Description
1 732.0
2 529.5
3 HP Bypass warm-up piping 399.44 Reheater spray piping 322.55 Feed water pump recirculation piping 150.0
6A HP Heater 8B normal drain 138.0
6B HP Heater 8B emergency drain 138.0
7A HP Heater 8A normal drain 138.0
7B HP Heater 8A emergency drain 138.0
8 135.0
8A H2 supply to pressure reducing station 100.08B CO2 Supply to CO2 expansion device 100.09A HP Heater 7B normal drain 108.09B HP Heater 7B emergency drain 108.0
10A HP Heater 7A normal drain 108.010B HP Heater 7A emergency drain 108.0
11 105.2
12 LP Bypass warm-up piping 98.6
13 Main Condensate piping up LP Heater 4 69.0
13A H2 supply to Generator 48.0
14 58.5
15 58.5
16 58.5
Test Package
No.
Test Pressure (bar)
Feed Water Pump discharge piping up to FRS
Feed Water piping from FRS to economizer inlet
HPT extraction steam supply piping to HP heater 8A & 8B
CRH steam supply piping to HP Heater 7A& 7B, ST gland seal, BFPT turbine, deaerator pegging, Heater 7B drip piping
Turbine driven boiler feed pump (LAC50AP001/002) piping
Turbine driven boiler feed pump (LAC60AP001/002) piping
Motor driven boiler feed pump (LAC70AP001/002) piping
DescriptionTest
Package No.
Test Pressure (bar)
17 58.5
18A HP Heater 6A normal drain 55.5
18B HP Heater 6A emergency drain 55.5
19A HP Heater 6B normal drain 55.5
19B HP Heater 6B emergency drain 55.5
20 HP Heater 6A BIS drip Piping 55.521 HP Heater 6B BIS drip Piping 55.5
22 52.5
23 52.5
24 52.5
25 34.5
26 33.0
27 Deaerator fill up piping from boiler fill pump 33.0
28 Feed water tank overflow piping 30.0
29 29.4
30 29.4
31 27.0
32 15.0
33 15.0
34 Closed cooling water piping 15.034A Service water Piping 15.035 Auxiliary cooling water piping 15.0
Motor driven boiler feed pump (LAC80AP001/002) piping
Bleed steam piping of HP Heater 6A BIS to HPH 6A
Bleed steam piping of HP Heater 6B BIS to HPH 6B
IPT extraction steam piping to HP heater 6A & 6B BIS
Condensate piping from LP heater 4 to deaerator
Condensate piping for deaerator & boiler initial fill up
Auxiliary steam piping for deaerator pegging
Auxiliary steam piping for BFPT drive turbine & gland sleal
IPT extraction steam supply piping to deaerator pegging and TDBFP drive turbine
Emergency make up system piping from CST
Normal make up system piping from demin plant
DescriptionTest
Package No.
Test Pressure (bar)
35A 15.0
36A LP Heater 4 normal drain piping 12.0
36B LP Heater 4 emergency drain piping 12.0
37A Instrument Air distribution piping 12.037B Service Air distribution piping 12.0
38 10.5
39A LP Heater 3 normal drain piping 10.539B LP Heater 3 emergency drain piping 10.5
40A Main cooling water 6.5
40B Condenser Tube Cleaning Piping 6.5
41 6.0
42 Condensate extraction pump sealing piping 6
43 Sealing water distribution piping 6
Lube oil supply & return piping to central lube oil purification unit
IPT extraction steam supply piping to LP heater 4
LPT extraction steam supply piping to LP heater 3
Total Supports
220 Err:509 26 17
920 Err:509 94 28
148 Err:509 42 0296 Err:509 35 072 Err:509 36 1
Hydrotest Completed 12 0
121 Err:509 17 0
Hydrotest Completed 13 13
118 Err:509 18 0
262 Err:509 14 0
Err:509 22 0Err:509 31 0
12 Err:509 10 4126 Err:509 9 0
Hydrotest Completed 11 7114 Err:509 9 0
1344 Err:509 147 0
Err:509 0
66 Err:509 90 0
Err:509 28 0
Err:509 22 0
Err:509 22 0
Err:509 18 0
Balance Inch Dia Weld as on 02 Nov '15
Balance Inch Dia Weld as on Date
Supports Completed
Total SupportsBalance Inch Dia Weld as
on 02 Nov '15Balance Inch Dia Weld as on Date
Supports Completed
Err:509 18 0
54 Err:509 15 0
114 Err:509 16 0
48 Err:509 11 0
128 Err:509 15 0
Err:509 17 0Err:509 17 0
Hydrotest Completed 4 0
Hydrotest Completed 4 0
488 Err:509 17 0
Err:509 30 12
Err:509 28 0
Err:509 26 0
Err:509 18 0
Err:509 13 0
Err:509 69 0
672 Err:509 38 0
Err:509 38 0
Err:509 34 0
1983 Err:509 434 2Err:509 56 0
280 Err:509 113 0
Total SupportsBalance Inch Dia Weld as
on 02 Nov '15Balance Inch Dia Weld as on Date
Supports Completed
Err:509 0
34 Err:509 7 0
60 Err:509
N/A 0N/A 0
156 Err:509 12 0
28 Err:509 7 090 Err:509
Line Completed 4 0
Err:509 28 0
298 Err:509 10 0
Err:509 186 0
Err:509 440 0
Nov/15
Dec/15
Dec/15Dec/15Dec/15
Nov/15
Dec/15
Nov/15
Dec/15
Jan/16
Nov/15Dec/15Nov/15Dec/15
Feb/16
Nov/15
Target Month for Hydro Test
Target Month for Hydro Test
Nov/15
Dec/15
Nov/15
Dec/15
Nov/15
Nov/15
Feb/16
Feb/16
Nov/15
Dec/15
Target Month for Hydro Test
Jan/16
Nov/15
Dec/15
Feb/16Feb/16
Feb/16
Nov/15Dec/15
12/1/2015
Feb/16
Remarks 04-Nov 05-Nov 06-Nov 07-Nov
6
Working on the balance statusWorking on the balance status
Support Erection i/p
Working on the balance status
Working on the balance status
Working on the balance status
Working on the balance status
Working on the balance status
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Ready for HT, LHS Pending {Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)}
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Remarks 04-Nov 05-Nov 06-Nov 07-Nov
Working on the balance status
Working on the balance statusWorking on the balance status
Ready for HT, LHS Pending
Ready for HT, LHS Pending
Working on the balance status
Working on the balance status
Working on the balance status
Working on the balance status
Working on the balance status
Working on the balance status
24
Working on the balance status
Working on the balance status
84 28 54 58Working on the balance status
32
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Remarks 04-Nov 05-Nov 06-Nov 07-Nov
Working on the balance status
Working on the balance status
Main Lube Oil work completed, TDBFP balance
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Test package has been divided into 2 (one for normal dr. and other for
emergency dr.)
Support Erection i/p Test package has been divided into 2
Test package has been divided into 2
08-Nov 09-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov
08-Nov 09-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov
88 92 60 104 110
08-Nov 09-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov
15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov
15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov
135 128 126 125 135 168
15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov
22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov
22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov
78
22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov
29-Nov 30-Nov
29-Nov 30-Nov
29-Nov 30-Nov