22
2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

Embed Size (px)

Citation preview

Page 1: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

2009 ROADWAY CONFERENCE

1R PROGRAM

Cathy Nelson

Steven Lindland

Page 2: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Technical Bulletin

Page 3: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Program

Pave Only Projects

Striping – Gravel Shoulders –Signal Loops

Page 4: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

Eligible Projects

Preservation Projects

Single Lift Non-Structural

Overlays or Inlay

Page 5: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

Eligible Projects

Grind & Inlay Plus an Overlay

Allowed with a Design Exception

Page 6: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Projects

Can Not Adversely Impact A

Safety Feature

Page 7: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Program

FHWA Preventative

Maintenance Program

Page 8: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

Statewide Traffic Barrier Inventory

Completed 2008

Page 9: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

Statewide Traffic Barrier Inventory

Page 10: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

230 Transition

Page 11: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland
Page 12: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Safety Fund

$6 million per year for Traffic Barriers

Page 13: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Safety Fund

Upgrade Substandard Traffic Barriers

Using a Statewide Strategic Process

Page 14: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

High Priority Barrier Features1 - Un-connected Transitions2 - Pre 230 Terminals3 - Pre 230 Transitions4 - Tongue & Groove Concrete Barrier5 - Pre 230 Type 1 and 1A Guardrail6 - Pre 230 Type 2 Guardrail7 - Pre 230 Impact Attenuators8 - Rebar Pin & Loop Concrete Barrier9 - 4 Loop Pin & Loop Concrete Barrier10 - 230 Transitions11 - 230 Impact Attenuators

Page 15: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

Cost to Upgrade High Priority FeaturesHIGH PRIORITY FEATURE NUMBER COST

UN-CONNECTED TRANSITIONS Included in Pre-230 Terminals

PRE-230 TERMINALS 11,100 units $45,000,000

PRE-230 TRANSITIONS 1,000 units $ 6,000,000

T&G CONCRETE BARRIER 7 miles $ 3,000,000

PRE-230 Type 1 GUARDRAIL 140 miles $19,000,000

PRE-230 Type 2 GUARDRAIL Included in Pre-230 Type 1

PRE-230 IMPACT ATTENUATORS 60 units $ 3,000,000

TOTAL $76,000,000

Page 16: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Roadside Inventory ROADWAY TYPICAL SECTIONS DESIGN CONSIDERATIONS (ADT – Speed) STRUCTURES SIGNS GUARDRAIL DRAINAGE FACILITIES PEDESTRIAN & BICYCLE FACILITIES SPECIAL PROBLEMS (Clear Zone Safety

Hazards)

Page 17: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Projects

Vertical Clearance Standard

Traffic Mobility Standards

Still Apply

Page 18: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

Approval of Applying 1R Standard

Region

Pavement Services Unit

FHWA

Page 19: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Program Benefits

Helps to Meet Pavement

Condition Targets

Page 20: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Program Benefits

Shorter Project Delivery Timeline

Page 21: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Program Benefits

Established a New Program to

Upgrade Substandard Traffic Barriers

Page 22: 2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

Questions