Control Framework Checkpoint Progress Checkpoint 2: By end of Jan 2012 Allocate Project Owner Confirm Start Date Checkpoint 3: By end Q2/2012 Assess Risks Identify Controls and Gaps Checkpoint 4: By end Q2/2012 Evidence remediation plan Checkpoint 5: By end Q2/2012 Agree assurance to be shared

Citation preview

Page 1: 29 th May Agenda 9.15 Arrival – Tea/Coffee served 9.30 Breakfast served 9.45 The importance of the…

29th MayAgenda

• 9.15 Arrival – Tea/Coffee served• 9.30 Breakfast served• 9.45 The importance of the Framework within the world of Service

Companies • 10.15 Q&A • 10.30 Networking• 11.00 Close

Control Framework

Control Framework Breakfast Group

Page 2: 29 th May Agenda 9.15 Arrival – Tea/Coffee served 9.30 Breakfast served 9.45 The importance of the…

Understandproject rationale

Understand data standards& control

framework

Assess risks Identify controls & gaps Agree assurance approach with Lloyd’s

Review & monitor

2011

Develop / Implement controls

Design & plan implementation

Activities

Outputs

Lloyd’s meet with managing agents to explain what is required of the managing agents

Analyse and assess where each managingagent wants to be by 2012

Each managing agent:

has identified a framework ownerhas set up a Governance Group with roles and responsibilities assignedhas a project team to see the implementationthroughhas carried out a high level impact analysis

Complete the Risk Assessment Document key controls Produce remediation plan to address any gaps Confirm evidence required for effective controls Determine the extent of sharing assurance with Lloyd’s Assess impact from changes Plan the implementation & change management

Risk assessment and control matrix Design adequacy assessment Evidence retention plan Content agreed on the evidence based assurance Detailed impact analysis Implementation plan, including change management

Controls and procedures in operation Training sessions Stakeholder communication sessions Confirm test plan for controls Confirm audit check list

Operations procedure manualTraining materialStakeholder communicationpackAudit check list

Test controls On-going feedback & monitor

Design effectiveness report Operational effectiveness report Report review

Q3 Q4Q2

Activities Activities Activities

Outputs Outputs Outputs

Q3 Q4Q2Q1

2012Q2Q1

2013

Page 3: 29 th May Agenda 9.15 Arrival – Tea/Coffee served 9.30 Breakfast served 9.45 The importance of the…

Control Framework

Checkpoint ProgressCheckpoint 2: By end of Jan 2012 • Allocate Project Owner• Confirm Start Date

Checkpoint 3: By end Q2/2012• Assess Risks• Identify Controls and Gaps

Checkpoint 4: By end Q2/2012• Evidence remediation plan

Checkpoint 5: By end Q2/2012• Agree assurance to be shared

Page 4: 29 th May Agenda 9.15 Arrival – Tea/Coffee served 9.30 Breakfast served 9.45 The importance of the…

Control Framework

Questions?