Upload
apvillalobos
View
69
Download
1
Tags:
Embed Size (px)
DESCRIPTION
catalogo bomba sistema contra incendio
Citation preview
BATTERY,DRY,DEKA,908DY420TANK,FUEL,500GAL,DOUBLE WALL119JOCKEY PUMP CONTROLLER118CNTR,DIESEL,FIRE,FTA1100-1100J117ENGINE,DIESEL,CLARKE,JX6H-UF,Tier3116PUMP, JOCKEY115VALVE,BFLY,ANVIL,7722,EPDM,GEAR,8214FLOWMETER,GROOVED,GERAND K-3000-8113VALVE,AIR RELEASE,175PSI,15A,.5212VALVE,CLA-VAL,2050B-4KG1,CL150,8111WASTE CONE,C.S.,8X12,CL150,CLOSED110VALVE, BUTTERFLY, WAFER, NIBCO, WD3510-8, 12"19VALVE,CHECK,NIBCO,KW-900-W,1218GAUGE,3.5,SS,0.25, DISCHARGE17PUMP,8100,CL150,12x10x18F,CW16GAUGE,3.5,316SS ,.25LM 30-0-30 GLY, SUCTION15VALVE,GATE,OSY,NIBCO,F-607-RW,1214SHACKLE 5 TON43LIFTING PLATE FOR 8" CHANNEL42SKID11
BOM
DESCRIPTIONQTYSYM
THIS DRAWING AND THE INFORMATION DEPICTED THEREIN IS THE PROPERTY OF XYLEM. COPIES ARE ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED OR COPIED, OR USED AS THE BASIS FOR THE MANUFACTURE OR SALE OF PRODUCTS WITHOUT PRIOR WRITTEN PERMISSION OF XYLEM. 1 /1
10/7/2011 M. HERNANDEZ
I.CETINKAYA
FDRH-3000-2-S
8/29/2011
SIZE
DRAWING NAME:
B REV
DRAWING #:
CHK:
DATE:DRN:
DATE:
SHEET :
10661 NEWKIRK STREETDALLAS, TX 75220
800.786.7480
3000 GPM_STANDARD_DRAWING
NOT FOR CONSTRUCTION
208.00
143.00
.00
.00
28.00
208.00
.00
.00
109.85
62.50FUELPUMP
64.50
1 2325.00184.00
1.00TYP.
69.88104.06207.06
1.00TYP.
25.81
71.50
142.00TYP.
4 5 6 7 8 14 9
13 12
11 10C
B
A
19 20 16 15 17
18
42.00CLEARENCEPER NOTE #4
42.00CLEARENCEPER NOTE #4
42.00CLEARENCEPER NOTE #4
NOTES:1. CUSTOMER PIPING MUST BE SUPPORTED NEAR ALL INTERFACE CONNECTIONS TO ELIMINATE STRAIN.2. ALL PIPING SUPPORTS ARE NOT SHOWN FOR CLARITY PURPOSES.3. ALL POLYMERIC DRAIN LINE PIPING TO THIS LOCATION.4. MINIMUM CLEARANCE TO ANY OBSTRUCTION REQUIRED BY THE NATIONAL ELECTRIC CODE.5. SHIPPING DIMENSIONS: 208"L x 143"W x 112"H.6. ESTIMATED SHIPPING WEIGHT: 18,000 LBS, ESTIMATED OPERATING WEIGHT: 20,600 LBS.7. CONDUIT AND SMALL PIPING RUNS TO FOLLOW STRUCTURAL MEMBERS, WHERE POSSIBLE, TO AVOID CREATING TRIP HAZARDS.8. TO ACHIEVE THE PROPER BUILDING FOUNDATION DESIGN, AN ENGINEER SHALL BE RETAINED WHO IS FAMILIAR WITH LOCAL BUILDING CODES, SOIL CONDITIONS, AND ANCHORING REQUIREMENTS.9. BASE PLATE SETTING PRIOR TO PIPING: GROUTING PROCEDURES AND FINAL ALIGNMENT MUST BE IN ACCORDANCE WITH THE XYLEM A-C FIRE PUMP INSTRUCTION MANUAL.10. INSTALL CHECK VALVE WITH HINGE PINS IN THE VERTICAL POSITION.11. PRESSURE SENSING LINE DRAINS TO BE PIPED TO THE SKID DRAIN MANIFOLD. ITEMS TO SHIP LOOSE: MUFFLER.METERING AND PRESSURE GAUGES.ANY TANK PIPING THAT EXCEEDS THE MAXIMUM SHIPPING HEIGHT. CUSTOMER INTERFACE CONNECTIONS:A. SUCTION: FLANGED, 12", CLASS 150#.B. DISCHARGE: FLANGED, 12", CLASS 150#.C. RELIEF VALVE DISCHARGE: 12", CLASS 150#, RF. PAINT SPECIFICATIONS:PAINT PER XYLEM FLOWTRONEX SPEC FPP-002.