This report summarises wind turbine orders thattook place from 1 January 2018 to 31 March 2019.
WindEurope tracks announced wind turbine orderson the basis of publicly available information oncommercial transactions and future deals,categorising them into firm orders, conditionalorders, partnerships and framework agreements.The latter entails more than one order in adetermined period with or without a specifiedamount of wind turbine units or capacity. Anyorders which do not fit into these categories areclassified as unknown.
We do not track Enercon orders because they arenot publicly available.
Nordex refers to Nordex-Acciona.
This publication contains information collected on aregular basis throughout the year and then verifiedwith relevant members of the industry beforepublishing. Neither WindEurope nor its members,nor their related entities are, by means of thispublication, rendering professional advice orservices. Neither WindEurope nor its members shallbe responsible for any loss whatsoever sustained byany person who relies on this publication.
TEXT AND ANALYSIS:
WindEurope Business Intelligence
Ivan Komusanac
MORE INFORMATION:
+32 2 213 18 38
Number of turbines Gearbox Diameter Generator Class Countries
Nordex* 238
N149/4500 111 Yes, 3 stages 149 DFIG S Sweden, Italy
N131/3900 51 Yes, 3 stages 131 DFIG S Netherlands, Sweden, Ukraine
N117/2400 9 Yes, 3 and 4 stages 117 DFIG I France
N131/3300 7 Yes, 3 stages 131 DFIG S Luxembourg
N131/3600 6 Yes, 3 stages 131 DFIG S France
N117/3675 6 Yes, 3 stages 117 DFIG II Netherlands
Siemens Gamesa* 78
SG 3.4-132 42 Yes, 3 stages 132 DFIG I, II Spain
SG 2.6-114 16 Yes, 3 stages 114 DFIG I, II Spain
SG 2.6-126 5 Yes, 3 stages 126 DFIG III Spain
Vestas 43
V126-3.45 26 Yes, 3 stages 126 ACR II Russia
V136-3.45 13 Yes, 3 stages 136 ACR II, III UK
V136-4.2 4 Yes, 3 stages 136 ACR II, S Denmark
Senvion 12
3.0M122 10 Yes, 3 stages 122 ACR III Italy
3.6M140 2 Yes, 3 stages 140 ACR I Italy
Onshore 2-3 MW 3.1-3.5 MW 3.5-4 MW 4-4.5 MW
Bosnia 15 turbines
Denmark 4 turbines
France 9 turbines 6 turbines 12 turbines
Greece 36 turbines
Italy 2 turbines 7 turbines
Luxembourg 7 turbines
Netherlands 13 turbines
Russia 26 turbines
Spain 21 turbines
Sweden 10 turbines 104 turbines
UK 13 turbines
Ukraine 34 turbines
Total 68 turbines 28 turbines 108 turbines 115 turbines
Offshore 3 MW
Italy 10 turbines
WindEurope counts wind turbine orders on the basis ofpublicly available deals and distinguishes between firmorders, conditional orders and framework agreements.Orders which do not fit into these categories are classifiedunder ‘unknown.’ All types of orders are tracked but analysisper country and company is carried out on firm orders alone,unless specified. We do not track Enercon orders becausethey are not publicly available. Furthermore, we do not tracksmall-scale turbines (i.e. those smaller than 100 kW).
Orders are tracked by relying on:
• offshorewind.biz
• rechargenews.com
• renewablesnow.com
• renews.biz
• windpowerintelligence.com
• windpowermonthly.com
Results are then cross-checked with companies’ officiallyreleased information on their websites:
• Acciona Energía, SA www.acciona-energia.es/
• Adwen adwenoffshore.com/
• GE, www.ge.com/renewableenergy
• MHI Vestas Offshore, http://www.mhivestasoffshore.com/
• Nordex SE www.nordex-online.com/en
• Senvion https://www.senvion.com/global/en/
• Siemens Gamesa Renewable Energy https://www.siemensgamesa.com/en-int
• Suzlon Wind Energy A/S www.suzlon.com/
• Vergnet SA www.vergnet.com/accueil.php
• Vestas www.vestas.com/