
of PGCIL) - Isharwal line at the
proposed 220 kV substation Sagwan
by erecting about 40 km 220 kV D/C
line (20 km either way) with 0.4 Sq"
ACSR.
40 2L1213* 2000.00 2010-11 World Bank
Dadhi Bana 2N1419* 2500.00 2011-12 Yet to be posedSubject to f inalisation of land at
village Dadhi Bana.
2U1269A 220 kV Dadhi Bana aproved in place
of earlier approval of upgradation ofexisting 132 kV substation Jhojju
Kalan to 220 kV level conveyed vide
R 543 daed 2.9.08 with 2x100 MVA
220/132 kV transformers.
83 1x100+
1x100+
2x.200
220/132+
220/33+
33/.4
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
28/170
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
To make provision of 12 no. 220 kV
bays including spare bays, 12 no.
132 kV bays including spare bays
and 15 no. 33 kV bays including
spare bays at proposed 220 kV
substation Dadhi Bana.
To allow DHBVNL to feed following
new 33 kV substations: i)
Khudana (10 MVA) from proposed
220 kV substation Dadhi Bana in
place of earlier approved (R 567
dated 03.11.2008) from 132 kV
substation Jhojju Kalan.
Ii) Mandola (10 MVA) and Changrod
(10 MVA) from proposed 220 kV
substation Dadhi Bana in place of
earlier approved (R 543 dated
02.09.2008) from proposed 132 kV
substation Makrani. iii)
Dhareru (10 MVA) from 132 kVsubstation dadri-II matching with
shifting of load of 33 kV substation
Makrana from 132 kV substation
Dadri II to proposed 132 kV
substation Makrani.
84 Construction of 220 kV D/C Dhanonda
Dadhi Bana line with 0.5 Sq" ACSR
conductor
38 2L1426*
2L1270A
2L1420A
1140.00 2011-12 Yet to be posed
85 Construction of 220 kV D/C Dadhi
Bana - Gignow line with 0.5 Sq" ACSR
conductor
40 2L1427* 1200.00 2011-12 World Bank
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
29/170
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Pla
86 Batta 1x100
1x100
2x0.2
220/132
220/33
33/0.4
2N1277* 3000.00 2010-11 Yet to be
posed
87 LILO of 220 kV Narwana Kaithal
double circuit line at proposed 220 kV
substation Batta.
2L1278* 2010-11 Yet to be
posed
Informing Hon'ble CM Haryana about
change in site and voltage level i.e.
creating 220 kV substation Batta in
place of upgradation of 33 kV
Kalayat to 132 kV level.
Raiwali 2x100
1x12.5/16
220/66
66/11
2N1322* 2500.00 2010-11 World Bank 1x12.5/16 MVA 66/11 kV transformer
for auxiliary supply
Additional 100 MVA 220/66 kV or
220/33 kV transformer shall be
installed in future as per load
requirement for which space shall be
provided in the switchyard.
33 kV yard shall not be created at
this stage but space shall be kept forthe same.
To make provision of 15 no. 220 kV
bays including spare bays, 15 nos.
66 kV bays including spare bays and
10 nos. 33 kV bays including spare
bays at proposed 220 kV substation
Raiwali.
89 LILO of one circuit of 220 kV D/C Tepla
- Madanpur line with 0.4 ACSR atproposed 220 kV substation Raiwali.
10 2L1323* 225.00 2010-11 World Bank
88
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
30/170
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
90 Construction of 220 kV D/C line with
0.5 sq ACSR from 400 kV substation
PGCIL (to be constructed near
Barwala) to proposed 220 kV
substation Raiwali.
20 2L1324* 550.00 2010-11 World Bank The execution shall be in the time
frame matching with commissioning
of 400 kV PGCIL substation.
91 Cancellation of earlier approved
feeding of 220 kV substation Sector 20
Gurgaon by creation of Daultabad -
Sector 20 Gurgaon line with 220 kVD/C quad moose conductor as
provided at Sr. No. 6 of approval
issued by CE/ Planning HVPNL
Panchkula vide memo No. R. 563/Ch-
23/HSS-348 dated 30.10.2008.
2L1320A No
to b
in In
92 Sector-3 Gurgaon (GIS) In principle approval for creation
of 220 kV GIS substation at sector
3 Gurgaon subject to allotment of
land for the same by HUDA
93 Sector-2 Gurgaon (GIS) In-principle approval for up-
gradation of existing 66 kV
substation sector-2 Gurgaon to
220 kV GIS substation in case
suitable land is not made available
by HUDA in adjoining sector-3
Gurgaon subject to suitability of
spare land at 66 kV substationsector-2 Gurgaon for the purpose
of upgradation.
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
31/170
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
94 220 kV D/C overhead line with twin
moose AAAC conductor with total line
length of 6.5 km approx. from
Daultabad to Railway line.
13 390.00 2011-12
95 220 kV D/C line with power cable
equivalent to twin moose AAAC
conductor with total line length of 2.5
km approx. from Railway line to
proposed 220 kV GIS substation sector2 or 3 Gurgaon.
5 2L1444* 1500.00 2011-12
96 220 kV D/C line with power cable
equivalent to single moose AAAC
conductor with total line length of 6.5
km approx. from proposed 220 kV GIS
substation sector 2 or 3 Gurgaon to
proposed 220 kV substation sector-20
Gurgaon.
13 3900.00 2011-12
Rampur Kamboan 1x100 MVA
1x100 MVA
2x0.2 MVA
220/66
220/33
33/0.4
2N1370* 3501.00 2010-11 PFC 03403021 220kV substation Rampur Kamboan
approved in place of Malikpur
Bangar approved vide R574 dated
8/12/08
2N1235A Additional 100 MVA 220/66 kV
transformer shall be installed in
future as per load requirement for
which space shall be provided in the
switchyard.
97
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
32/170
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
c
Inv
Plan
To make provision of 15 nos. 220 kV
bays including spare bays, 15 no. 66
kV bays including spare bays and 10
no. 33 kV bays including spare bays
at 220 kV substation Rampur
Kamboan
To allow UHBVNL to feed 33 kV
substations Rampur Kamboj
(proposed 10 MVA), Malikpur
Banger (proposed 10 MVA), Dhimo(proposed 10 MVA), Ledi (proposed
10 MVA) and Taharpur (proposed 10
MVA) from proposed 220 kV
substation Rampur Kamboan.
98 LILO of one circuit of 220 kV D/C
YTPP - Abdullapur line with 0.5 sq"
ACSR at proposed 220 kV substation
Rampur Kamboan. It is likely to
construct 220 kV D/C line from 400 kV
PGCIL substation (to be constructed
near Barwala) to proposed 220 kV
substation Rampur Kamboan via
another proposed 220 kV ss being
planned at village Sarawan
40 2L1371*
2L1236A
1500.00 2010-11 PFC 03403021
99 Erection of 220 kV D/C Sector 72 -
Badshahpur line with 0.5 Sq inch
ACSR
10 2L1381* 300.00 2009-10 To be Posed
100 Shifting of a portion of exisitngoverhead 66 kV D/C Badshahpur -
Sohna line passing through 220 kV
substation Badshahpur yard with 66 kV
XLPE underground cable to provide
space for erection of 220 kV bay.
6G1382* 2009-10 To be posed
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
33/170
Sr.
No.
Name of substation or line section Line
Length
(Ckt -
km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangement
Remarks W
co
u
Inve
Plan
101 Erection of 2 no. 220 kV bays at 220
kV substation Sector 72 Gurgaon for
accomodating 220 kV D/C Sector 72-
Badshahpur line.
2B1383* 200.00 2009-10 To be posed
102 2 no. 220 kV bays at 220 kV substation
Badshahpur for acomodating 220 kV
D/C Sector 72 - Badshahpur line
2B1384* 200.00 2009-10 To be posed
Total (220 kV) 2347.22 169186.34
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
34/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
132 kV Works
A
1 Jakhal 2x10/16 132/11 1U0467* 431.00 2009-10 REC 350023 One No 10/16 MVA, 132/11 kV T/F would
be installed in the 1st instance and the 2nd
susequently, as load grows
2 132 kV S/C line from proposed 220
kV substation Bhuna to 132 kV
substation Jakhal in place of earlierapproved Tohana - Jakhal line
25 1L0468* 369.00 2009-10 REC 350023 Proposed 132 kV S/S Jakhal would be
constructed in the available space in the
existing 33 kV substation Jakhal. Space forone 132 kV bay at 132 kV Jakhal shall be
provided for future expansion/ use.
3 Arya Nagar (Hissar) 1x10/16 132/11 1U0480* 633.00 2009-10 REC 350031
4 Stringing of 2nd. ckt. of Beer (132
kV)-to T-off point (Tower No.45) on
already erected D/C Towers &
Const. of 132 kV line bay at Beer
(132 kV substation)
3 1L0481* 17.00 2009-10 REC 350031
5 132 kV S/C line on D/C towers from
Location No. 45 (T-off point) to 132
KV Arya Nagar S/S with associated
bays at Arya Nagar
20 1L0482* 496.00 2009-10 REC 350031
6 Stringing of 2nd. ckt. f rom Hisar I.A
to Arya Nagar (direct).
38 1L0483* 211.00 2009-10 REC 350031
132 kV bay one number at Hissar
I.A substation.
1B0484* 2009-10 REC 350031
7 Dadri- Jhojjukalan S/C ine with 0.2Sq" ACSR in place of earlier
approved 2nd Ckt. of Dadri-Atela
16 1L0485* 254.00 2009-10 REC 350029
7 b One 132 kV bay at Dadri 1B0486* 86.00 2009-10 REC 350029
7 c Two 132 kV bays at Jhojjukalan 1B0487* 86.00 2009-10 REC 350029 One bay covered in the scheme
Works to be executed with financial assistance from REC
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
35/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
8 132 kV S/C line from 220 kV
Pehowa to 132 kV Malikpur and
connecting it to present 132 kV
Malikpur - Ismailabad line just
beyond Malikpur.
17 1L0493* 270.00 2009-10 REC 350029 I) Vacation of 132 kV bay at 132 kV
Malikpur currently feeding 132 kV
Ismailabad.
II) First few spans of this line will be
constructed with D/C towers to preserve the
right of way for any new 132 kV emanating
from adjacent bay to take care of future load
growth requirement of the area.
9 LILO of Tohana - Dharsul S/C lineat 220 kV substation Bhuna
38 1L0497* 577.00 2009-10 REC 350031
10 LILO of 132 kV Dharsul - Telewara
S/C line at 220 kV substation Bhuna
19 1L0498* 425.00 2009-10 REC 350031 Commissioned on 20.05.09
11 132 kV S/C line from 220 kV
proposed substation Bhuna to 132
kV substation Uklana
25 1L0511* 427.00 2009-10 REC 350031
12 one No. 132 kV bay at 132 kV
substation Uklana for
accommodating Bhuna line
1B0512* 56.00 2009-10 REC 350031
13 LILO of 132 kV Karnal - Indri S/C
line at 220 kV Nilokheri.
20 1L0505* 280.00 2009-10 REC 350030
14 Nagla Megha 2x10/16 132/11 1U0506* 712.00 2009-10 REC 350030 Commissioned with 1st T/F on 10.04.09
& 2nd T/F Commissioned on 24.04.09
15 132 kV Madhuban to Nagla Megha
S/C line.
7 1L0507* 111.00 2009-10 REC 350030 Commissioned on 9.3.09
16 132 kV bay at 132 kV substation
Madhuban for accommodating
Nagla Megha line -1 No
1L0508* 56.00 2009-10 REC 350030 Commissioned on 9.3.09
17 Halluwas (Dadri Road Bhiwani) 10/16 132/11 1N0522* 531.00 2009-10 REC 350028 At 6 acre land given by Gram Panchayat
free of cost.
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
36/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
18 Feeding 132 kV Halluwas from 220
kV substation Dadri by utilising idle
portion of 132 kV S/C Dadri -
Bhiwani line.
1 1L0523* 17.50 2009-10 REC 350028 Earlier work of augmentation of 220 kV
substation Bhiwani with additional 1x10/16
MVA 132/11 kV transformer vide memo No.
R. No. 298 / Ch.151/408/K-35 dated
8.4.2005 be treated as cancelled.
*Refurbishing of 132 kV bay at 220
kV substation Dadri for Halluwas
1B0524* 20.00 2009-10
19 Additional 132 kV S/C line from the
end of existing portion of Dadri-Bhiwani line upto the site of
proposed 132 kV substation
Halluwas with 0.2 Sq" ACSR.
1 1L0525* 16.00 2009-10 REC 350028
20 Bhutan Kalan 2x20/25 132/33 1U0533* 954.00 2009-10 REC 350031 To feed / connected to 33 kV substaions
Bhutan, Bhuna and Bhirdana etc.
1x5 33/11 1N0534* 2009-10 REC 350031
21 132 kV S/C line on D/C towers from
220 kV substation Bhuna to
proposed 132 kV substation Bhutan
Kalan with 0.2 Sq" ACSR
15 1L0535* 372.00 2009-10 REC 350031 For auxiliary load of 220 kV Bhuna
22 1x20/25 132/33 1U0761* 940 2009-10 REC 350035
4 33/11 1U0762* REC 350035
1x20/25 MVA 132/33 kV transformer beingproposed at 132 kV substation Kirmitch
would feed existing 33 kV substation
Kirmitch and any future/ proposed nearby
substation by UHBVN.
23 LILO of 132 kV Sagga Amin line
at 132 kV substation Kirmitch.
48 1L0763* 760 2009-10 REC 350035
Kirmich
(Upgradation from 33 kV level)
With double bus arrangement to provide
connectivity with both 220 kV Nissing and
220 kV Nilokheri matching with
commissioning of 220 kV substation
Nilokheri and shifting of 132 kV substation
Amin on 220 kV substation Nilokheri.
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
37/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
24 132 kV S/C line on D/C tower from
220 kV substation Nilokheri to
proposed 132 kV substation
Kirmitch
18 1L0764* 465 2009-10 REC 350035
25 Seka 2x20/25 132/33 1N0812* 1020.00 2009-10 REC 350035
1x4 33/11 3N0813* 2009-10 REC 350035
26 132 kV S/C line on D/C tower with0.4 sq ACSR from 220 kV
substation Narnaul to proposed 132
kV substation Seka.
10 1L0814* 300.00 2009-10 REC 350035
27 One No. 132 kV bay at 220 kV
substation Narnaul for
accommodating Narnaul Seka
132 kV line
60.00 2009-10 REC 350035
28 132 kV S/C line with 0.2 sqACSR
from 132 kV substation Ateli to 132
kV substation Mundia Khera.
11 1L0815* 210 2009-10 REC 350035
29 132 kV S/C line with 0.2 sqACSR
from proposed 132 kV substation
Seka to 132 kV substation Ateli.
20 1L0816* 380 2009-10 REC 350035
Habri 1x20/25 132/33 1N0822* 930.00 2009-10 REC 350035 Matching with the augmentation of 220 kV
substation Nissing with additional 1x100
MVA 220/132 kV transformer.
1x20/25 MVA 132/33 kV transformer being
proposed at 132 kV substation Habri would
feed load of existing 33 kV substation Habri
(16 MVA) and proposed new 33 kV
substation Deeg (10 MVA)
Creation of two No. 132 kV bays at 132 kV
substation Ateli and one No. bay at 132 kV
substation Mundia Khera for accommodating of Seka Ateli and Ateli -
Mundia Khera 132 kV lines -
2x20/25 MVA 132/33 kV transformer being
proposed at 132 kV substation Seka would
feed 33 kV substations Shobhapur,
Bhungarka and Bhilwara and any future/
proposed nearby substation by DHBVN.
30
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
38/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
1x20/25 132/33 1A0829* 2009-10 REC 350035 To facilitate feeding of proposed new 33 kV
substation Barsana (10 MVA)
31 132 kV S/C line on D/C towers with
0.2 sq ACSR from 132 kV
substation Rasina to proposed 132
kV substation Habri.
12 1L0823* 310.00 2009-10 REC 350035
32 132 kV bays at 132 kV substation
Rasina for accommodating S/C lineon D/C towers from 132 kV
substation Rasina to proposed 132
kV substation Habri.
1B0824* 80.00 2009-10 REC 350035
un
33 Stringing of 3rd 132 kV circuit
between 220 kV substation Bhiwani
and 132 kV substation Jui.
29 1L0783* 171 2009-10 REC 350036
i 132 kV bay at 220 kV Bhiwani - For
connecting to Jui (One No.)
1B0784* 60 2009-10 REC 350036
un
ii 132 kV bay at 132 kV Jui - For
connecting to Bhiwani (One No.)
1B0785* 60 2009-10 REC 350036
un
34 132 kV S/C line from 220 kV
substation Isharwal to 132 kV
substation Jui with 0.2 sq" ACSR.
36 1L0779* 660 2009-10 REC 350033
35 132 kV S/C line 220 kV substation
Isharwal to Miran with 0.2 sq"
ACSR.
12.5 1L0780* 242 2009-10 REC 350033
36 132 kV S/C line 220 kV substation
Isharwal to Tosham with 0.2 sq"
ACSR.
28 1L0781* 517 2009-10 REC 350033
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
39/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
37 132 kV S/C line 220 kV substation
Isharwal to Behal with 0.2 sq"
ACSR.
21 1L0782* 393 2009-10 REC 350033
38 132 kV bays at following
substations:
i 132 kV Jui - For connecting to
Isharwal (One No.)
1B0786* 65 2009-10 REC 350033
ii 132 kV Miran - For connecting to
Isharwal (One No.)
1B0787* 65 2009-10 REC 350033
iii 132 kV Tosham - For connecting to
Isharwal (One No.)
1B0788* 65 2009-10 REC 350033
iv 132 kV Behal - For connecting to
Isharwal (One No.)
1B0789* 65 2009-10 REC 350033
39 Bhusthala 2x20/25 132/33 1N0765* 800 2009-10 REC 350036 At the land being provided by gram
Panchayat free of cost.
2x200 kVA 33/0.4 3N0766* 2009-10 REC 350036 This substation will also cater to the load
demand of Ajrana and surrounding area.
40 132 kV D/C line from 220 kV
substation Durala to 132 kV
substation Bhusthala with 0.4 sq.
inch ACSR
25 1L0767* 375 2009-10 REC 350036
41 132 kV S/C line on D/C towers from
132 kV substation Bhusthala to 132
kV substation Ismailabad with 0.4sq. inch ACSR
12 1L0768* 300 2009-10 REC 350036
42 One no.132 kV bay at 132 kV
substation Ismailabad for
accommodating above line.
1B0769* 60 2009-10 REC 350036
Construction of 33 kV bays (two per
transformer of 132/33 kV rating) as and
when required to meet the load requirement
in the area.
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
40/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
Adhon 2x20/25
2x200 kVA
132/33
33/0.4
1N0770*
3N0771*
800 2009-10 REC 350036 At the land being provided by gram
Panchayat free of cost.
2009-10 REC 350036 This substation will also cater to the load
demand of Jhansa Road Kurukshetra and
44 132 kV S/C line on D/C towers from
220 kV substation Durala to 132 kV
substation Adhon with 0.4 sq. inch
ACSR
3 1L0772* 75 2009-10 REC 350036
45 Lukhi
(Up gradation from 33 kV level)
2x20/25
2x200 kVA
132/33
33/0.4
1U0773*
3U0774*
800 2009-10 REC 350036 This substation will also cater to the load
demand of Lukhi, Jyotisar and surrounding
area.
46 132 kV S/C line on D/C towers from
220 kV substation Durala to 132 kV
substation Lukhi with 0.4 sq. inch
ACSR
9 1L0775* 225 2009-10 REC 350036
47 LILO of 132 kV Pehowa Bhoreline at 132 kV substation Lukhi. 23 1L0776* 345 2009-10 REC 350036
48 Bodhni
(Up gradation from 33 kV level)
2x20/25
2x200 kVA
132/33
33/0.4
1N0777*
3U0811*
800 2009-10 REC 350037
49 LILO of S/C line 220 kV Pehowa
132 kV Ismailabad line at 132 kV
substation Bodhni.
15 1L0778* 225 2009-10 REC 350037
50 Provisison of double bus
arrangement at existing 132 kV
Bahadurgarh facilitating exchange
of power on both 220 kV substation
Narela & 220 kV substation
Bahadurgarh side
1G0473* 35 2009-10 NCRPB
43
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
41/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
51 LILO of 132 kV RohtakDadri line
at 132 kV substation Kalanaur in
place of present T-off arrangement
2 1L0536* 32.00 2009-10 NCRPB
52 Stringing of 2nd ckt of
RohtakMDUSampla 132 kV line
with 0.2 sq. inch ACSR.
21 1L0537* 124.00 2009-10 NCRPB 132 kV bays four numbers i.e. one No. each
at 220 kV substations Rohtak & 132 kV
substations Sampla and two Nos. at 132 kV
substation MDU Rohtak for accommodating
of stringing of 2nd ckt of Rohtak -MDU -Sampla 132 kV line
53 132 kV Sataundi
{Upgradation from 33 kV level}
2X20/25 132/33 1N0845* 1000 2009-10 World Bank At the land offered free of cost by Gram
Panchayat Sataundi adjacent to existing 33
kV substation. Only one 132/33 kV T/F
shall be commissioned in the first instance.
The second T/F shall be added as the load
grows.
The existing 33 kV substation sataundi will
continue to be fed from proposed 132 kVSataundi which will also feed proposed 33
kV substations Bastra and raipur Jattan.
54 LILO of one circuit of Bastra-Jundla
line at proposed 132 kV substation
Sataundi.
12 1L0846* 268.00 2009-10 REC 350065 The route of bastra-Sataundi-Jundla line
shall be selected in such a way that D/C line
from Bastra reaches Sataundi and then
proceeds to Jundla but only one of the
circuits enters Sataundi; the other circuit by
passes. Second circuit can be connected in
future when required.
55 Beholi 2x20/25
2x500 kVA
132/33
33/0.4
1N0958* 1000.00 2010-11 JICA through
REC 350050
HR-IC-DIS-
035-2009-
100844
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
42/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
56 Bega 2x20/25
2x500 kVA
132/33
33/0.4
1N0959* 800.00 2010-11 JICA through
REC 350050
HR-IC-DIS-
035-2009-
100844
57 Naultha 1x20/25
2x500 kVA
132/33
33/0.4
1N0960* 800.00 2010-11 JICA through
REC 350050
HR-IC-DIS-
035-2009-
100844
58 132 kV S/C line on D/C towers with
0.4 Sq. inch ACSR from Samalkha-
Beholi line.
8 1L0962* 280.00 2010-11 JICA through
REC 350054
HR-IC-DIS-
035-2009-
100848
59 132 kV S/C line on D/C towers with
0.2 Sq. inch ACSR from Samalkha-
Naultha line.
16 1L0963* 448.00 2010-11 JICA through
REC 350054
HR-IC-DIS-
035-2009-100848
60 132 kV S/C line on D/C towers with
0.2 Sq. inch ACSR from Samalkha
to Bega.
12 1L0964* 336.00 2010-11 JICA through
REC 350054
HR-IC-DIS-
035-2009-
100848
61 LILO of 132 kV S/C line from 400
kV substation Sewah to 132 kV
substation Israna at 132 kVsubstation Naultha.
4 1L0965* 40.00 2010-11 JICA through
REC 350054
HR-IC-DIS-035-2009-
100848
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
43/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
62 132 kV S/C line on D/C towers with
0.4 Sq. inch ACSR from Beholi to
Chhajpur.
13 1L0966* 455.00 2010-11 JICA through
REC 350054
HR-IC-DIS-
035-2009-
100848
63 LILO of 132 kV S/C Chandoli-
Chhajpur line at 220 kV substation
Chhajpur.
1 1L0968* 17.53 2010-11 Posed to
NCRPB on
05.05.2009
64 132 kV S/C line on D/C tower with0.4 Sq. inch ACSR from 220 kV
substation Chhajpur to 132 kV
substation Sector-29, Panipat.
9.7 1L0969* 331.06 2010-11 Posed toNCRPB on
05.05.2009
65 One no.132 kV bay at 132 kV
substation Sector-29, Panipat for
accommodating line from 220 kV
substation Chhajpur.
1B0970* 55.32 2010-11 Posed to
NCRPB on
05.05.2009
un
66 132 kV Kairu 1x20/25 132/33 1N1037* 800.00 2010-11 World Bank
67 LILO of 132 kV Isharwal-Jui S/C lineat 132 kV substaion Kairu
1L1038* World Bank
68 132 kV Khurana 2x20/25 132/33 1N1043* 1000.00 2009-10 REC 350066 Matching with augmentation of 220 kV
substation Cheeka by providing additional
1x100 MVA 220/132 kV transformer.
2x200 kVA 33/0.4 REC 350066 Initially 1x20/25 MVA 132/33 kV transformer
would be installed at 132 kV substation
Khurana to feed existing 33 kV substation
Siwan gate Kaithal and Kawartan.
2nd 20/25 MVA 132/33 kV transformers
would be installed at 132 kV substation
Khurana matching with creation of new 33
kV substation by UHBVN to be proposed in
the area for which the UHBVN may be
asked to create new 33 kV substations.
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
44/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
69 2 Nos 33 kV bays at 132 kV
subatation Khurana to
accommodate 33 kV lines for
feeding existing 33 kV substations
Siwan gate Kaithal and Kwartan.
3B1044*
3B1045*
75.00 2009-10 Included in the
cost of
subsstation
un
70 LILO of 132 kV Kaithal Sewan line
at 132 kV substation Khurana.
20 1L1046* 350.00 2009-10 REC 350066
71 132 kV S/C line on D/C tower with0.2 sq ACSR from upcoming 132
kV substation Kheri Gulam Ali to
proposed 132 kV substation
Khurana.
10 1L1047* 280.00 2009-10 REC 350066
72 132 kV line bay at 132 kV
substation Kheri Gulam Ali for
accommadating above line.
1B1048* 120.00 2009-10 Included in the
cost of
subsstation
un
73 132 kV Dablain 1x16/20 132/33 1N1078* 800.00 2009-10 REC 350064
74 LILO of 132 kV Narwana Uklana
line at proposed 132 kV substation
Dablain.
2 1L1079* 50.00 2009-10 REC 350064
75 Two numbers 33 kV bays at
proposed 132 kV substation Dablain
to feed existing 33 kV substation
Dhanoda (9 MVA) and the already
approved 33 kV substation Lochab
(8 MVA) from it
3B1080*
3B1081*
50.00 2009-10 REC 350064
un
76 LILO of 132 kV S/C Sirsa - Odhan
line at proposed 400 kV substation
Nuhiyawali.
16 1L1075* 280.00 2009-10 JICA through
REC 350058
HR-IC-DIS-
035-2009-
100852
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
45/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
77 Kheri Gulam Ali 1x20/25
1x200 kVA
132/33
33/0.4
1N0934* 800.00 2009-10 REC 350064 Matching with the commissioning of 3rd 100
MVA 220/132 kV transformer at 220 kV
substation Cheeka to feed existing 33 kV
substation Kheri Gulam Ali.
78 132 kV S/C line on D/C towers with
0.4 sq. inch ACSR from 220 kV
substation Cheeka to the proposed
132 kV substation Kheri Gulam Ali
25 1L0935* 875.00 2009-10 REC 350064 Matching with the commissioning of 3rd 100
MVA 220/132 kV transformer at 220 kV
substation Cheeka.
79 One number 132 kV bay at 220 kV
substation Cheeka for
accommodating Cheeka (220 kV) -
Kheri Gulam Ali, 132 kV S/C line on
D/C towers.
1B0936* 60.00 2009-10 REC 350064
un
80 2nd 20/25 MVA 132/33 kV
transformers proposed at 132 kV
substation Kheri Gulam Ali
1A0937* 200.00 2009-10 REC 350064 Matching with commissioning of proposed
33 kV substation Naagal (Lader Keena),
Serta and Atela/Budha Khera by UHBVN for
which the proposal from UHBVN is still
81 Conversion of existing 132 kV main
and transfer bus into double bus at
132 kV substation Safidon
1G0491* 35.00 2008-09 Yet to be
posed
Work completed and commissioned.
82 To provide Double bus arrangement
at 132 kV substation Jui
1G0492* 35.00 2008-09 Yet to be
posed
83 LILO of 132 kV S/C line between
Gharaunda and Madhuban at 220
kV substation Bastra.
10 1L0840* 175.30 2009-10 REC 350065
84 132 kV D/C line with 0.4 sqACSR
from propopsed 220 kV substation
Bastra to 132 kV substation
Naglamegha.
30 1L0841* 668.00 2009-10 REC 350065
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
46/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
85 Two No. 132 kV bays at 132 kV
substation Naglamegha for Bastra-
Naglamegha line.
1B0842* 110.64 2009-10 REC 350065
86 132 kV D/C line with 0.4 sqACSR
from proposed 220 kV substation
Bastra to 132 kV substation Jundla
via Sataundi.
44 1L0843* 980.00 2009-10 REC 350065
87 Two 132 kV bays at 132 kV
substation Jundla for Bastra-Jundla
line.
1B0844* 110.64 2009-10 REC 350065
un
88 Replacement of conductor between
132 kV substation Rohtak and 132
kV Sec-3, Sonepat Road Rohtak
from existing 0.15 sq ACSR to
maximum current carrying capacity
conductor physically in the same
range and which can be
accommodated on the existing
tower structures without requiring
mid span installation (5.5 km.).
11 1E0749* 55.00 2009-10 Yet to be
posed
89 132 kV S/C line with 0.2 Sq" ACSR
from 132 kV substation Jalmana to
132 kV substation Assandh
14 1L0854* 280.00 2009-10 REC 350042
a) 132 kV bay at 132 kV Jalmana - For
connecting to Assandh (One No.)
1B0855* 80.00 2009-10 REC 350042
un
b) 132 kV bay at 132 kV Assandh - For
connecting to Jalnama (One No.)
1B0856* 80.00 2009-10 REC 350042
un
LIST OF WORKS (66 kV AND ABOVE) 2009-10
8/22/2019 14_List of Works 2009-10
47/170
Sr.
No.
Name of substation or line
section
Line
Length
(Ckt - km)
Transformer
Capacity
(MVA)
Voltage
Ratio
(kV)
Code Tentative
Cost in Rs
lac
Tentative
completion
Schedule
Funds
Arrangements
Remarks
In
Pla
90 Nidana 1x20/25 132/33 1N0860* 953.00 2009-10 REC 350065 With double bus arrangement matching with
the augmentation of 220 kV substation
Nissing with 1x100 MVA 220/132 kV
transformer
1x4 33/11 3N0861* 2009-10 REC 350065 1x20/25 MVA 132/33 kV transformer being
proposed at 132 kV substation Naraina
would feed load of existing 33 kV substation
Taraori (16 MVA) and proposed 4 MVA
33/11 kV transformer at proposed 132 kV
substation Naraina.
91 LILO of existing 132 kV idle line
from 132 kV Karnal to 220 kV
Nissing at proposed 132 kV
substation Nidana
12 1L0862* 211.00 2009-10 REC 350065 4 MVA 33/11 kV transformer is proposed to
be provided for feeding village Naraina as
land is being offered free of cost by local
Panchayat for proposed 132 kV substation.
Therefore, it will ensure an independent
feeder to the concerned village and also to
provide auxiliary supply.
92 One 33 kV bay at 132 kV substationNidana for feeding the existing 33
kV substation Taraori.
3B0863* 25.00 2009-10 Included in thecost of
subsstation
un
93 132 kV S/C line on D/C towers with
0.4 ACSR from 400 kV substation
Kirori (Hisar) to 132 kV substation
Barwala.
20 1L0943* 700.00 2009-10 REC 350039 2nd circuit shall be strung subsequently as
per system requirement
94 Creation of one 132 kV line bay at
132 kV substation Barwala to
receive 132 kV line from proposed400 kV substation Kirori.
1B0944* 60.00 2009-10 REC 350039