5
1 PMFermiCOLPEm Resource From: Nicholas A Latzy [[email protected]] Sent: Wednesday, July 02, 2014 9:53 AM To: Brown, Christopher Cc: Govan, Tekia; Muniz, Adrian Subject: DTE Electric Chapter 1 ACRS Presentation Attachments: Chapter 1_Final.pptx Christopher, Attached to the email is the DTE Electric Chapter 1 ACRS Presentation. Thank you. Nicholas A. Latzy Principal Engineer - Nuclear Engineering Major Enterprise Projects DTE Energy (313)235-9226 (See attached file: Chapter 1_Final.pptx)

2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)

1

PMFermiCOLPEm Resource

From: Nicholas A Latzy [[email protected]]Sent: Wednesday, July 02, 2014 9:53 AMTo: Brown, ChristopherCc: Govan, Tekia; Muniz, AdrianSubject: DTE Electric Chapter 1 ACRS PresentationAttachments: Chapter 1_Final.pptx

Christopher, Attached to the email is the DTE Electric Chapter 1 ACRS Presentation. Thank you. Nicholas A. Latzy Principal Engineer - Nuclear Engineering Major Enterprise Projects DTE Energy (313)235-9226 (See attached file: Chapter 1_Final.pptx)

Page 2: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)

Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28) Subject: DTE Electric Chapter 1 ACRS Presentation Sent Date: 7/2/2014 9:52:35 AM Received Date: 7/2/2014 10:23:26 AM From: Nicholas A Latzy Created By: [email protected] Recipients: "Govan, Tekia" <[email protected]> Tracking Status: None "Muniz, Adrian" <[email protected]> Tracking Status: None "Brown, Christopher" <[email protected]> Tracking Status: None Post Office: dteenergy.com Files Size Date & Time MESSAGE 263 7/2/2014 10:23:26 AM Chapter 1_Final.pptx 7430363 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

Page 3: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)

Fermi 3 COLAPresentation to ACRS SubcommitteePresentation to ACRS SubcommitteeChapter 1

Page 4: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)

Fermi 3 Site

Page 5: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)

Chapter 1, Introduction and General Description of Plant

• ESBWR DCD Revision 10 Incorporated by reference

• Standard Material incorporated (including supplements and one departure)

• Additional site-specific material contained in Sections:

• 1 2 – General Plant Description• 1.2 – General Plant Description• Radwaste Building Reconfiguration Departure

• 1.4 – Identification of Agents and Contractors• Changed Company name to DTE Electric Company• Changed Company name to DTE Electric Company

• 1.5 – Post-Fukushima Near-Term Task Force Recommendations• Recommendations 4.2(Mitigating Strategies) and 7.1(SFP Instruments)

• 1.8 – Interfaces with Standard Design• Radwaste Building Reconfiguration Departure

• 1.12 – Impacts of Construction Activities on Fermi 2p• Management and Administrative Controls (ISG-22)