    New Architectural Rules under the

    2005 Revised IRRofPD 1096(The National Building Code)

    July 2005Metropolitan Manila

    by Archt. Armando Dominador N. ALL, fuap, piep, aaifMember, DPWH Board of Consultants (2002-2005)

    (Resource Person)

    IAPOA

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    2/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    1. H ierarchy of Bui lding Laws & Status

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    1. Basic Law (PD 1096 or the NBC);unchanged for

    now but may sti l l be repealed by an act of Congress (dependingon the progress of DPWH BOC legislative work);

    2. IRR of PD 1096/ NBC;revised by the BoC and NBCRCfrom 2000 through 2003; the 2005 Revised IRR was published

    April 2005 and took effect 02 May 2005;future revisions sti l l possibledepending on the outcome of the repeal effort on the basic law;

    3. Manual of Procedure;a newDPWH executive issuancefor completion by the BoC and NBCRC;

    4. Additional IRR Guidelines and Building andMaterial Standards;other executive issuances that maysti l l follow depending on need assessmentby the BoC & NBCRC;

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    3/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    2a.What was done to the National Building

    Code (NBC)? Is it still the Law?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    1. The present NBC was promulgated 19 March 1977 as PD 1096by President FM; its various Implementing Rules and Regulations (IRRs)were issued by the MPWTC until 16 July 1979; in 1992, only the IRR section

    on Permit Fees were amended;

    2. In the year 2000, the DPWH re-organized the Board of Consultants (BoC)

    composed of representatives of accredited professional organizations (APOs)and reconstituted the Building Research and Development Staff (BRDS) intothe NBC Review Committee (NBCRC);

    3. the BoC was headed by a past UAP President (Angel Lazaro, Jr.)

    and 36 other member-professionals took part in the 3-year effort to

    revise only the IRR, which was signed by the DPWH Secretary on 03 Nov2004, published April 2005 and which took effect 02 May 2005;

    4. as of 2005, PD 1096 (NBC) is still the only law on buildings asit was neither amended nor repealed;

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    4/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA2b.

    What wil l come next and when?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    1. With the 02 May 2005 effectivity date of the 2005 Revised

    IRR, the following may now take place:a. possible DPWH issuance ofgeneral information

    materials for the public; members of APOs like the UAP and thePICE may have their members trained in dissemination work and will

    be asked to help disseminate information on the IRR; and

    b. issuance of the manual of procedure for use by theBuilding Officials tasked to enforce the 2005 R-IRR; and

    2. sometime in 2006, crafting of thebill

    (the Building Law)

    that shall fully repeal PD 1096 (NBC) and fully assimilate theRevised IRR of 2005, should be completed; however, this newlegislative effort may extend to 2007 and beyond;

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    5/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    3. What are the general featuresof the 2005Revised IRR that may be of interest to Professionals?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    1. The 2005 Revised IRR applies particularly to all newstructures located in new developments, i.e., along new roadrights-of-way (RROWs), new subdivision or estate developments,particularly reclamation areas; rules on foot-printing and

    setbacks may be somewhat relaxed for new construction withinbuilt-up areas or for renovation/ rehabilitation projects;2. The Revised IRR integrates general design and physical

    planning concerns, particularly on the matter of the developmentand usage of RROWs and ROWs and their collective effect on thedetermination of building bulk inside properties facing RROWs;

    3. The building permit shall become a general permit to be firstsupported by ancillary or accessory permits; and

    4. Architectural & Structural Permits are types of ancillary permits.

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    6/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA4.

    What is the most important architectural

    provision of the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    Under Sec. 302.3 (Application for Permits) of the 2005 Revised IRR, thesigning and sealing of architectural documents shall be limited toArchitects*, a provision fully harmonized with stipulations of RA9266:

    SEC. 302. Application for Permits.

    1. Any person desiring to obtain a building permit XXX . . . XXX shall file applications therefore on

    the prescribed application forms

    2. XXX . . . XXX

    3. Five (5) sets of survey plans, design plans and specifications and other documents prepared, signed

    and sealed over the printed names of the duly licensed and registered professionals:

    a. XXX . . . XXX;

    b. Architect, in case of architectural documents; in case of architectural interior/ interior design

    documents, either an architect or interior designer may sign;

    c. Civil Engineer, in case of civil/ structural documents;d. XXX . . . XXX

    *Important Notes: 1) Temporary Restraining Order (TRO) replaced by Wri t of Preliminary

    I njunction (WPI ) dated 24 May 2005 issued by Mani la RTC Br anch 22 with NO fi nal decision to

    date; and 2) the QC RTC Branch 219 in i ts order dated 23 May 2005 dismissed claims by Civil

    Engineers (CEs) that they can sign and seal architectural documents.

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    7/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA5.

    What is RA 9266 and its relation to

    Sec.302.3 of the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    1) Republic Act or RA 9266 is The Architecture Act of 2004 which took effect10 April 2004, while its IRR took effect 01 December 2004;2) Section 302.3 of the 2005 Revised IRR of the NBC (PD1096) is already fully

    harmonized with RA9266 and its provisions limiting the preparation,signing and sealing of architectural documents only to RegisteredArchitects;

    3) Civil Engineers (CEs) who shall continue to sign and seal architecturalplans, specifications and documents shall still be subject to the applicationof the severe penalties under RA 9266 & its IRR(reference Sec. 29 of RA 9266);

    4) The DPWH can still legally bar CEs from signing and sealing architecturalplans, specifications and documents by invoking multiple provisions under

    RA 9266 (Sections 20, 29, 31, 32, 34, etc.) and its IRR, specifically Sec. 20.2of RA 9266 which prohibits acting Building Officials/ Building Officials (orany other officer or employee of the republic) from accepting or approvingany architectural plans or specifications not prepared in accordance withRA9266 and Sec. 44 which mandates all public officials to enforce RA9266.

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    8/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA6.

    What are the Architectural (A) Documents

    under the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    Following is a list of architectural documents appearing under Sec. 302.4 of theRevised IRR of PD 1096 which took effect 02 May 2005. The def in it ions are omittedfor brevity.

    a. Architectural Plans/ Drawingsi. Vicinity Map/ Location Plan . . .XXX.

    ii. Site Development Plan . . .XXX.iii. Perspective . . .XXX.iv. Floor Plans . . .XXX.v. Elevations, at least four (4) . . .XXX.vi. Sections, at least two (2) . . .XXX.vii. Reflected Ceiling Plan . . .XXX.

    viii.Details, in the form of plans, elevations/ sections:(a) accessible ramps . . .XXX(p) all types of partitions.

    ix. Schedule of Doors and Windows . . .XXX.x. Schedule of Finishes . . .XXX.xi. Details of Other Major Architectural Elements.

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    9/30

    8

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    10/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA8.

    What are the Other Architectural (OA)

    Documents under the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    Following is a list of other architectural documents appearing under Sec. 302.4 of theRevised IRR of PD 1096 which took effect 02 May 2005. The def in iti ons are omitted forbrevity.

    c. Plans and specific locations of all accessibility facilities . . .XXX.d. Detailed design of all such accessibility facilities outside and

    around buildings/ structures including parking areas, and their

    safety requirements . . .XXX.

    e. Fire Safety Documentsi. XXX

    ii. XXXiii.XXX

    iv.XXX

    v. XXX

    f. Other related documents

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    11/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA9.What do the termscarrying capacity, development

    control and development potentialactually mean (under

    the 2005 Revised IRR of the NBC/ PD 1096)?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    Carrying Capacity of Lot the optimized extent of physical development that may beintroduced into the lot without causing undue damage, effects or hardship on the end-usersof the proposed development or on neighboring occupants, entities, properties, lands,developments or the environment (whether man-made or natural) and with the proposedbuilding/structure capable of being supported by existing utility, transportation and service

    systems or by proposed expansions/upgrading of such systems within the immediate future;

    Development Control (for Lots and Buildings/ Structures) a set of inter-actingregulations concerning the physical utilization of a lot and likewise governing theplanning/design of spaces and/or the use/occupancy of a building/structure to be introduced(or already existing) on a lot; development controls help determine in detail the development

    potential and/or the carrying capacity of all lots and/or of proposed developments on lots;and

    Development Potential of Lotthe maximum extent of physical development that may beintroduced into the lot, i.e., the erection of the proposed buildings/ structures, after fullcompliance with the applicable regulations that need to be satisfied, specifically those foundin the Code, i.e., the PNBC.

    10

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    12/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA10.

    What are the new architectural features

    under Rule VI Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    1. Under Rule VII (Classification & Requirements of Buildings by Use andOccupancy), a schedule of principal, accessory and conditional uses/ occupanciesfor buildings was prepared and matched with specific zoning classifications;

    2. Rule VII, Sec. 704 : firewalls relative to foot-printing of buildings/ structuresshall be strictly implemented; for instance, firewalls are explicitly prohibited forlow density residential uses (R-1); allowed lengths of firewalls in relation to lotperimeter dimensions are prescribed for all other uses, specifically for residentialcondominium uses (R-5);

    3. Rule VII, Sec. 705 - 707 : prescribes Allowable Maximum Total Gross FloorAreas (TGFAs), which is the product of the Building Height Limit (BHL), i.e.,defined in both number of storeys and height in meters, and the Allowable

    Maximum Building Footprint (AMBF) for each type of building use/ occupancy;4. Rule VII, Sec. 707, Subsection 4 : prescribes more detailed parking

    requirements for each type of building use/ occupancy; parking must be integralparts of building projects and all parking located outside shall be consideredbuffer parking;

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    13/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    11a.What are the new architectural features

    under Rule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    1. Rule VIII (Light and Ventilation), Section 803 : maximum Percentage ofSite Occupancy (PSO) is discussed at length; the identifiable Total Open Spacewithin a Lot (TOSL) are sub-classified and limits prescribed for all buildinguses and occupancies, e.g., the Maximum Allowable Impervious Surface Area(ISA), the Minimum Unpaved Surface Area (USA);

    2. Rule VIII, Section 804 :a) prescribes a minimum front setback of only 4.50 meters for a low

    density residential (R-1) structure on a minimum lot size of 301 sq.m.(14.0 m frontage x 21.5 m depth);

    b) prescribes a minimum front setback of 8.00 meters at the ground floor

    level only for medium and high density residential (R-2 and R-3)buildings/ structures that are more than 3 storeys/ 9.0 m in height; andc) prescribes front setbacks of from 5.0 to 8.0 meters for all types of

    commercial, industrial, institutional and recreational developments plusincremental side and rear setbacks for such buildings/ structures.

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    14/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    11b.What are the new architectural features

    under Rule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    15/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    11c.What are the new architectural features

    under Rule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    DPWH BOC & NBCRC IAPOA

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    16/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    11d.What are the new architectural features

    under Rule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    12

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    17/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA12.

    What are the new architectural features

    under Rule XXof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    Rule XX (Signs), Section 2004, Subsection1.c.ii : Ground sign structures shall belocated within the property line and under nocircumstances shall these occupy the RROW/street or sidewalk/ arcade or similar access-

    ways.Rule XX (Signs), Section 2004, Subsection1.d.i : On non-arcaded RROW/ streets, signsshall not extend more than 1.20 meters overthe sidewalkmeasured horizontally from the wall

    line or building line. On arcaded RROW/ streets,the signs shall not project more than 0.60meters from the outermost portion of thewall line of the allowed structure over thearcade.

    DPWH Off f S BOC & NBCRC IAPOA

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    18/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    13a.What are the new architectural features

    of the Guidel inesunderRule VI Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    1. Under Rule VII Guidelines, building bulk limitations are suggested through theinteraction of Floor-Lot Area Ratios (FLAR), the Allowable Maximum Building Foot-print (AMBF), the Outermost Faces of the Building (OFB), the width of the road right-of-way (RROW) and all other applicable provisions for natural light and ventilation;

    2. Under Rule VII Guidelines, examples are shown as to the manner of sizingbuildings or establishing the development potentials of a lot/ property with the proper

    interactive application of the foregoing development controls; and3. Under Rule VII Guidelines, the following are also included:

    a) floor to lot area (FLAR) designations for all major building occupancies;b) factors are also suggested to convert Gross Floor Areas (GFA) to Total Gross Floor Area

    (TGFA);c) determination of the outermost face of building (OFB) and outermost limit of building

    projection (OLBP) using angles drawn from the centerline of the road right-of-way(RROW);d) establishing the OFB through the interactive use of the allowed maximum building

    footprint (AMBF), the building height limit (BHL), the allowable maximum volume ofbuilding (AMVB) and the angular plane along the RROW; and

    e) buildings and accessory structures within cemeteries & memorial parks.

    13b

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    19/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA13b.

    What are the new architectural features

    of the GuidelinesunderRule VI Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    13c

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    20/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA13c.

    What are the new architectural features

    of the GuidelinesunderRule VI Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    14a

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    21/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA14a.

    What are the new architectural features

    of the GuidelinesunderRule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    Under Rule VIII Guidelines, the following are included:a) suggested treatments for easements/ waterside rights-of-way (ROW),e.g., esplanades and promenades and stipulations on structuresallowed/ disallowed along or within designated easement areas ;

    b) view corridors/ sight lines along road rights-of-way (RROWs);

    c) suggested median and lane widths within RROWs;d) suggested minimum RROW provisions for developments withmultiple dwelling units;

    e) access to interior lots;f) suggested development components within RROWs at all its levels;g) use, treatment and development of arcades, sidewalks, curbs and

    driveways;h) incremental front setbacks for tall structures using RROW widths;i) detailed open space requirements for all building types/ occupancies;j) basement configurations for tall buildings; andk) design of public buildings and structures.

    14b

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    22/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA14b.

    What are the new architectural features

    of the GuidelinesunderRule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    14c

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    23/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA14c.

    What are the new architectural features

    of the GuidelinesunderRule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    14d

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    24/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA14d.

    What are the new architectural features

    of the Guidel inesunderRule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    14e

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    25/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA14e.

    What are the new architectural features

    of the GuidelinesunderRule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    14f

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    26/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA14f.

    What are the new architectural features

    of the GuidelinesunderRule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    14g

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    27/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA14g.

    What are the new architectural features

    of the GuidelinesunderRule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    Rule VI I I

    Rule VI I I

    Guidelines

    DPWH BOC & NBCRC IAPOA14h

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    28/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA14h.

    Whatare some of thenew architectural

    of the Guidel inesunderRule VI I Iof the 2005 Revised IRR?

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    Rule VI I

    DPWH Office of the Secretary BOC & NBCRC IAPOA

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    29/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    15.Caveat

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005Revised IRR

    of PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaif

    July 2005, Metropolitan Manila Member, DPWH Board of Consultants (2002-2005)

    To prevent illegal rule insertions in the printed version of

    the 2005 Revised IRR(which happened so many times in the past toprevious editions of the NBC IRR), the following steps should betaken:

    a) the DPWH must be the only and solely designated

    copyright holder to the 2005 Revised IRR;b) the only official source of the document (in either hard or

    soft versions) should be the DPWH; and

    c) the only official publisher should be the National PrintingOffice (NPO) located along EDSA in Quezon City (between East Ave.& Quezon Blvd.), i.e., not the National Bookstore!

    DPWH Office of the Secretary BOC & NBCRC IAPOA

  • 7/28/2019 29LRarchNBC Irr(Ju05)

    30/30

    DPWH Office of the Secretary BOC & NBCRC IAPOA

    Thank You

    and

    a Pleasant Morning

    to You All!

    __________________________________________________________________________________________________________________________________

    New Architectural Rules under the 2005 Revised IRRof PD 1096 (The National Building Code) b yArcht. Armando Dominador .N. ALLI, fuap, piep, aaifJuly 2005 Metropolitan Manila Member DPWH Board of Consultants (2002-2005)