SAP Note
Header Data
Symptom
When you try to post costs to a budget object (internal order, WBS element or others), the systemdisplays an availability control warning or error message. The message states that the assignedvalue exceeds the current budget (or the release).Or:If you post costs to a budget object (internal order, WBS element or others), the system shouldissue a warning or error message. Availability control does not respond as you expect.
It is not clear how the system determined the assigned value displayed in the budget transaction(for example CJ31, KO23).
Other Terms
Budget, assigned, available, tolerance limits, exceeded, release, supplement, reposting, return,original budget, exempt cost element, anticipated, CJ30, CJ31, CJ32, CJ33, CJ34, CJ35, CJ36, CJ37,CJ38, KO22, KO23, KO24, KO25, KO26, KO27, 12KST1A, PS report
Reason and Prerequisites
Availability control compares the current distributable budget (or release) with the assigned value.Due to the complex business background and the individual settings in Customizing, the calculation
of the assigned value may be very difficult to reproduce.
Solution
You can display the assigned value relevant for active availability control in the budgettransactions (for example, CJ31, KO23: Views -> Assigned). (Caution: The assigned value that isdisplayed in the cost reports (for example, 12KST1A) (passive availability control) very often doesnot match the assigned value of the active availability control, because all costs are listed in thecost reports without taking into account the logic of the active availability control, which isdescribed below in more detail. Only the assigned value that is displayed in the budget transactionsis relevant for the active availability control.)
The following explains in more detail the logic used to calculate the assigned value of theavailability control. You must also note the business scenario and the settings in Customizing. Forthe analysis, you can use the programs BPFCTRA0 (Note 196149) for projects and BPFCTRA1 (Note
392730) for orders. R/3 Enterprise allows you to perform the analysis from the budgetingtransactions using Extras > Availability control > Analysis.
1. Internal orders:
l Assigned value is calculated from:
¡ Actual costs and statistical actual costs
¡ Commitment (value types 21, 22), funds reservation (value type 2A), funds precommitment(value type 2B), funds commitment (value type 24)
¡ Debit through settlement on the internal order
¡ Credit through settlement to an object with (actual or potential) budget control (WBSelement, orders, networks and network activities). (Note 159850)
¡ Parked documents (value type 60), as of Release 4.6B
l The following does not contribute to the assigned value:
¡ Actual costs with a cost element that was defined as an exempt cost element in Customizingfor availability control (transaction OPTK).
¡ Credits through settlement to a non-budget controlled object (for example, the cost center).
178837 - Availability control: Incorrect assigned value?
Version 24 Validity: 24.09.2014 - active Language English
Released On 24.09.2014 09:45:36
Release Status Released for Customer
Component CO-OM-OPA-C Budgeting
PS-COS-BUD BudgetPriority Recommendations / Additional Info
Category Consulting
Other Components
8/16/2019 178837 - Availability Control, Incorrect Assigned Value
http://slidepdf.com/reader/full/178837-availability-control-incorrect-assigned-value 2/4
(Note 159850)
¡ Revenues
¡ Plan values
¡ Down payments (exception in statistical auxiliary account assingment to asset underconstruction: Note 50785)
¡ Remark: One part of the SAP documentation suggests that postings are not used in theassigned values if no tolerance limit is defined in Customizing for the availability controlfor the relevant transaction group. However, this is not the case! You can use thetransaction groups to control the activities of the availability control if the budget hasbeen exceeded. However, the update of the assigned value cannot be influenced in this way.
If the displayed assigned value does not correspond to this logic, then the assigned value isprobably incorrect. In this case, it may be helpful to reconstruct the availability control(transaction KO31). If the problem occurs repeatedly or a reconstruction does not help, contact SAPSupport.
2. Projects:
l The assigned value is calculated from:
¡ Actual costs and statistical actual costs on the WBS element in question
¡ Actual costs and statistical actual costs of subordinate WBS elements if these do not have abudget, that is, if they do not have the status 'budgeted'.
¡ Commitment (value types 21, 22), funds reservation (value type 2A), funds precommitment(value type 2B), funds commitment (value type 24) on the WBS element in question
¡ Commitment (value types 21, 22), funds reservation (value type 2A), funds precommitment(value type 2B), funds commitment (value type 24) of subordinate WBS elements if they haveno budget, that is to say if they do not have the status "budgeted"
¡ Residual order plan: Planned costs that exceed the total of actual costs and commitment forassigned networks, network activities or orders. (The plan value "reserves" the budget onthe WBS element. Therefore this budget cannot be consumed by another network, networkactivity, order or WBS element). The residual order plan is calculated depending on theassigned network, network activity or order.Here, the precise logic depends on the status of the assigned network, network activity ororder and on the Customizing settings. (You can find detailed information on this topic inthe Implementation Guide (IMG) "Define Order Value Updating": Project System-> Costs ->Planned costs -> Define Order Value Updating. See also Note 165085). In summary:With the status 'Released', the residual order plan is always included in the assignedvalue. With the status 'Created', this applies only if the 'Assign Funds in Plan' indicatoris set (transaction OPSV) in Customizing for the network type or order type.Exception: The residual order plan of networks or network activities that are used forforecasts (see relevant indicator in the network type, transaction OPSC) is never includedin the assigned value.With the status 'technically complete', 'complete' or 'deletion flag', the residual orderplan is never included in the assigned value.The plan values of assigned networks are not taken into account for valuated project stock.If you set the availability control to validation against annual values, the values plannedat year level are taken into account provided there is no overall plan value.
¡ debit through settlements to the WBS element
¡ Credit through settlement to an object with (actual or potential) budget control (WBSelement, orders, networks and network activities). (Note 159850)
¡ Parked documents (value type 60), as of Release 4.6B
l The following does not contribute to the assigned value:
¡ Actual costs with a cost element that was defined as an exempt cost element in Customizingfor availability control (transaction OPTK).
Remark: If a cost element is assigned to a value category for which the'Suppress' indicator is set in PS Customizing, then the cost element is presumably included in theassigned value of the availability control, but not in PS Customizing. This is because you should beable - within availability control (using exempt cost elements) and within PS Reporting (using valuecategories with the 'Suppress' indicator) - to define cost elements that should be ignoredindependently of one another.For information about this problem, see Note 777859.
¡ Credits through settlement to a non-budget controlled object (for example, the cost center).
(Note 159850)
¡ Credits of assigned production orders through delivery and debits through delivery ofproduction orders.
¡ Revenues
Remark: Depending on whether or not a cost element or revenue element isassigned to a value category in PS Customizing, the value category settings determine whether itconcerns costs or revenues (see Customizing transaction OPI1).
8/16/2019 178837 - Availability Control, Incorrect Assigned Value
http://slidepdf.com/reader/full/178837-availability-control-incorrect-assigned-value 3/4
¡ Plan values on WBS elements
¡ Plan values of attached orders to products of the sales order or project stock
¡ Funds commitment in the sales order or project stock (value type 11)
¡ Down payments (exception in statistical auxiliary account assignment to asset underconstruction: Note 50785)
¡ Remark: One part of the SAP documentation suggests that postings are not used in theassigned values if no tolerance limit is defined in Customizing for the availability controlfor the relevant transaction group. However, this is not the case! You can use thetransaction groups to control the activities of the availability control if the budget has
been exceeded. However, the update of the assigned value cannot be influenced in this way.
If the displayed assigned value does not correspond to this logic, then the assigned value isprobably incorrect. A reconstruction of availability control may be of help to you in this case(transaction CJBN). If the problem occurs repeatedly or a reconstruction does not help, contact SAPSupport.
Other Attributes
Validity
This document is not restricted to a software component or software component version
ReferencesThis document refers to:
SAP Notes
CJ30
CJ31
CJ32
CJ33
CJ34
CJ35
CJ36
CJ37
CJ38
CJBN
KO22
KO23
KO24
KO25
KO26
KO27
KO31
OPTK
1777489 Error from av. check for scheduling of network/maint. order
1424698 Budget overrun despite active availability control
1414563 Different assigned values in availability control/reporting
1118333 Assigned value for goods receipt in valuated project stock
821155 Projects: Value category customizing not taken into account
797046 Prevent GPDS/P entries from contributing to assigned values
793125 GPD: Availability Control with GPD
783161 Availability control check only if assigned value increases
668240 FAQ 2: Hierarchy reports 574187 Budget overrun in spite of error message
551506 FAQ note Overhead Cost Controlling
537416 Drilldown reporting: "Assigned" column in budget report
524498 PS-IS: Excluding network from assigned value
520717 Budget check in EBP
397799 INFORMATION: CO-OM-OPA (Order & Project Accounting)
392730 BPFCTRA1: analysis prgrm active availability control orders
Transaction codes
8/16/2019 178837 - Availability Control, Incorrect Assigned Value
http://slidepdf.com/reader/full/178837-availability-control-incorrect-assigned-value 4/4
This document is referenced by:
SAP Notes (21)
352584 Composite note 'Applicatn-specifc special features'
320470 CJCO, KOCO: Which costs are used for the budget carryforward
319525 BPCARRYF:Analysis program budget carryforward - projects
196149 BPFCTRA0: Analysis program active availabil.control projects
166394 Tolerance limits of active availability control
574187 Budget overrun in spite of error message
551506 FAQ note Overhead Cost Controlling
797046 Prevent GPDS/P entries from contributing to assigned values
793125 GPD: Availability Control with GPD
537416 Drilldown reporting: "Assigned" column in budget report
783161 Availability control check only if assigned value increases
1118333 Assigned value for goods receipt in valuated project stock
668240 FAQ 2: Hierarchy reports
1414563 Different assigned values in availability control/reporting
524498 PS-IS: Excluding network from assigned value
520717 Budget check in EBP
1424698 Budget overrun despite active availability control
1777489 Error from av. check for scheduling of network/maint. order
821155 Projects: Value category customizing not taken into account
320470 CJCO, KOCO: Which costs are used for the budget carryforward
319525 BPCARRYF:Analysis program budget carryforward - projects 352584 Composite note 'Applicatn-specifc special features'
392730 BPFCTRA1: analysis prgrm active availability control orders
397799 INFORMATION: CO-OM-OPA (Order & Project Accounting)
166394 Tolerance limits of active availability control
196149 BPFCTRA0: Analysis program active availabil.control projects