13
1.SOW For survey,commissioning,ATP,Dismantle,document requirement,follow Huawei re No. Standard SOW Unit Quantity 1 BTS Rack Site 1 or 2 2 Battery Rack Site 1 3 Feeder system Site 1 4 Antenna system Site 1 5 Mounting Bracket Site 1 6 Others Site 1 LOT No. Standard SOW Unit Quantity 1 IDU Hop 1 2 IF Cable Hop 1 3 ODU Hop 1 or 2 4 Antenna Hop 1 5 Others Hop 1 LOT 3.Payment terms: For survey:100% payment after submit TSSR(PASS Huawei verification) Partner PT.GCI Indonesia Signature: Signature: Date: Date: 1.1 BTS Installation SOW: Installation(including receiving material on site, Including accessor bar,combiner(if ha 1.2 MW Installation SOW:MW Installation&Pointing(including receiving materia required ) Including accessor so on(if have). (if can provide NPWP number,deduct 2% PPH23-Withold Tax,if can not provide N Tax). 4.Reciept or Invoice: Must have signature with Team Leader/PM/Other GCI Staf All the subcons, engineers must obey the following regulations. Any subcon d contract and give punishment according to our damage, any engineer disobeys letter and be kicked out from the project until stop contract. a.Firstly before any activity you must get permission letter.Secondly when y inform NOC.Especially when you are ready to leave the site you must confirm leave site. b. Activity of power supply, when you change MCB or any other power/rectifie first, especially for the existing equipments. All of these activities you m by email or hardcopy. c. Immediate communication and information feedback. Once any issue or troub (Within 5 Minutes), any delay will be regarded as disobeying this rule. d. Personal safety of subcon teams. According to the contract between GCI an responsibility for all your team memberes/engineers.please pay more attentio

2013-2015 Suncon Price Buget -IsAT Projeck PT.gci INDONSIA

Embed Size (px)

DESCRIPTION

gvyugvy7gvbyvb

Citation preview

Payment Terms1.SOWFor survey,commissioning,ATP,Dismantle,document requirement,follow Huawei requirement.1.1 BTS Installation SOW: Installation(including receiving material on site,Must offer document as GCI required )No.Standard SOWUnitQuantity1BTS RackSite1 or 22Battery RackSite13Feeder systemSite14Antenna systemSite15Mounting BracketSite16OthersSite1 LOTIncluding accessories such as LAN cable,gronding bar,combiner(if have),and so on.1.2 MW Installation SOW:MW Installation&Pointing(including receiving material on site,Must offer document as GCI required )No.Standard SOWUnitQuantity1IDUHop12IF CableHop13ODUHop1 or 24AntennaHop15OthersHop1 LOTIncluding accessories such as LAN cable,gronding bar,and so on(if have).2.PriceIncluding all duties and expenses.(if can provide NPWP number,deduct 2% PPH23-Withold Tax,if can not provide NPWP number,deduct 4% PPH23-With hold Tax).

3.Payment terms:For survey:100% payment after submit TSSR(PASS Huawei verification)4.Reciept or Invoice: Must have signature with Team Leader/PM/Other GCI Staff5.Project RegulationAll the subcons, engineers must obey the following regulations. Any subcon disobeys these rules we will stop the contract and give punishment according to our damage, any engineer disobeys this rules, which will be given warning letter and be kicked out from the project until stop contract.a.Firstly before any activity you must get permission letter.Secondly when you enter and leave the site you must inform NOC.Especially when you are ready to leave the site you must confirm with NOC everything is ok then you can leave site. b. Activity of power supply, when you change MCB or any other power/rectifier work you must report to Huawei and NOC first, especially for the existing equipments. All of these activities you must get approval from Huawei and Operator by email or hardcopy. c. Immediate communication and information feedback. Once any issue or trouble happens you must report to GCI PM ASAP (Within 5 Minutes), any delay will be regarded as disobeying this rule. d. Personal safety of subcon teams. According to the contract between GCI and subcon,all the subcon should take full responsibility for all your team memberes/engineers.please pay more attention to this issue and take enough protection actions and ensure the personal safety of your guys.PartnerPT.GCI Indonesia

Signature:Signature:Date:Date:

L3.1 BTS BaselineL3.1 BTS BaselineJakartaCJItem DescriptionUnitScenarioCompleted SOW(Install+commission+document+atp)Installation SOWCompleted SOW(Install+commission+document+atp)Installation SOW01 SurveyBTS0101_Survey: BTS or BTS&MW Engineering Survey + ReportSiteBTS or BTS&MW co-engineering survey(with report), include RF survey850,000935,000BTS0102_Survey: BTS or BTS&MW Engineering Survey + Simple ReportSiteBTS or BTS&MW co-engineering survey(with simple report), include RF survey, including summary and layout only, without TSSR.700,000770,00002 New0BTS0201_New: BTS/NodeB (1 system) + Power System + Antenna&Feedersitecomplete new site, with power system, with antenna&feedercan be used for Macro BTS, Micro BTS, DBS RRU not on tower4,500,00035000004,950,0003850000BTS0202_New: BTS/NodeB (1 system) + Power System + No Antenna&FeedersiteIBC site, with power system2,750,00020000003,025,0002200000BTS0203_New: BTS/NodeB (1 system) + No Power System + Antenna&Feedersitenew site, without power system;can be used for Macro BTS, Micro BTS, DBS RRU not on tower4,000,00030000004,400,0003300000BTS0204_New: BTS/NodeB (1 system) + No Power System + No Antenna&FeedersiteIBC site, without power system2,350,00017000002,585,0001870000BTS0205_New: DBS RRU on tower (1 system) + Power System + Antenna siteDBS RRU on tower, with power system3,800,00030000004,180,0003300000BTS0206_New: DBS RRU on tower (1 system) + Power System + No AntennasiteDBS RRU on tower, with power system, without antenna2,900,00020000003,190,0002200000BTS0207_New: DBS RRU on tower (1 system) + No Power System + AntennasiteDBS RRU on tower, without power system3,400,00026000003,740,0002860000BTS0208_New: DBS RRU on tower (1 system) + No Power System + No AntennasiteDBS RRU on tower, without power system, without antenna2,450,00017000002,695,0001870000BTS0209_New: BTS/NodeB (2 system) + Power System + Antenna&Feedersite5,400,00042000005,940,0004620000BTS0210_New: BTS/NodeB (2 system) + Power System + No Antenna&Feedersite3,300,00024000003,630,0002640000BTS0211_New: BTS/NodeB (2 system) + No Power System + Antenna&Feedersite4,800,00036000005,280,0003960000BTS0212_New: BTS/NodeB (2 system) + No Power System + No Antenna&Feedersite2,820,00020400003,102,0002244000BTS0213_New: DBS RRU on tower (2 system) + Power System + Antenna site4,560,00036000005,016,0003960000BTS0214_New: DBS RRU on tower (2 system) + Power System + No Antennasite3,480,00024000003,828,0002640000BTS0215_New: DBS RRU on tower (2 system) + No Power System + Antennasite4,080,00031200004,488,0003432000BTS0216_New: DBS RRU on tower (2 system) + No Power System + No Antennasite2,940,00020400003,234,0002244000BTS0217_New: BTS/NodeB (3 system) + Power System + Antenna&Feedersite6,300,00049000006,930,0005390000BTS0218_New: BTS/NodeB (3 system) + Power System + No Antenna&Feedersite3,850,00028000004,235,0003080000BTS0219_New: BTS/NodeB (3 system) + No Power System + Antenna&Feedersite5,600,00042000006,160,0004620000BTS0220_New: BTS/NodeB (3 system) + No Power System + No Antenna&Feedersite3,290,00023800003,619,0002618000BTS0221_New: DBS RRU on tower (3 system) + Power System + Antennasite5,320,00042000005,852,0004620000BTS0222_New: DBS RRU on tower (3 system) + Power System + No Antennasite4,060,00028000004,466,0003080000BTS0223_New: DBS RRU on tower (3 system) + No Power System + Antennasite4,760,00036400005,236,0004004000BTS0224_New: DBS RRU on tower (3 system) + No Power System + No Antennasite3,430,00023800003,773,000261800004 Codeploy with MWScenario for BTS/NobeB codeploy with MW, need to used together with "Codeploy with BTS/NobeB in MW BOQ.00BTS0401_Codeploy with MW: BTS/NodeB (1 system) + Power System + Antenna&Feedersite3,600,00031500003,960,0003465000BTS0402_Codeploy with MW: BTS/NodeB (1 system) + Power System + No Antenna&Feedersite2,200,00018000002,420,0001980000BTS0403_Codeploy with MW: BTS/NodeB (1 system) + No Power System + Antenna&Feedersite3,200,00027000003,520,0002970000BTS0404_Codeploy with MW: BTS/NodeB (1 system) + No Power System + No Antenna&Feedersite1,880,00015300002,068,0001683000BTS0405_Codeploy with MW: DBS RRU on tower (1 system) + Power System + Antennasite3,040,00027000003,344,0002970000BTS0406_Codeploy with MW: DBS RRU on tower (1 system) + Power System + No Antennasite2,320,00018000002,552,0001980000BTS0407_Codeploy with MW: DBS RRU on tower (1 system) + No Power System + Antennasite2,720,00023400002,992,0002574000BTS0408_Codeploy with MW: DBS RRU on tower (1 system) + No Power System + No Antennasite1,960,00015300002,156,0001683000BTS0409_Codeploy with MW: BTS/NodeB (2 system) + Power System + Antenna&Feedersite4,320,00037800004,752,0004158000BTS0410_Codeploy with MW: BTS/NodeB (2 system) + Power System + No Antenna&Feedersite2,640,00021600002,904,0002376000BTS0411_Codeploy with MW: BTS/NodeB (2 system) + No Power System + Antenna&Feedersite3,840,00032400004,224,0003564000BTS0412_Codeploy with MW: BTS/NodeB (2 system) + No Power System + No Antenna&Feedersite2,256,00018360002,481,6002019600BTS0413_Codeploy with MW: DBS RRU on tower (2 system) + Power System + Antennasite3,648,00032400004,012,8003564000BTS0414_Codeploy with MW: DBS RRU on tower (2 system) + Power System + No Antennasite2,784,00021600003,062,4002376000BTS0415_Codeploy with MW: DBS RRU on tower (2 system) + No Power System + Antennasite3,264,00028080003,590,4003088800BTS0416_Codeploy with MW: DBS RRU on tower (2 system) + No Power System + No Antennasite2,352,00018360002,587,2002019600BTS0417_Codeploy with MW: BTS/NodeB (3 system) + Power System + Antenna&Feedersite5,040,00044100005,544,0004851000BTS0418_Codeploy with MW: BTS/NodeB (3 system) + Power System + No Antenna&Feedersite3,080,00025200003,388,0002772000BTS0419_Codeploy with MW: BTS/NodeB (3 system) + No Power System + Antenna&Feedersite4,480,00037800004,928,0004158000BTS0420_Codeploy with MW: BTS/NodeB (3 system) + No Power System + No Antenna&Feedersite2,632,00021420002,895,2002356200BTS0421_Codeploy with MW: DBS RRU on tower (3 system) + Power System + Antennasite4,256,00037800004,681,6004158000BTS0422_Codeploy with MW: DBS RRU on tower (3 system) + Power System + No Antennasite3,248,00025200003,572,8002772000BTS0423_Codeploy with MW: DBS RRU on tower (3 system) + No Power System + Antennasite3,808,00032760004,188,8003603600BTS0424_Codeploy with MW: DBS RRU on tower (3 system) + No Power System + No Antennasite2,744,00021420003,018,400235620006 Redeployexclude dismantlement&packing.ONLY for 3rd party equipment redeploy; for Huawei equipment redeploy use "02 New".00BTS0601_Redeploy: BTS/NodeB (1 system) + Power System + Antenna&Feedersitecomplete redeploy, include BTS (or BBU, RRU), power system, antenna&feeder.Can be used for Macro BTS, Micro BTS, DBS RRU on tower, DBS RRU not on tower.4,950,00038500005,445,0004235000BTS0602_Redeploy: BTS/NodeB (1 system) + Power System + No Antenna&Feedersiteredeploy, include BTS(or BBU, RRU), power system, exclude antenna&feederCan be used for Macro BTS, Micro BTS, DBS RRU on tower, DBS RRU not on tower.3,025,00022000003,327,5002420000BTS0603_Redeploy: BTS/NodeB (1 system) + No Power System + Antenna&Feedersiteredeploy, include BTS(or BBU, RRU), antenna&feeder, exclude power system.Can be used for Macro BTS, Micro BTS, DBS RRU on tower, DBS RRU not on tower.4,400,00033000004,840,0003630000BTS0604_Redeploy: BTS/NodeB (1 system) + No Power System + No Antenna&Feedersiteredeploy, include BTS(or BBU, RRU), exclude power system, antenna&feeder.Can be used for Macro BTS, Micro BTS, DBS RRU on tower, DBS RRU not on tower.2,585,00018700002,843,500205700007 Additional-100BTS0702_Expansion: BTS/NodeB RF/TRX Boardsiteinclude RRU not on tower.500,000550,0000BTS0703_Expansion: BTS/NodeB Cabinetsitecabinet expansion.750,000825,0000BTS0704_Expansion: Sector + Antenna&Feedersitesector expansion, include main equipment, antenna&feeder.1,300,0001,430,0000BTS0705_Expansion: Sector + No Antenna&Feedersitesector expansion, include main equipment, exclude antenna&feeder.700,000770,0000BTS0706_Expansion: RRU on Towersiteexpansion for RRU on tower.750,000825,000008 Dismantlement&Packinginclude simple packing material.00BTS0801_Dismantlement&Packing: BTS/NodeB (1 system) + Power System + Antenna& Feedersitedismantle&packing, include BTS (or BBU, RRU), power system, antenna&feeder160000001760000BTS0802_Dismantlement&Packing: BTS/NodeB (1 system) + Power System + No Antenna&Feedersitedismantle&packing, include BTS (or BBU, RRU), power system, exclude antenna&feeder8500000935000BTS0803_Dismantlement&Packing: BTS/NodeB (1 system) + No Power System + Antenna&Feedersitedismantle&packing, include BTS (or BBU, RRU), antenna&feeder, exclude power system.140000001540000BTS0804_Dismantlement&Packing: BTS/NodeB (1 system) + No Power System + No Antenna&Feedersitedismantle&packing, include BTS (or BBU, RRU), exclude antenna&feeder, power system.6500000715000BTS0805_Dismantlement&Packing: BTS/NodeB (2 system) + Power System + Antenna& Feedersite192000002112000BTS0806_Dismantlement&Packing: BTS/NodeB (2 system) + Power System + No Antenna&Feedersite102000001122000BTS0807_Dismantlement&Packing: BTS/NodeB (2 system) + No Power System + Antenna&Feedersite168000001848000BTS0808_Dismantlement&Packing: BTS/NodeB (2 system) + No Power System + No Antenna&Feedersite7800000858000BTS0809_Dismantlement&Packing: BTS/NodeB (3 system) + Power System + Antenna& Feedersite224000002464000BTS0810_Dismantlement&Packing: BTS/NodeB (3 system) + Power System + No Antenna&Feedersite119000001309000BTS0811_Dismantlement&Packing: BTS/NodeB (3 system) + No Power System + Antenna&Feedersite196000002156000BTS0812_Dismantlement&Packing: BTS/NodeB (3 system) + No Power System + No Antenna&Feedersite9100000100100010 Additional-200BTS0901_E1 cross-connection from BTS/NodeB to BSC/RNCsite7000000770000BTS1003_Optional: Power System Replacement&Packingsite100000001100000BTS1004_Optional: Power Rectifier Installationsite7500000825000BTS1005_Optional: BTS/NodeB Battery Test with Dummy Loadsite4500000495000BTS1006_Optional: E1 Checkingsite5500000605000BTS1007_Optional: Antenna Replacement&Packingsite95000001045000BTS1008_Optional: Antenna Dismantlement&Packingsite5200000572000BTS1009_Optional: Feeder Dismantlement&Packingsite7000000770000BTS1010_Optional: Combiner/Diplexer/Triplexer/TMA/Filter Dismantlement&Packingsite5500000605000

L3.2 MW BaselineL3.2 MW BaselineJakartaCJItem DescriptionUnitQuick SOWCompleted SOW(Install+commission+document+atp)Installation SOWCompleted SOW(Install+commission+document+atp)Installation SOW01 SurveyMW0101_MW Engineering SurveySitesurvey+report450,000495,000MW0102_MW LOS survey Hopsurvey+report750,000825,00002 New0MW0201_New: MW 0.3/0.6m 2Hop Installation of IDU,Board,IF cable,ODU,Coupler,Antenna,+PAT3,800,0002,200,0004,180,0002420000MW0202_New: MW 0.3/0.6m 4Hop4,500,0002,640,0004,950,0002904000MW0203_New: MW 0.9/1.2m 2Hop4,500,0002,600,0004,950,0002860000MW0204_New: MW 0.9/1.2m 4Hop5,400,0003,120,0005,940,0003432000MW0205_New: MW 1.8m 2Hop5,400,0003,000,0005,940,0003300000MW0206_New: MW 1.8m 4Hop6,400,0003,600,0007,040,0003960000MW0207_New: MW >= 2.4m 2Hop6,400,0004,000,0007,040,0004400000MW0208_New: MW >= 2.4m 4Hop7,600,0004,800,0008,360,0005280000MW0209_New: MW(Without mounting pole) 0.3/0.6m 2Hop Installation of IDU,Board,IF cable,ODU,Coupler,Antenna(Without Mounting pole),+PAT3,420,0001,980,0003,762,0002178000MW0210_New: MW(Without mounting pole) 0.9/1.2m 2Hop4,050,0002,376,0004,455,0002613600MW0211_New: MW(Without E2E commissioning) 0.3/0.6m 2HopInstallation of IDU,Board,IF cable,ODU,Coupler,Antenna(Without E2E commissioning),+PAT3,150,0001,820,0003,465,0002002000MW0212_New: MW(Without E2E commissioning) 0.9/1.2m 2Hop3,780,0002,184,0004,158,000240240003 Codeploy with BTS/NodeBScenario for BTS/NobeB codeploy with MW, need to used together with "Codeploy with MW" in BTS BOQ.00MW0301_Codeploy with BTS/NobeB: MW 0.3/0.6m 2HopInstallation of IDU,Board,IF cable,ODU,Coupler,Antenna,+PAT3,040,0002,013,0003,344,0002214300MW0302_Codeploy with BTS/NobeB: MW 0.3/0.6m 4Hop3,600,0002,415,6003,960,0002657160MW0303_Codeploy with BTS/NobeB: MW 0.9/1.2m 2Hop3,600,0002,379,0003,960,0002616900MW0304_Codeploy with BTS/NobeB: MW 0.9/1.2m 4Hop4,320,0002,854,8004,752,0003140280MW0305_Codeploy with BTS/NobeB: MW 1.8m 2Hop4,320,0002,745,0004,752,0003019500MW0306_Codeploy with BTS/NobeB: MW 1.8m 4Hop5,120,0003,294,0005,632,0003623400MW0307_Codeploy with BTS/NobeB: MW >= 2.4m 2Hop5,120,0003,660,0005,632,0004026000MW0308_Codeploy with BTS/NobeB: MW >= 2.4m 4Hop6,080,0004,392,0006,688,000483120005 Redeployfor 3rd party MW redeploy only00MW0501_Redeploy: MW 0.3/0.6m 2HopInstallation of IDU,Board,IF cable,ODU,Coupler,Antenna,+PAT3,990,0002,310,0004,389,0002541000MW0502_Redeploy: MW 0.3/0.6m 4Hop4,725,0002,772,0005,197,5003049200MW0503_Redeploy: MW 0.9/1.2m 2Hop4,725,0002,730,0005,197,5003003000MW0504_Redeploy: MW 0.9/1.2m 4Hop5,670,0003,276,0006,237,0003603600MW0505_Redeploy: MW 1.8m 2Hop5,670,0003,150,0006,237,0003465000MW0506_Redeploy: MW 1.8m 4Hop6,720,0003,780,0007,392,0004158000MW0507_Redeploy: MW >= 2.4m 2Hop6,720,0004,200,0007,392,0004620000MW0508_Redeploy: MW >= 2.4m 4Hop7,980,0005,040,0008,778,000554400006 Dismantlement&Packing00MW0601_Dismanlement&Packing: MW 0.3/0.6m 2HopDismantlemen of IDU,Board,IF cable,ODU,Coupler,Antenna+Packing1,200,0001,200,0001,320,0001320000MW0602_Dismanlement&Packing: MW 0.3/0.6m 4Hop1,400,0001,400,0001,540,0001540000MW0603_Dismanlement&Packing: MW 0.9/1.2m 2Hop1,400,0001,400,0001,540,0001540000MW0604_Dismanlement&Packing: MW 0.9/1.2m 4Hop1,600,0001,600,0001,760,0001760000MW0605_Dismanlement&Packing: MW 1.8m 2Hop2,000,0002,000,0002,200,0002200000MW0606_Dismanlement&Packing: MW 1.8m 4Hop2,500,0002,500,0002,750,0002750000MW0607_Dismanlement&Packing: MW >= 2.4m 2Hop3,200,0003,200,0003,520,0003520000MW0608_Dismanlement&Packing: MW >= 2.4m 4Hop3,800,0003,800,0004,180,000418000007 Replacement00MW0702_Replacement: MW IDUSiteIDU Dismantlement+IDU installation and Commissioning 500,000450,000550,000495000MW0703_Replacement: MW ODUHopODU Dismantlement+ODU installation and Commissioning 1,000,000800,0001,100,000880000MW0704_Replacement: MW Antenna 0.3/0.6mHopAntenna Dismantlement+Antenna installation and Alignment2,800,0002,200,0003,080,0002420000MW0705_Replacement: MW Antenna 0.9/1.2mHop3,300,0002,600,0003,630,0002860000MW0706_Replacement: MW Antenna 1.8mHop4,000,0003,000,0004,400,0003300000MW0707_Replacement: MW Antenna >= 2.4mHop6,500,0004,000,0007,150,000440000009 Optional00MW0901_Optional: MW Frequency scanningHop2,000,0002,000,0002,200,0002200000MW0902_Optional: MW Frequency License Application until ISRHop350,000385,0000MW0904_Optional: MW IDU installation and Commissioning Site550,000605,0000MW0906_Optional: MW Hardware Upgradation and comissioing from 1+0 to 1+1/2+0Hop2,500,0002,750,0000MW0907_Optional: MW Hardware Degradation and comissioing from 1+1/2+0 to 1+0Hop1,800,0001,980,0000MW0910_Optional: Misplace Rectification MW Antenna 0.3/0.6mPcs1,000,000800,0001,100,000880000MW0911_Optional: Misplace Rectification MW Antenna 0.9/1.2mPcs1,250,0001,000,0001,375,0001100000MW0912_Optional: Misplace Rectification MW Antenna >= 1.2mPcs1,500,0001,250,0001,650,0001375000

L3.3 Core BaselineL3.3 Core Network BaselineJakartaCJItem DescriptionUnitSubcon PriceSubcon Price01 SurveyCN0101_Core Network Engineering Survey + ReportSite1,200,0001,320,00002 Hareware Installation and Supervision0CN0201_Hareware Installation and Supervision: Core Network CabinetCabinet1,500,0001,650,000CN0202_Hardware Installation and Supervision: Core Network SubrackSubrack500,000550,000CN0204_Hardware Installation and Supervision: Rectifier CabinetCabinet1,500,0001,650,000CN0205_Hardware Installation and Supervision: Rectifier ModuleSite500,000550,000CN0206_Hardware Installation and Supervision: Battery 300AH or belowBANK750,000825,000CN0207_Hardware Installation and Supervision: Battery 400AH ~ 650AHBANK950,0001,045,000CN0208_Hardware Installation and Supervision: Battery 800AH ~ 1300AHBANK1,250,0001,375,000CN0209_Hardware Installation and Supervision: Battery 1600AH ~ 2600AHBANK1,500,0001,650,000CN0210_Hardware Installation and Supervision: Battery 3000AH and aboveBANK2,000,0002,200,000CN0211_Hardware Installation and Supervision: UPS system including battery: 10KVA or belowSet850,000935,000CN0212_Hardware Installation and Supervision: UPS system including battery: 20KVA ~ 30KVASet1,700,0001,870,000CN0213_Hardware Installation and Supervision: UPS system including battery: 40KVA ~ 80KVASet2,200,0002,420,000CN0214_Hardware Installation and Supervision: Signal CableSet350,000385,000CN0215_Hardware Installation and Supervision: ODF or DDF RackRack450,000495,00003 Dismantlement&Packing0CN0301_Dismantlement&Packing: Core Network CabinetCabinet650,000715,000CN0302_Dismantlement&Packing: Rectifier CabinetCabinet600,000660,000CN0303_Dismantlement&Packing: Battery 300AH or belowBANK350,000385,000CN0304_Dismantlement&Packing: Battery 400AH ~ 650AHBANK450,000495,000CN0305_Dismantlement&Packing: Battery 800AH ~ 1300AHBANK650,000715,000CN0306_Dismantlement&Packing: Battery 1600AH ~ 2600AHBANK850,000935,000CN0307_Dismantlement&Packing: Battery 3000AH and aboveBANK950,0001,045,000CN0308_Dismantlement&Packing: Signal CableSet180,000198,000