23
Addressing Institutional Issues in Freight Planning 2007 TRB Annual Meeting January 9, 2017 Peter Plumeau Senior Director

2017 TRB Freight Institutional Issues Plumeau

Embed Size (px)

Citation preview

Page 1: 2017 TRB Freight Institutional Issues Plumeau

Addressing Institutional Issues in Freight Planning2007 TRB Annual MeetingJanuary 9, 2017

Peter PlumeauSenior Director

Page 2: 2017 TRB Freight Institutional Issues Plumeau

201.09.2017RSG

The Challenge

Economic vitality relies greatly on efficient and reliable freight systems to support both people and commerce

Economic cost of freight delays and inefficiencies is billions of dollars

Page 3: 2017 TRB Freight Institutional Issues Plumeau

301.09.2017RSG

Complex System of Public Institutions and Methodical Processes

Jurisdiction/ Geography

ModesPolicy Prioriti

es

Page 4: 2017 TRB Freight Institutional Issues Plumeau

401.09.2017RSG

Bottom-Line Oriented Freight Industry

Timeliness

Reliability

Resilience

Page 5: 2017 TRB Freight Institutional Issues Plumeau

501.09.2017RSG

Public Sector and Freight Industry Perspectives Don’t Always Align

Page 6: 2017 TRB Freight Institutional Issues Plumeau

601.09.2017RSG

This Misalignment Matters

Limited Public Understanding of

Freight’s Importance

Freight as Low Planning Priority

Freight Movement

Volume Growing

Freight Adapts to Challenges

Unintended Consequences

Page 7: 2017 TRB Freight Institutional Issues Plumeau

701.09.2017RSG

Unintended Consequences

Page 8: 2017 TRB Freight Institutional Issues Plumeau

801.09.2017RSG

Unintended Consequences

Page 9: 2017 TRB Freight Institutional Issues Plumeau

901.09.2017RSG

Unintended Consequences

Page 10: 2017 TRB Freight Institutional Issues Plumeau

Taking on the Institutional Challenges

Page 11: 2017 TRB Freight Institutional Issues Plumeau

1101.09.2017RSG

Taking on the Institutional Challenges

Education

Engagement

Integration

Page 12: 2017 TRB Freight Institutional Issues Plumeau

1201.09.2017RSG

Educating Planners and Policy-makers

Page 13: 2017 TRB Freight Institutional Issues Plumeau

1301.09.2017RSG

Educating Planners and Policy-makers

Page 14: 2017 TRB Freight Institutional Issues Plumeau

1401.09.2017RSG

Engaging Public and Private Stakeholders

Page 15: 2017 TRB Freight Institutional Issues Plumeau

1501.09.2017RSG

Engaging Public and Private Stakeholders

Page 16: 2017 TRB Freight Institutional Issues Plumeau

1601.09.2017RSG

Integrating Freight into Planning and Development

Maintain integrity of freight-supportive transportation system

Industrial Sanctuaries (Jacksonville and Portland)

Page 17: 2017 TRB Freight Institutional Issues Plumeau

1701.09.2017RSG

Integrating Freight into Planning and Development

Building Freight in from the Beginning• Seattle Complete Streets• Gothenburg – Frihamnen

Redevelopment

Page 18: 2017 TRB Freight Institutional Issues Plumeau

1801.09.2017RSG

Integrating Freight into Planning and Development

Regional Freight Priority Network (FPN)(Albany, NY Metro Area)

Page 19: 2017 TRB Freight Institutional Issues Plumeau

1901.09.2017RSG

Taking on the Institutional Challenges

Education

Engagement

Integration

Page 20: 2017 TRB Freight Institutional Issues Plumeau

Benefits of Institutional Rethinking

Page 21: 2017 TRB Freight Institutional Issues Plumeau

2101.09.2017RSG

Overcoming Historical Institutional Perspectives…

Limited Public Sector

Understanding of Freight

Freight as Low Planning Priority

Freight Movement

Volume Growing

Freight Adapts to Challenges

Unintended Consequences

Page 22: 2017 TRB Freight Institutional Issues Plumeau

2201.09.2017RSG

…Opens New Possibilities

Improved Public Sector

Understanding of Freight

Freight as Key Planning Priority

Freight Movement

Volume Growing

Freight Integrated into

Planning & Development

Desired Consequences

Page 23: 2017 TRB Freight Institutional Issues Plumeau

Contacts

www.rsginc.com

For More Information

www.rsginc.com

PETER PLUMEAUSENIOR DIRECTOR

[email protected]+1.802.861.0500