2011 NCHRP Bridge and

Structure Research

Update

Waseem Dekelbab

2011 AASHTO SCOBS Annual Meeting

Norfolk, VAMay 15-19, 2011

Page 2: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Outline

NCHRP Program Cycle

FY2012 NCHRP Program Funding

NCHRP Bridge and Structure Projects

– Funded (FY2012)

– Awarded (FY2011)

– Completed/Published

– In progress

NCHRP Products Developed for AASHTO SCOBS

Page 3: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Submittal Evaluation Program

Formulation

Program Approval

Panel Formulation

Proposal Process

Agency Selection

Project Surveillance

NCHRP Program Cycle

Page 4: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Submittal & Evaluation

• NCHRP solicits problem statements from authorized sources: DOTs, AASHTO Committees/Subcommittees, and FHWA (July-September)

• FHWA and NCHRP evaluation panels and staff evaluate problem statements

• SCOR and RAC rate the candidates in a mail ballot to set priority for the SCOR meeting in March

• NCHRP sends a summary report to the SCOR

NCHRP Program Cycle

Page 5: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Formulation & Approval

• SCOR meets to formulate the NCHRP Program (late March)

• FHWA approves of conformance with Federal-aid requirements

• SCOR sends a report to the AASHTO Board of Directors requesting approval of the projects

• AASHTO refers program to the NAS for administration

• NAS reviews for acceptance

NCHRP Program Cycle

Page 6: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Execution

• NCHRP solicits panel nominations (May-June)

• NCHRP appoints panel members

• Panel prepares RFP (July-September)

• NCHRP solicits proposals

• Panel reviews the proposals and makes recommendation for award of contract

• NCHRP negotiates and executes a contract

• NCHRP administers the project

NCHRP Program Cycle

Page 7: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2012 NCHRP Program Funding

Page 8: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2012 NCHRP Program Funding

$31,470,000

Continuation

New

18 Projects

46 Projects

$11,390,000

$20,080,000

Page 9: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2012 NCHRP Program

Continuation Projects

Continuations

18 Projects

$11,390,000

12 Special projects

$9,550,000

(84%)

Research for AASHTO SCO: Planning, Highway, Public

Transportation, and Environment

Synthesis, Legal Studies, IDEA, Domestic and International

Scan, and NCHRP Program Implementation

Surface Transportation Security Research

Research for Administration of HW&T Agencies (CEOs)

6 Continuation projects

$1,840,000

(16%)

Page 10: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2012 NCHRP New Projects

New

46 projects

$20,080,000

Other areas

37

$15,280,000

(76%)

Bridges & Structures

9

$4,800,000

(24%)

Page 11: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2012 NCHRP Bridge and

Structure Funded Projects

Page 12: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2012 NCHRP Bridge and Structure

Funded Projects (HSCOBS)

Project Title Funds

12-91Strand Debonding Guidelines for

Pretensioned Girders$750k

14-26 Culvert and Storm Drain Inspection Manual $500k

14-27Guidelines for a Comprehensive Preventive

Maintenance Plan for Tunnel Owners and

Operators$450k

14-28Improved Corrosion Inspection Techniques

for Ducted Strands for Cable Stayed and

Post-Tensioned Concrete Bridges$750k

24-38Bridge Foundation Settlement Criteria for

Design $450k

Page 13: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2012 NCHRP Bridge and Structure

Funded Projects

Project Title Funds

12-90Guidelines for Design and Shielding of

Bridge Piers$500K

24-36Scour at the Base of Retaining Walls

and Other Longitudinal Structures$500K

24-37Combining Individual Scour

Components to Determine Total Scour$600K

25-42Bridge Runoff Treatment Analysis and

Treatment Options$300K

Page 14: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2012 NCHRP Bridge and Structure

Funded Projects (HSCOBS)

Project Title Funds

20-07/

Task 316

Establishment of Appropriate Guidelines

for Use of the Direct and Indirect Design

Methods for Reinforced Concrete Pipe.

$100K

Page 15: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2011 NCHRP Bridge and

Structure Awarded Projects

Page 16: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

FY2011 NCHRP Bridge and Structure

Awarded Projects

Project Title Agency

12-87

Development of System Fracture

Analysis Methods for Fracture

Critical Steel Bridges

Virginia

Polytechnic

Institute

12-89Development of New AASHTO LRFD

Tunnel Design SpecificationsContract

pending

14-23

Quantify the Information Necessary

to Guide Bridge Preservation

Decisions

Selection

pending

18-16Self-Consolidating Concrete for Cast-

in-Place Bridge ComponentsContract

pending

Page 17: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Project Title Agency

Task

294

Continuation of Funding of 20-07 Task

245 - Update Bridge Temporary WorksWJE

Task

306

Revision of Strut-and-Tie Provisions in

the AASHTO LRFD Bridge Design

Specifications

Denis

Mitchell

Task

307

Updated Research for Collision

Damage and Repair of Prestessed

Concrete Beams

Contract

pending

FY2011 NCHRP Bridge and Structure

Awarded Projects(20-07)

Page 18: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure

Projects Completed/Published

Page 19: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure Projects

Published (2010)

Project Title Publication

12-72Blast-Resistant Highway Bridges:

Design and Detailing GuidelinesReport 645

15-29Design Specifications for Live Load

Distribution to Buried StructuresReport 647

24-31LRFD Design Specifications for

Shallow FoundationsReport 651

24-26Effects of Debris on Bridge Pier

ScourReport 653

Page 20: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure Projects

Published (2010)

Project Title Publication

18-14

Evaluation and Repair Procedures

for Precast/Prestressed Concrete

Girders with Longitudinal Cracking in

the Web

Report 654

10-73

Guide Specification for the Design of

Externally Bonded FRP Systems for

Repair and Strengthening of

Concrete Bridge Elements

Report 655

14-15

Developing a National Database

System for Maintenance Actions on

Highway Bridges

Report 668

Page 21: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure Projects

Completed/Published (2010/2011)

Project Title Publication

12-75

Design of FRP Systems for

Strengthening Concrete Girders in

Shear

Report 678

12-77Structural Design with High-

Strength ReinforcementReport 679

12-74Development of a Precast Bent Cap

System for Seismic RegionsReport 681

12-76

12-

76(01)

Protocols for Collecting and Using

Traffic Data in Bridge DesignReport 683

Page 22: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure Projects

Completed/Published (2011)

Project Title Publication

10-71Cast-in-Place Concrete Connections

for Precast Deck Systems

Web-Only

Document 173

10-70

Cost-Effective Connection Details for

Highway Sign, Luminaire, and Traffic

Signal Structures

To be available

as Web-Only

Document 176

12-88

Application of Accelerated Bridge

Construction Connections in

Moderate-to-High Seismic Regions

To be published

as Report 698

12-78A Comparison of AASHTO Bridge

Load Rating Methods

To be published

as Report 700

Page 23: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure Projects

Completed (2010)

Task Title

20-07/

Task 270

Application of AASHTO LRFD Specifications

to Design of Sound Barriers

20-07/

Task 276

Development of Guidelines for Rehabilitation

of Existing highway and Rail Transit Tunnels

20-

24(37)E

Measuring Performance Among State DOTs -

Bridge Conditions

Page 24: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure

Projects in Progress

Page 25: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure Projects in

Progress

Project Title

10-74Development of Fatigue Loading and Design

Methodology for High-Mast Lighting Poles (Nov. 2011)

10-80New Specifications for Structural Supports for Highway

Signs, Luminaires, and Traffic Signals (Nov. 2012)

12-79Guidelines for Analysis and Construction Engineering of

Curved and Skewed Steel Girder Bridges (Dec. 2011)

12-81Evaluation of Fatigue on the Serviceability of Highway

Bridges (Oct. 2011)

Page 26: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure Projects in

Progress

Project Title

12-82Developing Reliability-Based Bridge Inspection

Practices (Aug. 2011)

12-83Calibration of LRFD Concrete Bridge Design

Specifications for Serviceability (Apr. 2011)

12-84Guidelines for the Design and Rating of

Gusset Plate Connections (Dec. 2011)

12-85Roadway Bridges Fire Hazard Assessment

(Jun. 2012)

Page 27: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Bridge and Structure Projects in

Progress

Project Title

12-86 Bridge System Reliability for Redundancy (Jul. 2012)

12-87Development of System Fracture Analysis Methods

for Fracture Critical Steel Bridges (Jan. 2014)

15-38 Design Requirements for Culvert Joints (Nov. 2011)

24-34Risk-Based Approach for Bridge Scour Prediction (Oct. 2012)

Page 28: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP 20-07 Bridge and Structure

Projects in Progress

Task Title

262Review and Update of the AASHTO Guide

Specifications for Seismic Isolation Design (Jun. 2011)

285Recalibration of the LRFR Load Factors in the

AASHTO Manual for Bridge Evaluation (Jun. 2011)

294Continuation of Funding of 20-07 Task 245 - Update

Bridge Temporary Works (Feb. 2012)

306 Revision of Strut-and-Tie Provisions in the AASHTO

LRFD Bridge Design Specifications (Oct. 2011)

Page 29: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Summary Status of NCHRP Bridge and

Structure Projects

0

2

4

6

8

10

12

14

16

18

In progress In publication In development Contract pending

Page 30: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

NCHRP Products Developed for

AASHTO SCOBS

Page 31: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

02468

101214161820222426

10Specifications, Procedures

and Practices

12Bridges

14 Maintenance of

Way and Structures

18 Concrete Materials

20-07 Research for

AASHTO SCO on Highways

24 Mechanics and

Foundations

Of Interest 2011 Agenda Item Action Required Adopted

NCHRP Products Developed for

AASHTO SCOBS (1978-2011)

Page 32: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Acknowledgements

• Members of AASHTO SCOBS and its Technical Committees

• FHWA

• NCHRP Panel Members

• Research Teams

Page 33: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07

Research Project Products

Page 34: 2011 NCHRP Bridge and Structure Research Updatesp.bridges.transportation.org/Documents/2011 SCOBS...AASHTO Manual for Bridge Evaluation (Jun. 2011) 294 Continuation of Funding of 20-07