44
Technical Services Team Building 15 th September

160915 TS Team Building Session E Heiland

Embed Size (px)

Citation preview

Page 1: 160915 TS Team Building Session E Heiland

Technical Services Team Building 15th September

Page 2: 160915 TS Team Building Session E Heiland

Contents

2

● Team Building Exercises

● Our Mindset and Vision

● What Can We Learn From Myers-Briggs?

● Our Schedule – Focus till EOY

● What do we do well? What can we do better?

Page 3: 160915 TS Team Building Session E Heiland

Team Building Exercises

3

Page 4: 160915 TS Team Building Session E Heiland

● Goals

– Gain experience in exercise in lateral thinking and problem solving

● Procedure

– 9 straws laid out as shown – Move one straw but the sum must still read correctly

Straws

Page 5: 160915 TS Team Building Session E Heiland

● Goals – Highlighting the importance of effective

communication among participants

● Procedure – Resources: Pen and paper

– Teams of 2 people, sitting back to back

– One person describing the picture, the other person

will follow the drawing

– Note: Can outright say what the drawing is, have to use descriptive shapes

Blind Drawing

Page 6: 160915 TS Team Building Session E Heiland

● Goals – Gain experience in exercise in lateral thinking

● Procedure

– How many squares are located inside the heavy lined square?

How Many Squares?

Page 7: 160915 TS Team Building Session E Heiland

● Goals

– Demonstrate the effect of synergy – Look at a problem solving process

● Procedure

– Break the circle in 14 pieces by placing the straws inside the circle

– Do not break or split the straws

Sticks

Page 8: 160915 TS Team Building Session E Heiland

● Goals

– Encourage communication among participants

– Look at a problem solving process

● Procedure

– The court will have 15 excavators lying on it

– Divide the court into 5 sections with each section containing 3 excavators

– You are only allowed to use 3 straight lines to divide the court

Excavator Court

Page 9: 160915 TS Team Building Session E Heiland

Our Mindset and Vision

9

Page 10: 160915 TS Team Building Session E Heiland

Mindset – the Key to Success

10

● Have high energy levels

● Be proactive and

accountable

● Be persistent

● Be proud of your role and

try to be the best in your

job

Page 11: 160915 TS Team Building Session E Heiland

Develop a Growth Mindset

11

● We want to be here

Page 12: 160915 TS Team Building Session E Heiland

Failure is the Most Essential Step to Success

12

● Plan vs. reality

Page 13: 160915 TS Team Building Session E Heiland

Where we are

13

● Where are we currently?

Page 14: 160915 TS Team Building Session E Heiland

Our Vision

14

● Our role as Technical Services is to give the best possible support Production

● Be benchmark TS Department within Peabody Australia

● We lead by example

● We influence others

● We do what we say

● We deliver quality information on time by developing repeatable processes and documentation

● We hold each other to account

● We learn from our mistakes

● We challenge ourselves to improve

● We create a learning environment where people want come to work and have fun as well

Page 15: 160915 TS Team Building Session E Heiland

See the bigger picture

15

● Do what is best for business

and not the individual

– Safety

– Production

– Cost

● We all win and loose together

● Think win - win

● You as an individual do not

need to have all the answers –

get the team involved

Tech Serv Production

Page 16: 160915 TS Team Building Session E Heiland

What Can We Learn From Our Myers-Briggs Results?

16

Page 17: 160915 TS Team Building Session E Heiland

17

Myers- Briggs – Meaning of Letters

Page 18: 160915 TS Team Building Session E Heiland

18

Myers-Briggs – 16 Personality Types

2 Laps, Pistol, Thomas

Deb

Gilly

James

Mark

Page 19: 160915 TS Team Building Session E Heiland

19

Our Team

2 Laps

Pistol

Deb

Gilly

Disco Stu

James

Thomas

Mark

Page 20: 160915 TS Team Building Session E Heiland

20

Our Team

2 Laps, Pistol, Thomas - ISTJ

Page 21: 160915 TS Team Building Session E Heiland

21

Our Team

Deb - ESFJ

Page 22: 160915 TS Team Building Session E Heiland

Our Team

Gilly - ENTJ

22

Page 23: 160915 TS Team Building Session E Heiland

23

Our Team

Disco Stu, Mark - INTJ

Page 24: 160915 TS Team Building Session E Heiland

24

Our Team

James - ENTP

Page 25: 160915 TS Team Building Session E Heiland

Time for a Coffee Break

25

Page 26: 160915 TS Team Building Session E Heiland

Our Schedule – Focus Till EOY

26

Page 27: 160915 TS Team Building Session E Heiland

Mine Planning - Contents

27

● 6wk detail

● Key Mining Dates

● Critical shipping

● Overview to EOY

● Key Challenges

Page 28: 160915 TS Team Building Session E Heiland

MINE PLANNING

28

Page 29: 160915 TS Team Building Session E Heiland

MINE PLANNING

29

Page 30: 160915 TS Team Building Session E Heiland

Weekly Stage Plans

TODAY 15 Sept - 16

• CRITICAL PATH: drilling required behind EX12

• Plan: 1 unit in coal pit. Actual: 2 units (5 and 11)

• EX12 mining down to 180rl to uncover cast 4

• EX11 dropcut from south, opening new access for EX12

• EX20 assisting with EX11 waste, hauling north. • Open drilling bench behind EX12

Page 31: 160915 TS Team Building Session E Heiland

Weekly Stage Plans

Tuesday 20 Sept - 16

• CRITICAL PATH: drilling behind EX12 finishes and blasting on

520-523

• EX12 takes 5m cut, hauling north. Roll over face for dill

access

• EX11 mines dropcut to 215rl from south

• EX05 on coal, EX20 south of the bridge

Page 32: 160915 TS Team Building Session E Heiland

Weekly Stage Plans

Monday 26 Sept - 16

• CRITICAL PATH: EX11 and EX12 mine dropcuts next to

eachother to campaign strip 5/6 blocks 20-23. Haul south.

• EX05 and EX20 finish coal in 509-514

• Drill and blast Cast 3&4 (515-516, 516-517)

Page 33: 160915 TS Team Building Session E Heiland

Weekly Stage Plans

1 Oct - 16

• CRITICAL PATH: EX12 and EX11 are digging dual dropcuts in

to blocks 20-24

• EX05 and EX20 mining coal in 509-515

• Casts 3 & 4 (515-517) have been initiated, dozers begin push

• Drilling 10m bench on the north end to 170RL

Page 34: 160915 TS Team Building Session E Heiland

Weekly Stage Plans

7 Oct - 16

• CRITICAL PATH: EX11 uncovering 520-523 to 180rl for

blasting

• EX20 finishes coal in 514

• Dozer push in casts 3&4

• 10m bench blasted to 170rl, EX12 mining hauling north

• EX05 mines freedig in the north (or 601-607 south of bridge)

Page 35: 160915 TS Team Building Session E Heiland

Weekly Stage Plans

14 Oct - 16

• CRITICAL PATH: S5/6 block 23 blasted to 165RL, and

LOWWALL ACCESS ESTABLISHED

• EX12 continues mining to 170rl, hauling south, then across

new lowwall access

• EX20 and EX05 double-team 515-517

• EX11 uncovers 180RL for Cast 5

Page 36: 160915 TS Team Building Session E Heiland

Weekly Stage Plans

25 Oct - 16

• CRITICAL PATH: Drilling Cast 5 for November coal

• EX20 and EX05 double-team 515-517

• EX12 uses lowwall access to remove northern ramps,

uncovering cast surface 625-628 for December coal

• EX11 mines freedig or south of bridge

Page 37: 160915 TS Team Building Session E Heiland

Monthly Stage Plans

1 Nov - 16

• Cast 5 is initiated, dozers pushing 518-20

• EX05 and EX20 mine freedig at the north to allow for drilling in

the south

• EX11 mines south of the bridge until 616-617 area is blasted

• EX12 mines 10m pass to 170RL to uncover priority cast in

625-627. EX12 access from LOWWALL.

Page 38: 160915 TS Team Building Session E Heiland

Monthly Stage Plans

1 Dec - 16

• EX05 and EX11 uncover G517-520 coal, EX05 and EX20 mine

coal

• EX12 mines waste from lowwall access after cast/doze in strip

6.

• Drilling and blasting in the north end.

Page 39: 160915 TS Team Building Session E Heiland

Monthly Stage Plans

Jan - 17

1 Jan - 17

• EX05 and EX20 mine coal in G625-628 from lowwall

• EX05 mines south of the bridge

• EX12 begins regrading ramps

• EX11 mines blasted material in the north, creating new ramp

systems down to 200 then 180RL.

Page 40: 160915 TS Team Building Session E Heiland

Key Risks to 16wk Plan

Mine Plan

● Mining

– Tight digging areas, numerous dropcuts, and 2 diggers uncovering coal may reduce rates .

– Interactions between drilling and excavating – very tight schedule

– EX12 on critical path for at-risk November coal.

● Drill performance

– Drilling at full capacity through the end of the year. Any delay in drilling will directly affect coal uncovery.

● Trucking

– All excavators (including EX20) are planned to mine at full rate.

– Trucking and haul distances will become critical

● Operational

– Personnel issues may cause delays for operating machines

– High pressure on Maintenance to keep equipment running

40

Page 41: 160915 TS Team Building Session E Heiland

Key Dates

Mine Plan

● 26 Sept – Cast 3 (515-516)

● 26 Sept – EX12 finishes 5m pass 624-628 for drilling

● 26 Sept – EX11 and EX12 dual drop cuts in strip 5 & 6

● 30 Sept – Cast 4 (516-517)

● 14 Oct – Blast 523, create ramp to lowwall

● 25 Oct – EX11 finishes ucovering for 518-520 cast drilling

● 3 Nov – Cast 5 (518-520) CRITICAL NOV COAL

● 6 Nov – 520-523 blast to 165RL

● 8 Nov – EX12 finishes 10m pass 624-628 for drilling cast

● 13 Nov – Strip 6 Cast 1 (624-525)

● 20 Nov – Strip 6 Cast 2 (626-628)

● 22 Nov – Cast 6 (520)

● 26 Nov – Final Strip 5 Cast 7 (521-523)

41

Page 42: 160915 TS Team Building Session E Heiland

Where we want to be

42

● What do we need to do to move our team to the next

stage?

● Our goal is to achieve FY 2016 schedule

● Key risks

1. Interaction of Excavator and Drill and Blast Sequence

2. Truck requirements and maintain dig rates

3. Compliance to sequence

4. 15 day no coal in Nov

Page 43: 160915 TS Team Building Session E Heiland

Summary

43

● Safety is our # 1 priority

● Aim to achieve our FY

targets

● Lead by example and

influence people

● Work together as a

team

Be the

Page 44: 160915 TS Team Building Session E Heiland

44

QUESTIONS