13
28 BUS 150 KV LAWANG 1 400-800 /5 A 154/0.11 KV V3 51 51N 44 25 85 79 A/B LAWANG 2 SUTAMI 1 SUTAMI 2 SENGKALING 1 SENGKALING 2 200-400 /5 A TRAFO 2 MEIDENSHA P = 35 MVA E = 150/70 kV I = 134/289 A X = 10,17 % Vektor = YNyn0 200 Ohm 30 Sec. 96 P51 87 26 63 S51 NP51 Is = 50% P51=4A=160A - TD. 5 (SI) Inst= 14 x Is S51 = 4A=320A - TD. 3 (SI) 200 / 5 A 64 V T 25 V 20 Sec. 600 /1 A TRAFO 1 FUJI P = 50 MVA E = 150/70 kV I = 206/412 A X = 10 % Vektor = YNyn0 200 Ohm 30 Sec. 96 P51 87 26 63 S51 NS51 Is = 30% P51=1A=300A - TD. 0,25 (SI) Inst= ~ S51 = 1A=600A - TD. 0,2 (SI) 67G = 0,2A - TD.0,2 300 / 1 A 64 R 300/1 67G NS51=0,2A=60A - 5 S ( Sek. ) T2 = 10 S ( Pri.) 800 /5 A TRAFO 3 PAUWELS P = 35 MVA E = 150/70 kV I = 134/289 A X = 10,14 % Vektor = YNyn0 200 Ohm 30 Sec. 96 P51 87 26 63 S51 87NP Is = 30% P51=2A=160A - TD. 0,25 (SI) Inst= 14 x Is S51 = 4,25A= 340 A - TD. 0,2 (SI) 400 / 5 A 87NS R 400/5 NS51 BUS 70 KV AUTO PD A B 154 0,11 0,11 V3 V3 V3 SENGGURUH PD 400 /5 A 79 A B 79 400 /5 A PD TUREN B A B 51 1000 / 2000 /5 A 51=5A = 2000A -TD. 0,265 (SI) COUPEL BUS 70 KV 66 0,11 0,11 V3 V3 V3 KV KV 154/0.11 KV V3 51 51N 44 25 85 79 A/B 2000-1000 /5 A 154/0.11 KV V3 51 51N 44 25 85 79 A/B 2000-1000 /5 A 154/0.11 KV V3 51 51N 44 25 85 79 A/B 2000-1000 /5 A 154/0.11 KV V3 51 51N 44 25 85 79 A/B 2000-1000 /5 A 154/0.11 KV V3 51 51N 44 25 85 79 A/B 51=3,75A=750A- TD. 0,35 (SI) 51G=1A=200A - TD. 0,55 (SI) 51S/51H=2,8A=448A - 2Sec 51G/51GH=0,7A=112A- 2Sec 51S/51H=2,8A=448A - 2Sec 51G/51GH=0,7A=112A- 2Sec 2000-1000 /5 A 51=3,75A=750A- TD. 0,35 (SI) 51G=1A=200A - TD. 0,55 (SI) 51=4,5A=900A- TD. 0,15 (SI) 51G=1A=200A - TD. 0,4 (SI) 51=4,5A=900A- TD. 0,15 (SI) 51G=1A=200A - TD. 0,4 (SI) OLR NP51=0,7A=28A-1,5 Sec 51=6A=480A - TD. 0,39 (SI) 67G=0,35A=28A - 1,9 Sec 44S 67G 50G 44S 51 67G 51 B A AUTO PD A B POLEHAN 1 PD 400 /5 A 79 A B 79 400 /5 A PD POLEHAN 2 51=6A=480A - TD. 0,39 (SI) 67G=0,35A=28A - 1,9 Sec 44S 67G 50G 44S 51 67G 51 B A 51=6A=480A - TD. 0,39 (SI) 67G=0,35A=28A - 1,9 Sec 51=6A=480A - TD. 0,39 (SI) 67G=0,35A=28A - 1,9 Sec PAKIS 1 2000-1000 /5 A 154/0.11 KV V3 51 51N 44 25 85 79 A/B 51=9 A=1800A- TD. 0,15 (SI) 51G=1A=200A - TD. 0,4 (SI) A PAKIS 2 2000-1000 /5 A 154/0.11 KV V3 51 51N 44 25 85 79 A/B 51=9 A=1800A- TD. 0,15 (SI) 51G=1A=200A - TD. 0,4 (SI) SISTEM PROTEKSI GI. KEBONAGUNG 1 PT. PLN (PERSERO) P3B REGION JAWA TIMUR DAN BALI UPT MALANG Digambar : JU. Prot Meter & Scadatel Diperiksa : ASMAN OPHAR Disetujui : MANAGER UPT Tanggal : 01 Januari 2006 OLR OLR Trip PLHN 1 & 2 Trip PLHN 1 & 2 Trip PLHN 1 & 2 OLR TRF. IBT 1,2 &3 OLR TRF. IBT 1,2 &3

2 - Single Line Diagram Gi Kebonagung

Embed Size (px)

DESCRIPTION

single line diagram

Citation preview

Page 1: 2 - Single Line Diagram Gi Kebonagung

28

BUS 150 KV

LAWANG 1

400-8

00/5

A

154/0.11 KVV3

51 51N

44

25

85

79

A/B

LAWANG 2 SUTAMI 1 SUTAMI 2 SENGKALING 1 SENGKALING 2

200-4

00/5

A

TRAFO 2 MEIDENSHAP = 35 MVA

E = 150/70 kVI = 134/289 AX = 10,17 %

Vektor = YNyn0

200 Ohm30 Sec.

96

P51

8726

63

S51

NP51

Is = 50%

P51=4A=160A - TD. 5 (SI)Inst= 14 x Is

S51 = 4A=320A - TD. 3 (SI)

200 / 5

A

64 V

T25 V

20 Sec.

600/1

A

TRAFO 1 FUJIP = 50 MVA

E = 150/70 kVI = 206/412 A

X = 10 % Vektor = YNyn0

200 Ohm30 Sec.

96

P51

8726

63

S51

NS51

Is = 30%

P51=1A=300A - TD. 0,25 (SI)Inst= ~

S51 = 1A=600A - TD. 0,2 (SI)67G = 0,2A - TD.0,2

300 / 1

A

64 R

300/1

67G

NS51=0,2A=60A - 5 S ( Sek. ) T2 = 10 S ( Pri.)

800/5 A

TRAFO 3 PAUWELSP = 35 MVA

E = 150/70 kVI = 134/289 AX = 10,14 %

Vektor = YNyn0

200 Ohm30 Sec.

96

P51

8726

63

S51

87NP

Is = 30%

P51=2A=160A - TD. 0,25 (SI)Inst= 14 x Is

S51 = 4,25A= 340 A - TD. 0,2 (SI)

400 / 5

A

87NS R

400/5

NS51

BUS 70 KV

AUTO PD

A B

154 0,11 0,11 V3 V3 V3

SENGGURUH

PD

400/5

A

79

AB

79

400/5

A

PD

TUREN

B

A

B

51

1000 /

2000/5

A

51=5A = 2000A -TD. 0,265 (SI)

COUPEL BUS 70 KV

66 0,11 0,11 V3 V3 V3

KV

KV

154/0.11 KVV3

51 51N

44

25

85

79

A/B

2000-1

000/5

A

154/0.11 KVV3

51 51N

44

25

85

79

A/B

2000-1

000/5

A

154/0.11 KVV3

51 51N

44

25

85

79

A/B

2000-1

000/5

A

154/0.11 KVV3

51 51N

44

25

85

79

A/B

2000-1

000/5

A

154/0.11 KVV3

51 51N

44

25

85

79

A/B

51=3,75A=750A- TD. 0,35 (SI)51G=1A=200A - TD. 0,55 (SI)

51S/51H=2,8A=448A - 2Sec51G/51GH=0,7A=112A- 2Sec

51S/51H=2,8A=448A - 2Sec51G/51GH=0,7A=112A- 2Sec

2000-1

000/5

A

51=3,75A=750A- TD. 0,35 (SI)51G=1A=200A - TD. 0,55 (SI)

51=4,5A=900A- TD. 0,15 (SI)51G=1A=200A - TD. 0,4 (SI)

51=4,5A=900A- TD. 0,15 (SI)51G=1A=200A - TD. 0,4 (SI)

OLR

NP51=0,7A=28A-1,5 Sec

51=6A=480A - TD. 0,39 (SI)67G=0,35A=28A - 1,9 Sec

44S 67G 50G 44S 5167G51

BA

AUTO PD

A B

POLEHAN 1

PD

400/5

A

79

AB

79

400/5

A

PD

POLEHAN 2

51=6A=480A - TD. 0,39 (SI)67G=0,35A=28A - 1,9 Sec

44S 67G 50G 44S 5167G51

BA

51=6A=480A - TD. 0,39 (SI)67G=0,35A=28A - 1,9 Sec

51=6A=480A - TD. 0,39 (SI)67G=0,35A=28A - 1,9 Sec

PAKIS 1

2000-1

000/5

A

154/0.11 KVV3

51 51N

44

25

85

79

A/B

51=9 A=1800A- TD. 0,15 (SI)51G=1A=200A - TD. 0,4 (SI)

A

PAKIS 2

2000-1

000/5

A

154/0.11 KVV3

51 51N

44

25

85

79

A/B

51=9 A=1800A- TD. 0,15 (SI)51G=1A=200A - TD. 0,4 (SI)

SISTEM PROTEKSI GI. KEBONAGUNG 1

PT. PLN (PERSERO) P3BREGION JAWA TIMUR DAN BALIUPT MALANG

Digambar : JU. Prot Meter & Scadatel

Diperiksa : ASMAN OPHAR

Disetujui : MANAGER UPT

Tanggal : 01 Januari 2006

OLROLR

Trip PLHN 1 & 2 Trip PLHN 1 & 2

Trip PLHN 1 & 2

OLR TRF. IBT 1,2 &3

OLR TRF. IBT 1,2 &3

Page 2: 2 - Single Line Diagram Gi Kebonagung

BUS 150 KV

A

B

1000-2

000/5

A

500 Ohm25 A

30 Sec.

96

P51

8726

63

S51

50/5 A

NS51

T2

T1

Isu = 0,35x InIsr = 13 x In

P51=3,25A=260A - TD. 0,28 (SI)Inst= 8 x Is = 28 A= 2240 AP51G = 2 A= 160 A - 3 Sec

NS51 = 0,75A =7,5 - TD.0,175(LTI) (PRI) (T1)T2= T1+3 Sec (Sek)

S51 = 5A = 2000 A - TD. 0,175 (SI)Inst = 4xIs= 20 A = 8000A - T>> = 0,4 Sec

400 / 5

A 51G

TRAFO 4 UNINDOP = 60 MVA

E = 150/20 kVI = 230,9/1732 A

X = 12,39 % Vektor = YNyn0

BUS 20 kV

KLAYATAN

51 67G

40

0/5

A4

00

/5A

79

51 = 4 A - TD. 0,05

67G = 2A - 20 V

22000 / 110 / 110 VOLT V3 V3 3

GADANG

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

PAKISAJI

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

F4

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

F54

00

/5A

40

0/5

ASA

ME W

ITH

LE

FT

F6

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

F7

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

F8

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

KOPEL

10

00

- 2

00

0/5

A

51

51 = 4 A - TD. 0,1

64V

10V-1S

22000 / 110 / 110 VOLT V3 V3 3

F84

JANTI KOL.SUGIONO

51 67G40

0/5

A4

00

/5A

79

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

51 = 4A - TD.0,5

67G = 2A - 10V

BUS 20 Kv MEIDENSHA

KOPEL KE CUBICLE GOLD STAR TRF. V

12

00

/5A

ALARM

BUMIAYU

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

SPARE

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

WAGIR

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

SPARE

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

SPARE

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FTSPARE

40

0/5

A4

00

/5AS

AM

E W

ITH

LE

FT

BUS 20 Kv INOUE

BUS 150 KV

1000 - 2000 /5 A

51 = 5A=1000A - TD.0,75(D4) 51G=5A=1000A-TD.0,75(D4)

51

SISTEM PROTEKSI GI. KEBONAGUNG 2

PT. PLN (PERSERO) P3BREGION JAWA TIMUR DAN BALIUPT MALANG

Digambar : JU. Prot Meter & Scadatel

Diperiksa : ASMAN OPHAR

Disetujui : MANAGER UPT

Tanggal : 01 Januari 2006

Page 3: 2 - Single Line Diagram Gi Kebonagung

BUS 150 KV

A

B

64V

Alarm

10V-1S

BUS 20 Kv GOLD STAR

22000 / 110 / 110 VOLT V3 V3 3

1000-2

000/5

A

TRAFO 5 TELKP = 30 MVA

E = 150/20 kVI = 115,4/866 A

X = 12,35 % Vektor = YNyn0(D)

500 Ohm28 A

30 Sec.

300/5 A

96

P51

8726

63

S51

NP51

50/5 A

NS51

T2

T1

Is = 30% = 1,5A

P51=3,25A=130A - TD. 0,3 (SI)Inst= 9 x Is= 29,25A = 1170 A

NP51 = 0,75A =45A - TD. 0,625 (D8)

NS51 = 0,75A =7,5 A - TD.0,175 (LTI) (T1=Sek)T2 = T1 + 3 Sec ( Primer)

S51 = 2,5A=1000A - TD. 0,175 (SI)Inst = 4xIs= 10A = 4000A - T>>= 0,3 Sec

200-4

00/5

A

F84

SITIREJO

40

0/5

A2

00

/5ASA

ME W

ITH

LE

FT

KARANGDUREN

51 67G40

0/5

A2

00

/5A

79

51 = 4 A - TD. 0,075

67G = 2A - +300 - 1 S

40

0/5

A2

00

/5ASA

ME W

ITH

LE

FT

12

00

/5A

34/43

25/43

MATOS BUS SECTION F4

51 67G40

0/5

A2

00

/5A

79

51 = 4 A - TD. 0,075

67G = 2A - +300 - 1 S

40

0/5

A2

00

/5ASA

ME W

ITH

LE

FT

F5

40

0/5

A2

00

/5ASA

ME W

ITH

LE

FT

F6

12

00

/5A

BUS SECTION

KOPEL KECUB. MG TRF.4

2000 A

2500 A

200-4

00/ 1

A

1 / 1 A

SC 150 KV - 25 MVAR

46

51

27/59

Auto PD A/B

51>=0,58=116 A - TD.0,925 (SI)51>>=6,7A= 1340A - T= 200 mSec51G>=0,1A=40 A - TD. 1,3 (SI)51< = 0,1A=40A - T = 200 mSec

27 (V<) = 96,5V=135,1 kV - T = 1 Sec ( Close)27 (V<<) = 60V=84 kV - T = 10 mSec ( Block Close)59 (V>) = 112,5V=157,5 kV - T = 1 Sec ( Trip)

46(Unbalance ry.= 20%In=0,2 A - T= 5 Sec ( Alarm)46 = 40% = 0,4 A - T = 100 mSec (Trip)

SISTEM PROTEKSI GI. KEBONAGUNG 3

PT. PLN (PERSERO) P3BREGION JAWA TIMUR DAN BALIUPT MALANG

Digambar : JU. Prot Meter & Scadatel

Diperiksa : ASMAN OPHAR

Disetujui : MANAGER UPT

Tanggal : 01 Januari 2006

Page 4: 2 - Single Line Diagram Gi Kebonagung

Digambar : JU. Prot Meter & Scadatel

Diperiksa : ASMAN OPHAR

Disetujui : MANAGER UPT

Tanggal : 01 Januari 2006

Page 5: 2 - Single Line Diagram Gi Kebonagung

SENGKALING 2

800 A 800 A

BUS 70 KV

LAWANG 2

800 A

10 KA

800/400 A

154/0.11V3

2500 A

LAWANG 1

800 A

10 KA

800 A

800- 400/ 5 A

154/0.11V3

2500 A

SENGKALING 1

800 A

10 KA

1000/500 A

154/0.11V3

3150 A

10 KA

1000/500 A

800 A

2000 A

154/0.11V3

3150 A

154/0.11V3

800 A

400/5 A

SENGGURUH

10 KA66 / 0,11 KVV3 V3

800 A

2500 MVA

400/5 A

10 KA

600 A

800 A

400/5 A

POLEHAN 1

800 A 10 KA

800 A

400/5 A

POLEHAN 2

800 A10 KA

20 KA

2000/1000 A

2000 A

70 KVA

B

PAKIS 2 PAKIS 1

800 A

10 KA

2000 A

2000/1000 A

2000 A

800 A

10 KA

2000 A

2000/1000 A

154/0.11V3

2000 A

2000/1000 A

2000 A

2000 ABus A

Bus B

66.000 / 110 / 110 volt V3 V3 3

SUTAMI 2

800 A

1250 A

800/400 A

154/0.11V3

2000 A

10 KA

SUTAMI 1

800 A

1250 A

800/400 A

154/0.11V3

2000 A

10 KA

800 A 2000 A

BUS 150 KV

2000 A 2000 A 2000 A 2000 A 2000 A

TRAFO 1 FUJI150/70 kV - 50 MVA

YNyn0 (d5)

TRAFO 2 MEIDENSHA150/70 kV - 35 MVA

YNyn0 (d5)

40 KA

2000 A

300/1 A

600/1 A

1250 A

2000 A800 A

2500 A

2000 A

400/5 A

10 KA

1250 A

2500 A

220 Ohm191 A

30 Sec.

10 KA

800 A

600 A

800 KA

2000 A

200/5 A

800 A 800 A 800 A

2500 A

2000 A

400-200/5 A

10 KA

500 Ohm28 A

30 Sec.

TRAFO 4 UNINDO

150/20 kV - 60 MVAYNyn0 (d5)

100/5 A

1250 A

2000 A

400-200/5 A

10 KA

500 Ohm28 A

30 Sec.

TRAFO 5 TELK

150/20 kV - 30 MVAYNyn0 (d1)

50/5 A

50/5 A

2000 A2000 A

50/5 A

800 A 800 A10 KA

400/1 A

10 KA

10 KA

400/5 A

TRAFO 3 POUWELS150/70 kV - 35 MVA

YNyn0 (d5)

10 KA

TUREN

1500 MVA

800 A

154.000 / 110 / 110 volt V3 V3 3

2000 A 2000 A

66 / 0,11 KVV3 V3

66 / 0,11 KVV3 V3

66 / 0,11 KVV3 V3

2000 A

2500 A

200-400/ 1 A

1 / 1 A

SC 150 KV - 25 MVAR

SINGLE LINE DIAGRAM GI. KEBONAGUNG 1

PT. PLN (PERSERO) P3BREGION JAWA TIMUR DAN BALIUPT MALANG

Digambar : JU. Prot Meter & Scadatel

Diperiksa : ASMAN OPHAR

Disetujui : MANAGER UPT

Tanggal : 01 Januari 2006

Page 6: 2 - Single Line Diagram Gi Kebonagung

A

B

2500 A

1250 A

400-200/5 A

10 KA

500 Ohm28 A

30 Sec.

TRAFO 4 UNINDO

150/20 kV - 60 MVAYNyn0 (d5)

100/5 A

50/5 A

PS

2000A25kA

1000-2000/5A25kA

BUS SECTION

NA2XSY 1x800 mm

1000-2

000/5

A25kA

NA2XSY 1x800 mm

630A

25kA

JAN

TI

KO

L. S

UG

ION

O

BU

MI A

YU

KA

RA

NG

DU

RE

N

WA

GIR

SIT

IRE

JO

BUS 20 kV HYUNDAI

SP

AR

E

KLA

YA

TAN

SP

AR

E

SP

AR

E

22 /

0,1

1 /

0,1

1

kV V

3 V

3 3

PA

KIS

AJI

GA

DA

NG

200/

5A63

0A25

KA

630A

25K

A

630A

25K

A

630A

25K

A

630A

25K

A

630A

25K

A

630A

25K

A

630A

25K

A

BUS 20 kV MERLIN GERIN ( MG )

1250 A

1250 A

400-200/5 A

10 KA

500 Ohm28 A

30 Sec.

TRAFO 5 TELK

150/20 kV - 30 MVAYNyn0 (d1)50/5 A

50/5 A

KOPPEL

200/

5A

630A

25kA

200/

5A

630A

25kA

200/

5A

630A

25kA

200/

5A

630A

25kA

200/

5A

630A

25kA

200/

5A

630A

25kA

200/

5A

BUS 20 kV GOLD STAR 1

BUS 20 kV GOLD STAR 2

630A

25kA

630A

25kA

SP

AR

E

SP

AR

E

KOPPEL

KOPPEL

630A

25kA

1000-2

000/5

A25kA

630A

25kA

22 /

0,1

1 /

0,1

1

kV V

3 V

3 3

200/

5A

200/

5A

200/

5A

200/

5A

200/

5A

200/

5A

SINGLE LINE DIAGRAM GI. KEBONAGUNG 2

PT. PLN (PERSERO) P3BREGION JAWA TIMUR DAN BALIUPT MALANG

Digambar : JU. Prot Meter & Scadatel

Diperiksa : ASMAN OPHAR

Disetujui : MANAGER UPT

Tanggal : 01 Januari 2006

Page 7: 2 - Single Line Diagram Gi Kebonagung

SENGKALING 2

800 A 800 A

BUS 70 KV

LAWANG 2

800 A

10 KA

800/400 A

154/0.11V3

2500 A

LAWANG 1

800 A

10 KA

800 A

800- 400/ 5 A

154/0.11V3

2500 A

SENGKALING 1

800 A

10 KA

1000/500 A

154/0.11V3

3150 A

10 KA

1000/500 A

800 A

2000 A

154/0.11V3

3150 A

154/0.11V3

800 A

400/5 A

SENGGURUH

10 KA66 / 0,11 KVV3 V3

800 A

2500 MVA

400/5 A

10 KA

600 A

800 A

400/5 A

POLEHAN 1

800 A 10 KA

800 A

400/5 A

POLEHAN 2

800 A 10 KA

20 KA

2000/1000 A

2000 A

70 KVBUS A

BUS B

PAKIS 2 PAKIS 1

800 A

10 KA

2000 A

2000/1000 A

2000 A

800 A

10 KA

2000 A

2000/1000 A

154/0.11V3

2000 A

2000/1000 A

2000 A

2000 ABus A

Bus B

66.000 / 110 / 110 volt V3 V3 3

SUTAMI 2

800 A

1250 A

800/400 A

154/0.11V3

2000 A

10 KA

SUTAMI 1

800 A

1250 A

800/400 A

154/0.11V3

2000 A

10 KA

800 A 2000 A

BUS 150 KV

2000 A 2000 A 2000 A 2000 A 2000 A

TRAFO 1 FUJI150/70 kV - 50 MVA

YNyn0 (d5)

TRAFO 2 MEIDENSHA150/70 kV - 35 MVA

YNyn0 (d5)

40 KA

2000 A

300/1 A

600/1 A

1250 A

2000 A800 A

2500 A

2000 A

400/5 A

10 KA

1250 A

2500 A

220 Ohm191 A

30 Sec.

10 KA

800 A

600 A

800 KA

2000 A

200/5 A

800 A 800 A 800 A

2500 A

2000 A

400-200/5 A

10 KA

500 Ohm28 A

30 Sec.

TRAFO 4 UNINDO

150/20 kV - 60 MVAYNyn0 (d5)

100/5 A

1250 A

2000 A

400-200/5 A

10 KA

500 Ohm28 A

30 Sec.

TRAFO 5 TELK

150/20 kV - 30 MVAYNyn0 (d1)

50/5 A

50/5 A

2000 A2000 A

50/5 A

800 A 800 A10 KA

400/1 A

10 KA

10 KA

400/5 A

TRAFO 3 POUWELS150/70 kV - 35 MVA

YNyn0 (d5)

10 KA

TUREN

1500 MVA

800 A

154.000 / 110 / 110 volt V3 V3 3

2000 A2000 A

66 / 0,11 KVV3 V3

66 / 0,11 KVV3 V3

66 / 0,11 KVV3 V3

2000 A

2500 A

200-400/ 1 A

1 / 1 A

SC 150 KV - 25 MVAR

SINGLE LINE DIAGRAM GI. KEBONAGUNG 1

PT. PLN (PERSERO) P3BREGION JAWA TIMUR DAN BALIUPT MALANG

Digambar : JU. Prot Meter & Scadatel

Diperiksa : ASMAN OPHAR

Disetujui : MANAGER UPT

Tanggal : 01 Januari 2006

Page 8: 2 - Single Line Diagram Gi Kebonagung

SENGKALING 2

800 A 800 A

BUS 70 KV

LAWANG 2

800 A

10 KA

800/400 A

154/0.11V3

2500 A

LAWANG 1

800 A

10 KA

800 A

800- 400/ 5 A

154/0.11V3

2500 A

SENGKALING 1

800 A

10 KA

1000/500 A

154/0.11V3

3150 A

10 KA

1000/500 A

800 A

2000 A

154/0.11V3

3150 A

154/0.11V3

800 A

400/5 A

SENGGURUH

10 KA66 / 0,11 KVV3 V3

800 A

2500 MVA

400/5 A

10 KA

600 A

800 A

400/5 A

POLEHAN 1

800 A10 KA

800 A

400/5 A

POLEHAN 2

800 A10 KA

20 KA

2000/1000 A

2000 A

70 KVBUS A

BUS B

PAKIS 2 PAKIS 1

800 A

10 KA

2000 A

2000/1000 A

2000 A

800 A

10 KA

2000 A

2000/1000 A

154/0.11V3

2000 A

2000/1000 A

2000 A

2000 ABus A

Bus B

66.000 / 110 / 110 volt V3 V3 3

SUTAMI 2

800 A

1250 A

800/400 A

154/0.11V3

2000 A

10 KA

SUTAMI 1

800 A

1250 A

800/400 A

154/0.11V3

2000 A

10 KA

800 A 2000 A

BUS 150 KV

2000 A 2000 A 2000 A 2000 A 2000 A

TRAFO 1 FUJI150/70 kV - 50 MVA

YNyn0 (d5)

TRAFO 2 MEIDENSHA150/70 kV - 35 MVA

YNyn0 (d5)

40 KA

2000 A

300/1 A

600/1 A

1250 A

2000 A800 A

2500 A

2000 A

400/5 A

10 KA

1250 A

2500 A

220 Ohm191 A

30 Sec.

10 KA

800 A

600 A

800 KA

2000 A

200/5 A

800 A800 A 800 A

2500 A

2000 A

400-200/5 A

10 KA

500 Ohm28 A

30 Sec.

TRAFO 4 UNINDO

150/20 kV - 60 MVAYNyn0 (d5)

100/5 A

1250 A

2000 A

400-200/5 A

10 KA

500 Ohm28 A

30 Sec.

TRAFO 5 TELK

150/20 kV - 30 MVAYNyn0 (d1)

50/5 A

50/5 A

2000 A2000 A

50/5 A

800 A 800 A10 KA

400/1 A

10 KA

10 KA

400/5 A

TRAFO 3 POUWELS150/70 kV - 35 MVA

YNyn0 (d5)

10 KA

TUREN

1500 MVA

800 A

154.000 / 110 / 110 volt V3 V3 3

2000 A 2000 A

66 / 0,11 KVV3 V3

66 / 0,11 KVV3 V3

66 / 0,11 KVV3 V3

2000 A

2500 A

200-400/ 1 A

1 / 1 A

SC 150 KV - 25 MVAR

SINGLE LINE DIAGRAM GI. KEBONAGUNG 1

PT. PLN (PERSERO) P3BREGION JAWA TIMUR DAN BALIUPT MALANG

Digambar : JU. Prot Meter & Scadatel

Diperiksa : ASMAN OPHAR

Disetujui : MANAGER UPT

Tanggal : 01 Januari 2006