STUDIO JOURNAL WEEK 10 ACITIVITY: ON ‘ SITE’ – OVAL PAVILLION SITE VISIT OVAL PAVILLION Reinforcing steel bars, which are used as a tension to increase the strength of concrete conmmonly, in this case it is retaining wall LBL, the veneer of this type of timber has only got one direction, which is different to MDF, as it is more light and resistant. Steel & Timber frame structure Four load-bearing columns

2013-02 Reflective Jounral

  • Upload
    jessica

  • View
    220

  • Download
    0

Embed Size (px)

DESCRIPTION

week 10 submission Constructing Environment University of Melbounre

Citation preview

Page 1: 2013-02 Reflective Jounral

STUDIO JOURNAL WEEK 10 ACITIVITY: ON ‘ SITE’ – OVAL PAVILLION SITE VISIT

OVAL PAVILLION

Reinforcing steel bars, which

are used as a tension to

increase the strength of

concrete conmmonly, in this

case it is retaining wall

LBL, the veneer of this type of timber has

only got one direction, which is different to

MDF, as it is more light and resistant.

Steel & Timber frame

structure

Four load-bearing columns

 

 

Page 2: 2013-02 Reflective Jounral

STUDIO JOURNAL WEEK 10

The shape of this kind of wood board

is ‘z’ shape, so the nail will be

screwed into under the ‘-‘, so that

when next board follows up the

other part of ‘z’ from the opposite

direction will cover the nailed part

up, hence the nails are hidden.

Scaffolding

Timber studs

Nogging

There is also a fixed bracing

on the other side of the wall,

which window plate goes in

after it is beenfixed

Page 3: 2013-02 Reflective Jounral

STUDIO JOURNAL WEEK 10

Steel lintel ‘Z’ shaped purlin is used for

construction rather than ‘c’ shaped,

as’ z ‘ shaped purlin can cross over by

connecting members from both sides.

However, ’c’ shaped purlin can only

have one side connection.

ROD BRACING

IS USED AS TENSION BRACE TO

REINFORCE THE ROOF, SO IT IS

MORE STABLE.

This kind of brickwork is done by pouring

grout into the hollow section and placing

the reinforcing steel bar into the hollow

section, finality, the whole brick wall will

be built up using cement to stick bricks

altogether.

Page 4: 2013-02 Reflective Jounral

STUDIO JOURNAL WEEK 10

TIMBER STUDS

NOGGING

 

MUNTINS

HEADER TOP RAIL

STILES

BOTTOM RAIL