2007 Education K-12

Embed Size (px)

Citation preview

  • 8/15/2019 2007 Education K-12

    1/6

    Education K-12

    Academic Middle School San Francisco, CaliforniaThis is a two-story, 68,000 square foot building with a separatebuilding as Multi-Purpose Area. Designed new energymanagement system for the entire school and has control atapproximately 100 points. Two steam boilers and theheating/ventilation unit serving multi-purpose area had to bereplaced with new ones to be controlled via Energy ManagementSystem.

    Alice Fong Yu Alternative Middle School San Francisco, CaliforniaAlice Fong Yu is the first public Chinese language immersion

    school in the country. Winner of Award of Excellence in the NewBuilt Category of the 2002 C.A.S.H. /AIACC Leroy F. Green DesignAwards Program. NBA provided mechanical and electricalengineering services to meet fire, safety, and ADA requirements.

    Bret Harte Elementary School San Francisco, CaliforniaBret Harte was constructed in 1954 and had major renovation in1969. It is 79,000 square feet and is in the Bayview Hunters PointDistrict. Prop 39 bond money is financing major mechanical,

    electrical and plumbing and fire protection upgrades. It is beingdesigned under CHPS guidelines.

    Buena Vista Elementary School San Francisco, California This is a two story 32,500 square foot building. Providedconstruction documents for new lighting fixtures in corridors,classrooms, multipurpose room, staff lunch room, offices, restrooms, computer networking, and security system. Replacedcirculating pump and outside air thermostat. Provided new energymanagement control panel, remodeled two toilet rooms, andreplaced toilet exhaust fans and existing water fountains.

    897 Hyde Street 2nd Floor San Francisco, California 94109Telephone (415) 202 9840 Facsimile (415) 202 9838

    www.nbaeng.com

  • 8/15/2019 2007 Education K-12

    2/6

    Education K-12

    Cobb Elementary School San Francisco, California

    Part of Phase II of San Francisco Unified School District SchoolBuilding Improvements. Replaced plumbing fixtures on secondfloor boys' and girls' toilet rooms to comply with ADA requirementsand changed flushing arrangements for urinals from automatic(using timer) to manual

    Daniel Webster Elementary School San Francisco, CaliforniaThis is a 42,800 SF building that was built in 1936. Designedemergency lighting and exit signage. Surveyed building, providedcost estimates (unit prices) for florescent lamps, ballasts andlenses. Provided HID fixtures in auditorium. Added additional

    receptacles in teachers room and exhaust fans for the computerrooms.

    Douglas High School San Francisco, CaliforniaThis is a two story 22,000 square foot building. Project was OLAfunded project consisted of renovation and code upgrade ofheating, plumbing, and life safety systems. Also improvementswere made to meet ADA requirements and other energy savingdesigns were also implemented.

    Edison Elementary School San Francisco, CaliforniaThis is a three-story 59,200 square foot building. NBA designednew fire alarm system including horns and strobes (ADArequirements). Also provided electrical power, cabling and panelsfor additional outlets serving computers and printers in allclassrooms. Also provided infrastructure for future computernetworking.

    El Dorado Elementary School San Francisco, CaliforniaProvided design and construction documents for demolition of

    plumbing fixtures, including water closets, urinals, lavatories, andclassroom sinks. The new work includes installation of fixtures in 4different bathrooms and classroom sinks with drinking fountainbubbles in six different classrooms.

    897 Hyde Street 2nd Floor San Francisco, California 94109Telephone (415) 202 9840 Facsimile (415) 202 9838

    www.nbaeng.com

  • 8/15/2019 2007 Education K-12

    3/6

    Education K-12

    Fremont Unified School District Fremont, California

    Provided electrical power plan for modification and addition ofelectrical outlets, smoke detectors, and telephone conduits.Modified the lighting layout, performed Title 24 energycalculations. Also provided construction administration, reviewedshop drawings, and responded to RFIs.

    George Washington High School San Francisco, CaliforniaPerformed a walk-through and generated a report on the HVAC andplumbing needs of the school for Phase II of the San FranciscoUnified School District School Building Improvements.

    John O'Connell High School San Francisco, CaliforniaRedesigned complete HVAC plumbing, fire protection, andelectrical systems for five-story 200,000 SF vocational high schooldamaged by 1989 earthquake. The building required manyspecialty HVAC and plumbing systems for different vocationalshops and laboratories.

    Los Arboles Elementary School San Jose, CaliforniaProvided complete mechanical/plumbing engineering services forall phases of the project, including schematic design, designdevelopment, construction documents, bid/award and constructionadministration. Provided Title 24 energy compliance calculationsfor mechanical systems and building envelopes.

    Luther Burbank Middle School San Francisco, CaliforniaProvided plumbing and ventilation repairs to classrooms andbathrooms and renovation to boys and girls bathrooms to complywith ADA requirements. Provided a report and determined the

    scope of work with construction cost estimate.

    897 Hyde Street 2nd Floor San Francisco, California 94109Telephone (415) 202 9840 Facsimile (415) 202 9838

    www.nbaeng.com

  • 8/15/2019 2007 Education K-12

    4/6

    Education K-12

    Malcolm X Elementary School San Francisco, California

    Part of Phase II of San Francisco Unified School District SchoolBuilding Improvements. Designed plumbing system to replace 13plumbing fixtures in different toilet rooms to comply with ADArequirements. Provided new drinking fountains, replaced existingair compressor and ventilation system in teachers' lounge as wellas three toilet rooms.

    Mission Education Center San Francisco, CaliforniaThis project was among Phase II of San Francisco School Districtprojects. Reviewed existing plans for air distribution andrebalanced the entire system. Provided construction documents

    for testing and balancing, control upgrade, replacement of existingair compressor and supply air fans to the building.

    Mission High School San Francisco, CaliforniaFeasibility study that lead to design for modernization, renovationand code upgrade including ADA compliance of mechanical andelectrical systems for 260,000 SF, 5-story building. Projectincluded auditorium, classrooms, and science computerlaboratories. This project was part of the Phase I San FranciscoUnified School District School Building Improvements. Tasksconsisted of replacing the central plant steam boiler system,

    vacuum pump, sump pump, and all other accessories.

    Santee Elementary School San Jose, CaliforniaModernization work and conversion of library to a faculty room,renovation of kitchen, conversion of the media center back to astage for the multi-purpose room. Upgraded power in all therooms, ventilation for bathrooms and HVAC distributionmodification. Added a janitor closet, new fire alarm and emergencylighting system.

    897 Hyde Street 2nd Floor San Francisco, California 94109Telephone (415) 202 9840 Facsimile (415) 202 9838

    www.nbaeng.com

  • 8/15/2019 2007 Education K-12

    5/6

    Education K-12

    Sand Path Academy Project San Francisco California

    Provided project management, engineering and supervision ofdesign of HVAC, plumbing, fire protection including electricalpower distribution systems for an existing 8,000 SF retail spaceconverted into a school facility for mentally handicapped children.

    The facility design included mechanical and electrical systems fornew classroom, conference, library, restroom, and meeting rooms.

    San Francisco Community Elementary School San Francisco,California

    This project was among phase I of San Francisco School Districtprojects, a 34,000 SF building that was built in 1911. The project

    consisted of redesigning plumbing and ventilation systems for Girlsand Boys bathrooms to comply with ADA and designing fireprotection system for the kitchen hood.

    SFUSD On-Call Construction Management San Francisco,California

    This project consisted of construction management for twenty-sixschools throughout San Francisco. Our tasks included: inspection,constructability review, cost estimate, punch list and close out aswell as other CM work.

    Oakland Unified School District Oakland, CaliforniaDesigned the sanitary waste and domestic water services forportable classrooms at 41 school sites throughout the Oaklandarea. These projects included sink additions, bathroom, ADAcompliance, utility connections and contacting Fire Marshall.Performed site visits and evaluated capacities of existing utilities.

    Roosevelt Middle School San Francisco, California

    This project was among phase I of San Francisco School Districtprojects; a 121, 000 SF building that was built in 1930. Designednew fire alarm system for the entire school, designed under thefloor power for the computer room and conduits for LAN andcontrol/patch panel and reconnecting the equipment in therelocated wood working shop

    897 Hyde Street 2nd Floor San Francisco, California 94109Telephone (415) 202 9840 Facsimile (415) 202 9838

    www.nbaeng.com

  • 8/15/2019 2007 Education K-12

    6/6

    Education K-12

    Sunshine High School San Francisco, CaliforniaRenovation and code upgrading of heating, ventilating, plumbingand fire life safety systems of a two-story, 47,000 SF building.Upgraded handicapped toilets to ADA requirements. Performed anevaluation and needs assessment.

    Thurgood Marshall Academic High School San Francisco, CaliforniaThis is a college prepatory high school constructed in 1957. It is134,000 square feet and averages about 1000 students per year90%of whom graduate. Prop 39 bond money is financing long overdue renovations to electrical, HVAC, and plumbing and fireprotection systems. It is being designed using California HighPerformance Schools guideline and is a DSA project.

    Sutro Elementary School San Francisco, CaliforniaProvided construction documents plumbing on first and secondfloors. Provided new handicap accessible drinking fountains atCommunity Center exterior. Provided additional electrical outletsand new walls in each classroom and computer room. New floormounted electrical outlets were included as well as new outdoor

    security lighting, and repaired heating and ventilating unit controlsystem.

    Winfield Scott Elementary School San Francisco, California This 33,000 SF building was built in 1930. Modified boys/girlsbathrooms to comply with ADA requirements. Replaced sink,water, and gas piping for the stove in the Nutrition Area. Providednew sinks in all childcare rooms and classrooms, water lines anddrains for kitchen area. Provided new accessible drinkingfountains.

    897 Hyde Street 2nd Floor San Francisco, California 94109Telephone (415) 202 9840 Facsimile (415) 202 9838

    www.nbaeng.com