Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
9 eFORMAPPROVED
Form 3160-3 OMB NO. 1040-0136(Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995
DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.BUREAU OF LAND MANAGEMENT UTU-74972
6. IF INDIAN,ALLOTTEE OR TRIBE NAMEAPPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A
TYPE OF WORK 7. UNITAGREEMENT NAMEDRILL O DEEPEN O NIA
TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.O O O SINGLE O MULTIPLE
OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21
2. NAMEOF OPERATOR Contact: Jan Nelson 9. API WELL NO.QEP Uinta Basin, Inc. E-Mail: [email protected]
3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿
4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREAAt Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E
At proposed production zone SAME 164. 5]â4 GT14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE
35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL
PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40
669' +I-
18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on filecompleted, applied for, on this lease, ft
6850'ESBOOO24
21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration4907.6 GR ASAP 10 DAYS
24. Attachments
The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).3. A surface Use Plan (if location is on National Forest System Lands, 5. Operatorcertification.
the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by theauthorized officer.
SIGNED Name (Printed) JAN NELSON 28-Nov-05
TITLE REGULATORY AFFAIRS
(This space for Federal or State office use)
PERMIT NO. APPROVAL DATE
Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon
CONDITIONS PPROV ANY:
BRADLEYG. HILLAPPROVED BK TITLE DATE
See Instructions On Reverse Side
tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction
RECEIVED
FederalApprovalofthla
Action is
9 eFORMAPPROVED
Form 3160-3 OMB NO. 1040-0136(Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995
DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.BUREAU OF LAND MANAGEMENT UTU-74972
6. IF INDIAN,ALLOTTEE OR TRIBE NAMEAPPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A
TYPE OF WORK 7. UNITAGREEMENT NAMEDRILL O DEEPEN O NIA
TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.O O O SINGLE O MULTIPLE
OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21
2. NAMEOF OPERATOR Contact: Jan Nelson 9. API WELL NO.QEP Uinta Basin, Inc. E-Mail: [email protected]
3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿
4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREAAt Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E
At proposed production zone SAME 164. 5]â4 GT14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE
35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL
PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40
669' +I-
18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on filecompleted, applied for, on this lease, ft
6850'ESBOOO24
21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration4907.6 GR ASAP 10 DAYS
24. Attachments
The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).3. A surface Use Plan (if location is on National Forest System Lands, 5. Operatorcertification.
the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by theauthorized officer.
SIGNED Name (Printed) JAN NELSON 28-Nov-05
TITLE REGULATORY AFFAIRS
(This space for Federal or State office use)
PERMIT NO. APPROVAL DATE
Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon
CONDITIONS PPROV ANY:
BRADLEYG. HILLAPPROVED BK TITLE DATE
See Instructions On Reverse Side
tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction
RECEIVED
FederalApprovalofthla
Action is
9 eFORMAPPROVED
Form 3160-3 OMB NO. 1040-0136(Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995
DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.BUREAU OF LAND MANAGEMENT UTU-74972
6. IF INDIAN,ALLOTTEE OR TRIBE NAMEAPPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A
TYPE OF WORK 7. UNITAGREEMENT NAMEDRILL O DEEPEN O NIA
TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.O O O SINGLE O MULTIPLE
OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21
2. NAMEOF OPERATOR Contact: Jan Nelson 9. API WELL NO.QEP Uinta Basin, Inc. E-Mail: [email protected]
3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿
4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREAAt Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E
At proposed production zone SAME 164. 5]â4 GT14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE
35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL
PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40
669' +I-
18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on filecompleted, applied for, on this lease, ft
6850'ESBOOO24
21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration4907.6 GR ASAP 10 DAYS
24. Attachments
The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).3. A surface Use Plan (if location is on National Forest System Lands, 5. Operatorcertification.
the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by theauthorized officer.
SIGNED Name (Printed) JAN NELSON 28-Nov-05
TITLE REGULATORY AFFAIRS
(This space for Federal or State office use)
PERMIT NO. APPROVAL DATE
Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon
CONDITIONS PPROV ANY:
BRADLEYG. HILLAPPROVED BK TITLE DATE
See Instructions On Reverse Side
tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction
RECEIVED
FederalApprovalofthla
Action is
9 eFORMAPPROVED
Form 3160-3 OMB NO. 1040-0136(Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995
DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.BUREAU OF LAND MANAGEMENT UTU-74972
6. IF INDIAN,ALLOTTEE OR TRIBE NAMEAPPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A
TYPE OF WORK 7. UNITAGREEMENT NAMEDRILL O DEEPEN O NIA
TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.O O O SINGLE O MULTIPLE
OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21
2. NAMEOF OPERATOR Contact: Jan Nelson 9. API WELL NO.QEP Uinta Basin, Inc. E-Mail: [email protected]
3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿
4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREAAt Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E
At proposed production zone SAME 164. 5]â4 GT14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE
35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL
PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40
669' +I-
18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on filecompleted, applied for, on this lease, ft
6850'ESBOOO24
21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration4907.6 GR ASAP 10 DAYS
24. Attachments
The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).3. A surface Use Plan (if location is on National Forest System Lands, 5. Operatorcertification.
the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by theauthorized officer.
SIGNED Name (Printed) JAN NELSON 28-Nov-05
TITLE REGULATORY AFFAIRS
(This space for Federal or State office use)
PERMIT NO. APPROVAL DATE
Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon
CONDITIONS PPROV ANY:
BRADLEYG. HILLAPPROVED BK TITLE DATE
See Instructions On Reverse Side
tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction
RECEIVED
FederalApprovalofthla
Action is
QUESTAR EXPLR. & PROD.
T'7S R21E SL B.&M * " '°cation, BBS #15G-22-7-21, located as' ' ' shown in the SW 1/4 SE 1/4 of Section 22,
T7S, R21E, S.L.B.&M. Uintah County, Utah.S87°59'W
- 2651.22' (G.L.O.) BASIS OF ELEVATIONSS7°59'W
- 2658.48' (G.L.O.)BENCH MARK (43EAM) LOCATED IN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNAN BASIN,QUADRANGLE,UTAH, UINTAH COUNTY, 7.5 MINUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATESDEPARTMENTOF THE INTERIOR, GEOLOGICALSURVEY. SAID
- ELEVATIONIS MARKED AS BEING 4832 FEET.BASIS OF BEARINGS
BASIS OF BEARINGS IS A G.P.S. OBSERVATION.
o
1953 Brass Cap0.J' High, Moundof Stones
SCALE
CERTIFICATETHIS IS TO CERTIFYTHAT THE ABOVE PL FROMFIELD NOTES OF ACTUAL SURVEYS MASUPERVISIONAND THAT THE SAME A THEBEST OF MY KNOWLEDGEAND BEL
BBS /15G--22-7-21Elev. Ungraded Ground = 4909' 2022' REgTER L . .
REG RATION N . 319 .°
STA TAH ,•
195J Brass Cap1953 Brass CaP 0.4' High, Scattered0.5' High, Mound Ston., UINTAH ENGINEERING & NGof Stones a i
S88'15'W - 2694.12' (G.L.O.)' SBB°15'46"W
- 2696.12' (Meas.) 85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
LEGEND: (AUTONOMOUS NAD 83) SCALE DATE SURVEYED: DATE DRAWN:LATITUDE=
40°11'28.04" (40.191122) 1" = 1000' 11-11-05 11-13-05=
90° SYMBOL LONGITUDE= 109°32'20.96" (109.539156) PARTY REFERENCES(AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.L.O. PLAT
= PROPOSED WELL HEAD LATITUDE=40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109°32'18.47" (109.538464) COOL QUESTAR EXPLR. &
QUESTAR EXPLR. & PROD.
T'7S R21E SL B.&M * " '°cation, BBS #15G-22-7-21, located as' ' ' shown in the SW 1/4 SE 1/4 of Section 22,
T7S, R21E, S.L.B.&M. Uintah County, Utah.S87°59'W
- 2651.22' (G.L.O.) BASIS OF ELEVATIONSS7°59'W
- 2658.48' (G.L.O.)BENCH MARK (43EAM) LOCATED IN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNAN BASIN,QUADRANGLE,UTAH, UINTAH COUNTY, 7.5 MINUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATESDEPARTMENTOF THE INTERIOR, GEOLOGICALSURVEY. SAID
- ELEVATIONIS MARKED AS BEING 4832 FEET.BASIS OF BEARINGS
BASIS OF BEARINGS IS A G.P.S. OBSERVATION.
o
1953 Brass Cap0.J' High, Moundof Stones
SCALE
CERTIFICATETHIS IS TO CERTIFYTHAT THE ABOVE PL FROMFIELD NOTES OF ACTUAL SURVEYS MASUPERVISIONAND THAT THE SAME A THEBEST OF MY KNOWLEDGEAND BEL
BBS /15G--22-7-21Elev. Ungraded Ground = 4909' 2022' REgTER L . .
REG RATION N . 319 .°
STA TAH ,•
195J Brass Cap1953 Brass CaP 0.4' High, Scattered0.5' High, Mound Ston., UINTAH ENGINEERING & NGof Stones a i
S88'15'W - 2694.12' (G.L.O.)' SBB°15'46"W
- 2696.12' (Meas.) 85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
LEGEND: (AUTONOMOUS NAD 83) SCALE DATE SURVEYED: DATE DRAWN:LATITUDE=
40°11'28.04" (40.191122) 1" = 1000' 11-11-05 11-13-05=
90° SYMBOL LONGITUDE= 109°32'20.96" (109.539156) PARTY REFERENCES(AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.L.O. PLAT
= PROPOSED WELL HEAD LATITUDE=40°11'28.17" (40.191158) WEATHER FILE
A = SECTION CORNERS LOCATED. LONGITUDE=109°32'18.47" (109.538464) COOL QUESTAR EXPLR. &
QUESTAR EXPLR. & PROD.
T'7S R21E SL B.&M * " '°cation, BBS #15G-22-7-21, located as' ' ' shown in the SW 1/4 SE 1/4 of Section 22,
T7S, R21E, S.L.B.&M. Uintah County, Utah.S87°59'W
- 2651.22' (G.L.O.) BASIS OF ELEVATIONSS7°59'W
- 2658.48' (G.L.O.)BENCH MARK (43EAM) LOCATED IN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNAN BASIN,QUADRANGLE,UTAH, UINTAH COUNTY, 7.5 MINUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATESDEPARTMENTOF THE INTERIOR, GEOLOGICALSURVEY. SAID
- ELEVATIONIS MARKED AS BEING 4832 FEET.BASIS OF BEARINGS
BASIS OF BEARINGS IS A G.P.S. OBSERVATION.
o
1953 Brass Cap0.J' High, Moundof Stones
SCALE
CERTIFICATETHIS IS TO CERTIFYTHAT THE ABOVE PL FROMFIELD NOTES OF ACTUAL SURVEYS MASUPERVISIONAND THAT THE SAME A THEBEST OF MY KNOWLEDGEAND BEL
BBS /15G--22-7-21Elev. Ungraded Ground = 4909' 2022' REgTER L . .
REG RATION N . 319 .°
STA TAH ,•
195J Brass Cap1953 Brass CaP 0.4' High, Scattered0.5' High, Mound Ston., UINTAH ENGINEERING & NGof Stones a i
S88'15'W - 2694.12' (G.L.O.)' SBB°15'46"W
- 2696.12' (Meas.) 85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
LEGEND: (AUTONOMOUS NAD 83) SCALE DATE SURVEYED: DATE DRAWN:LATITUDE=
40°11'28.04" (40.191122) 1" = 1000' 11-11-05 11-13-05=
90° SYMBOL LONGITUDE= 109°32'20.96" (109.539156) PARTY REFERENCES(AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.L.O. PLAT
= PROPOSED WELL HEAD LATITUDE=40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109°32'18.47" (109.538464) COOL QUESTAR EXPLR. &
QUESTAR EXPLR. & PROD.
T'7S R21E SL B.&M * " '°cation, BBS #15G-22-7-21, located as' ' ' shown in the SW 1/4 SE 1/4 of Section 22,
T7S, R21E, S.L.B.&M. Uintah County, Utah.S87°59'W
- 2651.22' (G.L.O.) BASIS OF ELEVATIONSS7°59'W
- 2658.48' (G.L.O.)BENCH MARK (43EAM) LOCATED IN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNAN BASIN,QUADRANGLE,UTAH, UINTAH COUNTY, 7.5 MINUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATESDEPARTMENTOF THE INTERIOR, GEOLOGICALSURVEY. SAID
- ELEVATIONIS MARKED AS BEING 4832 FEET.BASIS OF BEARINGS
BASIS OF BEARINGS IS A G.P.S. OBSERVATION.
o
1953 Brass Cap0.J' High, Moundof Stones
SCALE
CERTIFICATETHIS IS TO CERTIFYTHAT THE ABOVE PL FROMFIELD NOTES OF ACTUAL SURVEYS MASUPERVISIONAND THAT THE SAME A THEBEST OF MY KNOWLEDGEAND BEL
BBS /15G--22-7-21Elev. Ungraded Ground = 4909' 2022' REgTER L . .
REG RATION N . 319 .°
STA TAH ,•
195J Brass Cap1953 Brass CaP 0.4' High, Scattered0.5' High, Mound Ston., UINTAH ENGINEERING & NGof Stones a i
S88'15'W - 2694.12' (G.L.O.)' SBB°15'46"W
- 2696.12' (Meas.) 85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
LEGEND: (AUTONOMOUS NAD 83) SCALE DATE SURVEYED: DATE DRAWN:LATITUDE=
40°11'28.04" (40.191122) 1" = 1000' 11-11-05 11-13-05=
90° SYMBOL LONGITUDE= 109°32'20.96" (109.539156) PARTY REFERENCES(AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.L.O. PLAT
= PROPOSED WELL HEAD LATITUDE=40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109°32'18.47" (109.538464) COOL QUESTAR EXPLR. &
O
Additional Operator Remarks
QEP Uinta Basin Inc. proposes to drill a well to 6850' to test the Green River. If productive,casing willbe run and the well completed. If dry, the well willbe plugged and abandoned asper BLM and State of Utah requirements
Please see QEP, Uinta Basin, Inc. Standard Operating Practices for Green River FormationWells located in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 and 24 East.
See Onshore Order No. 1 attached
Please be advised that QEP, Uinta Basin, Inc. agrees to be responsible under the termsand conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESBOOOO24. The principal isQEP,Uinta Basin, Inc. via surety as consent as provided for the 43 CFR
O
Additional Operator Remarks
QEP Uinta Basin Inc. proposes to drill a well to 6850' to test the Green River. If productive,casing willbe run and the well completed. If dry, the well willbe plugged and abandoned asper BLM and State of Utah requirements
Please see QEP, Uinta Basin, Inc. Standard Operating Practices for Green River FormationWells located in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 and 24 East.
See Onshore Order No. 1 attached
Please be advised that QEP, Uinta Basin, Inc. agrees to be responsible under the termsand conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESBOOOO24. The principal isQEP,Uinta Basin, Inc. via surety as consent as provided for the 43 CFR
O
Additional Operator Remarks
QEP Uinta Basin Inc. proposes to drill a well to 6850' to test the Green River. If productive,casing willbe run and the well completed. If dry, the well willbe plugged and abandoned asper BLM and State of Utah requirements
Please see QEP, Uinta Basin, Inc. Standard Operating Practices for Green River FormationWells located in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 and 24 East.
See Onshore Order No. 1 attached
Please be advised that QEP, Uinta Basin, Inc. agrees to be responsible under the termsand conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESBOOOO24. The principal isQEP,Uinta Basin, Inc. via surety as consent as provided for the 43 CFR
O
Additional Operator Remarks
QEP Uinta Basin Inc. proposes to drill a well to 6850' to test the Green River. If productive,casing willbe run and the well completed. If dry, the well willbe plugged and abandoned asper BLM and State of Utah requirements
Please see QEP, Uinta Basin, Inc. Standard Operating Practices for Green River FormationWells located in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 and 24 East.
See Onshore Order No. 1 attached
Please be advised that QEP, Uinta Basin, Inc. agrees to be responsible under the termsand conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESBOOOO24. The principal isQEP,Uinta Basin, Inc. via surety as consent as provided for the 43 CFR
O OQEP Uinta Basin, Inc.BBS 15G-22-7-21
ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore
Federal Oil and Gas Leases
AIIlease and/or unit operations will be conducted in such a manner that full compliance is madewith applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas No. 1, and the approvedplan of operations. The operator is fully responsible for the actions of his subcontractors. A copyof these conditions willbe furnished the field representative to insure compliance.
1. Formation Tops
The estimated tops of important geologic markers are as follows:
Formation DepthUinta SurfaceGreen River 3200'TD 6850'
2. Anticipated Depths of Oil, Gas, Water and Other Mineral Bearinq Zones
The estimated depths at which the topand bottom of the anticipated water, oil,gas orother mineral bearing formations are expected to be encountered are as follows:
Substance Formation DepthOil/Gas Green River 6850'
All fresh water and prospectively valuable minerals encountered during drilling, willberecorded by depth and adequately protected. All oiland gas shows willbe tested todetermine commercial potential.
AIIwater shows and water-bearing sands willbe reported to the BLMin Vernal, Utah.Copies of State of Utah form OGC-8-X are acceptable. If no flows are detected,samples willbe submitted to the BLMalong withany water analyses conducted.
3. Anticipated Bottom Hole Pressures
Maximum anticipated bottom hole pressure equals approximately2971.
O OQEP Uinta Basin, Inc.BBS 15G-22-7-21
ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore
Federal Oil and Gas Leases
AIIlease and/or unit operations will be conducted in such a manner that full compliance is madewith applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas No. 1, and the approvedplan of operations. The operator is fully responsible for the actions of his subcontractors. A copyof these conditions willbe furnished the field representative to insure compliance.
1. Formation Tops
The estimated tops of important geologic markers are as follows:
Formation DepthUinta SurfaceGreen River 3200'TD 6850'
2. Anticipated Depths of Oil, Gas, Water and Other Mineral Bearinq Zones
The estimated depths at which the topand bottom of the anticipated water, oil,gas orother mineral bearing formations are expected to be encountered are as follows:
Substance Formation DepthOil/Gas Green River 6850'
All fresh water and prospectively valuable minerals encountered during drilling, willberecorded by depth and adequately protected. All oiland gas shows willbe tested todetermine commercial potential.
AIIwater shows and water-bearing sands willbe reported to the BLMin Vernal, Utah.Copies of State of Utah form OGC-8-X are acceptable. If no flows are detected,samples willbe submitted to the BLMalong withany water analyses conducted.
3. Anticipated Bottom Hole Pressures
Maximum anticipated bottom hole pressure equals approximately2971.
O OQEP Uinta Basin, Inc.BBS 15G-22-7-21
ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore
Federal Oil and Gas Leases
AIIlease and/or unit operations will be conducted in such a manner that full compliance is madewith applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas No. 1, and the approvedplan of operations. The operator is fully responsible for the actions of his subcontractors. A copyof these conditions willbe furnished the field representative to insure compliance.
1. Formation Tops
The estimated tops of important geologic markers are as follows:
Formation DepthUinta SurfaceGreen River 3200'TD 6850'
2. Anticipated Depths of Oil, Gas, Water and Other Mineral Bearinq Zones
The estimated depths at which the topand bottom of the anticipated water, oil,gas orother mineral bearing formations are expected to be encountered are as follows:
Substance Formation DepthOil/Gas Green River 6850'
All fresh water and prospectively valuable minerals encountered during drilling, willberecorded by depth and adequately protected. All oiland gas shows willbe tested todetermine commercial potential.
AIIwater shows and water-bearing sands willbe reported to the BLMin Vernal, Utah.Copies of State of Utah form OGC-8-X are acceptable. If no flows are detected,samples willbe submitted to the BLMalong withany water analyses conducted.
3. Anticipated Bottom Hole Pressures
Maximum anticipated bottom hole pressure equals approximately2971.
O OQEP Uinta Basin, Inc.BBS 15G-22-7-21
ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore
Federal Oil and Gas Leases
AIIlease and/or unit operations will be conducted in such a manner that full compliance is madewith applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas No. 1, and the approvedplan of operations. The operator is fully responsible for the actions of his subcontractors. A copyof these conditions willbe furnished the field representative to insure compliance.
1. Formation Tops
The estimated tops of important geologic markers are as follows:
Formation DepthUinta SurfaceGreen River 3200'TD 6850'
2. Anticipated Depths of Oil, Gas, Water and Other Mineral Bearinq Zones
The estimated depths at which the topand bottom of the anticipated water, oil,gas orother mineral bearing formations are expected to be encountered are as follows:
Substance Formation DepthOil/Gas Green River 6850'
All fresh water and prospectively valuable minerals encountered during drilling, willberecorded by depth and adequately protected. All oiland gas shows willbe tested todetermine commercial potential.
AIIwater shows and water-bearing sands willbe reported to the BLMin Vernal, Utah.Copies of State of Utah form OGC-8-X are acceptable. If no flows are detected,samples willbe submitted to the BLMalong withany water analyses conducted.
3. Anticipated Bottom Hole Pressures
Maximum anticipated bottom hole pressure equals approximately2971.
O O
QEP UINTABASIN INC.BBS 15G-22-7-21
669' FSL 2022' FELSWSE, SECTION 22, T7S, R21E
UTU-74972UINTAH COUNTY, UTAH
ONSHORE ORDER NO. 1
MULTI- POINT SURFACE USE & OPERATIONS PLAN
An onsite inspection was conducted for the BBS 15G-22-7-21 on November 28, 2005.Weather conditions were clear and cold at the timeof the onsite. In attendance at the inspectionwere the following individuals:
Paul Buhler Bureau of Land ManagementAmy Torres Bureau of Land ManagementJan Nelson QEP Uinta Basin Inc.
1. Existing Roads:
The proposed well site is appro×imately 35 miles Southeast of Vernal, Utah.
Refer to Topo Maps A and B for location of access roads within a 2 - mile radius.
There willbe improvements made to existing two-trackroad.
2. Planned Access Roads:
Please see QEP Uinta Basin Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
Refer to Topo Map B for the location of the proposed access road.
The part of road that travels off lease willrequire a ROW. The part of the proposed access road isapproximately 7400' in length. The new access road willbe 30' in width crowned(2 to 3%), ditched and constructed with a running surface of 18 feet and a maximum disturbed width of 30 feet.
3. Location of Existinq Wells Within a 1 - Mile Radius:
Please refer to Topo Map C.
4. Location of Existinq & Proposed Facilities:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
Product will be contained in tanks and transportedfrom location.
A muffler will be placed on pumping unit for noise control.
5. Location and Type of Water Supply:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24
O O
QEP UINTABASIN INC.BBS 15G-22-7-21
669' FSL 2022' FELSWSE, SECTION 22, T7S, R21E
UTU-74972UINTAH COUNTY, UTAH
ONSHORE ORDER NO. 1
MULTI- POINT SURFACE USE & OPERATIONS PLAN
An onsite inspection was conducted for the BBS 15G-22-7-21 on November 28, 2005.Weather conditions were clear and cold at the timeof the onsite. In attendance at the inspectionwere the following individuals:
Paul Buhler Bureau of Land ManagementAmy Torres Bureau of Land ManagementJan Nelson QEP Uinta Basin Inc.
1. Existing Roads:
The proposed well site is appro×imately 35 miles Southeast of Vernal, Utah.
Refer to Topo Maps A and B for location of access roads within a 2 - mile radius.
There willbe improvements made to existing two-trackroad.
2. Planned Access Roads:
Please see QEP Uinta Basin Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
Refer to Topo Map B for the location of the proposed access road.
The part of road that travels off lease willrequire a ROW. The part of the proposed access road isapproximately 7400' in length. The new access road willbe 30' in width crowned(2 to 3%), ditched and constructed with a running surface of 18 feet and a maximum disturbed width of 30 feet.
3. Location of Existinq Wells Within a 1 - Mile Radius:
Please refer to Topo Map C.
4. Location of Existinq & Proposed Facilities:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
Product will be contained in tanks and transportedfrom location.
A muffler will be placed on pumping unit for noise control.
5. Location and Type of Water Supply:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24
O O
QEP UINTABASIN INC.BBS 15G-22-7-21
669' FSL 2022' FELSWSE, SECTION 22, T7S, R21E
UTU-74972UINTAH COUNTY, UTAH
ONSHORE ORDER NO. 1
MULTI- POINT SURFACE USE & OPERATIONS PLAN
An onsite inspection was conducted for the BBS 15G-22-7-21 on November 28, 2005.Weather conditions were clear and cold at the timeof the onsite. In attendance at the inspectionwere the following individuals:
Paul Buhler Bureau of Land ManagementAmy Torres Bureau of Land ManagementJan Nelson QEP Uinta Basin Inc.
1. Existing Roads:
The proposed well site is appro×imately 35 miles Southeast of Vernal, Utah.
Refer to Topo Maps A and B for location of access roads within a 2 - mile radius.
There willbe improvements made to existing two-trackroad.
2. Planned Access Roads:
Please see QEP Uinta Basin Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
Refer to Topo Map B for the location of the proposed access road.
The part of road that travels off lease willrequire a ROW. The part of the proposed access road isapproximately 7400' in length. The new access road willbe 30' in width crowned(2 to 3%), ditched and constructed with a running surface of 18 feet and a maximum disturbed width of 30 feet.
3. Location of Existinq Wells Within a 1 - Mile Radius:
Please refer to Topo Map C.
4. Location of Existinq & Proposed Facilities:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
Product will be contained in tanks and transportedfrom location.
A muffler will be placed on pumping unit for noise control.
5. Location and Type of Water Supply:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24
O O
QEP UINTABASIN INC.BBS 15G-22-7-21
669' FSL 2022' FELSWSE, SECTION 22, T7S, R21E
UTU-74972UINTAH COUNTY, UTAH
ONSHORE ORDER NO. 1
MULTI- POINT SURFACE USE & OPERATIONS PLAN
An onsite inspection was conducted for the BBS 15G-22-7-21 on November 28, 2005.Weather conditions were clear and cold at the timeof the onsite. In attendance at the inspectionwere the following individuals:
Paul Buhler Bureau of Land ManagementAmy Torres Bureau of Land ManagementJan Nelson QEP Uinta Basin Inc.
1. Existing Roads:
The proposed well site is appro×imately 35 miles Southeast of Vernal, Utah.
Refer to Topo Maps A and B for location of access roads within a 2 - mile radius.
There willbe improvements made to existing two-trackroad.
2. Planned Access Roads:
Please see QEP Uinta Basin Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
Refer to Topo Map B for the location of the proposed access road.
The part of road that travels off lease willrequire a ROW. The part of the proposed access road isapproximately 7400' in length. The new access road willbe 30' in width crowned(2 to 3%), ditched and constructed with a running surface of 18 feet and a maximum disturbed width of 30 feet.
3. Location of Existinq Wells Within a 1 - Mile Radius:
Please refer to Topo Map C.
4. Location of Existinq & Proposed Facilities:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
Product will be contained in tanks and transportedfrom location.
A muffler will be placed on pumping unit for noise control.
5. Location and Type of Water Supply:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24
O O
6. Source of Construction Materials:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
7. Methods of Handlinq Waste Materials:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
8. Ancillary Facilities:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
9. Well Site Layout: (See Location Layout Diagram)
The attached Location Layout Diagram describes drill pad cross-sections, cuts and fillsand locations of the mud tanks, reserve pit, flare pit, pipe racks, trailerparking, spoil dirtstockpile(s), and surface material stockpile(s).
Please see the attached diagram to describe rig orientation, parking areas, and accessroads.
A pit liner is required. A felt pit liner willbe required if bedrock is encountered.10. Plans for Reclamation of the Surface:
Please see QEP Uinta Basin, Inc. Standard Operating Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Township 07 and 08 South, Ranges 21 to 24 East.
Interim Reclamation:6 Ibs Hycrest Crested Wheatgrass6 lbs Needle &Thread GrassFinal Reclamation:Seed Mix # 1 - 3 lbs. Indian Rice Grass, 1 lbs. Needle &Thread Grass, 4 Ibs. Hycrest Crested Wheat3 lbs. Fourwing Saltbush
11. Surface Ownership:
The well pad and access road are located on lands owned by:
Bureau of Land Management170 South 500 EastVernal, Utah 84078(435) 781-4400
12. Other Information
A Class Ill archaeological survey was conducted by Montgomery ArchaeologyConsultants. A copy of this report was submitted directly to the appropriate agencies byMontgomery Archaeology Consultants. Cultural resource clearance was recommendedfor this location.
There is a Burrowing Owl Stipulation from April 1st to August 15th. No construction or drillingwillcommence during this period unless otherwise determined by a wildlifebiologist that the site is inactive.
No drillingor construction willtake place during the Pronghorn season May 10 thru June 20th.
QEP will clean out existing
O O
6. Source of Construction Materials:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
7. Methods of Handlinq Waste Materials:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
8. Ancillary Facilities:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
9. Well Site Layout: (See Location Layout Diagram)
The attached Location Layout Diagram describes drill pad cross-sections, cuts and fillsand locations of the mud tanks, reserve pit, flare pit, pipe racks, trailerparking, spoil dirtstockpile(s), and surface material stockpile(s).
Please see the attached diagram to describe rig orientation, parking areas, and accessroads.
A pit liner is required. A felt pit liner willbe required if bedrock is encountered.10. Plans for Reclamation of the Surface:
Please see QEP Uinta Basin, Inc. Standard Operating Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Township 07 and 08 South, Ranges 21 to 24 East.
Interim Reclamation:6 Ibs Hycrest Crested Wheatgrass6 lbs Needle &Thread GrassFinal Reclamation:Seed Mix # 1 - 3 lbs. Indian Rice Grass, 1 lbs. Needle &Thread Grass, 4 Ibs. Hycrest Crested Wheat3 lbs. Fourwing Saltbush
11. Surface Ownership:
The well pad and access road are located on lands owned by:
Bureau of Land Management170 South 500 EastVernal, Utah 84078(435) 781-4400
12. Other Information
A Class Ill archaeological survey was conducted by Montgomery ArchaeologyConsultants. A copy of this report was submitted directly to the appropriate agencies byMontgomery Archaeology Consultants. Cultural resource clearance was recommendedfor this location.
There is a Burrowing Owl Stipulation from April 1st to August 15th. No construction or drillingwillcommence during this period unless otherwise determined by a wildlifebiologist that the site is inactive.
No drillingor construction willtake place during the Pronghorn season May 10 thru June 20th.
QEP will clean out existing
O O
6. Source of Construction Materials:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
7. Methods of Handlinq Waste Materials:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
8. Ancillary Facilities:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
9. Well Site Layout: (See Location Layout Diagram)
The attached Location Layout Diagram describes drill pad cross-sections, cuts and fillsand locations of the mud tanks, reserve pit, flare pit, pipe racks, trailerparking, spoil dirtstockpile(s), and surface material stockpile(s).
Please see the attached diagram to describe rig orientation, parking areas, and accessroads.
A pit liner is required. A felt pit liner willbe required if bedrock is encountered.10. Plans for Reclamation of the Surface:
Please see QEP Uinta Basin, Inc. Standard Operating Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Township 07 and 08 South, Ranges 21 to 24 East.
Interim Reclamation:6 Ibs Hycrest Crested Wheatgrass6 lbs Needle &Thread GrassFinal Reclamation:Seed Mix # 1 - 3 lbs. Indian Rice Grass, 1 lbs. Needle &Thread Grass, 4 Ibs. Hycrest Crested Wheat3 lbs. Fourwing Saltbush
11. Surface Ownership:
The well pad and access road are located on lands owned by:
Bureau of Land Management170 South 500 EastVernal, Utah 84078(435) 781-4400
12. Other Information
A Class Ill archaeological survey was conducted by Montgomery ArchaeologyConsultants. A copy of this report was submitted directly to the appropriate agencies byMontgomery Archaeology Consultants. Cultural resource clearance was recommendedfor this location.
There is a Burrowing Owl Stipulation from April 1st to August 15th. No construction or drillingwillcommence during this period unless otherwise determined by a wildlifebiologist that the site is inactive.
No drillingor construction willtake place during the Pronghorn season May 10 thru June 20th.
QEP will clean out existing
O O
6. Source of Construction Materials:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
7. Methods of Handlinq Waste Materials:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
8. Ancillary Facilities:
Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.
9. Well Site Layout: (See Location Layout Diagram)
The attached Location Layout Diagram describes drill pad cross-sections, cuts and fillsand locations of the mud tanks, reserve pit, flare pit, pipe racks, trailerparking, spoil dirtstockpile(s), and surface material stockpile(s).
Please see the attached diagram to describe rig orientation, parking areas, and accessroads.
A pit liner is required. A felt pit liner willbe required if bedrock is encountered.10. Plans for Reclamation of the Surface:
Please see QEP Uinta Basin, Inc. Standard Operating Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Township 07 and 08 South, Ranges 21 to 24 East.
Interim Reclamation:6 Ibs Hycrest Crested Wheatgrass6 lbs Needle &Thread GrassFinal Reclamation:Seed Mix # 1 - 3 lbs. Indian Rice Grass, 1 lbs. Needle &Thread Grass, 4 Ibs. Hycrest Crested Wheat3 lbs. Fourwing Saltbush
11. Surface Ownership:
The well pad and access road are located on lands owned by:
Bureau of Land Management170 South 500 EastVernal, Utah 84078(435) 781-4400
12. Other Information
A Class Ill archaeological survey was conducted by Montgomery ArchaeologyConsultants. A copy of this report was submitted directly to the appropriate agencies byMontgomery Archaeology Consultants. Cultural resource clearance was recommendedfor this location.
There is a Burrowing Owl Stipulation from April 1st to August 15th. No construction or drillingwillcommence during this period unless otherwise determined by a wildlifebiologist that the site is inactive.
No drillingor construction willtake place during the Pronghorn season May 10 thru June 20th.
QEP will clean out existing
O OLessee's or Operator's Representative:
Jan NelsonRed Wash Rep.
QEP Uinta Basin, Inc.11002 East 17500 South
Vernal, Utah 84078(435) 781-4331
Certification:
All lease and/or unit operations will be conducted in such a manner that full complianceis made with all applicable laws, regulations, Onshore Oil&Gas Orders, the approved
plan of operations, and any applicable Notice to Lessees.
QEP Uinta Basin, Inc. willbe fully responsible for the actions of theirsubcontractors.
A complete copy of the approved Application for Permit to Drillwillbe furnished to thefield representative(s) to ensure compliance and shall be on location during all
construction and drilling operations
I hereby certifythat I, or persons under my direct supervision, have inspected theproposed drill site and access route; that I am familiar with the conditions which currently
exist; that the statements made in this plan are, to the best of my knowledge, true andcorrect; and that the work associated withthe operations proposed herein willbe
performed by QEP Uinta Basin, Inc. its' contractors and subcontractors in conformitywith this plan and the termsand conditions under which it is approved. This statement is
subject to the provisions of 18 U.S.C 1001 for the filing of a false statement.
/fl 28-Nov-05
/ Jan Nelson DateRed Wash
O OLessee's or Operator's Representative:
Jan NelsonRed Wash Rep.
QEP Uinta Basin, Inc.11002 East 17500 South
Vernal, Utah 84078(435) 781-4331
Certification:
All lease and/or unit operations will be conducted in such a manner that full complianceis made with all applicable laws, regulations, Onshore Oil&Gas Orders, the approved
plan of operations, and any applicable Notice to Lessees.
QEP Uinta Basin, Inc. willbe fully responsible for the actions of theirsubcontractors.
A complete copy of the approved Application for Permit to Drillwillbe furnished to thefield representative(s) to ensure compliance and shall be on location during all
construction and drilling operations
I hereby certifythat I, or persons under my direct supervision, have inspected theproposed drill site and access route; that I am familiar with the conditions which currently
exist; that the statements made in this plan are, to the best of my knowledge, true andcorrect; and that the work associated withthe operations proposed herein willbe
performed by QEP Uinta Basin, Inc. its' contractors and subcontractors in conformitywith this plan and the termsand conditions under which it is approved. This statement is
subject to the provisions of 18 U.S.C 1001 for the filing of a false statement.
/fl 28-Nov-05
/ Jan Nelson DateRed Wash
O OLessee's or Operator's Representative:
Jan NelsonRed Wash Rep.
QEP Uinta Basin, Inc.11002 East 17500 South
Vernal, Utah 84078(435) 781-4331
Certification:
All lease and/or unit operations will be conducted in such a manner that full complianceis made with all applicable laws, regulations, Onshore Oil&Gas Orders, the approved
plan of operations, and any applicable Notice to Lessees.
QEP Uinta Basin, Inc. willbe fully responsible for the actions of theirsubcontractors.
A complete copy of the approved Application for Permit to Drillwillbe furnished to thefield representative(s) to ensure compliance and shall be on location during all
construction and drilling operations
I hereby certifythat I, or persons under my direct supervision, have inspected theproposed drill site and access route; that I am familiar with the conditions which currently
exist; that the statements made in this plan are, to the best of my knowledge, true andcorrect; and that the work associated withthe operations proposed herein willbe
performed by QEP Uinta Basin, Inc. its' contractors and subcontractors in conformitywith this plan and the termsand conditions under which it is approved. This statement is
subject to the provisions of 18 U.S.C 1001 for the filing of a false statement.
/fl 28-Nov-05
/ Jan Nelson DateRed Wash
O OLessee's or Operator's Representative:
Jan NelsonRed Wash Rep.
QEP Uinta Basin, Inc.11002 East 17500 South
Vernal, Utah 84078(435) 781-4331
Certification:
All lease and/or unit operations will be conducted in such a manner that full complianceis made with all applicable laws, regulations, Onshore Oil&Gas Orders, the approved
plan of operations, and any applicable Notice to Lessees.
QEP Uinta Basin, Inc. willbe fully responsible for the actions of theirsubcontractors.
A complete copy of the approved Application for Permit to Drillwillbe furnished to thefield representative(s) to ensure compliance and shall be on location during all
construction and drilling operations
I hereby certifythat I, or persons under my direct supervision, have inspected theproposed drill site and access route; that I am familiar with the conditions which currently
exist; that the statements made in this plan are, to the best of my knowledge, true andcorrect; and that the work associated withthe operations proposed herein willbe
performed by QEP Uinta Basin, Inc. its' contractors and subcontractors in conformitywith this plan and the termsand conditions under which it is approved. This statement is
subject to the provisions of 18 U.S.C 1001 for the filing of a false statement.
/fl 28-Nov-05
/ Jan Nelson DateRed Wash
O OQUESTAR EXPLR. & PROD.
BBS #15G-22-7-21LOCATED IN UINTAH COUNTY, UTAH
SECTION 22, T7S, R21E, S.L.B.&M.
PHOTO: VIEW FROM CORNER #5 TO LOCATION STAKE CAMERA ANGLE: NORTHWESTERLY
P POSED ACC
PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: NORTHEASTERLY
LOCATIONPHOTOs 1 1 14 05 PHOTO85 South 200 East Vemal, Utah 84078 MONTIl DAY YEAR
435-789-1017 [email protected] TAKENBY:DA. DRAWNBY:C.P. REVISED:
O OQUESTAR EXPLR. & PROD.
BBS #15G-22-7-21LOCATED IN UINTAH COUNTY, UTAH
SECTION 22, T7S, R21E, S.L.B.&M.
PHOTO: VIEW FROM CORNER #5 TO LOCATION STAKE CAMERA ANGLE: NORTHWESTERLY
P POSED ACC
PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: NORTHEASTERLY
LOCATIONPHOTOs 1 1 14 05 PHOTO85 South 200 East Vemal, Utah 84078 MONTIl DAY YEAR
435-789-1017 [email protected] TAKENBY:DA. DRAWNBY:C.P. REVISED:
O OQUESTAR EXPLR. & PROD.
BBS #15G-22-7-21LOCATED IN UINTAH COUNTY, UTAH
SECTION 22, T7S, R21E, S.L.B.&M.
PHOTO: VIEW FROM CORNER #5 TO LOCATION STAKE CAMERA ANGLE: NORTHWESTERLY
P POSED ACC
PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: NORTHEASTERLY
LOCATIONPHOTOs 1 1 14 05 PHOTO85 South 200 East Vemal, Utah 84078 MONTIl DAY YEAR
435-789-1017 [email protected] TAKENBY:DA. DRAWNBY:C.P. REVISED:
O OQUESTAR EXPLR. & PROD.
BBS #15G-22-7-21LOCATED IN UINTAH COUNTY, UTAH
SECTION 22, T7S, R21E, S.L.B.&M.
PHOTO: VIEW FROM CORNER #5 TO LOCATION STAKE CAMERA ANGLE: NORTHWESTERLY
P POSED ACC
PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: NORTHEASTERLY
LOCATIONPHOTOs 1 1 14 05 PHOTO85 South 200 East Vemal, Utah 84078 MONTIl DAY YEAR
435-789-1017 [email protected] TAKENBY:DA. DRAWNBY:C.P. REVISED:
QUESTAR EXPLR. & PRO /FIGURE #iLOCATION LAYOUT FOR
BBS #15G-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.
669' FSL 2022' FELC-3.4' C-1.2' Proposed Access E-4.5'E/. 911.0 E/. 908.8' Road EL 9011'
7 8
48' Sta. J+50 '
SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrawn By· D.R.B. as Needed
NOTE
Appr
R.Flore Pit is to be /ocated U .
Weeaor 100' from the
PIPE TUBs
Pit ES. PIPE RACKSFLARE P/T
C-J.1' i I iE/. 910. 7' - - - ;
E/. 914.7 'gg¡ --
C-19.1' c I I =E¯
48'"'°
150' Sta. 1+75Otm. p/0 70'
E0 TOILET O F-6.O'E/. 9 O1.6 '
LIGHTPLANT
BOILER-b-
- COMPRESSOR WATER -
LO PUMP HOUSE I | TANKL
¯"¯ KOBOOSTER
-- Sta. O 51 ----
Total Pit Capacity TR SHW/2' of Freeboard= 10,620 Bh/s. ±rotoiPit Volume ,, Approx.
= 2,870 Cu. Yds. "PROPANE TOe Of' B A STORAGE Fill Slope
E/. 914.5> C- J.7'ri. art.y . L48 Sta. 0+00
at pro 4 Topsoit stockpiis
C-4.1' C-1.7 E-4.7NO 1ES: E 911. 7' E/. 909. J' E/. 902. 9'
Elev. Ungraded Ground At Loc. Stoke = 4908.7', UINTAH ENGINEERING & LAND SURVEYING
F/N/SHED GRADE ELEV AT LOC. STAKE = 490Z6 ,, s.. 24, ,,,, . ,,,,,, e,,,, ,,oy, , ,,,,,
QUESTAR EXPLR. & PRO /FIGURE #iLOCATION LAYOUT FOR
BBS #15G-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.
669' FSL 2022' FELC-3.4' C-1.2' Proposed Access E-4.5'E/. 911.0 E/. 908.8' Road EL 9011'
7 8
48' Sta. J+50 '
SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrawn By· D.R.B. as Needed
NOTE
Appr
R.Flore Pit is to be /ocated U .
Weeaor 100' from the
PIPE TUBs
Pit ES. PIPE RACKSFLARE P/T
C-J.1' i I iE/. 910. 7' - - - ;
E/. 914.7 'gg¡ --
C-19.1' c I I =E¯
48'"'°
150' Sta. 1+75Otm. p/0 70'
E0 TOILET O F-6.O'E/. 9 O1.6 '
LIGHTPLANT
BOILER-b-
- COMPRESSOR WATER -
LO PUMP HOUSE I | TANKL
¯"¯ KOBOOSTER
-- Sta. O 51 ----
Total Pit Capacity TR SHW/2' of Freeboard= 10,620 Bh/s. ±rotoiPit Volume ,, Approx.
= 2,870 Cu. Yds. "PROPANE TOe Of' B A STORAGE Fill Slope
E/. 914.5> C- J.7'ri. art.y . L48 Sta. 0+00
at pro 4 Topsoit stockpiis
C-4.1' C-1.7 E-4.7NO 1ES: E 911. 7' E/. 909. J' E/. 902. 9'
Elev. Ungraded Ground At Loc. Stoke = 4908.7', UINTAH ENGINEERING & LAND SURVEYING
F/N/SHED GRADE ELEV AT LOC. STAKE = 490Z6 ,, s.. 24, ,,,, . ,,,,,, e,,,, ,,oy, , ,,,,,
QUESTAR EXPLR. & PRO /FIGURE #iLOCATION LAYOUT FOR
BBS #15G-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.
669' FSL 2022' FELC-3.4' C-1.2' Proposed Access E-4.5'E/. 911.0 E/. 908.8' Road EL 9011'
7 8
48' Sta. J+50 '
SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrawn By· D.R.B. as Needed
NOTE
Appr
R.Flore Pit is to be /ocated U .
Weeaor 100' from the
PIPE TUBs
Pit ES. PIPE RACKSFLARE P/T
C-J.1' i I iE/. 910. 7' - - - ;
E/. 914.7 'gg¡ --
C-19.1' c I I =E¯
48'"'°
150' Sta. 1+75Otm. p/0 70'
E0 TOILET O F-6.O'E/. 9 O1.6 '
LIGHTPLANT
BOILER-b-
- COMPRESSOR WATER -
LO PUMP HOUSE I | TANKL
¯"¯ KOBOOSTER
-- Sta. O 51 ----
Total Pit Capacity TR SHW/2' of Freeboard= 10,620 Bh/s. ±rotoiPit Volume ,, Approx.
= 2,870 Cu. Yds. "PROPANE TOe Of' B A STORAGE Fill Slope
E/. 914.5> C- J.7'ri. art.y . L48 Sta. 0+00
at pro 4 Topsoit stockpiis
C-4.1' C-1.7 E-4.7NO 1ES: E 911. 7' E/. 909. J' E/. 902. 9'
Elev. Ungraded Ground At Loc. Stoke = 4908.7', UINTAH ENGINEERING & LAND SURVEYING
F/N/SHED GRADE ELEV AT LOC. STAKE = 490Z6 ,, s.. 24, ,,,, . ,,,,,, e,,,, ,,oy, , ,,,,,
QUESTAR EXPLR. & PRO /FIGURE #iLOCATION LAYOUT FOR
BBS #15G-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.
669' FSL 2022' FELC-3.4' C-1.2' Proposed Access E-4.5'E/. 911.0 E/. 908.8' Road EL 9011'
7 8
48' Sta. J+50 '
SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrawn By· D.R.B. as Needed
NOTE
Appr
R.Flore Pit is to be /ocated U .
Weeaor 100' from the
PIPE TUBs
Pit ES. PIPE RACKSFLARE P/T
C-J.1' i I iE/. 910. 7' - - - ;
E/. 914.7 'gg¡ --
C-19.1' c I I =E¯
48'"'°
150' Sta. 1+75Otm. p/0 70'
E0 TOILET O F-6.O'E/. 9 O1.6 '
LIGHTPLANT
BOILER-b-
- COMPRESSOR WATER -
LO PUMP HOUSE I | TANKL
¯"¯ KOBOOSTER
-- Sta. O 51 ----
Total Pit Capacity TR SHW/2' of Freeboard= 10,620 Bh/s. ±rotoiPit Volume ,, Approx.
= 2,870 Cu. Yds. "PROPANE TOe Of' B A STORAGE Fill Slope
E/. 914.5> C- J.7'ri. art.y . L48 Sta. 0+00
at pro 4 Topsoit stockpiis
C-4.1' C-1.7 E-4.7NO 1ES: E 911. 7' E/. 909. J' E/. 902. 9'
Elev. Ungraded Ground At Loc. Stoke = 4908.7', UINTAH ENGINEERING & LAND SURVEYING
F/N/SHED GRADE ELEV AT LOC. STAKE = 490Z6 ,, s.. 24, ,,,, . ,,,,,, e,,,, ,,oy, , ,,,,,
QUESTAR EXPLR. & PROD FIGURE #2°ts
. TYPICAL CROSS SECTIONS FORX-Sectionscale BBS #15G-22-7-21
SECTION 22, T7S, R21E, S.L.B.&M.1 = 50 669' FSL 2022' FEL
DATE 11-1D
48' 150'
Slope = 1 1/2: 1 ¯
S TA. J+50
10' 70' 48' 150'
Location Stoke
S TA. 1+ 75
10' 70 48' 150'
inished Grade
PreconstructionGrade 48 150
\ CUT
NOTE:
ITopsoil should ned be SM 0+ŒStripped Below Finished • * NOTE:Grade on Substructure Area. E/LL QUANT/TY/NCLUDES
5% FOR COMPACT/ON
APPROXIMATE YARDAGES EXCESS MATERIAL = 3,180 Cu. Yds.
CUT Topsoil & Pit Backfill = J,180 Cu. Yds.(6") Topsoil Stripping = 1,740 Cu. Yds (1/2 Pit Vol.)Remaining Location = 6,990 Cu. Yds. EXCESS UNBALANCE = 0 Cu. Yds.
TOTAL CUT = 8,7]O CU.YDS. (After Rehabilitation)
FILL = 5,550 CU.YDS. IIINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Vernal, Uto.h 84078 * (435)
QUESTAR EXPLR. & PROD FIGURE #2°ts
. TYPICAL CROSS SECTIONS FORX-Sectionscale BBS #15G-22-7-21
SECTION 22, T7S, R21E, S.L.B.&M.1 = 50 669' FSL 2022' FEL
DATE 11-1D
48' 150'
Slope = 1 1/2: 1 ¯
S TA. J+50
10' 70' 48' 150'
Location Stoke
S TA. 1+ 75
10' 70 48' 150'
inished Grade
PreconstructionGrade 48 150
\ CUT
NOTE:
ITopsoil should ned be SM 0+ŒStripped Below Finished • * NOTE:Grade on Substructure Area. E/LL QUANT/TY/NCLUDES
5% FOR COMPACT/ON
APPROXIMATE YARDAGES EXCESS MATERIAL = 3,180 Cu. Yds.
CUT Topsoil & Pit Backfill = J,180 Cu. Yds.(6") Topsoil Stripping = 1,740 Cu. Yds (1/2 Pit Vol.)Remaining Location = 6,990 Cu. Yds. EXCESS UNBALANCE = 0 Cu. Yds.
TOTAL CUT = 8,7]O CU.YDS. (After Rehabilitation)
FILL = 5,550 CU.YDS. IIINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Vernal, Uto.h 84078 * (435)
QUESTAR EXPLR. & PROD FIGURE #2°ts
. TYPICAL CROSS SECTIONS FORX-Sectionscale BBS #15G-22-7-21
SECTION 22, T7S, R21E, S.L.B.&M.1 = 50 669' FSL 2022' FEL
DATE 11-1D
48' 150'
Slope = 1 1/2: 1 ¯
S TA. J+50
10' 70' 48' 150'
Location Stoke
S TA. 1+ 75
10' 70 48' 150'
inished Grade
PreconstructionGrade 48 150
\ CUT
NOTE:
ITopsoil should ned be SM 0+ŒStripped Below Finished • * NOTE:Grade on Substructure Area. E/LL QUANT/TY/NCLUDES
5% FOR COMPACT/ON
APPROXIMATE YARDAGES EXCESS MATERIAL = 3,180 Cu. Yds.
CUT Topsoil & Pit Backfill = J,180 Cu. Yds.(6") Topsoil Stripping = 1,740 Cu. Yds (1/2 Pit Vol.)Remaining Location = 6,990 Cu. Yds. EXCESS UNBALANCE = 0 Cu. Yds.
TOTAL CUT = 8,7]O CU.YDS. (After Rehabilitation)
FILL = 5,550 CU.YDS. IIINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Vernal, Uto.h 84078 * (435)
QUESTAR EXPLR. & PROD FIGURE #2°ts
. TYPICAL CROSS SECTIONS FORX-Sectionscale BBS #15G-22-7-21
SECTION 22, T7S, R21E, S.L.B.&M.1 = 50 669' FSL 2022' FEL
DATE 11-1D
48' 150'
Slope = 1 1/2: 1 ¯
S TA. J+50
10' 70' 48' 150'
Location Stoke
S TA. 1+ 75
10' 70 48' 150'
inished Grade
PreconstructionGrade 48 150
\ CUT
NOTE:
ITopsoil should ned be SM 0+ŒStripped Below Finished • * NOTE:Grade on Substructure Area. E/LL QUANT/TY/NCLUDES
5% FOR COMPACT/ON
APPROXIMATE YARDAGES EXCESS MATERIAL = 3,180 Cu. Yds.
CUT Topsoil & Pit Backfill = J,180 Cu. Yds.(6") Topsoil Stripping = 1,740 Cu. Yds (1/2 Pit Vol.)Remaining Location = 6,990 Cu. Yds. EXCESS UNBALANCE = 0 Cu. Yds.
TOTAL CUT = 8,7]O CU.YDS. (After Rehabilitation)
FILL = 5,550 CU.YDS. IIINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Vernal, Uto.h 84078 * (435)
QUESTAR EXPLR. & PRO . FI #3INTERIM RECLAMATIONPLAN FOR
BBS #15G-22-7-21 .-
SECTION 22, T7S, R21E, S.L.B.&M. :g.
669' FSL 2022' FELAccess
Road ••
SCALE: 1" = 50'DATE: 11-13-05Drawn By D.R.B.
OWLL HEAD
Production Tanks
GAS UNIT
INTERIM RECLAMATIONUINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Verruzl, Utah 84078 * (435)
QUESTAR EXPLR. & PRO . FI #3INTERIM RECLAMATIONPLAN FOR
BBS #15G-22-7-21 .-
SECTION 22, T7S, R21E, S.L.B.&M. :g.
669' FSL 2022' FELAccess
Road ••
SCALE: 1" = 50'DATE: 11-13-05Drawn By D.R.B.
OWLL HEAD
Production Tanks
GAS UNIT
INTERIM RECLAMATIONUINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Verruzl, Utah 84078 * (435)
QUESTAR EXPLR. & PRO . FI #3INTERIM RECLAMATIONPLAN FOR
BBS #15G-22-7-21 .-
SECTION 22, T7S, R21E, S.L.B.&M. :g.
669' FSL 2022' FELAccess
Road ••
SCALE: 1" = 50'DATE: 11-13-05Drawn By D.R.B.
OWLL HEAD
Production Tanks
GAS UNIT
INTERIM RECLAMATIONUINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Verruzl, Utah 84078 * (435)
QUESTAR EXPLR. & PRO . FI #3INTERIM RECLAMATIONPLAN FOR
BBS #15G-22-7-21 .-
SECTION 22, T7S, R21E, S.L.B.&M. :g.
669' FSL 2022' FELAccess
Road ••
SCALE: 1" = 50'DATE: 11-13-05Drawn By D.R.B.
OWLL HEAD
Production Tanks
GAS UNIT
INTERIM RECLAMATIONUINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Verruzl, Utah 84078 * (435)
2R2
E E
PROPOSED LOCATION:BBS #15G-22-7-21
Bren an so m
'Joh se sorto
\ SEE TOPO B"
1
1
OURAY
WONS ALL O LD
LEGEND: QUESTAR EXPLR. & PROD.PROPOSED N BBS #15G-22-7-21
SECTION 22, T7S, R21E, S.L.B.&M.SW 1/4 SE 1/4
Uintah Engineering & Land Surveying TOPOGR A PH I C 11 14 05- 85 South 200 East Vernal, Utah 84078 M A P(435) 789-1017 * FAX (435) 789-1813 ONTH DAY YEARSCALE:1:100,000 DRAWNBY:C.P. ISED:00-00-00
2R2
E E
PROPOSED LOCATION:BBS #15G-22-7-21
Bren an so m
'Joh se sorto
\ SEE TOPO B"
1
1
OURAY
WONS ALL O LD
LEGEND: QUESTAR EXPLR. & PROD.PROPOSED N BBS #15G-22-7-21
SECTION 22, T7S, R21E, S.L.B.&M.SW 1/4 SE 1/4
Uintah Engineering & Land Surveying TOPOGR A PH I C 11 14 05- 85 South 200 East Vernal, Utah 84078 M A P(435) 789-1017 * FAX (435) 789-1813 ONTH DAY YEARSCALE:1:100,000 DRAWNBY:C.P. ISED:00-00-00
2R2
E E
PROPOSED LOCATION:BBS #15G-22-7-21
Bren an so m
'Joh se sorto
\ SEE TOPO B"
1
1
OURAY
WONS ALL O LD
LEGEND: QUESTAR EXPLR. & PROD.PROPOSED N BBS #15G-22-7-21
SECTION 22, T7S, R21E, S.L.B.&M.SW 1/4 SE 1/4
Uintah Engineering & Land Surveying TOPOGR A PH I C 11 14 05- 85 South 200 East Vernal, Utah 84078 M A P(435) 789-1017 * FAX (435) 789-1813 ONTH DAY YEARSCALE:1:100,000 DRAWNBY:C.P. ISED:00-00-00
2R2
E E
PROPOSED LOCATION:BBS #15G-22-7-21
Bren an so m
'Joh se sorto
\ SEE TOPO B"
1
1
OURAY
WONS ALL O LD
LEGEND: QUESTAR EXPLR. & PROD.PROPOSED N BBS #15G-22-7-21
SECTION 22, T7S, R21E, S.L.B.&M.SW 1/4 SE 1/4
Uintah Engineering & Land Surveying TOPOGR A PH I C 11 14 05- 85 South 200 East Vernal, Utah 84078 M A P(435) 789-1017 * FAX (435) 789-1813 ONTH DAY YEARSCALE:1:100,000 DRAWNBY:C.P. ISED:00-00-00
ole
PROPOSED LOCATIONS 5G 7-21
LEGEND: QUESTAR EXPLR. & PROD.EXISTING ROAD N BBS #15G-22-7-21
----------- PROPOSED ACCESS ROAD SECTION 22, T7S, R21E, S.L.B.&M---------- EXISTING 2-TRACK NEEDS UPGRADEDSW 1/4 SE 1/4
Uintah Engineering & Land Surveying TOPOGR A PH I c 11 14 0585 South 200 East VernnE, Utah 84078 I A 10NTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"= 1000 DRAWNBY:C.P. REVISED:
ole
PROPOSED LOCATIONS 5G 7-21
LEGEND: QUESTAR EXPLR. & PROD.EXISTING ROAD N BBS #15G-22-7-21
----------- PROPOSED ACCESS ROAD SECTION 22, T7S, R21E, S.L.B.&M---------- EXISTING 2-TRACK NEEDS UPGRADEDSW 1/4 SE 1/4
Uintah Engineering & Land Surveying TOPOGR A PH I c 11 14 0585 South 200 East VernnE, Utah 84078 I A 10NTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"= 1000 DRAWNBY:C.P. REVISED:
ole
PROPOSED LOCATIONS 5G 7-21
LEGEND: QUESTAR EXPLR. & PROD.EXISTING ROAD N BBS #15G-22-7-21
----------- PROPOSED ACCESS ROAD SECTION 22, T7S, R21E, S.L.B.&M---------- EXISTING 2-TRACK NEEDS UPGRADEDSW 1/4 SE 1/4
Uintah Engineering & Land Surveying TOPOGR A PH I c 11 14 0585 South 200 East VernnE, Utah 84078 I A 10NTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"= 1000 DRAWNBY:C.P. REVISED:
ole
PROPOSED LOCATIONS 5G 7-21
LEGEND: QUESTAR EXPLR. & PROD.EXISTING ROAD N BBS #15G-22-7-21
----------- PROPOSED ACCESS ROAD SECTION 22, T7S, R21E, S.L.B.&M---------- EXISTING 2-TRACK NEEDS UPGRADEDSW 1/4 SE 1/4
Uintah Engineering & Land Surveying TOPOGR A PH I c 11 14 0585 South 200 East VernnE, Utah 84078 I A 10NTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"= 1000 DRAWNBY:C.P. REVISED:
T
PROPOSED LOCATION:BBS #15G-22-7-21
LEGEND: QUESTAR EXPLR. & PROD.f DISPOSAL WELLS WATER WELLS N BBS #15G-22-7-21e PRODUCING WELLS ABANDONED WELLS SECTION 22, T7S, R21E, S.L.B.&M.# SHUT IN WELLS -@- TEMPORARILY ABANDONED SW 1/4 SE 1/4
- ÜÏntahEngineering & Land Š¯urveyingTOPOGR A PH I c 11 14 0585 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"=2000 DRAWNBY:C.E
T
PROPOSED LOCATION:BBS #15G-22-7-21
LEGEND: QUESTAR EXPLR. & PROD.f DISPOSAL WELLS WATER WELLS N BBS #15G-22-7-21e PRODUCING WELLS ABANDONED WELLS SECTION 22, T7S, R21E, S.L.B.&M.# SHUT IN WELLS -@- TEMPORARILY ABANDONED SW 1/4 SE 1/4
- ÜÏntahEngineering & Land Š¯urveyingTOPOGR A PH I c 11 14 0585 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"=2000 DRAWNBY:C.E
T
PROPOSED LOCATION:BBS #15G-22-7-21
LEGEND: QUESTAR EXPLR. & PROD.f DISPOSAL WELLS WATER WELLS N BBS #15G-22-7-21e PRODUCING WELLS ABANDONED WELLS SECTION 22, T7S, R21E, S.L.B.&M.# SHUT IN WELLS -@- TEMPORARILY ABANDONED SW 1/4 SE 1/4
- ÜÏntahEngineering & Land Š¯urveyingTOPOGR A PH I c 11 14 0585 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"=2000 DRAWNBY:C.E
T
PROPOSED LOCATION:BBS #15G-22-7-21
LEGEND: QUESTAR EXPLR. & PROD.f DISPOSAL WELLS WATER WELLS N BBS #15G-22-7-21e PRODUCING WELLS ABANDONED WELLS SECTION 22, T7S, R21E, S.L.B.&M.# SHUT IN WELLS -@- TEMPORARILY ABANDONED SW 1/4 SE 1/4
- ÜÏntahEngineering & Land Š¯urveyingTOPOGR A PH I c 11 14 0585 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"=2000 DRAWNBY:C.E
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
APD RECEIVED: 12/01/2005 API NO. ASSIGNED: 43-047-37443
WELL NAME: BBS 15G-22-7-21
OPERATOR: QEP UINTA BASIN, INC. ( N2460 )CONTACT: JAN NELSON PHONE NUMBER: 435-781-4331
PROPOSED LOCATION:
SWSE 22 070S 210E INSPECT LOCATN BY: / /SURFACE: 0669 FSL 2022 FEL
Tech Review Initials DateBOTTOM: 0669 FSL 2022 FEL
UINTAH Engineering
WILDCAT ( 1 ) Geology
LEASE TYPE: 1 - Federal SurfaceLEASE NUMBER: UTU-74972
SURFACE OWNER: 1 - FederalLATITUDE: 40.19114
PROPOSED FORMATION: GRRV
COALBED METHANE WELL? NO LONGITUDE: -109.5385
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
Plat R649-2-3.
Bond: Fed[1] Ind[] Sta[] Fee[]Unit
(NO.ESBOOO24 )Potash (Y/N) \/' R649-3-2. General
Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells
Water Permit R649-3-3. Exception(No.43-8496 )
RDCC Review (Y/N)Drilling Unit
(Date: ) Board Cause No:Eff Date:
Fee Surf Agreement (Y/N) Siting:
\18 Intent to Commingle (Y/N),R649-3-11. Directional Drill
COMMENTS:
STIPULATIONS: d i
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
APD RECEIVED: 12/01/2005 API NO. ASSIGNED: 43-047-37443
WELL NAME: BBS 15G-22-7-21
OPERATOR: QEP UINTA BASIN, INC. ( N2460 )CONTACT: JAN NELSON PHONE NUMBER: 435-781-4331
PROPOSED LOCATION:
SWSE 22 070S 210E INSPECT LOCATN BY: / /SURFACE: 0669 FSL 2022 FEL
Tech Review Initials DateBOTTOM: 0669 FSL 2022 FEL
UINTAH Engineering
WILDCAT ( 1 ) Geology
LEASE TYPE: 1 - FederalSurface
LEASE NUMBER: UTU-74972
SURFACE OWNER: 1 - FederalLATITUDE: 40.19114
PROPOSED FORMATION: GRRV
COALBED METHANE WELL? NO LONGITUDE: -109.5385
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
Plat R649-2-3.
Bond: Fed[1] Ind[] Sta[] Fee[]Unit
(NO.ESBOOO24 )Potash (Y/N) \/' R649-3-2. General
Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells
Water Permit R649-3-3. Exception(No.43-8496 )
RDCC Review (Y/N)Drilling Unit
(Date: ) Board Cause No:Eff Date:
Fee Surf Agreement (Y/N) Siting:
\18 Intent to Commingle (Y/N),R649-3-11. Directional Drill
COMMENTS:
STIPULATIONS: d i
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
APD RECEIVED: 12/01/2005 API NO. ASSIGNED: 43-047-37443
WELL NAME: BBS 15G-22-7-21
OPERATOR: QEP UINTA BASIN, INC. ( N2460 )CONTACT: JAN NELSON PHONE NUMBER: 435-781-4331
PROPOSED LOCATION:
SWSE 22 070S 210E INSPECT LOCATN BY: / /SURFACE: 0669 FSL 2022 FEL
Tech Review Initials DateBOTTOM: 0669 FSL 2022 FEL
UINTAH Engineering
WILDCAT ( 1 ) Geology
LEASE TYPE: 1 - Federal SurfaceLEASE NUMBER: UTU-74972
SURFACE OWNER: 1 - FederalLATITUDE: 40.19114
PROPOSED FORMATION: GRRV
COALBED METHANE WELL? NO LONGITUDE: -109.5385
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
Plat R649-2-3.
Bond: Fed[1] Ind[] Sta[] Fee[]Unit
(NO.ESBOOO24 )Potash (Y/N) \/' R649-3-2. General
Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells
Water Permit R649-3-3. Exception(No.43-8496 )
RDCC Review (Y/N)Drilling Unit
(Date: ) Board Cause No:Eff Date:
Fee Surf Agreement (Y/N) Siting:
\18 Intent to Commingle (Y/N),R649-3-11. Directional Drill
COMMENTS:
STIPULATIONS: d i
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
APD RECEIVED: 12/01/2005 API NO. ASSIGNED: 43-047-37443
WELL NAME: BBS 15G-22-7-21
OPERATOR: QEP UINTA BASIN, INC. ( N2460 )CONTACT: JAN NELSON PHONE NUMBER: 435-781-4331
PROPOSED LOCATION:
SWSE 22 070S 210E INSPECT LOCATN BY: / /SURFACE: 0669 FSL 2022 FEL
Tech Review Initials DateBOTTOM: 0669 FSL 2022 FEL
UINTAH Engineering
WILDCAT ( 1 ) Geology
LEASE TYPE: 1 - Federal SurfaceLEASE NUMBER: UTU-74972
SURFACE OWNER: 1 - FederalLATITUDE: 40.19114
PROPOSED FORMATION: GRRV
COALBED METHANE WELL? NO LONGITUDE: -109.5385
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
Plat R649-2-3.
Bond: Fed[1] Ind[] Sta[] Fee[]Unit
(NO.ESBOOO24 )Potash (Y/N) \/' R649-3-2. General
Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells
Water Permit R649-3-3. Exception(No.43-8496 )
RDCC Review (Y/N)Drilling Unit
(Date: ) Board Cause No:Eff Date:
Fee Surf Agreement (Y/N) Siting:
\18 Intent to Commingle (Y/N),R649-3-11. Directional Drill
COMMENTS:
STIPULATIONS: d i
WV Sw-Ifr7-21
BB E 15G-Ifr7-21
x
T7S R21E
BBS 15G-22 7-21PEUCANLUCE UNFF2
STIRRUP UNITSU+W267-21
f.EOTA UNIT A 2 26 in
OPERATOR: QEP UITNA BASIN INC (N2460)
SEC: 22 T.7S R.21E
FIELD:WILDCAT (001)
COUNTY: UINTAH
SPACING: R649-3-2 / GENERAL SITING Wells Status
: : s¶g=GOEN Utah OilGas and Mmmyx LOCATION ABANDONED
NEW LOCATIONField Status Unit Status g PLUGGED & ABANDONED
ABANDONED EXPLORATORY ¾ PRODUCING GASACTIVE N
PS LRAGE e OD IN OILCOMBINED NF SECONDARY
• SHUT-IN OILINACTIVE NDLING)s( TEMP. ABANDONEDPROPOSED
PP GAS o TEST WELL
L M N TED PP GEOTHERML & WATER INJECTION SPP OIL g wATER SUPPLY PREPARED BY: DIANA WFUTNEYSECONDARY WATER DISPOSAL DATE. 5-DECEMBER-2005TERMINATED
,
WV Sw-Ifr7-21
BB E 15G-Ifr7-21
x
T7S R21E
BBS 15G-22 7-21PEUCANLUCE UNFF2
STIRRUP UNITSU+W267-21
f.EOTA UNIT A 2 26 in
OPERATOR: QEP UITNA BASIN INC (N2460)
SEC: 22 T.7S R.21E
FIELD:WILDCAT (001)
COUNTY: UINTAH
SPACING: R649-3-2 / GENERAL SITING Wells Status
: : s¶g=GOEN Utah OilGas and Mmmyx LOCATION ABANDONED
NEW LOCATIONField Status Unit Status g PLUGGED & ABANDONED
ABANDONED EXPLORATORY ¾ PRODUCING GASACTIVE N
PS LRAGE e OD IN OILCOMBINED NF SECONDARY
• SHUT-IN OILINACTIVE NDLING)s( TEMP. ABANDONEDPROPOSED
PP GAS o TEST WELL
L M N TED PP GEOTHERML & WATER INJECTION SPP OIL g wATER SUPPLY PREPARED BY: DIANA WFUTNEYSECONDARY WATER DISPOSAL DATE. 5-DECEMBER-2005TERMINATED
,
WV Sw-Ifr7-21
BB E 15G-Ifr7-21
x
T7S R21E
BBS 15G-22 7-21PEUCANLUCE UNFF2
STIRRUP UNITSU+W267-21
f.EOTA UNIT A 2 26 in
OPERATOR: QEP UITNA BASIN INC (N2460)
SEC: 22 T.7S R.21E
FIELD:WILDCAT (001)
COUNTY: UINTAH
SPACING: R649-3-2 / GENERAL SITING Wells Status
: : s¶g=GOEN Utah OilGas and MmmyX LOCATION ABANDONED
NEW LOCATIONField Status Unit Status g PLUGGED & ABANDONED
ABANDONED EXPLORATORY y PRODUCING GASACTIVE N
PS LRAGE e OD IN OILCOMBINED NF SECONDARY
• SHUT-IN OILINACTIVE NDLING)s( TEMP. ABANDONEDPROPOSED
PP GAS o TEST WELL
L M N TED PP GEOTHERML & WATER INJECTION SPP OIL g wATER SUPPLY PREPARED BY: DIANA WFUTNEYSECONDARY WATER DISPOSAL DATE. 5-DECEMBER-2005TERMINATED
,
WV Sw-Ifr7-21
BB E 15G-Ifr7-21
x
T7S R21E
BBS 15G-22 7-21PEUCANLUCE UNFF2
STIRRUP UNITSU+W267-21
f.EOTA UNIT A 2 26 in
OPERATOR: QEP UITNA BASIN INC (N2460)
SEC: 22 T.7S R.21E
FIELD:WILDCAT (001)
COUNTY: UINTAH
SPACING: R649-3-2 / GENERAL SITING Wells Status
: : s¶g=GOEN Utah OilGas and MmmyX LOCATION ABANDONED
NEW LOCATIONField Status Unit Status g PLUGGED & ABANDONED
ABANDONED EXPLORATORY y PRODUCING GASACTIVE N
PS LRAGE e OD IN OILCOMBINED NF SECONDARY
• SHUT-IN OILINACTIVE NDLING)s( TEMP. ABANDONEDPROPOSED
PP GAS o TEST WELL
L M N TED PP GEOTHERML & WATER INJECTION SPP OIL g wATER SUPPLY PREPARED BY: DIANA WFUTNEYSECONDARY WATER DISPOSAL DATE. 5-DECEMBER-2005TERMINATED
,
O Oe JON M. HUNTSMAN, JR.
Governor
GARY R. HERBERT••• Lieutenant Governor
State of Utah December 5, 2005
Department ofNatural Resources
MICHAEL R. STYLERExecutive Director QEP Uinta Basin, Inc.
11002 E 17500 SDivision of Vernal, UT 84078Oil, Gas & MiningJOHN R. BAZADivision Director
Re: BBS 15G-22-7-21 Well, 669' FSL, 2022' FEL, SW SE, Sec. 22, T. 7 South,R. 21 East, Uintah County, Utah
Gentlemen:
Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the attached Conditions ofApproval, approval to drill the referenced well is granted.
This approval shall expire one year from the above date unless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to this well is 43-047-37443.
Sincerely,
Gil HuntAssociate Director
pabEnclosures
cc: Uintah County AssessorBureau of Land Management, Vernal District Office
1594 WestNorth Ternple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801)538-5340•facsimile (801)359-3940•TTY (801) 538-7458
O Oe JON M. HUNTSMAN, JR.
Governor
GARY R. HERBERT••• Lieutenant Governor
State of Utah December 5, 2005
Department ofNatural Resources
MICHAEL R. STYLERExecutive Director QEP Uinta Basin, Inc.
11002 E 17500 SDivision ofVernal, UT 84078Oil, Gas & Mining
JOHN R. BAZADivision Director
Re: BBS 15G-22-7-21 Well, 669' FSL, 2022' FEL, SW SE, Sec. 22, T. 7 South,R. 21 East, Uintah County, Utah
Gentlemen:
Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the attached Conditions ofApproval, approval to drill the referenced well is granted.
This approval shall expire one year from the above date unless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to this well is 43-047-37443.
Sincerely,
Gil HuntAssociate Director
pabEnclosures
cc: Uintah County AssessorBureau of Land Management, Vernal District Office
1594 WestNorth Ternple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801)538-5340•facsimile (801)359-3940•TTY (801) 538-7458
O Oe JON M. HUNTSMAN, JR.
Governor
GARY R. HERBERT••• Lieutenant Governor
State of Utah December 5, 2005
Department ofNatural Resources
MICHAEL R. STYLERExecutive Director QEP Uinta Basin, Inc.
11002 E 17500 SDivision of Vernal, UT 84078Oil, Gas & MiningJOHN R. BAZADivision Director
Re: BBS 15G-22-7-21 Well, 669' FSL, 2022' FEL, SW SE, Sec. 22, T. 7 South,R. 21 East, Uintah County, Utah
Gentlemen:
Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the attached Conditions ofApproval, approval to drill the referenced well is granted.
This approval shall expire one year from the above date unless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to this well is 43-047-37443.
Sincerely,
Gil HuntAssociate Director
pabEnclosures
cc: Uintah County AssessorBureau of Land Management, Vernal District Office
1594 WestNorth Ternple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801)538-5340•facsimile (801)359-3940•TTY (801) 538-7458
O Oe JON M. HUNTSMAN, JR.
Governor
GARY R. HERBERT••• Lieutenant Governor
State of Utah December 5, 2005
Department ofNatural Resources
MICHAEL R. STYLERExecutive Director QEP Uinta Basin, Inc.
11002 E 17500 SDivision of Vernal, UT 84078Oil, Gas & MiningJOHN R. BAZADivision Director
Re: BBS 15G-22-7-21 Well, 669' FSL, 2022' FEL, SW SE, Sec. 22, T. 7 South,R. 21 East, Uintah County, Utah
Gentlemen:
Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the attached Conditions ofApproval, approval to drill the referenced well is granted.
This approval shall expire one year from the above date unless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to this well is 43-047-37443.
Sincerely,
Gil HuntAssociate Director
pabEnclosures
cc: Uintah County AssessorBureau of Land Management, Vernal District Office
1594 WestNorth Ternple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801)538-5340•facsimile (801)359-3940•TTY (801) 538-7458
O OOperator: QEP Uinta Basin, Inc.Well Name & Number BBS 15G-22-7-21
API Number: 43-047-37443Lease: UTU-74972
Location: SW SE Sec._ 22_ T. 7 South R. 21 East
Conditions of Approval
1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.
2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.
Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338
3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.
4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.
5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of tlie Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion ofits analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the
O OOperator: QEP Uinta Basin, Inc.Well Name & Number BBS 15G-22-7-21
API Number: 43-047-37443Lease: UTU-74972
Location: SW SE Sec._ 22_ T. 7 South R. 21 East
Conditions of Approval
1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.
2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.
Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338
3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.
4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.
5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of tlie Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion ofits analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the
O OOperator: QEP Uinta Basin, Inc.Well Name & Number BBS 15G-22-7-21
API Number: 43-047-37443Lease: UTU-74972
Location: SW SE Sec._ 22_ T. 7 South R. 21 East
Conditions of Approval
1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.
2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.
Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338
3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.
4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.
5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of tlie Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion ofits analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the
O OOperator: QEP Uinta Basin, Inc.Well Name & Number BBS 15G-22-7-21
API Number: 43-047-37443Lease: UTU-74972
Location: SW SE Sec._ 22_ T. 7 South R. 21 East
Conditions of Approval
1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.
2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.
Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338
3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.
4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.
5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of tlie Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion ofits analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the
NOV2 9 2005FORM APPROVED
Form 3160-3OMB NO. 1040-0136
(July1992) UNITED STATES SUBMITINTRIPLICATE* Ëxpires:February28.1995
DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.
BUREAU OF LAND MANAGEMENT UTU-74972
6. 1FINDIAN,ALLOTTEE OR TRIBE NAME
APPLICATION FOR PERMIT TO DRILL OR DEEPEN NIA
TYPE OF WORK 7. UNITAGREEMENT NAME
DRILL DEEPEN . NIA
TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.
O O SINGLE O MULTIPLE
OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21
2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO.
QEP Uinta Basin, Inc. E-Mail: [email protected] )3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT
11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 UNDESIGNATED
4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA
At Surface 669' FSL 2022' FEL, SWSE, SECTION 22, T7S, R21E SWSE, SECTION 22, T7S, R21E
At proposed production zone SAME
14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE
35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT
15. DISTANCE FROlvi PROPOSED LOCATIONTO NEAREST 16.NO.0F ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL
PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40
669' +/-
18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file
completed, applied for, on this lease, ft 6850'ESBOOO24
21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration
4907.6 GR ASAP 10 DAYS
24. Attachments
The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:
1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).
3. A surface Use Plan (if location is on National Forest System Lands' 5. Operator certification.
the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information andlor plans as may be required by the
authorized officer.
SIGNED Name (Printed) JAN NELSON epted by the 28-Nov-05
TITLE FFAIRS
ederal or State office use)
OgRECORDONLYPERMIT NO. APPROVAL DATE
Application approval does not warrant or cedify the applicantholds any le itable titleto those rights in the subject lease whichwouldentitle the applicant to conduct operations thereon
CONDITIONS OF AL, IF AN
APPROVED TITLE MOTS OSS DATE
See Instructions On Reverse Side
Title 18 US ection 1001. makes it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statementsor representations as to any mater within its jurisdiction
REGEiVED ÛÑRDEggyMAYI 12WS
/S$ DIV.0FOIL,GAS&
NOV2 9 2005FORM APPROVED
Form 3160-3OMB NO. 1040-0136
(July1992) UNITED STATES SUBMITINTRIPLICATE* Ëxpires:February28.1995
DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.
BUREAU OF LAND MANAGEMENT UTU-74972
6. 1FINDIAN,ALLOTTEE OR TRIBE NAME
APPLICATION FOR PERMIT TO DRILL OR DEEPEN NIA
TYPE OF WORK 7. UNITAGREEMENT NAME
DRILL DEEPEN . NIA
TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.
O O SINGLE O MULTIPLE
OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21
2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO.
QEP Uinta Basin, Inc. E-Mail: [email protected] )3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT
11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 UNDESIGNATED
4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA
At Surface 669' FSL 2022' FEL, SWSE, SECTION 22, T7S, R21E SWSE, SECTION 22, T7S, R21E
At proposed production zone SAME
14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE
35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT
15. DISTANCE FROlvi PROPOSED LOCATIONTO NEAREST 16.NO.0F ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL
PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40
669' +/-
18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file
completed, applied for, on this lease, ft 6850'ESBOOO24
21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration
4907.6 GR ASAP 10 DAYS
24. Attachments
The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:
1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).
3. A surface Use Plan (if location is on National Forest System Lands' 5. Operator certification.
the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information andlor plans as may be required by the
authorized officer.
SIGNED Name (Printed) JAN NELSON epted by the 28-Nov-05
TITLE FFAIRS
ederal or State office use)
OgRECORDONLYPERMIT NO. APPROVAL DATE
Application approval does not warrant or cedify the applicantholds any le itable titleto those rights in the subject lease whichwouldentitle the applicant to conduct operations thereon
CONDITIONS OF AL, IF AN
APPROVED TITLE MOTS OSS DATE
See Instructions On Reverse Side
Title 18 US ection 1001. makes it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statementsor representations as to any mater within its jurisdiction
REGEiVED ÛÑRDEggyMAYI 12WS
/S$ DIV.0FOIL,GAS&
NOV2 9 2005FORM APPROVED
Form 3160-3OMB NO. 1040-0136
(July1992) UNITED STATES SUBMITINTRIPLICATE* Ëxpires:February28.1995
DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.
BUREAU OF LAND MANAGEMENT UTU-74972
6. 1FINDIAN,ALLOTTEE OR TRIBE NAME
APPLICATION FOR PERMIT TO DRILL OR DEEPEN NIA
TYPE OF WORK 7. UNITAGREEMENT NAME
DRILL DEEPEN . NIA
TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.
O O SINGLE O MULTIPLE
OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21
2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO.
QEP Uinta Basin, Inc. E-Mail: [email protected] )3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT
11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 UNDESIGNATED
4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA
At Surface 669' FSL 2022' FEL, SWSE, SECTION 22, T7S, R21E SWSE, SECTION 22, T7S, R21E
At proposed production zone SAME
14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE
35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT
15. DISTANCE FROlvi PROPOSED LOCATIONTO NEAREST 16.NO.0F ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL
PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40
669' +/-
18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file
completed, applied for, on this lease, ft 6850'ESBOOO24
21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration
4907.6 GR ASAP 10 DAYS
24. Attachments
The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:
1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).
3. A surface Use Plan (if location is on National Forest System Lands' 5. Operator certification.
the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information andlor plans as may be required by the
authorized officer.
SIGNED Name (Printed) JAN NELSON epted by the 28-Nov-05
TITLE FFAIRS
ederal or State office use)
OgRECORDONLYPERMIT NO. APPROVAL DATE
Application approval does not warrant or cedify the applicantholds any le itable titleto those rights in the subject lease whichwouldentitle the applicant to conduct operations thereon
CONDITIONS OF AL, IF AN
APPROVED TITLE MOTS OSS DATE
See Instructions On Reverse Side
Title 18 US ection 1001. makes it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statementsor representations as to any mater within its jurisdiction
REGEiVED ÛÑRDEggyMAYI 12WS
/S$ DIV.0FOIL,GAS&
NOV2 9 2005FORM APPROVED
Form 3160-3OMB NO. 1040-0136
(July1992) UNITED STATES SUBMITINTRIPLICATE* Ëxpires:February28.1995
DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.
BUREAU OF LAND MANAGEMENT UTU-74972
6. 1FINDIAN,ALLOTTEE OR TRIBE NAME
APPLICATION FOR PERMIT TO DRILL OR DEEPEN NIA
TYPE OF WORK 7. UNITAGREEMENT NAME
DRILL DEEPEN . NIA
TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.
O O SINGLE O MULTIPLE
OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21
2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO.
QEP Uinta Basin, Inc. E-Mail: [email protected] )3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT
11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 UNDESIGNATED
4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA
At Surface 669' FSL 2022' FEL, SWSE, SECTION 22, T7S, R21E SWSE, SECTION 22, T7S, R21E
At proposed production zone SAME
14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE
35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT
15. DISTANCE FROlvi PROPOSED LOCATIONTO NEAREST 16.NO.0F ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL
PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40
669' +/-
18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file
completed, applied for, on this lease, ft 6850'ESBOOO24
21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration
4907.6 GR ASAP 10 DAYS
24. Attachments
The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:
1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).
3. A surface Use Plan (if location is on National Forest System Lands' 5. Operator certification.
the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information andlor plans as may be required by the
authorized officer.
SIGNED Name (Printed) JAN NELSON epted by the 28-Nov-05
TITLE FFAIRS
ederal or State office use)
OgRECORDONLYPERMIT NO. APPROVAL DATE
Application approval does not warrant or cedify the applicantholds any le itable titleto those rights in the subject lease whichwouldentitle the applicant to conduct operations thereon
CONDITIONS OF AL, IF AN
APPROVED TITLE MOTS OSS DATE
See Instructions On Reverse Side
Title 18 US ection 1001. makes it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statementsor representations as to any mater within its jurisdiction
REGEiVED ÛÑRDEggyMAYI 12WS
/S$ DIV.0FOIL,GAS&
UNITED STATES DEPARTMENT OF THE INTERIOR S -
BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE
170 South 500 East VERNAL, UT 84078 (435) 781-4400
CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TODRILL
Company: QEP UINTA BASIN INC Location: SWSE, Sec.25 , T8S, R24EWell No: BBS 15G-22-7-21 Lease No: UTU-74972API No: 43-047-37443 Agreement: N/A
Petroleum Engineer: Matt Baker Office: 435-781-4490 Cell: 435-828-4470Petroleum Engineer: Michael Lee Office: 435-781-4432 Cell: 435-828-7875Supervisory Petroleum Technician: Jamie Sparger Office: 435-781-4502 Cell: 435-828-3913Environmental Scientist: Paul Buhler Office: 435-781-4475 Cell: 435-828-4029Environmental Scientist: Karl Wright Office: 435-781-4484Natural Resource Specialist: Holly Villa Office: 435-781-4404Natural Resource Specialist: Melissa Hawk Office: 435-781-4476
.
After hours message number:.(435) 781-4513 Office Fax: (435) 781-4410
A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE
All lease and/or unit operations are to be conducted in such a manner that full compliance ismade with the applicable laws, regulations (43 CFR Part 3160), and this approved Applicationfor Permit to Drill including Surface and Downhole Conditions of Approval. The operator isconsidered fully responsible for the actions of his subcontractors. A copy of the approved APDmust be on location during construction, drilling, and completion operations. This permit isapproved for a one-year period. An additional year extension may be applied for bysundry notice prior to expiration.
NOTIFICATION REQUIREMENTS
Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Paul BuhlerES / NRS) access roads.
Location Completion - Prior to moving on the drilling rig.(Notify Paul BuhlerES / NRS)
Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify PE)
Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Jamie Sparger SPT) all casing strings.
BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Jamie Sparger SPT)
First Production Notice - Within Five (5) business days after new well begins or(Notify PE) production resumes after well has been off production for more
than ninety (90)
UNITED STATES DEPARTMENT OF THE INTERIOR S -
BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE
170 South 500 East VERNAL, UT 84078 (435) 781-4400
CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TODRILL
Company: QEP UINTA BASIN INC Location: SWSE, Sec.25 , T8S, R24EWell No: BBS 15G-22-7-21 Lease No: UTU-74972API No: 43-047-37443 Agreement: N/A
Petroleum Engineer: Matt Baker Office: 435-781-4490 Cell: 435-828-4470Petroleum Engineer: Michael Lee Office: 435-781-4432 Cell: 435-828-7875Supervisory Petroleum Technician: Jamie Sparger Office: 435-781-4502 Cell: 435-828-3913Environmental Scientist: Paul Buhler Office: 435-781-4475 Cell: 435-828-4029Environmental Scientist: Karl Wright Office: 435-781-4484Natural Resource Specialist: Holly Villa Office: 435-781-4404Natural Resource Specialist: Melissa Hawk Office: 435-781-4476
.
After hours message number:.(435) 781-4513 Office Fax: (435) 781-4410
A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE
All lease and/or unit operations are to be conducted in such a manner that full compliance ismade with the applicable laws, regulations (43 CFR Part 3160), and this approved Applicationfor Permit to Drill including Surface and Downhole Conditions of Approval. The operator isconsidered fully responsible for the actions of his subcontractors. A copy of the approved APDmust be on location during construction, drilling, and completion operations. This permit isapproved for a one-year period. An additional year extension may be applied for bysundry notice prior to expiration.
NOTIFICATION REQUIREMENTS
Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Paul BuhlerES / NRS) access roads.
Location Completion - Prior to moving on the drilling rig.(Notify Paul BuhlerES / NRS)
Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify PE)
Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Jamie Sparger SPT) all casing strings.
BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Jamie Sparger SPT)
First Production Notice - Within Five (5) business days after new well begins or(Notify PE) production resumes after well has been off production for more
than ninety (90)
UNITED STATES DEPARTMENT OF THE INTERIOR S -
BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE
170 South 500 East VERNAL, UT 84078 (435) 781-4400
CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TODRILL
Company: QEP UINTA BASIN INC Location: SWSE, Sec.25 , T8S, R24EWell No: BBS 15G-22-7-21 Lease No: UTU-74972API No: 43-047-37443 Agreement: N/A
Petroleum Engineer: Matt Baker Office: 435-781-4490 Cell: 435-828-4470Petroleum Engineer: Michael Lee Office: 435-781-4432 Cell: 435-828-7875Supervisory Petroleum Technician: Jamie Sparger Office: 435-781-4502 Cell: 435-828-3913Environmental Scientist: Paul Buhler Office: 435-781-4475 Cell: 435-828-4029Environmental Scientist: Karl Wright Office: 435-781-4484Natural Resource Specialist: Holly Villa Office: 435-781-4404Natural Resource Specialist: Melissa Hawk Office: 435-781-4476
.
After hours message number:.(435) 781-4513 Office Fax: (435) 781-4410
A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE
All lease and/or unit operations are to be conducted in such a manner that full compliance ismade with the applicable laws, regulations (43 CFR Part 3160), and this approved Applicationfor Permit to Drill including Surface and Downhole Conditions of Approval. The operator isconsidered fully responsible for the actions of his subcontractors. A copy of the approved APDmust be on location during construction, drilling, and completion operations. This permit isapproved for a one-year period. An additional year extension may be applied for bysundry notice prior to expiration.
NOTIFICATION REQUIREMENTS
Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Paul BuhlerES / NRS) access roads.
Location Completion - Prior to moving on the drilling rig.(Notify Paul BuhlerES / NRS)
Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify PE)
Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Jamie Sparger SPT) all casing strings.
BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Jamie Sparger SPT)
First Production Notice - Within Five (5) business days after new well begins or(Notify PE) production resumes after well has been off production for more
than ninety (90)
UNITED STATES DEPARTMENT OF THE INTERIOR S -
BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE
170 South 500 East VERNAL, UT 84078 (435) 781-4400
CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TODRILL
Company: QEP UINTA BASIN INC Location: SWSE, Sec.25 , T8S, R24EWell No: BBS 15G-22-7-21 Lease No: UTU-74972API No: 43-047-37443 Agreement: N/A
Petroleum Engineer: Matt Baker Office: 435-781-4490 Cell: 435-828-4470Petroleum Engineer: Michael Lee Office: 435-781-4432 Cell: 435-828-7875Supervisory Petroleum Technician: Jamie Sparger Office: 435-781-4502 Cell: 435-828-3913Environmental Scientist: Paul Buhler Office: 435-781-4475 Cell: 435-828-4029Environmental Scientist: Karl Wright Office: 435-781-4484Natural Resource Specialist: Holly Villa Office: 435-781-4404Natural Resource Specialist: Melissa Hawk Office: 435-781-4476
.
After hours message number:.(435) 781-4513 Office Fax: (435) 781-4410
A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE
All lease and/or unit operations are to be conducted in such a manner that full compliance ismade with the applicable laws, regulations (43 CFR Part 3160), and this approved Applicationfor Permit to Drill including Surface and Downhole Conditions of Approval. The operator isconsidered fully responsible for the actions of his subcontractors. A copy of the approved APDmust be on location during construction, drilling, and completion operations. This permit isapproved for a one-year period. An additional year extension may be applied for bysundry notice prior to expiration.
NOTIFICATION REQUIREMENTS
Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Paul BuhlerES / NRS) access roads.
Location Completion - Prior to moving on the drilling rig.(Notify Paul BuhlerES / NRS)
Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify PE)
Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Jamie Sparger SPT) all casing strings.
BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Jamie Sparger SPT)
First Production Notice - Within Five (5) business days after new well begins or(Notify PE) production resumes after well has been off production for more
than ninety (90)
COAs: Page 2 of 6Well: BBS 15G-22-7-21
SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)
1. Oil well, product will be trucked. No pipeline needed at this
COAs: Page 2 of 6Well: BBS 15G-22-7-21
SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)
1. Oil well, product will be trucked. No pipeline needed at this
COAs: Page 2 of 6Well: BBS 15G-22-7-21
SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)
1. Oil well, product will be trucked. No pipeline needed at this
COAs: Page 2 of 6Well: BBS 15G-22-7-21
SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)
1. Oil well, product will be trucked. No pipeline needed at this
COAs: Page 3 of 6Well: BBS 15G-22-7-21
DOWNHOLE CONDITIONS OF APPROVAL
All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:
SITE SPECIFIC DOWNHOLE CONDITIONS OF APPROVAL
DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS1. There shall be no deviation from the proposed drilling, completion, and/or workover
program as approved. Safe drilling and operating practices must be observed. All wells,whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, leaseserial number, well number, and surveyed description of the well. Any changes inoperation must have prior approval from the BLM, Vernal Field Office PetroleumEngineers.
2. The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.
3. Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least24 hours in advance of casing cementing operations and BOPE & casing pressuretests.
4. Blowout prevention equipment (BOPE) will remain in use until the well is completed orabandoned. Closing unit controls must remain unobstructed and readily accessible at alltimes. Choke manifolds must be located outside of the rig substructure.
All BOPE components will be inspected daily and those inspections shall be recorded inthe daily drilling report. Components shall be operated and tested as required by OnshoreOil & Gas Order No. 2 to insure good mechanical working order. All BOPE pressuretests must be performed by a test pump with a chart recorder and NOT_by the rig pumps.Test must be reported in the driller's log.
BOP drills must be initially conducted by each drilling crew within 24 hours of drillingout from under the surface casing and weekly thereafter as specified in Onshore Oil &Gas Order No. 2.
Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.
No aggressive/fresh hard-banded drill pipe shall be used within casing.
5. All shows of fresh water and minerals will be reported and protected. A sample will betaken of any water flows and a water analysis furnished the BLM, Vernal Field Office.All oil and gas shows will be adequateÏytested for commercial possibilities, reported, andprotected.
6. No location will be constructed or moved, no well will be plugged, and no drilling
COAs: Page 3 of 6Well: BBS 15G-22-7-21
DOWNHOLE CONDITIONS OF APPROVAL
All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:
SITE SPECIFIC DOWNHOLE CONDITIONS OF APPROVAL
DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS1. There shall be no deviation from the proposed drilling, completion, and/or workover
program as approved. Safe drilling and operating practices must be observed. All wells,whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, leaseserial number, well number, and surveyed description of the well. Any changes inoperation must have prior approval from the BLM, Vernal Field Office PetroleumEngineers.
2. The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.
3. Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least24 hours in advance of casing cementing operations and BOPE & casing pressuretests.
4. Blowout prevention equipment (BOPE) will remain in use until the well is completed orabandoned. Closing unit controls must remain unobstructed and readily accessible at alltimes. Choke manifolds must be located outside of the rig substructure.
All BOPE components will be inspected daily and those inspections shall be recorded inthe daily drilling report. Components shall be operated and tested as required by OnshoreOil & Gas Order No. 2 to insure good mechanical working order. All BOPE pressuretests must be performed by a test pump with a chart recorder and NOT_by the rig pumps.Test must be reported in the driller's log.
BOP drills must be initially conducted by each drilling crew within 24 hours of drillingout from under the surface casing and weekly thereafter as specified in Onshore Oil &Gas Order No. 2.
Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.
No aggressive/fresh hard-banded drill pipe shall be used within casing.
5. All shows of fresh water and minerals will be reported and protected. A sample will betaken of any water flows and a water analysis furnished the BLM, Vernal Field Office.All oil and gas shows will be adequateÏytested for commercial possibilities, reported, andprotected.
6. No location will be constructed or moved, no well will be plugged, and no drilling
COAs: Page 3 of 6Well: BBS 15G-22-7-21
DOWNHOLE CONDITIONS OF APPROVAL
All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:
SITE SPECIFIC DOWNHOLE CONDITIONS OF APPROVAL
DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS1. There shall be no deviation from the proposed drilling, completion, and/or workover
program as approved. Safe drilling and operating practices must be observed. All wells,whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, leaseserial number, well number, and surveyed description of the well. Any changes inoperation must have prior approval from the BLM, Vernal Field Office PetroleumEngineers.
2. The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.
3. Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least24 hours in advance of casing cementing operations and BOPE & casing pressuretests.
4. Blowout prevention equipment (BOPE) will remain in use until the well is completed orabandoned. Closing unit controls must remain unobstructed and readily accessible at alltimes. Choke manifolds must be located outside of the rig substructure.
All BOPE components will be inspected daily and those inspections shall be recorded inthe daily drilling report. Components shall be operated and tested as required by OnshoreOil & Gas Order No. 2 to insure good mechanical working order. All BOPE pressuretests must be performed by a test pump with a chart recorder and NOT_by the rig pumps.Test must be reported in the driller's log.
BOP drills must be initially conducted by each drilling crew within 24 hours of drillingout from under the surface casing and weekly thereafter as specified in Onshore Oil &Gas Order No. 2.
Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.
No aggressive/fresh hard-banded drill pipe shall be used within casing.
5. All shows of fresh water and minerals will be reported and protected. A sample will betaken of any water flows and a water analysis furnished the BLM, Vernal Field Office.All oil and gas shows will be adequateÏytested for commercial possibilities, reported, andprotected.
6. No location will be constructed or moved, no well will be plugged, and no drilling
COAs: Page 3 of 6Well: BBS 15G-22-7-21
DOWNHOLE CONDITIONS OF APPROVAL
All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:
SITE SPECIFIC DOWNHOLE CONDITIONS OF APPROVAL
DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS1. There shall be no deviation from the proposed drilling, completion, and/or workover
program as approved. Safe drilling and operating practices must be observed. All wells,whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, leaseserial number, well number, and surveyed description of the well. Any changes inoperation must have prior approval from the BLM, Vernal Field Office PetroleumEngineers.
2. The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.
3. Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least24 hours in advance of casing cementing operations and BOPE & casing pressuretests.
4. Blowout prevention equipment (BOPE) will remain in use until the well is completed orabandoned. Closing unit controls must remain unobstructed and readily accessible at alltimes. Choke manifolds must be located outside of the rig substructure.
All BOPE components will be inspected daily and those inspections shall be recorded inthe daily drilling report. Components shall be operated and tested as required by OnshoreOil & Gas Order No. 2 to insure good mechanical working order. All BOPE pressuretests must be performed by a test pump with a chart recorder and NOT_by the rig pumps.Test must be reported in the driller's log.
BOP drills must be initially conducted by each drilling crew within 24 hours of drillingout from under the surface casing and weekly thereafter as specified in Onshore Oil &Gas Order No. 2.
Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.
No aggressive/fresh hard-banded drill pipe shall be used within casing.
5. All shows of fresh water and minerals will be reported and protected. A sample will betaken of any water flows and a water analysis furnished the BLM, Vernal Field Office.All oil and gas shows will be adequateÏytested for commercial possibilities, reported, andprotected.
6. No location will be constructed or moved, no well will be plugged, and no drilling
COAs: Page 4 of 6Well: BBS 15G-22-7-21
workover equipment will be removed from a well to be placed in a suspended statuswithout prior approval of the BLM, Vernal Field Office. If operations are to besuspended for more than 30 days, prior approval of the BLM, Vernal Field Office mustbe obtained and notification given before resumption of operations.
7. Chronologic drilling progress reports must be filed directly with the BLM, Vernal FieldOffice on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.
Any change in the program must be approved by the BLM, Vernal Field Office. "SundryNotices and Reports on Wells" (Form BLM 3160-5) must be filed for all changes of plansand other operations in accordance with 43 CFR 3162.3-2.
Emergency approval may be obtained orally, but such approval does not waive thewritten report requirement. Any additional construction, reconstruction, or alterations offacilities, including roads, gathering lines, batteries, etc., which will result in thedisturbance of new ground, will require the filing of a suitable plan pursuant to OnshoreOil & Gas Order No. 1 of 43 CFR 3164.1 and prior approval by the BLM, Vernal FieldOffice.
In accordance with 43 CFR 3162.4-3, this well must be reported on the "Monthly Reportof Operations" (Oil and Gas Operations Report ((OGOR)) starting with the month inwhich operations commence and continue each month until the well is physically pluggedand abandoned. This report shall be filed in duplicate, directly with the MineralsManagement Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.
8. Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) will be submitted not later than 30days after completion of the well or after completion of operations being performed, inaccordance with 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and allother surveys or data obtained and compiled during the drilling, workover, and/orcompletion operations, will be filed on BLM Form 3160-4. Submit with the wellcompletion report a geologic report including, at a minimum, formation tops, and asummary and conclusions. Also include deviation surveys, sample descriptions, striplogs, core data, drill stem test data, and results of production tests if performed. Samples(cuttings, fluid, and/or gas) will be submitted only when requested by the BLM, VernalField Office.
Please submit an electronic copy of all logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM. The cement bond log must be submitted in rasterformat (TIF, PDF other).
9. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease willhave prior written approval from the BLM, Vernal Field Office.
All measurement points shall be identified as point of sales or allocation for
COAs: Page 4 of 6Well: BBS 15G-22-7-21
workover equipment will be removed from a well to be placed in a suspended statuswithout prior approval of the BLM, Vernal Field Office. If operations are to besuspended for more than 30 days, prior approval of the BLM, Vernal Field Office mustbe obtained and notification given before resumption of operations.
7. Chronologic drilling progress reports must be filed directly with the BLM, Vernal FieldOffice on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.
Any change in the program must be approved by the BLM, Vernal Field Office. "SundryNotices and Reports on Wells" (Form BLM 3160-5) must be filed for all changes of plansand other operations in accordance with 43 CFR 3162.3-2.
Emergency approval may be obtained orally, but such approval does not waive thewritten report requirement. Any additional construction, reconstruction, or alterations offacilities, including roads, gathering lines, batteries, etc., which will result in thedisturbance of new ground, will require the filing of a suitable plan pursuant to OnshoreOil & Gas Order No. 1 of 43 CFR 3164.1 and prior approval by the BLM, Vernal FieldOffice.
In accordance with 43 CFR 3162.4-3, this well must be reported on the "Monthly Reportof Operations" (Oil and Gas Operations Report ((OGOR)) starting with the month inwhich operations commence and continue each month until the well is physically pluggedand abandoned. This report shall be filed in duplicate, directly with the MineralsManagement Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.
8. Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) will be submitted not later than 30days after completion of the well or after completion of operations being performed, inaccordance with 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and allother surveys or data obtained and compiled during the drilling, workover, and/orcompletion operations, will be filed on BLM Form 3160-4. Submit with the wellcompletion report a geologic report including, at a minimum, formation tops, and asummary and conclusions. Also include deviation surveys, sample descriptions, striplogs, core data, drill stem test data, and results of production tests if performed. Samples(cuttings, fluid, and/or gas) will be submitted only when requested by the BLM, VernalField Office.
Please submit an electronic copy of all logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM. The cement bond log must be submitted in rasterformat (TIF, PDF other).
9. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease willhave prior written approval from the BLM, Vernal Field Office.
All measurement points shall be identified as point of sales or allocation for
COAs: Page 4 of 6Well: BBS 15G-22-7-21
workover equipment will be removed from a well to be placed in a suspended statuswithout prior approval of the BLM, Vernal Field Office. If operations are to besuspended for more than 30 days, prior approval of the BLM, Vernal Field Office mustbe obtained and notification given before resumption of operations.
7. Chronologic drilling progress reports must be filed directly with the BLM, Vernal FieldOffice on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.
Any change in the program must be approved by the BLM, Vernal Field Office. "SundryNotices and Reports on Wells" (Form BLM 3160-5) must be filed for all changes of plansand other operations in accordance with 43 CFR 3162.3-2.
Emergency approval may be obtained orally, but such approval does not waive thewritten report requirement. Any additional construction, reconstruction, or alterations offacilities, including roads, gathering lines, batteries, etc., which will result in thedisturbance of new ground, will require the filing of a suitable plan pursuant to OnshoreOil & Gas Order No. 1 of 43 CFR 3164.1 and prior approval by the BLM, Vernal FieldOffice.
In accordance with 43 CFR 3162.4-3, this well must be reported on the "Monthly Reportof Operations" (Oil and Gas Operations Report ((OGOR)) starting with the month inwhich operations commence and continue each month until the well is physically pluggedand abandoned. This report shall be filed in duplicate, directly with the MineralsManagement Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.
8. Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) will be submitted not later than 30days after completion of the well or after completion of operations being performed, inaccordance with 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and allother surveys or data obtained and compiled during the drilling, workover, and/orcompletion operations, will be filed on BLM Form 3160-4. Submit with the wellcompletion report a geologic report including, at a minimum, formation tops, and asummary and conclusions. Also include deviation surveys, sample descriptions, striplogs, core data, drill stem test data, and results of production tests if performed. Samples(cuttings, fluid, and/or gas) will be submitted only when requested by the BLM, VernalField Office.
Please submit an electronic copy of all logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM. The cement bond log must be submitted in rasterformat (TIF, PDF other).
9. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease willhave prior written approval from the BLM, Vernal Field Office.
All measurement points shall be identified as point of sales or allocation for
COAs: Page 4 of 6Well: BBS 15G-22-7-21
workover equipment will be removed from a well to be placed in a suspended statuswithout prior approval of the BLM, Vernal Field Office. If operations are to besuspended for more than 30 days, prior approval of the BLM, Vernal Field Office mustbe obtained and notification given before resumption of operations.
7. Chronologic drilling progress reports must be filed directly with the BLM, Vernal FieldOffice on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.
Any change in the program must be approved by the BLM, Vernal Field Office. "SundryNotices and Reports on Wells" (Form BLM 3160-5) must be filed for all changes of plansand other operations in accordance with 43 CFR 3162.3-2.
Emergency approval may be obtained orally, but such approval does not waive thewritten report requirement. Any additional construction, reconstruction, or alterations offacilities, including roads, gathering lines, batteries, etc., which will result in thedisturbance of new ground, will require the filing of a suitable plan pursuant to OnshoreOil & Gas Order No. 1 of 43 CFR 3164.1 and prior approval by the BLM, Vernal FieldOffice.
In accordance with 43 CFR 3162.4-3, this well must be reported on the "Monthly Reportof Operations" (Oil and Gas Operations Report ((OGOR)) starting with the month inwhich operations commence and continue each month until the well is physically pluggedand abandoned. This report shall be filed in duplicate, directly with the MineralsManagement Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.
8. Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) will be submitted not later than 30days after completion of the well or after completion of operations being performed, inaccordance with 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and allother surveys or data obtained and compiled during the drilling, workover, and/orcompletion operations, will be filed on BLM Form 3160-4. Submit with the wellcompletion report a geologic report including, at a minimum, formation tops, and asummary and conclusions. Also include deviation surveys, sample descriptions, striplogs, core data, drill stem test data, and results of production tests if performed. Samples(cuttings, fluid, and/or gas) will be submitted only when requested by the BLM, VernalField Office.
Please submit an electronic copy of all logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM. The cement bond log must be submitted in rasterformat (TIF, PDF other).
9. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease willhave prior written approval from the BLM, Vernal Field Office.
All measurement points shall be identified as point of sales or allocation for
COAs: Page 5 of 6Well: BBS 15G-22-7-21
determination prior to the installation of facilities.
10. Oil and gas meters will be calibrated in place prior to any deliveries. The Field OfficePetroleum Engineers will be provided with a date and time for the initial metercalibration and all future meter proving schedules. A copy of the meter calibrationreports will be submitted to the BLM, Vernal Field Office. All measurement facilitieswill conform to the API standards for liquid hydrocarbons and the AGA standards fornatural gas measurement.
11. A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall besubmitted to the BLM, Vernal Field Office within 30 days of installation or firstproduction, whichever occurs first. All site security regulations as specified in OnshoreOil & Gas Order No. 3 shall be adhered to. All product lines entering and leavinghydrocarbon storage tanks will be effectively sealed in accordance with Onshore Oil &Gas Order No. 3.
12. This APD is approved subject to the requirement that, should the well be successfullycompleted for production, the BLM, Vernal Field office must be notified when it isplaced in a producing status. Such notification will be by written communication andmust be received in this office by not later than the fifth business day following the dateon which the well is placed on production. The notification shall provide, as a minimum,the following informational items:
a. Operator name, address, and telephone number.
b. Well name and number.
c. Well location (¼¼,Sec., Twn, Rng, and P.M.).
d. Date well was placed in a producing status (date of first productionfor which royalty will be paid).
e. The nature of the well's production, (i.e., crude oil, or crude oil andcasing head gas, or natural gas and entrained liquid hydrocarbons).
f. The Federal or Indian lease prefix and number on which the well islocated; otherwise the non-Federal or non-Indian land category,i.e., State or private.
g. Unit agreement and / or participating area name and number, ifapplicable.
h. Communitization agreement number, if applicable.
13. Any venting or flaring of gas will be done in accordance with Notice to Lessees (NTL)4A and needs prior approval from Field Office Petroleum Engineers.
14. All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in
COAs: Page 5 of 6Well: BBS 15G-22-7-21
determination prior to the installation of facilities.
10. Oil and gas meters will be calibrated in place prior to any deliveries. The Field OfficePetroleum Engineers will be provided with a date and time for the initial metercalibration and all future meter proving schedules. A copy of the meter calibrationreports will be submitted to the BLM, Vernal Field Office. All measurement facilitieswill conform to the API standards for liquid hydrocarbons and the AGA standards fornatural gas measurement.
11. A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall besubmitted to the BLM, Vernal Field Office within 30 days of installation or firstproduction, whichever occurs first. All site security regulations as specified in OnshoreOil & Gas Order No. 3 shall be adhered to. All product lines entering and leavinghydrocarbon storage tanks will be effectively sealed in accordance with Onshore Oil &Gas Order No. 3.
12. This APD is approved subject to the requirement that, should the well be successfullycompleted for production, the BLM, Vernal Field office must be notified when it isplaced in a producing status. Such notification will be by written communication andmust be received in this office by not later than the fifth business day following the dateon which the well is placed on production. The notification shall provide, as a minimum,the following informational items:
a. Operator name, address, and telephone number.
b. Well name and number.
c. Well location (¼¼,Sec., Twn, Rng, and P.M.).
d. Date well was placed in a producing status (date of first productionfor which royalty will be paid).
e. The nature of the well's production, (i.e., crude oil, or crude oil andcasing head gas, or natural gas and entrained liquid hydrocarbons).
f. The Federal or Indian lease prefix and number on which the well islocated; otherwise the non-Federal or non-Indian land category,i.e., State or private.
g. Unit agreement and / or participating area name and number, ifapplicable.
h. Communitization agreement number, if applicable.
13. Any venting or flaring of gas will be done in accordance with Notice to Lessees (NTL)4A and needs prior approval from Field Office Petroleum Engineers.
14. All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in
COAs: Page 5 of 6Well: BBS 15G-22-7-21
determination prior to the installation of facilities.
10. Oil and gas meters will be calibrated in place prior to any deliveries. The Field OfficePetroleum Engineers will be provided with a date and time for the initial metercalibration and all future meter proving schedules. A copy of the meter calibrationreports will be submitted to the BLM, Vernal Field Office. All measurement facilitieswill conform to the API standards for liquid hydrocarbons and the AGA standards fornatural gas measurement.
11. A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall besubmitted to the BLM, Vernal Field Office within 30 days of installation or firstproduction, whichever occurs first. All site security regulations as specified in OnshoreOil & Gas Order No. 3 shall be adhered to. All product lines entering and leavinghydrocarbon storage tanks will be effectively sealed in accordance with Onshore Oil &Gas Order No. 3.
12. This APD is approved subject to the requirement that, should the well be successfullycompleted for production, the BLM, Vernal Field office must be notified when it isplaced in a producing status. Such notification will be by written communication andmust be received in this office by not later than the fifth business day following the dateon which the well is placed on production. The notification shall provide, as a minimum,the following informational items:
a. Operator name, address, and telephone number.
b. Well name and number.
c. Well location (¼¼,Sec., Twn, Rng, and P.M.).
d. Date well was placed in a producing status (date of first productionfor which royalty will be paid).
e. The nature of the well's production, (i.e., crude oil, or crude oil andcasing head gas, or natural gas and entrained liquid hydrocarbons).
f. The Federal or Indian lease prefix and number on which the well islocated; otherwise the non-Federal or non-Indian land category,i.e., State or private.
g. Unit agreement and / or participating area name and number, ifapplicable.
h. Communitization agreement number, if applicable.
13. Any venting or flaring of gas will be done in accordance with Notice to Lessees (NTL)4A and needs prior approval from Field Office Petroleum Engineers.
14. All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in
COAs: Page 5 of 6Well: BBS 15G-22-7-21
determination prior to the installation of facilities.
10. Oil and gas meters will be calibrated in place prior to any deliveries. The Field OfficePetroleum Engineers will be provided with a date and time for the initial metercalibration and all future meter proving schedules. A copy of the meter calibrationreports will be submitted to the BLM, Vernal Field Office. All measurement facilitieswill conform to the API standards for liquid hydrocarbons and the AGA standards fornatural gas measurement.
11. A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall besubmitted to the BLM, Vernal Field Office within 30 days of installation or firstproduction, whichever occurs first. All site security regulations as specified in OnshoreOil & Gas Order No. 3 shall be adhered to. All product lines entering and leavinghydrocarbon storage tanks will be effectively sealed in accordance with Onshore Oil &Gas Order No. 3.
12. This APD is approved subject to the requirement that, should the well be successfullycompleted for production, the BLM, Vernal Field office must be notified when it isplaced in a producing status. Such notification will be by written communication andmust be received in this office by not later than the fifth business day following the dateon which the well is placed on production. The notification shall provide, as a minimum,the following informational items:
a. Operator name, address, and telephone number.
b. Well name and number.
c. Well location (¼¼,Sec., Twn, Rng, and P.M.).
d. Date well was placed in a producing status (date of first productionfor which royalty will be paid).
e. The nature of the well's production, (i.e., crude oil, or crude oil andcasing head gas, or natural gas and entrained liquid hydrocarbons).
f. The Federal or Indian lease prefix and number on which the well islocated; otherwise the non-Federal or non-Indian land category,i.e., State or private.
g. Unit agreement and / or participating area name and number, ifapplicable.
h. Communitization agreement number, if applicable.
13. Any venting or flaring of gas will be done in accordance with Notice to Lessees (NTL)4A and needs prior approval from Field Office Petroleum Engineers.
14. All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in
COAs: Page 6 of 6Well: BBS 15G-22-7-21
3A will be reported to the BLM, Vernal Field Office. Major events as defined inNTL3A, will be reported verbally within 24 hours, followed by a written report within 15days. "Other than Major Events" will be reported in writing within 15 days. "MinorEvents" will be reported on the Monthly Report of Operations and Production
15. Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. Apermanent disposal method must be approved by this office and in operation prior to theend of this 90-day period. In order to meet this deadline, an application for the proposedpermanent disposal method shall be submitted along with any necessary water analyses,as soon as possible, but no later than 45 days after the date of first production. Anymethod of disposal which has not been approved prior to the end of the authorized 90-dayperiod will be considered as an Incident of Noncompliance and will be grounds forissuing a shut-in order until an acceptable manner for disposing of said water is providedand approved by this office.
16. Unless the plugging is to take place immediately upon receipt of oral approval, tlte FieldOffice Petroleum Engineers must be notified at least 24 hours in advance of the pluggingof the well, in order that a representative may witness plugging operations. If a well issuspended or abandoned, all pits must be fenced immediately until they are backfilled.The "Subsequent Report of Abandonment" (Form BLM 3160-5) must be submittedwithin 30 days after the actual plugging of the well bore, showing location of plugs,amount of cement in each, and amount of casing left in hole, and the current status of thesurface
COAs: Page 6 of 6Well: BBS 15G-22-7-21
3A will be reported to the BLM, Vernal Field Office. Major events as defined inNTL3A, will be reported verbally within 24 hours, followed by a written report within 15days. "Other than Major Events" will be reported in writing within 15 days. "MinorEvents" will be reported on the Monthly Report of Operations and Production
15. Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. Apermanent disposal method must be approved by this office and in operation prior to theend of this 90-day period. In order to meet this deadline, an application for the proposedpermanent disposal method shall be submitted along with any necessary water analyses,as soon as possible, but no later than 45 days after the date of first production. Anymethod of disposal which has not been approved prior to the end of the authorized 90-dayperiod will be considered as an Incident of Noncompliance and will be grounds forissuing a shut-in order until an acceptable manner for disposing of said water is providedand approved by this office.
16. Unless the plugging is to take place immediately upon receipt of oral approval, tlte FieldOffice Petroleum Engineers must be notified at least 24 hours in advance of the pluggingof the well, in order that a representative may witness plugging operations. If a well issuspended or abandoned, all pits must be fenced immediately until they are backfilled.The "Subsequent Report of Abandonment" (Form BLM 3160-5) must be submittedwithin 30 days after the actual plugging of the well bore, showing location of plugs,amount of cement in each, and amount of casing left in hole, and the current status of thesurface
COAs: Page 6 of 6Well: BBS 15G-22-7-21
3A will be reported to the BLM, Vernal Field Office. Major events as defined inNTL3A, will be reported verbally within 24 hours, followed by a written report within 15days. "Other than Major Events" will be reported in writing within 15 days. "MinorEvents" will be reported on the Monthly Report of Operations and Production
15. Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. Apermanent disposal method must be approved by this office and in operation prior to theend of this 90-day period. In order to meet this deadline, an application for the proposedpermanent disposal method shall be submitted along with any necessary water analyses,as soon as possible, but no later than 45 days after the date of first production. Anymethod of disposal which has not been approved prior to the end of the authorized 90-dayperiod will be considered as an Incident of Noncompliance and will be grounds forissuing a shut-in order until an acceptable manner for disposing of said water is providedand approved by this office.
16. Unless the plugging is to take place immediately upon receipt of oral approval, tlte FieldOffice Petroleum Engineers must be notified at least 24 hours in advance of the pluggingof the well, in order that a representative may witness plugging operations. If a well issuspended or abandoned, all pits must be fenced immediately until they are backfilled.The "Subsequent Report of Abandonment" (Form BLM 3160-5) must be submittedwithin 30 days after the actual plugging of the well bore, showing location of plugs,amount of cement in each, and amount of casing left in hole, and the current status of thesurface
COAs: Page 6 of 6Well: BBS 15G-22-7-21
3A will be reported to the BLM, Vernal Field Office. Major events as defined inNTL3A, will be reported verbally within 24 hours, followed by a written report within 15days. "Other than Major Events" will be reported in writing within 15 days. "MinorEvents" will be reported on the Monthly Report of Operations and Production
15. Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. Apermanent disposal method must be approved by this office and in operation prior to theend of this 90-day period. In order to meet this deadline, an application for the proposedpermanent disposal method shall be submitted along with any necessary water analyses,as soon as possible, but no later than 45 days after the date of first production. Anymethod of disposal which has not been approved prior to the end of the authorized 90-dayperiod will be considered as an Incident of Noncompliance and will be grounds forissuing a shut-in order until an acceptable manner for disposing of said water is providedand approved by this office.
16. Unless the plugging is to take place immediately upon receipt of oral approval, tlte FieldOffice Petroleum Engineers must be notified at least 24 hours in advance of the pluggingof the well, in order that a representative may witness plugging operations. If a well issuspended or abandoned, all pits must be fenced immediately until they are backfilled.The "Subsequent Report of Abandonment" (Form BLM 3160-5) must be submittedwithin 30 days after the actual plugging of the well bore, showing location of plugs,amount of cement in each, and amount of casing left in hole, and the current status of thesurface
Forn 3160-5 UNITED STATES FORM APPROVED
oune1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135
BUREAU OF LAND MANAGEMENT Expires: March 31, 1993
5 Lease Designation and Seria1No.
SUNDRY NOTICES AND REPORTS ON WELLS UTU-74972
Do not use this form for proposals to drill or to deepen or reentry to a different reservoirUse "APPLICATION FOR PERMIT---" for such proposalS 5 If Indian, Allottecor TribeName
N/A
SUBMIT IN TRIPLICA TE """"°r CA, Agreement Designation
1 Type of Well N/A
11 0 0 - 00NFllEN11AL3 WellNamcandNo.
BBS 15G-22-7-21
2 Name of Operator
QEP, UINTA BASIN, INC. 9 API Well No
3 Address andTelephone No Contact: [email protected] 43-047-37443
11002 E. 17500 S. VERNAL, UT 84078-8526 435-781-4342 Fax 435-781-4357 10. Field and Pool, or Exploratory Area
4 Location of Well (Footage, Sec., T , R., M., or Survey Description) UNDESIGNATED
SWSE, SEC22-T7S-R21E, 669' FSL, 2022' FEL 11. County or Parish, State
UINTAH COUNTY, UTAH
12 CHECK APPROPRIATE B 3X(s) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
O Notice of Intent Abandonment Chwe oUlm
Recompletion New Construction
Subsequent Report Plugging Back Non-Routine Fracturing
Water Shut-Off
O Final Abandonment Notice Altering Casing C-k to Ig tion
Other SPUD Dispose Water
(Note) Report results of multiple completion on WellCompletion or Recompletion Report andLog form )
13 Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled,give subsurface locations and measuredand true vertical depths for all markers and zones pertinent to this work)
On 9/29/2006 - Drilled 60' of 20" conductor hole. Ran 2 jt's 60' of 14" conductor pipe and cement w/ Ready Mix.
RECEIVEDOCT04 2006
3 - BLM, 2- Utah OG&M, 1 -- Denver, I - ille Word file-server DIV.OFOlL,GAS&MINING14. I hereby c e
Title Office Administrator II Date 0/0 /06
(This space for Federal or State office use)
Approved by: Title Date
Conditions of approval, if any
Title 18 U.S.C. Section 1001, makes it a crimefor any person knowingly and willfully to make to any departmentor agency of the UnitedStates any false,fictitious or fraudulentstatements or
representations as to any matter within its jurisdiction.
*See instruction on Reverse Side
Forn 3160-5 UNITED STATES FORM APPROVED
oune1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135
BUREAU OF LAND MANAGEMENT Expires: March 31, 1993
5 Lease Designation and Seria1No.
SUNDRY NOTICES AND REPORTS ON WELLS UTU-74972
Do not use this form for proposals to drill or to deepen or reentry to a different reservoirUse "APPLICATION FOR PERMIT---" for such proposalS 5 If Indian, Allottecor TribeName
N/A
SUBMIT IN TRIPLICA TE """"°r CA, Agreement Designation
1 Type of Well N/A
11 0 0 - 00NFllEN11AL3 WellNamcandNo.
BBS 15G-22-7-21
2 Name of Operator
QEP, UINTA BASIN, INC. 9 API Well No
3 Address andTelephone No Contact: [email protected] 43-047-37443
11002 E. 17500 S. VERNAL, UT 84078-8526 435-781-4342 Fax 435-781-4357 10. Field and Pool, or Exploratory Area
4 Location of Well (Footage, Sec., T , R., M., or Survey Description) UNDESIGNATED
SWSE, SEC22-T7S-R21E, 669' FSL, 2022' FEL 11. County or Parish, State
UINTAH COUNTY, UTAH
12 CHECK APPROPRIATE B 3X(s) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
O Notice of Intent Abandonment Chwe oUlm
Recompletion New Construction
Subsequent Report Plugging Back Non-Routine Fracturing
Water Shut-Off
O Final Abandonment Notice Altering Casing C-k to Ig tion
Other SPUD Dispose Water
(Note) Report results of multiple completion on WellCompletion or Recompletion Report andLog form )
13 Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled,give subsurface locations and measuredand true vertical depths for all markers and zones pertinent to this work)
On 9/29/2006 - Drilled 60' of 20" conductor hole. Ran 2 jt's 60' of 14" conductor pipe and cement w/ Ready Mix.
RECEIVEDOCT04 2006
3 - BLM, 2- Utah OG&M, 1 -- Denver, I - ille Word file-server DIV.OFOlL,GAS&MINING14. I hereby c e
Title Office Administrator II Date 0/0 /06
(This space for Federal or State office use)
Approved by: Title Date
Conditions of approval, if any
Title 18 U.S.C. Section 1001, makes it a crimefor any person knowingly and willfully to make to any departmentor agency of the UnitedStates any false,fictitious or fraudulentstatements or
representations as to any matter within its jurisdiction.
*See instruction on Reverse Side
Forn 3160-5 UNITED STATES FORM APPROVED
oune1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135
BUREAU OF LAND MANAGEMENT Expires: March 31, 1993
5 Lease Designation and Seria1No.
SUNDRY NOTICES AND REPORTS ON WELLS UTU-74972
Do not use this form for proposals to drill or to deepen or reentry to a different reservoirUse "APPLICATION FOR PERMIT---" for such proposalS 5 If Indian, Allottecor TribeName
N/A
SUBMIT IN TRIPLICA TE """"°r CA, Agreement Designation
1 Type of Well N/A
11 0 0 - 00NFllEN11AL3 WellNamcandNo.
BBS 15G-22-7-21
2 Name of Operator
QEP, UINTA BASIN, INC. 9 API Well No
3 Address andTelephone No Contact: [email protected] 43-047-37443
11002 E. 17500 S. VERNAL, UT 84078-8526 435-781-4342 Fax 435-781-4357 10. Field and Pool, or Exploratory Area
4 Location of Well (Footage, Sec., T , R., M., or Survey Description) UNDESIGNATED
SWSE, SEC22-T7S-R21E, 669' FSL, 2022' FEL 11. County or Parish, State
UINTAH COUNTY, UTAH
12 CHECK APPROPRIATE B 3X(s) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
O Notice of Intent Abandonment Chwe oUlm
Recompletion New Construction
Subsequent Report Plugging Back Non-Routine Fracturing
Water Shut-Off
O Final Abandonment Notice Altering Casing C-k to Ig tion
Other SPUD Dispose Water
(Note) Report results of multiple completion on WellCompletion or Recompletion Report andLog form )
13 Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled,give subsurface locations and measuredand true vertical depths for all markers and zones pertinent to this work)
On 9/29/2006 - Drilled 60' of 20" conductor hole. Ran 2 jt's 60' of 14" conductor pipe and cement w/ Ready Mix.
RECEIVEDOCT04 2006
3 - BLM, 2- Utah OG&M, 1 -- Denver, I - ille Word file-server DIV.OFOlL,GAS&MINING14. I hereby c e
Title Office Administrator II Date 0/0 /06
(This space for Federal or State office use)
Approved by: Title Date
Conditions of approval, if any
Title 18 U.S.C. Section 1001, makes it a crimefor any person knowingly and willfully to make to any departmentor agency of the UnitedStates any false,fictitious or fraudulentstatements or
representations as to any matter within its jurisdiction.
*See instruction on Reverse Side
Forn 3160-5 UNITED STATES FORM APPROVED
oune1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135
BUREAU OF LAND MANAGEMENT Expires: March 31, 1993
5 Lease Designation and Seria1No.
SUNDRY NOTICES AND REPORTS ON WELLS UTU-74972
Do not use this form for proposals to drill or to deepen or reentry to a different reservoirUse "APPLICATION FOR PERMIT---" for such proposalS 5 If Indian, Allottecor TribeName
N/A
SUBMIT IN TRIPLICA TE """"°r CA, Agreement Designation
1 Type of Well N/A
11 0 0 - 00NFllEN11AL3 WellNamcandNo.
BBS 15G-22-7-21
2 Name of Operator
QEP, UINTA BASIN, INC. 9 API Well No
3 Address andTelephone No Contact: [email protected] 43-047-37443
11002 E. 17500 S. VERNAL, UT 84078-8526 435-781-4342 Fax 435-781-4357 10. Field and Pool, or Exploratory Area
4 Location of Well (Footage, Sec., T , R., M., or Survey Description) UNDESIGNATED
SWSE, SEC22-T7S-R21E, 669' FSL, 2022' FEL 11. County or Parish, State
UINTAH COUNTY, UTAH
12 CHECK APPROPRIATE B 3X(s) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
O Notice of Intent Abandonment Chwe oUlm
Recompletion New Construction
Subsequent Report Plugging Back Non-Routine Fracturing
Water Shut-Off
O Final Abandonment Notice Altering Casing C-k to Ig tion
Other SPUD Dispose Water
(Note) Report results of multiple completion on WellCompletion or Recompletion Report andLog form )
13 Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled,give subsurface locations and measuredand true vertical depths for all markers and zones pertinent to this work)
On 9/29/2006 - Drilled 60' of 20" conductor hole. Ran 2 jt's 60' of 14" conductor pipe and cement w/ Ready Mix.
RECEIVEDOCT04 2006
3 - BLM, 2- Utah OG&M, 1 -- Denver, I - ille Word file-server DIV.OFOlL,GAS&MINING14. I hereby c e
Title Office Administrator II Date 0/0 /06
(This space for Federal or State office use)
Approved by: Title Date
Conditions of approval, if any
Title 18 U.S.C. Section 1001, makes it a crimefor any person knowingly and willfully to make to any departmentor agency of the UnitedStates any false,fictitious or fraudulentstatements or
representations as to any matter within its jurisdiction.
*See instruction on Reverse Side
State of Utah OPERATOR ACCT. No. N-2460Division of Oil, Gas and Mining OPERATOR: QEP Uinta Basin, Inc.
ADDRESS: 11002 East 17500 SouthENTITY ACTIONFORM - FORM 6 Vernal, Utah 84078-8526 (435)781-4300
Action Current New Entity API Number Well Name QQ SC TP RG County Spud Date EffectiveDateCode Entity No. No.
A 99999 43-047¾ BBS 15G-22-7-21 SWSE 22 7S 21E Uintah 9/29/2006 |---
WELL 1 COMMENTS: 00NFllENTIALWELL iCOMMENTS:
WELL 3 COMMENTS:
WELL 4 COMMENTS:
WELL 5 COMMENTS:
ACTION CODES (See instructions on back of form)A - Establish new entity for new well (single wellonly)B - Add new wellto existing entity (groupor unitwell)C - Re-assign well from one existing entity to another existing entity SignatureD - Re-assign wellfrom one existing entity to a new entityE - Other (explain in comments section) OfficeAdministrator 11 10/01/06
Title DateNOTE: Use COMMENT section to explainwhy each Action Code was selected
Phone No. (435)781-4342
(3/89)
RECEIVED CONRDENTIALOCTO4 2006
DIV.OFOlL,GAS&
State of Utah OPERATOR ACCT. No. N-2460Division of Oil, Gas and Mining OPERATOR: QEP Uinta Basin, Inc.
ADDRESS: 11002 East 17500 SouthENTITY ACTIONFORM - FORM 6 Vernal, Utah 84078-8526 (435)781-4300
Action Current New Entity API Number Well Name QQ SC TP RG County Spud Date EffectiveDateCode Entity No. No.
A 99999 43-047¾ BBS 15G-22-7-21 SWSE 22 7S 21E Uintah 9/29/2006 |---
WELL 1 COMMENTS: 00NFllENTIALWELL iCOMMENTS:
WELL 3 COMMENTS:
WELL 4 COMMENTS:
WELL 5 COMMENTS:
ACTION CODES (See instructions on back of form)A - Establish new entity for new well (single wellonly)B - Add new wellto existing entity (groupor unitwell)C - Re-assign well from one existing entity to another existing entity SignatureD - Re-assign wellfrom one existing entity to a new entityE - Other (explain in comments section) OfficeAdministrator 11 10/01/06
Title DateNOTE: Use COMMENT section to explainwhy each Action Code was selected
Phone No. (435)781-4342
(3/89)
RECEIVED CONRDENTIALOCTO4 2006
DIV.OFOlL,GAS&
State of Utah OPERATOR ACCT. No. N-2460Division of Oil, Gas and Mining OPERATOR: QEP Uinta Basin, Inc.
ADDRESS: 11002 East 17500 SouthENTITY ACTIONFORM - FORM 6 Vernal, Utah 84078-8526 (435)781-4300
Action Current New Entity API Number Well Name QQ SC TP RG County Spud Date EffectiveDateCode Entity No. No.
A 99999 43-047¾ BBS 15G-22-7-21 SWSE 22 7S 21E Uintah 9/29/2006 |---
WELL 1 COMMENTS: 00NFllENTIALWELL iCOMMENTS:
WELL 3 COMMENTS:
WELL 4 COMMENTS:
WELL 5 COMMENTS:
ACTION CODES (See instructions on back of form)A - Establish new entity for new well (single wellonly)B - Add new wellto existing entity (groupor unitwell)C - Re-assign well from one existing entity to another existing entity SignatureD - Re-assign wellfrom one existing entity to a new entityE - Other (explain in comments section) OfficeAdministrator 11 10/01/06
Title DateNOTE: Use COMMENT section to explainwhy each Action Code was selected
Phone No. (435)781-4342
(3/89)
RECEIVED CONRDENTIALOCTO4 2006
DIV.OFOlL,GAS&
State of Utah OPERATOR ACCT. No. N-2460Division of Oil, Gas and Mining OPERATOR: QEP Uinta Basin, Inc.
ADDRESS: 11002 East 17500 SouthENTITY ACTIONFORM - FORM 6 Vernal, Utah 84078-8526 (435)781-4300
Action Current New Entity API Number Well Name QQ SC TP RG County Spud Date EffectiveDateCode Entity No. No.
A 99999 43-047¾ BBS 15G-22-7-21 SWSE 22 7S 21E Uintah 9/29/2006 |---
WELL 1 COMMENTS: 00NFllENTIALWELL iCOMMENTS:
WELL 3 COMMENTS:
WELL 4 COMMENTS:
WELL 5 COMMENTS:
ACTION CODES (See instructions on back of form)A - Establish new entity for new well (single wellonly)B - Add new wellto existing entity (groupor unitwell)C - Re-assign well from one existing entity to another existing entity SignatureD - Re-assign wellfrom one existing entity to a new entityE - Other (explain in comments section) OfficeAdministrator 11 10/01/06
Title DateNOTE: Use COMMENT section to explainwhy each Action Code was selected
Phone No. (435)781-4342
(3/89)
RECEIVED CONRDENTIALOCTO4 2006
DIV.OFOlL,GAS&
CONRDEQEPBBS 15G 22-7-2143-047-3744322 7S 21E
11-14-06-11-20-06Still Drilling - currently @5930 as of 11-20-06Received 11-22-06
1l-21-06-12-13-06TD @6828 on 11-22-06, Rig Released on 11-24-06Received
CONRDEQEPBBS 15G 22-7-2143-047-3744322 7S 21E
11-14-06-11-20-06Still Drilling - currently @5930 as of 11-20-06Received 11-22-06
1l-21-06-12-13-06TD @6828 on 11-22-06, Rig Released on 11-24-06Received
CONRDEQEPBBS 15G 22-7-2143-047-3744322 7S 21E
11-14-06-11-20-06Still Drilling - currently @5930 as of 11-20-06Received 11-22-06
1l-21-06-12-13-06TD @6828 on 11-22-06, Rig Released on 11-24-06Received
CONRDEQEPBBS 15G 22-7-2143-047-3744322 7S 21E
11-14-06-11-20-06Still Drilling - currently @5930 as of 11-20-06Received 11-22-06
1l-21-06-12-13-06TD @6828 on 11-22-06, Rig Released on 11-24-06Received
CONFIDENR
Questar E & P Page 1 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: -g Rig Number:
Date From - To Hours Code e Description of Operations
1/25/2007 06:00 - 16:00 10.00 WOT 4 On 1/24/07- INITIALCOMPLETION REPORT. On standby waitng on road graderto celar locaiton.
24 Hour Forecast: Will MIRU.
1/26/2007 06:00 - 16:00 10.00 BOP 1 On 1/25/2007 SICP=0#.MIRU Gudac Bros Well Service. ND top flange. NU BOP. SWIFN.
24 Hour Forecast: will PU tbg.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
1/29/2007 06:00 - 16:00 10.00 TRP 2 On 1/26/07 SICP = 0#. PU, tally& rabbit in hole w/ 4-3/4" bit, 5-1/2" csg scraper &210 jts new2-7/8" J-55 tbg to tag @6740'. Displaced hole w/ 150 bbis 2% KCLwater. LD 5 jts. POOH w/ 102 stds tbg. LD bit & scraper. Drain up. SWIFWE.
24 Hour Forecast: Will run CBL log.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
1/30/2007 06:00 - 16:00 10.00 PERF 2 On 1/29/07, SICP = 0#. MIRU Cutters WL. Run a CBL/DVLIGR log from tag @6725' to surface. Correlated the CBL to the Halliburton Open Hole log dated11/23/06. Pressure tested csg to 4000#. OK. Perforated per the Cutters CBLdated 1/29/07, H4a Lime interval 6575' - 6580' at 4 SPF w/ 90* phasing, 4" HSC csggun. RDMOCutters WL. RIH w/ Weatherford HD PKR, 1 jt 2-7/8" tbg, 2.31"XN-Nipple &2-7/8" tbg to 6500'. Poured diesel down tbg & csg. Set PKR w/ 40Kcompression. Drain up equipment. SWIFN.
24 Hour Forecast: Will pump 5000 gal 28% acid job.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580'
1/31/2007 06:00 - 16:00 10.00 STIM i On 1/30/07, SICP = 0#. Pre-job safety meeting. MIRU Halliburton acid crew.Prime & test Halliburton lines. Pumped 3 bbis 2% KCL water to load tbg. Breakdown perfs @2903# wl 2% KCL water. Pumped 5000 gals 28% HCL acid in toperfs @6575' - 80'. Pumped acid @4 BPM & 1800# pressure. Flushed tbg & csgwl 100 bbis 2% KCL water. Max pressure = 2900#.FG =
.60. ISIP = 1300#. 5minute SI = 1154#. 15 minuteSI = 997#. Total fluid pumped = 226 bbis. RDMOHalliburton acid crew. Open well, flowed back 50 bbis fluid. Well died. RU swabequipment. 1st run fluid level @surface. Made 3 runs, well 20 bbis acid, water &1% oil(heavy oil). Well died. Made 13 more swab runs. FFL = 2200'. Each swabrun recovered aicd,water & 5% oil. Had steady acid gas glow after each run. Totalrecovered today = 167 bbis. Final PH = 3. RD swab equipment. Drain up. Flushedtbg wl 40 bbis 2% KCL. SWIFN.
24 Hour Forecast: Will flow test well.
RECE YvED Printed: 3/6/2007 12:47:21 PM
MARO6 2007DIV.0FOlL,GAS&
CONFIDENR
Questar E & P Page 1 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: -g Rig Number:
Date From - To Hours Code e Description of Operations
1/25/2007 06:00 - 16:00 10.00 WOT 4 On 1/24/07- INITIALCOMPLETION REPORT. On standby waitng on road graderto celar locaiton.
24 Hour Forecast: Will MIRU.
1/26/2007 06:00 - 16:00 10.00 BOP 1 On 1/25/2007 SICP=0#.MIRU Gudac Bros Well Service. ND top flange. NU BOP. SWIFN.
24 Hour Forecast: will PU tbg.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
1/29/2007 06:00 - 16:00 10.00 TRP 2 On 1/26/07 SICP = 0#. PU, tally& rabbit in hole w/ 4-3/4" bit, 5-1/2" csg scraper &210 jts new2-7/8" J-55 tbg to tag @6740'. Displaced hole w/ 150 bbis 2% KCLwater. LD 5 jts. POOH w/ 102 stds tbg. LD bit & scraper. Drain up. SWIFWE.
24 Hour Forecast: Will run CBL log.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
1/30/2007 06:00 - 16:00 10.00 PERF 2 On 1/29/07, SICP = 0#. MIRU Cutters WL. Run a CBL/DVLIGR log from tag @6725' to surface. Correlated the CBL to the Halliburton Open Hole log dated11/23/06. Pressure tested csg to 4000#. OK. Perforated per the Cutters CBLdated 1/29/07, H4a Lime interval 6575' - 6580' at 4 SPF w/ 90* phasing, 4" HSC csggun. RDMOCutters WL. RIH w/ Weatherford HD PKR, 1 jt 2-7/8" tbg, 2.31"XN-Nipple &2-7/8" tbg to 6500'. Poured diesel down tbg & csg. Set PKR w/ 40Kcompression. Drain up equipment. SWIFN.
24 Hour Forecast: Will pump 5000 gal 28% acid job.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580'
1/31/2007 06:00 - 16:00 10.00 STIM i On 1/30/07, SICP = 0#. Pre-job safety meeting. MIRU Halliburton acid crew.Prime & test Halliburton lines. Pumped 3 bbis 2% KCL water to load tbg. Breakdown perfs @2903# wl 2% KCL water. Pumped 5000 gals 28% HCL acid in toperfs @6575' - 80'. Pumped acid @4 BPM & 1800# pressure. Flushed tbg & csgwl 100 bbis 2% KCL water. Max pressure = 2900#.FG =
.60. ISIP = 1300#. 5minute SI = 1154#. 15 minuteSI = 997#. Total fluid pumped = 226 bbis. RDMOHalliburton acid crew. Open well, flowed back 50 bbis fluid. Well died. RU swabequipment. 1st run fluid level @surface. Made 3 runs, well 20 bbis acid, water &1% oil(heavy oil). Well died. Made 13 more swab runs. FFL = 2200'. Each swabrun recovered aicd,water & 5% oil. Had steady acid gas glow after each run. Totalrecovered today = 167 bbis. Final PH = 3. RD swab equipment. Drain up. Flushedtbg wl 40 bbis 2% KCL. SWIFN.
24 Hour Forecast: Will flow test well.
RECE YvED Printed: 3/6/2007 12:47:21 PM
MARO6 2007DIV.0FOlL,GAS&
CONFIDENR
Questar E & P Page 1 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: -g Rig Number:
Date From - To Hours Code e Description of Operations
1/25/2007 06:00 - 16:00 10.00 WOT 4 On 1/24/07- INITIALCOMPLETION REPORT. On standby waitng on road graderto celar locaiton.
24 Hour Forecast: Will MIRU.
1/26/2007 06:00 - 16:00 10.00 BOP 1 On 1/25/2007 SICP=0#.MIRU Gudac Bros Well Service. ND top flange. NU BOP. SWIFN.
24 Hour Forecast: will PU tbg.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
1/29/2007 06:00 - 16:00 10.00 TRP 2 On 1/26/07 SICP = 0#. PU, tally& rabbit in hole w/ 4-3/4" bit, 5-1/2" csg scraper &210 jts new2-7/8" J-55 tbg to tag @6740'. Displaced hole w/ 150 bbis 2% KCLwater. LD 5 jts. POOH w/ 102 stds tbg. LD bit & scraper. Drain up. SWIFWE.
24 Hour Forecast: Will run CBL log.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
1/30/2007 06:00 - 16:00 10.00 PERF 2 On 1/29/07, SICP = 0#. MIRU Cutters WL. Run a CBL/DVLIGR log from tag @6725' to surface. Correlated the CBL to the Halliburton Open Hole log dated11/23/06. Pressure tested csg to 4000#. OK. Perforated per the Cutters CBLdated 1/29/07, H4a Lime interval 6575' - 6580' at 4 SPF w/ 90* phasing, 4" HSC csggun. RDMOCutters WL. RIH w/ Weatherford HD PKR, 1 jt 2-7/8" tbg, 2.31"XN-Nipple &2-7/8" tbg to 6500'. Poured diesel down tbg & csg. Set PKR w/ 40Kcompression. Drain up equipment. SWIFN.
24 Hour Forecast: Will pump 5000 gal 28% acid job.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580'
1/31/2007 06:00 - 16:00 10.00 STIM i On 1/30/07, SICP = 0#. Pre-job safety meeting. MIRU Halliburton acid crew.Prime & test Halliburton lines. Pumped 3 bbis 2% KCL water to load tbg. Breakdown perfs @2903# wl 2% KCL water. Pumped 5000 gals 28% HCL acid in toperfs @6575' - 80'. Pumped acid @4 BPM & 1800# pressure. Flushed tbg & csgwl 100 bbis 2% KCL water. Max pressure = 2900#.FG =
.60. ISIP = 1300#. 5minute SI = 1154#. 15 minuteSI = 997#. Total fluid pumped = 226 bbis. RDMOHalliburton acid crew. Open well, flowed back 50 bbis fluid. Well died. RU swabequipment. 1st run fluid level @surface. Made 3 runs, well 20 bbis acid, water &1% oil(heavy oil). Well died. Made 13 more swab runs. FFL = 2200'. Each swabrun recovered aicd,water & 5% oil. Had steady acid gas glow after each run. Totalrecovered today = 167 bbis. Final PH = 3. RD swab equipment. Drain up. Flushedtbg wl 40 bbis 2% KCL. SWIFN.
24 Hour Forecast: Will flow test well.
RECE YvED Printed: 3/6/2007 12:47:21 PM
MARO6 2007DIV.0FOlL,GAS&
CONFIDENR
Questar E & P Page 1 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: -g Rig Number:
Date From - To Hours Code e Description of Operations
1/25/2007 06:00 - 16:00 10.00 WOT 4 On 1/24/07- INITIALCOMPLETION REPORT. On standby waitng on road graderto celar locaiton.
24 Hour Forecast: Will MIRU.
1/26/2007 06:00 - 16:00 10.00 BOP 1 On 1/25/2007 SICP=0#.MIRU Gudac Bros Well Service. ND top flange. NU BOP. SWIFN.
24 Hour Forecast: will PU tbg.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
1/29/2007 06:00 - 16:00 10.00 TRP 2 On 1/26/07 SICP = 0#. PU, tally& rabbit in hole w/ 4-3/4" bit, 5-1/2" csg scraper &210 jts new2-7/8" J-55 tbg to tag @6740'. Displaced hole w/ 150 bbis 2% KCLwater. LD 5 jts. POOH w/ 102 stds tbg. LD bit & scraper. Drain up. SWIFWE.
24 Hour Forecast: Will run CBL log.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
1/30/2007 06:00 - 16:00 10.00 PERF 2 On 1/29/07, SICP = 0#. MIRU Cutters WL. Run a CBL/DVLIGR log from tag @6725' to surface. Correlated the CBL to the Halliburton Open Hole log dated11/23/06. Pressure tested csg to 4000#. OK. Perforated per the Cutters CBLdated 1/29/07, H4a Lime interval 6575' - 6580' at 4 SPF w/ 90* phasing, 4" HSC csggun. RDMOCutters WL. RIH w/ Weatherford HD PKR, 1 jt 2-7/8" tbg, 2.31"XN-Nipple &2-7/8" tbg to 6500'. Poured diesel down tbg & csg. Set PKR w/ 40Kcompression. Drain up equipment. SWIFN.
24 Hour Forecast: Will pump 5000 gal 28% acid job.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580'
1/31/2007 06:00 - 16:00 10.00 STIM i On 1/30/07, SICP = 0#. Pre-job safety meeting. MIRU Halliburton acid crew.Prime & test Halliburton lines. Pumped 3 bbis 2% KCL water to load tbg. Breakdown perfs @2903# wl 2% KCL water. Pumped 5000 gals 28% HCL acid in toperfs @6575' - 80'. Pumped acid @4 BPM & 1800# pressure. Flushed tbg & csgwl 100 bbis 2% KCL water. Max pressure = 2900#.FG =
.60. ISIP = 1300#. 5minute SI = 1154#. 15 minuteSI = 997#. Total fluid pumped = 226 bbis. RDMOHalliburton acid crew. Open well, flowed back 50 bbis fluid. Well died. RU swabequipment. 1st run fluid level @surface. Made 3 runs, well 20 bbis acid, water &1% oil(heavy oil). Well died. Made 13 more swab runs. FFL = 2200'. Each swabrun recovered aicd,water & 5% oil. Had steady acid gas glow after each run. Totalrecovered today = 167 bbis. Final PH = 3. RD swab equipment. Drain up. Flushedtbg wl 40 bbis 2% KCL. SWIFN.
24 Hour Forecast: Will flow test well.
RECE YvED Printed: 3/6/2007 12:47:21 PM
MARO6 2007DIV.0FOlL,GAS&
Questar E & P Page 2 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:
Date From - To Hours Code C Description of Operations
1/31/2007 06:00 - 10:00 10.00 STIM iCasing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580' Aciidized
2/1/2007 06:00 - 16:00 10.00 SWAB 1 1/30/07 - SICP =0#. Pre-lob safety meeting.BLLTR: 132. Pkr @6500'. Perfs @6575' - 6580'. Open well. RU swabequipment. 1st run fluid level @2000'. PF 3200'. Recovered 6 bbis fluid; 59% gascut oil. Made 18 swab runs. Recovered 109 bbis fluid. Cutting 95% oilthe last 9runs. FFL = 3300'. Total recovered today = 109 bbis. BLLTR = 23 bbis. FER = 18BPH. RD swab equipment. Drain up. Final PH = 7. SWIFN.
24 Hour Forecast: Will POOH w/ PKR.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580' Aciidized
2/2/2007 06:00 - 16:00 10.00 TRP 2 On 2/1/07, SICP = 0#. BLLTR = 23. Pkr @6500'. Perfs @6575'- 6580'. Openwell Pumped 50 bbis 2% KCL water down tbg. Well wouldn't fillup. Released Pkr.
POOH w/ 2-7/8" tbg, laying down xn-nipple & Pkr. RIH w/ pinned NC, 1 jt tbg,PSN, 2 jts 2-78" tbg. Type "T" anchor & 204 jts 2-7/8" tbg. ND BOP. Set TAC wl17K tension. Land on B-1 adapter. NU WH. Pumped 8 bbis xyzol & 10 2% KCLwater. Drain up. SWIFN.
24 Hour Forecast: Will RIH w/ pump &rods.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575'-6580' Aciidized
2/3/2007 06:00 - 16:00 10.00 TRP 2 On 2/2/07, SICP = 0#. RU Hot Oiler. Flushed tbg wl 45 bbis 250* 2% KCL water.Primed pump (#1466),2-1/2 x 1-3/4 16 x 19 x 20. RHACpump 16". RIH wl pump,152 plain 3/4" rods, 112 plain 7/8" rods, 1-1/2" x 26 polish rod. Filled w/ 15 galdiesel & 15 bbis 2%. Long stroked pump to 800#. OK. RDMOservice rig&equipment. BLLTR = 253 bbis.FINAL COMPLETION REPORT.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575'-6580' Aciidized
Tbg DetailKB 15.0
Printed: 3/6/2007 12:47:21
Questar E & P Page 2 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:
Date From - To Hours Code C Description of Operations
1/31/2007 06:00 - 10:00 10.00 STIM iCasing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580' Aciidized
2/1/2007 06:00 - 16:00 10.00 SWAB 1 1/30/07 - SICP =0#. Pre-lob safety meeting.BLLTR: 132. Pkr @6500'. Perfs @6575' - 6580'. Open well. RU swabequipment. 1st run fluid level @2000'. PF 3200'. Recovered 6 bbis fluid; 59% gascut oil. Made 18 swab runs. Recovered 109 bbis fluid. Cutting 95% oilthe last 9runs. FFL = 3300'. Total recovered today = 109 bbis. BLLTR = 23 bbis. FER = 18BPH. RD swab equipment. Drain up. Final PH = 7. SWIFN.
24 Hour Forecast: Will POOH w/ PKR.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580' Aciidized
2/2/2007 06:00 - 16:00 10.00 TRP 2 On 2/1/07, SICP = 0#. BLLTR = 23. Pkr @6500'. Perfs @6575'- 6580'. Openwell Pumped 50 bbis 2% KCL water down tbg. Well wouldn't fillup. Released Pkr.
POOH w/ 2-7/8" tbg, laying down xn-nipple & Pkr. RIH w/ pinned NC, 1 jt tbg,PSN, 2 jts 2-78" tbg. Type "T" anchor & 204 jts 2-7/8" tbg. ND BOP. Set TAC wl17K tension. Land on B-1 adapter. NU WH. Pumped 8 bbis xyzol & 10 2% KCLwater. Drain up. SWIFN.
24 Hour Forecast: Will RIH w/ pump &rods.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575'-6580' Aciidized
2/3/2007 06:00 - 16:00 10.00 TRP 2 On 2/2/07, SICP = 0#. RU Hot Oiler. Flushed tbg wl 45 bbis 250* 2% KCL water.Primed pump (#1466),2-1/2 x 1-3/4 16 x 19 x 20. RHACpump 16". RIH wl pump,152 plain 3/4" rods, 112 plain 7/8" rods, 1-1/2" x 26 polish rod. Filled w/ 15 galdiesel & 15 bbis 2%. Long stroked pump to 800#. OK. RDMOservice rig&equipment. BLLTR = 253 bbis.FINAL COMPLETION REPORT.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575'-6580' Aciidized
Tbg DetailKB 15.0
Printed: 3/6/2007 12:47:21
Questar E & P Page 2 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:
Date From - To Hours Code C Description of Operations
1/31/2007 06:00 - 10:00 10.00 STIM iCasing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580' Aciidized
2/1/2007 06:00 - 16:00 10.00 SWAB 1 1/30/07 - SICP =0#. Pre-lob safety meeting.BLLTR: 132. Pkr @6500'. Perfs @6575' - 6580'. Open well. RU swabequipment. 1st run fluid level @2000'. PF 3200'. Recovered 6 bbis fluid; 59% gascut oil. Made 18 swab runs. Recovered 109 bbis fluid. Cutting 95% oilthe last 9runs. FFL = 3300'. Total recovered today = 109 bbis. BLLTR = 23 bbis. FER = 18BPH. RD swab equipment. Drain up. Final PH = 7. SWIFN.
24 Hour Forecast: Will POOH w/ PKR.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580' Aciidized
2/2/2007 06:00 - 16:00 10.00 TRP 2 On 2/1/07, SICP = 0#. BLLTR = 23. Pkr @6500'. Perfs @6575'- 6580'. Openwell Pumped 50 bbis 2% KCL water down tbg. Well wouldn't fillup. Released Pkr.
POOH w/ 2-7/8" tbg, laying down xn-nipple & Pkr. RIH w/ pinned NC, 1 jt tbg,PSN, 2 jts 2-78" tbg. Type "T" anchor & 204 jts 2-7/8" tbg. ND BOP. Set TAC wl17K tension. Land on B-1 adapter. NU WH. Pumped 8 bbis xyzol & 10 2% KCLwater. Drain up. SWIFN.
24 Hour Forecast: Will RIH w/ pump &rods.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575'-6580' Aciidized
2/3/2007 06:00 - 16:00 10.00 TRP 2 On 2/2/07, SICP = 0#. RU Hot Oiler. Flushed tbg wl 45 bbis 250* 2% KCL water.Primed pump (#1466),2-1/2 x 1-3/4 16 x 19 x 20. RHACpump 16". RIH wl pump,152 plain 3/4" rods, 112 plain 7/8" rods, 1-1/2" x 26 polish rod. Filled w/ 15 galdiesel & 15 bbis 2%. Long stroked pump to 800#. OK. RDMOservice rig&equipment. BLLTR = 253 bbis.FINAL COMPLETION REPORT.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575'-6580' Aciidized
Tbg DetailKB 15.0
Printed: 3/6/2007 12:47:21
Questar E & P Page 2 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:
Date From - To Hours Code C Description of Operations
1/31/2007 06:00 - 10:00 10.00 STIM iCasing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580' Aciidized
2/1/2007 06:00 - 16:00 10.00 SWAB 1 1/30/07 - SICP =0#. Pre-lob safety meeting.BLLTR: 132. Pkr @6500'. Perfs @6575' - 6580'. Open well. RU swabequipment. 1st run fluid level @2000'. PF 3200'. Recovered 6 bbis fluid; 59% gascut oil. Made 18 swab runs. Recovered 109 bbis fluid. Cutting 95% oilthe last 9runs. FFL = 3300'. Total recovered today = 109 bbis. BLLTR = 23 bbis. FER = 18BPH. RD swab equipment. Drain up. Final PH = 7. SWIFN.
24 Hour Forecast: Will POOH w/ PKR.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575' - 6580' Aciidized
2/2/2007 06:00 - 16:00 10.00 TRP 2 On 2/1/07, SICP = 0#. BLLTR = 23. Pkr @6500'. Perfs @6575'- 6580'. Openwell Pumped 50 bbis 2% KCL water down tbg. Well wouldn't fillup. Released Pkr.
POOH w/ 2-7/8" tbg, laying down xn-nipple & Pkr. RIH w/ pinned NC, 1 jt tbg,PSN, 2 jts 2-78" tbg. Type "T" anchor & 204 jts 2-7/8" tbg. ND BOP. Set TAC wl17K tension. Land on B-1 adapter. NU WH. Pumped 8 bbis xyzol & 10 2% KCLwater. Drain up. SWIFN.
24 Hour Forecast: Will RIH w/ pump &rods.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575'-6580' Aciidized
2/3/2007 06:00 - 16:00 10.00 TRP 2 On 2/2/07, SICP = 0#. RU Hot Oiler. Flushed tbg wl 45 bbis 250* 2% KCL water.Primed pump (#1466),2-1/2 x 1-3/4 16 x 19 x 20. RHACpump 16". RIH wl pump,152 plain 3/4" rods, 112 plain 7/8" rods, 1-1/2" x 26 polish rod. Filled w/ 15 galdiesel & 15 bbis 2%. Long stroked pump to 800#. OK. RDMOservice rig&equipment. BLLTR = 253 bbis.FINAL COMPLETION REPORT.
Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'
PerfsH4a Lime6575'-6580' Aciidized
Tbg DetailKB 15.0
Printed: 3/6/2007 12:47:21
Questar E &P Page 3 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:
Date From - To Hours Code C Description of Operations
2/3/2007 06:00 - 16:00 10.00 TRP 2 B-1 Adaptor 0.0Tension 1.50204 jts 2-7/8" J-55 6547.835-1/2" Type T TAC 2.6716 jts 2-7/8" Special Hardened Pipe 64.86PSN 1.102 jts 2-7/8" J-55 32.0Pinned Notch Collar .45
Tbg Tail @ 6665.41PSN @ 6631.86
Rod & Pump Detail1-1/2" x 25' Polish Rodno ponies152 - 7/8" Plan
Weatherford Pump2.5 x 1.75 x 16 19 20RHAC Pump # #1466161. max stroke
Printed: 3/6f2007 12:47 21
Questar E &P Page 3 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:
Date From - To Hours Code C Description of Operations
2/3/2007 06:00 - 16:00 10.00 TRP 2 B-1 Adaptor 0.0Tension 1.50204 jts 2-7/8" J-55 6547.835-1/2" Type T TAC 2.6716 jts 2-7/8" Special Hardened Pipe 64.86PSN 1.102 jts 2-7/8" J-55 32.0Pinned Notch Collar .45
Tbg Tail @ 6665.41PSN @ 6631.86
Rod & Pump Detail1-1/2" x 25' Polish Rodno ponies152 - 7/8" Plan
Weatherford Pump2.5 x 1.75 x 16 19 20RHAC Pump # #1466161. max stroke
Printed: 3/6f2007 12:47 21
Questar E &P Page 3 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:
Date From - To Hours Code C Description of Operations
2/3/2007 06:00 - 16:00 10.00 TRP 2 B-1 Adaptor 0.0Tension 1.50204 jts 2-7/8" J-55 6547.835-1/2" Type T TAC 2.6716 jts 2-7/8" Special Hardened Pipe 64.86PSN 1.102 jts 2-7/8" J-55 32.0Pinned Notch Collar .45
Tbg Tail @ 6665.41PSN @ 6631.86
Rod & Pump Detail1-1/2" x 25' Polish Rodno ponies152 - 7/8" Plan
Weatherford Pump2.5 x 1.75 x 16 19 20RHAC Pump # #1466161. max stroke
Printed: 3/6f2007 12:47 21
Questar E &P Page 3 of 3
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:
Date From - To Hours Code C Description of Operations
2/3/2007 06:00 - 16:00 10.00 TRP 2 B-1 Adaptor 0.0Tension 1.50204 jts 2-7/8" J-55 6547.835-1/2" Type T TAC 2.6716 jts 2-7/8" Special Hardened Pipe 64.86PSN 1.102 jts 2-7/8" J-55 32.0Pinned Notch Collar .45
Tbg Tail @ 6665.41PSN @ 6631.86
Rod & Pump Detail1-1/2" x 25' Polish Rodno ponies152 - 7/8" Plan
Weatherford Pump2.5 x 1.75 x 16 19 20RHAC Pump # #1466161. max stroke
Printed: 3/6f2007 12:47 21
' a 31604 Forn approved.
(November1983) UNITED STATES SUBMIT IN DUPLICATE Budget Bureau No. 1004-0137
(formerly 9-330) DEPARTMENT OF THE INTERIOR (See other in- ExpiresAugust 31, 1985
BUREAU OF LAND MANAGEMENT structions on
\SIGNA110N AND SERIAL NO
UTU-74972
L ALLOTIEE OR TRIBE NAME
WELL COMPLETION OR RECOMPLETION REPORT AND LOG * N/A
la. TYPEOFWELL OIL GAS 7. UNITAGREEMENTNAME
WELL WELL DRY Other N/A
b TYPE OF COMPLETION
NEW WORK DEEP- PLUG DIFF. 8. FARMORLEASENAMEWELL OVER EN BACK RESVR Other
2. NAME OF OPERATOR 9. WELL NO.
QEP UINTA BASIN, INC. BBS 15G 22 7 21
3. ADDRESS OF OPERATUR Contact: Dahn Caldwell 435-781-4342 10. FIELD AND POOL, OR WILDCAT
1571 East 1700 South Vernal, UT 84078 Fax # 435.781.43574. LOCATIONOFWELL(ReportiocadondearlyandinaccordancewilkanyStarereµirensema? UNDESIGNATED
At surface 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E II. SEC.,T., R., M., OR BLOCK AND SURVEYOR AREA
At top rod.interval reported below 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E SEC 22-T7S-R21E
At total depth 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E
I14. PERMITNO. DATEISSUED 12. COUNTYOR 13. STATEPARISH
43-047-37443 UINTAH UT15. DATE SPUDDED 16. DATE T.D. REACHED 17. DATE COMPL. (Ready to prod) 18. ELEVAT10NS (Di .RKB, RT, GR, ETC.)* 19. ELEV. CASINGHEAD
9/29/06 11/22/06 2/2/07 IB20. TOTALDEPTH, MD & TVD 21. PLUG BACK T.D., MD & TVD 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS
HOW MANY* DRlLLED BY6828' 6767' --->
24. PRODUCING INTERVAI/S), OF THIS COMPLETION-TOP, BOTIOM, NAME (MD AND TVD)* 25. WAS DIRECTIONALSURVEY MADE
H4s Lime 6575'- 6580'NO
26. TYPE ELECTRIC AND OTHER LOGS RUN 27. WAS WELL CORED
GR/CBL & HRI SPECTRAL DENSITY DSN NO28. CASING RECORD (Report aHstrings set in weH)
CASING SIZE WEIGHT, LB /FT DEP1H SET (MD) HOLE SIZE CEMENTING RECORD AMOUNT PULLED
9-5/8" 36# 495' 12-1/4" 300 SXS5-1/2" 15.5# 6806' 7-7/8" 640 SXS
29. LINER RECORD 30 TUBINGRECORDSIZE TOP (MD) BOTIOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" 8679'31. PERFORATION RECORD (Interml, size and number) 32 ACID, SHOT, FRACTURE, CEMENT SQUEEZE,ETC.
H4a Lime 6575' - 6580' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
6575' - 6580' 5000 GALS 28% ACID JOB
33.* PRODUCTIONDATE FIRST PRODUCTION PRODUCTION METHOD (FA>wing,gas hß, pumping,size a ofpump) AINO32007 WELL STATUS(Producing or
.daten)
2/6/07 FLOWlNG PRODUCINGDATE OF TEST HOURS TESTED CHOKE SIZE PROD'N FOR OIL-BBL r Mb GAS-OIL RATIO
TEST PERIOD2/11/07 24 N/A 163 N/A 36
FLOW. TUBINGPRESS CASlNG PRESSURE CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR.)24-HOUR RATE
140 14034. DISPOSlTION OF GAS (Soki, usedfor fuel,wnted, etc) TEST WITNESSED BY
35. LISTOFATTACHMENTSWELLBORE SCHEMATIC
36 I hereby certify that the foregoing and attached f Rion is lete and conect as d 1availablerecords
SIGNED JIM SIMONTON COMPLETION SUPERVISOR DATE 4/2/07
(See lastructions and Spaces for Additional Data on Reverse
' a 31604 Forn approved.
(November1983) UNITED STATES SUBMIT IN DUPLICATE Budget Bureau No. 1004-0137
(formerly 9-330) DEPARTMENT OF THE INTERIOR (See other in- ExpiresAugust 31, 1985
BUREAU OF LAND MANAGEMENT structions on
\SIGNA110N AND SERIAL NO
UTU-74972
L ALLOTIEE OR TRIBE NAME
WELL COMPLETION OR RECOMPLETION REPORT AND LOG * N/A
la. TYPEOFWELL OIL GAS 7. UNITAGREEMENTNAME
WELL WELL DRY Other N/A
b TYPE OF COMPLETION
NEW WORK DEEP- PLUG DIFF. 8. FARMORLEASENAMEWELL OVER EN BACK RESVR Other
2. NAME OF OPERATOR 9. WELL NO.
QEP UINTA BASIN, INC. BBS 15G 22 7 21
3. ADDRESS OF OPERATUR Contact: Dahn Caldwell 435-781-4342 10. FIELD AND POOL, OR WILDCAT
1571 East 1700 South Vernal, UT 84078 Fax # 435.781.43574. LOCATIONOFWELL(ReportiocadondearlyandinaccordancewilkanyStarereµirensema? UNDESIGNATED
At surface 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E II. SEC.,T., R., M., OR BLOCK AND SURVEYOR AREA
At top rod.interval reported below 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E SEC 22-T7S-R21E
At total depth 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E
I14. PERMITNO. DATEISSUED 12. COUNTYOR 13. STATEPARISH
43-047-37443 UINTAH UT15. DATE SPUDDED 16. DATE T.D. REACHED 17. DATE COMPL. (Ready to prod) 18. ELEVAT10NS (Di .RKB, RT, GR, ETC.)* 19. ELEV. CASINGHEAD
9/29/06 11/22/06 2/2/07 IB20. TOTALDEPTH, MD & TVD 21. PLUG BACK T.D., MD & TVD 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS
HOW MANY* DRlLLED BY6828' 6767' --->
24. PRODUCING INTERVAI/S), OF THIS COMPLETION-TOP, BOTIOM, NAME (MD AND TVD)* 25. WAS DIRECTIONALSURVEY MADE
H4s Lime 6575'- 6580'NO
26. TYPE ELECTRIC AND OTHER LOGS RUN 27. WAS WELL CORED
GR/CBL & HRI SPECTRAL DENSITY DSN NO28. CASING RECORD (Report aHstrings set in weH)
CASING SIZE WEIGHT, LB /FT DEP1H SET (MD) HOLE SIZE CEMENTING RECORD AMOUNT PULLED
9-5/8" 36# 495' 12-1/4" 300 SXS5-1/2" 15.5# 6806' 7-7/8" 640 SXS
29. LINER RECORD 30 TUBINGRECORDSIZE TOP (MD) BOTIOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" 8679'31. PERFORATION RECORD (Interml, size and number) 32 ACID, SHOT, FRACTURE, CEMENT SQUEEZE,ETC.
H4a Lime 6575' - 6580' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
6575' - 6580' 5000 GALS 28% ACID JOB
33.* PRODUCTIONDATE FIRST PRODUCTION PRODUCTION METHOD (FA>wing,gas hß, pumping,size a ofpump) AINO32007 WELL STATUS(Producing or
.daten)
2/6/07 FLOWlNG PRODUCINGDATE OF TEST HOURS TESTED CHOKE SIZE PROD'N FOR OIL-BBL r Mb GAS-OIL RATIO
TEST PERIOD2/11/07 24 N/A 163 N/A 36
FLOW. TUBINGPRESS CASlNG PRESSURE CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR.)24-HOUR RATE
140 14034. DISPOSlTION OF GAS (Soki, usedfor fuel,wnted, etc) TEST WITNESSED BY
35. LISTOFATTACHMENTSWELLBORE SCHEMATIC
36 I hereby certify that the foregoing and attached f Rion is lete and conect as d 1availablerecords
SIGNED JIM SIMONTON COMPLETION SUPERVISOR DATE 4/2/07
(See lastructions and Spaces for Additional Data on Reverse
' a 31604 Forn approved.
(November1983) UNITED STATES SUBMIT IN DUPLICATE Budget Bureau No. 1004-0137
(formerly 9-330) DEPARTMENT OF THE INTERIOR (See other in- ExpiresAugust 31, 1985
BUREAU OF LAND MANAGEMENT structions on
\SIGNA110N AND SERIAL NO
UTU-74972
L ALLOTIEE OR TRIBE NAME
WELL COMPLETION OR RECOMPLETION REPORT AND LOG * N/A
la. TYPEOFWELL OIL GAS 7. UNITAGREEMENTNAME
WELL WELL DRY Other N/A
b TYPE OF COMPLETION
NEW WORK DEEP- PLUG DIFF. 8. FARMORLEASENAMEWELL OVER EN BACK RESVR Other
2. NAME OF OPERATOR 9. WELL NO.
QEP UINTA BASIN, INC. BBS 15G 22 7 21
3. ADDRESS OF OPERATUR Contact: Dahn Caldwell 435-781-4342 10. FIELD AND POOL, OR WILDCAT
1571 East 1700 South Vernal, UT 84078 Fax # 435.781.43574. LOCATIONOFWELL(ReportiocadondearlyandinaccordancewilkanyStarereµirensema? UNDESIGNATED
At surface 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E II. SEC.,T., R., M., OR BLOCK AND SURVEYOR AREA
At top rod.interval reported below 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E SEC 22-T7S-R21E
At total depth 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E
I14. PERMITNO. DATEISSUED 12. COUNTYOR 13. STATEPARISH
43-047-37443 UINTAH UT15. DATE SPUDDED 16. DATE T.D. REACHED 17. DATE COMPL. (Ready to prod) 18. ELEVAT10NS (Di .RKB, RT, GR, ETC.)* 19. ELEV. CASINGHEAD
9/29/06 11/22/06 2/2/07 IB20. TOTALDEPTH, MD & TVD 21. PLUG BACK T.D., MD & TVD 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS
HOW MANY* DRlLLED BY6828' 6767' --->
24. PRODUCING INTERVAI/S), OF THIS COMPLETION-TOP, BOTIOM, NAME (MD AND TVD)* 25. WAS DIRECTIONALSURVEY MADE
H4s Lime 6575'- 6580'NO
26. TYPE ELECTRIC AND OTHER LOGS RUN 27. WAS WELL CORED
GR/CBL & HRI SPECTRAL DENSITY DSN NO28. CASING RECORD (Report aHstrings set in weH)
CASING SIZE WEIGHT, LB /FT DEP1H SET (MD) HOLE SIZE CEMENTING RECORD AMOUNT PULLED
9-5/8" 36# 495' 12-1/4" 300 SXS5-1/2" 15.5# 6806' 7-7/8" 640 SXS
29. LINER RECORD 30 TUBINGRECORDSIZE TOP (MD) BOTIOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" 8679'31. PERFORATION RECORD (Interml, size and number) 32 ACID, SHOT, FRACTURE, CEMENT SQUEEZE,ETC.
H4a Lime 6575' - 6580' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
6575' - 6580' 5000 GALS 28% ACID JOB
33.* PRODUCTIONDATE FIRST PRODUCTION PRODUCTION METHOD (FA>wing,gas hß, pumping,size a ofpump) AINO32007 WELL STATUS(Producing or
.daten)
2/6/07 FLOWlNG PRODUCINGDATE OF TEST HOURS TESTED CHOKE SIZE PROD'N FOR OIL-BBL r Mb GAS-OIL RATIO
TEST PERIOD2/11/07 24 N/A 163 N/A 36
FLOW. TUBINGPRESS CASlNG PRESSURE CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR.)24-HOUR RATE
140 14034. DISPOSlTION OF GAS (Soki, usedfor fuel,wnted, etc) TEST WITNESSED BY
35. LISTOFATTACHMENTSWELLBORE SCHEMATIC
36 I hereby certify that the foregoing and attached f Rion is lete and conect as d 1availablerecords
SIGNED JIM SIMONTON COMPLETION SUPERVISOR DATE 4/2/07
(See lastructions and Spaces for Additional Data on Reverse
' a 31604 Forn approved.
(November1983) UNITED STATES SUBMIT IN DUPLICATE Budget Bureau No. 1004-0137
(formerly 9-330) DEPARTMENT OF THE INTERIOR (See other in- ExpiresAugust 31, 1985
BUREAU OF LAND MANAGEMENT structions on
\SIGNA110N AND SERIAL NO
UTU-74972
L ALLOTIEE OR TRIBE NAME
WELL COMPLETION OR RECOMPLETION REPORT AND LOG * N/A
la. TYPEOFWELL OIL GAS 7. UNITAGREEMENTNAME
WELL WELL DRY Other N/A
b TYPE OF COMPLETION
NEW WORK DEEP- PLUG DIFF. 8. FARMORLEASENAMEWELL OVER EN BACK RESVR Other
2. NAME OF OPERATOR 9. WELL NO.
QEP UINTA BASIN, INC. BBS 15G 22 7 21
3. ADDRESS OF OPERATUR Contact: Dahn Caldwell 435-781-4342 10. FIELD AND POOL, OR WILDCAT
1571 East 1700 South Vernal, UT 84078 Fax # 435.781.43574. LOCATIONOFWELL(ReportiocadondearlyandinaccordancewilkanyStarereµirensema? UNDESIGNATED
At surface 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E II. SEC.,T., R., M., OR BLOCK AND SURVEYOR AREA
At top rod.interval reported below 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E SEC 22-T7S-R21E
At total depth 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E
I14. PERMITNO. DATEISSUED 12. COUNTYOR 13. STATEPARISH
43-047-37443 UINTAH UT15. DATE SPUDDED 16. DATE T.D. REACHED 17. DATE COMPL. (Ready to prod) 18. ELEVAT10NS (Di .RKB, RT, GR, ETC.)* 19. ELEV. CASINGHEAD
9/29/06 11/22/06 2/2/07 IB20. TOTALDEPTH, MD & TVD 21. PLUG BACK T.D., MD & TVD 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS
HOW MANY* DRlLLED BY6828' 6767' --->
24. PRODUCING INTERVAI/S), OF THIS COMPLETION-TOP, BOTIOM, NAME (MD AND TVD)* 25. WAS DIRECTIONALSURVEY MADE
H4s Lime 6575'- 6580'NO
26. TYPE ELECTRIC AND OTHER LOGS RUN 27. WAS WELL CORED
GR/CBL & HRI SPECTRAL DENSITY DSN NO28. CASING RECORD (Report aHstrings set in weH)
CASING SIZE WEIGHT, LB /FT DEP1H SET (MD) HOLE SIZE CEMENTING RECORD AMOUNT PULLED
9-5/8" 36# 495' 12-1/4" 300 SXS5-1/2" 15.5# 6806' 7-7/8" 640 SXS
29. LINER RECORD 30 TUBINGRECORDSIZE TOP (MD) BOTIOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" 8679'31. PERFORATION RECORD (Interml, size and number) 32 ACID, SHOT, FRACTURE, CEMENT SQUEEZE,ETC.
H4a Lime 6575' - 6580' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
6575' - 6580' 5000 GALS 28% ACID JOB
33.* PRODUCTIONDATE FIRST PRODUCTION PRODUCTION METHOD (FA>wing,gas hß, pumping,size a ofpump) AINO32007 WELL STATUS(Producing or
.daten)
2/6/07 FLOWlNG PRODUCINGDATE OF TEST HOURS TESTED CHOKE SIZE PROD'N FOR OIL-BBL r Mb GAS-OIL RATIO
TEST PERIOD2/11/07 24 N/A 163 N/A 36
FLOW. TUBINGPRESS CASlNG PRESSURE CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR.)24-HOUR RATE
140 14034. DISPOSlTION OF GAS (Soki, usedfor fuel,wnted, etc) TEST WITNESSED BY
35. LISTOFATTACHMENTSWELLBORE SCHEMATIC
36 I hereby certify that the foregoing and attached f Rion is lete and conect as d 1availablerecords
SIGNED JIM SIMONTON COMPLETION SUPERVISOR DATE 4/2/07
(See lastructions and Spaces for Additional Data on Reverse
37. 1 SUMMARY OF POROUS ZONES: (Show all important zones of porosityand contentsthereoft cored intervals; and alldrill-stem tests, includingdepth interval tested, cushion used, timetool open, flowingandshut-inpressures,and 38. GEOLOGIC MARKERS
recoveries): BBS 15G 22 7 21
FORMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP
UINTA SURFACE NAME MEAS. DEPTH TRUE
GRgEN RIVER 3200' VERT. DEPTH
TD 6828' UINTA SURFACEGREEN RIVER 3200'TD
37. 1 SUMMARY OF POROUS ZONES: (Show all important zones of porosityand contentsthereoft cored intervals; and alldrill-stem tests, includingdepth interval tested, cushion used, timetool open, flowingandshut-inpressures,and 38. GEOLOGIC MARKERS
recoveries): BBS 15G 22 7 21
FORMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP
UINTA SURFACE NAME MEAS. DEPTH TRUE
GRgEN RIVER 3200' VERT. DEPTH
TD 6828' UINTA SURFACEGREEN RIVER 3200'TD
37. 1 SUMMARY OF POROUS ZONES: (Show all important zones of porosityand contentsthereoft cored intervals; and alldrill-stem tests, includingdepth interval tested, cushion used, timetool open, flowingandshut-inpressures,and 38. GEOLOGIC MARKERS
recoveries): BBS 15G 22 7 21
FORMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP
UINTA SURFACE NAME MEAS. DEPTH TRUE
GRgEN RIVER 3200' VERT. DEPTH
TD 6828' UINTA SURFACEGREEN RIVER 3200'TD
37. 1 SUMMARY OF POROUS ZONES: (Show all important zones of porosityand contentsthereoft cored intervals; and alldrill-stem tests, includingdepth interval tested, cushion used, timetool open, flowingandshut-inpressures,and 38. GEOLOGIC MARKERS
recoveries): BBS 15G 22 7 21
FORMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP
UINTA SURFACE NAME MEAS. DEPTH TRUE
GRgEN RIVER 3200' VERT. DEPTH
TD 6828' UINTA SURFACEGREEN RIVER 3200'TD
UTDSS79001FIELD: Brennan Bott0MS GL: 4,909 ' KBE: 4,924 ' Spud Date: 9-29-06 Completion date: 2-3-07
Weli: BBS 15G-22-7-21 TD: 6,828 ' PBTD: 6,767 ' Canent Well Status:
Location - surface: 669' FSL, 2022' FEt, SW/SESec. 22, T7S, R21E Reason for Pull/Workover: InHial completionof oil well
location - bottom hole:API#:43-047 37443 UIntah Mr Utah Deviation: Less than1 deg/100'
WellboreSchernatlC TMbing Landing Detaih
Descttption Size Footage Depth
KB 15.00 15.00
Surface casing Hanger 0.75 15.75
Size: 9-5/8" 15 155 2 7/8" 6.5# tbg 8,629.23 8,644.98
Weight: 36# 2.31" XN-nipple 0.84 8,645.82
Grade: J-55 1 jts 2-7/8" J-55 32.48 8,678.30
Set @ 495 Barred noiched collar 0.80 8,679.10
Cmtdw/ sk 300 EOT 0 8,679.10
Hole size: 12-1/4"Tubing Information:Condition:New: X Used: Rerun:
i Toc e 160 ' Grade: .1-55
Weight (#|ft): 6.5#
EXCLUDEDPERFS OPENPERFS
Wenhead Detan: Example: 7-1/16" 3000#4- 1/16" 10K
Other:Hanger: Yes x No
SuckerRodDetall:Size #Rods Rod Type
1 1/2" x 26' Polish Rodno ponles7/8" plain rods 112
3/4" plain rods 152
RodInformationCondition:New: x Used: Rerun:
Grade:Manufacture:
PumpInfonnation:Pumpsize 2.5x1.75x16x19x20Make&SAWeatherford RHAC #1466
Max SbOIŒ161" RUn Date: 1-23-07
Renm: New Run:x Rebuild:
SUMMARY1-30-07Zone 1 5000 gal 28% acidjob. H4a Ume 6575'-6580'1-8-07 Tumed wellover to production.
6575'-6580' H4a Ume
F-nipple O 8646EOT 0 8679
Production CasingSize: 5-1/2"Weight: 15.5#Grade: J-55
Set @ 6806 PETD@ 6767 '
H I s/ sk640
TD @ 6828 '
Prepared Br Todd Selliert Date: 2-347 NOTE: Short its cso 0 siss'-6S', (Cutters Wirenne
UTDSS79001FIELD: Brennan Bott0MS GL: 4,909 ' KBE: 4,924 ' Spud Date: 9-29-06 Completion date: 2-3-07
Weli: BBS 15G-22-7-21 TD: 6,828 ' PBTD: 6,767 ' Canent Well Status:
Location - surface: 669' FSL, 2022' FEt, SW/SESec. 22, T7S, R21E Reason for Pull/Workover: InHial completionof oil well
location - bottom hole:API#:43-047 37443 UIntah Mr Utah Deviation: Less than1 deg/100'
WellboreSchernatlC TMbing Landing Detaih
Descttption Size Footage Depth
KB 15.00 15.00
Surface casing Hanger 0.75 15.75
Size: 9-5/8" 15 155 2 7/8" 6.5# tbg 8,629.23 8,644.98
Weight: 36# 2.31" XN-nipple 0.84 8,645.82
Grade: J-55 1 jts 2-7/8" J-55 32.48 8,678.30
Set @ 495 Barred noiched collar 0.80 8,679.10
Cmtdw/ sk 300 EOT 0 8,679.10
Hole size: 12-1/4"Tubing Information:Condition:New: X Used: Rerun:
i Toc e 160 ' Grade: .1-55
Weight (#|ft): 6.5#
EXCLUDEDPERFS OPENPERFS
Wenhead Detan: Example: 7-1/16" 3000#4- 1/16" 10K
Other:Hanger: Yes x No
SuckerRodDetall:Size #Rods Rod Type
1 1/2" x 26' Polish Rodno ponles7/8" plain rods 112
3/4" plain rods 152
RodInformationCondition:New: x Used: Rerun:
Grade:Manufacture:
PumpInfonnation:Pumpsize 2.5x1.75x16x19x20Make&SAWeatherford RHAC #1466
Max SbOIŒ161" RUn Date: 1-23-07
Renm: New Run:x Rebuild:
SUMMARY1-30-07Zone 1 5000 gal 28% acidjob. H4a Ume 6575'-6580'1-8-07 Tumed wellover to production.
6575'-6580' H4a Ume
F-nipple O 8646EOT 0 8679
Production CasingSize: 5-1/2"Weight: 15.5#Grade: J-55
Set @ 6806 PETD@ 6767 '
H I s/ sk640
TD @ 6828 '
Prepared Br Todd Selliert Date: 2-347 NOTE: Short its cso 0 siss'-6S', (Cutters Wirenne
UTDSS79001FIELD: Brennan Bott0MS GL: 4,909 ' KBE: 4,924 ' Spud Date: 9-29-06 Completion date: 2-3-07
Weli: BBS 15G-22-7-21 TD: 6,828 ' PBTD: 6,767 ' Canent Well Status:
Location - surface: 669' FSL, 2022' FEt, SW/SESec. 22, T7S, R21E Reason for Pull/Workover: InHial completionof oil well
location - bottom hole:API#:43-047 37443 UIntah Mr Utah Deviation: Less than1 deg/100'
WellboreSchernatlC TMbing Landing Detaih
Descttption Size Footage Depth
KB 15.00 15.00
Surface casing Hanger 0.75 15.75
Size: 9-5/8" 15 155 2 7/8" 6.5# tbg 8,629.23 8,644.98
Weight: 36# 2.31" XN-nipple 0.84 8,645.82
Grade: J-55 1 jts 2-7/8" J-55 32.48 8,678.30
Set @ 495 Barred noiched collar 0.80 8,679.10
Cmtdw/ sk 300 EOT 0 8,679.10
Hole size: 12-1/4"Tubing Information:Condition:New: X Used: Rerun:
i Toc e 160 ' Grade: .1-55
Weight (#|ft): 6.5#
EXCLUDEDPERFS OPENPERFS
Wenhead Detan: Example: 7-1/16" 3000#4- 1/16" 10K
Other:Hanger: Yes x No
SuckerRodDetall:Size #Rods Rod Type
1 1/2" x 26' Polish Rodno ponles7/8" plain rods 112
3/4" plain rods 152
RodInformationCondition:New: x Used: Rerun:
Grade:Manufacture:
PumpInfonnation:Pumpsize 2.5x1.75x16x19x20Make&SAWeatherford RHAC #1466
Max SbOIŒ161" RUn Date: 1-23-07
Renm: New Run:x Rebuild:
SUMMARY1-30-07Zone 1 5000 gal 28% acidjob. H4a Ume 6575'-6580'1-8-07 Tumed wellover to production.
6575'-6580' H4a Ume
F-nipple O 8646EOT 0 8679
Production CasingSize: 5-1/2"Weight: 15.5#Grade: J-55
Set @ 6806 PETD@ 6767 '
H I s/ sk640
TD @ 6828 '
Prepared Br Todd Selliert Date: 2-347 NOTE: Short its cso 0 siss'-6S', (Cutters Wirenne
UTDSS79001FIELD: Brennan Bott0MS GL: 4,909 ' KBE: 4,924 ' Spud Date: 9-29-06 Completion date: 2-3-07
Weli: BBS 15G-22-7-21 TD: 6,828 ' PBTD: 6,767 ' Canent Well Status:
Location - surface: 669' FSL, 2022' FEt, SW/SESec. 22, T7S, R21E Reason for Pull/Workover: InHial completionof oil well
location - bottom hole:API#:43-047 37443 UIntah Mr Utah Deviation: Less than1 deg/100'
WellboreSchernatlC TMbing Landing Detaih
Descttption Size Footage Depth
KB 15.00 15.00
Surface casing Hanger 0.75 15.75
Size: 9-5/8" 15 155 2 7/8" 6.5# tbg 8,629.23 8,644.98
Weight: 36# 2.31" XN-nipple 0.84 8,645.82
Grade: J-55 1 jts 2-7/8" J-55 32.48 8,678.30
Set @ 495 Barred noiched collar 0.80 8,679.10
Cmtdw/ sk 300 EOT 0 8,679.10
Hole size: 12-1/4"Tubing Information:Condition:New: X Used: Rerun:
i Toc e 160 ' Grade: .1-55
Weight (#|ft): 6.5#
EXCLUDEDPERFS OPENPERFS
Wenhead Detan: Example: 7-1/16" 3000#4- 1/16" 10K
Other:Hanger: Yes x No
SuckerRodDetall:Size #Rods Rod Type
1 1/2" x 26' Polish Rodno ponles7/8" plain rods 112
3/4" plain rods 152
RodInformationCondition:New: x Used: Rerun:
Grade:Manufacture:
PumpInfonnation:Pumpsize 2.5x1.75x16x19x20Make&SAWeatherford RHAC #1466
Max SbOIŒ161" RUn Date: 1-23-07
Renm: New Run:x Rebuild:
SUMMARY1-30-07Zone 1 5000 gal 28% acidjob. H4a Ume 6575'-6580'1-8-07 Tumed wellover to production.
6575'-6580' H4a Ume
F-nipple O 8646EOT 0 8679
Production CasingSize: 5-1/2"Weight: 15.5#Grade: J-55
Set @ 6806 PETD@ 6767 '
H I s/ sk640
TD @ 6828 '
Prepared Br Todd Selliert Date: 2-347 NOTE: Short its cso 0 siss'-6S', (Cutters Wirenne
Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ
Change of Operator (Well Sold) X - Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 1/1/2007
FROM: (Old Operator): TO: ( New Operator):N2460-QEP Uinta Basin, Inc. N5085-QuestarE&P Company
1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265
Phone: 1 (303) 672-6900 Phone: 1 (303) 672-6900
CA No. Unit:WELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL
NO TYPE STATUSSEE ATTACHED LISTS *
OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 4/19/2007
2. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 4/16/2007
3. The new company was checked on the Department of Commerce, Division of Corporations Database on: 1/31/2005
4a. Is the new operator registered in the State of Utah: Business Number: 764611-0143
5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE
5b. Inspections of LA PA state/fee well sites complete on: n/a
5c. Reports current for Production/Disposition & Sundries on: n/a
6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,
or operator change for all wells listed on Federal or Indian leases on: BLM 4/23/2007 BIA
7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on: 4/23/2007
8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:
9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority to
Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:
DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 4/30/2007 and 5/15/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 4/30/2007 and 5/15/20073. Bond information entered in RBDMS on: 4/30/2007 and 5/15/20074. Fee/State wells attached to bond in RBDMS on: 4/30/2007 and 5/15/20075. Injection Projects to new operator in RBDMS on: 4/30/2007 and 5/15/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: n/a
BOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESB0000242. Indian well(s) covered by Bond Number: 7994463a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 965003033
3b. The FORMER operator has requested a release of liability from their bond on: n/a
LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division
of their responsibility to notify all interest owners of this change on: n/a
COMMENTS: THIS IS A COMPANY NAME CHANGE.SOME WELL NAMES HAVE BEEN CHANGED AS REQUESTED
Questar E&P FORM A.xls 4/30/2007 AND
Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ
Change of Operator (Well Sold) X - Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 1/1/2007
FROM: (Old Operator): TO: ( New Operator):N2460-QEP Uinta Basin, Inc. N5085-QuestarE&P Company
1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265
Phone: 1 (303) 672-6900 Phone: 1 (303) 672-6900
CA No. Unit:WELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL
NO TYPE STATUSSEE ATTACHED LISTS *
OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 4/19/2007
2. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 4/16/2007
3. The new company was checked on the Department of Commerce, Division of Corporations Database on: 1/31/2005
4a. Is the new operator registered in the State of Utah: Business Number: 764611-0143
5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE
5b. Inspections of LA PA state/fee well sites complete on: n/a
5c. Reports current for Production/Disposition & Sundries on: n/a
6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,
or operator change for all wells listed on Federal or Indian leases on: BLM 4/23/2007 BIA
7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on: 4/23/2007
8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:
9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority to
Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:
DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 4/30/2007 and 5/15/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 4/30/2007 and 5/15/20073. Bond information entered in RBDMS on: 4/30/2007 and 5/15/20074. Fee/State wells attached to bond in RBDMS on: 4/30/2007 and 5/15/20075. Injection Projects to new operator in RBDMS on: 4/30/2007 and 5/15/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: n/a
BOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESB0000242. Indian well(s) covered by Bond Number: 7994463a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 965003033
3b. The FORMER operator has requested a release of liability from their bond on: n/a
LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division
of their responsibility to notify all interest owners of this change on: n/a
COMMENTS: THIS IS A COMPANY NAME CHANGE.SOME WELL NAMES HAVE BEEN CHANGED AS REQUESTED
Questar E&P FORM A.xls 4/30/2007 AND
Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ
Change of Operator (Well Sold) X - Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 1/1/2007
FROM: (Old Operator): TO: ( New Operator):N2460-QEP Uinta Basin, Inc. N5085-QuestarE&P Company
1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265
Phone: 1 (303) 672-6900 Phone: 1 (303) 672-6900
CA No. Unit:WELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL
NO TYPE STATUSSEE ATTACHED LISTS *
OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 4/19/2007
2. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 4/16/2007
3. The new company was checked on the Department of Commerce, Division of Corporations Database on: 1/31/2005
4a. Is the new operator registered in the State of Utah: Business Number: 764611-0143
5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE
5b. Inspections of LA PA state/fee well sites complete on: n/a
5c. Reports current for Production/Disposition & Sundries on: n/a
6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,
or operator change for all wells listed on Federal or Indian leases on: BLM 4/23/2007 BIA
7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on: 4/23/2007
8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:
9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority to
Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:
DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 4/30/2007 and 5/15/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 4/30/2007 and 5/15/20073. Bond information entered in RBDMS on: 4/30/2007 and 5/15/20074. Fee/State wells attached to bond in RBDMS on: 4/30/2007 and 5/15/20075. Injection Projects to new operator in RBDMS on: 4/30/2007 and 5/15/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: n/a
BOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESB0000242. Indian well(s) covered by Bond Number: 7994463a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 965003033
3b. The FORMER operator has requested a release of liability from their bond on: n/a
LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division
of their responsibility to notify all interest owners of this change on: n/a
COMMENTS: THIS IS A COMPANY NAME CHANGE.SOME WELL NAMES HAVE BEEN CHANGED AS REQUESTED
Questar E&P FORM A.xls 4/30/2007 AND
Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ
Change of Operator (Well Sold) X - Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 1/1/2007
FROM: (Old Operator): TO: ( New Operator):N2460-QEP Uinta Basin, Inc. N5085-QuestarE&P Company
1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265
Phone: 1 (303) 672-6900 Phone: 1 (303) 672-6900
CA No. Unit:WELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL
NO TYPE STATUSSEE ATTACHED LISTS *
OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 4/19/2007
2. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 4/16/2007
3. The new company was checked on the Department of Commerce, Division of Corporations Database on: 1/31/2005
4a. Is the new operator registered in the State of Utah: Business Number: 764611-0143
5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE
5b. Inspections of LA PA state/fee well sites complete on: n/a
5c. Reports current for Production/Disposition & Sundries on: n/a
6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,
or operator change for all wells listed on Federal or Indian leases on: BLM 4/23/2007 BIA
7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on: 4/23/2007
8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:
9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority to
Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:
DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 4/30/2007 and 5/15/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 4/30/2007 and 5/15/20073. Bond information entered in RBDMS on: 4/30/2007 and 5/15/20074. Fee/State wells attached to bond in RBDMS on: 4/30/2007 and 5/15/20075. Injection Projects to new operator in RBDMS on: 4/30/2007 and 5/15/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: n/a
BOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESB0000242. Indian well(s) covered by Bond Number: 7994463a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 965003033
3b. The FORMER operator has requested a release of liability from their bond on: n/a
LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division
of their responsibility to notify all interest owners of this change on: n/a
COMMENTS: THIS IS A COMPANY NAME CHANGE.SOME WELL NAMES HAVE BEEN CHANGED AS REQUESTED
Questar E&P FORM A.xls 4/30/2007 AND
of8
QEP
Uin
taB
asin
(N24
60)
toQ
UES
TAR
Ean
dP
(N50
85)
4/30
/200
7an
d5/
15/2
007
Orig
inal
Wel
lN
ame
Wel
lNam
e&
no.
Q/Q
SEC
TWP
RN
GA
PII
Entit
yLe
ase
Wel
lTy
peSt
atus
FED
ERA
L2-2
9-7-
22FE
DER
AL2
-29-
7-22
|NES
W29
070S
|220
E|4
3047
1542
352
66|F
eder
al|G
WIS
UTA
HFE
DD
-1U
TAH
FED
D-1
SWSW
1407
0S|2
40E
4304
7159
3610
699
Fede
ral
GW
ISU
TAH
FED
D-2
UTA
HFE
DD
-2N
ESW
2507
0S24
0E43
0471
5937
9295
Fede
ral
GW
SPR
INC
E1
PRIN
CE
1SW
SW10
070S
240E
4304
7161
9970
35Fe
dera
lG
W.P
UTA
HFE
DD
-4U
TAH
FED
D-4
SWSE
1407
0S|2
40E
4304
7312
1592
97Fe
dera
lG
WS
FZB
B1
BR
ENN
AN
FZ-B
B1
NES
E20
070S
I21
0E43
0473
1805
1095
2Fe
dera
liG
WTA
EAST
CO
YO
TEFE
D14
-4-8
-25
EAST
CO
YO
TEFE
D14
-4-8
-25
SESW
0408
0Si
250E
4304
7324
9311
630
Fede
ral
OW
PFS
PRIN
CE
4PR
INC
E4
SWSW
0307
0S24
0E43
0473
2677
7035
'Fed
eral
OW
.PG
YPS
UM
HIL
LS21
GH
21W
GSW
SW|
2108
0S21
0E|
4304
7326
9211
819
|Fed
eral
GW
PSA
GE
GR
OU
SEFE
D6-
14-8
-22
OU
SG6
148
22SE
NW
\14
080S
220E
4304
7327
4611
944
IFed
eral
GW
PG
YPS
UM
HIL
LS22
WG
GH
22W
GSW
NW
2208
0SI
210E
4304
7328
1812
336
IFed
eral
_GW
PSA
GE
GR
OU
SE12
A-1
4-8-
22|S
AG
EG
RO
USE
12A
-14-
8-22
NW
SW14
080S
220E
4304
7331
7712
524
|Fed
eral
GW
SO
UG
B12
W-2
0-8-
22O
UG
B12
W-2
0-8-
22N
WSW
|20
080S
220E
4304
7332
4913
488
|Fed
eral
GW
PG
BU
15-1
8-8-
22O
UG
B15
188
22SW
SE|
1808
0S22
0E43
0473
3364
1269
0|F
eder
alG
WP
GLE
NB
ENC
HFE
D3W
-17-
8-22
IOU
GB
3W17
822
INEN
W17
080S
220E
4304
7335
1312
950
|Fed
eral
GW
PG
LEN
BEN
CH
FED
5W-1
7-8-
22|O
UG
B5W
178
22iS
WN
W17
080S
220E
4304
7335
1412
873
IFed
eral
GW
PW
VFE
D9W
-8-8
-22
_W
V9W
88
22N
ESE
0808
0S22
0E43
0473
3515
1339
5F
dera
lG
WP
GB
FED
9W-1
8-8-
22O
UG
B9W
188
22N
ESE
1808
0S22
0E43
0473
3516
1299
7,F
eder
alG
WP
OU
GB
3W-2
0-8-
22O
UG
B3W
-20-
8-22
NEN
WI
2008
0S22
0E43
0473
3526
1351
4iF
eder
alG
WP
GLE
NB
ENC
H12
W-3
0-8-
22O
UG
B12
W30
822
NW
SWI
3008
0S22
0E43
0473
3670
1338
0.F
eder
alG
WiP
WV
FU10
W-8
-8-2
2|W
V10
W8
822
NW
SE|
0808
0S22
0E43
0473
3814
1345
0F
dera
l|G
W|P
GH
7W-2
1-8-
21G
H7W
-21-
8-21
ISW
NE
|21
080S
210E
|430
4733
845
1305
0|F
eder
al|G
W|P
GH
9W-2
1-8-
21G
H9W
-21-
8-21
_IN
ESE
I21
080S
210E
4304
7338
4613
074
|Fed
eral
|GW
IPG
H11
W-2
1-8-
21G
H11
W-2
1-8-
21IN
ESW
I21
080S
210E
I43
0473
3847
1304
9IF
eder
al|G
WIP
GH
15W
-21-
8-21
GH
15W
-21-
8-21
SWSE
2108
0S21
0EI 4
3047
3384
813
051
Fede
ral
|GW
PW
V7W
-22-
8-21
|WV
7W-2
2-8-
21SW
NE
|22
080S
210E
|43
0473
3907
|132
30Fe
dera
l|G
WP
WV
9W-2
3-8-
21IW
V9W
-23-
8-21
NES
E23
|080
S21
0E|4
3047
3390
913
160
IFed
eral
|GW
IP
GH
U14
W-2
0-8-
21G
H14
W20
821
SESW
2008
0S21
0E|4
3047
3391
5|1
3073
|Fed
eral
GW
|PG
B4W
-30-
8-22
OU
GB
4W30
822
NW
NW
3008
0S22
0EI
4304
7339
45I
1337
2IF
eder
alG
WIP
GB
9W-1
9-8-
22O
UG
B9W
198
22IN
ESE
1908
0S22
0E43
0473
3946
i13
393
Fede
ral
GW
IP
GB
10W
-30-
8-22
OU
GB
10W
308
22|N
WSE
3008
0S22
0E|4
3047
3394
7|1
3389
Fede
ral
|GW
PG
B12
W-1
9-8-
22O
UG
B12
W19
822
|NW
SW19
080S
220E
4304
7339
4813
388
Fede
ral
IGW
PG
B9W
-25-
8-21
GB
9W-2
5-8-
21IN
ESE
I25
080S
210E
4304
7339
6013
390
Fede
ral
iGW
PW
V1W
-5-8
-22
SU1W
58
22N
ENE
0508
0S22
0E43
0473
3985
1336
9Fe
dera
lG
WP
WV
3W-5
-8-2
2SU
3W5
822
NEN
W05
080S
220E
4304
7339
8713
321
Fede
ral
IOW
SW
V7W
-5-8
-22
.SU
7W5
822
SWN
E|
0508
0SI2
20E
|430
4733
988
1323
5Fe
dera
lG
WP
WV
9W-5
-8-2
2SU
9W5
822
NES
EI
0508
0SI
220E
|43
0473
3990
1323
8Fe
dera
lG
WP
WV
11W
-5-8
-22
SU11
W5
822
NES
W\
0508
0S.
220E
4304
7339
9213
239
Fede
ral
I GW
SW
V13
W-5
-8-2
2SU
13W
58
22SW
SW|
0508
0S' 22
0E43
0473
3994
1323
6Fe
dera
lG
WS
WV
15W
-5-8
-22
SU15
W5
822
SWSE
|05
080S
220E
4304
7339
9613
240
IFed
eral
¡GW
PW
V8W
-8-8
-22
WV
8W-8
-8-2
2SE
NE
I08
080S
220E
I43
0473
4005
1332
0|F
eder
alG
W|P
WV
14W
-8-8
-22
IWV
14W
-8-8
-22
SESW
I08
080S
I22
0EI
4304
7340
0713
322
Fede
ral
iGW
of8
QEP
Uin
taB
asin
(N24
60)
toQ
UES
TAR
Ean
dP
(N50
85)
4/30
/200
7an
d5/
15/2
007
Orig
inal
Wel
lN
ame
Wel
lNam
e&
no.
Q/Q
SEC
TWP
RN
GA
PII
Entit
yLe
ase
Wel
lTy
peSt
atus
FED
ERA
L2-2
9-7-
22FE
DER
AL2
-29-
7-22
|NES
W29
070S
|220
E|4
3047
1542
352
66|F
eder
al|G
WIS
UTA
HFE
DD
-1U
TAH
FED
D-1
SWSW
1407
0S|2
40E
4304
7159
3610
699
Fede
ral
GW
ISU
TAH
FED
D-2
UTA
HFE
DD
-2N
ESW
2507
0S24
0E43
0471
5937
9295
Fede
ral
GW
SPR
INC
E1
PRIN
CE
1SW
SW10
070S
240E
4304
7161
9970
35Fe
dera
lG
W.P
UTA
HFE
DD
-4U
TAH
FED
D-4
SWSE
1407
0S|2
40E
4304
7312
1592
97Fe
dera
lG
WS
FZB
B1
BR
ENN
AN
FZ-B
B1
NES
E20
070S
I21
0E43
0473
1805
1095
2Fe
dera
liG
WTA
EAST
CO
YO
TEFE
D14
-4-8
-25
EAST
CO
YO
TEFE
D14
-4-8
-25
SESW
0408
0Si
250E
4304
7324
9311
630
Fede
ral
OW
PFS
PRIN
CE
4PR
INC
E4
SWSW
0307
0S24
0E43
0473
2677
7035
'Fed
eral
OW
.PG
YPS
UM
HIL
LS21
GH
21W
GSW
SW|
2108
0S21
0E|
4304
7326
9211
819
|Fed
eral
GW
PSA
GE
GR
OU
SEFE
D6-
14-8
-22
OU
SG6
148
22SE
NW
\14
080S
220E
4304
7327
4611
944
IFed
eral
GW
PG
YPS
UM
HIL
LS22
WG
GH
22W
GSW
NW
2208
0SI
210E
4304
7328
1812
336
IFed
eral
_GW
PSA
GE
GR
OU
SE12
A-1
4-8-
22|S
AG
EG
RO
USE
12A
-14-
8-22
NW
SW14
080S
220E
4304
7331
7712
524
|Fed
eral
GW
SO
UG
B12
W-2
0-8-
22O
UG
B12
W-2
0-8-
22N
WSW
|20
080S
220E
4304
7332
4913
488
|Fed
eral
GW
PG
BU
15-1
8-8-
22O
UG
B15
188
22SW
SE|
1808
0S22
0E43
0473
3364
1269
0|F
eder
alG
WP
GLE
NB
ENC
HFE
D3W
-17-
8-22
IOU
GB
3W17
822
INEN
W17
080S
220E
4304
7335
1312
950
|Fed
eral
GW
PG
LEN
BEN
CH
FED
5W-1
7-8-
22|O
UG
B5W
178
22iS
WN
W17
080S
220E
4304
7335
1412
873
IFed
eral
GW
PW
VFE
D9W
-8-8
-22
_W
V9W
88
22N
ESE
0808
0S22
0E43
0473
3515
1339
5F
dera
lG
WP
GB
FED
9W-1
8-8-
22O
UG
B9W
188
22N
ESE
1808
0S22
0E43
0473
3516
1299
7,F
eder
alG
WP
OU
GB
3W-2
0-8-
22O
UG
B3W
-20-
8-22
NEN
WI
2008
0S22
0E43
0473
3526
1351
4iF
eder
alG
WP
GLE
NB
ENC
H12
W-3
0-8-
22O
UG
B12
W30
822
NW
SWI
3008
0S22
0E43
0473
3670
1338
0.F
eder
alG
WiP
WV
FU10
W-8
-8-2
2|W
V10
W8
822
NW
SE|
0808
0S22
0E43
0473
3814
1345
0F
dera
l|G
W|P
GH
7W-2
1-8-
21G
H7W
-21-
8-21
ISW
NE
|21
080S
210E
|430
4733
845
1305
0|F
eder
al|G
W|P
GH
9W-2
1-8-
21G
H9W
-21-
8-21
_IN
ESE
I21
080S
210E
4304
7338
4613
074
|Fed
eral
|GW
IPG
H11
W-2
1-8-
21G
H11
W-2
1-8-
21IN
ESW
I21
080S
210E
I43
0473
3847
1304
9IF
eder
al|G
WIP
GH
15W
-21-
8-21
GH
15W
-21-
8-21
SWSE
2108
0S21
0EI 4
3047
3384
813
051
Fede
ral
|GW
PW
V7W
-22-
8-21
|WV
7W-2
2-8-
21SW
NE
|22
080S
210E
|43
0473
3907
|132
30Fe
dera
l|G
WP
WV
9W-2
3-8-
21IW
V9W
-23-
8-21
NES
E23
|080
S21
0E|4
3047
3390
913
160
IFed
eral
|GW
IP
GH
U14
W-2
0-8-
21G
H14
W20
821
SESW
2008
0S21
0E|4
3047
3391
5|1
3073
|Fed
eral
GW
|PG
B4W
-30-
8-22
OU
GB
4W30
822
NW
NW
3008
0S22
0EI
4304
7339
45I
1337
2IF
eder
alG
WIP
GB
9W-1
9-8-
22O
UG
B9W
198
22IN
ESE
1908
0S22
0E43
0473
3946
i13
393
Fede
ral
GW
IP
GB
10W
-30-
8-22
OU
GB
10W
308
22|N
WSE
3008
0S22
0E|4
3047
3394
7|1
3389
Fede
ral
|GW
PG
B12
W-1
9-8-
22O
UG
B12
W19
822
|NW
SW19
080S
220E
4304
7339
4813
388
Fede
ral
IGW
PG
B9W
-25-
8-21
GB
9W-2
5-8-
21IN
ESE
I25
080S
210E
4304
7339
6013
390
Fede
ral
iGW
PW
V1W
-5-8
-22
SU1W
58
22N
ENE
0508
0S22
0E43
0473
3985
1336
9Fe
dera
lG
WP
WV
3W-5
-8-2
2SU
3W5
822
NEN
W05
080S
220E
4304
7339
8713
321
Fede
ral
IOW
SW
V7W
-5-8
-22
.SU
7W5
822
SWN
E|
0508
0SI2
20E
|430
4733
988
1323
5Fe
dera
lG
WP
WV
9W-5
-8-2
2SU
9W5
822
NES
EI
0508
0SI
220E
|43
0473
3990
1323
8Fe
dera
lG
WP
WV
11W
-5-8
-22
SU11
W5
822
NES
W\
0508
0S.
220E
4304
7339
9213
239
Fede
ral
I GW
SW
V13
W-5
-8-2
2SU
13W
58
22SW
SW|
0508
0S' 22
0E43
0473
3994
1323
6Fe
dera
lG
WS
WV
15W
-5-8
-22
SU15
W5
822
SWSE
|05
080S
220E
4304
7339
9613
240
IFed
eral
¡GW
PW
V8W
-8-8
-22
WV
8W-8
-8-2
2SE
NE
I08
080S
220E
I43
0473
4005
1332
0|F
eder
alG
W|P
WV
14W
-8-8
-22
IWV
14W
-8-8
-22
SESW
I08
080S
I22
0EI
4304
7340
0713
322
Fede
ral
iGW
of8
QEP
Uin
taB
asin
(N24
60)
toQ
UES
TAR
Ean
dP
(N50
85)
4/30
/200
7an
d5/
15/2
007
Orig
inal
Wel
lN
ame
Wel
lNam
e&
no.
Q/Q
SEC
TWP
RN
GA
PII
Entit
yLe
ase
Wel
lTy
peSt
atus
FED
ERA
L2-2
9-7-
22FE
DER
AL2
-29-
7-22
|NES
W29
070S
|220
E|4
3047
1542
352
66|F
eder
al|G
WIS
UTA
HFE
DD
-1U
TAH
FED
D-1
SWSW
1407
0S|2
40E
4304
7159
3610
699
Fede
ral
GW
ISU
TAH
FED
D-2
UTA
HFE
DD
-2N
ESW
2507
0S24
0E43
0471
5937
9295
Fede
ral
GW
SPR
INC
E1
PRIN
CE
1SW
SW10
070S
240E
4304
7161
9970
35Fe
dera
lG
W.P
UTA
HFE
DD
-4U
TAH
FED
D-4
SWSE
1407
0S|2
40E
4304
7312
1592
97Fe
dera
lG
WS
FZB
B1
BR
ENN
AN
FZ-B
B1
NES
E20
070S
I21
0E43
0473
1805
1095
2Fe
dera
liG
WTA
EAST
CO
YO
TEFE
D14
-4-8
-25
EAST
CO
YO
TEFE
D14
-4-8
-25
SESW
0408
0Si
250E
4304
7324
9311
630
Fede
ral
OW
PFS
PRIN
CE
4PR
INC
E4
SWSW
0307
0S24
0E43
0473
2677
7035
'Fed
eral
OW
.PG
YPS
UM
HIL
LS21
GH
21W
GSW
SW|
2108
0S21
0E|
4304
7326
9211
819
|Fed
eral
GW
PSA
GE
GR
OU
SEFE
D6-
14-8
-22
OU
SG6
148
22SE
NW
\14
080S
220E
4304
7327
4611
944
IFed
eral
GW
PG
YPS
UM
HIL
LS22
WG
GH
22W
GSW
NW
2208
0SI
210E
4304
7328
1812
336
IFed
eral
_GW
PSA
GE
GR
OU
SE12
A-1
4-8-
22|S
AG
EG
RO
USE
12A
-14-
8-22
NW
SW14
080S
220E
4304
7331
7712
524
|Fed
eral
GW
SO
UG
B12
W-2
0-8-
22O
UG
B12
W-2
0-8-
22N
WSW
|20
080S
220E
4304
7332
4913
488
|Fed
eral
GW
PG
BU
15-1
8-8-
22O
UG
B15
188
22SW
SE|
1808
0S22
0E43
0473
3364
1269
0|F
eder
alG
WP
GLE
NB
ENC
HFE
D3W
-17-
8-22
IOU
GB
3W17
822
INEN
W17
080S
220E
4304
7335
1312
950
|Fed
eral
GW
PG
LEN
BEN
CH
FED
5W-1
7-8-
22|O
UG
B5W
178
22iS
WN
W17
080S
220E
4304
7335
1412
873
IFed
eral
GW
PW
VFE
D9W
-8-8
-22
_W
V9W
88
22N
ESE
0808
0S22
0E43
0473
3515
1339
5F
dera
lG
WP
GB
FED
9W-1
8-8-
22O
UG
B9W
188
22N
ESE
1808
0S22
0E43
0473
3516
1299
7,F
eder
alG
WP
OU
GB
3W-2
0-8-
22O
UG
B3W
-20-
8-22
NEN
WI
2008
0S22
0E43
0473
3526
1351
4iF
eder
alG
WP
GLE
NB
ENC
H12
W-3
0-8-
22O
UG
B12
W30
822
NW
SWI
3008
0S22
0E43
0473
3670
1338
0.F
eder
alG
WiP
WV
FU10
W-8
-8-2
2|W
V10
W8
822
NW
SE|
0808
0S22
0E43
0473
3814
1345
0F
dera
l|G
W|P
GH
7W-2
1-8-
21G
H7W
-21-
8-21
ISW
NE
|21
080S
210E
|430
4733
845
1305
0|F
eder
al|G
W|P
GH
9W-2
1-8-
21G
H9W
-21-
8-21
_IN
ESE
I21
080S
210E
4304
7338
4613
074
|Fed
eral
|GW
IPG
H11
W-2
1-8-
21G
H11
W-2
1-8-
21IN
ESW
I21
080S
210E
I43
0473
3847
1304
9IF
eder
al|G
WIP
GH
15W
-21-
8-21
GH
15W
-21-
8-21
SWSE
2108
0S21
0EI 4
3047
3384
813
051
Fede
ral
|GW
PW
V7W
-22-
8-21
|WV
7W-2
2-8-
21SW
NE
|22
080S
210E
|43
0473
3907
|132
30Fe
dera
l|G
WP
WV
9W-2
3-8-
21IW
V9W
-23-
8-21
NES
E23
|080
S21
0E|4
3047
3390
913
160
IFed
eral
|GW
IP
GH
U14
W-2
0-8-
21G
H14
W20
821
SESW
2008
0S21
0E|4
3047
3391
5|1
3073
|Fed
eral
GW
|PG
B4W
-30-
8-22
OU
GB
4W30
822
NW
NW
3008
0S22
0EI
4304
7339
45I
1337
2IF
eder
alG
WIP
GB
9W-1
9-8-
22O
UG
B9W
198
22IN
ESE
1908
0S22
0E43
0473
3946
i13
393
Fede
ral
GW
IP
GB
10W
-30-
8-22
OU
GB
10W
308
22|N
WSE
3008
0S22
0E|4
3047
3394
7|1
3389
Fede
ral
|GW
PG
B12
W-1
9-8-
22O
UG
B12
W19
822
|NW
SW19
080S
220E
4304
7339
4813
388
Fede
ral
IGW
PG
B9W
-25-
8-21
GB
9W-2
5-8-
21IN
ESE
I25
080S
210E
4304
7339
6013
390
Fede
ral
iGW
PW
V1W
-5-8
-22
SU1W
58
22N
ENE
0508
0S22
0E43
0473
3985
1336
9Fe
dera
lG
WP
WV
3W-5
-8-2
2SU
3W5
822
NEN
W05
080S
220E
4304
7339
8713
321
Fede
ral
IOW
SW
V7W
-5-8
-22
.SU
7W5
822
SWN
E|
0508
0SI2
20E
|430
4733
988
1323
5Fe
dera
lG
WP
WV
9W-5
-8-2
2SU
9W5
822
NES
EI
0508
0SI
220E
|43
0473
3990
1323
8Fe
dera
lG
WP
WV
11W
-5-8
-22
SU11
W5
822
NES
W\
0508
0S.
220E
4304
7339
9213
239
Fede
ral
I GW
SW
V13
W-5
-8-2
2SU
13W
58
22SW
SW|
0508
0S' 22
0E43
0473
3994
1323
6Fe
dera
lG
WS
WV
15W
-5-8
-22
SU15
W5
822
SWSE
|05
080S
220E
4304
7339
9613
240
IFed
eral
¡GW
PW
V8W
-8-8
-22
WV
8W-8
-8-2
2SE
NE
I08
080S
220E
I43
0473
4005
1332
0|F
eder
alG
W|P
WV
14W
-8-8
-22
IWV
14W
-8-8
-22
SESW
I08
080S
I22
0EI
4304
7340
0713
322
Fede
ral
iGW
of8
QEP
Uin
taB
asin
(N24
60)
toQ
UES
TAR
Ean
dP
(N50
85)
4/30
/200
7an
d5/
15/2
007
Orig
inal
Wel
lN
ame
Wel
lNam
e&
no.
Q/Q
SEC
TWP
RN
GA
PII
Entit
yLe
ase
Wel
lTy
peSt
atus
FED
ERA
L2-2
9-7-
22FE
DER
AL2
-29-
7-22
|NES
W29
070S
|220
E|4
3047
1542
352
66|F
eder
al|G
WIS
UTA
HFE
DD
-1U
TAH
FED
D-1
SWSW
1407
0S|2
40E
4304
7159
3610
699
Fede
ral
GW
ISU
TAH
FED
D-2
UTA
HFE
DD
-2N
ESW
2507
0S24
0E43
0471
5937
9295
Fede
ral
GW
SPR
INC
E1
PRIN
CE
1SW
SW10
070S
240E
4304
7161
9970
35Fe
dera
lG
W.P
UTA
HFE
DD
-4U
TAH
FED
D-4
SWSE
1407
0S|2
40E
4304
7312
1592
97Fe
dera
lG
WS
FZB
B1
BR
ENN
AN
FZ-B
B1
NES
E20
070S
I21
0E43
0473
1805
1095
2Fe
dera
liG
WTA
EAST
CO
YO
TEFE
D14
-4-8
-25
EAST
CO
YO
TEFE
D14
-4-8
-25
SESW
0408
0Si
250E
4304
7324
9311
630
Fede
ral
OW
PFS
PRIN
CE
4PR
INC
E4
SWSW
0307
0S24
0E43
0473
2677
7035
'Fed
eral
OW
.PG
YPS
UM
HIL
LS21
GH
21W
GSW
SW|
2108
0S21
0E|
4304
7326
9211
819
|Fed
eral
GW
PSA
GE
GR
OU
SEFE
D6-
14-8
-22
OU
SG6
148
22SE
NW
\14
080S
220E
4304
7327
4611
944
IFed
eral
GW
PG
YPS
UM
HIL
LS22
WG
GH
22W
GSW
NW
2208
0SI
210E
4304
7328
1812
336
IFed
eral
_GW
PSA
GE
GR
OU
SE12
A-1
4-8-
22|S
AG
EG
RO
USE
12A
-14-
8-22
NW
SW14
080S
220E
4304
7331
7712
524
|Fed
eral
GW
SO
UG
B12
W-2
0-8-
22O
UG
B12
W-2
0-8-
22N
WSW
|20
080S
220E
4304
7332
4913
488
|Fed
eral
GW
PG
BU
15-1
8-8-
22O
UG
B15
188
22SW
SE|
1808
0S22
0E43
0473
3364
1269
0|F
eder
alG
WP
GLE
NB
ENC
HFE
D3W
-17-
8-22
IOU
GB
3W17
822
INEN
W17
080S
220E
4304
7335
1312
950
|Fed
eral
GW
PG
LEN
BEN
CH
FED
5W-1
7-8-
22|O
UG
B5W
178
22iS
WN
W17
080S
220E
4304
7335
1412
873
IFed
eral
GW
PW
VFE
D9W
-8-8
-22
_W
V9W
88
22N
ESE
0808
0S22
0E43
0473
3515
1339
5F
dera
lG
WP
GB
FED
9W-1
8-8-
22O
UG
B9W
188
22N
ESE
1808
0S22
0E43
0473
3516
1299
7,F
eder
alG
WP
OU
GB
3W-2
0-8-
22O
UG
B3W
-20-
8-22
NEN
WI
2008
0S22
0E43
0473
3526
1351
4iF
eder
alG
WP
GLE
NB
ENC
H12
W-3
0-8-
22O
UG
B12
W30
822
NW
SWI
3008
0S22
0E43
0473
3670
1338
0.F
eder
alG
WiP
WV
FU10
W-8
-8-2
2|W
V10
W8
822
NW
SE|
0808
0S22
0E43
0473
3814
1345
0F
dera
l|G
W|P
GH
7W-2
1-8-
21G
H7W
-21-
8-21
ISW
NE
|21
080S
210E
|430
4733
845
1305
0|F
eder
al|G
W|P
GH
9W-2
1-8-
21G
H9W
-21-
8-21
_IN
ESE
I21
080S
210E
4304
7338
4613
074
|Fed
eral
|GW
IPG
H11
W-2
1-8-
21G
H11
W-2
1-8-
21IN
ESW
I21
080S
210E
I43
0473
3847
1304
9IF
eder
al|G
WIP
GH
15W
-21-
8-21
GH
15W
-21-
8-21
SWSE
2108
0S21
0EI 4
3047
3384
813
051
Fede
ral
|GW
PW
V7W
-22-
8-21
|WV
7W-2
2-8-
21SW
NE
|22
080S
210E
|43
0473
3907
|132
30Fe
dera
l|G
WP
WV
9W-2
3-8-
21IW
V9W
-23-
8-21
NES
E23
|080
S21
0E|4
3047
3390
913
160
IFed
eral
|GW
IP
GH
U14
W-2
0-8-
21G
H14
W20
821
SESW
2008
0S21
0E|4
3047
3391
5|1
3073
|Fed
eral
GW
|PG
B4W
-30-
8-22
OU
GB
4W30
822
NW
NW
3008
0S22
0EI
4304
7339
45I
1337
2IF
eder
alG
WIP
GB
9W-1
9-8-
22O
UG
B9W
198
22IN
ESE
1908
0S22
0E43
0473
3946
i13
393
Fede
ral
GW
IP
GB
10W
-30-
8-22
OU
GB
10W
308
22|N
WSE
3008
0S22
0E|4
3047
3394
7|1
3389
Fede
ral
|GW
PG
B12
W-1
9-8-
22O
UG
B12
W19
822
|NW
SW19
080S
220E
4304
7339
4813
388
Fede
ral
IGW
PG
B9W
-25-
8-21
GB
9W-2
5-8-
21IN
ESE
I25
080S
210E
4304
7339
6013
390
Fede
ral
iGW
PW
V1W
-5-8
-22
SU1W
58
22N
ENE
0508
0S22
0E43
0473
3985
1336
9Fe
dera
lG
WP
WV
3W-5
-8-2
2SU
3W5
822
NEN
W05
080S
220E
4304
7339
8713
321
Fede
ral
IOW
SW
V7W
-5-8
-22
.SU
7W5
822
SWN
E|
0508
0SI2
20E
|430
4733
988
1323
5Fe
dera
lG
WP
WV
9W-5
-8-2
2SU
9W5
822
NES
EI
0508
0SI
220E
|43
0473
3990
1323
8Fe
dera
lG
WP
WV
11W
-5-8
-22
SU11
W5
822
NES
W\
0508
0S.
220E
4304
7339
9213
239
Fede
ral
I GW
SW
V13
W-5
-8-2
2SU
13W
58
22SW
SW|
0508
0S' 22
0E43
0473
3994
1323
6Fe
dera
lG
WS
WV
15W
-5-8
-22
SU15
W5
822
SWSE
|05
080S
220E
4304
7339
9613
240
IFed
eral
¡GW
PW
V8W
-8-8
-22
WV
8W-8
-8-2
2SE
NE
I08
080S
220E
I43
0473
4005
1332
0|F
eder
alG
W|P
WV
14W
-8-8
-22
IWV
14W
-8-8
-22
SESW
I08
080S
I22
0EI
4304
7340
0713
322
Fede
ral
iGW
2of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
Wel
tNan
ieN
o.Q
/QSE
CTW
PR
NG
API
Entit
yLe
ase
Wel
lTy
peSt
atus
OU
GB
6W-2
0-8-
22O
UG
B6W
-20-
8-22
|SEN
W20
080S
220E
4304
7340
1813
518
Fede
ral
GW
PG
B5W
-30-
8-22
OU
GB
5W30
822
SWN
W30
080S
220E
4304
7340
25I
1350
2Fe
dera
lG
WP
GB
11W
-20-
8-22
OU
GB
11W
208
22N
ESW
2008
0S22
0E43
0473
4039
.13
413
Fede
ral
GW
PO
UG
B4W
-20-
8-22
OU
GB
4W-2
0-8-
22N
WN
W20
080S
220E
4304
7340
43i
1352
0Fe
dera
lG
WP
GH
5W-2
1-8-
21G
H5W
-21-
8-21
SWN
W21
080S
210E
4304
7341
47.
1338
7Fe
dera
lG
WP
GH
6W-2
1-8-
21G
H6W
-21-
8-21
SEN
W21
080S
210E
4304
7341
4813
371
IFed
eral
GW
GH
8W-2
1-8-
21G
H8W
-21-
8-21
SEN
E21
080S
210E
4304
7341
49i
1329
3.F
eder
alG
WP
GH
10W
-20-
8-21
GH
10W
-20-
8-21
NW
SE_
2008
0S21
0E43
0473
4151
1332
8Fe
dera
lG
WP
GH
10W
-21-
8-21
GH
10W
-21-
8-21
NW
SE21
080S
210E
4304
7341
5213
378
Fede
ral
GW
PG
H12
W-2
1-8-
21G
H12
W-2
1-8-
21N
WSW
2108
0S21
0E43
0473
4153
1329
4Fe
dera
lG
WP
GH
14W
-21-
8-21
GH
14W
-21-
8-21
SESW
2108
0S21
0E43
0473
4154
1329
2Fe
dera
lG
WP
GH
16W
-21-
8-21
GH
16W
-21-
8-21
SESE
_21
080S
210E
4304
7341
5713
329
Fede
ral
GW
PG
B5W
-20-
8-22
OU
GB
5W20
822
SWN
W20
080S
220E
4304
7342
0913
414
Fede
ral
GW
PW
V6W
-22-
8-21
WV
6W-2
2-8-
21SE
NW
2208
0S21
0E43
0473
4272
1337
9__F
eder
al__
GW
PG
H1W
-20-
8-21
GH
1W-2
0-8-
21N
ENE
I20
080S
210E
4304
7343
2713
451
Fede
ral
GW
PG
H2W
-20-
8-21
GH
2W-2
0-8-
21N
WN
E20
080S
210E
4304
7343
2813
527
Fede
ral_
_G
WP
GH
3W-2
0-8-
21G
H3W
-20-
8-21
NEN
W20
080S
210E
4304
7343
2913
728
Fede
ral
GW
.PG
H7W
-20-
8-21
GH
7W-2
0-8-
21_
SWN
E|
2008
0S21
0E43
0473
4332
1353
7Fe
dera
l|G
WP
GH
9W-2
0-8-
21G
H9W
-20-
8-21
NES
E20
080S
210E
4304
7343
3313
411
Fede
ral
IGW
PG
H11
W-2
0-8-
21G
HllW
-20-
8-21
NES
WI
2008
0S_
210E
4304
7343
3413
410
Fede
ral
GW
LPG
H15
W-2
0-8-
21G
H15
W-2
0-8-
21SW
SE20
080S
210E
4304
7343
3513
407
Fede
ral
GW
.PG
H16
W-2
0-8-
21G
H16
W-2
0-8-
21SE
SE|
2008
0S21
0E43
0473
4336
1350
1Fe
dera
lG
WP
WV
12W
-23-
8-21
WV
12W
-23-
8-21
NW
SW23
080S
210E
4304
7343
4313
430
Fede
ral
GW
PO
UG
B13
W-2
0-8-
22O
UG
B13
W-2
0-8-
22SW
SWI
2008
0S22
0E43
0473
4348
1349
5Fe
dera
lG
W.P
OU
GB
14W
-20-
8-22
OU
GB
14W
-20-
8-22
SESW
2008
0S22
0E43
0473
4349
1350
7Fe
dera
lG
W:P
OU
GB
11W
-29-
8-22
OU
GB
11W
-29-
8-22
NES
W29
080S
220E
4304
7343
5013
526
Fede
ral
GW
iPW
V11
G-5
-8-2
2W
VX
11G
58
22N
ESW
Í05
080S
220E
4304
7343
8813
422
Fede
ral
OW
ÍPW
V13
G-5
-8-2
2W
VX
13G
58
22SW
SWI
0508
0S22
0E43
0473
4389
1373
8Fe
dera
lO
WiP
WV
15G
-5-8
-22
WV
X15
G5
822
SWSE
0508
0S22
0E43
0473
4390
1345
9Fe
dera
lO
W.P
SUB
REN
NA
NW
15W
-18-
7-22
SUB
REN
NA
NW
15W
-18-
7-22
SWSE
1807
0S22
0E43
0473
4403
1344
2Fe
dera
l.G
WiT
A
STIR
RU
PU
16W
-5-8
-22
SU16
W5
822
SESE
I05
080S
220E
4304
7344
4613
654
Fede
ral
GW
PST
IRR
UP
U2W
-5-8
-22
SU2W
58
22N
WN
E05
080S
220E
4304
7344
5513
700
Fede
ral
GW
iPW
V10
W-5
-8-2
2SU
10W
58
22N
WSE
0508
0S22
0E43
0473
4456
1354
0Fe
dera
lG
WP
WV
16W
-8-8
-22
WV
16W
-8-8
-22
SESE
0808
0S22
0E43
0473
4470
1350
8Fe
dera
lG
WP
GB
16W
X-3
0-8-
22O
UG
B16
WX
308
22SE
SE30
080S
220E
4304
7345
0613
431
Fede
ral
GW
PO
UG
B1W
-19-
8-22
OU
GB
lW-1
9-8-
22N
ENE
1908
0SI2
20E
4304
7345
1213
469
IFed
eral
GW
PO
UG
B2W
-19-
8-22
OU
GB
2W-1
9-8-
22N
WN
E19
080S
I 220
E43
0473
4513
1346
1IF
eder
alG
WP
OU
GB
5W-1
9-8-
22O
UG
B5W
-19-
8-22
SWN
W19
080S
220E
4304
7345
1413
460
Fede
rilG
WP
OU
GB
7W-1
9-8-
22O
UG
B7W
-19-
8-22
SWN
E19
080S
220E
4304
7345
1513
462
Fede
ral
GW
PO
UG
B8W
-19-
8-22
OU
GB
8W-1
9-8-
22SE
NE
1908
0S22
0E43
0473
4516
1348
9Fe
dera
lG
WP
OU
GB
11W
-19-
8-22
OU
GB
11W
-19-
8-22
NES
W19
080S
220E
4304
7345
1713
467
IFed
eral
GW
iPO
UG
B16
W-1
9-8-
22O
UG
B16
W-1
9-8-
22SE
SE19
080S
220E
,43
0473
4522
1347
6IF
eder
alG
W
2of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
Wel
tNan
ieN
o.Q
/QSE
CTW
PR
NG
API
Entit
yLe
ase
Wel
lTy
peSt
atus
OU
GB
6W-2
0-8-
22O
UG
B6W
-20-
8-22
|SEN
W20
080S
220E
4304
7340
1813
518
Fede
ral
GW
PG
B5W
-30-
8-22
OU
GB
5W30
822
SWN
W30
080S
220E
4304
7340
25I
1350
2Fe
dera
lG
WP
GB
11W
-20-
8-22
OU
GB
11W
208
22N
ESW
2008
0S22
0E43
0473
4039
.13
413
Fede
ral
GW
PO
UG
B4W
-20-
8-22
OU
GB
4W-2
0-8-
22N
WN
W20
080S
220E
4304
7340
43i
1352
0Fe
dera
lG
WP
GH
5W-2
1-8-
21G
H5W
-21-
8-21
SWN
W21
080S
210E
4304
7341
47.
1338
7Fe
dera
lG
WP
GH
6W-2
1-8-
21G
H6W
-21-
8-21
SEN
W21
080S
210E
4304
7341
4813
371
IFed
eral
GW
GH
8W-2
1-8-
21G
H8W
-21-
8-21
SEN
E21
080S
210E
4304
7341
49i
1329
3.F
eder
alG
WP
GH
10W
-20-
8-21
GH
10W
-20-
8-21
NW
SE_
2008
0S21
0E43
0473
4151
1332
8Fe
dera
lG
WP
GH
10W
-21-
8-21
GH
10W
-21-
8-21
NW
SE21
080S
210E
4304
7341
5213
378
Fede
ral
GW
PG
H12
W-2
1-8-
21G
H12
W-2
1-8-
21N
WSW
2108
0S21
0E43
0473
4153
1329
4Fe
dera
lG
WP
GH
14W
-21-
8-21
GH
14W
-21-
8-21
SESW
2108
0S21
0E43
0473
4154
1329
2Fe
dera
lG
WP
GH
16W
-21-
8-21
GH
16W
-21-
8-21
SESE
_21
080S
210E
4304
7341
5713
329
Fede
ral
GW
PG
B5W
-20-
8-22
OU
GB
5W20
822
SWN
W20
080S
220E
4304
7342
0913
414
Fede
ral
GW
PW
V6W
-22-
8-21
WV
6W-2
2-8-
21SE
NW
2208
0S21
0E43
0473
4272
1337
9__F
eder
al__
GW
PG
H1W
-20-
8-21
GH
1W-2
0-8-
21N
ENE
I20
080S
210E
4304
7343
2713
451
Fede
ral
GW
PG
H2W
-20-
8-21
GH
2W-2
0-8-
21N
WN
E20
080S
210E
4304
7343
2813
527
Fede
ral_
_G
WP
GH
3W-2
0-8-
21G
H3W
-20-
8-21
NEN
W20
080S
210E
4304
7343
2913
728
Fede
ral
GW
.PG
H7W
-20-
8-21
GH
7W-2
0-8-
21_
SWN
E|
2008
0S21
0E43
0473
4332
1353
7Fe
dera
l|G
WP
GH
9W-2
0-8-
21G
H9W
-20-
8-21
NES
E20
080S
210E
4304
7343
3313
411
Fede
ral
IGW
PG
H11
W-2
0-8-
21G
HllW
-20-
8-21
NES
WI
2008
0S_
210E
4304
7343
3413
410
Fede
ral
GW
LPG
H15
W-2
0-8-
21G
H15
W-2
0-8-
21SW
SE20
080S
210E
4304
7343
3513
407
Fede
ral
GW
.PG
H16
W-2
0-8-
21G
H16
W-2
0-8-
21SE
SE|
2008
0S21
0E43
0473
4336
1350
1Fe
dera
lG
WP
WV
12W
-23-
8-21
WV
12W
-23-
8-21
NW
SW23
080S
210E
4304
7343
4313
430
Fede
ral
GW
PO
UG
B13
W-2
0-8-
22O
UG
B13
W-2
0-8-
22SW
SWI
2008
0S22
0E43
0473
4348
1349
5Fe
dera
lG
W.P
OU
GB
14W
-20-
8-22
OU
GB
14W
-20-
8-22
SESW
2008
0S22
0E43
0473
4349
1350
7Fe
dera
lG
W:P
OU
GB
11W
-29-
8-22
OU
GB
11W
-29-
8-22
NES
W29
080S
220E
4304
7343
5013
526
Fede
ral
GW
iPW
V11
G-5
-8-2
2W
VX
11G
58
22N
ESW
Í05
080S
220E
4304
7343
8813
422
Fede
ral
OW
ÍPW
V13
G-5
-8-2
2W
VX
13G
58
22SW
SWI
0508
0S22
0E43
0473
4389
1373
8Fe
dera
lO
WiP
WV
15G
-5-8
-22
WV
X15
G5
822
SWSE
0508
0S22
0E43
0473
4390
1345
9Fe
dera
lO
W.P
SUB
REN
NA
NW
15W
-18-
7-22
SUB
REN
NA
NW
15W
-18-
7-22
SWSE
1807
0S22
0E43
0473
4403
1344
2Fe
dera
l.G
WiT
A
STIR
RU
PU
16W
-5-8
-22
SU16
W5
822
SESE
I05
080S
220E
4304
7344
4613
654
Fede
ral
GW
PST
IRR
UP
U2W
-5-8
-22
SU2W
58
22N
WN
E05
080S
220E
4304
7344
5513
700
Fede
ral
GW
iPW
V10
W-5
-8-2
2SU
10W
58
22N
WSE
0508
0S22
0E43
0473
4456
1354
0Fe
dera
lG
WP
WV
16W
-8-8
-22
WV
16W
-8-8
-22
SESE
0808
0S22
0E43
0473
4470
1350
8Fe
dera
lG
WP
GB
16W
X-3
0-8-
22O
UG
B16
WX
308
22SE
SE30
080S
220E
4304
7345
0613
431
Fede
ral
GW
PO
UG
B1W
-19-
8-22
OU
GB
lW-1
9-8-
22N
ENE
1908
0SI2
20E
4304
7345
1213
469
IFed
eral
GW
PO
UG
B2W
-19-
8-22
OU
GB
2W-1
9-8-
22N
WN
E19
080S
I 220
E43
0473
4513
1346
1IF
eder
alG
WP
OU
GB
5W-1
9-8-
22O
UG
B5W
-19-
8-22
SWN
W19
080S
220E
4304
7345
1413
460
Fede
rilG
WP
OU
GB
7W-1
9-8-
22O
UG
B7W
-19-
8-22
SWN
E19
080S
220E
4304
7345
1513
462
Fede
ral
GW
PO
UG
B8W
-19-
8-22
OU
GB
8W-1
9-8-
22SE
NE
1908
0S22
0E43
0473
4516
1348
9Fe
dera
lG
WP
OU
GB
11W
-19-
8-22
OU
GB
11W
-19-
8-22
NES
W19
080S
220E
4304
7345
1713
467
IFed
eral
GW
iPO
UG
B16
W-1
9-8-
22O
UG
B16
W-1
9-8-
22SE
SE19
080S
220E
,43
0473
4522
1347
6IF
eder
alG
W
2of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
Wel
tNan
ieN
o.Q
/QSE
CTW
PR
NG
API
Entit
yLe
ase
Wel
lTy
peSt
atus
OU
GB
6W-2
0-8-
22O
UG
B6W
-20-
8-22
|SEN
W20
080S
220E
4304
7340
1813
518
Fede
ral
GW
PG
B5W
-30-
8-22
OU
GB
5W30
822
SWN
W30
080S
220E
4304
7340
25I
1350
2Fe
dera
lG
WP
GB
11W
-20-
8-22
OU
GB
11W
208
22N
ESW
2008
0S22
0E43
0473
4039
.13
413
Fede
ral
GW
PO
UG
B4W
-20-
8-22
OU
GB
4W-2
0-8-
22N
WN
W20
080S
220E
4304
7340
43i
1352
0Fe
dera
lG
WP
GH
5W-2
1-8-
21G
H5W
-21-
8-21
SWN
W21
080S
210E
4304
7341
47.
1338
7Fe
dera
lG
WP
GH
6W-2
1-8-
21G
H6W
-21-
8-21
SEN
W21
080S
210E
4304
7341
4813
371
IFed
eral
GW
GH
8W-2
1-8-
21G
H8W
-21-
8-21
SEN
E21
080S
210E
4304
7341
49i
1329
3.F
eder
alG
WP
GH
10W
-20-
8-21
GH
10W
-20-
8-21
NW
SE_
2008
0S21
0E43
0473
4151
1332
8Fe
dera
lG
WP
GH
10W
-21-
8-21
GH
10W
-21-
8-21
NW
SE21
080S
210E
4304
7341
5213
378
Fede
ral
GW
PG
H12
W-2
1-8-
21G
H12
W-2
1-8-
21N
WSW
2108
0S21
0E43
0473
4153
1329
4Fe
dera
lG
WP
GH
14W
-21-
8-21
GH
14W
-21-
8-21
SESW
2108
0S21
0E43
0473
4154
1329
2Fe
dera
lG
WP
GH
16W
-21-
8-21
GH
16W
-21-
8-21
SESE
_21
080S
210E
4304
7341
5713
329
Fede
ral
GW
PG
B5W
-20-
8-22
OU
GB
5W20
822
SWN
W20
080S
220E
4304
7342
0913
414
Fede
ral
GW
PW
V6W
-22-
8-21
WV
6W-2
2-8-
21SE
NW
2208
0S21
0E43
0473
4272
1337
9__F
eder
al__
GW
PG
H1W
-20-
8-21
GH
1W-2
0-8-
21N
ENE
I20
080S
210E
4304
7343
2713
451
Fede
ral
GW
PG
H2W
-20-
8-21
GH
2W-2
0-8-
21N
WN
E20
080S
210E
4304
7343
2813
527
Fede
ral_
_G
WP
GH
3W-2
0-8-
21G
H3W
-20-
8-21
NEN
W20
080S
210E
4304
7343
2913
728
Fede
ral
GW
.PG
H7W
-20-
8-21
GH
7W-2
0-8-
21_
SWN
E|
2008
0S21
0E43
0473
4332
1353
7Fe
dera
l|G
WP
GH
9W-2
0-8-
21G
H9W
-20-
8-21
NES
E20
080S
210E
4304
7343
3313
411
Fede
ral
IGW
PG
H11
W-2
0-8-
21G
HllW
-20-
8-21
NES
WI
2008
0S_
210E
4304
7343
3413
410
Fede
ral
GW
LPG
H15
W-2
0-8-
21G
H15
W-2
0-8-
21SW
SE20
080S
210E
4304
7343
3513
407
Fede
ral
GW
.PG
H16
W-2
0-8-
21G
H16
W-2
0-8-
21SE
SE|
2008
0S21
0E43
0473
4336
1350
1Fe
dera
lG
WP
WV
12W
-23-
8-21
WV
12W
-23-
8-21
NW
SW23
080S
210E
4304
7343
4313
430
Fede
ral
GW
PO
UG
B13
W-2
0-8-
22O
UG
B13
W-2
0-8-
22SW
SWI
2008
0S22
0E43
0473
4348
1349
5Fe
dera
lG
W.P
OU
GB
14W
-20-
8-22
OU
GB
14W
-20-
8-22
SESW
2008
0S22
0E43
0473
4349
1350
7Fe
dera
lG
W:P
OU
GB
11W
-29-
8-22
OU
GB
11W
-29-
8-22
NES
W29
080S
220E
4304
7343
5013
526
Fede
ral
GW
iPW
V11
G-5
-8-2
2W
VX
11G
58
22N
ESW
Í05
080S
220E
4304
7343
8813
422
Fede
ral
OW
ÍPW
V13
G-5
-8-2
2W
VX
13G
58
22SW
SWI
0508
0S22
0E43
0473
4389
1373
8Fe
dera
lO
WiP
WV
15G
-5-8
-22
WV
X15
G5
822
SWSE
0508
0S22
0E43
0473
4390
1345
9Fe
dera
lO
W.P
SUB
REN
NA
NW
15W
-18-
7-22
SUB
REN
NA
NW
15W
-18-
7-22
SWSE
1807
0S22
0E43
0473
4403
1344
2Fe
dera
l.G
WiT
A
STIR
RU
PU
16W
-5-8
-22
SU16
W5
822
SESE
I05
080S
220E
4304
7344
4613
654
Fede
ral
GW
PST
IRR
UP
U2W
-5-8
-22
SU2W
58
22N
WN
E05
080S
220E
4304
7344
5513
700
Fede
ral
GW
iPW
V10
W-5
-8-2
2SU
10W
58
22N
WSE
0508
0S22
0E43
0473
4456
1354
0Fe
dera
lG
WP
WV
16W
-8-8
-22
WV
16W
-8-8
-22
SESE
0808
0S22
0E43
0473
4470
1350
8Fe
dera
lG
WP
GB
16W
X-3
0-8-
22O
UG
B16
WX
308
22SE
SE30
080S
220E
4304
7345
0613
431
Fede
ral
GW
PO
UG
B1W
-19-
8-22
OU
GB
lW-1
9-8-
22N
ENE
1908
0SI2
20E
4304
7345
1213
469
IFed
eral
GW
PO
UG
B2W
-19-
8-22
OU
GB
2W-1
9-8-
22N
WN
E19
080S
I 220
E43
0473
4513
1346
1IF
eder
alG
WP
OU
GB
5W-1
9-8-
22O
UG
B5W
-19-
8-22
SWN
W19
080S
220E
4304
7345
1413
460
Fede
rilG
WP
OU
GB
7W-1
9-8-
22O
UG
B7W
-19-
8-22
SWN
E19
080S
220E
4304
7345
1513
462
Fede
ral
GW
PO
UG
B8W
-19-
8-22
OU
GB
8W-1
9-8-
22SE
NE
1908
0S22
0E43
0473
4516
1348
9Fe
dera
lG
WP
OU
GB
11W
-19-
8-22
OU
GB
11W
-19-
8-22
NES
W19
080S
220E
4304
7345
1713
467
IFed
eral
GW
iPO
UG
B16
W-1
9-8-
22O
UG
B16
W-1
9-8-
22SE
SE19
080S
220E
,43
0473
4522
1347
6IF
eder
alG
W
2of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
Wel
tNan
ieN
o.Q
/QSE
CTW
PR
NG
API
Entit
yLe
ase
Wel
lTy
peSt
atus
OU
GB
6W-2
0-8-
22O
UG
B6W
-20-
8-22
|SEN
W20
080S
220E
4304
7340
1813
518
Fede
ral
GW
PG
B5W
-30-
8-22
OU
GB
5W30
822
SWN
W30
080S
220E
4304
7340
25I
1350
2Fe
dera
lG
WP
GB
11W
-20-
8-22
OU
GB
11W
208
22N
ESW
2008
0S22
0E43
0473
4039
.13
413
Fede
ral
GW
PO
UG
B4W
-20-
8-22
OU
GB
4W-2
0-8-
22N
WN
W20
080S
220E
4304
7340
43i
1352
0Fe
dera
lG
WP
GH
5W-2
1-8-
21G
H5W
-21-
8-21
SWN
W21
080S
210E
4304
7341
47.
1338
7Fe
dera
lG
WP
GH
6W-2
1-8-
21G
H6W
-21-
8-21
SEN
W21
080S
210E
4304
7341
4813
371
IFed
eral
GW
GH
8W-2
1-8-
21G
H8W
-21-
8-21
SEN
E21
080S
210E
4304
7341
49i
1329
3.F
eder
alG
WP
GH
10W
-20-
8-21
GH
10W
-20-
8-21
NW
SE_
2008
0S21
0E43
0473
4151
1332
8Fe
dera
lG
WP
GH
10W
-21-
8-21
GH
10W
-21-
8-21
NW
SE21
080S
210E
4304
7341
5213
378
Fede
ral
GW
PG
H12
W-2
1-8-
21G
H12
W-2
1-8-
21N
WSW
2108
0S21
0E43
0473
4153
1329
4Fe
dera
lG
WP
GH
14W
-21-
8-21
GH
14W
-21-
8-21
SESW
2108
0S21
0E43
0473
4154
1329
2Fe
dera
lG
WP
GH
16W
-21-
8-21
GH
16W
-21-
8-21
SESE
_21
080S
210E
4304
7341
5713
329
Fede
ral
GW
PG
B5W
-20-
8-22
OU
GB
5W20
822
SWN
W20
080S
220E
4304
7342
0913
414
Fede
ral
GW
PW
V6W
-22-
8-21
WV
6W-2
2-8-
21SE
NW
2208
0S21
0E43
0473
4272
1337
9__F
eder
al__
GW
PG
H1W
-20-
8-21
GH
1W-2
0-8-
21N
ENE
I20
080S
210E
4304
7343
2713
451
Fede
ral
GW
PG
H2W
-20-
8-21
GH
2W-2
0-8-
21N
WN
E20
080S
210E
4304
7343
2813
527
Fede
ral_
_G
WP
GH
3W-2
0-8-
21G
H3W
-20-
8-21
NEN
W20
080S
210E
4304
7343
2913
728
Fede
ral
GW
.PG
H7W
-20-
8-21
GH
7W-2
0-8-
21_
SWN
E|
2008
0S21
0E43
0473
4332
1353
7Fe
dera
l|G
WP
GH
9W-2
0-8-
21G
H9W
-20-
8-21
NES
E20
080S
210E
4304
7343
3313
411
Fede
ral
IGW
PG
H11
W-2
0-8-
21G
HllW
-20-
8-21
NES
WI
2008
0S_
210E
4304
7343
3413
410
Fede
ral
GW
LPG
H15
W-2
0-8-
21G
H15
W-2
0-8-
21SW
SE20
080S
210E
4304
7343
3513
407
Fede
ral
GW
.PG
H16
W-2
0-8-
21G
H16
W-2
0-8-
21SE
SE|
2008
0S21
0E43
0473
4336
1350
1Fe
dera
lG
WP
WV
12W
-23-
8-21
WV
12W
-23-
8-21
NW
SW23
080S
210E
4304
7343
4313
430
Fede
ral
GW
PO
UG
B13
W-2
0-8-
22O
UG
B13
W-2
0-8-
22SW
SWI
2008
0S22
0E43
0473
4348
1349
5Fe
dera
lG
W.P
OU
GB
14W
-20-
8-22
OU
GB
14W
-20-
8-22
SESW
2008
0S22
0E43
0473
4349
1350
7Fe
dera
lG
W:P
OU
GB
11W
-29-
8-22
OU
GB
11W
-29-
8-22
NES
W29
080S
220E
4304
7343
5013
526
Fede
ral
GW
iPW
V11
G-5
-8-2
2W
VX
11G
58
22N
ESW
Í05
080S
220E
4304
7343
8813
422
Fede
ral
OW
ÍPW
V13
G-5
-8-2
2W
VX
13G
58
22SW
SWI
0508
0S22
0E43
0473
4389
1373
8Fe
dera
lO
WiP
WV
15G
-5-8
-22
WV
X15
G5
822
SWSE
0508
0S22
0E43
0473
4390
1345
9Fe
dera
lO
W.P
SUB
REN
NA
NW
15W
-18-
7-22
SUB
REN
NA
NW
15W
-18-
7-22
SWSE
1807
0S22
0E43
0473
4403
1344
2Fe
dera
l.G
WiT
A
STIR
RU
PU
16W
-5-8
-22
SU16
W5
822
SESE
I05
080S
220E
4304
7344
4613
654
Fede
ral
GW
PST
IRR
UP
U2W
-5-8
-22
SU2W
58
22N
WN
E05
080S
220E
4304
7344
5513
700
Fede
ral
GW
iPW
V10
W-5
-8-2
2SU
10W
58
22N
WSE
0508
0S22
0E43
0473
4456
1354
0Fe
dera
lG
WP
WV
16W
-8-8
-22
WV
16W
-8-8
-22
SESE
0808
0S22
0E43
0473
4470
1350
8Fe
dera
lG
WP
GB
16W
X-3
0-8-
22O
UG
B16
WX
308
22SE
SE30
080S
220E
4304
7345
0613
431
Fede
ral
GW
PO
UG
B1W
-19-
8-22
OU
GB
lW-1
9-8-
22N
ENE
1908
0SI2
20E
4304
7345
1213
469
IFed
eral
GW
PO
UG
B2W
-19-
8-22
OU
GB
2W-1
9-8-
22N
WN
E19
080S
I 220
E43
0473
4513
1346
1IF
eder
alG
WP
OU
GB
5W-1
9-8-
22O
UG
B5W
-19-
8-22
SWN
W19
080S
220E
4304
7345
1413
460
Fede
rilG
WP
OU
GB
7W-1
9-8-
22O
UG
B7W
-19-
8-22
SWN
E19
080S
220E
4304
7345
1513
462
Fede
ral
GW
PO
UG
B8W
-19-
8-22
OU
GB
8W-1
9-8-
22SE
NE
1908
0S22
0E43
0473
4516
1348
9Fe
dera
lG
WP
OU
GB
11W
-19-
8-22
OU
GB
11W
-19-
8-22
NES
W19
080S
220E
4304
7345
1713
467
IFed
eral
GW
iPO
UG
B16
W-1
9-8-
22O
UG
B16
W-1
9-8-
22SE
SE19
080S
220E
,43
0473
4522
1347
6IF
eder
alG
W
of8
QEP
Uin
taB
asin
(N24
60)
toQ
UES
TAR
Ean
dP
(N50
85)
4/30
/200
7an
d5/
15/2
007
Orig
inal
Wel
lN
ame
Wel
lNam
e&
No.
Q/Q
SEC
TWP
RN
GA
PIEn
tity
ILea
seW
ell
Type
|Sta
tus
GB
lW-3
0-8-
22O
UG
B1W
308
22N
ENE
|30
080S
220E
|430
4734
528
1348
7|F
eder
aliG
WIP
GB
3W-3
0-8-
22O
UG
B3W
308
22N
ENW
I30
080S
220E
I43
0473
4529
1349
3Fe
dera
lG
WIP
GB
6W-3
0-8-
22O
UG
B6W
308
22SE
NW
I30
080S
220E
I43
0473
4530
1351
9Fe
dera
lG
WIP
GB
7W-3
0-8-
22O
UG
B7W
308
22SW
NE
3008
0S22
0E43
0473
4531
1349
4Fe
dera
lIG
W|P
GB
8W-3
0-8-
22O
UG
B8W
308
22SE
NE
|30
080S
220E
|43
0473
4532
1348
3|F
eder
alG
W|P
GB
9W-3
0-8-
22IO
UG
B9W
308
22N
ESE
I30
080S
220E
I43
0473
4533
1350
0|F
eder
al|G
WP
OU
GB
6W-1
9-8-
22IO
UG
B6W
-19-
8-22
SEN
WI
1908
0S22
0EI 4
3047
3453
413
475
IFed
eral
IGW
PO
UG
B10
W-1
9-8-
22O
UG
B10
W-1
9-8-
22N
WSE
1908
0S22
0EI
4304
7345
3513
479
Fede
ral
IGW
PO
UG
B13
W-1
9-8-
22|O
UG
B13
W-1
9-8-
22SW
SW19
080S
220E
|430
4734
536
1347
8Fe
dera
lG
WIP
OU
GB
14W
-19-
8-22
IOU
GB
14W
-19-
8-22
SESW
I19
i08
0S22
0EI
4304
7345
3713
484
|Fed
eral
iGW
IPO
UG
B15
W-1
9-8-
22O
UG
B15
W-1
9-8-
22IS
WSE
I19
I 080
S22
0EI 4
3047
3453
813
482
|Fed
eral
.GW
IPO
UG
B12
W-1
7-8-
22O
UG
B12
W-1
7-8-
22N
WSW
17|0
80S
220E
4304
7345
4213
543
Fede
ral
IGW
PO
UG
B6W
-17-
8-22
|OU
GB
6W-1
7-8-
22SE
NW
|17
|080
S22
0E43
0473
4543
1353
6|F
eder
al¡G
W|P
OU
GB
13W
-17-
8-22
|OU
GB
13W
-17-
8-22
SWSW
1708
0S22
0E|4
3047
3454
413
547
.Fed
eral
iGW
IPO
UG
B6W
-29-
8-22
IOU
GB
6W-2
9-8-
22,S
ENW
2908
0S22
0EI
4304
7345
4513
535
IFed
eral
GW
IPO
UG
B3W
-29-
8-22
OU
GB
3W-2
9-8-
22N
ENW
2908
0S22
0E|
4304
7345
4613
509
IFed
eral
GW
PO
UG
B13
W-2
9-8-
22IO
UG
B13
W-2
9-8-
22SW
SW29
080S
220E
4304
7345
4713
506
IFed
eral
GW
|PO
UG
B4W
-29-
8-22
IOU
GB
4W-2
9-8-
22N
WN
W29
080S
220E
I43
0473
4548
1353
4Fe
dera
lG
W|P
OU
GB
5W-2
9-8-
22|O
UG
B5W
-29-
8-22
SWN
W29
080S
220E
I43
0473
4549
1350
5Fe
dera
lG
WIP
OU
GB
14W
-17-
8-22
|OU
GB
14W
-17-
8-22
SESW
1708
0S22
0E43
0473
4550
1355
0IF
eder
alG
WIP
OU
GB
11W
-17-
8-22
|OU
GB
11W
-17-
8-22
NES
W17
080S
220E
4304
7345
53|1
3671
Fede
ral
GW
|PO
UG
B14
W-2
9-8-
22|O
UG
B14
W-2
9-8-
22SE
SW29
080S
220E
4304
7345
54|1
3528
Fede
ral
GW
IPO
UG
B2W
-17-
8-22
OU
GB
2W-1
7-8-
22IN
WN
E17
080S
220E
4304
7345
5913
539
Fede
ral
GW
IPO
UG
B7W
-17-
8-22
OU
GB
7W-1
7-8-
22SW
NE
1708
0S22
0E43
0473
4560
1359
9Fe
dera
l|G
WIP
OU
GB
16W
-18-
8-22
|OU
GB
16W
-18-
8-22
|SÈS
E18
080S
220E
4304
7345
6313
559
Fede
ral
|GW
IP
OU
GB
1W-2
9-8-
22O
UG
BlW
-29-
8-22
NEN
E29
|080
S22
0E43
0473
45_7
313
562
Fede
ral
IGW
IP
OU
GB
7W-2
9-8-
22O
UG
B7W
-29-
8-22
SWN
E29
|080
Si
220E
|430
4734
574
1356
4Fe
dera
lIG
WP
OU
GB
8W-2
9-8-
22O
UG
B8W
-29-
8-22
SEN
E29
|080
Si
220E
I43
0473
4575
1360
9Fe
dera
lIG
WS
OU
GB
9W-2
9-8-
22O
UG
B9W
-29-
8-22
NES
E29
080S
220E
4304
7345
7613
551
Fede
ral
.GW
IP
OU
GB
10W
-29-
8-22
|OU
GB
10W
-29-
8-22
NW
SE29
|080
S22
0E|
4304
7345
7713
594
Fede
ral
|GW
|PO
UG
B15
W-2
9-8-
22O
UG
B15
W-2
9-8-
22IS
WSE
29|0
80S
220E
|43
0473
4578
1356
9Fe
dera
l|G
W|P
OU
GB
2W-2
0-8-
22O
UG
B2W
-20-
8-22
NW
NE
20|0
80S
I 220
EI
4304
7345
9913
664
Fede
ral
|GW
IPO
UG
B2W
-29-
8-22
OU
GB
2W-2
9-8-
22N
WN
E29
|080
S22
0EI
4304
7346
0013
691
Fede
ral
GW
IPO
UG
B15
W-1
7-8-
22O
UG
B15
W-1
7-8-
22SW
SE17
|080
S22
0E43
0473
4601
1363
2Fe
dera
lG
W_
PO
UG
B16
W-1
7-8-
22O
UG
B16
W-1
7-8-
22SE
SE17
|080
S22
0E|
4304
7346
0213
639
Fede
ral
|GW
IP
OU
GB
16W
-29-
8-22
OU
GB
16W
-29-
8-22
SESE
29Í0
80S
220E
|43
0473
4603
1361
0Fe
dera
l'G
WP
OU
GB
1W-2
0-8-
22O
UG
BlW
-20-
8-22
NEN
E20
080S
I22
0EI
4304
7346
0413
612
Fede
ral
'GW
,PO
UG
B1W
-17-
8-22
OU
GB
lW-1
7-8-
22N
ENE
1708
0S22
0E43
0473
4623
1370
1Fe
dera
l' G
WP
OU
GB
9W-1
7-8-
22O
UG
B9W
-17-
8-22
NES
E17
080S
220E
|43
0473
4624
1366
3IF
eder
alG
WP
OU
GB
10W
-17-
8-22
IOU
GB
10W
-17-
8-22
NW
SE17
080S
I220
E|
4304
7346
2513
684
|Fed
eral
GW
|PO
UG
B9W
-20-
8-22
OU
GB
9W-2
0-8-
22N
ESE
2008
0SI2
20E
|430
4734
630
1363
7IF
eder
alG
WIP
OU
GB
10W
-20-
8-22
OU
GB
10W
-20-
8-22
NW
SE20
080S
I 220
EI4
3047
3463
113
682
IFed
eral
GW
of8
QEP
Uin
taB
asin
(N24
60)
toQ
UES
TAR
Ean
dP
(N50
85)
4/30
/200
7an
d5/
15/2
007
Orig
inal
Wel
lN
ame
Wel
lNam
e&
No.
Q/Q
SEC
TWP
RN
GA
PIEn
tity
ILea
seW
ell
Type
|Sta
tus
GB
lW-3
0-8-
22O
UG
B1W
308
22N
ENE
|30
080S
220E
|430
4734
528
1348
7|F
eder
aliG
WIP
GB
3W-3
0-8-
22O
UG
B3W
308
22N
ENW
I30
080S
220E
I43
0473
4529
1349
3Fe
dera
lG
WIP
GB
6W-3
0-8-
22O
UG
B6W
308
22SE
NW
I30
080S
220E
I43
0473
4530
1351
9Fe
dera
lG
WIP
GB
7W-3
0-8-
22O
UG
B7W
308
22SW
NE
3008
0S22
0E43
0473
4531
1349
4Fe
dera
lIG
W|P
GB
8W-3
0-8-
22O
UG
B8W
308
22SE
NE
|30
080S
220E
|43
0473
4532
1348
3|F
eder
alG
W|P
GB
9W-3
0-8-
22IO
UG
B9W
308
22N
ESE
I30
080S
220E
I43
0473
4533
1350
0|F
eder
al|G
WP
OU
GB
6W-1
9-8-
22IO
UG
B6W
-19-
8-22
SEN
WI
1908
0S22
0EI 4
3047
3453
413
475
IFed
eral
IGW
PO
UG
B10
W-1
9-8-
22O
UG
B10
W-1
9-8-
22N
WSE
1908
0S22
0EI
4304
7345
3513
479
Fede
ral
IGW
PO
UG
B13
W-1
9-8-
22|O
UG
B13
W-1
9-8-
22SW
SW19
080S
220E
|430
4734
536
1347
8Fe
dera
lG
WIP
OU
GB
14W
-19-
8-22
IOU
GB
14W
-19-
8-22
SESW
I19
i08
0S22
0EI
4304
7345
3713
484
|Fed
eral
iGW
IPO
UG
B15
W-1
9-8-
22O
UG
B15
W-1
9-8-
22IS
WSE
I19
I 080
S22
0EI 4
3047
3453
813
482
|Fed
eral
.GW
IPO
UG
B12
W-1
7-8-
22O
UG
B12
W-1
7-8-
22N
WSW
17|0
80S
220E
4304
7345
4213
543
Fede
ral
IGW
PO
UG
B6W
-17-
8-22
|OU
GB
6W-1
7-8-
22SE
NW
|17
|080
S22
0E43
0473
4543
1353
6|F
eder
al¡G
W|P
OU
GB
13W
-17-
8-22
|OU
GB
13W
-17-
8-22
SWSW
1708
0S22
0E|4
3047
3454
413
547
.Fed
eral
iGW
IPO
UG
B6W
-29-
8-22
IOU
GB
6W-2
9-8-
22,S
ENW
2908
0S22
0EI
4304
7345
4513
535
IFed
eral
GW
IPO
UG
B3W
-29-
8-22
OU
GB
3W-2
9-8-
22N
ENW
2908
0S22
0E|
4304
7345
4613
509
IFed
eral
GW
PO
UG
B13
W-2
9-8-
22IO
UG
B13
W-2
9-8-
22SW
SW29
080S
220E
4304
7345
4713
506
IFed
eral
GW
|PO
UG
B4W
-29-
8-22
IOU
GB
4W-2
9-8-
22N
WN
W29
080S
220E
I43
0473
4548
1353
4Fe
dera
lG
W|P
OU
GB
5W-2
9-8-
22|O
UG
B5W
-29-
8-22
SWN
W29
080S
220E
I43
0473
4549
1350
5Fe
dera
lG
WIP
OU
GB
14W
-17-
8-22
|OU
GB
14W
-17-
8-22
SESW
1708
0S22
0E43
0473
4550
1355
0IF
eder
alG
WIP
OU
GB
11W
-17-
8-22
|OU
GB
11W
-17-
8-22
NES
W17
080S
220E
4304
7345
53|1
3671
Fede
ral
GW
|PO
UG
B14
W-2
9-8-
22|O
UG
B14
W-2
9-8-
22SE
SW29
080S
220E
4304
7345
54|1
3528
Fede
ral
GW
IPO
UG
B2W
-17-
8-22
OU
GB
2W-1
7-8-
22IN
WN
E17
080S
220E
4304
7345
5913
539
Fede
ral
GW
IPO
UG
B7W
-17-
8-22
OU
GB
7W-1
7-8-
22SW
NE
1708
0S22
0E43
0473
4560
1359
9Fe
dera
l|G
WIP
OU
GB
16W
-18-
8-22
|OU
GB
16W
-18-
8-22
|SÈS
E18
080S
220E
4304
7345
6313
559
Fede
ral
|GW
IP
OU
GB
1W-2
9-8-
22O
UG
BlW
-29-
8-22
NEN
E29
|080
S22
0E43
0473
45_7
313
562
Fede
ral
IGW
IP
OU
GB
7W-2
9-8-
22O
UG
B7W
-29-
8-22
SWN
E29
|080
Si
220E
|430
4734
574
1356
4Fe
dera
lIG
WP
OU
GB
8W-2
9-8-
22O
UG
B8W
-29-
8-22
SEN
E29
|080
Si
220E
I43
0473
4575
1360
9Fe
dera
lIG
WS
OU
GB
9W-2
9-8-
22O
UG
B9W
-29-
8-22
NES
E29
080S
220E
4304
7345
7613
551
Fede
ral
.GW
IP
OU
GB
10W
-29-
8-22
|OU
GB
10W
-29-
8-22
NW
SE29
|080
S22
0E|
4304
7345
7713
594
Fede
ral
|GW
|PO
UG
B15
W-2
9-8-
22O
UG
B15
W-2
9-8-
22IS
WSE
29|0
80S
220E
|43
0473
4578
1356
9Fe
dera
l|G
W|P
OU
GB
2W-2
0-8-
22O
UG
B2W
-20-
8-22
NW
NE
20|0
80S
I 220
EI
4304
7345
9913
664
Fede
ral
|GW
IPO
UG
B2W
-29-
8-22
OU
GB
2W-2
9-8-
22N
WN
E29
|080
S22
0EI
4304
7346
0013
691
Fede
ral
GW
IP
OU
GB
15W
-17-
8-22
OU
GB
15W
-17-
8-22
SWSE
17|0
80S
220E
4304
7346
0113
632
Fede
ral
GW
_P
OU
GB
16W
-17-
8-22
OU
GB
16W
-17-
8-22
SESE
17|0
80S
220E
|43
0473
4602
1363
9Fe
dera
l|G
WIP
OU
GB
16W
-29-
8-22
OU
GB
16W
-29-
8-22
SESE
29Í0
80S
220E
|43
0473
4603
1361
0Fe
dera
l'G
WP
OU
GB
1W-2
0-8-
22O
UG
BlW
-20-
8-22
NEN
E20
080S
I22
0EI
4304
7346
0413
612
Fede
ral
'GW
,PO
UG
B1W
-17-
8-22
OU
GB
lW-1
7-8-
22N
ENE
1708
0S22
0E43
0473
4623
1370
1Fe
dera
l' G
WP
OU
GB
9W-1
7-8-
22O
UG
B9W
-17-
8-22
NES
E17
080S
220E
|43
0473
4624
1366
3IF
eder
alG
WP
OU
GB
10W
-17-
8-22
IOU
GB
10W
-17-
8-22
NW
SE17
080S
I220
E|
4304
7346
2513
684
|Fed
eral
GW
|PO
UG
B9W
-20-
8-22
OU
GB
9W-2
0-8-
22N
ESE
2008
0SI2
20E
|430
4734
630
1363
7IF
eder
alG
WIP
OU
GB
10W
-20-
8-22
OU
GB
10W
-20-
8-22
NW
SE20
080S
I 220
EI4
3047
3463
113
682
IFed
eral
GW
of8
QEP
Uin
taB
asin
(N24
60)
toQ
UES
TAR
Ean
dP
(N50
85)
4/30
/200
7an
d5/
15/2
007
Orig
inal
Wel
lN
ame
Wel
lNam
e&
No.
Q/Q
SEC
TWP
RN
GA
PIEn
tity
ILea
seW
ell
Type
|Sta
tus
GB
lW-3
0-8-
22O
UG
B1W
308
22N
ENE
|30
080S
220E
|430
4734
528
1348
7|F
eder
aliG
WIP
GB
3W-3
0-8-
22O
UG
B3W
308
22N
ENW
I30
080S
220E
I43
0473
4529
1349
3Fe
dera
lG
WIP
GB
6W-3
0-8-
22O
UG
B6W
308
22SE
NW
I30
080S
220E
I43
0473
4530
1351
9Fe
dera
lG
WIP
GB
7W-3
0-8-
22O
UG
B7W
308
22SW
NE
3008
0S22
0E43
0473
4531
1349
4Fe
dera
lIG
W|P
GB
8W-3
0-8-
22O
UG
B8W
308
22SE
NE
|30
080S
220E
|43
0473
4532
1348
3|F
eder
alG
W|P
GB
9W-3
0-8-
22IO
UG
B9W
308
22N
ESE
I30
080S
220E
I43
0473
4533
1350
0|F
eder
al|G
WP
OU
GB
6W-1
9-8-
22IO
UG
B6W
-19-
8-22
SEN
WI
1908
0S22
0EI 4
3047
3453
413
475
IFed
eral
IGW
PO
UG
B10
W-1
9-8-
22O
UG
B10
W-1
9-8-
22N
WSE
1908
0S22
0EI
4304
7345
3513
479
Fede
ral
IGW
PO
UG
B13
W-1
9-8-
22|O
UG
B13
W-1
9-8-
22SW
SW19
080S
220E
|430
4734
536
1347
8Fe
dera
lG
WIP
OU
GB
14W
-19-
8-22
IOU
GB
14W
-19-
8-22
SESW
I19
i08
0S22
0EI
4304
7345
3713
484
|Fed
eral
iGW
IPO
UG
B15
W-1
9-8-
22O
UG
B15
W-1
9-8-
22IS
WSE
I19
I 080
S22
0EI 4
3047
3453
813
482
|Fed
eral
.GW
IPO
UG
B12
W-1
7-8-
22O
UG
B12
W-1
7-8-
22N
WSW
17|0
80S
220E
4304
7345
4213
543
Fede
ral
IGW
PO
UG
B6W
-17-
8-22
|OU
GB
6W-1
7-8-
22SE
NW
|17
|080
S22
0E43
0473
4543
1353
6|F
eder
al¡G
W|P
OU
GB
13W
-17-
8-22
|OU
GB
13W
-17-
8-22
SWSW
1708
0S22
0E|4
3047
3454
413
547
.Fed
eral
iGW
IPO
UG
B6W
-29-
8-22
IOU
GB
6W-2
9-8-
22,S
ENW
2908
0S22
0EI
4304
7345
4513
535
IFed
eral
GW
IPO
UG
B3W
-29-
8-22
OU
GB
3W-2
9-8-
22N
ENW
2908
0S22
0E|
4304
7345
4613
509
IFed
eral
GW
PO
UG
B13
W-2
9-8-
22IO
UG
B13
W-2
9-8-
22SW
SW29
080S
220E
4304
7345
4713
506
IFed
eral
GW
|PO
UG
B4W
-29-
8-22
IOU
GB
4W-2
9-8-
22N
WN
W29
080S
220E
I43
0473
4548
1353
4Fe
dera
lG
W|P
OU
GB
5W-2
9-8-
22|O
UG
B5W
-29-
8-22
SWN
W29
080S
220E
I43
0473
4549
1350
5Fe
dera
lG
WIP
OU
GB
14W
-17-
8-22
|OU
GB
14W
-17-
8-22
SESW
1708
0S22
0E43
0473
4550
1355
0IF
eder
alG
WIP
OU
GB
11W
-17-
8-22
|OU
GB
11W
-17-
8-22
NES
W17
080S
220E
4304
7345
53|1
3671
Fede
ral
GW
|PO
UG
B14
W-2
9-8-
22|O
UG
B14
W-2
9-8-
22SE
SW29
080S
220E
4304
7345
54|1
3528
Fede
ral
GW
IPO
UG
B2W
-17-
8-22
OU
GB
2W-1
7-8-
22IN
WN
E17
080S
220E
4304
7345
5913
539
Fede
ral
GW
IPO
UG
B7W
-17-
8-22
OU
GB
7W-1
7-8-
22SW
NE
1708
0S22
0E43
0473
4560
1359
9Fe
dera
l|G
WIP
OU
GB
16W
-18-
8-22
|OU
GB
16W
-18-
8-22
|SÈS
E18
080S
220E
4304
7345
6313
559
Fede
ral
|GW
IP
OU
GB
1W-2
9-8-
22O
UG
BlW
-29-
8-22
NEN
E29
|080
S22
0E43
0473
45_7
313
562
Fede
ral
IGW
IP
OU
GB
7W-2
9-8-
22O
UG
B7W
-29-
8-22
SWN
E29
|080
Si
220E
|430
4734
574
1356
4Fe
dera
lIG
WP
OU
GB
8W-2
9-8-
22O
UG
B8W
-29-
8-22
SEN
E29
|080
Si
220E
I43
0473
4575
1360
9Fe
dera
lIG
WS
OU
GB
9W-2
9-8-
22O
UG
B9W
-29-
8-22
NES
E29
080S
220E
4304
7345
7613
551
Fede
ral
.GW
IP
OU
GB
10W
-29-
8-22
|OU
GB
10W
-29-
8-22
NW
SE29
|080
S22
0E|
4304
7345
7713
594
Fede
ral
|GW
|PO
UG
B15
W-2
9-8-
22O
UG
B15
W-2
9-8-
22IS
WSE
29|0
80S
220E
|43
0473
4578
1356
9Fe
dera
l|G
W|P
OU
GB
2W-2
0-8-
22O
UG
B2W
-20-
8-22
NW
NE
20|0
80S
I 220
EI
4304
7345
9913
664
Fede
ral
|GW
IPO
UG
B2W
-29-
8-22
OU
GB
2W-2
9-8-
22N
WN
E29
|080
S22
0EI
4304
7346
0013
691
Fede
ral
GW
IPO
UG
B15
W-1
7-8-
22O
UG
B15
W-1
7-8-
22SW
SE17
|080
S22
0E43
0473
4601
1363
2Fe
dera
lG
W_
PO
UG
B16
W-1
7-8-
22O
UG
B16
W-1
7-8-
22SE
SE17
|080
S22
0E|
4304
7346
0213
639
Fede
ral
|GW
IP
OU
GB
16W
-29-
8-22
OU
GB
16W
-29-
8-22
SESE
29Í0
80S
220E
|43
0473
4603
1361
0Fe
dera
l'G
WP
OU
GB
1W-2
0-8-
22O
UG
BlW
-20-
8-22
NEN
E20
080S
I22
0EI
4304
7346
0413
612
Fede
ral
'GW
,PO
UG
B1W
-17-
8-22
OU
GB
lW-1
7-8-
22N
ENE
1708
0S22
0E43
0473
4623
1370
1Fe
dera
l' G
WP
OU
GB
9W-1
7-8-
22O
UG
B9W
-17-
8-22
NES
E17
080S
220E
|43
0473
4624
1366
3IF
eder
alG
WP
OU
GB
10W
-17-
8-22
IOU
GB
10W
-17-
8-22
NW
SE17
080S
I220
E|
4304
7346
2513
684
|Fed
eral
GW
|PO
UG
B9W
-20-
8-22
OU
GB
9W-2
0-8-
22N
ESE
2008
0SI2
20E
|430
4734
630
1363
7IF
eder
alG
WIP
OU
GB
10W
-20-
8-22
OU
GB
10W
-20-
8-22
NW
SE20
080S
I 220
EI4
3047
3463
113
682
IFed
eral
GW
of8
QEP
Uin
taB
asin
(N24
60)
toQ
UES
TAR
Ean
dP
(N50
85)
4/30
/200
7an
d5/
15/2
007
Orig
inal
Wel
lN
ame
Wel
lNam
e&
No.
Q/Q
SEC
TWP
RN
GA
PIEn
tity
ILea
seW
ell
Type
|Sta
tus
GB
lW-3
0-8-
22O
UG
B1W
308
22N
ENE
|30
080S
220E
|430
4734
528
1348
7|F
eder
aliG
WIP
GB
3W-3
0-8-
22O
UG
B3W
308
22N
ENW
I30
080S
220E
I43
0473
4529
1349
3Fe
dera
lG
WIP
GB
6W-3
0-8-
22O
UG
B6W
308
22SE
NW
I30
080S
220E
I43
0473
4530
1351
9Fe
dera
lG
WIP
GB
7W-3
0-8-
22O
UG
B7W
308
22SW
NE
3008
0S22
0E43
0473
4531
1349
4Fe
dera
lIG
W|P
GB
8W-3
0-8-
22O
UG
B8W
308
22SE
NE
|30
080S
220E
|43
0473
4532
1348
3|F
eder
alG
W|P
GB
9W-3
0-8-
22IO
UG
B9W
308
22N
ESE
I30
080S
220E
I43
0473
4533
1350
0|F
eder
al|G
WP
OU
GB
6W-1
9-8-
22IO
UG
B6W
-19-
8-22
SEN
WI
1908
0S22
0EI 4
3047
3453
413
475
IFed
eral
IGW
PO
UG
B10
W-1
9-8-
22O
UG
B10
W-1
9-8-
22N
WSE
1908
0S22
0EI
4304
7345
3513
479
Fede
ral
IGW
PO
UG
B13
W-1
9-8-
22|O
UG
B13
W-1
9-8-
22SW
SW19
080S
220E
|430
4734
536
1347
8Fe
dera
lG
WIP
OU
GB
14W
-19-
8-22
IOU
GB
14W
-19-
8-22
SESW
I19
i08
0S22
0EI
4304
7345
3713
484
|Fed
eral
iGW
IPO
UG
B15
W-1
9-8-
22O
UG
B15
W-1
9-8-
22IS
WSE
I19
I 080
S22
0EI 4
3047
3453
813
482
|Fed
eral
.GW
IPO
UG
B12
W-1
7-8-
22O
UG
B12
W-1
7-8-
22N
WSW
17|0
80S
220E
4304
7345
4213
543
Fede
ral
IGW
PO
UG
B6W
-17-
8-22
|OU
GB
6W-1
7-8-
22SE
NW
|17
|080
S22
0E43
0473
4543
1353
6|F
eder
al¡G
W|P
OU
GB
13W
-17-
8-22
|OU
GB
13W
-17-
8-22
SWSW
1708
0S22
0E|4
3047
3454
413
547
.Fed
eral
iGW
IPO
UG
B6W
-29-
8-22
IOU
GB
6W-2
9-8-
22,S
ENW
2908
0S22
0EI
4304
7345
4513
535
IFed
eral
GW
IPO
UG
B3W
-29-
8-22
OU
GB
3W-2
9-8-
22N
ENW
2908
0S22
0E|
4304
7345
4613
509
IFed
eral
GW
PO
UG
B13
W-2
9-8-
22IO
UG
B13
W-2
9-8-
22SW
SW29
080S
220E
4304
7345
4713
506
IFed
eral
GW
|PO
UG
B4W
-29-
8-22
IOU
GB
4W-2
9-8-
22N
WN
W29
080S
220E
I43
0473
4548
1353
4Fe
dera
lG
W|P
OU
GB
5W-2
9-8-
22|O
UG
B5W
-29-
8-22
SWN
W29
080S
220E
I43
0473
4549
1350
5Fe
dera
lG
WIP
OU
GB
14W
-17-
8-22
|OU
GB
14W
-17-
8-22
SESW
1708
0S22
0E43
0473
4550
1355
0IF
eder
alG
WIP
OU
GB
11W
-17-
8-22
|OU
GB
11W
-17-
8-22
NES
W17
080S
220E
4304
7345
53|1
3671
Fede
ral
GW
|PO
UG
B14
W-2
9-8-
22|O
UG
B14
W-2
9-8-
22SE
SW29
080S
220E
4304
7345
54|1
3528
Fede
ral
GW
IPO
UG
B2W
-17-
8-22
OU
GB
2W-1
7-8-
22IN
WN
E17
080S
220E
4304
7345
5913
539
Fede
ral
GW
IPO
UG
B7W
-17-
8-22
OU
GB
7W-1
7-8-
22SW
NE
1708
0S22
0E43
0473
4560
1359
9Fe
dera
l|G
WIP
OU
GB
16W
-18-
8-22
|OU
GB
16W
-18-
8-22
|SÈS
E18
080S
220E
4304
7345
6313
559
Fede
ral
|GW
IP
OU
GB
1W-2
9-8-
22O
UG
BlW
-29-
8-22
NEN
E29
|080
S22
0E43
0473
45_7
313
562
Fede
ral
IGW
IP
OU
GB
7W-2
9-8-
22O
UG
B7W
-29-
8-22
SWN
E29
|080
Si
220E
|430
4734
574
1356
4Fe
dera
lIG
WP
OU
GB
8W-2
9-8-
22O
UG
B8W
-29-
8-22
SEN
E29
|080
Si
220E
I43
0473
4575
1360
9Fe
dera
lIG
WS
OU
GB
9W-2
9-8-
22O
UG
B9W
-29-
8-22
NES
E29
080S
220E
4304
7345
7613
551
Fede
ral
.GW
IP
OU
GB
10W
-29-
8-22
|OU
GB
10W
-29-
8-22
NW
SE29
|080
S22
0E|
4304
7345
7713
594
Fede
ral
|GW
|PO
UG
B15
W-2
9-8-
22O
UG
B15
W-2
9-8-
22IS
WSE
29|0
80S
220E
|43
0473
4578
1356
9Fe
dera
l|G
W|P
OU
GB
2W-2
0-8-
22O
UG
B2W
-20-
8-22
NW
NE
20|0
80S
I 220
EI
4304
7345
9913
664
Fede
ral
|GW
IPO
UG
B2W
-29-
8-22
OU
GB
2W-2
9-8-
22N
WN
E29
|080
S22
0EI
4304
7346
0013
691
Fede
ral
GW
IPO
UG
B15
W-1
7-8-
22O
UG
B15
W-1
7-8-
22SW
SE17
|080
S22
0E43
0473
4601
1363
2Fe
dera
lG
W_
PO
UG
B16
W-1
7-8-
22O
UG
B16
W-1
7-8-
22SE
SE17
|080
S22
0E|
4304
7346
0213
639
Fede
ral
|GW
IP
OU
GB
16W
-29-
8-22
OU
GB
16W
-29-
8-22
SESE
29Í0
80S
220E
|43
0473
4603
1361
0Fe
dera
l'G
WP
OU
GB
1W-2
0-8-
22O
UG
BlW
-20-
8-22
NEN
E20
080S
I22
0EI
4304
7346
0413
612
Fede
ral
'GW
,PO
UG
B1W
-17-
8-22
OU
GB
lW-1
7-8-
22N
ENE
1708
0S22
0E43
0473
4623
1370
1Fe
dera
l' G
WP
OU
GB
9W-1
7-8-
22O
UG
B9W
-17-
8-22
NES
E17
080S
220E
|43
0473
4624
1366
3IF
eder
alG
WP
OU
GB
10W
-17-
8-22
IOU
GB
10W
-17-
8-22
NW
SE17
080S
I220
E|
4304
7346
2513
684
|Fed
eral
GW
|PO
UG
B9W
-20-
8-22
OU
GB
9W-2
0-8-
22N
ESE
2008
0SI2
20E
|430
4734
630
1363
7IF
eder
alG
WIP
OU
GB
10W
-20-
8-22
OU
GB
10W
-20-
8-22
NW
SE20
080S
I 220
EI4
3047
3463
113
682
IFed
eral
GW
4of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
SO85
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
elÏR
ame&
No.
Q/Q
SEC
TWP
RN
GA
PIEn
tity
Leas
eW
ell
Type
Stat
us
OU
GB
15W
-20-
8-22
OU
GB
15W
-20-
8-22
SWSE
Í20
080S
220E
4304
7346
32|1
3613
iFed
eral
GW
,PW
IH15
MU
-21-
8-22
OU
WIH
15M
U21
822
SWSE
i21
080S
I 220
EI
4304
7346
3413
991
Fede
ral
'GW
IPO
UW
IH13
W-2
1-8-
22O
UW
IH13
W-2
1-8-
22SW
SWI
2108
0S22
0E43
0473
4646
1374
5|F
eder
al|G
W|P
OU
GB
11W
-15-
8-22
OU
GB
11W
-15-
8-22
NES
WI
1508
0S|2
20E
|43
0473
4648
1382
2|F
eder
al|G
WIP
OU
GB
13W
-9-8
-22
OU
GB
13W
-9-8
-22
SWSW
0908
0SI2
20E
4304
7346
5413
706
IFed
eral
IGW
IPO
UW
IH14
W-2
1-8-
22O
UW
IH14
W-2
1-8-
22SE
SW21
080S
I 220
Ei
4304
7346
6413
720
IFed
eral
IGW
IPO
UG
B12
WX
-29-
8-22
OU
GB
12W
X-2
9-8-
22N
WSW
2908
0S22
0E43
0473
4668
1355
5Fe
dera
lG
WIP
OU
WIH
10W
-21-
8-22
OU
WIH
10W
-21-
8-22
NW
SE21
080S
|220
E|
4304
7346
8113
662
|Fed
eral
|GW
|PO
UG
B4G
-21-
8-22
OU
GB
4G-2
1-8-
22N
WN
W21
080S
I220
E43
0473
4685
1377
2|F
eder
alIO
W|P
OU
GB
3W-2
1-8-
22O
UG
B3W
-21-
8-22
NEN
W21
080S
I 220
E43
0473
4686
1374
6IF
eder
alIG
WIP
OU
GB
16SG
-30-
8-22
OU
GB
16SG
-30-
8-22
SESE
3008
0S22
0E43
0473
4688
1359
3IF
eder
alG
WIS
OU
WIH
7W-2
1-8-
22O
UW
IH7W
-21-
8-22
SWN
E21
080S
220E
4304
7346
8913
716
|Fed
eral
GW
iPO
UG
B5W
-21-
8-22
OU
GB
5W-2
1-8-
22SW
NW
2108
0S22
0Ei
4304
7346
9013
770
IFed
eral
GW
.PW
IH1M
U-2
1-8-
22W
IH1M
U-2
1-8-
22N
ENE
2108
0SI 2
20E
i43
0473
4693
1400
1'F
eder
alG
WIP
OU
GB
5G-1
9-8-
22O
UG
B5G
-19-
8-22
SWN
W19
| 080
S22
0E[
4304
7346
9513
786
IFed
eral
OW
PO
UG
B7W
-20-
8-22
OU
GB
7W-2
0-8-
22SW
NE
2008
0S22
0E|4
3047
3470
513
710
IFed
eral
GW
.PO
USG
14W
-15-
8-22
OU
SG14
W-1
5-8-
22SE
SW15
|080
S22
0E|4
3047
3471
013
821
Fede
ral
GW
IP
OU
SG15
W-1
5-8-
22O
USG
15W
-15-
8-22
SWSE
1508
0S22
0E43
0473
4711
1379
0Fe
dera
l|G
WIP
OU
SG16
W-1
5-8-
22O
USG
16W
-15-
8-22
SESE
1508
0S22
0E43
0473
4712
1382
0Fe
dera
lIG
WiP
OU
SG4W
-15-
8-22
OU
SG4W
-15-
8-22
NW
NW
1508
0S22
0E43
0473
4713
1377
5'F
eder
alIG
WiP
OU
SG12
W-1
5-8-
22O
USG
12W
-15-
8-22
NW
SW15
080S
220E
4304
7347
1413
838
Fede
ral
GW
PO
UG
B5M
U-1
5-8-
22O
UG
B5M
U-1
5-8-
22SW
NW
1508
0Si
220E
4304
7347
15|1
3900
Fede
ral
GW
IPO
USG
8W-1
5-8-
22O
USG
8W-1
5-8-
22SE
NE
15I 0
80S
I220
E43
0473
4717
|138
19Fe
dera
lG
WiP
OU
SG9W
-15-
8-22
OU
SG9W
-15-
8-22
NES
E15
080S
220E
4304
7347
1813
773
Fede
ral
GW
OU
SG10
W-1
5-8-
22O
USG
10W
-15-
8-22
NW
SE15
080S
220E
4304
7347
1913
722
Fede
ral
GW
PO
USG
2MU
-15-
8-22
OU
SG2M
U-1
5-8-
22N
WN
E15
|080
S|2
20E
4304
7347
2113
887
Fede
ral
GW
PO
USG
7W-1
5-8-
22O
USG
7W-1
5-8-
22SW
NE
15I
080S
|220
E43
0473
4722
1392
0IF
eder
alG
WP
OU
GB
14SG
-29-
8-22
OU
GB
14SG
-29-
8-22
SESW
2908
0SI 2
20E
4304
7347
4314
034
IFed
eral
GW
PO
UG
B16
SG-2
9-8-
22O
UG
B16
SG-2
9-8-
22SE
SE|
2908
0Si
220E
4304
7347
4413
771
|Fed
eral
GW
PO
UG
B13
W-1
0-8-
22O
UG
B13
W-1
0-8-
22SW
SW|
1008
0S|2
20E
4304
7347
5413
774
Fede
ral
G_W
_P
OU
GB
6MU
-21-
8-22
OU
GB
6MU
-21-
8-22
SEN
W21
080S
i22
0E43
0473
4755
1401
2Fe
dera
lG
WP
OU
SG10
W-1
0-8-
22O
USG
10W
-10-
8-22
NW
SE10
080S
I 220
E43
0473
4764
1375
1Fe
dera
lG
WP
OU
GB
14M
-10-
8-22
OU
GB
14M
-10-
8-22
SESW
10' 08
0Si
220E
4304
7347
6813
849
Fede
ral
ÖW
PO
USG
9W-1
0-8-
22O
USG
9W-1
0-8-
22N
ESE
10i
080S
|220
E|
4304
7347
8313
725
Fede
ral
GW
PO
USG
16W
-10-
8-22
OU
SG16
W-1
0-8-
22SE
SE10
|080
SI
220E
|430
4734
784
1378
1Fe
dera
lG
WP
GB
3M-2
7-8-
21G
B3M
-27-
8-21
NEN
W27
,08
0SI 2
10E
4304
7349
0014
614
'Fed
eral
GW
PW
VX
11D
-22-
8-21
WV
X11
D-2
2-8-
21N
ESW
22i
080S
210E
4304
7349
0214
632
Fede
ral
GW
,DR
LG
B11
M-2
7-8-
21G
B11
M-2
7-8-
21N
ESW
27' 08
0S21
0E43
0473
4952
1380
9,F
eder
alIG
WP
GB
9D-2
7-8-
21G
B9D
-27-
8-21
NES
E27
080S
|210
E43
0473
4956
|146
33|F
eder
al|G
W|D
RL
GB
1D-2
7-8-
21G
B1D
-27-
8-21
|NEN
E27
080S
I210
E43
0473
4957
i14
634
|Fed
eral
GW
DR
LW
RU
EIH
2M-3
5-8-
22W
RU
EIH
2M-3
5-8-
22[N
WN
E35
080S
I220
E43
0473
5052
1393
1Fe
dera
lIG
WIP
GY
PSU
MH
ILLS
12M
U-2
0-8-
21IG
H12
MU
2082
1IN
WSW
20- 0
80S
210E
4304
7350
69'
1412
9Fe
dera
lIG
W
4of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
SO85
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
elÏR
ame&
No.
Q/Q
SEC
TWP
RN
GA
PIEn
tity
Leas
eW
ell
Type
Stat
us
OU
GB
15W
-20-
8-22
OU
GB
15W
-20-
8-22
SWSE
Í20
080S
220E
4304
7346
32|1
3613
iFed
eral
GW
,PW
IH15
MU
-21-
8-22
OU
WIH
15M
U21
822
SWSE
i21
080S
I 220
EI
4304
7346
3413
991
Fede
ral
'GW
IPO
UW
IH13
W-2
1-8-
22O
UW
IH13
W-2
1-8-
22SW
SWI
2108
0S22
0E43
0473
4646
1374
5|F
eder
al|G
W|P
OU
GB
11W
-15-
8-22
OU
GB
11W
-15-
8-22
NES
WI
1508
0S|2
20E
|43
0473
4648
1382
2|F
eder
al|G
WIP
OU
GB
13W
-9-8
-22
OU
GB
13W
-9-8
-22
SWSW
0908
0SI2
20E
4304
7346
5413
706
IFed
eral
IGW
IPO
UW
IH14
W-2
1-8-
22O
UW
IH14
W-2
1-8-
22SE
SW21
080S
I 220
Ei
4304
7346
6413
720
IFed
eral
IGW
IPO
UG
B12
WX
-29-
8-22
OU
GB
12W
X-2
9-8-
22N
WSW
2908
0S22
0E43
0473
4668
1355
5Fe
dera
lG
WIP
OU
WIH
10W
-21-
8-22
OU
WIH
10W
-21-
8-22
NW
SE21
080S
|220
E|
4304
7346
8113
662
|Fed
eral
|GW
|PO
UG
B4G
-21-
8-22
OU
GB
4G-2
1-8-
22N
WN
W21
080S
I220
E43
0473
4685
1377
2|F
eder
alIO
W|P
OU
GB
3W-2
1-8-
22O
UG
B3W
-21-
8-22
NEN
W21
080S
I 220
E43
0473
4686
1374
6IF
eder
alIG
WIP
OU
GB
16SG
-30-
8-22
OU
GB
16SG
-30-
8-22
SESE
3008
0S22
0E43
0473
4688
1359
3IF
eder
alG
WIS
OU
WIH
7W-2
1-8-
22O
UW
IH7W
-21-
8-22
SWN
E21
080S
220E
4304
7346
8913
716
|Fed
eral
GW
iPO
UG
B5W
-21-
8-22
OU
GB
5W-2
1-8-
22SW
NW
2108
0S22
0Ei
4304
7346
9013
770
IFed
eral
GW
.PW
IH1M
U-2
1-8-
22W
IH1M
U-2
1-8-
22N
ENE
2108
0SI 2
20E
i43
0473
4693
1400
1'F
eder
alG
WIP
OU
GB
5G-1
9-8-
22O
UG
B5G
-19-
8-22
SWN
W19
| 080
S22
0E[
4304
7346
9513
786
IFed
eral
OW
PO
UG
B7W
-20-
8-22
OU
GB
7W-2
0-8-
22SW
NE
2008
0S22
0E|4
3047
3470
513
710
IFed
eral
GW
.PO
USG
14W
-15-
8-22
OU
SG14
W-1
5-8-
22SE
SW15
|080
S22
0E|4
3047
3471
013
821
Fede
ral
GW
IP
OU
SG15
W-1
5-8-
22O
USG
15W
-15-
8-22
SWSE
1508
0S22
0E43
0473
4711
1379
0Fe
dera
l|G
WIP
OU
SG16
W-1
5-8-
22O
USG
16W
-15-
8-22
SESE
1508
0S22
0E43
0473
4712
1382
0Fe
dera
lIG
WiP
OU
SG4W
-15-
8-22
OU
SG4W
-15-
8-22
NW
NW
1508
0S22
0E43
0473
4713
1377
5'F
eder
alIG
WiP
OU
SG12
W-1
5-8-
22O
USG
12W
-15-
8-22
NW
SW15
080S
220E
4304
7347
1413
838
Fede
ral
GW
PO
UG
B5M
U-1
5-8-
22O
UG
B5M
U-1
5-8-
22SW
NW
1508
0Si
220E
4304
7347
15|1
3900
Fede
ral
GW
IPO
USG
8W-1
5-8-
22O
USG
8W-1
5-8-
22SE
NE
15I 0
80S
I220
E43
0473
4717
|138
19Fe
dera
lG
WiP
OU
SG9W
-15-
8-22
OU
SG9W
-15-
8-22
NES
E15
080S
220E
4304
7347
1813
773
Fede
ral
GW
OU
SG10
W-1
5-8-
22O
USG
10W
-15-
8-22
NW
SE15
080S
220E
4304
7347
1913
722
Fede
ral
GW
PO
USG
2MU
-15-
8-22
OU
SG2M
U-1
5-8-
22N
WN
E15
|080
S|2
20E
4304
7347
2113
887
Fede
ral
GW
PO
USG
7W-1
5-8-
22O
USG
7W-1
5-8-
22SW
NE
15I
080S
|220
E43
0473
4722
1392
0IF
eder
alG
WP
OU
GB
14SG
-29-
8-22
OU
GB
14SG
-29-
8-22
SESW
2908
0SI 2
20E
4304
7347
4314
034
IFed
eral
GW
PO
UG
B16
SG-2
9-8-
22O
UG
B16
SG-2
9-8-
22SE
SE|
2908
0Si
220E
4304
7347
4413
771
|Fed
eral
GW
PO
UG
B13
W-1
0-8-
22O
UG
B13
W-1
0-8-
22SW
SW|
1008
0S|2
20E
4304
7347
5413
774
Fede
ral
G_W
_P
OU
GB
6MU
-21-
8-22
OU
GB
6MU
-21-
8-22
SEN
W21
080S
i22
0E43
0473
4755
1401
2Fe
dera
lG
WP
OU
SG10
W-1
0-8-
22O
USG
10W
-10-
8-22
NW
SE10
080S
I 220
E43
0473
4764
1375
1Fe
dera
lG
WP
OU
GB
14M
-10-
8-22
OU
GB
14M
-10-
8-22
SESW
10' 08
0Si
220E
4304
7347
6813
849
Fede
ral
ÖW
PO
USG
9W-1
0-8-
22O
USG
9W-1
0-8-
22N
ESE
10i
080S
|220
E|
4304
7347
8313
725
Fede
ral
GW
PO
USG
16W
-10-
8-22
OU
SG16
W-1
0-8-
22SE
SE10
|080
SI
220E
|430
4734
784
1378
1Fe
dera
lG
WP
GB
3M-2
7-8-
21G
B3M
-27-
8-21
NEN
W27
,08
0SI 2
10E
4304
7349
0014
614
'Fed
eral
GW
PW
VX
11D
-22-
8-21
WV
X11
D-2
2-8-
21N
ESW
22i
080S
210E
4304
7349
0214
632
Fede
ral
GW
,DR
LG
B11
M-2
7-8-
21G
B11
M-2
7-8-
21N
ESW
27' 08
0S21
0E43
0473
4952
1380
9,F
eder
alIG
WP
GB
9D-2
7-8-
21G
B9D
-27-
8-21
NES
E27
080S
|210
E43
0473
4956
|146
33|F
eder
al|G
W|D
RL
GB
1D-2
7-8-
21G
B1D
-27-
8-21
|NEN
E27
080S
I210
E43
0473
4957
i14
634
|Fed
eral
GW
DR
LW
RU
EIH
2M-3
5-8-
22W
RU
EIH
2M-3
5-8-
22[N
WN
E35
080S
I220
E43
0473
5052
1393
1Fe
dera
lIG
WIP
GY
PSU
MH
ILLS
12M
U-2
0-8-
21IG
H12
MU
2082
1IN
WSW
20- 0
80S
210E
4304
7350
69'
1412
9Fe
dera
lIG
W
4of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
SO85
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
elÏR
ame&
No.
Q/Q
SEC
TWP
RN
GA
PIEn
tity
Leas
eW
ell
Type
Stat
us
OU
GB
15W
-20-
8-22
OU
GB
15W
-20-
8-22
SWSE
Í20
080S
220E
4304
7346
32|1
3613
iFed
eral
GW
,PW
IH15
MU
-21-
8-22
OU
WIH
15M
U21
822
SWSE
i21
080S
I 220
EI
4304
7346
3413
991
Fede
ral
'GW
IPO
UW
IH13
W-2
1-8-
22O
UW
IH13
W-2
1-8-
22SW
SWI
2108
0S22
0E43
0473
4646
1374
5|F
eder
al|G
W|P
OU
GB
11W
-15-
8-22
OU
GB
11W
-15-
8-22
NES
WI
1508
0S|2
20E
|43
0473
4648
1382
2|F
eder
al|G
WIP
OU
GB
13W
-9-8
-22
OU
GB
13W
-9-8
-22
SWSW
0908
0SI2
20E
4304
7346
5413
706
IFed
eral
IGW
IPO
UW
IH14
W-2
1-8-
22O
UW
IH14
W-2
1-8-
22SE
SW21
080S
I 220
Ei
4304
7346
6413
720
IFed
eral
IGW
IPO
UG
B12
WX
-29-
8-22
OU
GB
12W
X-2
9-8-
22N
WSW
2908
0S22
0E43
0473
4668
1355
5Fe
dera
lG
WIP
OU
WIH
10W
-21-
8-22
OU
WIH
10W
-21-
8-22
NW
SE21
080S
|220
E|
4304
7346
8113
662
|Fed
eral
|GW
|PO
UG
B4G
-21-
8-22
OU
GB
4G-2
1-8-
22N
WN
W21
080S
I220
E43
0473
4685
1377
2|F
eder
alIO
W|P
OU
GB
3W-2
1-8-
22O
UG
B3W
-21-
8-22
NEN
W21
080S
I 220
E43
0473
4686
1374
6IF
eder
alIG
WIP
OU
GB
16SG
-30-
8-22
OU
GB
16SG
-30-
8-22
SESE
3008
0S22
0E43
0473
4688
1359
3IF
eder
alG
WIS
OU
WIH
7W-2
1-8-
22O
UW
IH7W
-21-
8-22
SWN
E21
080S
220E
4304
7346
8913
716
|Fed
eral
GW
iPO
UG
B5W
-21-
8-22
OU
GB
5W-2
1-8-
22SW
NW
2108
0S22
0Ei
4304
7346
9013
770
IFed
eral
GW
.PW
IH1M
U-2
1-8-
22W
IH1M
U-2
1-8-
22N
ENE
2108
0SI 2
20E
i43
0473
4693
1400
1'F
eder
alG
WIP
OU
GB
5G-1
9-8-
22O
UG
B5G
-19-
8-22
SWN
W19
| 080
S22
0E[
4304
7346
9513
786
IFed
eral
OW
PO
UG
B7W
-20-
8-22
OU
GB
7W-2
0-8-
22SW
NE
2008
0S22
0E|4
3047
3470
513
710
IFed
eral
GW
.PO
USG
14W
-15-
8-22
OU
SG14
W-1
5-8-
22SE
SW15
|080
S22
0E|4
3047
3471
013
821
Fede
ral
GW
IP
OU
SG15
W-1
5-8-
22O
USG
15W
-15-
8-22
SWSE
1508
0S22
0E43
0473
4711
1379
0Fe
dera
l|G
WIP
OU
SG16
W-1
5-8-
22O
USG
16W
-15-
8-22
SESE
1508
0S22
0E43
0473
4712
1382
0Fe
dera
lIG
WiP
OU
SG4W
-15-
8-22
OU
SG4W
-15-
8-22
NW
NW
1508
0S22
0E43
0473
4713
1377
5'F
eder
alIG
WiP
OU
SG12
W-1
5-8-
22O
USG
12W
-15-
8-22
NW
SW15
080S
220E
4304
7347
1413
838
Fede
ral
GW
PO
UG
B5M
U-1
5-8-
22O
UG
B5M
U-1
5-8-
22SW
NW
1508
0Si
220E
4304
7347
15|1
3900
Fede
ral
GW
IPO
USG
8W-1
5-8-
22O
USG
8W-1
5-8-
22SE
NE
15I 0
80S
I220
E43
0473
4717
|138
19Fe
dera
lG
WiP
OU
SG9W
-15-
8-22
OU
SG9W
-15-
8-22
NES
E15
080S
220E
4304
7347
1813
773
Fede
ral
GW
OU
SG10
W-1
5-8-
22O
USG
10W
-15-
8-22
NW
SE15
080S
220E
4304
7347
1913
722
Fede
ral
GW
PO
USG
2MU
-15-
8-22
OU
SG2M
U-1
5-8-
22N
WN
E15
|080
S|2
20E
4304
7347
2113
887
Fede
ral
GW
PO
USG
7W-1
5-8-
22O
USG
7W-1
5-8-
22SW
NE
15I
080S
|220
E43
0473
4722
1392
0IF
eder
alG
WP
OU
GB
14SG
-29-
8-22
OU
GB
14SG
-29-
8-22
SESW
2908
0SI 2
20E
4304
7347
4314
034
IFed
eral
GW
PO
UG
B16
SG-2
9-8-
22O
UG
B16
SG-2
9-8-
22SE
SE|
2908
0Si
220E
4304
7347
4413
771
|Fed
eral
GW
PO
UG
B13
W-1
0-8-
22O
UG
B13
W-1
0-8-
22SW
SW|
1008
0S|2
20E
4304
7347
5413
774
Fede
ral
G_W
_P
OU
GB
6MU
-21-
8-22
OU
GB
6MU
-21-
8-22
SEN
W21
080S
i22
0E43
0473
4755
1401
2Fe
dera
lG
WP
OU
SG10
W-1
0-8-
22O
USG
10W
-10-
8-22
NW
SE10
080S
I 220
E43
0473
4764
1375
1Fe
dera
lG
WP
OU
GB
14M
-10-
8-22
OU
GB
14M
-10-
8-22
SESW
10' 08
0Si
220E
4304
7347
6813
849
Fede
ral
ÖW
PO
USG
9W-1
0-8-
22O
USG
9W-1
0-8-
22N
ESE
10i
080S
|220
E|
4304
7347
8313
725
Fede
ral
GW
PO
USG
16W
-10-
8-22
OU
SG16
W-1
0-8-
22SE
SE10
|080
SI
220E
|430
4734
784
1378
1Fe
dera
lG
WP
GB
3M-2
7-8-
21G
B3M
-27-
8-21
NEN
W27
,08
0SI 2
10E
4304
7349
0014
614
'Fed
eral
GW
PW
VX
11D
-22-
8-21
WV
X11
D-2
2-8-
21N
ESW
22i
080S
210E
4304
7349
0214
632
Fede
ral
GW
,DR
LG
B11
M-2
7-8-
21G
B11
M-2
7-8-
21N
ESW
27' 08
0S21
0E43
0473
4952
1380
9,F
eder
alIG
WP
GB
9D-2
7-8-
21G
B9D
-27-
8-21
NES
E27
080S
|210
E43
0473
4956
|146
33|F
eder
al|G
W|D
RL
GB
1D-2
7-8-
21G
B1D
-27-
8-21
|NEN
E27
080S
I210
E43
0473
4957
i14
634
|Fed
eral
GW
DR
LW
RU
EIH
2M-3
5-8-
22W
RU
EIH
2M-3
5-8-
22[N
WN
E35
080S
I220
E43
0473
5052
1393
1Fe
dera
lIG
WIP
GY
PSU
MH
ILLS
12M
U-2
0-8-
21IG
H12
MU
2082
1IN
WSW
20- 0
80S
210E
4304
7350
69'
1412
9Fe
dera
lIG
W
4of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
SO85
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
elÏR
ame&
No.
Q/Q
SEC
TWP
RN
GA
PIEn
tity
Leas
eW
ell
Type
Stat
us
OU
GB
15W
-20-
8-22
OU
GB
15W
-20-
8-22
SWSE
Í20
080S
220E
4304
7346
32|1
3613
iFed
eral
GW
,PW
IH15
MU
-21-
8-22
OU
WIH
15M
U21
822
SWSE
i21
080S
I 220
EI
4304
7346
3413
991
Fede
ral
'GW
IPO
UW
IH13
W-2
1-8-
22O
UW
IH13
W-2
1-8-
22SW
SWI
2108
0S22
0E43
0473
4646
1374
5|F
eder
al|G
W|P
OU
GB
11W
-15-
8-22
OU
GB
11W
-15-
8-22
NES
WI
1508
0S|2
20E
|43
0473
4648
1382
2|F
eder
al|G
WIP
OU
GB
13W
-9-8
-22
OU
GB
13W
-9-8
-22
SWSW
0908
0SI2
20E
4304
7346
5413
706
IFed
eral
IGW
IPO
UW
IH14
W-2
1-8-
22O
UW
IH14
W-2
1-8-
22SE
SW21
080S
I 220
Ei
4304
7346
6413
720
IFed
eral
IGW
IPO
UG
B12
WX
-29-
8-22
OU
GB
12W
X-2
9-8-
22N
WSW
2908
0S22
0E43
0473
4668
1355
5Fe
dera
lG
WIP
OU
WIH
10W
-21-
8-22
OU
WIH
10W
-21-
8-22
NW
SE21
080S
|220
E|
4304
7346
8113
662
|Fed
eral
|GW
|PO
UG
B4G
-21-
8-22
OU
GB
4G-2
1-8-
22N
WN
W21
080S
I220
E43
0473
4685
1377
2|F
eder
alIO
W|P
OU
GB
3W-2
1-8-
22O
UG
B3W
-21-
8-22
NEN
W21
080S
I 220
E43
0473
4686
1374
6IF
eder
alIG
WIP
OU
GB
16SG
-30-
8-22
OU
GB
16SG
-30-
8-22
SESE
3008
0S22
0E43
0473
4688
1359
3IF
eder
alG
WIS
OU
WIH
7W-2
1-8-
22O
UW
IH7W
-21-
8-22
SWN
E21
080S
220E
4304
7346
8913
716
|Fed
eral
GW
iPO
UG
B5W
-21-
8-22
OU
GB
5W-2
1-8-
22SW
NW
2108
0S22
0Ei
4304
7346
9013
770
IFed
eral
GW
.PW
IH1M
U-2
1-8-
22W
IH1M
U-2
1-8-
22N
ENE
2108
0SI 2
20E
i43
0473
4693
1400
1'F
eder
alG
WIP
OU
GB
5G-1
9-8-
22O
UG
B5G
-19-
8-22
SWN
W19
| 080
S22
0E[
4304
7346
9513
786
IFed
eral
OW
PO
UG
B7W
-20-
8-22
OU
GB
7W-2
0-8-
22SW
NE
2008
0S22
0E|4
3047
3470
513
710
IFed
eral
GW
.PO
USG
14W
-15-
8-22
OU
SG14
W-1
5-8-
22SE
SW15
|080
S22
0E|4
3047
3471
013
821
Fede
ral
GW
IP
OU
SG15
W-1
5-8-
22O
USG
15W
-15-
8-22
SWSE
1508
0S22
0E43
0473
4711
1379
0Fe
dera
l|G
WIP
OU
SG16
W-1
5-8-
22O
USG
16W
-15-
8-22
SESE
1508
0S22
0E43
0473
4712
1382
0Fe
dera
lIG
WiP
OU
SG4W
-15-
8-22
OU
SG4W
-15-
8-22
NW
NW
1508
0S22
0E43
0473
4713
1377
5'F
eder
alIG
WiP
OU
SG12
W-1
5-8-
22O
USG
12W
-15-
8-22
NW
SW15
080S
220E
4304
7347
1413
838
Fede
ral
GW
PO
UG
B5M
U-1
5-8-
22O
UG
B5M
U-1
5-8-
22SW
NW
1508
0Si
220E
4304
7347
15|1
3900
Fede
ral
GW
IPO
USG
8W-1
5-8-
22O
USG
8W-1
5-8-
22SE
NE
15I 0
80S
I220
E43
0473
4717
|138
19Fe
dera
lG
WiP
OU
SG9W
-15-
8-22
OU
SG9W
-15-
8-22
NES
E15
080S
220E
4304
7347
1813
773
Fede
ral
GW
OU
SG10
W-1
5-8-
22O
USG
10W
-15-
8-22
NW
SE15
080S
220E
4304
7347
1913
722
Fede
ral
GW
PO
USG
2MU
-15-
8-22
OU
SG2M
U-1
5-8-
22N
WN
E15
|080
S|2
20E
4304
7347
2113
887
Fede
ral
GW
PO
USG
7W-1
5-8-
22O
USG
7W-1
5-8-
22SW
NE
15I
080S
|220
E43
0473
4722
1392
0IF
eder
alG
WP
OU
GB
14SG
-29-
8-22
OU
GB
14SG
-29-
8-22
SESW
2908
0SI 2
20E
4304
7347
4314
034
IFed
eral
GW
PO
UG
B16
SG-2
9-8-
22O
UG
B16
SG-2
9-8-
22SE
SE|
2908
0Si
220E
4304
7347
4413
771
|Fed
eral
GW
PO
UG
B13
W-1
0-8-
22O
UG
B13
W-1
0-8-
22SW
SW|
1008
0S|2
20E
4304
7347
5413
774
Fede
ral
G_W
_P
OU
GB
6MU
-21-
8-22
OU
GB
6MU
-21-
8-22
SEN
W21
080S
i22
0E43
0473
4755
1401
2Fe
dera
lG
WP
OU
SG10
W-1
0-8-
22O
USG
10W
-10-
8-22
NW
SE10
080S
I 220
E43
0473
4764
1375
1Fe
dera
lG
WP
OU
GB
14M
-10-
8-22
OU
GB
14M
-10-
8-22
SESW
10' 08
0Si
220E
4304
7347
6813
849
Fede
ral
ÖW
PO
USG
9W-1
0-8-
22O
USG
9W-1
0-8-
22N
ESE
10i
080S
|220
E|
4304
7347
8313
725
Fede
ral
GW
PO
USG
16W
-10-
8-22
OU
SG16
W-1
0-8-
22SE
SE10
|080
SI
220E
|430
4734
784
1378
1Fe
dera
lG
WP
GB
3M-2
7-8-
21G
B3M
-27-
8-21
NEN
W27
,08
0SI 2
10E
4304
7349
0014
614
'Fed
eral
GW
PW
VX
11D
-22-
8-21
WV
X11
D-2
2-8-
21N
ESW
22i
080S
210E
4304
7349
0214
632
Fede
ral
GW
,DR
LG
B11
M-2
7-8-
21G
B11
M-2
7-8-
21N
ESW
27' 08
0S21
0E43
0473
4952
1380
9,F
eder
alIG
WP
GB
9D-2
7-8-
21G
B9D
-27-
8-21
NES
E27
080S
|210
E43
0473
4956
|146
33|F
eder
al|G
W|D
RL
GB
1D-2
7-8-
21G
B1D
-27-
8-21
|NEN
E27
080S
I210
E43
0473
4957
i14
634
|Fed
eral
GW
DR
LW
RU
EIH
2M-3
5-8-
22W
RU
EIH
2M-3
5-8-
22[N
WN
E35
080S
I220
E43
0473
5052
1393
1Fe
dera
lIG
WIP
GY
PSU
MH
ILLS
12M
U-2
0-8-
21IG
H12
MU
2082
1IN
WSW
20- 0
80S
210E
4304
7350
69'
1412
9Fe
dera
lIG
W
5of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
SO85
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
#Ny
Q/Q
SEC
TWP
RN
GA
PIi
Entit
yLe
ase
Wel
lTy
peSt
atus
OU
SG4W
-11-
8-22
OU
SG4W
-11-
8-22
INW
NW
1108
0SI2
20E
4304
7350
7114
814
Fede
ral
IGW
|DR
LO
USG
5W-1
1-8-
22O
USG
5W-1
1-8-
22SW
NW
1108
0S22
0E43
0473
5072
.14
815
Fede
ral
GW
IDR
LO
USG
6W-1
1-8-
22SG
6ML
118
22_
__
SEN
W11
080S
220E
4304
7350
7314
825
Fede
ral
|GW
IPO
USG
5MU
-14-
8-22
OU
SG5M
U-1
4-8-
22SW
NW
14|0
80S
220E
4304
7350
7613
989
Fede
ral
¡GW
|PO
USG
6MU
-14-
8-22
OU
SG6M
U-1
4-8-
22SE
NW
14I0
80S
I220
E43
0473
5077
1412
8Fe
dera
lIG
WIP
SG12
MU
-14-
8-22
SG12
MU
-14-
8-22
NW
SW14
I 080
S22
0E43
0473
5078
1392
1Fe
dera
l'G
WP
OU
SG13
MU
-14-
8-22
OU
SG13
MU
-14-
8-22
SWSW
1408
0S22
0E43
0473
5079
,13
990
Fede
ral
'GW
PO
USG
9MU
-11-
8-22
OU
SG9M
U-1
1-8-
22N
ESE
1108
0S22
0E43
0473
5091
i13
967
Fede
ral
GW
PSG
11SG
-23-
8-22
SG11
SG-2
3-8-
22N
ESW
|23
|080
S22
0E43
0473
5099
|139
01Fe
dera
l_G
W_
SO
USG
14W
-11-
8-22
OU
SG14
W-1
1-8-
22SE
SW11
080S
220E
4304
7351
14|
1479
7Fe
dera
lG
WD
RL
SG5M
U-2
3-8-
22SG
5MU
-23-
8-22
SWN
W23
080S
220E
4304
7351
1514
368
Fede
ral
GW
PSG
6MU
-23-
8-22
SG6M
U-2
3-8-
22SE
NW
|23
|080
S22
0E43
0473
5116
1423
1Fe
dera
lG
WP
SG14
MU
-23-
8-22
SG14
MU
-23-
8-22
SESW
|23
|080
S22
0E43
0473
5117
|140
69IF
eder
alG
WP
SG13
MU
-23-
8-22
SG13
MU
-23-
8-22
SWSW
|23
|080
S22
0E43
0473
5190
| 141
03IF
eder
aliG
WiP
WH
7G-1
0-7-
24W
H7G
-10-
7-24
_SW
NE
I10
070S
240E
4304
7352
4114
002
Fede
ral
GW
PG
B4D
-28-
8-21
GB
4D-2
8-8-
21N
WN
W28
|080
S21
0E43
0473
5246
1464
5Fe
dera
l_
GW
PG
B7M
-28-
8-21
GB
7M-2
8-8-
21SW
NE
I28
|080
S|2
10E
|430
4735
247
1443
2|F
eder
alIG
W|P
GB
14M
-28-
8-21
GB
14M
-28-
8-21
SESW
28|0
80S
210E
I43
0473
5248
1399
2|F
eder
alG
WiP
SG11
MU
-23-
8-22
SG11
MU
-23-
8-22
NES
W.
2308
0SI 2
20E
I 430
4735
257
1397
3IF
eder
alG
WIP
SG15
MU
-14-
8-22
SG15
MU
-14-
8-22
SWSE
1408
0S22
0E43
0473
5328
1433
8Fe
dal
GW
PEI
HX
14M
U-2
5-8-
22EI
HX
14M
U-2
5-8-
22SE
SWi
2508
0S|2
20E
4304
7353
3014
501
Fede
ral
GW
PEI
HX
11M
U-2
5-8-
22EI
HX
11M
U-2
5-8-
22N
ESW
I25
080S
220E
4304
7353
3114
470
Fede
ral
GW
PN
BE
12M
L-10
-9-2
3N
BE
12M
L-10
-9-2
3N
WSW
I10
090S
I 230
E43
0473
5333
1426
0Fe
dera
lG
WP
NB
E13
ML-
17-9
-23
NB
E13
ML-
17-9
-23
SWSW
1709
0S23
0E43
0473
5_S3
414
000
Fede
ral
GW
PN
BE
4ML-
26-9
-23
NB
E4M
L-26
-9-2
3N
WN
W|
26|0
90S
|230
E43
0473
5335
1421
5Fe
dera
lG
WP
SG7M
U-1
1-8-
22SG
7MU
-ll-8
-22
SWN
E11
|080
S|2
20E
4304
7353
7414
635
iFed
eral
GW
PSG
1MU
-11-
8-22
SG1M
U-ll
-8-2
2N
ENE
1108
0SI 2
20E
4304
7353
7514
279
'Fed
eral
__G
WP
OU
SG13
W-1
1-8-
22O
USG
13W
-11-
8-22
SWSW
1108
0S22
0E43
0473
5377
1479
6Fe
dera
lG
WD
RL
SG3M
U-1
1-8-
22SG
3MU
-ll-8
-22
NEN
W11
080S
220E
4304
7353
7914
978
IFed
eral
IGW
PSG
8MU
-11-
8-22
SG8M
U-ll
-8-2
2SE
NE
1108
0S|2
20E
4304
7353
8014
616
Fede
ral
.GW
PSG
2MU
-11-
8-22
SG2M
U-ll
-8-2
2N
WN
E11
i08
0SI2
20E
4304
7353
8114
636
iFed
er1
GW
IPSG
10M
U-1
1-8-
22SG
10M
U-1
1-8-
22N
WSE
11i
080S
220E
4304
7353
8214
979
Fede
ral
GW
PO
UG
B8M
U-1
0-8-
22|O
UG
B8M
U-1
0-8-
22SE
NE
10'
080S
220E
4304
7354
2215
321
IFed
eral
GW
D¯R
Ï
EIH
X2M
U-2
5-8-
22|E
IHX
2MU
-25-
8-22
NW
NE
25|
080S
220E
4304
7354
2714
666
IFed
eral
GW
,PEI
HX
1MU
-25-
8-22
EIH
X1M
U-2
5-8-
22N
ENE
25I
080S
|220
E43
0473
54_2
8_
1470
5IF
eder
alG
W|P
EIH
X7M
U-2
5-8-
22_
EIH
X7M
U-2
5-8-
22,SW
NE
25I
080S
I220
E43
0473
5429
1468
2iF
eder
alG
W|P
EIH
X8M
U-2
5-8-
22EI
HX
8MU
-25-
8-22
SEN
E25
i08
0SI 2
20E
4304
7354
3014
706
Fede
ral
GW
IPEI
HX
9MU
-25-
8-22
|EIH
X9M
U-2
5-8-
22N
ESE
2508
0S22
0E43
0473
5433
1455
8Fe
dera
lW
PEI
HX
16M
U-2
5-8-
22|E
IHX
16M
U-2
5-8-
22|S
ESE
25|0
80S
|220
E43
0473
5434
|145
02Fe
dera
l|G
WP
EIH
X15
MU
-25-
8-22
|EIH
X15
MU
-25-
8-22
SWSE
25I0
80S
|220
E43
0473
5_43
5I
1457
1Fe
dera
l|G
WP
EIH
X10
MU
-25-
8-22
EIH
X10
MU
-25-
8-22
NW
SE25
I 080
SI 2
20E
4304
7354
3614
537
Fede
ral
IGW
PG
B3M
U-3
-8-2
2G
B3M
U-3
-8-2
2N
ENW
03I 0
80S
I 220
E43
0473
5457
1457
5Fe
dera
lIG
W
5of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
SO85
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
#Ny
Q/Q
SEC
TWP
RN
GA
PIi
Entit
yLe
ase
Wel
lTy
peSt
atus
OU
SG4W
-11-
8-22
OU
SG4W
-11-
8-22
INW
NW
1108
0SI2
20E
4304
7350
7114
814
Fede
ral
IGW
|DR
LO
USG
5W-1
1-8-
22O
USG
5W-1
1-8-
22SW
NW
1108
0S22
0E43
0473
5072
.14
815
Fede
ral
GW
IDR
LO
USG
6W-1
1-8-
22SG
6ML
118
22_
__
SEN
W11
080S
220E
4304
7350
7314
825
Fede
ral
|GW
IP
OU
SG5M
U-1
4-8-
22O
USG
5MU
-14-
8-22
SWN
W14
|080
S22
0E43
0473
5076
1398
9Fe
dera
l¡G
W|P
OU
SG6M
U-1
4-8-
22O
USG
6MU
-14-
8-22
SEN
W14
I080
SI2
20E
4304
7350
7714
128
Fede
ral
IGW
IP
SG12
MU
-14-
8-22
SG12
MU
-14-
8-22
NW
SW14
I 080
S22
0E43
0473
5078
1392
1Fe
dera
l'G
WP
OU
SG13
MU
-14-
8-22
OU
SG13
MU
-14-
8-22
SWSW
1408
0S22
0E43
0473
5079
,13
990
Fede
ral
'GW
PO
USG
9MU
-11-
8-22
OU
SG9M
U-1
1-8-
22N
ESE
1108
0S22
0E43
0473
5091
i13
967
Fede
ral
GW
PSG
11SG
-23-
8-22
SG11
SG-2
3-8-
22N
ESW
|23
|080
S22
0E43
0473
5099
|139
01Fe
dera
l_G
W_
SO
USG
14W
-11-
8-22
OU
SG14
W-1
1-8-
22SE
SW11
080S
220E
4304
7351
14|
1479
7Fe
dera
lG
WD
RL
SG5M
U-2
3-8-
22SG
5MU
-23-
8-22
SWN
W23
080S
220E
4304
7351
1514
368
Fede
ral
GW
PSG
6MU
-23-
8-22
SG6M
U-2
3-8-
22SE
NW
|23
|080
S22
0E43
0473
5116
1423
1Fe
dera
lG
WP
SG14
MU
-23-
8-22
SG14
MU
-23-
8-22
SESW
|23
|080
S22
0E43
0473
5117
|140
69IF
eder
alG
WP
SG13
MU
-23-
8-22
SG13
MU
-23-
8-22
SWSW
|23
|080
S22
0E43
0473
5190
| 141
03IF
eder
aliG
WiP
WH
7G-1
0-7-
24W
H7G
-10-
7-24
_SW
NE
I10
070S
240E
4304
7352
4114
002
Fede
ral
GW
PG
B4D
-28-
8-21
GB
4D-2
8-8-
21N
WN
W28
|080
S21
0E43
0473
5246
1464
5Fe
dera
l_
GW
PG
B7M
-28-
8-21
GB
7M-2
8-8-
21SW
NE
I28
|080
S|2
10E
|430
4735
247
1443
2|F
eder
alIG
W|P
GB
14M
-28-
8-21
GB
14M
-28-
8-21
SESW
28|0
80S
210E
I43
0473
5248
1399
2|F
eder
alG
WiP
SG11
MU
-23-
8-22
SG11
MU
-23-
8-22
NES
W.
2308
0SI 2
20E
I 430
4735
257
1397
3IF
eder
alG
WIP
SG15
MU
-14-
8-22
SG15
MU
-14-
8-22
SWSE
1408
0S22
0E43
0473
5328
1433
8Fe
dal
GW
PEI
HX
14M
U-2
5-8-
22EI
HX
14M
U-2
5-8-
22SE
SWi
2508
0S|2
20E
4304
7353
3014
501
Fede
ral
GW
PEI
HX
11M
U-2
5-8-
22EI
HX
11M
U-2
5-8-
22N
ESW
I25
080S
220E
4304
7353
3114
470
Fede
ral
GW
PN
BE
12M
L-10
-9-2
3N
BE
12M
L-10
-9-2
3N
WSW
I10
090S
I 230
E43
0473
5333
1426
0Fe
dera
lG
WP
NB
E13
ML-
17-9
-23
NB
E13
ML-
17-9
-23
SWSW
1709
0S23
0E43
0473
5_S3
414
000
Fede
ral
GW
PN
BE
4ML-
26-9
-23
NB
E4M
L-26
-9-2
3N
WN
W|
26|0
90S
|230
E43
0473
5335
1421
5Fe
dera
lG
WP
SG7M
U-1
1-8-
22SG
7MU
-ll-8
-22
SWN
E11
|080
S|2
20E
4304
7353
7414
635
iFed
eral
GW
PSG
1MU
-11-
8-22
SG1M
U-ll
-8-2
2N
ENE
1108
0SI 2
20E
4304
7353
7514
279
'Fed
eral
__G
WP
OU
SG13
W-1
1-8-
22O
USG
13W
-11-
8-22
SWSW
1108
0S22
0E43
0473
5377
1479
6Fe
dera
lG
WD
RL
SG3M
U-1
1-8-
22SG
3MU
-ll-8
-22
NEN
W11
080S
220E
4304
7353
7914
978
IFed
eral
IGW
PSG
8MU
-11-
8-22
SG8M
U-ll
-8-2
2SE
NE
1108
0S|2
20E
4304
7353
8014
616
Fede
ral
.GW
PSG
2MU
-11-
8-22
SG2M
U-ll
-8-2
2N
WN
E11
i08
0SI2
20E
4304
7353
8114
636
iFed
er1
GW
IPSG
10M
U-1
1-8-
22SG
10M
U-1
1-8-
22N
WSE
11i
080S
220E
4304
7353
8214
979
Fede
ral
GW
PO
UG
B8M
U-1
0-8-
22|O
UG
B8M
U-1
0-8-
22SE
NE
10'
080S
220E
4304
7354
2215
321
IFed
eral
GW
D¯R
Ï
EIH
X2M
U-2
5-8-
22|E
IHX
2MU
-25-
8-22
NW
NE
25|
080S
220E
4304
7354
2714
666
IFed
eral
GW
,PEI
HX
1MU
-25-
8-22
EIH
X1M
U-2
5-8-
22N
ENE
25I
080S
|220
E43
0473
54_2
8_
1470
5IF
eder
alG
W|P
EIH
X7M
U-2
5-8-
22_
EIH
X7M
U-2
5-8-
22,SW
NE
25I
080S
I220
E43
0473
5429
1468
2iF
eder
alG
W|P
EIH
X8M
U-2
5-8-
22EI
HX
8MU
-25-
8-22
SEN
E25
i08
0SI 2
20E
4304
7354
3014
706
Fede
ral
GW
IPEI
HX
9MU
-25-
8-22
|EIH
X9M
U-2
5-8-
22N
ESE
2508
0S22
0E43
0473
5433
1455
8Fe
dera
lW
PEI
HX
16M
U-2
5-8-
22|E
IHX
16M
U-2
5-8-
22|S
ESE
25|0
80S
|220
E43
0473
5434
|145
02Fe
dera
l|G
WP
EIH
X15
MU
-25-
8-22
|EIH
X15
MU
-25-
8-22
SWSE
25I0
80S
|220
E43
0473
5_43
5I
1457
1Fe
dera
l|G
WP
EIH
X10
MU
-25-
8-22
EIH
X10
MU
-25-
8-22
NW
SE25
I 080
SI 2
20E
4304
7354
3614
537
Fede
ral
IGW
PG
B3M
U-3
-8-2
2G
B3M
U-3
-8-2
2N
ENW
03I 0
80S
I 220
E43
0473
5457
1457
5Fe
dera
lIG
W
5of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
SO85
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
#Ny
Q/Q
SEC
TWP
RN
GA
PIi
Entit
yLe
ase
Wel
lTy
peSt
atus
OU
SG4W
-11-
8-22
OU
SG4W
-11-
8-22
INW
NW
1108
0SI2
20E
4304
7350
7114
814
Fede
ral
IGW
|DR
LO
USG
5W-1
1-8-
22O
USG
5W-1
1-8-
22SW
NW
1108
0S22
0E43
0473
5072
.14
815
Fede
ral
GW
IDR
LO
USG
6W-1
1-8-
22SG
6ML
118
22_
__
SEN
W11
080S
220E
4304
7350
7314
825
Fede
ral
|GW
IPO
USG
5MU
-14-
8-22
OU
SG5M
U-1
4-8-
22SW
NW
14|0
80S
220E
4304
7350
7613
989
Fede
ral
¡GW
|PO
USG
6MU
-14-
8-22
OU
SG6M
U-1
4-8-
22SE
NW
14I0
80S
I220
E43
0473
5077
1412
8Fe
dera
lIG
WIP
SG12
MU
-14-
8-22
SG12
MU
-14-
8-22
NW
SW14
I 080
S22
0E43
0473
5078
1392
1Fe
dera
l'G
WP
OU
SG13
MU
-14-
8-22
OU
SG13
MU
-14-
8-22
SWSW
1408
0S22
0E43
0473
5079
,13
990
Fede
ral
'GW
PO
USG
9MU
-11-
8-22
OU
SG9M
U-1
1-8-
22N
ESE
1108
0S22
0E43
0473
5091
i13
967
Fede
ral
GW
PSG
11SG
-23-
8-22
SG11
SG-2
3-8-
22N
ESW
|23
|080
S22
0E43
0473
5099
|139
01Fe
dera
l_G
W_
SO
USG
14W
-11-
8-22
OU
SG14
W-1
1-8-
22SE
SW11
080S
220E
4304
7351
14|
1479
7Fe
dera
lG
WD
RL
SG5M
U-2
3-8-
22SG
5MU
-23-
8-22
SWN
W23
080S
220E
4304
7351
1514
368
Fede
ral
GW
PSG
6MU
-23-
8-22
SG6M
U-2
3-8-
22SE
NW
|23
|080
S22
0E43
0473
5116
1423
1Fe
dera
lG
WP
SG14
MU
-23-
8-22
SG14
MU
-23-
8-22
SESW
|23
|080
S22
0E43
0473
5117
|140
69IF
eder
alG
WP
SG13
MU
-23-
8-22
SG13
MU
-23-
8-22
SWSW
|23
|080
S22
0E43
0473
5190
| 141
03IF
eder
aliG
WiP
WH
7G-1
0-7-
24W
H7G
-10-
7-24
_SW
NE
I10
070S
240E
4304
7352
4114
002
Fede
ral
GW
PG
B4D
-28-
8-21
GB
4D-2
8-8-
21N
WN
W28
|080
S21
0E43
0473
5246
1464
5Fe
dera
l_
GW
PG
B7M
-28-
8-21
GB
7M-2
8-8-
21SW
NE
I28
|080
S|2
10E
|430
4735
247
1443
2|F
eder
alIG
W|P
GB
14M
-28-
8-21
GB
14M
-28-
8-21
SESW
28|0
80S
210E
I43
0473
5248
1399
2|F
eder
alG
WiP
SG11
MU
-23-
8-22
SG11
MU
-23-
8-22
NES
W.
2308
0SI 2
20E
I 430
4735
257
1397
3IF
eder
alG
WIP
SG15
MU
-14-
8-22
SG15
MU
-14-
8-22
SWSE
1408
0S22
0E43
0473
5328
1433
8Fe
dal
GW
PEI
HX
14M
U-2
5-8-
22EI
HX
14M
U-2
5-8-
22SE
SWi
2508
0S|2
20E
4304
7353
3014
501
Fede
ral
GW
PEI
HX
11M
U-2
5-8-
22EI
HX
11M
U-2
5-8-
22N
ESW
I25
080S
220E
4304
7353
3114
470
Fede
ral
GW
PN
BE
12M
L-10
-9-2
3N
BE
12M
L-10
-9-2
3N
WSW
I10
090S
I 230
E43
0473
5333
1426
0Fe
dera
lG
WP
NB
E13
ML-
17-9
-23
NB
E13
ML-
17-9
-23
SWSW
1709
0S23
0E43
0473
5_S3
414
000
Fede
ral
GW
PN
BE
4ML-
26-9
-23
NB
E4M
L-26
-9-2
3N
WN
W|
26|0
90S
|230
E43
0473
5335
1421
5Fe
dera
lG
WP
SG7M
U-1
1-8-
22SG
7MU
-ll-8
-22
SWN
E11
|080
S|2
20E
4304
7353
7414
635
iFed
eral
GW
PSG
1MU
-11-
8-22
SG1M
U-ll
-8-2
2N
ENE
1108
0SI 2
20E
4304
7353
7514
279
'Fed
eral
__G
WP
OU
SG13
W-1
1-8-
22O
USG
13W
-11-
8-22
SWSW
1108
0S22
0E43
0473
5377
1479
6Fe
dera
lG
WD
RL
SG3M
U-1
1-8-
22SG
3MU
-ll-8
-22
NEN
W11
080S
220E
4304
7353
7914
978
IFed
eral
IGW
PSG
8MU
-11-
8-22
SG8M
U-ll
-8-2
2SE
NE
1108
0S|2
20E
4304
7353
8014
616
Fede
ral
.GW
PSG
2MU
-11-
8-22
SG2M
U-ll
-8-2
2N
WN
E11
i08
0SI2
20E
4304
7353
8114
636
iFed
er1
GW
IPSG
10M
U-1
1-8-
22SG
10M
U-1
1-8-
22N
WSE
11i
080S
220E
4304
7353
8214
979
Fede
ral
GW
PO
UG
B8M
U-1
0-8-
22|O
UG
B8M
U-1
0-8-
22SE
NE
10'
080S
220E
4304
7354
2215
321
IFed
eral
GW
D¯R
Ï
EIH
X2M
U-2
5-8-
22|E
IHX
2MU
-25-
8-22
NW
NE
25|
080S
220E
4304
7354
2714
666
IFed
eral
GW
,PEI
HX
1MU
-25-
8-22
EIH
X1M
U-2
5-8-
22N
ENE
25I
080S
|220
E43
0473
54_2
8_
1470
5IF
eder
alG
W|P
EIH
X7M
U-2
5-8-
22_
EIH
X7M
U-2
5-8-
22,SW
NE
25I
080S
I220
E43
0473
5429
1468
2iF
eder
alG
W|P
EIH
X8M
U-2
5-8-
22EI
HX
8MU
-25-
8-22
SEN
E25
i08
0SI 2
20E
4304
7354
3014
706
Fede
ral
GW
IPEI
HX
9MU
-25-
8-22
|EIH
X9M
U-2
5-8-
22N
ESE
2508
0S22
0E43
0473
5433
1455
8Fe
dera
lW
PEI
HX
16M
U-2
5-8-
22|E
IHX
16M
U-2
5-8-
22|S
ESE
25|0
80S
|220
E43
0473
5434
|145
02Fe
dera
l|G
WP
EIH
X15
MU
-25-
8-22
|EIH
X15
MU
-25-
8-22
SWSE
25I0
80S
|220
E43
0473
5_43
5I
1457
1Fe
dera
l|G
WP
EIH
X10
MU
-25-
8-22
EIH
X10
MU
-25-
8-22
NW
SE25
I 080
SI 2
20E
4304
7354
3614
537
Fede
ral
IGW
PG
B3M
U-3
-8-2
2G
B3M
U-3
-8-2
2N
ENW
03I 0
80S
I 220
E43
0473
5457
1457
5Fe
dera
lIG
W
5of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
SO85
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
#Ny
Q/Q
SEC
TWP
RN
GA
PIi
Entit
yLe
ase
Wel
lTy
peSt
atus
OU
SG4W
-11-
8-22
OU
SG4W
-11-
8-22
INW
NW
1108
0SI2
20E
4304
7350
7114
814
Fede
ral
IGW
|DR
LO
USG
5W-1
1-8-
22O
USG
5W-1
1-8-
22SW
NW
1108
0S22
0E43
0473
5072
.14
815
Fede
ral
GW
IDR
LO
USG
6W-1
1-8-
22SG
6ML
118
22_
__
SEN
W11
080S
220E
4304
7350
7314
825
Fede
ral
|GW
IPO
USG
5MU
-14-
8-22
OU
SG5M
U-1
4-8-
22SW
NW
14|0
80S
220E
4304
7350
7613
989
Fede
ral
¡GW
|PO
USG
6MU
-14-
8-22
OU
SG6M
U-1
4-8-
22SE
NW
14I0
80S
I220
E43
0473
5077
1412
8Fe
dera
lIG
WIP
SG12
MU
-14-
8-22
SG12
MU
-14-
8-22
NW
SW14
I 080
S22
0E43
0473
5078
1392
1Fe
dera
l'G
WP
OU
SG13
MU
-14-
8-22
OU
SG13
MU
-14-
8-22
SWSW
1408
0S22
0E43
0473
5079
,13
990
Fede
ral
'GW
PO
USG
9MU
-11-
8-22
OU
SG9M
U-1
1-8-
22N
ESE
1108
0S22
0E43
0473
5091
i13
967
Fede
ral
GW
PSG
11SG
-23-
8-22
SG11
SG-2
3-8-
22N
ESW
|23
|080
S22
0E43
0473
5099
|139
01Fe
dera
l_G
W_
SO
USG
14W
-11-
8-22
OU
SG14
W-1
1-8-
22SE
SW11
080S
220E
4304
7351
14|
1479
7Fe
dera
lG
WD
RL
SG5M
U-2
3-8-
22SG
5MU
-23-
8-22
SWN
W23
080S
220E
4304
7351
1514
368
Fede
ral
GW
PSG
6MU
-23-
8-22
SG6M
U-2
3-8-
22SE
NW
|23
|080
S22
0E43
0473
5116
1423
1Fe
dera
lG
WP
SG14
MU
-23-
8-22
SG14
MU
-23-
8-22
SESW
|23
|080
S22
0E43
0473
5117
|140
69IF
eder
alG
WP
SG13
MU
-23-
8-22
SG13
MU
-23-
8-22
SWSW
|23
|080
S22
0E43
0473
5190
| 141
03IF
eder
aliG
WiP
WH
7G-1
0-7-
24W
H7G
-10-
7-24
_SW
NE
I10
070S
240E
4304
7352
4114
002
Fede
ral
GW
PG
B4D
-28-
8-21
GB
4D-2
8-8-
21N
WN
W28
|080
S21
0E43
0473
5246
1464
5Fe
dera
l_
GW
PG
B7M
-28-
8-21
GB
7M-2
8-8-
21SW
NE
I28
|080
S|2
10E
|430
4735
247
1443
2|F
eder
alIG
W|P
GB
14M
-28-
8-21
GB
14M
-28-
8-21
SESW
28|0
80S
210E
I43
0473
5248
1399
2|F
eder
alG
WiP
SG11
MU
-23-
8-22
SG11
MU
-23-
8-22
NES
W.
2308
0SI 2
20E
I 430
4735
257
1397
3IF
eder
alG
WIP
SG15
MU
-14-
8-22
SG15
MU
-14-
8-22
SWSE
1408
0S22
0E43
0473
5328
1433
8Fe
dal
GW
PEI
HX
14M
U-2
5-8-
22EI
HX
14M
U-2
5-8-
22SE
SWi
2508
0S|2
20E
4304
7353
3014
501
Fede
ral
GW
PEI
HX
11M
U-2
5-8-
22EI
HX
11M
U-2
5-8-
22N
ESW
I25
080S
220E
4304
7353
3114
470
Fede
ral
GW
PN
BE
12M
L-10
-9-2
3N
BE
12M
L-10
-9-2
3N
WSW
I10
090S
I 230
E43
0473
5333
1426
0Fe
dera
lG
WP
NB
E13
ML-
17-9
-23
NB
E13
ML-
17-9
-23
SWSW
1709
0S23
0E43
0473
5_S3
414
000
Fede
ral
GW
PN
BE
4ML-
26-9
-23
NB
E4M
L-26
-9-2
3N
WN
W|
26|0
90S
|230
E43
0473
5335
1421
5Fe
dera
lG
WP
SG7M
U-1
1-8-
22SG
7MU
-ll-8
-22
SWN
E11
|080
S|2
20E
4304
7353
7414
635
iFed
eral
GW
PSG
1MU
-11-
8-22
SG1M
U-ll
-8-2
2N
ENE
1108
0SI 2
20E
4304
7353
7514
279
'Fed
eral
__G
WP
OU
SG13
W-1
1-8-
22O
USG
13W
-11-
8-22
SWSW
1108
0S22
0E43
0473
5377
1479
6Fe
dera
lG
WD
RL
SG3M
U-1
1-8-
22SG
3MU
-ll-8
-22
NEN
W11
080S
220E
4304
7353
7914
978
IFed
eral
IGW
PSG
8MU
-11-
8-22
SG8M
U-ll
-8-2
2SE
NE
1108
0S|2
20E
4304
7353
8014
616
Fede
ral
.GW
PSG
2MU
-11-
8-22
SG2M
U-ll
-8-2
2N
WN
E11
i08
0SI2
20E
4304
7353
8114
636
iFed
er1
GW
IPSG
10M
U-1
1-8-
22SG
10M
U-1
1-8-
22N
WSE
11i
080S
220E
4304
7353
8214
979
Fede
ral
GW
PO
UG
B8M
U-1
0-8-
22|O
UG
B8M
U-1
0-8-
22SE
NE
10'
080S
220E
4304
7354
2215
321
IFed
eral
GW
D¯R
Ï
EIH
X2M
U-2
5-8-
22|E
IHX
2MU
-25-
8-22
NW
NE
25|
080S
220E
4304
7354
2714
666
IFed
eral
GW
,PEI
HX
1MU
-25-
8-22
EIH
X1M
U-2
5-8-
22N
ENE
25I
080S
|220
E43
0473
54_2
8_
1470
5IF
eder
alG
W|P
EIH
X7M
U-2
5-8-
22_
EIH
X7M
U-2
5-8-
22,SW
NE
25I
080S
I220
E43
0473
5429
1468
2iF
eder
alG
W|P
EIH
X8M
U-2
5-8-
22EI
HX
8MU
-25-
8-22
SEN
E25
i08
0SI 2
20E
4304
7354
3014
706
Fede
ral
GW
IPEI
HX
9MU
-25-
8-22
|EIH
X9M
U-2
5-8-
22N
ESE
2508
0S22
0E43
0473
5433
1455
8Fe
dera
lW
PEI
HX
16M
U-2
5-8-
22|E
IHX
16M
U-2
5-8-
22|S
ESE
25|0
80S
|220
E43
0473
5434
|145
02Fe
dera
l|G
WP
EIH
X15
MU
-25-
8-22
|EIH
X15
MU
-25-
8-22
SWSE
25I0
80S
|220
E43
0473
5_43
5I
1457
1Fe
dera
l|G
WP
EIH
X10
MU
-25-
8-22
EIH
X10
MU
-25-
8-22
NW
SE25
I 080
SI 2
20E
4304
7354
3614
537
Fede
ral
IGW
PG
B3M
U-3
-8-2
2G
B3M
U-3
-8-2
2N
ENW
03I 0
80S
I 220
E43
0473
5457
1457
5Fe
dera
lIG
W
6of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
elln
ame
&N
o.Q
/QSE
CTW
P' R
NG
API
Entit
yLe
ase
Wel
lTy
peSt
atus
NB
E15
M-1
7-9-
23N
BE
15M
-17-
9-23
SWSE
1709
0SI2
30E
_43
0473
5463
1442
3'F
eder
al'G
WIP
NB
E7M
L-17
-9-2
3N
BE
7ML-
17-9
-23
SWN
Ei
1709
0S|2
30E
·
4304
7354
6414
232
Fede
ral
IGW
PN
BE
3ML-
17-9
-23
NB
E3M
L-17
-9-2
3N
ENW
1709
0S23
0E.
4304
7354
6514
276
Fede
ral
¡GW
IPN
BE
11M
-17-
9-23
NB
E11
M-1
7-9-
23N
ESW
1709
0S23
0E43
0473
5466
1443
1Fe
dera
l|G
WP
NB
E10
ML-
10-9
-23
NB
E10
ML-
10-9
-23
NW
SE10
090S
,23
0E,
4304
7356
5014
377
Fede
ral
IGW
IPN
BE
6ML-
10-9
-23
NB
E6M
L-10
-9-2
3SE
NW
1009
0S.
230E
4304
7356
5114
422
Fede
ral
GW
NB
E12
ML-
17-9
-23
NB
E12
ML-
17-9
-23
NW
SW17
090S
I23
0E43
0473
5652
1427
8Fe
dera
lG
WIP
NB
E6M
L-26
-9-2
3N
BE
6ML-
26-9
-23
SEN
W26
090S
230E
4304
7356
6414
378
Fede
ral
GW
|PN
BE
11M
L-26
-9-2
3N
BE
11M
L-26
-9-2
3N
ESW
2609
0SI2
30E
4304
7356
6514
340
Fede
ral
GW
iPN
BE
15M
L-26
-9-2
3N
BE
15M
L-26
-9-2
3SW
SEI
2609
0SI 2
30E
.43
0473
5666
1432
6Fe
dera
lIG
WIP
SG4M
U-2
3-8-
22SG
4MU
-23-
8-22
NW
NW
2308
0S22
0E43
0473
5758
1438
0Fe
dera
l|G
W'P
RW
S8M
L-14
-9-2
4R
WS
8ML-
14-9
-24
SEN
E'
1409
0S|2
40E
4304
7358
0314
539
Fede
ral
GW
|SSG
llMU
-14-
8-22
SG11
MU
-14-
8-22
NES
W14
080S
220E
4304
7358
2914
486
Fede
ral
IGW
IPR
BD
SFE
D1G
-7-1
0-18
RB
DS
FED
1G-7
-10-
18N
ENE
I07
100S
180E
4304
7359
3214
457
Fede
ral
OW
SR
BD
SFE
D14
G-8
-10-
18R
BD
SFE
D14
G-8
-10-
18SE
SW,
0810
0S18
0E43
0473
5933
1443
3IF
eder
alIO
WIP
OU
SG14
MU
-14-
8-22
OU
SG14
MU
-14-
8-22
SESW
,14
080S
220E
.43
0473
5950
1447
9'F
eder
alIG
W|P
CO
Y10
ML-
14-8
-24
CO
Y10
ML-
14-8
-24
NW
SE1
1408
0S|2
40E
4304
7360
38Fe
dera
l¡G
W|A
PDC
OY
12M
L-24
-8-2
4C
OY
12M
L-24
-8-2
4N
WSW
|24
080S
I240
E43
0473
6039
1459
2Fe
dera
lIO
W|P
WIH
1AM
U-2
1-8-
22W
IHlA
MU
-21-
8-22
INEN
EI
2108
0SI2
20E
'43
0473
6060
1498
0Fe
dera
lIG
WIP
NB
E4M
L-10
-9-2
3N
BE
4ML-
10-9
-23
NW
NW
1009
0S23
0E.
4304
7360
9815
732
,Fed
eral
IGW
IPN
BE
8ML-
10-9
-23
NB
E8M
L-10
-9-2
3_
SEN
E10
090S
230E
4304
7360
9915
733
Fede
ral
IGW
PN
BE
16M
L-10
-9-2
3N
BE
16M
L-10
-9-2
3SE
SE10
090S
230E
4304
7361
0014
728
Fede
ral
GW
PN
BE
8ML-
12-9
-23
NB
E8M
L-12
-9-2
3SE
NE
1209
0SI 2
30E
4304
7361
4315
859
Fede
ral
GW
DR
LW
H12
G-1
1-7-
24W
H12
G-1
1-7-
24IN
WSW
.11
070S
|240
E43
0473
6195
Fede
ral
GW
APD
HC
16M
-6-7
-22
HC
16M
-6-7
-22
SESE
'06
070S
220E
4304
7361
97Fe
dera
lG
WA
PDH
C14
M-6
-7-2
2H
C14
M-6
-7-2
2SE
SW06
070S
220E
4304
7361
98Fe
dera
lG
W_
|APD
WW
T8M
L-25
-8-2
4W
WT
8ML-
25-8
-24
SEN
E.
2508
0S24
0EI
4304
7361
99II
¾de
ral
iGW
IAPD
GB
16D
-28-
8-21
GB
16D
-28-
8-21
ISES
E28
080S
210E
4304
7362
6014
981
Fede
ral
GW
IP
WH
7G-3
-7-2
4W
H7G
-3-7
-24
SWN
E03
070S
240E
4304
7363
47Fe
dera
lG
WA
PDN
BE
5ML-
10-9
-23
NB
E5M
L-10
-9-2
3SW
NW
1009
0S|2
30E
4304
7363
5315
227
Fede
ral
GW
|PN
BE
7ML-
10-9
-23
NB
E7M
L-10
-9-2
3|S
WN
E10
090S
|230
E43
0473
6355
1585
0Fe
dera
lG
WD
RL
NB
E3M
L-10
-9-2
3N
BE
3ML-
10-9
-23
NEN
W10
090S
I 230
E43
0473
6356
1539
3Fe
dera
lG
WP
WH
4G-1
0-7-
24W
H4G
-10-
7-24
NW
NW
1007
0S' 24
0E43
0473
6359
Fede
ral
GW
APD
EIH
X4M
U-3
6-8-
22EI
HX
4MU
-36-
8-22
NW
NW
|36
080S
220E
4304
7364
4414
875
Fede
ral
GW
PEI
HX
3MU
-36-
8-22
EIH
X3M
U-3
6-8-
22N
ENW
|36
080S
220E
4304
7364
4514
860
Fede
ral
|GW
PEI
HX
2MU
-36-
8-22
IEIH
X2M
U-3
6-8-
22N
WN
E36
080S
.22
0E43
0473
6446
1484
0Fe
dera
l|G
WP
EIH
X1M
U-3
6-8-
22EI
HX
1MU
-36-
8-22
NEN
E36
080S
220E
4304
7364
4714
861
Fede
ral
i GW
PW
WT
2ML-
24-8
-24
|WW
T2M
L-24
-8-2
4N
WN
E24
080S
240E
4304
7365
15Fe
dera
lG
WA
PDR
WS
1ML-
1-9-
24|R
WS
1ML-
1-9-
24N
ENE
0109
0S24
0E43
0473
6517
Fede
ral
GW
APD
RW
S3M
L-1-
9-24
IRW
S3M
L-1-
9-24
NEN
W01
090S
240E
4304
7365
18Fe
dera
liG
WA
PDR
WS
9ML-
1-9-
24|R
WS
9ML-
1-9-
24N
ESE
0109
0S24
0E43
0473
6519
IFed
eral
i GW
APD
RW
S15
ML-
1-9-
24|R
WS
15M
L-1-
9-24
SWSE
0109
0S24
0E43
0473
6521
.Fed
eral
IGW
6of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
elln
ame
&N
o.Q
/QSE
CTW
P' R
NG
API
Entit
yLe
ase
Wel
lTy
peSt
atus
NB
E15
M-1
7-9-
23N
BE
15M
-17-
9-23
SWSE
1709
0SI2
30E
_43
0473
5463
1442
3'F
eder
al'G
WIP
NB
E7M
L-17
-9-2
3N
BE
7ML-
17-9
-23
SWN
Ei
1709
0S|2
30E
·
4304
7354
6414
232
Fede
ral
IGW
PN
BE
3ML-
17-9
-23
NB
E3M
L-17
-9-2
3N
ENW
1709
0S23
0E.
4304
7354
6514
276
Fede
ral
¡GW
IPN
BE
11M
-17-
9-23
NB
E11
M-1
7-9-
23N
ESW
1709
0S23
0E43
0473
5466
1443
1Fe
dera
l|G
WP
NB
E10
ML-
10-9
-23
NB
E10
ML-
10-9
-23
NW
SE10
090S
,23
0E,
4304
7356
5014
377
Fede
ral
IGW
IPN
BE
6ML-
10-9
-23
NB
E6M
L-10
-9-2
3SE
NW
1009
0S.
230E
4304
7356
5114
422
Fede
ral
GW
NB
E12
ML-
17-9
-23
NB
E12
ML-
17-9
-23
NW
SW17
090S
I23
0E43
0473
5652
1427
8Fe
dera
lG
WIP
NB
E6M
L-26
-9-2
3N
BE
6ML-
26-9
-23
SEN
W26
090S
230E
4304
7356
6414
378
Fede
ral
GW
|PN
BE
11M
L-26
-9-2
3N
BE
11M
L-26
-9-2
3N
ESW
2609
0SI2
30E
4304
7356
6514
340
Fede
ral
GW
iPN
BE
15M
L-26
-9-2
3N
BE
15M
L-26
-9-2
3SW
SEI
2609
0SI 2
30E
.43
0473
5666
1432
6Fe
dera
lIG
WIP
SG4M
U-2
3-8-
22SG
4MU
-23-
8-22
NW
NW
2308
0S22
0E43
0473
5758
1438
0Fe
dera
l|G
W'P
RW
S8M
L-14
-9-2
4R
WS
8ML-
14-9
-24
SEN
E'
1409
0S|2
40E
4304
7358
0314
539
Fede
ral
GW
|SSG
llMU
-14-
8-22
SG11
MU
-14-
8-22
NES
W14
080S
220E
4304
7358
2914
486
Fede
ral
IGW
IPR
BD
SFE
D1G
-7-1
0-18
RB
DS
FED
1G-7
-10-
18N
ENE
I07
100S
180E
4304
7359
3214
457
Fede
ral
OW
SR
BD
SFE
D14
G-8
-10-
18R
BD
SFE
D14
G-8
-10-
18SE
SW,
0810
0S18
0E43
0473
5933
1443
3IF
eder
alIO
WIP
OU
SG14
MU
-14-
8-22
OU
SG14
MU
-14-
8-22
SESW
,14
080S
220E
.43
0473
5950
1447
9'F
eder
alIG
W|P
CO
Y10
ML-
14-8
-24
CO
Y10
ML-
14-8
-24
NW
SE1
1408
0S|2
40E
4304
7360
38Fe
dera
l¡G
W|A
PDC
OY
12M
L-24
-8-2
4C
OY
12M
L-24
-8-2
4N
WSW
|24
080S
I240
E43
0473
6039
1459
2Fe
dera
lIO
W|P
WIH
1AM
U-2
1-8-
22W
IHlA
MU
-21-
8-22
INEN
EI
2108
0SI2
20E
'43
0473
6060
1498
0Fe
dera
lIG
WIP
NB
E4M
L-10
-9-2
3N
BE
4ML-
10-9
-23
NW
NW
1009
0S23
0E.
4304
7360
9815
732
,Fed
eral
IGW
IPN
BE
8ML-
10-9
-23
NB
E8M
L-10
-9-2
3_
SEN
E10
090S
230E
4304
7360
9915
733
Fede
ral
IGW
PN
BE
16M
L-10
-9-2
3N
BE
16M
L-10
-9-2
3SE
SE10
090S
230E
4304
7361
0014
728
Fede
ral
GW
PN
BE
8ML-
12-9
-23
NB
E8M
L-12
-9-2
3SE
NE
1209
0SI 2
30E
4304
7361
4315
859
Fede
ral
GW
DR
LW
H12
G-1
1-7-
24W
H12
G-1
1-7-
24IN
WSW
.11
070S
|240
E43
0473
6195
Fede
ral
GW
APD
HC
16M
-6-7
-22
HC
16M
-6-7
-22
SESE
'06
070S
220E
4304
7361
97Fe
dera
lG
WA
PDH
C14
M-6
-7-2
2H
C14
M-6
-7-2
2SE
SW06
070S
220E
4304
7361
98Fe
dera
lG
W_
|APD
WW
T8M
L-25
-8-2
4W
WT
8ML-
25-8
-24
SEN
E.
2508
0S24
0EI
4304
7361
99II
¾de
ral
iGW
IAPD
GB
16D
-28-
8-21
GB
16D
-28-
8-21
ISES
E28
080S
210E
4304
7362
6014
981
Fede
ral
GW
IP
WH
7G-3
-7-2
4W
H7G
-3-7
-24
SWN
E03
070S
240E
4304
7363
47Fe
dera
lG
WA
PDN
BE
5ML-
10-9
-23
NB
E5M
L-10
-9-2
3SW
NW
1009
0S|2
30E
4304
7363
5315
227
Fede
ral
GW
|PN
BE
7ML-
10-9
-23
NB
E7M
L-10
-9-2
3|S
WN
E10
090S
|230
E43
0473
6355
1585
0Fe
dera
lG
WD
RL
NB
E3M
L-10
-9-2
3N
BE
3ML-
10-9
-23
NEN
W10
090S
I 230
E43
0473
6356
1539
3Fe
dera
lG
WP
WH
4G-1
0-7-
24W
H4G
-10-
7-24
NW
NW
1007
0S' 24
0E43
0473
6359
Fede
ral
GW
APD
EIH
X4M
U-3
6-8-
22EI
HX
4MU
-36-
8-22
NW
NW
|36
080S
220E
4304
7364
4414
875
Fede
ral
GW
PEI
HX
3MU
-36-
8-22
EIH
X3M
U-3
6-8-
22N
ENW
|36
080S
220E
4304
7364
4514
860
Fede
ral
|GW
PEI
HX
2MU
-36-
8-22
IEIH
X2M
U-3
6-8-
22N
WN
E36
080S
.22
0E43
0473
6446
1484
0Fe
dera
l|G
WP
EIH
X1M
U-3
6-8-
22EI
HX
1MU
-36-
8-22
NEN
E36
080S
220E
4304
7364
4714
861
Fede
ral
i GW
PW
WT
2ML-
24-8
-24
|WW
T2M
L-24
-8-2
4N
WN
E24
080S
240E
4304
7365
15Fe
dera
lG
WA
PDR
WS
1ML-
1-9-
24|R
WS
1ML-
1-9-
24N
ENE
0109
0S24
0E43
0473
6517
Fede
ral
GW
APD
RW
S3M
L-1-
9-24
IRW
S3M
L-1-
9-24
NEN
W01
090S
240E
4304
7365
18Fe
dera
liG
WA
PDR
WS
9ML-
1-9-
24|R
WS
9ML-
1-9-
24N
ESE
0109
0S24
0E43
0473
6519
IFed
eral
i GW
APD
RW
S15
ML-
1-9-
24|R
WS
15M
L-1-
9-24
SWSE
0109
0S24
0E43
0473
6521
.Fed
eral
IGW
6of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
elln
ame
&N
o.Q
/QSE
CTW
P' R
NG
API
Entit
yLe
ase
Wel
lTy
peSt
atus
NB
E15
M-1
7-9-
23N
BE
15M
-17-
9-23
SWSE
1709
0SI2
30E
_43
0473
5463
1442
3'F
eder
al'G
WIP
NB
E7M
L-17
-9-2
3N
BE
7ML-
17-9
-23
SWN
Ei
1709
0S|2
30E
·
4304
7354
6414
232
Fede
ral
IGW
PN
BE
3ML-
17-9
-23
NB
E3M
L-17
-9-2
3N
ENW
1709
0S23
0E.
4304
7354
6514
276
Fede
ral
¡GW
IPN
BE
11M
-17-
9-23
NB
E11
M-1
7-9-
23N
ESW
1709
0S23
0E43
0473
5466
1443
1Fe
dera
l|G
WP
NB
E10
ML-
10-9
-23
NB
E10
ML-
10-9
-23
NW
SE10
090S
,23
0E,
4304
7356
5014
377
Fede
ral
IGW
IPN
BE
6ML-
10-9
-23
NB
E6M
L-10
-9-2
3SE
NW
1009
0S.
230E
4304
7356
5114
422
Fede
ral
GW
NB
E12
ML-
17-9
-23
NB
E12
ML-
17-9
-23
NW
SW17
090S
I23
0E43
0473
5652
1427
8Fe
dera
lG
WIP
NB
E6M
L-26
-9-2
3N
BE
6ML-
26-9
-23
SEN
W26
090S
230E
4304
7356
6414
378
Fede
ral
GW
|PN
BE
11M
L-26
-9-2
3N
BE
11M
L-26
-9-2
3N
ESW
2609
0SI2
30E
4304
7356
6514
340
Fede
ral
GW
iPN
BE
15M
L-26
-9-2
3N
BE
15M
L-26
-9-2
3SW
SEI
2609
0SI 2
30E
.43
0473
5666
1432
6Fe
dera
lIG
WIP
SG4M
U-2
3-8-
22SG
4MU
-23-
8-22
NW
NW
2308
0S22
0E43
0473
5758
1438
0Fe
dera
l|G
W'P
RW
S8M
L-14
-9-2
4R
WS
8ML-
14-9
-24
SEN
E'
1409
0S|2
40E
4304
7358
0314
539
Fede
ral
GW
|SSG
llMU
-14-
8-22
SG11
MU
-14-
8-22
NES
W14
080S
220E
4304
7358
2914
486
Fede
ral
IGW
IPR
BD
SFE
D1G
-7-1
0-18
RB
DS
FED
1G-7
-10-
18N
ENE
I07
100S
180E
4304
7359
3214
457
Fede
ral
OW
SR
BD
SFE
D14
G-8
-10-
18R
BD
SFE
D14
G-8
-10-
18SE
SW,
0810
0S18
0E43
0473
5933
1443
3IF
eder
alIO
WIP
OU
SG14
MU
-14-
8-22
OU
SG14
MU
-14-
8-22
SESW
,14
080S
220E
.43
0473
5950
1447
9'F
eder
alIG
W|P
CO
Y10
ML-
14-8
-24
CO
Y10
ML-
14-8
-24
NW
SE1
1408
0S|2
40E
4304
7360
38Fe
dera
l¡G
W|A
PDC
OY
12M
L-24
-8-2
4C
OY
12M
L-24
-8-2
4N
WSW
|24
080S
I240
E43
0473
6039
1459
2Fe
dera
lIO
W|P
WIH
1AM
U-2
1-8-
22W
IHlA
MU
-21-
8-22
INEN
EI
2108
0SI2
20E
'43
0473
6060
1498
0Fe
dera
lIG
WIP
NB
E4M
L-10
-9-2
3N
BE
4ML-
10-9
-23
NW
NW
1009
0S23
0E.
4304
7360
9815
732
,Fed
eral
IGW
IPN
BE
8ML-
10-9
-23
NB
E8M
L-10
-9-2
3_
SEN
E10
090S
230E
4304
7360
9915
733
Fede
ral
IGW
PN
BE
16M
L-10
-9-2
3N
BE
16M
L-10
-9-2
3SE
SE10
090S
230E
4304
7361
0014
728
Fede
ral
GW
PN
BE
8ML-
12-9
-23
NB
E8M
L-12
-9-2
3SE
NE
1209
0SI 2
30E
4304
7361
4315
859
Fede
ral
GW
DR
LW
H12
G-1
1-7-
24W
H12
G-1
1-7-
24IN
WSW
.11
070S
|240
E43
0473
6195
Fede
ral
GW
APD
HC
16M
-6-7
-22
HC
16M
-6-7
-22
SESE
'06
070S
220E
4304
7361
97Fe
dera
lG
WA
PDH
C14
M-6
-7-2
2H
C14
M-6
-7-2
2SE
SW06
070S
220E
4304
7361
98Fe
dera
lG
W_
|APD
WW
T8M
L-25
-8-2
4W
WT
8ML-
25-8
-24
SEN
E.
2508
0S24
0EI
4304
7361
99II
¾de
ral
iGW
IAPD
GB
16D
-28-
8-21
GB
16D
-28-
8-21
ISES
E28
080S
210E
4304
7362
6014
981
Fede
ral
GW
IP
WH
7G-3
-7-2
4W
H7G
-3-7
-24
SWN
E03
070S
240E
4304
7363
47Fe
dera
lG
WA
PDN
BE
5ML-
10-9
-23
NB
E5M
L-10
-9-2
3SW
NW
1009
0S|2
30E
4304
7363
5315
227
Fede
ral
GW
|PN
BE
7ML-
10-9
-23
NB
E7M
L-10
-9-2
3|S
WN
E10
090S
|230
E43
0473
6355
1585
0Fe
dera
lG
WD
RL
NB
E3M
L-10
-9-2
3N
BE
3ML-
10-9
-23
NEN
W10
090S
I 230
E43
0473
6356
1539
3Fe
dera
lG
WP
WH
4G-1
0-7-
24W
H4G
-10-
7-24
NW
NW
1007
0S' 24
0E43
0473
6359
Fede
ral
GW
APD
EIH
X4M
U-3
6-8-
22EI
HX
4MU
-36-
8-22
NW
NW
|36
080S
220E
4304
7364
4414
875
Fede
ral
GW
PEI
HX
3MU
-36-
8-22
EIH
X3M
U-3
6-8-
22N
ENW
|36
080S
220E
4304
7364
4514
860
Fede
ral
|GW
PEI
HX
2MU
-36-
8-22
IEIH
X2M
U-3
6-8-
22N
WN
E36
080S
.22
0E43
0473
6446
1484
0Fe
dera
l|G
WP
EIH
X1M
U-3
6-8-
22EI
HX
1MU
-36-
8-22
NEN
E36
080S
220E
4304
7364
4714
861
Fede
ral
i GW
PW
WT
2ML-
24-8
-24
|WW
T2M
L-24
-8-2
4N
WN
E24
080S
240E
4304
7365
15Fe
dera
lG
WA
PDR
WS
1ML-
1-9-
24|R
WS
1ML-
1-9-
24N
ENE
0109
0S24
0E43
0473
6517
Fede
ral
GW
APD
RW
S3M
L-1-
9-24
IRW
S3M
L-1-
9-24
NEN
W01
090S
240E
4304
7365
18Fe
dera
liG
WA
PDR
WS
9ML-
1-9-
24|R
WS
9ML-
1-9-
24N
ESE
0109
0S24
0E43
0473
6519
IFed
eral
i GW
APD
RW
S15
ML-
1-9-
24|R
WS
15M
L-1-
9-24
SWSE
0109
0S24
0E43
0473
6521
.Fed
eral
IGW
6of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lNam
eW
elln
ame
&N
o.Q
/QSE
CTW
P' R
NG
API
Entit
yLe
ase
Wel
lTy
peSt
atus
NB
E15
M-1
7-9-
23N
BE
15M
-17-
9-23
SWSE
1709
0SI2
30E
_43
0473
5463
1442
3'F
eder
al'G
WIP
NB
E7M
L-17
-9-2
3N
BE
7ML-
17-9
-23
SWN
Ei
1709
0S|2
30E
·
4304
7354
6414
232
Fede
ral
IGW
PN
BE
3ML-
17-9
-23
NB
E3M
L-17
-9-2
3N
ENW
1709
0S23
0E.
4304
7354
6514
276
Fede
ral
¡GW
IPN
BE
11M
-17-
9-23
NB
E11
M-1
7-9-
23N
ESW
1709
0S23
0E43
0473
5466
1443
1Fe
dera
l|G
WP
NB
E10
ML-
10-9
-23
NB
E10
ML-
10-9
-23
NW
SE10
090S
,23
0E,
4304
7356
5014
377
Fede
ral
IGW
IPN
BE
6ML-
10-9
-23
NB
E6M
L-10
-9-2
3SE
NW
1009
0S.
230E
4304
7356
5114
422
Fede
ral
GW
NB
E12
ML-
17-9
-23
NB
E12
ML-
17-9
-23
NW
SW17
090S
I23
0E43
0473
5652
1427
8Fe
dera
lG
WIP
NB
E6M
L-26
-9-2
3N
BE
6ML-
26-9
-23
SEN
W26
090S
230E
4304
7356
6414
378
Fede
ral
GW
|PN
BE
11M
L-26
-9-2
3N
BE
11M
L-26
-9-2
3N
ESW
2609
0SI2
30E
4304
7356
6514
340
Fede
ral
GW
iPN
BE
15M
L-26
-9-2
3N
BE
15M
L-26
-9-2
3SW
SEI
2609
0SI 2
30E
.43
0473
5666
1432
6Fe
dera
lIG
WIP
SG4M
U-2
3-8-
22SG
4MU
-23-
8-22
NW
NW
2308
0S22
0E43
0473
5758
1438
0Fe
dera
l|G
W'P
RW
S8M
L-14
-9-2
4R
WS
8ML-
14-9
-24
SEN
E'
1409
0S|2
40E
4304
7358
0314
539
Fede
ral
GW
|SSG
llMU
-14-
8-22
SG11
MU
-14-
8-22
NES
W14
080S
220E
4304
7358
2914
486
Fede
ral
IGW
IPR
BD
SFE
D1G
-7-1
0-18
RB
DS
FED
1G-7
-10-
18N
ENE
I07
100S
180E
4304
7359
3214
457
Fede
ral
OW
SR
BD
SFE
D14
G-8
-10-
18R
BD
SFE
D14
G-8
-10-
18SE
SW,
0810
0S18
0E43
0473
5933
1443
3IF
eder
alIO
WIP
OU
SG14
MU
-14-
8-22
OU
SG14
MU
-14-
8-22
SESW
,14
080S
220E
.43
0473
5950
1447
9'F
eder
alIG
W|P
CO
Y10
ML-
14-8
-24
CO
Y10
ML-
14-8
-24
NW
SE1
1408
0S|2
40E
4304
7360
38Fe
dera
l¡G
W|A
PDC
OY
12M
L-24
-8-2
4C
OY
12M
L-24
-8-2
4N
WSW
|24
080S
I240
E43
0473
6039
1459
2Fe
dera
lIO
W|P
WIH
1AM
U-2
1-8-
22W
IHlA
MU
-21-
8-22
INEN
EI
2108
0SI2
20E
'43
0473
6060
1498
0Fe
dera
lIG
WIP
NB
E4M
L-10
-9-2
3N
BE
4ML-
10-9
-23
NW
NW
1009
0S23
0E.
4304
7360
9815
732
,Fed
eral
IGW
IPN
BE
8ML-
10-9
-23
NB
E8M
L-10
-9-2
3_
SEN
E10
090S
230E
4304
7360
9915
733
Fede
ral
IGW
PN
BE
16M
L-10
-9-2
3N
BE
16M
L-10
-9-2
3SE
SE10
090S
230E
4304
7361
0014
728
Fede
ral
GW
PN
BE
8ML-
12-9
-23
NB
E8M
L-12
-9-2
3SE
NE
1209
0SI 2
30E
4304
7361
4315
859
Fede
ral
GW
DR
LW
H12
G-1
1-7-
24W
H12
G-1
1-7-
24IN
WSW
.11
070S
|240
E43
0473
6195
Fede
ral
GW
APD
HC
16M
-6-7
-22
HC
16M
-6-7
-22
SESE
'06
070S
220E
4304
7361
97Fe
dera
lG
WA
PDH
C14
M-6
-7-2
2H
C14
M-6
-7-2
2SE
SW06
070S
220E
4304
7361
98Fe
dera
lG
W_
|APD
WW
T8M
L-25
-8-2
4W
WT
8ML-
25-8
-24
SEN
E.
2508
0S24
0EI
4304
7361
99II
¾de
ral
iGW
IAPD
GB
16D
-28-
8-21
GB
16D
-28-
8-21
ISES
E28
080S
210E
4304
7362
6014
981
Fede
ral
GW
IP
WH
7G-3
-7-2
4W
H7G
-3-7
-24
SWN
E03
070S
240E
4304
7363
47Fe
dera
lG
WA
PDN
BE
5ML-
10-9
-23
NB
E5M
L-10
-9-2
3SW
NW
1009
0S|2
30E
4304
7363
5315
227
Fede
ral
GW
|PN
BE
7ML-
10-9
-23
NB
E7M
L-10
-9-2
3|S
WN
E10
090S
|230
E43
0473
6355
1585
0Fe
dera
lG
WD
RL
NB
E3M
L-10
-9-2
3N
BE
3ML-
10-9
-23
NEN
W10
090S
I 230
E43
0473
6356
1539
3Fe
dera
lG
WP
WH
4G-1
0-7-
24W
H4G
-10-
7-24
NW
NW
1007
0S' 24
0E43
0473
6359
Fede
ral
GW
APD
EIH
X4M
U-3
6-8-
22EI
HX
4MU
-36-
8-22
NW
NW
|36
080S
220E
4304
7364
4414
875
Fede
ral
GW
PEI
HX
3MU
-36-
8-22
EIH
X3M
U-3
6-8-
22N
ENW
|36
080S
220E
4304
7364
4514
860
Fede
ral
|GW
PEI
HX
2MU
-36-
8-22
IEIH
X2M
U-3
6-8-
22N
WN
E36
080S
.22
0E43
0473
6446
1484
0Fe
dera
l|G
WP
EIH
X1M
U-3
6-8-
22EI
HX
1MU
-36-
8-22
NEN
E36
080S
220E
4304
7364
4714
861
Fede
ral
i GW
PW
WT
2ML-
24-8
-24
|WW
T2M
L-24
-8-2
4N
WN
E24
080S
240E
4304
7365
15Fe
dera
lG
WA
PDR
WS
1ML-
1-9-
24|R
WS
1ML-
1-9-
24N
ENE
0109
0S24
0E43
0473
6517
Fede
ral
GW
APD
RW
S3M
L-1-
9-24
IRW
S3M
L-1-
9-24
NEN
W01
090S
240E
4304
7365
18Fe
dera
liG
WA
PDR
WS
9ML-
1-9-
24|R
WS
9ML-
1-9-
24N
ESE
0109
0S24
0E43
0473
6519
IFed
eral
i GW
APD
RW
S15
ML-
1-9-
24|R
WS
15M
L-1-
9-24
SWSE
0109
0S24
0E43
0473
6521
.Fed
eral
IGW
7of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
We1
1Nam
e&
No;
Q/Q
SEC
TWP
RN
GA
PIEn
tity
Leas
eW
ell
Type
Stat
us
BSW
1ML-
12-9
-24
|BSW
1ML-
12-9
-24
|NEN
EI
12|0
90S
|240
E43
0473
6522
Fede
ral
|GW
APD
BSW
11M
L-13
-9-2
4B
SW11
ML-
13-9
-24
INES
WI
13|0
90S
i24
0E43
0473
6523
Fede
ral
|GW
APD
NB
E7M
L-26
-9-2
3N
BE
7ML-
26-9
-23
SWN
EI
26| 0
90S
230E
4304
7365
8716
008
iFed
eral
IGW
DR
LN
BE
8ML-
26-9
-23
NB
E8M
L-26
-9-2
3SE
NE
26I
090S
230E
4304
7365
8815
689
|Fed
eral
'GW
PN
BE
1ML-
26-9
-23
|NB
E1M
L-26
-9-2
3N
ENE
|26
090S
230E
|43
0473
6589
1588
0|F
eder
al|G
WD
RL
NB
E2M
L-26
-9-2
3IN
BE
2ML-
26-9
-23
NW
NE
2609
0S23
0E|4
3047
3659
015
898
|Fed
eral
|GW
NR
LN
BE
3ML-
26-9
-23
[NB
E3M
L-26
-9-2
3N
ENW
2609
0SI2
30E
I43
0473
6591
1590
6Fe
dera
lIG
WD
RL
NB
E5M
L-26
-9-2
3N
BE
5ML-
26-9
-23
ISW
NW
i26
090S
230E
4304
7365
9215
839
Fede
ral
IGW
DR
LN
BE
9ML-
10-9
-23
INB
E9M
L-10
-9-2
3IN
ESE
1009
0S23
0E|
4304
7365
9315
438
Fede
ral
|GW
|PN
BE
11M
L-10
-9-2
3[N
BE
11M
L-10
-9-2
3N
ESW
I10
090S
|230
EI
4304
7365
94|1
5228
Fede
ral
|GW
IPN
BE
15M
L-10
-9-2
3[N
BE
15M
L-10
-9-2
3SW
SE_
I10
090S
|230
EI
4304
7365
95|1
5439
Fede
ral
|GW
IPN
BE
1ML-
12-9
-23
NB
E1M
L-12
-9-2
3N
ENE
1209
0SI2
30E
4304
7366
13Fe
dera
lIG
WIA
PDN
BE
2ML-
17-9
-23
¡NB
E2M
L-17
-9-2
3|N
WN
E17
090S
|230
E43
0473
6614
1512
6Fe
dera
lIG
WP
NB
E4M
L-17
-9-2
3N
BE
4ML-
17-9
-23
|NW
NW
17|0
90S
|230
E|
4304
7366
1515
177
Fede
ral
¡GW
|PN
BE
6ML-
17-9
-23
NB
E6M
L-17
-9-2
3|S
ENW
17|0
90S
230E
I43
0473
6616
|15
127
IFed
eral
.GW
IPN
BE
10M
L-17
-9-2
3|N
BE
10M
L-17
-9-2
3|N
WSE
17| 0
90S
230E
|430
4736
617
1512
8IF
eder
alIG
WP
NB
E14
ML-
17-9
-23
|NB
E14
ML-
17-9
-23
SESW
1709
0S23
0E43
0473
6618
1508
8Fe
dera
l.G
WP
NB
E9M
L-26
-9-2
3]N
BE
9ML-
26-9
-23
|NES
E26
090S
230E
|430
4736
619
1532
2Fe
dera
l|G
W|P
NB
E10
D-2
6-9-
23IN
BE
10D
-26-
9-23
|NW
SE26
090S
230E
I43
0473
6620
1597
5Fe
dera
liG
WID
RL
NB
E12
ML-
26-9
-23
NB
E12
ML-
26-9
-23
INW
SW26
090S
230E
4304
7366
2115
840
Fede
ral
IGW
DR
LN
BE
13M
L-26
-9-2
3|N
BE
13M
L-26
-9-2
3|S
WSW
2609
0S23
0E43
0473
6622
1569
0Fe
dera
lG
WP
NB
E14
ML-
26-9
-23
NB
E14
ML-
26-9
-23
|SES
W26
090S
230E
|43
0473
6623
1526
2Fe
dera
l|G
WP
NB
E16
ML-
26-9
-23
NB
E16
ML-
26-9
-23
SESE
I26
090S
230E
I43
0473
6624
1573
5Fe
dera
lIG
WP
RW
S13
ML-
14-9
-24
RW
S13
ML-
14-9
-24
SWSW
1409
0S.2
40E
I430
4736
737
Fede
ral
[GW
'APD
RW
S12
ML-
14-9
-24
RW
S12
ML-
14-9
-24
NW
SW14
090S
240E
4304
7367
38Fe
dera
lG
WA
PDSG
3MU
-23-
8-22
SG3M
U-2
3-8-
22SE
SW|
1408
0S' 22
0E|
4304
7369
4015
100
Fede
ral
|GW
PN
BE
5ML-
17-9
-23
NB
E5M
L-17
-9-2
3SW
NW
1709
0SI2
30E
I43
0473
6941
1510
1IF
eder
aliG
WiP
WW
T2M
L-25
-8-2
4W
WT
2ML-
25-8
-24
NW
NE
2508
0SI 2
40E
4304
7373
01IF
eder
alG
WIA
PDW
WT
1ML-
25-8
-24
WW
T1M
L-25
-8-2
4N
ENE
2508
0S24
0E43
0473
7302
Fede
ral
'GW
IAPD
HK
15M
L-19
-8-2
5H
K15
ML-
19-8
-25
SWSE
1908
0S25
0E43
0473
7303
|Fed
eral
GW
APD
WT
13M
L-19
-8-2
5W
T13
ML-
19-8
-25
ISW
SW19
080S
250E
4304
7373
04|
|Fed
eral
GW
|APD
HK
3ML-
29-8
-25
HK
3ML-
29-8
-25
NEN
W_
2908
0SI2
50E
4304
7373
05|
|Fed
eral
GW
iAPD
HK
5ML-
29-8
-25
HK
5ML-
29-8
-25
SWN
W29
080S
250E
4304
7373
30|
|Fed
eral
GW
IAPD
HK
2ML-
30-8
-25
HK
2ML-
30-8
-25
NW
NE
3008
0S25
0E43
0473
7331
Fede
ral
GW
APD
HK
5ML-
30-8
-25
HK
5ML-
30-8
-25
SWN
W30
080S
|250
E43
0473
7332
|Fed
eral
GW
IAPD
HK
10M
L-30
-8-2
5H
K10
ML-
30-8
-25
NW
SE30
080S
I250
E43
0473
7333
||F
eder
alG
WIA
PD
HK
14M
L-30
-8-2
5H
K14
ML-
30-8
-25
SESW
i30
080S
I 250
E43
0473
7334
|IF
eder
alG
WIA
PDH
K6M
L-30
-8-2
5H
K6M
L-30
-8-2
5SE
NW
-30
080S
250E
4304
7373
48IF
eder
alG
W|A
PDH
K8M
L-30
-8-2
5H
K8M
L-30
-8-2
5SE
NE
)30
080S
250E
4304
7373
49Fe
dera
lIG
W|A
PDW
WT
7ML-
25-8
-24
WW
T7M
L-25
-8-2
4IS
WN
E25
080S
|240
E43
0473
7407
|IF
eder
alG
W|A
PDW
WT
9ML-
25-8
-24
WW
T9M
L-25
-8-2
4N
ESE
I25
080S
I240
E43
0473
7408
|iF
eder
alIG
W|A
PDW
WT
10M
L-25
-8-2
4W
WT
10M
L-25
-8-2
4IN
WSE
I25
080S
|240
E.
4304
7374
09I
iFed
eral
IGW
7of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
We1
1Nam
e&
No;
Q/Q
SEC
TWP
RN
GA
PIEn
tity
Leas
eW
ell
Type
Stat
us
BSW
1ML-
12-9
-24
|BSW
1ML-
12-9
-24
|NEN
EI
12|0
90S
|240
E43
0473
6522
Fede
ral
|GW
APD
BSW
11M
L-13
-9-2
4B
SW11
ML-
13-9
-24
INES
WI
13|0
90S
i24
0E43
0473
6523
Fede
ral
|GW
APD
NB
E7M
L-26
-9-2
3N
BE
7ML-
26-9
-23
SWN
EI
26| 0
90S
230E
4304
7365
8716
008
iFed
eral
IGW
DR
LN
BE
8ML-
26-9
-23
NB
E8M
L-26
-9-2
3SE
NE
26I
090S
230E
4304
7365
8815
689
|Fed
eral
'GW
PN
BE
1ML-
26-9
-23
|NB
E1M
L-26
-9-2
3N
ENE
|26
090S
230E
|43
0473
6589
1588
0|F
eder
al|G
WD
RL
NB
E2M
L-26
-9-2
3IN
BE
2ML-
26-9
-23
NW
NE
2609
0S23
0E|4
3047
3659
015
898
|Fed
eral
|GW
NR
LN
BE
3ML-
26-9
-23
[NB
E3M
L-26
-9-2
3N
ENW
2609
0SI2
30E
I43
0473
6591
1590
6Fe
dera
lIG
WD
RL
NB
E5M
L-26
-9-2
3N
BE
5ML-
26-9
-23
ISW
NW
i26
090S
230E
4304
7365
9215
839
Fede
ral
IGW
DR
LN
BE
9ML-
10-9
-23
INB
E9M
L-10
-9-2
3IN
ESE
1009
0S23
0E|
4304
7365
9315
438
Fede
ral
|GW
|PN
BE
11M
L-10
-9-2
3[N
BE
11M
L-10
-9-2
3N
ESW
I10
090S
|230
EI
4304
7365
94|1
5228
Fede
ral
|GW
IPN
BE
15M
L-10
-9-2
3[N
BE
15M
L-10
-9-2
3SW
SE_
I10
090S
|230
EI
4304
7365
95|1
5439
Fede
ral
|GW
IPN
BE
1ML-
12-9
-23
NB
E1M
L-12
-9-2
3N
ENE
1209
0SI2
30E
4304
7366
13Fe
dera
lIG
WIA
PDN
BE
2ML-
17-9
-23
¡NB
E2M
L-17
-9-2
3|N
WN
E17
090S
|230
E43
0473
6614
1512
6Fe
dera
lIG
WP
NB
E4M
L-17
-9-2
3N
BE
4ML-
17-9
-23
|NW
NW
17|0
90S
|230
E|
4304
7366
1515
177
Fede
ral
¡GW
|PN
BE
6ML-
17-9
-23
NB
E6M
L-17
-9-2
3|S
ENW
17|0
90S
230E
I43
0473
6616
|15
127
IFed
eral
.GW
IPN
BE
10M
L-17
-9-2
3|N
BE
10M
L-17
-9-2
3|N
WSE
17| 0
90S
230E
|430
4736
617
1512
8IF
eder
alIG
WP
NB
E14
ML-
17-9
-23
|NB
E14
ML-
17-9
-23
SESW
1709
0S23
0E43
0473
6618
1508
8Fe
dera
l.G
WP
NB
E9M
L-26
-9-2
3]N
BE
9ML-
26-9
-23
|NES
E26
090S
230E
|430
4736
619
1532
2Fe
dera
l|G
W|P
NB
E10
D-2
6-9-
23IN
BE
10D
-26-
9-23
|NW
SE26
090S
230E
I43
0473
6620
1597
5Fe
dera
liG
WID
RL
NB
E12
ML-
26-9
-23
NB
E12
ML-
26-9
-23
INW
SW26
090S
230E
4304
7366
2115
840
Fede
ral
IGW
DR
LN
BE
13M
L-26
-9-2
3|N
BE
13M
L-26
-9-2
3|S
WSW
2609
0S23
0E43
0473
6622
1569
0Fe
dera
lG
WP
NB
E14
ML-
26-9
-23
NB
E14
ML-
26-9
-23
|SES
W26
090S
230E
|43
0473
6623
1526
2Fe
dera
l|G
WP
NB
E16
ML-
26-9
-23
NB
E16
ML-
26-9
-23
SESE
I26
090S
230E
I43
0473
6624
1573
5Fe
dera
lIG
WP
RW
S13
ML-
14-9
-24
RW
S13
ML-
14-9
-24
SWSW
1409
0S.2
40E
I430
4736
737
Fede
ral
[GW
'APD
RW
S12
ML-
14-9
-24
RW
S12
ML-
14-9
-24
NW
SW14
090S
240E
4304
7367
38Fe
dera
lG
WA
PDSG
3MU
-23-
8-22
SG3M
U-2
3-8-
22SE
SW|
1408
0S' 22
0E|
4304
7369
4015
100
Fede
ral
|GW
PN
BE
5ML-
17-9
-23
NB
E5M
L-17
-9-2
3SW
NW
1709
0SI2
30E
I43
0473
6941
1510
1IF
eder
aliG
WiP
WW
T2M
L-25
-8-2
4W
WT
2ML-
25-8
-24
NW
NE
2508
0SI 2
40E
4304
7373
01IF
eder
alG
WIA
PDW
WT
1ML-
25-8
-24
WW
T1M
L-25
-8-2
4N
ENE
2508
0S24
0E43
0473
7302
Fede
ral
'GW
IAPD
HK
15M
L-19
-8-2
5H
K15
ML-
19-8
-25
SWSE
1908
0S25
0E43
0473
7303
|Fed
eral
GW
APD
WT
13M
L-19
-8-2
5W
T13
ML-
19-8
-25
ISW
SW19
080S
250E
4304
7373
04|
|Fed
eral
GW
|APD
HK
3ML-
29-8
-25
HK
3ML-
29-8
-25
NEN
W_
2908
0SI2
50E
4304
7373
05|
|Fed
eral
GW
iAPD
HK
5ML-
29-8
-25
HK
5ML-
29-8
-25
SWN
W29
080S
250E
4304
7373
30|
|Fed
eral
GW
IAPD
HK
2ML-
30-8
-25
HK
2ML-
30-8
-25
NW
NE
3008
0S25
0E43
0473
7331
Fede
ral
GW
APD
HK
5ML-
30-8
-25
HK
5ML-
30-8
-25
SWN
W30
080S
|250
E43
0473
7332
|Fed
eral
GW
IAPD
HK
10M
L-30
-8-2
5H
K10
ML-
30-8
-25
NW
SE30
080S
I250
E43
0473
7333
||F
eder
alG
WIA
PD
HK
14M
L-30
-8-2
5H
K14
ML-
30-8
-25
SESW
i30
080S
I 250
E43
0473
7334
|IF
eder
alG
WIA
PDH
K6M
L-30
-8-2
5H
K6M
L-30
-8-2
5SE
NW
-30
080S
250E
4304
7373
48IF
eder
alG
W|A
PDH
K8M
L-30
-8-2
5H
K8M
L-30
-8-2
5SE
NE
)30
080S
250E
4304
7373
49Fe
dera
lIG
W|A
PDW
WT
7ML-
25-8
-24
WW
T7M
L-25
-8-2
4IS
WN
E25
080S
|240
E43
0473
7407
|IF
eder
alG
W|A
PDW
WT
9ML-
25-8
-24
WW
T9M
L-25
-8-2
4N
ESE
I25
080S
I240
E43
0473
7408
|iF
eder
alIG
W|A
PDW
WT
10M
L-25
-8-2
4W
WT
10M
L-25
-8-2
4IN
WSE
I25
080S
|240
E.
4304
7374
09I
iFed
eral
IGW
7of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
We1
1Nam
e&
No;
Q/Q
SEC
TWP
RN
GA
PIEn
tity
Leas
eW
ell
Type
Stat
us
BSW
1ML-
12-9
-24
|BSW
1ML-
12-9
-24
|NEN
EI
12|0
90S
|240
E43
0473
6522
Fede
ral
|GW
APD
BSW
11M
L-13
-9-2
4B
SW11
ML-
13-9
-24
INES
WI
13|0
90S
i24
0E43
0473
6523
Fede
ral
|GW
APD
NB
E7M
L-26
-9-2
3N
BE
7ML-
26-9
-23
SWN
EI
26| 0
90S
230E
4304
7365
8716
008
iFed
eral
IGW
DR
LN
BE
8ML-
26-9
-23
NB
E8M
L-26
-9-2
3SE
NE
26I
090S
230E
4304
7365
8815
689
|Fed
eral
'GW
PN
BE
1ML-
26-9
-23
|NB
E1M
L-26
-9-2
3N
ENE
|26
090S
230E
|43
0473
6589
1588
0|F
eder
al|G
WD
RL
NB
E2M
L-26
-9-2
3IN
BE
2ML-
26-9
-23
NW
NE
2609
0S23
0E|4
3047
3659
015
898
|Fed
eral
|GW
NR
LN
BE
3ML-
26-9
-23
[NB
E3M
L-26
-9-2
3N
ENW
2609
0SI2
30E
I43
0473
6591
1590
6Fe
dera
lIG
WD
RL
NB
E5M
L-26
-9-2
3N
BE
5ML-
26-9
-23
ISW
NW
i26
090S
230E
4304
7365
9215
839
Fede
ral
IGW
DR
LN
BE
9ML-
10-9
-23
INB
E9M
L-10
-9-2
3IN
ESE
1009
0S23
0E|
4304
7365
9315
438
Fede
ral
|GW
|PN
BE
11M
L-10
-9-2
3[N
BE
11M
L-10
-9-2
3N
ESW
I10
090S
|230
EI
4304
7365
94|1
5228
Fede
ral
|GW
IPN
BE
15M
L-10
-9-2
3[N
BE
15M
L-10
-9-2
3SW
SE_
I10
090S
|230
EI
4304
7365
95|1
5439
Fede
ral
|GW
IPN
BE
1ML-
12-9
-23
NB
E1M
L-12
-9-2
3N
ENE
1209
0SI2
30E
4304
7366
13Fe
dera
lIG
WIA
PDN
BE
2ML-
17-9
-23
¡NB
E2M
L-17
-9-2
3|N
WN
E17
090S
|230
E43
0473
6614
1512
6Fe
dera
lIG
WP
NB
E4M
L-17
-9-2
3N
BE
4ML-
17-9
-23
|NW
NW
17|0
90S
|230
E|
4304
7366
1515
177
Fede
ral
¡GW
|PN
BE
6ML-
17-9
-23
NB
E6M
L-17
-9-2
3|S
ENW
17|0
90S
230E
I43
0473
6616
|15
127
IFed
eral
.GW
IPN
BE
10M
L-17
-9-2
3|N
BE
10M
L-17
-9-2
3|N
WSE
17| 0
90S
230E
|430
4736
617
1512
8IF
eder
alIG
WP
NB
E14
ML-
17-9
-23
|NB
E14
ML-
17-9
-23
SESW
1709
0S23
0E43
0473
6618
1508
8Fe
dera
l.G
WP
NB
E9M
L-26
-9-2
3]N
BE
9ML-
26-9
-23
|NES
E26
090S
230E
|430
4736
619
1532
2Fe
dera
l|G
W|P
NB
E10
D-2
6-9-
23IN
BE
10D
-26-
9-23
|NW
SE26
090S
230E
I43
0473
6620
1597
5Fe
dera
liG
WID
RL
NB
E12
ML-
26-9
-23
NB
E12
ML-
26-9
-23
INW
SW26
090S
230E
4304
7366
2115
840
Fede
ral
IGW
DR
LN
BE
13M
L-26
-9-2
3|N
BE
13M
L-26
-9-2
3|S
WSW
2609
0S23
0E43
0473
6622
1569
0Fe
dera
lG
WP
NB
E14
ML-
26-9
-23
NB
E14
ML-
26-9
-23
|SES
W26
090S
230E
|43
0473
6623
1526
2Fe
dera
l|G
WP
NB
E16
ML-
26-9
-23
NB
E16
ML-
26-9
-23
SESE
I26
090S
230E
I43
0473
6624
1573
5Fe
dera
lIG
WP
RW
S13
ML-
14-9
-24
RW
S13
ML-
14-9
-24
SWSW
1409
0S.2
40E
I430
4736
737
Fede
ral
[GW
'APD
RW
S12
ML-
14-9
-24
RW
S12
ML-
14-9
-24
NW
SW14
090S
240E
4304
7367
38Fe
dera
lG
WA
PDSG
3MU
-23-
8-22
SG3M
U-2
3-8-
22SE
SW|
1408
0S' 22
0E|
4304
7369
4015
100
Fede
ral
|GW
PN
BE
5ML-
17-9
-23
NB
E5M
L-17
-9-2
3SW
NW
1709
0SI2
30E
I43
0473
6941
1510
1IF
eder
aliG
WiP
WW
T2M
L-25
-8-2
4W
WT
2ML-
25-8
-24
NW
NE
2508
0SI 2
40E
4304
7373
01IF
eder
alG
WIA
PDW
WT
1ML-
25-8
-24
WW
T1M
L-25
-8-2
4N
ENE
2508
0S24
0E43
0473
7302
Fede
ral
'GW
IAPD
HK
15M
L-19
-8-2
5H
K15
ML-
19-8
-25
SWSE
1908
0S25
0E43
0473
7303
|Fed
eral
GW
APD
WT
13M
L-19
-8-2
5W
T13
ML-
19-8
-25
ISW
SW19
080S
250E
4304
7373
04|
|Fed
eral
GW
|APD
HK
3ML-
29-8
-25
HK
3ML-
29-8
-25
NEN
W_
2908
0SI2
50E
4304
7373
05|
|Fed
eral
GW
iAPD
HK
5ML-
29-8
-25
HK
5ML-
29-8
-25
SWN
W29
080S
250E
4304
7373
30|
|Fed
eral
GW
IAPD
HK
2ML-
30-8
-25
HK
2ML-
30-8
-25
NW
NE
3008
0S25
0E43
0473
7331
Fede
ral
GW
APD
HK
5ML-
30-8
-25
HK
5ML-
30-8
-25
SWN
W30
080S
|250
E43
0473
7332
|Fed
eral
GW
IAPD
HK
10M
L-30
-8-2
5H
K10
ML-
30-8
-25
NW
SE30
080S
I250
E43
0473
7333
||F
eder
alG
WIA
PD
HK
14M
L-30
-8-2
5H
K14
ML-
30-8
-25
SESW
i30
080S
I 250
E43
0473
7334
|IF
eder
alG
WIA
PDH
K6M
L-30
-8-2
5H
K6M
L-30
-8-2
5SE
NW
-30
080S
250E
4304
7373
48IF
eder
alG
W|A
PDH
K8M
L-30
-8-2
5H
K8M
L-30
-8-2
5SE
NE
)30
080S
250E
4304
7373
49Fe
dera
lIG
W|A
PDW
WT
7ML-
25-8
-24
WW
T7M
L-25
-8-2
4IS
WN
E25
080S
|240
E43
0473
7407
|IF
eder
alG
W|A
PDW
WT
9ML-
25-8
-24
WW
T9M
L-25
-8-2
4N
ESE
I25
080S
I240
E43
0473
7408
|iF
eder
alIG
W|A
PDW
WT
10M
L-25
-8-2
4W
WT
10M
L-25
-8-2
4IN
WSE
I25
080S
|240
E.
4304
7374
09I
iFed
eral
IGW
7of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
We1
1Nam
e&
No;
Q/Q
SEC
TWP
RN
GA
PIEn
tity
Leas
eW
ell
Type
Stat
us
BSW
1ML-
12-9
-24
|BSW
1ML-
12-9
-24
|NEN
EI
12|0
90S
|240
E43
0473
6522
Fede
ral
|GW
APD
BSW
11M
L-13
-9-2
4B
SW11
ML-
13-9
-24
INES
WI
13|0
90S
i24
0E43
0473
6523
Fede
ral
|GW
APD
NB
E7M
L-26
-9-2
3N
BE
7ML-
26-9
-23
SWN
EI
26| 0
90S
230E
4304
7365
8716
008
iFed
eral
IGW
DR
LN
BE
8ML-
26-9
-23
NB
E8M
L-26
-9-2
3SE
NE
26I
090S
230E
4304
7365
8815
689
|Fed
eral
'GW
PN
BE
1ML-
26-9
-23
|NB
E1M
L-26
-9-2
3N
ENE
|26
090S
230E
|43
0473
6589
1588
0|F
eder
al|G
WD
RL
NB
E2M
L-26
-9-2
3IN
BE
2ML-
26-9
-23
NW
NE
2609
0S23
0E|4
3047
3659
015
898
|Fed
eral
|GW
NR
LN
BE
3ML-
26-9
-23
[NB
E3M
L-26
-9-2
3N
ENW
2609
0SI2
30E
I43
0473
6591
1590
6Fe
dera
lIG
WD
RL
NB
E5M
L-26
-9-2
3N
BE
5ML-
26-9
-23
ISW
NW
i26
090S
230E
4304
7365
9215
839
Fede
ral
IGW
DR
LN
BE
9ML-
10-9
-23
INB
E9M
L-10
-9-2
3IN
ESE
1009
0S23
0E|
4304
7365
9315
438
Fede
ral
|GW
|PN
BE
11M
L-10
-9-2
3[N
BE
11M
L-10
-9-2
3N
ESW
I10
090S
|230
EI
4304
7365
94|1
5228
Fede
ral
|GW
IPN
BE
15M
L-10
-9-2
3[N
BE
15M
L-10
-9-2
3SW
SE_
I10
090S
|230
EI
4304
7365
95|1
5439
Fede
ral
|GW
IPN
BE
1ML-
12-9
-23
NB
E1M
L-12
-9-2
3N
ENE
1209
0SI2
30E
4304
7366
13Fe
dera
lIG
WIA
PDN
BE
2ML-
17-9
-23
¡NB
E2M
L-17
-9-2
3|N
WN
E17
090S
|230
E43
0473
6614
1512
6Fe
dera
lIG
WP
NB
E4M
L-17
-9-2
3N
BE
4ML-
17-9
-23
|NW
NW
17|0
90S
|230
E|
4304
7366
1515
177
Fede
ral
¡GW
|PN
BE
6ML-
17-9
-23
NB
E6M
L-17
-9-2
3|S
ENW
17|0
90S
230E
I43
0473
6616
|15
127
IFed
eral
.GW
IPN
BE
10M
L-17
-9-2
3|N
BE
10M
L-17
-9-2
3|N
WSE
17| 0
90S
230E
|430
4736
617
1512
8IF
eder
alIG
WP
NB
E14
ML-
17-9
-23
|NB
E14
ML-
17-9
-23
SESW
1709
0S23
0E43
0473
6618
1508
8Fe
dera
l.G
WP
NB
E9M
L-26
-9-2
3]N
BE
9ML-
26-9
-23
|NES
E26
090S
230E
|430
4736
619
1532
2Fe
dera
l|G
W|P
NB
E10
D-2
6-9-
23IN
BE
10D
-26-
9-23
|NW
SE26
090S
230E
I43
0473
6620
1597
5Fe
dera
liG
WID
RL
NB
E12
ML-
26-9
-23
NB
E12
ML-
26-9
-23
INW
SW26
090S
230E
4304
7366
2115
840
Fede
ral
IGW
DR
LN
BE
13M
L-26
-9-2
3|N
BE
13M
L-26
-9-2
3|S
WSW
2609
0S23
0E43
0473
6622
1569
0Fe
dera
lG
WP
NB
E14
ML-
26-9
-23
NB
E14
ML-
26-9
-23
|SES
W26
090S
230E
|43
0473
6623
1526
2Fe
dera
l|G
WP
NB
E16
ML-
26-9
-23
NB
E16
ML-
26-9
-23
SESE
I26
090S
230E
I43
0473
6624
1573
5Fe
dera
lIG
WP
RW
S13
ML-
14-9
-24
RW
S13
ML-
14-9
-24
SWSW
1409
0S.2
40E
I430
4736
737
Fede
ral
[GW
'APD
RW
S12
ML-
14-9
-24
RW
S12
ML-
14-9
-24
NW
SW14
090S
240E
4304
7367
38Fe
dera
lG
WA
PDSG
3MU
-23-
8-22
SG3M
U-2
3-8-
22SE
SW|
1408
0S' 22
0E|
4304
7369
4015
100
Fede
ral
|GW
PN
BE
5ML-
17-9
-23
NB
E5M
L-17
-9-2
3SW
NW
1709
0SI2
30E
I43
0473
6941
1510
1IF
eder
aliG
WiP
WW
T2M
L-25
-8-2
4W
WT
2ML-
25-8
-24
NW
NE
2508
0SI 2
40E
4304
7373
01IF
eder
alG
WIA
PDW
WT
1ML-
25-8
-24
WW
T1M
L-25
-8-2
4N
ENE
2508
0S24
0E43
0473
7302
Fede
ral
'GW
IAPD
HK
15M
L-19
-8-2
5H
K15
ML-
19-8
-25
SWSE
1908
0S25
0E43
0473
7303
|Fed
eral
GW
APD
WT
13M
L-19
-8-2
5W
T13
ML-
19-8
-25
ISW
SW19
080S
250E
4304
7373
04|
|Fed
eral
GW
|APD
HK
3ML-
29-8
-25
HK
3ML-
29-8
-25
NEN
W_
2908
0SI2
50E
4304
7373
05|
|Fed
eral
GW
iAPD
HK
5ML-
29-8
-25
HK
5ML-
29-8
-25
SWN
W29
080S
250E
4304
7373
30|
|Fed
eral
GW
IAPD
HK
2ML-
30-8
-25
HK
2ML-
30-8
-25
NW
NE
3008
0S25
0E43
0473
7331
Fede
ral
GW
APD
HK
5ML-
30-8
-25
HK
5ML-
30-8
-25
SWN
W30
080S
|250
E43
0473
7332
|Fed
eral
GW
IAPD
HK
10M
L-30
-8-2
5H
K10
ML-
30-8
-25
NW
SE30
080S
I250
E43
0473
7333
||F
eder
alG
WIA
PD
HK
14M
L-30
-8-2
5H
K14
ML-
30-8
-25
SESW
i30
080S
I 250
E43
0473
7334
|IF
eder
alG
WIA
PDH
K6M
L-30
-8-2
5H
K6M
L-30
-8-2
5SE
NW
-30
080S
250E
4304
7373
48IF
eder
alG
W|A
PDH
K8M
L-30
-8-2
5H
K8M
L-30
-8-2
5SE
NE
)30
080S
250E
4304
7373
49Fe
dera
lIG
W|A
PDW
WT
7ML-
25-8
-24
WW
T7M
L-25
-8-2
4IS
WN
E25
080S
|240
E43
0473
7407
|IF
eder
alG
W|A
PDW
WT
9ML-
25-8
-24
WW
T9M
L-25
-8-2
4N
ESE
I25
080S
I240
E43
0473
7408
|iF
eder
alIG
W|A
PDW
WT
10M
L-25
-8-2
4W
WT
10M
L-25
-8-2
4IN
WSE
I25
080S
|240
E.
4304
7374
09I
iFed
eral
IGW
8of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
¶eR
$am
eg;N
oQ
iQSE
CTW
PR
NG
API
Entit
yIL
ease
Wel
lTy
peSt
atus
WW
T15
ML-
25-8
-24
WW
T15
ML-
25-8
-24
SWSE
2508
0S24
0E43
0473
7410
Fede
ral
GW
APD
BB
S15
G-2
2-7-
21B
BS
15G
-22-
7-21
SWSE
2207
0S21
0E43
0473
7443
1568
8iF
eder
alO
W|P
WW
T15
ML-
13-8
-24
WW
T15
ML-
13-8
-24
SWSE
1308
0S24
0E43
0473
7524
Fede
ral
GW
iAPD
WW
T16
ML-
13-8
-24
WW
T16
ML-
13-8
-24
SESE
1308
0S24
0EI
4304
7375
25i
IFed
eral
GW
IAPD
CO
Y6M
L-23
-8-2
4C
OY
6ML-
23-8
-24
SEN
W23
080S
240E
4304
7375
26Fe
dera
lG
WA
PDN
BZ
8ML-
23-8
-24
NB
Z8M
L-23
-8-2
4SE
NE
2308
0S24
0E.
4304
7375
27Fe
dera
lG
WA
PDC
OY
9ML-
23-8
-24
CO
Y9M
L-23
-8-2
4N
ESE
2308
0S24
0Ei
4304
7375
28Fe
dera
lG
WA
PDN
BZ
15M
L-23
-8-2
4N
BZ
15M
L-23
-8-2
4SW
SE23
080S
240E
i43
0473
7529
Fede
ral
GW
APD
CO
Y16
ML-
23-8
-24
CO
Y16
ML-
23-8
-24
SESE
2308
0S24
0E43
0473
7530
Fede
ral
GW
APD
CO
Y5M
L-24
-8-2
4C
OY
5ML-
24-8
-24
SWN
W24
080S
240E
4304
7375
31Fe
dera
lG
WA
PDC
OY
6ML-
24-8
-24
CO
Y6M
L-24
-8-2
4SE
NW
2408
0S24
0E43
0473
7532
_
Fede
ral
GW
APD
CO
Y6M
L-21
-8-2
4.C
OY
6ML-
21-8
-24
SEN
W21
080S
240E
4304
7375
84Fe
dera
lG
WA
PDC
OY
4ML-
21-8
-24
CO
Y4M
L-21
-8-2
4N
WN
W21
080S
240E
4304
7375
85Fe
dera
lG
WA
PDC
OY
14M
L-21
-8-2
4C
OY
14M
L-21
-8-2
4SE
SW21
080S
240E
4304
7375
86Fe
dera
lG
WA
PDC
OY
15M
L-21
-8-2
4C
OY
15M
L-21
-8-2
4SW
SE21
080S
240E
4304
7375
87Fe
dera
lG
WN
EWW
WT
1ML-
24-8
-24
WW
T1M
L-24
-8-2
4N
ENE
2408
0S24
0E43
0473
7590
Fede
ral
GW
APD
RW
S13
ML-
23-9
-24
RW
S13
ML-
23-9
-24
SWSW
2309
0S24
0E43
0473
7591
Fede
ral
GW
APD
WW
T8M
L-24
-8-2
4W
WT
8ML-
24-8
-24
SEN
E24
080S
240E
4304
7376
40Fe
dera
lG
WA
PDG
B16
ML-
20-8
-22
GB
16M
L-20
-8-2
2SE
SE20
080S
220E
|430
4737
664
1594
8Fe
dera
lG
WD
RL
NB
Z1M
L-29
-8-2
4N
BZ
1ML-
29-8
-24
NEN
E29
080S
240E
i43
0473
7666
_Fe
dera
lG
WA
PDW
WT
16M
L-24
-8-2
4W
WT
16M
L-24
-8-2
4SE
SE24
080S
240E
4304
7379
30Fe
dera
lG
WA
PDW
WT
15M
L-24
-8-2
4W
WT
15M
L-24
-8-2
4|S
WSE
2408
0S24
0E|
4304
7379
31Fe
dera
lG
WA
PDC
OY
14M
L-24
-8-2
4C
OY
14M
L-24
-8-2
4SE
SW24
080S
240E
4304
7379
32Fe
dera
lG
WA
PDC
OY
13M
L-24
-8-2
4C
OY
13M
L-24
-8-2
4SW
SW24
080S
240E
43_0
4737
933
Fede
ral
GW
APD
CO
Y11
ML-
24-8
-24
CO
Y11
ML-
24-8
-24
NES
W24
080S
240E
4304
7379
34Fe
dera
lG
WA
PDC
OY
15M
L-14
-8-2
4C
OY
15M
L-14
-8-2
4SW
SE14
080S
240E
4304
7379
35Fe
dera
lG
WA
PDC
OY
14M
L-14
-8-2
4C
OY
14M
L-14
-8-2
4SE
SW14
080S
240E
4304
7379
36Fe
dera
lG
WA
PDC
OY
12M
L-14
-8-2
4C
OY
12M
L-14
-8-2
4N
WSW
1408
0S24
0E43
0473
7937
Fede
ral
GW
APD
CO
Y11
ML-
14-8
-24
CO
YllM
L-14
-8-2
4N
ESW
1408
0S24
0E43
0473
7938
iFe
dera
lG
WA
PDW
VX
8ML-
5-8-
22W
VX
8ML-
5-8-
22SE
NE
0508
0S22
0E43
0473
8140
,IF
eder
alG
WA
PDW
VX
6ML-
5-8-
22W
VX
6ML-
5-8-
22SE
NW
0508
0S22
0E43
0473
8141
|Fe
dera
lG
WA
PDB
BS
5G-2
3-7-
21B
BS
5G-2
3-7-
21SW
NW
2307
0S21
0E43
0473
8471
|Fe
dera
lO
WA
PDG
B12
SG-2
9-8-
22|G
B12
SG-2
9-8-
22N
WSW
2908
0SI 2
20E
4304
7387
66|
Fede
ral
GW
APD
GB
10SG
-30-
8-22
GB
10SG
-30-
8-22
NW
SE30
080S
220E
4304
7387
67Fe
dera
lG
WA
PDN
BE
12SW
D-1
0-9-
23|N
BE
12SW
D-1
0-9-
23N
WSW
1009
0S23
0E43
0473
8875
Fede
ral
WD
APD
OP
16M
U-3
-7-2
0O
P16
MU
-3-7
-20
SESE
0307
0S20
0E43
0473
89_4
4_|
Fede
ral
OW
APD
WF
1P-1
-15-
19W
F1P
-1-1
5-19
NW
NW
0615
0S20
0EI
4304
7367
81|1
4862
.Indi
anIG
W
8of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
¶eR
$am
eg;N
oQ
iQSE
CTW
PR
NG
API
Entit
yIL
ease
Wel
lTy
peSt
atus
WW
T15
ML-
25-8
-24
WW
T15
ML-
25-8
-24
SWSE
2508
0S24
0E43
0473
7410
Fede
ral
GW
APD
BB
S15
G-2
2-7-
21B
BS
15G
-22-
7-21
SWSE
2207
0S21
0E43
0473
7443
1568
8iF
eder
alO
W|P
WW
T15
ML-
13-8
-24
WW
T15
ML-
13-8
-24
SWSE
1308
0S24
0E43
0473
7524
Fede
ral
GW
iAPD
WW
T16
ML-
13-8
-24
WW
T16
ML-
13-8
-24
SESE
1308
0S24
0EI
4304
7375
25i
IFed
eral
GW
IAPD
CO
Y6M
L-23
-8-2
4C
OY
6ML-
23-8
-24
SEN
W23
080S
240E
4304
7375
26Fe
dera
lG
WA
PDN
BZ
8ML-
23-8
-24
NB
Z8M
L-23
-8-2
4SE
NE
2308
0S24
0E.
4304
7375
27Fe
dera
lG
WA
PDC
OY
9ML-
23-8
-24
CO
Y9M
L-23
-8-2
4N
ESE
2308
0S24
0Ei
4304
7375
28Fe
dera
lG
WA
PDN
BZ
15M
L-23
-8-2
4N
BZ
15M
L-23
-8-2
4SW
SE23
080S
240E
i43
0473
7529
Fede
ral
GW
APD
CO
Y16
ML-
23-8
-24
CO
Y16
ML-
23-8
-24
SESE
2308
0S24
0E43
0473
7530
Fede
ral
GW
APD
CO
Y5M
L-24
-8-2
4C
OY
5ML-
24-8
-24
SWN
W24
080S
240E
4304
7375
31Fe
dera
lG
WA
PDC
OY
6ML-
24-8
-24
CO
Y6M
L-24
-8-2
4SE
NW
2408
0S24
0E43
0473
7532
_
Fede
ral
GW
APD
CO
Y6M
L-21
-8-2
4.C
OY
6ML-
21-8
-24
SEN
W21
080S
240E
4304
7375
84Fe
dera
lG
WA
PDC
OY
4ML-
21-8
-24
CO
Y4M
L-21
-8-2
4N
WN
W21
080S
240E
4304
7375
85Fe
dera
lG
WA
PDC
OY
14M
L-21
-8-2
4C
OY
14M
L-21
-8-2
4SE
SW21
080S
240E
4304
7375
86Fe
dera
lG
WA
PDC
OY
15M
L-21
-8-2
4C
OY
15M
L-21
-8-2
4SW
SE21
080S
240E
4304
7375
87Fe
dera
lG
WN
EWW
WT
1ML-
24-8
-24
WW
T1M
L-24
-8-2
4N
ENE
2408
0S24
0E43
0473
7590
Fede
ral
GW
APD
RW
S13
ML-
23-9
-24
RW
S13
ML-
23-9
-24
SWSW
2309
0S24
0E43
0473
7591
Fede
ral
GW
APD
WW
T8M
L-24
-8-2
4W
WT
8ML-
24-8
-24
SEN
E24
080S
240E
4304
7376
40Fe
dera
lG
WA
PDG
B16
ML-
20-8
-22
GB
16M
L-20
-8-2
2SE
SE20
080S
220E
|430
4737
664
1594
8Fe
dera
lG
WD
RL
NB
Z1M
L-29
-8-2
4N
BZ
1ML-
29-8
-24
NEN
E29
080S
240E
i43
0473
7666
_Fe
dera
lG
WA
PDW
WT
16M
L-24
-8-2
4W
WT
16M
L-24
-8-2
4SE
SE24
080S
240E
4304
7379
30Fe
dera
lG
WA
PDW
WT
15M
L-24
-8-2
4W
WT
15M
L-24
-8-2
4|S
WSE
2408
0S24
0E|
4304
7379
31Fe
dera
lG
WA
PDC
OY
14M
L-24
-8-2
4C
OY
14M
L-24
-8-2
4SE
SW24
080S
240E
4304
7379
32Fe
dera
lG
WA
PDC
OY
13M
L-24
-8-2
4C
OY
13M
L-24
-8-2
4SW
SW24
080S
240E
43_0
4737
933
Fede
ral
GW
APD
CO
Y11
ML-
24-8
-24
CO
Y11
ML-
24-8
-24
NES
W24
080S
240E
4304
7379
34Fe
dera
lG
WA
PDC
OY
15M
L-14
-8-2
4C
OY
15M
L-14
-8-2
4SW
SE14
080S
240E
4304
7379
35Fe
dera
lG
WA
PDC
OY
14M
L-14
-8-2
4C
OY
14M
L-14
-8-2
4SE
SW14
080S
240E
4304
7379
36Fe
dera
lG
WA
PDC
OY
12M
L-14
-8-2
4C
OY
12M
L-14
-8-2
4N
WSW
1408
0S24
0E43
0473
7937
Fede
ral
GW
APD
CO
Y11
ML-
14-8
-24
CO
YllM
L-14
-8-2
4N
ESW
1408
0S24
0E43
0473
7938
iFe
dera
lG
WA
PDW
VX
8ML-
5-8-
22W
VX
8ML-
5-8-
22SE
NE
0508
0S22
0E43
0473
8140
,IF
eder
alG
WA
PDW
VX
6ML-
5-8-
22W
VX
6ML-
5-8-
22SE
NW
0508
0S22
0E43
0473
8141
|Fe
dera
lG
WA
PDB
BS
5G-2
3-7-
21B
BS
5G-2
3-7-
21SW
NW
2307
0S21
0E43
0473
8471
|Fe
dera
lO
WA
PDG
B12
SG-2
9-8-
22|G
B12
SG-2
9-8-
22N
WSW
2908
0SI 2
20E
4304
7387
66|
Fede
ral
GW
APD
GB
10SG
-30-
8-22
GB
10SG
-30-
8-22
NW
SE30
080S
220E
4304
7387
67Fe
dera
lG
WA
PDN
BE
12SW
D-1
0-9-
23|N
BE
12SW
D-1
0-9-
23N
WSW
1009
0S23
0E43
0473
8875
Fede
ral
WD
APD
OP
16M
U-3
-7-2
0O
P16
MU
-3-7
-20
SESE
0307
0S20
0E43
0473
89_4
4_|
Fede
ral
OW
APD
WF
1P-1
-15-
19W
F1P
-1-1
5-19
NW
NW
0615
0S20
0EI
4304
7367
81|1
4862
.Indi
anIG
W
8of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
¶eR
$am
eg;N
oQ
iQSE
CTW
PR
NG
API
Entit
yIL
ease
Wel
lTy
peSt
atus
WW
T15
ML-
25-8
-24
WW
T15
ML-
25-8
-24
SWSE
2508
0S24
0E43
0473
7410
Fede
ral
GW
APD
BB
S15
G-2
2-7-
21B
BS
15G
-22-
7-21
SWSE
2207
0S21
0E43
0473
7443
1568
8iF
eder
alO
W|P
WW
T15
ML-
13-8
-24
WW
T15
ML-
13-8
-24
SWSE
1308
0S24
0E43
0473
7524
Fede
ral
GW
iAPD
WW
T16
ML-
13-8
-24
WW
T16
ML-
13-8
-24
SESE
1308
0S24
0EI
4304
7375
25i
IFed
eral
GW
IAPD
CO
Y6M
L-23
-8-2
4C
OY
6ML-
23-8
-24
SEN
W23
080S
240E
4304
7375
26Fe
dera
lG
WA
PDN
BZ
8ML-
23-8
-24
NB
Z8M
L-23
-8-2
4SE
NE
2308
0S24
0E.
4304
7375
27Fe
dera
lG
WA
PDC
OY
9ML-
23-8
-24
CO
Y9M
L-23
-8-2
4N
ESE
2308
0S24
0Ei
4304
7375
28Fe
dera
lG
WA
PDN
BZ
15M
L-23
-8-2
4N
BZ
15M
L-23
-8-2
4SW
SE23
080S
240E
i43
0473
7529
Fede
ral
GW
APD
CO
Y16
ML-
23-8
-24
CO
Y16
ML-
23-8
-24
SESE
2308
0S24
0E43
0473
7530
Fede
ral
GW
APD
CO
Y5M
L-24
-8-2
4C
OY
5ML-
24-8
-24
SWN
W24
080S
240E
4304
7375
31Fe
dera
lG
WA
PDC
OY
6ML-
24-8
-24
CO
Y6M
L-24
-8-2
4SE
NW
2408
0S24
0E43
0473
7532
_
Fede
ral
GW
APD
CO
Y6M
L-21
-8-2
4.C
OY
6ML-
21-8
-24
SEN
W21
080S
240E
4304
7375
84Fe
dera
lG
WA
PDC
OY
4ML-
21-8
-24
CO
Y4M
L-21
-8-2
4N
WN
W21
080S
240E
4304
7375
85Fe
dera
lG
WA
PDC
OY
14M
L-21
-8-2
4C
OY
14M
L-21
-8-2
4SE
SW21
080S
240E
4304
7375
86Fe
dera
lG
WA
PDC
OY
15M
L-21
-8-2
4C
OY
15M
L-21
-8-2
4SW
SE21
080S
240E
4304
7375
87Fe
dera
lG
WN
EWW
WT
1ML-
24-8
-24
WW
T1M
L-24
-8-2
4N
ENE
2408
0S24
0E43
0473
7590
Fede
ral
GW
APD
RW
S13
ML-
23-9
-24
RW
S13
ML-
23-9
-24
SWSW
2309
0S24
0E43
0473
7591
Fede
ral
GW
APD
WW
T8M
L-24
-8-2
4W
WT
8ML-
24-8
-24
SEN
E24
080S
240E
4304
7376
40Fe
dera
lG
WA
PDG
B16
ML-
20-8
-22
GB
16M
L-20
-8-2
2SE
SE20
080S
220E
|430
4737
664
1594
8Fe
dera
lG
WD
RL
NB
Z1M
L-29
-8-2
4N
BZ
1ML-
29-8
-24
NEN
E29
080S
240E
i43
0473
7666
_Fe
dera
lG
WA
PDW
WT
16M
L-24
-8-2
4W
WT
16M
L-24
-8-2
4SE
SE24
080S
240E
4304
7379
30Fe
dera
lG
WA
PDW
WT
15M
L-24
-8-2
4W
WT
15M
L-24
-8-2
4|S
WSE
2408
0S24
0E|
4304
7379
31Fe
dera
lG
WA
PDC
OY
14M
L-24
-8-2
4C
OY
14M
L-24
-8-2
4SE
SW24
080S
240E
4304
7379
32Fe
dera
lG
WA
PDC
OY
13M
L-24
-8-2
4C
OY
13M
L-24
-8-2
4SW
SW24
080S
240E
43_0
4737
933
Fede
ral
GW
APD
CO
Y11
ML-
24-8
-24
CO
Y11
ML-
24-8
-24
NES
W24
080S
240E
4304
7379
34Fe
dera
lG
WA
PDC
OY
15M
L-14
-8-2
4C
OY
15M
L-14
-8-2
4SW
SE14
080S
240E
4304
7379
35Fe
dera
lG
WA
PDC
OY
14M
L-14
-8-2
4C
OY
14M
L-14
-8-2
4SE
SW14
080S
240E
4304
7379
36Fe
dera
lG
WA
PDC
OY
12M
L-14
-8-2
4C
OY
12M
L-14
-8-2
4N
WSW
1408
0S24
0E43
0473
7937
Fede
ral
GW
APD
CO
Y11
ML-
14-8
-24
CO
YllM
L-14
-8-2
4N
ESW
1408
0S24
0E43
0473
7938
iFe
dera
lG
WA
PDW
VX
8ML-
5-8-
22W
VX
8ML-
5-8-
22SE
NE
0508
0S22
0E43
0473
8140
,IF
eder
alG
WA
PDW
VX
6ML-
5-8-
22W
VX
6ML-
5-8-
22SE
NW
0508
0S22
0E43
0473
8141
|Fe
dera
lG
WA
PDB
BS
5G-2
3-7-
21B
BS
5G-2
3-7-
21SW
NW
2307
0S21
0E43
0473
8471
|Fe
dera
lO
WA
PDG
B12
SG-2
9-8-
22|G
B12
SG-2
9-8-
22N
WSW
2908
0SI 2
20E
4304
7387
66|
Fede
ral
GW
APD
GB
10SG
-30-
8-22
GB
10SG
-30-
8-22
NW
SE30
080S
220E
4304
7387
67Fe
dera
lG
WA
PDN
BE
12SW
D-1
0-9-
23|N
BE
12SW
D-1
0-9-
23N
WSW
1009
0S23
0E43
0473
8875
Fede
ral
WD
APD
OP
16M
U-3
-7-2
0O
P16
MU
-3-7
-20
SESE
0307
0S20
0E43
0473
89_4
4_|
Fede
ral
OW
APD
WF
1P-1
-15-
19W
F1P
-1-1
5-19
NW
NW
0615
0S20
0EI
4304
7367
81|1
4862
.Indi
anIG
W
8of
8Q
EPU
inta
Bas
in(N
2460
)to
QU
ESTA
RE
and
P(N
5085
)4/
30/2
007
and
5/15
/200
7
Orig
inal
Wel
lN
ame
¶eR
$am
eg;N
oQ
iQSE
CTW
PR
NG
API
Entit
yIL
ease
Wel
lTy
peSt
atus
WW
T15
ML-
25-8
-24
WW
T15
ML-
25-8
-24
SWSE
2508
0S24
0E43
0473
7410
Fede
ral
GW
APD
BB
S15
G-2
2-7-
21B
BS
15G
-22-
7-21
SWSE
2207
0S21
0E43
0473
7443
1568
8iF
eder
alO
W|P
WW
T15
ML-
13-8
-24
WW
T15
ML-
13-8
-24
SWSE
1308
0S24
0E43
0473
7524
Fede
ral
GW
iAPD
WW
T16
ML-
13-8
-24
WW
T16
ML-
13-8
-24
SESE
1308
0S24
0EI
4304
7375
25i
IFed
eral
GW
IAPD
CO
Y6M
L-23
-8-2
4C
OY
6ML-
23-8
-24
SEN
W23
080S
240E
4304
7375
26Fe
dera
lG
WA
PDN
BZ
8ML-
23-8
-24
NB
Z8M
L-23
-8-2
4SE
NE
2308
0S24
0E.
4304
7375
27Fe
dera
lG
WA
PDC
OY
9ML-
23-8
-24
CO
Y9M
L-23
-8-2
4N
ESE
2308
0S24
0Ei
4304
7375
28Fe
dera
lG
WA
PDN
BZ
15M
L-23
-8-2
4N
BZ
15M
L-23
-8-2
4SW
SE23
080S
240E
i43
0473
7529
Fede
ral
GW
APD
CO
Y16
ML-
23-8
-24
CO
Y16
ML-
23-8
-24
SESE
2308
0S24
0E43
0473
7530
Fede
ral
GW
APD
CO
Y5M
L-24
-8-2
4C
OY
5ML-
24-8
-24
SWN
W24
080S
240E
4304
7375
31Fe
dera
lG
WA
PDC
OY
6ML-
24-8
-24
CO
Y6M
L-24
-8-2
4SE
NW
2408
0S24
0E43
0473
7532
_
Fede
ral
GW
APD
CO
Y6M
L-21
-8-2
4.C
OY
6ML-
21-8
-24
SEN
W21
080S
240E
4304
7375
84Fe
dera
lG
WA
PDC
OY
4ML-
21-8
-24
CO
Y4M
L-21
-8-2
4N
WN
W21
080S
240E
4304
7375
85Fe
dera
lG
WA
PDC
OY
14M
L-21
-8-2
4C
OY
14M
L-21
-8-2
4SE
SW21
080S
240E
4304
7375
86Fe
dera
lG
WA
PDC
OY
15M
L-21
-8-2
4C
OY
15M
L-21
-8-2
4SW
SE21
080S
240E
4304
7375
87Fe
dera
lG
WN
EWW
WT
1ML-
24-8
-24
WW
T1M
L-24
-8-2
4N
ENE
2408
0S24
0E43
0473
7590
Fede
ral
GW
APD
RW
S13
ML-
23-9
-24
RW
S13
ML-
23-9
-24
SWSW
2309
0S24
0E43
0473
7591
Fede
ral
GW
APD
WW
T8M
L-24
-8-2
4W
WT
8ML-
24-8
-24
SEN
E24
080S
240E
4304
7376
40Fe
dera
lG
WA
PDG
B16
ML-
20-8
-22
GB
16M
L-20
-8-2
2SE
SE20
080S
220E
|430
4737
664
1594
8Fe
dera
lG
WD
RL
NB
Z1M
L-29
-8-2
4N
BZ
1ML-
29-8
-24
NEN
E29
080S
240E
i43
0473
7666
_Fe
dera
lG
WA
PDW
WT
16M
L-24
-8-2
4W
WT
16M
L-24
-8-2
4SE
SE24
080S
240E
4304
7379
30Fe
dera
lG
WA
PDW
WT
15M
L-24
-8-2
4W
WT
15M
L-24
-8-2
4|S
WSE
2408
0S24
0E|
4304
7379
31Fe
dera
lG
WA
PDC
OY
14M
L-24
-8-2
4C
OY
14M
L-24
-8-2
4SE
SW24
080S
240E
4304
7379
32Fe
dera
lG
WA
PDC
OY
13M
L-24
-8-2
4C
OY
13M
L-24
-8-2
4SW
SW24
080S
240E
43_0
4737
933
Fede
ral
GW
APD
CO
Y11
ML-
24-8
-24
CO
Y11
ML-
24-8
-24
NES
W24
080S
240E
4304
7379
34Fe
dera
lG
WA
PDC
OY
15M
L-14
-8-2
4C
OY
15M
L-14
-8-2
4SW
SE14
080S
240E
4304
7379
35Fe
dera
lG
WA
PDC
OY
14M
L-14
-8-2
4C
OY
14M
L-14
-8-2
4SE
SW14
080S
240E
4304
7379
36Fe
dera
lG
WA
PDC
OY
12M
L-14
-8-2
4C
OY
12M
L-14
-8-2
4N
WSW
1408
0S24
0E43
0473
7937
Fede
ral
GW
APD
CO
Y11
ML-
14-8
-24
CO
YllM
L-14
-8-2
4N
ESW
1408
0S24
0E43
0473
7938
iFe
dera
lG
WA
PDW
VX
8ML-
5-8-
22W
VX
8ML-
5-8-
22SE
NE
0508
0S22
0E43
0473
8140
,IF
eder
alG
WA
PDW
VX
6ML-
5-8-
22W
VX
6ML-
5-8-
22SE
NW
0508
0S22
0E43
0473
8141
|Fe
dera
lG
WA
PDB
BS
5G-2
3-7-
21B
BS
5G-2
3-7-
21SW
NW
2307
0S21
0E43
0473
8471
|Fe
dera
lO
WA
PDG
B12
SG-2
9-8-
22|G
B12
SG-2
9-8-
22N
WSW
2908
0SI 2
20E
4304
7387
66|
Fede
ral
GW
APD
GB
10SG
-30-
8-22
GB
10SG
-30-
8-22
NW
SE30
080S
220E
4304
7387
67Fe
dera
lG
WA
PDN
BE
12SW
D-1
0-9-
23|N
BE
12SW
D-1
0-9-
23N
WSW
1009
0S23
0E43
0473
8875
Fede
ral
WD
APD
OP
16M
U-3
-7-2
0O
P16
MU
-3-7
-20
SESE
0307
0S20
0E43
0473
89_4
4_|
Fede
ral
OW
APD
WF
1P-1
-15-
19W
F1P
-1-1
5-19
NW
NW
0615
0S20
0EI
4304
7367
81|1
4862
.Indi
anIG
W
STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES
DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERLALNUMBER:
see attached6. 1FINDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:
Do not use thisform for proposals todrill new wells,significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or todrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for auch proposale See attached
i TYPE OF WEL.L B. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHER see attached2. NAMEOF OPERATOR 9. API NUMBER.
QUESTAR EXPLORATIONAND PRODUCTION COMPANY attached3. ADDRESS OF OPERATOR: PHONE NUMBER 10 FIELDAND POOL, OR Wit.DCAT1050 17th Street Suite 500 Denver ,, CO as 80265 (303) 308-3068
4. LOCATIONOF WELL
FOOTAGESATSURFACE: attached COUNTY: Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO REPAIR WELL
Approximate date workwillstart CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
1/1/2007 CHANGE TO PREV10US PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGE TUBING PLUG AND ABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of workcompletion:
O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION Change
12 DESCRIBE PROPOSED ORCOMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Effective January 1, 2007 operator of record, QEP Uinta Basin, Inc., willhereafter be known as QUESTAR EXPLORATIONAND PRODUCTION COMPANY. This name change involves only an internal corporate name change and no thirdpartychange of operator is involved. The same employees willcontinue to be responsible for operations of the properties describedon the attached list. Alloperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965003033Fee Land Bond Number: 965003033Current operator of record, QEP UINTABASIN, INC ereby résigns as operator of the properties as described on theattached list.
Ja ,N , Executive Vice President, QEP Uinta Basin, Inc.Successor operator of record, QUESTAR EXPLORATIO ÁND P UCTION COMPANY, hereby assumes all rights, dutiesand obligations as operator of the properties as descr ed on the ttached list
Ja Neese, Execktive Vice PresidentQ star Exploration and Production Company
NAME(PLEASEPRINT) D 'rÃK.,Stanberry TITLE Supervisor, Regulatory Affairs
SIGNATURE ..r DATE 3/16/2007
(This space for Stato use only)
APRI S 2007(5/2000) (See Instructions on Reverse
STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES
DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERLALNUMBER:
see attached6. 1FINDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:
Do not use thisform for proposals todrill new wells,significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or todrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for auch proposale See attached
i TYPE OF WEL.L B. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHER see attached2. NAMEOF OPERATOR 9. API NUMBER.
QUESTAR EXPLORATIONAND PRODUCTION COMPANY attached3. ADDRESS OF OPERATOR: PHONE NUMBER 10 FIELDAND POOL, OR Wit.DCAT1050 17th Street Suite 500 Denver ,, CO as 80265 (303) 308-3068
4. LOCATIONOF WELL
FOOTAGESATSURFACE: attached COUNTY: Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO REPAIR WELL
Approximate date workwillstart CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
1/1/2007 CHANGE TO PREV10US PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGE TUBING PLUG AND ABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of workcompletion:
O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION Change
12 DESCRIBE PROPOSED ORCOMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Effective January 1, 2007 operator of record, QEP Uinta Basin, Inc., willhereafter be known as QUESTAR EXPLORATIONAND PRODUCTION COMPANY. This name change involves only an internal corporate name change and no thirdpartychange of operator is involved. The same employees willcontinue to be responsible for operations of the properties describedon the attached list. Alloperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965003033Fee Land Bond Number: 965003033Current operator of record, QEP UINTABASIN, INC ereby résigns as operator of the properties as described on theattached list.
Ja ,N , Executive Vice President, QEP Uinta Basin, Inc.Successor operator of record, QUESTAR EXPLORATIO ÁND P UCTION COMPANY, hereby assumes all rights, dutiesand obligations as operator of the properties as descr ed on the ttached list
Ja Neese, Execktive Vice PresidentQ star Exploration and Production Company
NAME(PLEASEPRINT) D 'rÃK.,Stanberry TITLE Supervisor, Regulatory Affairs
SIGNATURE ..r DATE 3/16/2007
(This space for Stato use only)
APRI S 2007(5/2000) (See Instructions on Reverse
STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES
DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERLALNUMBER:
see attached6. 1FINDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:
Do not use thisform for proposals todrill new wells,significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or todrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for auch proposale See attached
i TYPE OF WEL.L B. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHER see attached2. NAMEOF OPERATOR 9. API NUMBER.
QUESTAR EXPLORATIONAND PRODUCTION COMPANY attached3. ADDRESS OF OPERATOR: PHONE NUMBER 10 FIELDAND POOL, OR Wit.DCAT1050 17th Street Suite 500 Denver ,, CO as 80265 (303) 308-3068
4. LOCATIONOF WELL
FOOTAGESATSURFACE: attached COUNTY: Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO REPAIR WELL
Approximate date workwillstart CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
1/1/2007 CHANGE TO PREV10US PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGE TUBING PLUG AND ABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of workcompletion:
O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION Change
12 DESCRIBE PROPOSED ORCOMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Effective January 1, 2007 operator of record, QEP Uinta Basin, Inc., willhereafter be known as QUESTAR EXPLORATIONAND PRODUCTION COMPANY. This name change involves only an internal corporate name change and no thirdpartychange of operator is involved. The same employees willcontinue to be responsible for operations of the properties describedon the attached list. Alloperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965003033Fee Land Bond Number: 965003033Current operator of record, QEP UINTABASIN, INC ereby résigns as operator of the properties as described on theattached list.
Ja ,N , Executive Vice President, QEP Uinta Basin, Inc.Successor operator of record, QUESTAR EXPLORATIO ÁND P UCTION COMPANY, hereby assumes all rights, dutiesand obligations as operator of the properties as descr ed on the ttached list
Ja Neese, Execktive Vice PresidentQ star Exploration and Production Company
NAME(PLEASEPRINT) D 'rÃK.,Stanberry TITLE Supervisor, Regulatory Affairs
SIGNATURE ..r DATE 3/16/2007
(This space for Stato use only)
APRI S 2007(5/2000) (See Instructions on Reverse
STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES
DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERLALNUMBER:
see attached6. 1FINDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:
Do not use thisform for proposals todrill new wells,significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or todrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for auch proposale See attached
i TYPE OF WEL.L B. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHER see attached2. NAMEOF OPERATOR 9. API NUMBER.
QUESTAR EXPLORATIONAND PRODUCTION COMPANY attached3. ADDRESS OF OPERATOR: PHONE NUMBER 10 FIELDAND POOL, OR Wit.DCAT1050 17th Street Suite 500 Denver ,, CO as 80265 (303) 308-3068
4. LOCATIONOF WELL
FOOTAGESATSURFACE: attached COUNTY: Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO REPAIR WELL
Approximate date workwillstart CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
1/1/2007 CHANGE TO PREV10US PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGE TUBING PLUG AND ABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of workcompletion:
O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION Change
12 DESCRIBE PROPOSED ORCOMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Effective January 1, 2007 operator of record, QEP Uinta Basin, Inc., willhereafter be known as QUESTAR EXPLORATIONAND PRODUCTION COMPANY. This name change involves only an internal corporate name change and no thirdpartychange of operator is involved. The same employees willcontinue to be responsible for operations of the properties describedon the attached list. Alloperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965003033Fee Land Bond Number: 965003033Current operator of record, QEP UINTABASIN, INC ereby résigns as operator of the properties as described on theattached list.
Ja ,N , Executive Vice President, QEP Uinta Basin, Inc.Successor operator of record, QUESTAR EXPLORATIO ÁND P UCTION COMPANY, hereby assumes all rights, dutiesand obligations as operator of the properties as descr ed on the ttached list
Ja Neese, Execktive Vice PresidentQ star Exploration and Production Company
NAME(PLEASEPRINT) D 'rÃK.,Stanberry TITLE Supervisor, Regulatory Affairs
SIGNATURE ..r DATE 3/16/2007
(This space for Stato use only)
APRI S 2007(5/2000) (See Instructions on Reverse
STATEOFUTAH FORMSDEPARTMENT OF NATURALRESOURCES
DIVISION OF OIL, GAS AND MINING 5. LEASEDEStGNATIONANDSERIALNUMBER.see attached
6. (F INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenterplugged wells,or to See attacheddrill horizontal laterals Use APPLICATION FOR PERMIT TO DRlLLform for such proposals.
1 TYPE OF WELL 8. WELL NAMEand NUMBEROIL WELL GAS WELL OTHER see attached2.NAMEOFOPERATOR 9 APINUMBEAQUESTAR EXPLORATION AND PRODUCTION COMPANY attached
3 ADDRESS OF OPERATOR PHONE NUMEER: 10. FFELDANDPOOL, OR WILDCAT1050 17th Street Suite 500 Denver y,p CO ,_80265 (303) 308-3068
4 LOCATIONOF WELL
FOOTAGESATSURFACE attached COUNTY. Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERlDIAN: STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL
Approximate date work will start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
1/1/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGE TUBING PLUG ANDABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATERSHUT-OFFDate of work completion:
COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Well Name ChangesCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
PER THE ATTACHED LIST OF WELLS, QUESTAR EXPLORATIONAND PRODUCTION COMPANYREQUESTS THAT THEINDIVIDUAL WELL NAMES BE UPDATED INYOUR RECORDS.
NAME (PLEASE PRINT). , TITLE Supervisor, Regulatory Affairs
(This spaco for State use only)
RECEIVED(5/2000) (See Instructions on Reverse Side)
UNOFOIL,GAS&
STATEOFUTAH FORMSDEPARTMENT OF NATURALRESOURCES
DIVISION OF OIL, GAS AND MINING 5. LEASEDEStGNATIONANDSERIALNUMBER.see attached
6. (F INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenterplugged wells,or to See attacheddrill horizontal laterals Use APPLICATION FOR PERMIT TO DRlLLform for such proposals.
1 TYPE OF WELL 8. WELL NAMEand NUMBEROIL WELL GAS WELL OTHER see attached2.NAMEOFOPERATOR 9 APINUMBEAQUESTAR EXPLORATION AND PRODUCTION COMPANY attached
3 ADDRESS OF OPERATOR PHONE NUMEER: 10. FFELDANDPOOL, OR WILDCAT1050 17th Street Suite 500 Denver y,p CO ,_80265 (303) 308-3068
4 LOCATIONOF WELL
FOOTAGESATSURFACE attached COUNTY. Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERlDIAN: STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL
Approximate date work will start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
1/1/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGE TUBING PLUG ANDABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATERSHUT-OFFDate of work completion:
COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Well Name ChangesCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
PER THE ATTACHED LIST OF WELLS, QUESTAR EXPLORATIONAND PRODUCTION COMPANYREQUESTS THAT THEINDIVIDUAL WELL NAMES BE UPDATED INYOUR RECORDS.
NAME (PLEASE PRINT). , TITLE Supervisor, Regulatory Affairs
(This spaco for State use only)
RECEIVED(5/2000) (See Instructions on Reverse Side)
UNOFOIL,GAS&
STATEOFUTAH FORMSDEPARTMENT OF NATURALRESOURCES
DIVISION OF OIL, GAS AND MINING 5. LEASEDEStGNATIONANDSERIALNUMBER.see attached
6. (F INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenterplugged wells,or to See attacheddrill horizontal laterals Use APPLICATION FOR PERMIT TO DRlLLform for such proposals.
1 TYPE OF WELL 8. WELL NAMEand NUMBEROIL WELL GAS WELL OTHER see attached2.NAMEOFOPERATOR 9 APINUMBEAQUESTAR EXPLORATION AND PRODUCTION COMPANY attached
3 ADDRESS OF OPERATOR PHONE NUMEER: 10. FFELDANDPOOL, OR WILDCAT1050 17th Street Suite 500 Denver y,p CO ,_80265 (303) 308-3068
4 LOCATIONOF WELL
FOOTAGESATSURFACE attached COUNTY. Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERlDIAN: STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL
Approximate date work will start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
1/1/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGE TUBING PLUG ANDABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATERSHUT-OFFDate of work completion:
COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Well Name ChangesCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
PER THE ATTACHED LIST OF WELLS, QUESTAR EXPLORATIONAND PRODUCTION COMPANYREQUESTS THAT THEINDIVIDUAL WELL NAMES BE UPDATED INYOUR RECORDS.
NAME (PLEASE PRINT). , TITLE Supervisor, Regulatory Affairs
(This spaco for State use only)
RECEIVED(5/2000) (See Instructions on Reverse Side)
UNOFOIL,GAS&
STATEOFUTAH FORMSDEPARTMENT OF NATURALRESOURCES
DIVISION OF OIL, GAS AND MINING 5. LEASEDEStGNATIONANDSERIALNUMBER.see attached
6. (F INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenterplugged wells,or to See attacheddrill horizontal laterals Use APPLICATION FOR PERMIT TO DRlLLform for such proposals.
1 TYPE OF WELL 8. WELL NAMEand NUMBEROIL WELL GAS WELL OTHER see attached2.NAMEOFOPERATOR 9 APINUMBEAQUESTAR EXPLORATION AND PRODUCTION COMPANY attached
3 ADDRESS OF OPERATOR PHONE NUMEER: 10. FFELDANDPOOL, OR WILDCAT1050 17th Street Suite 500 Denver y,p CO ,_80265 (303) 308-3068
4 LOCATIONOF WELL
FOOTAGESATSURFACE attached COUNTY. Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERlDIAN: STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATE NATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL
Approximate date work will start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
1/1/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGE TUBING PLUG ANDABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
CHANGE WELL STATUS PRODUCTION (START/RESUME) WATERSHUT-OFFDate of work completion:
COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Well Name ChangesCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
PER THE ATTACHED LIST OF WELLS, QUESTAR EXPLORATIONAND PRODUCTION COMPANYREQUESTS THAT THEINDIVIDUAL WELL NAMES BE UPDATED INYOUR RECORDS.
NAME (PLEASE PRINT). , TITLE Supervisor, Regulatory Affairs
(This spaco for State use only)
RECEIVED(5/2000) (See Instructions on Reverse Side)
UNOFOIL,GAS&
\ United States Department of the Interior
BUREAU OF LAND MANAGEMENTUtah State OfficeP.O. Box45l55
Salt Lake City, UT 84145-0155http://www.blm.gov/ut/st/en.html
IN REPLY REFER TO:3100(UT-922)
January 23, 2008
Memorandum
To: Vernal Field Office
From: Chief, Branch of Fluid Minerals
Subject: Name Change Approval
Attached is a certified copy of the Certificate of Name Change issued by the Texas Secretary ofState and a decision letter recognizing the merger from the Eastern States state office. We haveupdated our records to reflect the name change in the attached list of leases.
The name change from QEP Uinta Basin, Inc. into Questar Exploration and Production Co.is effective May 1, 2007, which is a correction to the effective dated stated in the decision letter.For verification of effective date, please refer to the name change certificate from the State ofTexas.
/s/ Leslie Wilcken
Leslie WilckenLand Law ExaminerBranch of Fluid Minerals
cc: MMSState of Utah, DOGM,
bec: Dave MascarenasSusan BaumanConnie Seare
g 23
\ United States Department of the Interior
BUREAU OF LAND MANAGEMENTUtah State OfficeP.O. Box45l55
Salt Lake City, UT 84145-0155http://www.blm.gov/ut/st/en.html
IN REPLY REFER TO:3100(UT-922)
January 23, 2008
Memorandum
To: Vernal Field Office
From: Chief, Branch of Fluid Minerals
Subject: Name Change Approval
Attached is a certified copy of the Certificate of Name Change issued by the Texas Secretary ofState and a decision letter recognizing the merger from the Eastern States state office. We haveupdated our records to reflect the name change in the attached list of leases.
The name change from QEP Uinta Basin, Inc. into Questar Exploration and Production Co.is effective May 1, 2007, which is a correction to the effective dated stated in the decision letter.For verification of effective date, please refer to the name change certificate from the State ofTexas.
/s/ Leslie Wilcken
Leslie WilckenLand Law ExaminerBranch of Fluid Minerals
cc: MMSState of Utah, DOGM,
bec: Dave MascarenasSusan BaumanConnie Seare
g 23
\ United States Department of the Interior
BUREAU OF LAND MANAGEMENTUtah State OfficeP.O. Box45l55
Salt Lake City, UT 84145-0155http://www.blm.gov/ut/st/en.html
IN REPLY REFER TO:3100(UT-922)
January 23, 2008
Memorandum
To: Vernal Field Office
From: Chief, Branch of Fluid Minerals
Subject: Name Change Approval
Attached is a certified copy of the Certificate of Name Change issued by the Texas Secretary ofState and a decision letter recognizing the merger from the Eastern States state office. We haveupdated our records to reflect the name change in the attached list of leases.
The name change from QEP Uinta Basin, Inc. into Questar Exploration and Production Co.is effective May 1, 2007, which is a correction to the effective dated stated in the decision letter.For verification of effective date, please refer to the name change certificate from the State ofTexas.
/s/ Leslie Wilcken
Leslie WilckenLand Law ExaminerBranch of Fluid Minerals
cc: MMSState of Utah, DOGM,
bec: Dave MascarenasSusan BaumanConnie Seare
g 23
\ United States Department of the Interior
BUREAU OF LAND MANAGEMENTUtah State OfficeP.O. Box45l55
Salt Lake City, UT 84145-0155http://www.blm.gov/ut/st/en.html
IN REPLY REFER TO:3100(UT-922)
January 23, 2008
Memorandum
To: Vernal Field Office
From: Chief, Branch of Fluid Minerals
Subject: Name Change Approval
Attached is a certified copy of the Certificate of Name Change issued by the Texas Secretary ofState and a decision letter recognizing the merger from the Eastern States state office. We haveupdated our records to reflect the name change in the attached list of leases.
The name change from QEP Uinta Basin, Inc. into Questar Exploration and Production Co.is effective May 1, 2007, which is a correction to the effective dated stated in the decision letter.For verification of effective date, please refer to the name change certificate from the State ofTexas.
/s/ Leslie Wilcken
Leslie WilckenLand Law ExaminerBranch of Fluid Minerals
cc: MMSState of Utah, DOGM,
bec: Dave MascarenasSusan BaumanConnie Seare
g 23
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS AND MINING
APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUMBER
BBS 15G-22-7-21
2. TYPE OF WORK
DRILL NEW WELL REENTER P&A WELL DEEPEN WELL 3. FIELD OR WILDCAT
BRENNAN BOTTOM
4. TYPE OF WELLOil Well Coalbed Methane Well: NO
5. UNIT or COMMUNITIZATION AGREEMENT NAMEJOHNSON BOTTOM
6. NAME OF OPERATORQUESTAR EXPLORATION & PRODUCTION CO
7. OPERATOR PHONE435 781-4362
8. ADDRESS OF OPERATOR11002 East 17500 South, Vernal, UT, 84078
9. OPERATOR [email protected]
10. MINERAL LEASE NUMBER(FEDERAL, INDIAN, OR STATE)
UTU16551
11. MINERAL OWNERSHIP
FEDERAL INDIAN STATE FEE 12. SURFACE OWNERSHIP
FEDERAL INDIAN STATE FEE
13. NAME OF SURFACE OWNER (if box 12 = 'fee')
14. SURFACE OWNER PHONE (if box 12 = 'fee')
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee')
16. SURFACE OWNER E-MAIL (if box 12 = 'fee')
17. INDIAN ALLOTTEE OR TRIBE NAME(if box 12 = 'INDIAN')
18. INTEND TO COMMINGLE PRODUCTION FROMMULTIPLE FORMATIONS
YES (Submit Commingling Application) NO
19. SLANT
VERTICAL DIRECTIONAL HORIZONTAL
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S
Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S
At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S
21. COUNTYUINTAH
22. DISTANCE TO NEAREST LEASE LINE (Feet)669
23. NUMBER OF ACRES IN DRILLING UNIT2320
25. DISTANCE TO NEAREST WELL IN SAME POOL(Applied For Drilling or Completed)
0
26. PROPOSED DEPTHMD: 10580 TVD: 6374
27. ELEVATION - GROUND LEVEL
4907
28. BOND NUMBER
ESB000024
29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
A36125 - 49-2153
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY
DRILLED)
TOPOGRAPHICAL MAP
NAME Jan Nelson TITLE Permit Agent PHONE 435 781-4331
SIGNATURE DATE 09/08/2009 EMAIL [email protected]
API NUMBER ASSIGNED
43047374430000
Permit Manager
APPROVAL
FORM 3
AMENDED REPORT
API Well No: 43047374430000 Received: 9/8/2009
CONFIDENTIAL
API Well No: 43047374430000 Received: 9/8/2009
FORM 3STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING
APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUSM15ER22-7-21
2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL BRENNAN BOTTOM
4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO JOHNSON BOTTOM
6. NAME OF OPERATOR 7. OPERATOR PHONEQUESTAR EXPLORATION & PRODUCTION CO 435 781-4362
8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL11002 East 17500 South, Vernal, UT, 84078 [email protected]
10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, ORUSTA )1 FEDERAL ) INDIAN ( ) STATE I FEE FEDERAL INDIAN STATE I FEE I
13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')
17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT
(if box 12 = 'INDIAN')MULTIPLE FORMATIONS
YES I (Submit Commingling Application) NO I ) VERTICALI DIRECTIONALI HORIZONTAL
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S
Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S
At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S
21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITUINTAH 669 2320
25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 10580 TVD: 63740
27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
4907 ESBOOOO24 A36125 -49-2153
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAPDRILLED)
NAME lan Nelson TITLE Permit Agent PHONE 435 781-4331
SIGNATURE DATE 09/08/2009 EMAIL [email protected]
API NUMBER ASSIGNED APPROVAL
43047374430000
Permit
API Well No: 43047374430000 Received 9/8/2009
I-ORM 3STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING
APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUSM15ER22-7-21
2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL BRENNAN BOTTOM
4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO JOHNSON BOTTOM
6. NAME OF OPERATOR 7. OPERATOR PHONEQUESTAR EXPLORATION & PRODUCTION CO 435 781-4362
8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL11002 East 17500 South, Vernal, UT, 84078 [email protected]
10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, ORUSTU
5 1 FEDERAL INDIAN I STATE FEE FEDERAL INDIAN STATE I FEE I
13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')
17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT
(if box 12 = 'INDIAN')MULTIPLE FORMATIONS
YES I (Submit Commingling Application) NO I ) VERTICALI DIRECTIONAL I HORIZONTAL
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S
Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S
At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S
21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITUINTAH 669 2320
25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 10580 TVD: 63740
27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
4907 ESBOOOO24 A36125 -49-2153
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP
DRILLED)
NAME Jan Nelson TITLE Permit Agent PHONE 435 781-4331
SIGNATURE DATE 09/08/2009 EMAIL [email protected]
API NUMBER ASSIGNED APPROVAL
43047374430000
Permit
API Well No: 43047374430000 Received 9/8/2009
I-ORM 3STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING
APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUSM15ER22-7-21
2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL BRENNAN BOTTOM
4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO JOHNSON BOTTOM
6. NAME OF OPERATOR 7. OPERATOR PHONEQUESTAR EXPLORATION & PRODUCTION CO 435 781-4362
8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL11002 East 17500 South, Vernal, UT, 84078 [email protected]
10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, ORUSTU
5 1 FEDERAL INDIAN I STATE FEE FEDERAL INDIAN STATE I FEE I
13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')
17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT
(if box 12 = 'INDIAN')MULTIPLE FORMATIONS
YES I (Submit Commingling Application) NO I ) VERTICALI DIRECTIONAL I HORIZONTAL
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S
Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S
At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S
21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITUINTAH 669 2320
25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 10580 TVD: 63740
27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
4907 ESBOOOO24 A36125 -49-2153
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP
DRILLED)
NAME Jan Nelson TITLE Permit Agent PHONE 435 781-4331
SIGNATURE DATE 09/08/2009 EMAIL [email protected]
API NUMBER ASSIGNED APPROVAL
43047374430000
Permit
API Well No: 43047374430000 Received 9/8/2009
I-ORM 3STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING
APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUSM15ER22-7-21
2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL BRENNAN BOTTOM
4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO JOHNSON BOTTOM
6. NAME OF OPERATOR 7. OPERATOR PHONEQUESTAR EXPLORATION & PRODUCTION CO 435 781-4362
8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL11002 East 17500 South, Vernal, UT, 84078 [email protected]
10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, ORUSTU
5 1 FEDERAL INDIAN I STATE FEE FEDERAL INDIAN STATE I FEE I
13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')
17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT
(if box 12 = 'INDIAN')MULTIPLE FORMATIONS
YES I (Submit Commingling Application) NO I ) VERTICALI DIRECTIONAL I HORIZONTAL
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S
Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S
At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S
21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITUINTAH 669 2320
25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 10580 TVD: 63740
27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
4907 ESBOOOO24 A36125 -49-2153
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP
DRILLED)
NAME Jan Nelson TITLE Permit Agent PHONE 435 781-4331
SIGNATURE DATE 09/08/2009 EMAIL [email protected]
API NUMBER ASSIGNED APPROVAL
43047374430000
Permit
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 9.625 0 495
Pipe Grade Length Weight
Grade J-55 LT&C 495 36.0
API Well No: 43047374430000 Received: 9/8/2009
CONFIDENTIAL
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 9.625 0 495
Pipe Grade Length Weight
Grade J-55 LT&C 495
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 9.625 0 495
Pipe Grade Length Weight
Grade J-55 LT&C 495
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 9.625 0 495
Pipe Grade Length Weight
Grade J-55 LT&C 495
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 9.625 0 495
Pipe Grade Length Weight
Grade J-55 LT&C 495
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6806
Pipe Grade Length Weight
Grade J-55 LT&C 6806 15.5
API Well No: 43047374430000 Received: 9/8/2009
CONFIDENTIAL
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6806
Pipe Grade Length Weight
Grade J-55 LT&C 6806
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6806
Pipe Grade Length Weight
Grade J-55 LT&C 6806
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6806
Pipe Grade Length Weight
Grade J-55 LT&C 6806
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6806
Pipe Grade Length Weight
Grade J-55 LT&C 6806
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
L1 4.75 3.5 0 10580
Pipe Grade Length Weight
Grade J-55 LT&C 4418 9.2
API Well No: 43047374430000 Received: 9/8/2009
CONFIDENTIAL
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Ll 4.75 3.5 0 10580
Pipe Grade Length Weight
Grade J-55 LT&C 4418
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Ll 4.75 3.5 0 10580
Pipe Grade Length Weight
Grade J-55 LT&C 4418
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Ll 4.75 3.5 0 10580
Pipe Grade Length Weight
Grade J-55 LT&C 4418
API Well No: 43047374430000 Received: 9/8/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Ll 4.75 3.5 0 10580
Pipe Grade Length Weight
Grade J-55 LT&C 4418
’API
Wel
lNo:
4304
7374
4300
00’
’API
Wel
lNo:
4304
7374
4300
00’
’API
Wel
lNo:
4304
7374
4300
00’
’API
Wel
lNo:
4304
7374
4300
00’
CONFIDEN
TIAL
QUESTAR EXPLR. & PROD.
T?'S R21E SL B.&M Well location, BBS #15G--22-7-21, located as' • • shown in the SW 1/4 SE 1/4 of Section 22,
T7S, R21E, S.L.B.dcM. Uintah County, Utah.
SS7°59'W- 2658.48' (G.L.O.) SBT59'W - 2651.22' (G.LO.) BASIS OF ELEVATION
BENCHMARK (43EAM) LOCATEDIN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKENFROM THE BRENNANBASIN,QUADRANGLE,UTAH,UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHED BY THE UNITEDSTATES
- DEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKEDAS BEING4832 FEET.
BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATlON.
Noz
of SimesNO7E·
9 THEPROPOSED SOUTHEASTLATERALBOTTOM-! HOLEFOR THISWELLIS LOCATEDIN TNE NE SC A LE
1/4 SE 1/4 OF SECTION27. T7S, R21E,S.LB.&M. AT A DISTANCEOF 2080' FSL 660°
CERT1FICATE00 FEL IT BEARS 516°43'27"E 4131.91 FROM THE WHilligPROPOSED WELL HEAD.THISIS TO CERTIFY THAT THEABOVE OMFIELDNOTESOF ACTUALSURVEYSMSUPERVISIONANDTHATTHESAME AND CORR EBESTOF MYKNOWLEDGEANDBEU , i 13
/ vUn'g5rode2 7und
= 4909'.
2022'L
REVISED:08-14-07 L.K.
Îs wTufe " '"""" UINTAH GINEERING a LAND VEYING
S68°15'W- 2694.12 L O.)
* S6875'46"W - 2696.12 (Mees.)¯
85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
bLEGEND: (AUTONOMOUSNAD 83) SCALE DATESURVEYED: DATE DRAWN:LATITUDE=
40°11'28.04" (40.191122) 1" = 1000 11-11-05 11-13-05=
90° SYMBOL LONGITUDE- 109°32'20.96° (109.539156) PARTY REFERENCES
= PROPOSED WELL HEAD (AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.LO. PLATLATITUDE=
40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109'32'18.47" (109.538464) COOL QUESTAR EXPLR. &
QUESTAR EXPLR. & PROD.
T?'S R21E SL B.&M Well location, BBS #15G--22-7-21, located as' • • shown in the SW 1/4 SE 1/4 of Section 22,
T7S, R21E, S.L.B.dcM. Uintah County, Utah.
SS7°59'W- 2658.48' (G.L.O.) SBT59'W - 2651.22' (G.LO.) BASIS OF ELEVATION
BENCHMARK (43EAM) LOCATEDIN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKENFROM THE BRENNANBASIN,QUADRANGLE,UTAH,UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHED BY THE UNITEDSTATES
- DEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKEDAS BEING4832 FEET.
BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATlON.
Noz
of SimesNO7E·
9 THEPROPOSED SOUTHEASTLATERALBOTTOM-! HOLEFOR THISWELLIS LOCATEDIN TNE NE SC A LE
1/4 SE 1/4 OF SECTION27. T7S, R21E,S.LB.&M. AT A DISTANCEOF 2080' FSL 660°
CERT1FICATE00 FEL IT BEARS 516°43'27"E 4131.91 FROM THE WHilligPROPOSED WELL HEAD.THISIS TO CERTIFY THAT THEABOVE OMFIELDNOTESOF ACTUALSURVEYSMSUPERVISIONANDTHATTHESAME AND CORR EBESTOF MYKNOWLEDGEANDBEU , i 13
/ vUn'g5rode2 7und
= 4909'.
2022'L
REVISED:08-14-07 L.K.
Îs wTufe " '"""" UINTAH GINEERING a LAND VEYING
S68°15'W- 2694.12 L O.)
* S6875'46"W - 2696.12 (Mees.)¯
85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
bLEGEND: (AUTONOMOUSNAD 83) SCALE DATESURVEYED: DATE DRAWN:LATITUDE=
40°11'28.04" (40.191122) 1" = 1000 11-11-05 11-13-05=
90° SYMBOL LONGITUDE- 109°32'20.96° (109.539156) PARTY REFERENCES
= PROPOSED WELL HEAD (AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.LO. PLATLATITUDE=
40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109'32'18.47" (109.538464) COOL QUESTAR EXPLR. &
QUESTAR EXPLR. & PROD.
T?'S R21E SL B.&M Well location, BBS #15G--22-7-21, located as' • • shown in the SW 1/4 SE 1/4 of Section 22,
T7S, R21E, S.L.B.dcM. Uintah County, Utah.
SS7°59'W- 2658.48' (G.L.O.) SBT59'W - 2651.22' (G.LO.) BASIS OF ELEVATION
BENCHMARK (43EAM) LOCATEDIN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKENFROM THE BRENNANBASIN,QUADRANGLE,UTAH,UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHED BY THE UNITEDSTATES
- DEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKEDAS BEING4832 FEET.
BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATlON.
Noz
of SimesNO7E·
9 THEPROPOSED SOUTHEASTLATERALBOTTOM-! HOLEFOR THISWELLIS LOCATEDIN TNE NE SC A LE
1/4 SE 1/4 OF SECTION27. T7S, R21E,S.LB.&M. AT A DISTANCEOF 2080' FSL 660°
CERT1FICATE00 FEL IT BEARS 516°43'27"E 4131.91 FROM THE WHilligPROPOSED WELL HEAD.THISIS TO CERTIFY THAT THEABOVE OMFIELDNOTESOF ACTUALSURVEYSMSUPERVISIONANDTHATTHESAME AND CORR EBESTOF MYKNOWLEDGEANDBEU , i 13
/ vUn'g5rode2 7und
= 4909'.
2022'L
REVISED:08-14-07 L.K.
Îs wTufe " '"""" UINTAH GINEERING a LAND VEYING
S68°15'W- 2694.12 L O.)
* S6875'46"W - 2696.12 (Mees.)¯
85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
bLEGEND: (AUTONOMOUSNAD 83) SCALE DATESURVEYED: DATE DRAWN:LATITUDE=
40°11'28.04" (40.191122) 1" = 1000 11-11-05 11-13-05=
90° SYMBOL LONGITUDE- 109°32'20.96° (109.539156) PARTY REFERENCES
= PROPOSED WELL HEAD (AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.LO. PLATLATITUDE=
40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109'32'18.47" (109.538464) COOL QUESTAR EXPLR. &
QUESTAR EXPLR. & PROD.
T?'S R21E SL B.&M Well location, BBS #15G--22-7-21, located as' • • shown in the SW 1/4 SE 1/4 of Section 22,
T7S, R21E, S.L.B.dcM. Uintah County, Utah.
SS7°59'W- 2658.48' (G.L.O.) SBT59'W - 2651.22' (G.LO.) BASIS OF ELEVATION
BENCHMARK (43EAM) LOCATEDIN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKENFROM THE BRENNANBASIN,QUADRANGLE,UTAH,UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHED BY THE UNITEDSTATES
- DEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKEDAS BEING4832 FEET.
BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATlON.
Noz
of SimesNO7E·
9 THEPROPOSED SOUTHEASTLATERALBOTTOM-! HOLEFOR THISWELLIS LOCATEDIN TNE NE SC A LE
1/4 SE 1/4 OF SECTION27. T7S, R21E,S.LB.&M. AT A DISTANCEOF 2080' FSL 660°
CERT1FICATE00 FEL IT BEARS 516°43'27"E 4131.91 FROM THE WHilligPROPOSED WELL HEAD.THISIS TO CERTIFY THAT THEABOVE OMFIELDNOTESOF ACTUALSURVEYSMSUPERVISIONANDTHATTHESAME AND CORR EBESTOF MYKNOWLEDGEANDBEU , i 13
/ vUn'g5rode2 7und
= 4909'.
2022'L
REVISED:08-14-07 L.K.
Îs wTufe " '"""" UINTAH GINEERING a LAND VEYING
S68°15'W- 2694.12 L O.)
* S6875'46"W - 2696.12 (Mees.)¯
85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
bLEGEND: (AUTONOMOUSNAD 83) SCALE DATESURVEYED: DATE DRAWN:LATITUDE=
40°11'28.04" (40.191122) 1" = 1000 11-11-05 11-13-05=
90° SYMBOL LONGITUDE- 109°32'20.96° (109.539156) PARTY REFERENCES
= PROPOSED WELL HEAD (AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.LO. PLATLATITUDE=
40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109'32'18.47" (109.538464) COOL QUESTAR EXPLR. &
’API
Wel
lNo:
4304
7374
4300
00’
’API
Wel
lNo:
4304
7374
4300
00’
’API
Wel
lNo:
4304
7374
4300
00’
’API
Wel
lNo:
4304
7374
4300
00’
CONFIDEN
TIAL
QUESTAR EXPLR. & PROD.Well location, BBS #15G-22-7-21 (BOTTOM HOLE),T7S R21E S.L.B.&M. 1963***CP located as shown in the NE 1/4 SE 1/4 of0.4' H/gh, Scattered
stones Section 27, T7S, R21E, S.L.B.&M. Uintah County,
S8815'w - 2694.12' (GL.O.)58875'46"W- 2696.12'(Me¤s.) Utah.
BASIS OF ELEVATION
I 9 "|"g 87'09' BENCH MARK (43EAM) LOCATEDIN THE SE 1/4 OF SECT10Nor semes (G.L.O.) 21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNANBASIN,
QUADRANGLE,UTAH, UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHEDBY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAID
d ELEVATIONIS MARKEDAS BEING 4832 FEET.BASIS OF BEARINGS
BASIS OF BEARINGSIS A G.P.S. OBSERVATION.
NOTE:THE PROPOSED SOUTHEASTLATERALBOTTOMHOLEFOR THIS WELLBEARS S18°43°27°E
4131.91' FROMTHE PROPOSED WELLHEAD. N
27 (G.L.O.)o o o
BBS /15G-22- 7-21,
° '¯¯
BOTTOMHOLEC) 660 I- --
SCALE
CERTIFICATE illiLA
THIS IS TO CERT1FYTHAT THE ABOVE REPFIELDNOTES OF ACTUALSURVEYSMA MSUPERVISIONAND THAT THE SAME A AND CBEST OF MY KNOWLEDGEAND BEUE
' No. 1
REGIS O LA D SOOR
REVISED: 08-21-09 L.K. REGISTR
REVISED: 08-14-07 L.K. STATE O 7p yO
UINTAH SGINEERING & IAND SJRVEYING5304.42' (G.L.O.)
85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
LEGEND: SCALE DATE SURVEYED: DA7E DRAWN:1" = 1000' 11-11-05 11-13-05
= 90 SYMBOL NAD 83 (TARGET BOTTOM HOLE) rARTY REFERENCE5LA71TUDE= 4010'49.38" (40.180383)= PROPOSED WELLHEAD. LONGITUDE = 109'32'03.88" (109.534411) D.A. C.F. D.R.B. G.L.O. PLAT
A = SECTION CORNERS LOCATEDDNC
EDE93 140"
9041393722)WEA1NER Fl
UESTAR EXPLR. &
QUESTAR EXPLR. & PROD.Well location, BBS #15G-22-7-21 (BOTTOM HOLE),T7S R21E S.L.B.&M. 1963***CP located as shown in the NE 1/4 SE 1/4 of0.4' H/gh, Scattered
stones Section 27, T7S, R21E, S.L.B.&M. Uintah County,
S8815'w - 2694.12' (GL.O.)58875'46"W- 2696.12'(Me¤s.) Utah.
BASIS OF ELEVATION
I 9 "|"g 87'09' BENCH MARK (43EAM) LOCATEDIN THE SE 1/4 OF SECT10Nor semes (G.L.O.) 21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNANBASIN,
QUADRANGLE,UTAH, UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHEDBY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAID
d ELEVATIONIS MARKEDAS BEING 4832 FEET.BASIS OF BEARINGS
BASIS OF BEARINGSIS A G.P.S. OBSERVATION.
NOTE:THE PROPOSED SOUTHEASTLATERALBOTTOMHOLEFOR THIS WELLBEARS S18°43°27°E
4131.91' FROMTHE PROPOSED WELLHEAD. N
27 (G.L.O.)o o o
BBS /15G-22- 7-21,
° '¯¯
BOTTOMHOLEC) 660 I- --
SCALE
CERTIFICATE illiLA
THIS IS TO CERT1FYTHAT THE ABOVE REPFIELDNOTES OF ACTUALSURVEYSMA MSUPERVISIONAND THAT THE SAME A AND CBEST OF MY KNOWLEDGEAND BEUE
' No. 1
REGIS O LA D SOOR
REVISED: 08-21-09 L.K. REGISTR
REVISED: 08-14-07 L.K. STATE O 7p yO
UINTAH SGINEERING & IAND SJRVEYING5304.42' (G.L.O.)
85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
LEGEND: SCALE DATE SURVEYED: DA7E DRAWN:1" = 1000' 11-11-05 11-13-05
= 90 SYMBOL NAD 83 (TARGET BOTTOM HOLE) rARTY REFERENCE5LA71TUDE= 4010'49.38" (40.180383)= PROPOSED WELLHEAD. LONGITUDE = 109'32'03.88" (109.534411) D.A. C.F. D.R.B. G.L.O. PLAT
A = SECTION CORNERS LOCATEDDNC
EDE93 140"
9041393722)WEA1NER Fl
UESTAR EXPLR. &
QUESTAR EXPLR. & PROD.Well location, BBS #15G-22-7-21 (BOTTOM HOLE),T7S R21E S.L.B.&M. 1963***CP located as shown in the NE 1/4 SE 1/4 of0.4' H/gh, Scattered
stones Section 27, T7S, R21E, S.L.B.&M. Uintah County,
S8815'w - 2694.12' (GL.O.)58875'46"W- 2696.12'(Me¤s.) Utah.
BASIS OF ELEVATION
I 9 "|"g 87'09' BENCH MARK (43EAM) LOCATEDIN THE SE 1/4 OF SECT10Nor semes (G.L.O.) 21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNANBASIN,
QUADRANGLE,UTAH, UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHEDBY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAID
d ELEVATIONIS MARKEDAS BEING 4832 FEET.BASIS OF BEARINGS
BASIS OF BEARINGSIS A G.P.S. OBSERVATION.
NOTE:THE PROPOSED SOUTHEASTLATERALBOTTOMHOLEFOR THIS WELLBEARS S18°43°27°E
4131.91' FROMTHE PROPOSED WELLHEAD. N
27 (G.L.O.)o o o
BBS /15G-22- 7-21,
° '¯¯
BOTTOMHOLEC) 660 I- --
SCALE
CERTIFICATE illiLA
THIS IS TO CERT1FYTHAT THE ABOVE REPFIELDNOTES OF ACTUALSURVEYSMA MSUPERVISIONAND THAT THE SAME A AND CBEST OF MY KNOWLEDGEAND BEUE
' No. 1
REGIS O LA D SOOR
REVISED: 08-21-09 L.K. REGISTR
REVISED: 08-14-07 L.K. STATE O 7p yO
UINTAH SGINEERING & IAND SJRVEYING5304.42' (G.L.O.)
85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
LEGEND: SCALE DATE SURVEYED: DA7E DRAWN:1" = 1000' 11-11-05 11-13-05
= 90 SYMBOL NAD 83 (TARGET BOTTOM HOLE) rARTY REFERENCE5LA71TUDE= 4010'49.38" (40.180383)= PROPOSED WELLHEAD. LONGITUDE = 109'32'03.88" (109.534411) D.A. C.F. D.R.B. G.L.O. PLAT
A = SECTION CORNERS LOCATEDDNC
EDE93 140"
9041393722)WEA1NER Fl
UESTAR EXPLR. &
QUESTAR EXPLR. & PROD.Well location, BBS #15G-22-7-21 (BOTTOM HOLE),T7S R21E S.L.B.&M. 1963***CP located as shown in the NE 1/4 SE 1/4 of0.4' H/gh, Scattered
stones Section 27, T7S, R21E, S.L.B.&M. Uintah County,
S8815'w - 2694.12' (GL.O.)58875'46"W- 2696.12'(Me¤s.) Utah.
BASIS OF ELEVATION
I 9 "|"g 87'09' BENCH MARK (43EAM) LOCATEDIN THE SE 1/4 OF SECT10Nor semes (G.L.O.) 21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNANBASIN,
QUADRANGLE,UTAH, UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHEDBY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAID
d ELEVATIONIS MARKEDAS BEING 4832 FEET.BASIS OF BEARINGS
BASIS OF BEARINGSIS A G.P.S. OBSERVATION.
NOTE:THE PROPOSED SOUTHEASTLATERALBOTTOMHOLEFOR THIS WELLBEARS S18°43°27°E
4131.91' FROMTHE PROPOSED WELLHEAD. N
27 (G.L.O.)o o o
BBS /15G-22- 7-21,
° '¯¯
BOTTOMHOLEC) 660 I- --
SCALE
CERTIFICATE illiLA
THIS IS TO CERT1FYTHAT THE ABOVE REPFIELDNOTES OF ACTUALSURVEYSMA MSUPERVISIONAND THAT THE SAME A AND CBEST OF MY KNOWLEDGEAND BEUE
' No. 1
REGIS O LA D SOOR
REVISED: 08-21-09 L.K. REGISTR
REVISED: 08-14-07 L.K. STATE O 7p yO
UINTAH SGINEERING & IAND SJRVEYING5304.42' (G.L.O.)
85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017
LEGEND: SCALE DATE SURVEYED: DA7E DRAWN:1" = 1000' 11-11-05 11-13-05
= 90 SYMBOL NAD 83 (TARGET BOTTOM HOLE) rARTY REFERENCE5LA71TUDE= 4010'49.38" (40.180383)= PROPOSED WELLHEAD. LONGITUDE = 109'32'03.88" (109.534411) D.A. C.F. D.R.B. G.L.O. PLAT
A = SECTION CORNERS LOCATEDDNC
EDE93 140"
9041393722)WEA1NER Fl
UESTAR EXPLR. &
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
DRILLING PROGRAM
ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore
Federal Oil and Gas Leases
All lease and/or unit operations will be conducted in such a manner that full compliance ismade with applicable laws, regulations (43 CFR 3100), Onshore Oil & Gas No. 1, and theapproved plan of operations. The operator is fully responsible for the actions of itssubcontractors. A copy of these conditions will be furnished the field representative to insurecompliance.
1. Formation Tops
The estimated top of important geologic markers are as follows:
Formation Depth, TVD Depth, MDGreen River 3,200' 3,200'Kick Off Point 6,202' 6,202'Green River (H4a Lime) 6,560' 6,782'TD 6,374' l0,580'
2. Anticipated Depths of Oil, Gas, Water, and Other Mineral Bearing Zones
The estimated depths at which the top an bottom of the anticipated water, oil, gas, orother mineral bearing formations are expected to be encountered as follows:
Substance Formation Depth, TVD Depth, MDOil/Gas Green River (H4a Lime) 6,560' - 6,374' 6,782' - 10,580'
All fresh water and prospectively valuable minerals encountered during drilling willbe recorded by depth and adequately protected. All oil and gas shows will be testedto determine commercial potential.
All water shows and water-bearing sands will be reported to the BLM in Vernal,Utah. Copies of State of Utah form OGC-8-X are acceptable. If flows are detected,samples will be submitted to the BLM along with any water analyses conducted.Fresh water will be obtained from Wonsits Valley water right A36125 (which wasfiled on May 7, 1964) or Red Wash water right # 49-2153 (which was filed on March25, 1960). It was determined by the Fish and Wildlife Service that any water rightnumber filed before 1989 is not depleting to the Upper Colorado River System, tosupply fresh water for drilling purposes. All water resulting from drilling operationswill be disposed of at Red Wash Central Battery Disposal site; SWSE, Section 27,T7S, R23E or Wonsits Valley Disposal Site; SWNW, Section 12, T8S, R21E.
Page 1 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
DRILLING PROGRAM
ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore
Federal Oil and Gas Leases
All lease and/or unit operations will be conducted in such a manner that full compliance ismade with applicable laws, regulations (43 CFR 3100), Onshore Oil & Gas No. 1, and theapproved plan of operations. The operator is fully responsible for the actions of itssubcontractors. A copy of these conditions will be furnished the field representative to insurecompliance.
1. Formation Tops
The estimated top of important geologic markers are as follows:
Formation Depth, TVD Depth, MDGreen River 3,200' 3,200'Kick Off Point 6,202' 6,202'Green River (H4a Lime) 6,560' 6,782'TD 6,374' l0,580'
2. Anticipated Depths of Oil, Gas, Water, and Other Mineral Bearing Zones
The estimated depths at which the top an bottom of the anticipated water, oil, gas, orother mineral bearing formations are expected to be encountered as follows:
Substance Formation Depth, TVD Depth, MDOil/Gas Green River (H4a Lime) 6,560' - 6,374' 6,782' - 10,580'
All fresh water and prospectively valuable minerals encountered during drilling willbe recorded by depth and adequately protected. All oil and gas shows will be testedto determine commercial potential.
All water shows and water-bearing sands will be reported to the BLM in Vernal,Utah. Copies of State of Utah form OGC-8-X are acceptable. If flows are detected,samples will be submitted to the BLM along with any water analyses conducted.Fresh water will be obtained from Wonsits Valley water right A36125 (which wasfiled on May 7, 1964) or Red Wash water right # 49-2153 (which was filed on March25, 1960). It was determined by the Fish and Wildlife Service that any water rightnumber filed before 1989 is not depleting to the Upper Colorado River System, tosupply fresh water for drilling purposes. All water resulting from drilling operationswill be disposed of at Red Wash Central Battery Disposal site; SWSE, Section 27,T7S, R23E or Wonsits Valley Disposal Site; SWNW, Section 12, T8S, R21E.
Page 1 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
DRILLING PROGRAM
ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore
Federal Oil and Gas Leases
All lease and/or unit operations will be conducted in such a manner that full compliance ismade with applicable laws, regulations (43 CFR 3100), Onshore Oil & Gas No. 1, and theapproved plan of operations. The operator is fully responsible for the actions of itssubcontractors. A copy of these conditions will be furnished the field representative to insurecompliance.
1. Formation Tops
The estimated top of important geologic markers are as follows:
Formation Depth, TVD Depth, MDGreen River 3,200' 3,200'Kick Off Point 6,202' 6,202'Green River (H4a Lime) 6,560' 6,782'TD 6,374' l0,580'
2. Anticipated Depths of Oil, Gas, Water, and Other Mineral Bearing Zones
The estimated depths at which the top an bottom of the anticipated water, oil, gas, orother mineral bearing formations are expected to be encountered as follows:
Substance Formation Depth, TVD Depth, MDOil/Gas Green River (H4a Lime) 6,560' - 6,374' 6,782' - 10,580'
All fresh water and prospectively valuable minerals encountered during drilling willbe recorded by depth and adequately protected. All oil and gas shows will be testedto determine commercial potential.
All water shows and water-bearing sands will be reported to the BLM in Vernal,Utah. Copies of State of Utah form OGC-8-X are acceptable. If flows are detected,samples will be submitted to the BLM along with any water analyses conducted.Fresh water will be obtained from Wonsits Valley water right A36125 (which wasfiled on May 7, 1964) or Red Wash water right # 49-2153 (which was filed on March25, 1960). It was determined by the Fish and Wildlife Service that any water rightnumber filed before 1989 is not depleting to the Upper Colorado River System, tosupply fresh water for drilling purposes. All water resulting from drilling operationswill be disposed of at Red Wash Central Battery Disposal site; SWSE, Section 27,T7S, R23E or Wonsits Valley Disposal Site; SWNW, Section 12, T8S, R21E.
Page 1 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
DRILLING PROGRAM
ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore
Federal Oil and Gas Leases
All lease and/or unit operations will be conducted in such a manner that full compliance ismade with applicable laws, regulations (43 CFR 3100), Onshore Oil & Gas No. 1, and theapproved plan of operations. The operator is fully responsible for the actions of itssubcontractors. A copy of these conditions will be furnished the field representative to insurecompliance.
1. Formation Tops
The estimated top of important geologic markers are as follows:
Formation Depth, TVD Depth, MDGreen River 3,200' 3,200'Kick Off Point 6,202' 6,202'Green River (H4a Lime) 6,560' 6,782'TD 6,374' l0,580'
2. Anticipated Depths of Oil, Gas, Water, and Other Mineral Bearing Zones
The estimated depths at which the top an bottom of the anticipated water, oil, gas, orother mineral bearing formations are expected to be encountered as follows:
Substance Formation Depth, TVD Depth, MDOil/Gas Green River (H4a Lime) 6,560' - 6,374' 6,782' - 10,580'
All fresh water and prospectively valuable minerals encountered during drilling willbe recorded by depth and adequately protected. All oil and gas shows will be testedto determine commercial potential.
All water shows and water-bearing sands will be reported to the BLM in Vernal,Utah. Copies of State of Utah form OGC-8-X are acceptable. If flows are detected,samples will be submitted to the BLM along with any water analyses conducted.Fresh water will be obtained from Wonsits Valley water right A36125 (which wasfiled on May 7, 1964) or Red Wash water right # 49-2153 (which was filed on March25, 1960). It was determined by the Fish and Wildlife Service that any water rightnumber filed before 1989 is not depleting to the Upper Colorado River System, tosupply fresh water for drilling purposes. All water resulting from drilling operationswill be disposed of at Red Wash Central Battery Disposal site; SWSE, Section 27,T7S, R23E or Wonsits Valley Disposal Site; SWNW, Section 12, T8S, R21E.
Page 1 of
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
3. Operator's Specification for Pressure Control Equipment
A. 3,000 psi double gate, 3,000 psi annular (schematic attached)
B. Function test daily.
C. All casing strings shall be pressure tested (0.22psi/ft or 1,500 psi, whicheveris greater) prior to drilling the plug after cementing; test pressure shall notexceed the internal yield of the casing.
D. Ram type preventers and associated equipment shall be tested to ratedworking pressure if isolated by a test plug or to 50% of the internal yieldpressure of casing, whichever is less. BOP and related equipment shall meetthe minimum requirements of Onshore Oil & Gas Order No. 2 for equipmentand testing requirements, procedures, etc..., for a 3M system and individualcomponents shall be operable as designed.
4. Casing Program
As this well is a re-entry of an existing well the surface and production casing stringsare already in place as detailed below.
Hole Size Casing Size Depth, MD Weight Grade12 ¼" 9 5/8" 495' 36.0 J-557 7/8" 5 ½" 6,806' 15.5 J-55
The lateral portion of this wellbore will be cased with a slotted liner.
Hole Size Casing Size Top,MD Bottom, MD Weight Grade4 3/4" 3 1/2" Flush 6,162' 10,580' 9.2 J-55
Please refer to the attached wellbore diagram and re-entry procedure for furtherdetails.
5. Auxilliary Eauipment
A. Kelly Cock - Yes
B. Float at the bit - No
C. Monitoring equipment on the mud system - visually and/or PVT or FlowShow
D. Fully opening safety valve on the rig floor - Yes
E. Rotating Head - Yes
Page 2 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
3. Operator's Specification for Pressure Control Equipment
A. 3,000 psi double gate, 3,000 psi annular (schematic attached)
B. Function test daily.
C. All casing strings shall be pressure tested (0.22psi/ft or 1,500 psi, whicheveris greater) prior to drilling the plug after cementing; test pressure shall notexceed the internal yield of the casing.
D. Ram type preventers and associated equipment shall be tested to ratedworking pressure if isolated by a test plug or to 50% of the internal yieldpressure of casing, whichever is less. BOP and related equipment shall meetthe minimum requirements of Onshore Oil & Gas Order No. 2 for equipmentand testing requirements, procedures, etc..., for a 3M system and individualcomponents shall be operable as designed.
4. Casing Program
As this well is a re-entry of an existing well the surface and production casing stringsare already in place as detailed below.
Hole Size Casing Size Depth, MD Weight Grade12 ¼" 9 5/8" 495' 36.0 J-557 7/8" 5 ½" 6,806' 15.5 J-55
The lateral portion of this wellbore will be cased with a slotted liner.
Hole Size Casing Size Top,MD Bottom, MD Weight Grade4 3/4" 3 1/2" Flush 6,162' 10,580' 9.2 J-55
Please refer to the attached wellbore diagram and re-entry procedure for furtherdetails.
5. Auxilliary Eauipment
A. Kelly Cock - Yes
B. Float at the bit - No
C. Monitoring equipment on the mud system - visually and/or PVT or FlowShow
D. Fully opening safety valve on the rig floor - Yes
E. Rotating Head - Yes
Page 2 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
3. Operator's Specification for Pressure Control Equipment
A. 3,000 psi double gate, 3,000 psi annular (schematic attached)
B. Function test daily.
C. All casing strings shall be pressure tested (0.22psi/ft or 1,500 psi, whicheveris greater) prior to drilling the plug after cementing; test pressure shall notexceed the internal yield of the casing.
D. Ram type preventers and associated equipment shall be tested to ratedworking pressure if isolated by a test plug or to 50% of the internal yieldpressure of casing, whichever is less. BOP and related equipment shall meetthe minimum requirements of Onshore Oil & Gas Order No. 2 for equipmentand testing requirements, procedures, etc..., for a 3M system and individualcomponents shall be operable as designed.
4. Casing Program
As this well is a re-entry of an existing well the surface and production casing stringsare already in place as detailed below.
Hole Size Casing Size Depth, MD Weight Grade12 ¼" 9 5/8" 495' 36.0 J-557 7/8" 5 ½" 6,806' 15.5 J-55
The lateral portion of this wellbore will be cased with a slotted liner.
Hole Size Casing Size Top,MD Bottom, MD Weight Grade4 3/4" 3 1/2" Flush 6,162' 10,580' 9.2 J-55
Please refer to the attached wellbore diagram and re-entry procedure for furtherdetails.
5. Auxilliary Eauipment
A. Kelly Cock - Yes
B. Float at the bit - No
C. Monitoring equipment on the mud system - visually and/or PVT or FlowShow
D. Fully opening safety valve on the rig floor - Yes
E. Rotating Head - Yes
Page 2 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
3. Operator's Specification for Pressure Control Equipment
A. 3,000 psi double gate, 3,000 psi annular (schematic attached)
B. Function test daily.
C. All casing strings shall be pressure tested (0.22psi/ft or 1,500 psi, whicheveris greater) prior to drilling the plug after cementing; test pressure shall notexceed the internal yield of the casing.
D. Ram type preventers and associated equipment shall be tested to ratedworking pressure if isolated by a test plug or to 50% of the internal yieldpressure of casing, whichever is less. BOP and related equipment shall meetthe minimum requirements of Onshore Oil & Gas Order No. 2 for equipmentand testing requirements, procedures, etc..., for a 3M system and individualcomponents shall be operable as designed.
4. Casing Program
As this well is a re-entry of an existing well the surface and production casing stringsare already in place as detailed below.
Hole Size Casing Size Depth, MD Weight Grade12 ¼" 9 5/8" 495' 36.0 J-557 7/8" 5 ½" 6,806' 15.5 J-55
The lateral portion of this wellbore will be cased with a slotted liner.
Hole Size Casing Size Top,MD Bottom, MD Weight Grade4 3/4" 3 1/2" Flush 6,162' 10,580' 9.2 J-55
Please refer to the attached wellbore diagram and re-entry procedure for furtherdetails.
5. Auxilliary Eauipment
A. Kelly Cock - Yes
B. Float at the bit - No
C. Monitoring equipment on the mud system - visually and/or PVT or FlowShow
D. Fully opening safety valve on the rig floor - Yes
E. Rotating Head - Yes
Page 2 of
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
If drilling with air the following will be used:
F. The blooie line shall be at least 6" in diameter and extend at least 100' fromthe wellbore into the reserve/blooie pit.
G. Blooie line ignition shall be provided by a continuous pilot (ignited whendrilling below 500')
H. Compressor shall be tied directly to the blooie line through a manifold
I. A mister with a continuous stream of water shall be installed near the end ofthe blooie lines for dust suppression.
Drilling of the lateral will be done with water based mud systems consisting primarilyof fresh water, bentonite, lignite, caustic, lime, soda ash, and polymers. Nochromates will be used. It is not intended to use oil in the mud, however, in the eventit is used the concentration will be less than 4% by volume. Maximum anticipatedmud weight is 9.0 ppg.
No minimum quantity of weight material will be required to be kept on location.
PVT/Flow show will be used upon exit of existing production casing to TD.
Gas detector will be used upon exit of existing production casing to TD.
6. Testing. Loening, and Coring Program
A. Cores - None Anticipated
B. DST -None Anticipated
C. Logging:i. Mud logging from casing exit to TD
ii. MWD-GR will be utilized during drilling operations to aid in landingthe curve and maintaining the lateral within the desired zone.
D. Formation and completion interval: H4a Lime interval, final determination ofcompletion will be made by analysis of mud logging data. Stimulation:stimulation will be designed for the particular area of interest encountered.
Page 3 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
If drilling with air the following will be used:
F. The blooie line shall be at least 6" in diameter and extend at least 100' fromthe wellbore into the reserve/blooie pit.
G. Blooie line ignition shall be provided by a continuous pilot (ignited whendrilling below 500')
H. Compressor shall be tied directly to the blooie line through a manifold
I. A mister with a continuous stream of water shall be installed near the end ofthe blooie lines for dust suppression.
Drilling of the lateral will be done with water based mud systems consisting primarilyof fresh water, bentonite, lignite, caustic, lime, soda ash, and polymers. Nochromates will be used. It is not intended to use oil in the mud, however, in the eventit is used the concentration will be less than 4% by volume. Maximum anticipatedmud weight is 9.0 ppg.
No minimum quantity of weight material will be required to be kept on location.
PVT/Flow show will be used upon exit of existing production casing to TD.
Gas detector will be used upon exit of existing production casing to TD.
6. Testing. Loening, and Coring Program
A. Cores - None Anticipated
B. DST -None Anticipated
C. Logging:i. Mud logging from casing exit to TD
ii. MWD-GR will be utilized during drilling operations to aid in landingthe curve and maintaining the lateral within the desired zone.
D. Formation and completion interval: H4a Lime interval, final determination ofcompletion will be made by analysis of mud logging data. Stimulation:stimulation will be designed for the particular area of interest encountered.
Page 3 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
If drilling with air the following will be used:
F. The blooie line shall be at least 6" in diameter and extend at least 100' fromthe wellbore into the reserve/blooie pit.
G. Blooie line ignition shall be provided by a continuous pilot (ignited whendrilling below 500')
H. Compressor shall be tied directly to the blooie line through a manifold
I. A mister with a continuous stream of water shall be installed near the end ofthe blooie lines for dust suppression.
Drilling of the lateral will be done with water based mud systems consisting primarilyof fresh water, bentonite, lignite, caustic, lime, soda ash, and polymers. Nochromates will be used. It is not intended to use oil in the mud, however, in the eventit is used the concentration will be less than 4% by volume. Maximum anticipatedmud weight is 9.0 ppg.
No minimum quantity of weight material will be required to be kept on location.
PVT/Flow show will be used upon exit of existing production casing to TD.
Gas detector will be used upon exit of existing production casing to TD.
6. Testing. Loening, and Coring Program
A. Cores - None Anticipated
B. DST -None Anticipated
C. Logging:i. Mud logging from casing exit to TD
ii. MWD-GR will be utilized during drilling operations to aid in landingthe curve and maintaining the lateral within the desired zone.
D. Formation and completion interval: H4a Lime interval, final determination ofcompletion will be made by analysis of mud logging data. Stimulation:stimulation will be designed for the particular area of interest encountered.
Page 3 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
If drilling with air the following will be used:
F. The blooie line shall be at least 6" in diameter and extend at least 100' fromthe wellbore into the reserve/blooie pit.
G. Blooie line ignition shall be provided by a continuous pilot (ignited whendrilling below 500')
H. Compressor shall be tied directly to the blooie line through a manifold
I. A mister with a continuous stream of water shall be installed near the end ofthe blooie lines for dust suppression.
Drilling of the lateral will be done with water based mud systems consisting primarilyof fresh water, bentonite, lignite, caustic, lime, soda ash, and polymers. Nochromates will be used. It is not intended to use oil in the mud, however, in the eventit is used the concentration will be less than 4% by volume. Maximum anticipatedmud weight is 9.0 ppg.
No minimum quantity of weight material will be required to be kept on location.
PVT/Flow show will be used upon exit of existing production casing to TD.
Gas detector will be used upon exit of existing production casing to TD.
6. Testing. Loening, and Coring Program
A. Cores - None Anticipated
B. DST -None Anticipated
C. Logging:i. Mud logging from casing exit to TD
ii. MWD-GR will be utilized during drilling operations to aid in landingthe curve and maintaining the lateral within the desired zone.
D. Formation and completion interval: H4a Lime interval, final determination ofcompletion will be made by analysis of mud logging data. Stimulation:stimulation will be designed for the particular area of interest encountered.
Page 3 of
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
7. Cementing Program
As this is a re-entry well and a slotted liner will be run in the newly drilled lateralthere will be no cement required to drill this well. Please refer to the attachedwellbore diagram for existing casing and cement conditions.
8. Anticipated Abnormal Pressures and Temperatures, Other Potential Hazards
No abnormal temperatures or pressures are anticipated. No H2S has beenencountered or is known to exist from previous wells drilled to similar depths in thegeneral area. Maximum anticipated bottom-hole pressure equals approximately 3,250psi. Maximum anticipated bottom hole temperature is approximately 160°F.
Page 4 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
7. Cementing Program
As this is a re-entry well and a slotted liner will be run in the newly drilled lateralthere will be no cement required to drill this well. Please refer to the attachedwellbore diagram for existing casing and cement conditions.
8. Anticipated Abnormal Pressures and Temperatures, Other Potential Hazards
No abnormal temperatures or pressures are anticipated. No H2S has beenencountered or is known to exist from previous wells drilled to similar depths in thegeneral area. Maximum anticipated bottom-hole pressure equals approximately 3,250psi. Maximum anticipated bottom hole temperature is approximately 160°F.
Page 4 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
7. Cementing Program
As this is a re-entry well and a slotted liner will be run in the newly drilled lateralthere will be no cement required to drill this well. Please refer to the attachedwellbore diagram for existing casing and cement conditions.
8. Anticipated Abnormal Pressures and Temperatures, Other Potential Hazards
No abnormal temperatures or pressures are anticipated. No H2S has beenencountered or is known to exist from previous wells drilled to similar depths in thegeneral area. Maximum anticipated bottom-hole pressure equals approximately 3,250psi. Maximum anticipated bottom hole temperature is approximately 160°F.
Page 4 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry
7. Cementing Program
As this is a re-entry well and a slotted liner will be run in the newly drilled lateralthere will be no cement required to drill this well. Please refer to the attachedwellbore diagram for existing casing and cement conditions.
8. Anticipated Abnormal Pressures and Temperatures, Other Potential Hazards
No abnormal temperatures or pressures are anticipated. No H2S has beenencountered or is known to exist from previous wells drilled to similar depths in thegeneral area. Maximum anticipated bottom-hole pressure equals approximately 3,250psi. Maximum anticipated bottom hole temperature is approximately 160°F.
Page 4 of
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.
3MBOPSTACK
FlowlineRotatingHead
SpacerSpool
I
3MAnnular
3MDoubleRam
Mill Line 3"ChokeLine
2" 3M 2"3M 3"3M 3"3M y,s, ..., lG.L Cluck Manual gggg jÇ g. .... .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_1
I I
3Mx 3MMulti-BowlHead
9 5/8"3MCasingHead
Page 1
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.
3MBOPSTACK
FlowlineRotatingHead
SpacerSpool
I
3MAnnular
3MDoubleRam
Mill Line 3"ChokeLine
2" 3M 2"3M 3"3M 3"3M y,s, ..., lG.L Cluck Manual gggg jÇ g. .... .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_1
I I
3Mx 3MMulti-BowlHead
9 5/8"3MCasingHead
Page 1
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.
3MBOPSTACK
FlowlineRotatingHead
SpacerSpool
I
3MAnnular
3MDoubleRam
Mill Line 3"ChokeLine
2" 3M 2"3M 3"3M 3"3M y,s, ..., lG.L Cluck Manual gggg jÇ g. .... .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_1
I I
3Mx 3MMulti-BowlHead
9 5/8"3MCasingHead
Page 1
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.
3MBOPSTACK
FlowlineRotatingHead
SpacerSpool
I
3MAnnular
3MDoubleRam
Mill Line 3"ChokeLine
2" 3M 2"3M 3"3M 3"3M y,s, ..., lG.L Cluck Manual gggg jÇ g. .... .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_1
I I
3Mx 3MMulti-BowlHead
9 5/8"3MCasingHead
Page 1
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.
3M CHOKE MANIFOLD
omsmemenom
ADNTABLE CHONE
3M CHOKB MANIFOLD EQUIPMENT - CONFIOURATIONOF CHOKBSMAY VARYß4 m 39528. Bepr.27. 1989)
Page 2 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.
3M CHOKE MANIFOLD
omsmemenom
ADNTABLE CHONE
3M CHOKB MANIFOLD EQUIPMENT - CONFIOURATIONOF CHOKBSMAY VARYß4 m 39528. Bepr.27. 1989)
Page 2 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.
3M CHOKE MANIFOLD
omsmemenom
ADNTABLE CHONE
3M CHOKB MANIFOLD EQUIPMENT - CONFIOURATIONOF CHOKBS MAY VARYß4 m 39528. Bepr.27. 1989)
Page 2 of
'APIWellNo:43047374430000'
ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.
3M CHOKE MANIFOLD
omsmemenom
ADNTABLE CHONE
3M CHOKB MANIFOLD EQUIPMENT - CONFIOURATIONOF CHOKBS MAY VARYß4 m 39528. Bepr.27. 1989)
Page 2 of
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
QUESTAR EXPLR & PROD. FIGURE #iLOCATION LAYOUT FOR
BBS #150-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.
669' FSL 2022' FELC- J.4' C-1.2' Proposed Access o F-4.58 911.0' B. 908.8' Road 8. 901 /
48' Sta. J+50SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrown By: D.R.B. as Needed gg
REVISED: 08- 21-09 L.K Approx. / . ANDTop ofCut Slope
N 613 c
Flore Pit is to be /ocateda min. of 100' from theWell Head
9107
E/. 914. 's.
Û- ÍÛ. 48 150' Sta. 1+75
L 901.6'
Sta. 0 SI ----
7etal Pit Capac/fy--W/2' of Freeboard- 10,620 Ðb/s. ±Total Pit Vdume ApprOX.
- 2,870 Cu- Yds Toe ofFill Slope
EL 914s :- a st; 48 Sto. O 00 .C-1E.9
(htm. pit, Topsoi/ Stockpile ..:. .. 4.
C- 4. 1 C- 1 7 F- 4. 7'NOŒS " *"·7
E/ev Ungraded Ground AtL.oc/
Stoke = 4908.7UINTAH ENclNEERING & LAND SURVEYING
FINISHED GRADE ELEV A T LOC. STAKE = 490Z6 ,, s. 2 o s.,, . v.,.... es., 4447, .<<4e>
'APIWellNo:43047374430000'
QUESTAR EXPLR & PROD. FIGURE #iLOCATION LAYOUT FOR
BBS #150-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.
669' FSL 2022' FELC- J.4' C-1.2' Proposed Access o F-4.58 911.0' B. 908.8' Road 8. 901 /
48' Sta. J+50SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrown By: D.R.B. as Needed gg
REVISED: 08- 21-09 L.K Approx. / . ANDTop ofCut Slope
N 613 c
Flore Pit is to be /ocateda min. of 100' from theWell Head
9107
E/. 914. 's.
Û- ÍÛ. 48 150' Sta. 1+75
L 901.6'
Sta. 0 SI ----
7etal Pit Capac/fy--W/2' of Freeboard- 10,620 Ðb/s. ±Total Pit Vdume ApprOX.
- 2,870 Cu- Yds Toe ofFill Slope
EL 914s :- a st; 48 Sto. O 00 .C-1E.9
(htm. pit, Topsoi/ Stockpile ..:. .. 4.
C- 4. 1 C- 1 7 F- 4. 7'NOŒS " *"·7
E/ev Ungraded Ground AtL.oc/
Stoke = 4908.7UINTAH ENclNEERING & LAND SURVEYING
FINISHED GRADE ELEV A T LOC. STAKE = 490Z6 ,, s. 2 o s.,, . v.,.... es., 4447, .<<4e>
'APIWellNo:43047374430000'
QUESTAR EXPLR & PROD. FIGURE #iLOCATION LAYOUT FOR
BBS #150-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.
669' FSL 2022' FELC- J.4' C-1.2' Proposed Access o F-4.58 911.0' B. 908.8' Road 8. 901 /
48' Sta. J+50SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrown By: D.R.B. as Needed gg
REVISED: 08- 21-09 L.K Approx. / . ANDTop ofCut Slope
N 613 c
Flore Pit is to be /ocateda min. of 100' from theWell Head
9107
E/. 914. 's.
Û- ÍÛ. 48 150' Sta. 1+75
L 901.6'
Sta. 0 SI ----
7etal Pit Capac/fy--W/2' of Freeboard- 10,620 Ðb/s. ±Total Pit Vdume ApprOX.
- 2,870 Cu- Yds Toe ofFill Slope
EL 914s :- a st; 48 Sto. O 00 .C-1E.9
(htm. pit, Topsoi/ Stockpile ..:. .. 4.
C- 4. 1 C- 1 7 F- 4. 7'NOŒS " *"·7
E/ev Ungraded Ground AtL.oc/
Stoke = 4908.7UINTAH ENclNEERING & LAND SURVEYING
FINISHED GRADE ELEV A T LOC. STAKE = 490Z6 ,, s. 2 o s.,, . v.,.... es., 4447, .<<4e>
'APIWellNo:43047374430000'
QUESTAR EXPLR & PROD. FIGURE #iLOCATION LAYOUT FOR
BBS #150-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.
669' FSL 2022' FELC- J.4' C-1.2' Proposed Access o F-4.58 911.0' B. 908.8' Road 8. 901 /
48' Sta. J+50SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrown By: D.R.B. as Needed gg
REVISED: 08- 21-09 L.K Approx. / . ANDTop ofCut Slope
N 613 c
Flore Pit is to be /ocateda min. of 100' from theWell Head
9107
E/. 914. 's.
Û- ÍÛ. 48 150' Sta. 1+75
L 901.6'
Sta. 0 SI ----
7etal Pit Capac/fy--W/2' of Freeboard- 10,620 Ðb/s. ±Total Pit Vdume ApprOX.
- 2,870 Cu- Yds Toe ofFill Slope
EL 914s :- a st; 48 Sto. O 00 .C-1E.9
(htm. pit, Topsoi/ Stockpile ..:. .. 4.
C- 4. 1 C- 1 7 F- 4. 7'NOŒS " *"·7
E/ev Ungraded Ground AtL.oc/
Stoke = 4908.7UINTAH ENclNEERING & LAND SURVEYING
FINISHED GRADE ELEV A T LOC. STAKE = 490Z6 ,, s. 2 o s.,, . v.,.... es., 4447, .<<4e>
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
QUESTAR EXPLR. & PROD. FIGURE #TYPICAL RIG LAYOUTFOR
BBS #15G-22-7-21 gggySECTION 22, T7S, R21E, S.L.B.&M. o L ANO
669' FSL 2022' FELNo. 161316
RO
SCALE: 1" =50° NAN
DATE: 11-13-05Drawn By· D.R.B.
REVISED: 08--21-09 L.K.
NO7E:Elare P/t /s to be locateda min. of 100' from theWell Head.
PIPE TUSS
PIPE RACKS
150'
TOILET O
'¯ ¯ LICHTPLANT
BOILER
PUMP HOUSECOM SOR WANTER
BOOSTER
Sto O 51Total P/t Cqpacity TR SHW/2' of Freeboard= 10,620 Bb/s. ±Total P/t Volume
- 2, 870 Cu. Yds.PROPANESTORAGE
UINTAH ENGINEERING & LAND SURVEYING85 So, ß00 East * Vernal. UtaA 84078 * (435)
'APIWellNo:43047374430000'
QUESTAR EXPLR. & PROD. FIGURE #TYPICAL RIG LAYOUTFOR
BBS #15G-22-7-21 gggySECTION 22, T7S, R21E, S.L.B.&M. o L ANO
669' FSL 2022' FELNo. 161316
RO
SCALE: 1" =50° NAN
DATE: 11-13-05Drawn By· D.R.B.
REVISED: 08--21-09 L.K.
NO7E:Elare P/t /s to be locateda min. of 100' from theWell Head.
PIPE TUSS
PIPE RACKS
150'
TOILET O
'¯ ¯ LICHTPLANT
BOILER
PUMP HOUSECOM SOR WANTER
BOOSTER
Sto O 51Total P/t Cqpacity TR SHW/2' of Freeboard= 10,620 Bb/s. ±Total P/t Volume
- 2, 870 Cu. Yds.PROPANESTORAGE
UINTAH ENGINEERING & LAND SURVEYING85 So, ß00 East * Vernal. UtaA 84078 * (435)
'APIWellNo:43047374430000'
QUESTAR EXPLR. & PROD. FIGURE #TYPICAL RIG LAYOUTFOR
BBS #15G-22-7-21 gggySECTION 22, T7S, R21E, S.L.B.&M. o L ANO
669' FSL 2022' FELNo. 161316
RO
SCALE: 1" =50° NAN
DATE: 11-13-05Drawn By· D.R.B.
REVISED: 08--21-09 L.K.
NO7E:Elare P/t /s to be locateda min. of 100' from theWell Head.
PIPE TUSS
PIPE RACKS
150'
TOILET O
'¯ ¯ LICHTPLANT
BOILER
PUMP HOUSECOM SOR WANTER
BOOSTER
Sto O 51Total P/t Cqpacity TR SHW/2' of Freeboard= 10,620 Bb/s. ±Total P/t Volume
- 2, 870 Cu. Yds.PROPANESTORAGE
UINTAH ENGINEERING & LAND SURVEYING85 So, ß00 East * Vernal. UtaA 84078 * (435)
'APIWellNo:43047374430000'
QUESTAR EXPLR. & PROD. FIGURE #TYPICAL RIG LAYOUTFOR
BBS #15G-22-7-21 gggySECTION 22, T7S, R21E, S.L.B.&M. o L ANO
669' FSL 2022' FELNo. 161316
RO
SCALE: 1" =50° NAN
DATE: 11-13-05Drawn By· D.R.B.
REVISED: 08--21-09 L.K.
NO7E:Elare P/t /s to be locateda min. of 100' from theWell Head.
PIPE TUSS
PIPE RACKS
150'
TOILET O
'¯ ¯ LICHTPLANT
BOILER
PUMP HOUSECOM SOR WANTER
BOOSTER
Sto O 51Total P/t Cqpacity TR SHW/2' of Freeboard= 10,620 Bb/s. ±Total P/t Volume
- 2, 870 Cu. Yds.PROPANESTORAGE
UINTAH ENGINEERING & LAND SURVEYING85 So, ß00 East * Vernal. UtaA 84078 * (435)
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000' - -
oros .o
SEE TOPO "iͶ .
LEGEND: QUESTAR CXPLR, & PROD.PROPOSED I CATION N gas y se.227.2,
SECTION 22, T7S, R21E, S.L B.& M.
'APIWellNo:43047374430000' - -
oros .o
SEE TOPO "iͶ .
LEGEND: QUESTAR CXPLR, & PROD.PROPOSED I CATION N gas y se.227.2,
SECTION 22, T7S, R21E, S.L B.& M.
'APIWellNo:43047374430000' - -
oros .o
SEE TOPO "iͶ .
LEGEND: QUESTAR CXPLR, & PROD.PROPOSED I CATION N gas y se.227.2,
SECTION 22, T7S, R21E, S.L B.& M.
'APIWellNo:43047374430000' - -
oros .o
SEE TOPO "iͶ .
LEGEND: QUESTAR CXPLR, & PROD.PROPOSED I CATION N gas y se.227.2,
SECTION 22, T7S, R21E, S.L B.& M.
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
21
POSED LOCATIONBS #15G-22-7-21 23 ,
loso
I. .d i t pË . .
LEGEND: QUESTAR EXPLR. & PROD.Extstrocuomo N Bus #15G-22-7-21
-------- -- ruorosen.weyss now' SECTION 22, T7S, R21E, S.I .ß.&M.-------•-- EXi%itNG 2-TRA( K NEEI)N t l'URADVD
SW 1/4 SE I/4
E Cintah Engineering & Land Surveying I POGR A P II I fl i t4 05SCAI E: I" - 2000 IlRAWNßV:C.P. REVlSED:
'APIWellNo:43047374430000'
21
POSED LOCATIONBS #15G-22-7-21 23 ,
loso
I. .d i t pË . .
LEGEND: QUESTAR EXPLR. & PROD.Extstrocuomo N Bus #15G-22-7-21
-------- -- ruorosen.weyss now' SECTION 22, T7S, R21E, S.I .ß.&M.-------•-- EXi%itNG 2-TRA( K NEEI)N t l'URADVD
SW 1/4 SE I/4
E Cintah Engineering & Land Surveying I POGR A P II I fl i t4 05SCAI E: I" - 2000 IlRAWNßV:C.P. REVlSED:
'APIWellNo:43047374430000'
21
POSED LOCATIONBS #15G-22-7-21 23 ,
loso
I. .d i t pË . .
LEGEND: QUESTAR EXPLR. & PROD.Extstrocuomo N Bus #15G-22-7-21
-------- -- ruorosen.weyss now' SECTION 22, T7S, R21E, S.I .ß.&M.-------•-- EXi%itNG 2-TRA( K NEEI)N t l'URADVD
SW 1/4 SE I/4
E Cintah Engineering & Land Surveying I POGR A P II I fl i t4 05SCAI E: I" - 2000 IlRAWNßV:C.P. REVlSED:
'APIWellNo:43047374430000'
21
POSED LOCATIONBS #15G-22-7-21 23 ,
loso
I. .d i t pË . .
LEGEND: QUESTAR EXPLR. & PROD.Extstrocuomo N Bus #15G-22-7-21
-------- -- ruorosen.weyss now' SECTION 22, T7S, R21E, S.I .ß.&M.-------•-- EXi%itNG 2-TRA( K NEEI)N t l'URADVD
SW 1/4 SE I/4
E Cintah Engineering & Land Surveying I POGR A P II I fl i t4 05SCAI E: I" - 2000 IlRAWNßV:C.P. REVlSED:
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
POSED I Cxl'l N -
BS #L - 2-7 21
LEGEND: QUESTAR EX PLR. & PROD.p'oisrtsAi.wEx.ts waiEuwELLs N gnagiso.22.7.2ie ruunuciNc wr·:r.I s AnAsno.NED wi·:I ts SECTION 22, T7S, R21 E, S.I,.B.& M.# surT is wi·:i-is TEwonAuli.vAsANoose:o SW 1/4 SE 1/4
- Uiutah Engineering & l.and Surveying TOPOGR A P II I f i ll 4 0585 Natalia 200 14ssst Ves*asati. fittait 8 5078 A Ÿ ypp | pg ig·ARyt35) 780-1017 * 5+'A% (*635) 189-1813SCALE:[" = 2000 DRAWNBY:C.P.
'APIWellNo:43047374430000'
POSED I Cxl'l N -
BS #L - 2-7 21
LEGEND: QUESTAR EX PLR. & PROD.p'oisrtsAi.wEx.ts waiEuwELLs N gnagiso.22.7.2ie ruunuciNc wr·:r.I s AnAsno.NED wi·:I ts SECTION 22, T7S, R21 E, S.I,.B.& M.# surT is wi·:i-is TEwonAuli.vAsANoose:o SW 1/4 SE 1/4
- Uiutah Engineering & l.and Surveying TOPOGR A P II I f i ll 4 0585 Natalia 200 14ssst Ves*asati. fittait 8 5078 A Ÿ ypp | pg ig·ARyt35) 780-1017 * 5+'A% (*635) 189-1813SCALE:[" = 2000 DRAWNBY:C.P.
'APIWellNo:43047374430000'
POSED I Cxl'l N -
BS #L - 2-7 21
LEGEND: QUESTAR EX PLR. & PROD.p'oisrtsAi.wEx.ts waiEuwELLs N gnagiso.22.7.2ie ruunuciNc wr·:r.I s AnAsno.NED wi·:I ts SECTION 22, T7S, R21 E, S.I,.B.& M.# surT is wi·:i-is TEwonAuli.vAsANoose:o SW 1/4 SE 1/4
- Uiutah Engineering & l.and Surveying TOPOGR A P II I f i ll 4 0585 Natalia 200 14ssst Ves*asati. fittait 8 5078 A Ÿ ypp | pg ig·ARyt35) 780-1017 * 5+'A% (*635) 189-1813SCALE:[" = 2000 DRAWNBY:C.P.
'APIWellNo:43047374430000'
POSED I Cxl'l N -
BS #L - 2-7 21
LEGEND: QUESTAR EX PLR. & PROD.p'oisrtsAi.wEx.ts waiEuwELLs N gnagiso.22.7.2ie ruunuciNc wr·:r.I s AnAsno.NED wi·:I ts SECTION 22, T7S, R21 E, S.I,.B.& M.# surT is wi·:i-is TEwonAuli.vAsANoose:o SW 1/4 SE 1/4
- Uiutah Engineering & l.and Surveying TOPOGR A P II I f i ll 4 0585 Natalia 200 14ssst Ves*asati. fittait 8 5078 A Ÿ ypp | pg ig·ARyt35) 780-1017 * 5+'A% (*635) 189-1813SCALE:[" = 2000 DRAWNBY:C.P.
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-09 ProposalReportDate: September1, 2009 SurveylDLSComputationMethod: MinimumCurvature/ Lubinski
CIIent: VerilcalSectionAzimuth: 161.000°Field: Uinia VerlicalSectionOrigin: N0.000 ft,E 0.000ft
StructureISlot: BBS/ BBS15G-22-7-21 TVDReferenceDatum: KBWell: BBS15G-22-7-21 TVDReferenceElevation: 4925.0ftrelativetoMSL
Borehole: I.ateral 1 Sea BedIGround LevelElevation: 4909.000 ftrelativetoMSLUWIIAPI#: MagneticDeclination: 11.353°
SurveyNamel Date: BBS15G-22.7-21Lateral1 DrillingPlanCJL7-6-09/ July6,2009 TotalFieldStrength: 52649.826nTTortIAHDI DDII ERDratio: 92.800°/ 4169.06ft/ S.795/ 0.636 MagneticDip: 66.076°
GridCoordinateSystem: NADO3UtahStatePlanes, CentralZone, USFeet DeclinationDate: July06, 2009LocallonLat/Long: N40 1128.040,W109 32 20.960 MagneticDecilnallonModel: IGRF2005
LocationGridNIEYlX: N7244345.810 ftUS,E 2188149.353 ftUS NorthReference: GridNorthGrldConvergenceAngle: +1.25607498° TotalCorrMagNorth+ GridNorth: +10.097°
GridScale Factor: 0.99991810 LocalCoordinatesReferencedTo: WellHead
Comments md IncIlnation Azimuth TVD c NS EW Closure DLS ToolFace
(it) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (dog) (deg/100ft) (deg)Tie-In 0.00 0.00 161.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00MKOP 6202.00 0.00 161.00 6202.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00M
6300.00 15.68 161.00 6298.78 13.33 -12.60 4.34 13.33 161.00 16.00 0.00G6400.00 31.68 161.00 6390.06 53.36 -50.45 17.37 53.36 161.00 16.00 0.00G6500.00 47.68 161.00 6466.78 117.00 -110.63 38.09 117.00 161.00 16.00 0.00G
6600.00 63.68 161.00 6522.98 199.32 -188.46 64.89 199.32 161.00 16.00 0.00G6700.00 79.68 161.00 6554.31 293.95 -277.93 95.70 293.95 161.00 16.00 0.00G
Enter H4 Lime 6782.00 92.80 161.00 6559.67 375.59 -355.13 122.28 375.59 161.00 16.00 0.00GTD 10580.00 92.80 161.00 6374.14 4169.06 -3941.92 1357.31 4169.06 161.00 0.00 0.00G
Survev Tvne: Non-Def Proposal
Survev Error Model: NONE version *** 3-D 95.00% Confidence 2.7955 sigmaSurveyinq Proa:
MD From ( ft ) MDTo ( ft ) EOU Freq Survev Tool Tvoe Borehole -> Survey0.00 10580.00 1/100.00 NULL_ZERO(default toolused) Lateral 1 -> BBS 15G-22-7-21 Lateral 1 DrillingPlan CJL 7-6-
WelIDesign Ver Bld(doc40x_37 ) BBS 15G-22-7-21\BBS 15G-22-7-21\Lateral 1\BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-Œhnerated 9/1/2009 9:22 AM Page 1 of
'APIWellNo:43047374430000'
BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-09 ProposalReportDate: September1, 2009 SurveylDLSComputationMethod: MinimumCurvature/ Lubinski
CIIent: VerilcalSectionAzimuth: 161.000°Field: Uinia VerlicalSectionOrigin: N0.000 ft,E 0.000ft
StructureISlot: BBS/ BBS15G-22-7-21 TVDReferenceDatum: KBWell: BBS15G-22-7-21 TVDReferenceElevation: 4925.0ftrelativetoMSL
Borehole: I.ateral 1 Sea BedIGround LevelElevation: 4909.000 ftrelativetoMSLUWIIAPI#: MagneticDeclination: 11.353°
SurveyNamel Date: BBS15G-22.7-21Lateral1 DrillingPlanCJL7-6-09/ July6,2009 TotalFieldStrength: 52649.826nTTortIAHDI DDII ERDratio: 92.800°/ 4169.06ft/ S.795/ 0.636 MagneticDip: 66.076°
GridCoordinateSystem: NADO3UtahStatePlanes, CentralZone, USFeet DeclinationDate: July06, 2009LocallonLat/Long: N40 1128.040,W109 32 20.960 MagneticDecilnallonModel: IGRF2005
LocationGridNIEYlX: N7244345.810 ftUS,E 2188149.353 ftUS NorthReference: GridNorthGrldConvergenceAngle: +1.25607498° TotalCorrMagNorth+ GridNorth: +10.097°
GridScale Factor: 0.99991810 LocalCoordinatesReferencedTo: WellHead
Comments md IncIlnation Azimuth TVD c NS EW Closure DLS ToolFace
(it) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (dog) (deg/100ft) (deg)Tie-In 0.00 0.00 161.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00MKOP 6202.00 0.00 161.00 6202.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00M
6300.00 15.68 161.00 6298.78 13.33 -12.60 4.34 13.33 161.00 16.00 0.00G6400.00 31.68 161.00 6390.06 53.36 -50.45 17.37 53.36 161.00 16.00 0.00G6500.00 47.68 161.00 6466.78 117.00 -110.63 38.09 117.00 161.00 16.00 0.00G
6600.00 63.68 161.00 6522.98 199.32 -188.46 64.89 199.32 161.00 16.00 0.00G6700.00 79.68 161.00 6554.31 293.95 -277.93 95.70 293.95 161.00 16.00 0.00G
Enter H4 Lime 6782.00 92.80 161.00 6559.67 375.59 -355.13 122.28 375.59 161.00 16.00 0.00GTD 10580.00 92.80 161.00 6374.14 4169.06 -3941.92 1357.31 4169.06 161.00 0.00 0.00G
Survev Tvne: Non-Def Proposal
Survev Error Model: NONE version *** 3-D 95.00% Confidence 2.7955 sigmaSurveyinq Proa:
MD From ( ft ) MDTo ( ft ) EOU Freq Survev Tool Tvoe Borehole -> Survey0.00 10580.00 1/100.00 NULL_ZERO(default toolused) Lateral 1 -> BBS 15G-22-7-21 Lateral 1 DrillingPlan CJL 7-6-
WelIDesign Ver Bld(doc40x_37 ) BBS 15G-22-7-21\BBS 15G-22-7-21\Lateral 1\BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-Œhnerated 9/1/2009 9:22 AM Page 1 of
'APIWellNo:43047374430000'
BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-09 ProposalReportDate: September1, 2009 SurveylDLSComputationMethod: MinimumCurvature/ Lubinski
CIIent: VerilcalSectionAzimuth: 161.000°Field: Uinia VerlicalSectionOrigin: N0.000 ft,E 0.000ft
StructureISlot: BBS/ BBS15G-22-7-21 TVDReferenceDatum: KBWell: BBS15G-22-7-21 TVDReferenceElevation: 4925.0ftrelativetoMSL
Borehole: I.ateral 1 Sea BedIGround LevelElevation: 4909.000 ftrelativetoMSLUWIIAPI#: MagneticDeclination: 11.353°
SurveyNamel Date: BBS15G-22.7-21Lateral1 DrillingPlanCJL7-6-09/ July6,2009 TotalFieldStrength: 52649.826nTTortIAHDI DDII ERDratio: 92.800°/ 4169.06ft/ S.795/ 0.636 MagneticDip: 66.076°
GridCoordinateSystem: NADO3UtahStatePlanes, CentralZone, USFeet DeclinationDate: July06, 2009LocallonLat/Long: N40 1128.040,W109 32 20.960 MagneticDecilnallonModel: IGRF2005
LocationGridNIEYlX: N7244345.810 ftUS,E 2188149.353 ftUS NorthReference: GridNorthGrldConvergenceAngle: +1.25607498° TotalCorrMagNorth+ GridNorth: +10.097°
GridScale Factor: 0.99991810 LocalCoordinatesReferencedTo: WellHead
Comments md IncIlnation Azimuth TVD c NS EW Closure DLS ToolFace
(it) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (dog) (deg/100ft) (deg)Tie-In 0.00 0.00 161.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00MKOP 6202.00 0.00 161.00 6202.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00M
6300.00 15.68 161.00 6298.78 13.33 -12.60 4.34 13.33 161.00 16.00 0.00G6400.00 31.68 161.00 6390.06 53.36 -50.45 17.37 53.36 161.00 16.00 0.00G6500.00 47.68 161.00 6466.78 117.00 -110.63 38.09 117.00 161.00 16.00 0.00G
6600.00 63.68 161.00 6522.98 199.32 -188.46 64.89 199.32 161.00 16.00 0.00G6700.00 79.68 161.00 6554.31 293.95 -277.93 95.70 293.95 161.00 16.00 0.00G
Enter H4 Lime 6782.00 92.80 161.00 6559.67 375.59 -355.13 122.28 375.59 161.00 16.00 0.00GTD 10580.00 92.80 161.00 6374.14 4169.06 -3941.92 1357.31 4169.06 161.00 0.00 0.00G
Survev Tvne: Non-Def Proposal
Survev Error Model: NONE version *** 3-D 95.00% Confidence 2.7955 sigmaSurveyinq Proa:
MD From ( ft ) MDTo ( ft ) EOU Freq Survev Tool Tvoe Borehole -> Survey0.00 10580.00 1/100.00 NULL_ZERO(default toolused) Lateral 1 -> BBS 15G-22-7-21 Lateral 1 DrillingPlan CJL 7-6-
WelIDesign Ver Bld(doc40x_37 ) BBS 15G-22-7-21\BBS 15G-22-7-21\Lateral 1\BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-Œhnerated 9/1/2009 9:22 AM Page 1 of
'APIWellNo:43047374430000'
BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-09 ProposalReportDate: September1, 2009 SurveylDLSComputationMethod: MinimumCurvature/ Lubinski
CIIent: VerilcalSectionAzimuth: 161.000°Field: Uinia VerlicalSectionOrigin: N0.000 ft,E 0.000ft
StructureISlot: BBS/ BBS15G-22-7-21 TVDReferenceDatum: KBWell: BBS15G-22-7-21 TVDReferenceElevation: 4925.0ftrelativetoMSL
Borehole: I.ateral 1 Sea BedIGround LevelElevation: 4909.000 ftrelativetoMSLUWIIAPI#: MagneticDeclination: 11.353°
SurveyNamel Date: BBS15G-22.7-21Lateral1 DrillingPlanCJL7-6-09/ July6,2009 TotalFieldStrength: 52649.826nTTortIAHDI DDII ERDratio: 92.800°/ 4169.06ft/ S.795/ 0.636 MagneticDip: 66.076°
GridCoordinateSystem: NADO3UtahStatePlanes, CentralZone, USFeet DeclinationDate: July06, 2009LocallonLat/Long: N40 1128.040,W109 32 20.960 MagneticDecilnallonModel: IGRF2005
LocationGridNIEYlX: N7244345.810 ftUS,E 2188149.353 ftUS NorthReference: GridNorthGrldConvergenceAngle: +1.25607498° TotalCorrMagNorth+ GridNorth: +10.097°
GridScale Factor: 0.99991810 LocalCoordinatesReferencedTo: WellHead
Comments md IncIlnation Azimuth TVD c NS EW Closure DLS ToolFace
(it) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (dog) (deg/100ft) (deg)Tie-In 0.00 0.00 161.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00MKOP 6202.00 0.00 161.00 6202.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00M
6300.00 15.68 161.00 6298.78 13.33 -12.60 4.34 13.33 161.00 16.00 0.00G6400.00 31.68 161.00 6390.06 53.36 -50.45 17.37 53.36 161.00 16.00 0.00G6500.00 47.68 161.00 6466.78 117.00 -110.63 38.09 117.00 161.00 16.00 0.00G
6600.00 63.68 161.00 6522.98 199.32 -188.46 64.89 199.32 161.00 16.00 0.00G6700.00 79.68 161.00 6554.31 293.95 -277.93 95.70 293.95 161.00 16.00 0.00G
Enter H4 Lime 6782.00 92.80 161.00 6559.67 375.59 -355.13 122.28 375.59 161.00 16.00 0.00GTD 10580.00 92.80 161.00 6374.14 4169.06 -3941.92 1357.31 4169.06 161.00 0.00 0.00G
Survev Tvne: Non-Def Proposal
Survev Error Model: NONE version *** 3-D 95.00% Confidence 2.7955 sigmaSurveyinq Proa:
MD From ( ft ) MDTo ( ft ) EOU Freq Survev Tool Tvoe Borehole -> Survey0.00 10580.00 1/100.00 NULL_ZERO(default toolused) Lateral 1 -> BBS 15G-22-7-21 Lateral 1 DrillingPlan CJL 7-6-
WelIDesign Ver Bld(doc40x_37 ) BBS 15G-22-7-21\BBS 15G-22-7-21\Lateral 1\BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-Œhnerated 9/1/2009 9:22 AM Page 1 of
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
Schluinberger~ BBS 15G-22-7-21 UInta " ' BMh47etcParmarm. O alosures T(A052Lili!S:taPLrwaGuerg2weUBfu MicermenWad trutF2005 Op 40076' Dah skardbä¾if9 L Stell?66tc Feiflyg 7444)Assinut GralÖ¡rrr wirtsgytm Sinc $$$15[172721 TVOAgr AF(ikimasinta Llimigg 451M- in fasc§ënT I IWNSDS6G Ent.sp 29mkae½avs 6embrFat epsWipm Pim OBS1•<13trim Sav0ms Af¢00.3W
«< W Scale = 1(in):1500(ft) E »>-1500 0 1500 3000
KOP
Enter H4 Ume
AA
1500
-1500 8
3000
-3000
vVv
TD
fis 15G-22-721 Lateral 1 Drillinji Plan E JL 7-6494500
Ile
Gr ur6000Tot Carr (M->G +10 09ti99
KOP
1 G-22-7-21Lateral 1 Drilling Plan CJL7-6-09 G (+ 4989
Entse H4 Litrie
7500
SHL: 669' FSL & 2,022' FEL (Sec 22 T7S R21E)BHL:2,080' FSL & 660' FEL (Sec 27 T7S R21E)
9000
0 1500 3000 4500Vertical Section (ft)Azim = 161 ale = 1(in):1500(ft) Origin = 0 N/-S, OEl-W
Nonhmg:72443455li Emring:215814935R
TargetBucription Grid Caeni Larmi cuerd
Legend
RNCrilemilblnk
Priikmilaint Ril INCL AzlM T.Eli XIIEC IgúLJIG) E(±)DE§§ DLEllelu o 00 0 00 161 00 0 00 0.00 o 00 0 00KOP 6202 00 0 00 161 00 6202 00 0.00 0 00 0 00 0.00Enlar]M IJme 6182 00 92 50 161 00 6559 67 375.39 -355 13 122 28 16.001Ð 1055000 9280 16100 637414 4169.06 -394192 135131 0.00
Q lily Conilol
Dumn:1heo9:25AMSepleuiler01,
Ihawn by: Cunmi UserChokerl by:
'APIWellNo:43047374430000'
Schluinberger~ BBS 15G-22-7-21 UInta " ' BMh47etcParmarm. O alosures T(A052Lili!S:taPLrwaGuerg2weUBfu MicermenWad trutF2005 Op 40076' Dah skardbä¾if9 L Stell?66tc Feiflyg 7444)Assinut GralÖ¡rrr wirtsgytm Sinc $$$15[172721 TVOAgr AF(ikimasinta Llimigg 451M- in fasc§ënT I IWNSDS6G Ent.sp 29mkae½avs 6embrFat epsWipm Pim OBS1•<13trim Sav0ms Af¢00.3W
«< W Scale = 1(in):1500(ft) E »>-1500 0 1500 3000
KOP
Enter H4 Ume
AA
1500
-1500 8
3000
-3000
vVv
TD
fis 15G-22-721 Lateral 1 Drillinji Plan E JL 7-6494500
Ile
Gr ur6000Tot Carr (M->G +10 09ti99
KOP
1 G-22-7-21Lateral 1 Drilling Plan CJL7-6-09 G (+ 4989
Entse H4 Litrie
7500
SHL: 669' FSL & 2,022' FEL (Sec 22 T7S R21E)BHL:2,080' FSL & 660' FEL (Sec 27 T7S R21E)
9000
0 1500 3000 4500Vertical Section (ft)Azim = 161 ale = 1(in):1500(ft) Origin = 0 N/-S, OEl-W
Nonhmg:72443455li Emring:215814935R
TargetBucription Grid Caeni Larmi cuerd
Legend
RNCrilemilblnk
Priikmilaint Ril INCL AzlM T.Eli XIIEC IgúLJIG) E(±)DE§§ DLEllelu o 00 0 00 161 00 0 00 0.00 o 00 0 00KOP 6202 00 0 00 161 00 6202 00 0.00 0 00 0 00 0.00Enlar]M IJme 6182 00 92 50 161 00 6559 67 375.39 -355 13 122 28 16.001Ð 1055000 9280 16100 637414 4169.06 -394192 135131 0.00
Q lily Conilol
Dumn:1heo9:25AMSepleuiler01,
Ihawn by: Cunmi UserChokerl by:
'APIWellNo:43047374430000'
Schluinberger~ BBS 15G-22-7-21 UInta " ' BMh47etcParmarm. O alosures T(A052Lili!S:taPLrwaGuerg2weUBfu MicermenWad trutF2005 Op 40076' Dah skardbä¾if9 L Stell?66tc Feiflyg 7444)Assinut GralÖ¡rrr wirtsgytm Sinc $$$15[172721 TVOAgr AF(ikimasinta Llimigg 451M- in fasc§ënT I IWNSDS6G Ent.sp 29mkae½avs 6embrFat epsWipm Pim OBS1•<13trim Sav0ms Af¢00.3W
«< W Scale = 1(in):1500(ft) E »>-1500 0 1500 3000
KOP
Enter H4 Ume
AA
1500
-1500 8
3000
-3000
vVv
TD
fis 15G-22-721 Lateral 1 Drillinji Plan E JL 7-6494500
Ile
Gr ur6000Tot Carr (M->G +10 09ti99
KOP
1 G-22-7-21Lateral 1 Drilling Plan CJL7-6-09 G (+ 4989
Entse H4 Litrie
7500
SHL: 669' FSL & 2,022' FEL (Sec 22 T7S R21E)BHL:2,080' FSL & 660' FEL (Sec 27 T7S R21E)
9000
0 1500 3000 4500Vertical Section (ft)Azim = 161 ale = 1(in):1500(ft) Origin = 0 N/-S, OEl-W
Nonhmg:72443455li Emring:215814935R
TargetBucription Grid Caeni Larmi cuerd
Legend
RNCrilemilblnk
Priikmilaint Ril INCL AzlM T.Eli XIIEC IgúLJIG) E(±)DE§§ DLEllelu o 00 0 00 161 00 0 00 0.00 o 00 0 00KOP 6202 00 0 00 161 00 6202 00 0.00 0 00 0 00 0.00Enlar]M IJme 6182 00 92 50 161 00 6559 67 375.39 -355 13 122 28 16.001Ð 1055000 9280 16100 637414 4169.06 -394192 135131 0.00
Q lily Conilol
Dumn:1heo9:25AMSepleuiler01,
Ihawn by: Cunmi UserChokerl by:
'APIWellNo:43047374430000'
Schluinberger~ BBS 15G-22-7-21 UInta " ' BMh47etcParmarm. O alosures T(A052Lili!S:taPLrwaGuerg2weUBfu MicermenWad trutF2005 Op 40076' Dah skardbä¾if9 L Stell?66tc Feiflyg 7444)Assinut GralÖ¡rrr wirtsgytm Sinc $$$15[172721 TVOAgr AF(ikimasinta Llimigg 451M- in fasc§ënT I IWNSDS6G Ent.sp 29mkae½avs 6embrFat epsWipm Pim OBS1•<13trim Sav0ms Af¢00.3W
«< W Scale = 1(in):1500(ft) E »>-1500 0 1500 3000
KOP
Enter H4 Ume
AA
1500
-1500 8
3000
-3000
vVv
TD
fis 15G-22-721 Lateral 1 Drillinji Plan E JL 7-6494500
Ile
Gr ur6000Tot Carr (M->G +10 09ti99
KOP
1 G-22-7-21Lateral 1 Drilling Plan CJL7-6-09 G (+ 4989
Entse H4 Litrie
7500
SHL: 669' FSL & 2,022' FEL (Sec 22 T7S R21E)BHL:2,080' FSL & 660' FEL (Sec 27 T7S R21E)
9000
0 1500 3000 4500Vertical Section (ft)Azim = 161 ale = 1(in):1500(ft) Origin = 0 N/-S, OEl-W
Nonhmg:72443455li Emring:215814935R
TargetBucription Grid Caeni Larmi cuerd
Legend
RNCrilemilblnk
Priikmilaint Ril INCL AzlM T.Eli XIIEC IgúLJIG) E(±)DE§§ DLEllelu o 00 0 00 161 00 0 00 0.00 o 00 0 00KOP 6202 00 0 00 161 00 6202 00 0.00 0 00 0 00 0.00Enlar]M IJme 6182 00 92 50 161 00 6559 67 375.39 -355 13 122 28 16.001Ð 1055000 9280 16100 637414 4169.06 -394192 135131 0.00
Q lily Conilol
Dumn:1heo9:25AMSepleuiler01,
Ihawn by: Cunmi UserChokerl by:
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to test the Green River. If productive, casing will be run and the well completed. If dry, the well will be plugged and abandoned as per BLM and State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under the terms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is Questar Exploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell, Questar Drilling Engineer at 303-308-3628.
Additional Operator Remarks
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
Additional Operator Remarks
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at
'APIWellNo:43047374430000'
Additional Operator Remarks
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at
'APIWellNo:43047374430000'
Additional Operator Remarks
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at
'APIWellNo:43047374430000'
Additional Operator Remarks
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at
QUESTAR EXPLORATION AND PRODUCTION BBS 15G-22-7-21 API: 43-047-37443 Summarized Re-Entry Procedure 1. Rig down pumping unit, clear location of all unnecessary equipment. 2. MIRU pulling unit. 3. ND tubing head, NU BOP’s (3M). 4. Kill well if necessary. 5. Pull out of hole with 264 rods (112 - 7/8” plain, & 152 - ¾” plain) and 2 ½” x 1 ¾”
x 16 x 19 x 20’ RHAC pump. 6. Unseat tubing anchor and POOH with 208 jts 2 7/8” 6.5# J-55 tubing, TAC, PSN,
T-Anchor. 7. PU bit and 5 ½” casing scraper, RIH to 6,500’. 8. Roll hole with KCl water, TOOH with bit and scraper. 9. RU wireline truck and RIH with CIBP. 10. Set top of CIBP @ +/- 6,206’, 2’ above nearest collar @ 6,208’. 11. ND BOP’s 12. RD pulling unit, move off location. 13. MIRU drilling rig. 14. NU rig’s 3,000 WP rated BOP. 15. RIH with whipstock, set and orient whipstock.. 16. TIH with milling BHA, mill window in 5 ½” casing @ 6,192’ top, 6,202’ bottom. 17. TOOH, PU directional BHA, TIH. 18. Drill well at a 161° azimuth with 16°/100’ build rates to land in H4a Lime
formation at a TVD of +/- 6,560’. 19. Drill +/- 3,798’ of lateral in H4a Lime.
a. Mud system to be water based mud, weights are expected to be in the 8.4 – 8.8 ppg range.
20. Circulate and condition hole, TOOH, LD 4,000’ DP. a. PU slotted liner, blank liner and liner dropping tool. b. RIH w/ liner and dropping tool, drop liner 2’ outside window. c. TOOH, LD remainder of DP.
21. RIH and set RBP @ +/- 4,500’ to isolate lateral. 22. ND BOP’s. 23. RDMOL.
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
QUESTAR EXPLORATION AND PRODUCTION
BBS 15G-22-7-21API: 43-047-37443Summarized Re-Entry Procedure
1. Rig down pumping unit, clear location of all unnecessary equipment.2. MIRU pulling unit.
3. ND tubing head, NU BOP's (3M).4. Kill well if necessary.
5. Pull out of hole with 264 rods (112 - '/s"plain, & 152 - ¾" plain) and 2 ½" xl ¾"x 16 x 19 x 20' RHAC pump.
6. Unseat tubing anchor and POOH with 208 jts 2 '/8"6.5# J-55 tubing, TAC, PSN,T-Anchor.
7. PU bit and 5 ½" casing scraper, RIH to 6,500'.8. Roll hole with KCl water, TOOH with bit and scraper.9. RU wireline truck and RIH with CIBP.10. Set top of CIBP @+/- 6,206', 2' above nearest collar @6,208'.11. ND BOP's12. RD pulling unit, move off location.13. MIRU drilling rig.
14. NU rig's 3,000 WP rated BOP.15. RIH with whipstock, set and orient whipstock..
16. TIH with milling BHA, mill window in 5 ½" casing @6,192' top, 6,202' bottom.17. TOOH, PU directional BHA, TIH.18. Drill well at a 161° azimuth with 16°/100' build rates to land in H4a Lime
formation at a TVD of+/- 6,560'.19. Drill +/- 3,798' of lateral in H4a Lime.
a. Mud system to be water based mud, weights are expected to be in the 8.4 -
8.8 ppg range.
20. Circulate and condition hole, TOOH, LD 4,000' DP.a. PU slotted liner, blank liner and liner dropping tool.b. RIH w/ liner and dropping tool, drop liner 2' outside window.
c. TOOH, LD remainder of DP.21. RIH and set RBP @+/- 4,500' to isolate lateral.22. ND BOP's.23.
'APIWellNo:43047374430000'
QUESTAR EXPLORATION AND PRODUCTION
BBS 15G-22-7-21API: 43-047-37443Summarized Re-Entry Procedure
1. Rig down pumping unit, clear location of all unnecessary equipment.2. MIRU pulling unit.
3. ND tubing head, NU BOP's (3M).4. Kill well if necessary.
5. Pull out of hole with 264 rods (112 - '/s"plain, & 152 - ¾" plain) and 2 ½" xl ¾"x 16 x 19 x 20' RHAC pump.
6. Unseat tubing anchor and POOH with 208 jts 2 '/8"6.5# J-55 tubing, TAC, PSN,T-Anchor.
7. PU bit and 5 ½" casing scraper, RIH to 6,500'.8. Roll hole with KCl water, TOOH with bit and scraper.9. RU wireline truck and RIH with CIBP.10. Set top of CIBP @+/- 6,206', 2' above nearest collar @6,208'.11. ND BOP's12. RD pulling unit, move off location.13. MIRU drilling rig.
14. NU rig's 3,000 WP rated BOP.15. RIH with whipstock, set and orient whipstock..
16. TIH with milling BHA, mill window in 5 ½" casing @6,192' top, 6,202' bottom.17. TOOH, PU directional BHA, TIH.18. Drill well at a 161° azimuth with 16°/100' build rates to land in H4a Lime
formation at a TVD of+/- 6,560'.19. Drill +/- 3,798' of lateral in H4a Lime.
a. Mud system to be water based mud, weights are expected to be in the 8.4 -
8.8 ppg range.
20. Circulate and condition hole, TOOH, LD 4,000' DP.a. PU slotted liner, blank liner and liner dropping tool.b. RIH w/ liner and dropping tool, drop liner 2' outside window.
c. TOOH, LD remainder of DP.21. RIH and set RBP @+/- 4,500' to isolate lateral.22. ND BOP's.23.
'APIWellNo:43047374430000'
QUESTAR EXPLORATION AND PRODUCTION
BBS 15G-22-7-21API: 43-047-37443Summarized Re-Entry Procedure
1. Rig down pumping unit, clear location of all unnecessary equipment.2. MIRU pulling unit.
3. ND tubing head, NU BOP's (3M).4. Kill well if necessary.
5. Pull out of hole with 264 rods (112 - '/s"plain, & 152 - ¾" plain) and 2 ½" xl ¾"x 16 x 19 x 20' RHAC pump.
6. Unseat tubing anchor and POOH with 208 jts 2 '/8"6.5# J-55 tubing, TAC, PSN,T-Anchor.
7. PU bit and 5 ½" casing scraper, RIH to 6,500'.8. Roll hole with KCl water, TOOH with bit and scraper.9. RU wireline truck and RIH with CIBP.10. Set top of CIBP @+/- 6,206', 2' above nearest collar @6,208'.11. ND BOP's12. RD pulling unit, move off location.13. MIRU drilling rig.
14. NU rig's 3,000 WP rated BOP.15. RIH with whipstock, set and orient whipstock..
16. TIH with milling BHA, mill window in 5 ½" casing @6,192' top, 6,202' bottom.17. TOOH, PU directional BHA, TIH.18. Drill well at a 161° azimuth with 16°/100' build rates to land in H4a Lime
formation at a TVD of+/- 6,560'.19. Drill +/- 3,798' of lateral in H4a Lime.
a. Mud system to be water based mud, weights are expected to be in the 8.4 -
8.8 ppg range.
20. Circulate and condition hole, TOOH, LD 4,000' DP.a. PU slotted liner, blank liner and liner dropping tool.b. RIH w/ liner and dropping tool, drop liner 2' outside window.
c. TOOH, LD remainder of DP.21. RIH and set RBP @+/- 4,500' to isolate lateral.22. ND BOP's.23.
'APIWellNo:43047374430000'
QUESTAR EXPLORATION AND PRODUCTION
BBS 15G-22-7-21API: 43-047-37443Summarized Re-Entry Procedure
1. Rig down pumping unit, clear location of all unnecessary equipment.2. MIRU pulling unit.
3. ND tubing head, NU BOP's (3M).4. Kill well if necessary.
5. Pull out of hole with 264 rods (112 - '/s"plain, & 152 - ¾" plain) and 2 ½" xl ¾"x 16 x 19 x 20' RHAC pump.
6. Unseat tubing anchor and POOH with 208 jts 2 '/8"6.5# J-55 tubing, TAC, PSN,T-Anchor.
7. PU bit and 5 ½" casing scraper, RIH to 6,500'.8. Roll hole with KCl water, TOOH with bit and scraper.9. RU wireline truck and RIH with CIBP.10. Set top of CIBP @+/- 6,206', 2' above nearest collar @6,208'.11. ND BOP's12. RD pulling unit, move off location.13. MIRU drilling rig.
14. NU rig's 3,000 WP rated BOP.15. RIH with whipstock, set and orient whipstock..
16. TIH with milling BHA, mill window in 5 ½" casing @6,192' top, 6,202' bottom.17. TOOH, PU directional BHA, TIH.18. Drill well at a 161° azimuth with 16°/100' build rates to land in H4a Lime
formation at a TVD of+/- 6,560'.19. Drill +/- 3,798' of lateral in H4a Lime.
a. Mud system to be water based mud, weights are expected to be in the 8.4 -
8.8 ppg range.
20. Circulate and condition hole, TOOH, LD 4,000' DP.a. PU slotted liner, blank liner and liner dropping tool.b. RIH w/ liner and dropping tool, drop liner 2' outside window.
c. TOOH, LD remainder of DP.21. RIH and set RBP @+/- 4,500' to isolate lateral.22. ND BOP's.23.
BBS 15G-22-7-21 Re-Entry Horizontal Well
Whipstock
3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted lin
16o Dogleg
9-5/8", 36#, J-55casing set @ 495'
Perfs 6,575' - 6,580'
Top of cement @ 1,166'
CIBP set @ 6,206'
Top of window @ 6,192'
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'BBS15G-22-7-21Re-EntryHorizontalWell
9-5/8", 36#, J-55casing set @495'
Top of cement @ 1,166'
Top of window @6,192'
Whipstock16° Dogleg
CIBP set @6,206' +
Perfs 6,575' - 6,580' ::: :::: 3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted
'APIWellNo:43047374430000'BBS15G-22-7-21Re-EntryHorizontalWell
9-5/8", 36#, J-55casing set @495'
Top of cement @ 1,166'
Top of window @6,192'
Whipstock16° Dogleg
CIBP set @6,206'
Perfs 6,575' - 6,580' ::: :::: 3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted
'APIWellNo:43047374430000'BBS15G-22-7-21Re-EntryHorizontalWell
9-5/8", 36#, J-55casing set @495'
Top of cement @ 1,166'
Top of window @6,192'
Whipstock16° Dogleg
CIBP set @6,206'
Perfs 6,575' - 6,580' ::: :::: 3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted
'APIWellNo:43047374430000'BBS15G-22-7-21Re-EntryHorizontalWell
9-5/8", 36#, J-55casing set @495'
Top of cement @ 1,166'
Top of window @6,192'
Whipstock16° Dogleg
CIBP set @6,206'
Perfs 6,575' - 6,580' ::: :::: 3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to test the Green River. If productive, casing will be run and the well completed. If dry, the well will be plugged and abandoned as per BLM and State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under the terms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is Questar Exploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell, Questar Drilling Engineer at 303-308-3628.
Additional Operator Remarks
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
'APIWellNo:43047374430000'
Additional Operator Remarks
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at
'APIWellNo:43047374430000'
Additional Operator Remarks
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at
'APIWellNo:43047374430000'
Additional Operator Remarks
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at
'APIWellNo:43047374430000'
Additional Operator Remarks
Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.
See Onshore Order No. 1 attached
Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.
Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.
PLEASE FIND ATTACHED:
1. Re-Entry Procedure
2. Drilling Proposal
3. 8-point Program
4. Proposed Well Bore Diagram
5. Legal Plats / Map Prepared by UELS
6. Location Layout Refering to Reserve Pit
If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at
(09/14/2009) Diana Mason - Johnson Bottom.doc Page 1
United States Department of the InteriorBUREAU OF LAND MANAGEMENT
Utah State OfficeP.O. Box 45155
Salt Lake City, Utah 84145-0155
IN REPLY REFER TO:3160(UT-922)
September 11, 2009
Memorandum
To: Assistant District Manager Minerals, Vernal District
From: Michael Coulthard, Petroleum Engineer
Subject: 2008 Plan of Development Johnson Bottom, Uintah County, Utah.
Pursuant to email between Diana Whitney, Division of Oil, Gas and Mining, and Mickey Coulthard, Utah State Office, Bureau of Land Management, the following horizontal well is planned for calendar year 2008 within the Johnson Bottom Unit, Uintah County, Utah
API # WELL NAME LOCATION
(Proposed PZ Green River)
43-047-37443 BBS 15G-22-7-21 Sec 22 T07S R21E 0669 FSL 2022 FEL Lateral 1 Sec 27 T07S R21E 2080 FSL 0660 FEL
This office has no objection to permitting the well at this time.
/s/ Michael L. Coulthard
bcc: File – Johnson Bottom UnitDivision of Oil Gas and MiningCentral Files Agr. Sec. ChronFluid Chron
MCoulthard:mc:9-11-09
’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’
CONFIDENTIAL
(09¾ygggagd4ggg4gggn Bottom.doc Page 1
United States Department of the Interior
BUREAU OF LAND MANAGEMENTUtah State Office
P.O. Box 45155Salt Lake City, Utah 84145-0155
IN REPLY REFER TO:3160(UT-922)
September 11, 2009
Memorandum
To: Assistant District Manager Minerals, Vernal District
From: Michael Coulthard, Petroleum Engineer
Subject: 2008 Plan of Development Johnson Bottom,Uintah County, Utah.
Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following horizontal well is planned for calendaryear 2008 within the Johnson Bottom Unit, Uintah County, Utah
API# WELLNAME LOCATION
(Proposed PZ Green River)
43-047-37443 BBS 15G-22-7-21 Sec 22 TO7S R21E 0669 FSL 2022 FELLateral 1 Sec 27 TO7S R21E 2080 FSL 0660 FEL
This office has no objection to permitting the well at this time.
/s/ Michael L. Coulthard
bcc: File - Johnson Bottom UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron
(09¾ygggagd4ggg4gggn Bottom.doc Page 1
United States Department of the Interior
BUREAU OF LAND MANAGEMENTUtah State Office
P.O. Box 45155Salt Lake City, Utah 84145-0155
IN REPLY REFER TO:3160(UT-922)
September 11, 2009
Memorandum
To: Assistant District Manager Minerals, Vernal District
From: Michael Coulthard, Petroleum Engineer
Subject: 2008 Plan of Development Johnson Bottom,Uintah County, Utah.
Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following horizontal well is planned for calendaryear 2008 within the Johnson Bottom Unit, Uintah County, Utah
API# WELLNAME LOCATION
(Proposed PZ Green River)
43-047-37443 BBS 15G-22-7-21 Sec 22 TO7S R21E 0669 FSL 2022 FELLateral 1 Sec 27 TO7S R21E 2080 FSL 0660 FEL
This office has no objection to permitting the well at this time.
/s/ Michael L. Coulthard
bcc: File - Johnson Bottom UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron
(09¾ygggagd4ggg4gggn Bottom.doc Page 1
United States Department of the Interior
BUREAU OF LAND MANAGEMENTUtah State Office
P.O. Box 45155Salt Lake City, Utah 84145-0155
IN REPLY REFER TO:3160(UT-922)
September 11, 2009
Memorandum
To: Assistant District Manager Minerals, Vernal District
From: Michael Coulthard, Petroleum Engineer
Subject: 2008 Plan of Development Johnson Bottom,Uintah County, Utah.
Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following horizontal well is planned for calendaryear 2008 within the Johnson Bottom Unit, Uintah County, Utah
API# WELLNAME LOCATION
(Proposed PZ Green River)
43-047-37443 BBS 15G-22-7-21 Sec 22 TO7S R21E 0669 FSL 2022 FELLateral 1 Sec 27 TO7S R21E 2080 FSL 0660 FEL
This office has no objection to permitting the well at this time.
/s/ Michael L. Coulthard
bcc: File - Johnson Bottom UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron
(09¾ygggagd4ggg4gggn Bottom.doc Page 1
United States Department of the Interior
BUREAU OF LAND MANAGEMENTUtah State Office
P.O. Box 45155Salt Lake City, Utah 84145-0155
IN REPLY REFER TO:3160(UT-922)
September 11, 2009
Memorandum
To: Assistant District Manager Minerals, Vernal District
From: Michael Coulthard, Petroleum Engineer
Subject: 2008 Plan of Development Johnson Bottom,Uintah County, Utah.
Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following horizontal well is planned for calendaryear 2008 within the Johnson Bottom Unit, Uintah County, Utah
API# WELLNAME LOCATION
(Proposed PZ Green River)
43-047-37443 BBS 15G-22-7-21 Sec 22 TO7S R21E 0669 FSL 2022 FELLateral 1 Sec 27 TO7S R21E 2080 FSL 0660 FEL
This office has no objection to permitting the well at this time.
/s/ Michael L. Coulthard
bcc: File - Johnson Bottom UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron
â
ª
N
N
N
'
N
B R E N N A N B O T T O M F I E L DB R E N N A N B O T T O M F I E L D
T A P A D E R OT A P A D E R O
22
27
23
26
21
28
1516
4304734408SU 4W-26-7-21
4304738471BBS 5G-23-7-21
4304734383WV 10W-26-7-21
4304737443BBS 15G-22-7-21
4304739180SU PURDY 4G-27-7-21
4304710875PELICAN LAKE UNIT 2
4304739181SU PURDY 10G-27-7-21
4304731117LEOTA UNIT A-2-26-1D
Map Produced by Diana MasonMap Prepared:
Well Name: BBS 15G-22-7-21API Number: 4304737443
Township 07.0 S Section 22Range 21.0 EMeridian: SLBM
F1,200 0 1,200600 Feet
1:11,790
UnitsSTATUS
ACTIVE
EXPLORATORY
GAS STORAGE
NF PP OIL
NF SECONDARY
PI OIL
PP GAS
PP GEOTHERML
PP OIL
SECONDARY
TERMINATED
FieldsSTATUS
ACTIVE
COMBINED
Sections
Wells Query Events
D <all other values>
GIS_STAT_TYPE
" <Null>
APD
H DRL
4 GI
!* GS
N LA
G NEW
7 OPS
ª PA
* PGW
' POW
O RET
¸ SGW
· SOW
6 TA
" TW
¸ WD
¸ WI
=* WS
Tooele
Millard
Iron
San Juan
Kane
Juab
Uintah
Box Elder
Emery
Garfield
Grand
Utah
Beaver Wayne
Duchesne
Sevier
Summit
Rich
Washington
Carbon
Sanpete
Cache
Piute
Davis
Wasatch
Weber
DaggettSalt Lake
Morgan
Location Map
Operator: QUESTAR EXPLORATION & PRODUCTION CO
’APIW
ellNo:43047374430000’
’APIW
ellNo:43047374430000’
’APIW
ellNo:43047374430000’
’APIW
ellNo:43047374430000’
CONFIDENTIAL
16 API Number: 4304737443Well Name: BBS 15G-22-7-21
Township 07.0 S Range 21.0 E Section 22Meridian: SLBM
Operator: QUESTAR EXPLORATION & PRODUCTION CO
Map Prepared:Map Produced by Diana Mason
22
Fields PA
sTAluscTrve
BRENNAN BOTTOM FIELD
43047374434304710875 BBS 15G-22-7-21
PELICAN LAKE UNIT
O ws
CacheBox Elder Rich Location Map
4304734408 / Weber
4304739180SU 4W-26-7-21
avisAor -
SummitSU PURDY 4G-27-7-21
Tooeleat Lak
Utah
sate DuchesnU ah
JuabCarbon
4304731117LEOTAUNITA-2-26-1D
MillardEmery Grand
26 362 6r
TAPADERO 2728 Beaver Wayne
Garfeld
/ San Juan
Washington Kane
SU PU13
7-7-21 W1004
2 21 .y
200 600
16 API Number: 4304737443Well Name: BBS 15G-22-7-21
Township 07.0 S Range 21.0 E Section 22
Meridian: SLBMOperator: QUESTAR EXPLORATION & PRODUCTION CO
Map Prepared:Map Produced by Diana Mason
Fields PA
sTAluscTrve
BRENNAN BOTTOM FIELD "" esar
43047374434304710875 BBS 15G-22-7-21
PELICAN LAKE UNIT
O ws
CacheBox Elder Rich Location Map
4304734408 / Weber
4304739180SU 4W-26-7-21
avisAor -
SummitSU PURDY 4G-27-7-21
Tooeleat Lak
Utah
sate DuchesnU ah
JuabCarbon
4304731117LEOTAUNITA-2-26-1D
MillardEmery Grand
26 362 6r
TAPADERO 2728 Beaver Wayne
Garfeld
/ San Juan
Washington Kane
SU PU13
7-7-21 W1004
2 21 .y
200 600
16 API Number: 4304737443Well Name: BBS 15G-22-7-21
Township 07.0 S Range 21.0 E Section 22Meridian: SLBM
Operator: QUESTAR EXPLORATION & PRODUCTION CO
Map Prepared:Map Produced by Diana Mason
Fields PA
sTAluscTrve
BRENNAN BOTTOM FIELD "" esar
43047374434304710875 BBS 15G-22-7-21
PELICAN LAKE UNIT
O ws
CacheBox Elder Rich Location Map
4304734408 / Weber
4304739180SU 4W-26-7-21
avisAor -
SummitSU PURDY 4G-27-7-21
Tooeleat Lak
Utah
sate DuchesnU ah
JuabCarbon
4304731117LEOTAUNITA-2-26-1D
MillardEmery Grand
26 362 6r
TAPADERO 2728 Beaver Wayne
Garfeld
/ San Juan
Washington Kane
SU PU13
7-7-21 W1004
2 21 .y
200 600
16 API Number: 4304737443Well Name: BBS 15G-22-7-21
Township 07.0 S Range 21.0 E Section 22Meridian: SLBM
Operator: QUESTAR EXPLORATION & PRODUCTION CO
Map Prepared:Map Produced by Diana Mason
Fields PA
sTAluscTrve
BRENNAN BOTTOM FIELD "" esar
43047374434304710875 BBS 15G-22-7-21
PELICAN LAKE UNIT
O ws
CacheBox Elder Rich Location Map
4304734408 / Weber
4304739180SU 4W-26-7-21
avisAor -
SummitSU PURDY 4G-27-7-21
Tooeleat Lak
Utah
sate DuchesnU ah
JuabCarbon
4304731117LEOTAUNITA-2-26-1D
MillardEmery Grand
26 362 6r
TAPADERO 2728 Beaver Wayne
Garfeld
/ San Juan
Washington Kane
SU PU13
7-7-21 W1004
2 21 .y
200 600
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000
WELL NAME: BBS 15G-22-7-21
OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331
CONTACT: Jan Nelson
PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:
SURFACE: 0669 FSL 2022 FEL Engineering Review:
BOTTOM: 2080 FSL 0660 FEL Geology Review:
COUNTY: UINTAH
LATITUDE: 40.19114 LONGITUDE: -109.53847
UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00
FIELD NAME: BRENNAN BOTTOM
LEASE TYPE: 1 - Federal
LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 1 - Federal COALBED METHANE: NO
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - ESB000024 Unit: JOHNSON BOTTOM
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
Comments: Presite Completed 070430 FR N2460:9/30/09 Original off conf date 3/2/08:
Stipulations: 4 - Federal Approval - bhill 15 - Directional - bhill
CONFIDENTIAL
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
I
I
APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000
WELL NAME: BBS 15G-22-7-21
OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331
CONTACT: Jan Nelson
PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:
SURFACE: 0669 FSL 2022 FEL Engineering Review:
BOTTOM: 2080 FSL 0660 FEL Geology Review:
COUNTY: UINTAH
LATITUDE: 40.19114 LONGITUDE: -109.53847
UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00
FIELD NAME: BRENNAN BOTTOM
LEASE TYPE: 1 - Federal
LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 1 - Federal COALBED METHANE: NO
I
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - ESBOOOO24 Unit: JOHNSON BOTTOM
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
I
Comments: Presite Completed070430 FR N2460:9/30/09 Original off conf date 3/2/08:
Stipulations: 4 - Federal Approval - bhill15 - Directional -
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
I
I
APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000
WELL NAME: BBS 15G-22-7-21
OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331
CONTACT: Jan Nelson
PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:
SURFACE: 0669 FSL 2022 FEL Engineering Review:
BOTTOM: 2080 FSL 0660 FEL Geology Review:
COUNTY: UINTAH
LATITUDE: 40.19114 LONGITUDE: -109.53847
UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00
FIELD NAME: BRENNAN BOTTOM
LEASE TYPE: 1 - Federal
LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 1 - Federal COALBED METHANE: NO
I
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - ESBOOOO24 Unit: JOHNSON BOTTOM
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
I
Comments: Presite Completed070430 FR N2460:9/30/09 Original off conf date 3/2/08:
Stipulations: 4 - Federal Approval - bhill15 - Directional -
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
I
I
APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000
WELL NAME: BBS 15G-22-7-21
OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331
CONTACT: Jan Nelson
PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:
SURFACE: 0669 FSL 2022 FEL Engineering Review:
BOTTOM: 2080 FSL 0660 FEL Geology Review:
COUNTY: UINTAH
LATITUDE: 40.19114 LONGITUDE: -109.53847
UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00
FIELD NAME: BRENNAN BOTTOM
LEASE TYPE: 1 - Federal
LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 1 - Federal COALBED METHANE: NO
I
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - ESBOOOO24 Unit: JOHNSON BOTTOM
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
I
Comments: Presite Completed070430 FR N2460:9/30/09 Original off conf date 3/2/08:
Stipulations: 4 - Federal Approval - bhill15 - Directional -
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
I
I
APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000
WELL NAME: BBS 15G-22-7-21
OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331
CONTACT: Jan Nelson
PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:
SURFACE: 0669 FSL 2022 FEL Engineering Review:
BOTTOM: 2080 FSL 0660 FEL Geology Review:
COUNTY: UINTAH
LATITUDE: 40.19114 LONGITUDE: -109.53847
UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00
FIELD NAME: BRENNAN BOTTOM
LEASE TYPE: 1 - Federal
LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 1 - Federal COALBED METHANE: NO
I
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - ESBOOOO24 Unit: JOHNSON BOTTOM
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
I
Comments: Presite Completed070430 FR N2460:9/30/09 Original off conf date 3/2/08:
Stipulations: 4 - Federal Approval - bhill15 - Directional -
Permit To Drill
******************Well Name: BBS 15G-22-7-21
API Well Number: 43047374430000
Lease Number: UTU16551
Surface Owner: FEDERAL
Approval Date: 10/1/2009
Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078
Authority:Pursuant to Utah Code Ann. §40-6-1 et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.
In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.
Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well: • Within 24 hours following the spudding of the well – contact Carol Daniels at 801-538-5284 (please leave a voicemail message if not available) OR submit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas website at https://oilgas.ogm.utah.gov
Reporting Requirements:
API Well No: 43047374430000API Well No: 43047374430000
State of UtahDEPARTMENT OF NATURAL RESOURCES
'- MICHAEL R. STYLER
GARY R. HERBERT Excutiw Drotor
comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor
Permit To Drillkkkkkkkkkkkkkkkkkk
Well Name: BBS 15G-22-7-21API Well Number: 43047374430000
Lease Number: UTUl6551Surface Owner: FEDERALApproval Date: 10/1/2009
Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078
Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.
In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.
Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:
• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov
Reporting
API Well No: 43047374430000
State of UtahDEPARTMENT OF NATURAL RESOURCES
'- MICHAEL R. STYLER
GARY R. HERBERT Excutiw Drotor
comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor
Permit To Drillkkkkkkkkkkkkkkkkkk
Well Name: BBS 15G-22-7-21API Well Number: 43047374430000
Lease Number: UTUl6551Surface Owner: FEDERALApproval Date: 10/1/2009
Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078
Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.
In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.
Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:
• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov
Reporting
API Well No: 43047374430000
State of UtahDEPARTMENT OF NATURAL RESOURCES
'- MICHAEL R. STYLER
GARY R. HERBERT Excutiw Drotor
comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor
Permit To Drillkkkkkkkkkkkkkkkkkk
Well Name: BBS 15G-22-7-21API Well Number: 43047374430000
Lease Number: UTUl6551Surface Owner: FEDERALApproval Date: 10/1/2009
Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078
Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.
In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.
Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:
• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov
Reporting
API Well No: 43047374430000
State of UtahDEPARTMENT OF NATURAL RESOURCES
'- MICHAEL R. STYLER
GARY R. HERBERT Excutiw Drotor
comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor
Permit To Drillkkkkkkkkkkkkkkkkkk
Well Name: BBS 15G-22-7-21API Well Number: 43047374430000
Lease Number: UTUl6551Surface Owner: FEDERALApproval Date: 10/1/2009
Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078
Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.
In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.
Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:
• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov
Reporting
All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to: • Entity Action Form (Form 6) – due within 5 days of spudding the well • Monthly Status Report (Form 9) – due by 5th day of the following calendar month • Requests to Change Plans (Form 9) – due prior to implementation • Written Notice of Emergency Changes (Form 9) – due within 5 days • Notice of Operations Suspension or Resumption (Form 9) – due prior to implementation • Report of Water Encountered (Form 7) – due within 30 days after completion • Well Completion Report (Form 8) – due within 30 days after completion or plugging
Approved By:
For Gil HuntAssociate Director, Oil & Gas
API Well No: 43047374430000API Well No: 43047374430000
All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:
• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging
Approved By:
For Gil HuntAssociate Director, Oil &
API Well No: 43047374430000
All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:
• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging
Approved By:
For Gil HuntAssociate Director, Oil &
API Well No: 43047374430000
All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:
• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging
Approved By:
For Gil HuntAssociate Director, Oil &
API Well No: 43047374430000
All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:
• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging
Approved By:
For Gil HuntAssociate Director, Oil &
STATE OF UTAH AMENDEDREPORT O FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)
DIVISIONOF OIL,GAS AND MINING 5. LEASE DES1GNATIONANDSERIALNUMBER:UTU-74972
6. IF INDIAN,ALLOTTEEOR TRIBENAMEWELL COMPLETION 011 RECOMPLETIONREPORT AND LOG N/A
ia. TYPE OF WELL: OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAMEWELL WELL JOHNSON BOTTOM
b. TYPE OF WORK: 8. WELLNAMEand NUMBER:N
LHL ENEEP-
RYF
R. OTHER Horizontal BBS 15G 22-7-212. NAMEOF OPERATOR: 9. API NUMBER:
QUESTAR EXPLORATION & PRODUCTIONCOMPANY 43047374433. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WILDCAT
11002 E. 17500 S. on y VERNAL STATE UT zie 84078 (435) 781-4342 BRENNAN BOTTOM4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP,RANGE,
ATSURFACE: 669' FSL 2022 FEL MERIDIAN:22
7SATTOP PRODUCING INTERVALREPORTED BELOW: 669' FSL 2022 FEL
12. COUNTY 13. STATEATTOTAL DEPTH: 2539 FSE 591 FEL NE EC 27-7S-R21EUINTAH UTAH
14. DATESPUDDED: 15 DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB,RT, GL):12/2/2009 12/17/2009 ABANDONED READYTOPRODUCE 2 15' KB
18. TOTALDEFTH: MD 10 054 19. PLUG BACKT.D.: MD 8,480 20. IF MULTlPLECOMPLETlONS, HOW MANY?* 21. DEPTH BRIDGE MD
TVD æ d4M Tvo oC ¥f PLUG SET:TVD
22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN (Submit copy of each) 23.
WAS WELLCORED? NO YES (Submit analysis)NO LOGSWAS DST RUN? NO YES (Submit report)DIRECTIONALSURVEY? NO YES (Submit copy)
24. CASINGAND LINERRECORD (Report all strings set in well)
HOLESIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM(MD) STAGEDCEMHENTERCNEMEONFS
KES VOLSUBBL) CEMENTTOP ** AMOUNTPULLED
4.875 2-7/8 10.4 6,181 10,054 n/a 0
26. TUBINGRECORD
SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKERSET (MD)2.875 6,154
28. PRODUCINGINTERVALS 27. PERFORATION RECORDFORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM(TVD) INTERVAL(ToplBot - MD) SIZE NO HOLES PERFORATIONSTATUS
(A) GREEN RIVER 6,795 8,300 6,795 8,300 open Squeezed
(B) Open Squeezed
(C) Open Squeezed
(D) Open Squeezed
ž8. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.
DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL
6795' - 8440' 23,000 gals 15% HCL
29. ENCLOSEDATTACHMENTS: 30. WELL STATUS:
O ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONALSURVEY CompletedO SUNDRY NOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER:
(5/2000) RECEIVED (CONTINUEDON BACK)
DEC3 1 2009DIV.0FOIL,GAS&MINING
STATE OF UTAH AMENDEDREPORT O FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)
DIVISIONOF OIL,GAS AND MINING 5. LEASE DES1GNATIONANDSERIALNUMBER:UTU-74972
6. IF INDIAN,ALLOTTEEOR TRIBENAMEWELL COMPLETION 011 RECOMPLETIONREPORT AND LOG N/A
ia. TYPE OF WELL: OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAMEWELL WELL JOHNSON BOTTOM
b. TYPE OF WORK: 8. WELLNAMEand NUMBER:N
LHL ENEEP-
RYF
R. OTHER Horizontal BBS 15G 22-7-212. NAMEOF OPERATOR: 9. API NUMBER:
QUESTAR EXPLORATION & PRODUCTIONCOMPANY 43047374433. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WILDCAT
11002 E. 17500 S. on y VERNAL STATE UT zie 84078 (435) 781-4342 BRENNAN BOTTOM4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP,RANGE,
ATSURFACE: 669' FSL 2022 FEL MERIDIAN:22
7SATTOP PRODUCING INTERVALREPORTED BELOW: 669' FSL 2022 FEL
12. COUNTY 13. STATEATTOTAL DEPTH: 2539 FSE 591 FEL NE EC 27-7S-R21EUINTAH UTAH
14. DATESPUDDED: 15 DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB,RT, GL):12/2/2009 12/17/2009 ABANDONED READYTOPRODUCE 2 15' KB
18. TOTALDEFTH: MD 10 054 19. PLUG BACKT.D.: MD 8,480 20. IF MULTlPLECOMPLETlONS, HOW MANY?* 21. DEPTH BRIDGE MD
TVD æ d4M Tvo oC ¥f PLUG SET:TVD
22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN (Submit copy of each) 23.
WAS WELLCORED? NO YES (Submit analysis)NO LOGSWAS DST RUN? NO YES (Submit report)DIRECTIONALSURVEY? NO YES (Submit copy)
24. CASINGAND LINERRECORD (Report all strings set in well)
HOLESIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM(MD) STAGEDCEMHENTERCNEMEONFS
KES VOLSUBBL) CEMENTTOP ** AMOUNTPULLED
4.875 2-7/8 10.4 6,181 10,054 n/a 0
26. TUBINGRECORD
SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKERSET (MD)2.875 6,154
28. PRODUCINGINTERVALS 27. PERFORATION RECORDFORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM(TVD) INTERVAL(ToplBot - MD) SIZE NO HOLES PERFORATIONSTATUS
(A) GREEN RIVER 6,795 8,300 6,795 8,300 open Squeezed
(B) Open Squeezed
(C) Open Squeezed
(D) Open Squeezed
ž8. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.
DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL
6795' - 8440' 23,000 gals 15% HCL
29. ENCLOSEDATTACHMENTS: 30. WELL STATUS:
O ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONALSURVEY CompletedO SUNDRY NOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER:
(5/2000) RECEIVED (CONTINUEDON BACK)
DEC3 1 2009DIV.0FOIL,GAS&MINING
STATE OF UTAH AMENDEDREPORT O FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)
DIVISIONOF OIL,GAS AND MINING 5. LEASE DES1GNATIONANDSERIALNUMBER:UTU-74972
6. IF INDIAN,ALLOTTEEOR TRIBENAMEWELL COMPLETION 011 RECOMPLETIONREPORT AND LOG N/A
ia. TYPE OF WELL: OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAMEWELL WELL JOHNSON BOTTOM
b. TYPE OF WORK: 8. WELLNAMEand NUMBER:N
LHL ENEEP-
RYF
R. OTHER Horizontal BBS 15G 22-7-212. NAMEOF OPERATOR: 9. API NUMBER:
QUESTAR EXPLORATION & PRODUCTIONCOMPANY 43047374433. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WILDCAT
11002 E. 17500 S. on y VERNAL STATE UT zie 84078 (435) 781-4342 BRENNAN BOTTOM4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP,RANGE,
ATSURFACE: 669' FSL 2022 FEL MERIDIAN:22
7SATTOP PRODUCING INTERVALREPORTED BELOW: 669' FSL 2022 FEL
12. COUNTY 13. STATEATTOTAL DEPTH: 2539 FSE 591 FEL NE EC 27-7S-R21EUINTAH UTAH
14. DATESPUDDED: 15 DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB,RT, GL):12/2/2009 12/17/2009 ABANDONED READYTOPRODUCE 2 15' KB
18. TOTALDEFTH: MD 10 054 19. PLUG BACKT.D.: MD 8,480 20. IF MULTlPLECOMPLETlONS, HOW MANY?* 21. DEPTH BRIDGE MD
TVD æ d4M Tvo oC ¥f PLUG SET:TVD
22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN (Submit copy of each) 23.
WAS WELLCORED? NO YES (Submit analysis)NO LOGSWAS DST RUN? NO YES (Submit report)DIRECTIONALSURVEY? NO YES (Submit copy)
24. CASINGAND LINERRECORD (Report all strings set in well)
HOLESIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM(MD) STAGEDCEMHENTERCNEMEONFS
KES VOLSUBBL) CEMENTTOP ** AMOUNTPULLED
4.875 2-7/8 10.4 6,181 10,054 n/a 0
26. TUBINGRECORD
SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKERSET (MD)2.875 6,154
28. PRODUCINGINTERVALS 27. PERFORATION RECORDFORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM(TVD) INTERVAL(ToplBot - MD) SIZE NO HOLES PERFORATIONSTATUS
(A) GREEN RIVER 6,795 8,300 6,795 8,300 open Squeezed
(B) Open Squeezed
(C) Open Squeezed
(D) Open Squeezed
ž8. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.
DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL
6795' - 8440' 23,000 gals 15% HCL
29. ENCLOSEDATTACHMENTS: 30. WELL STATUS:
O ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONALSURVEY CompletedO SUNDRY NOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER:
(5/2000) RECEIVED (CONTINUEDON BACK)
DEC3 1 2009DIV.0FOIL,GAS&MINING
STATE OF UTAH AMENDEDREPORT O FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)
DIVISIONOF OIL,GAS AND MINING 5. LEASE DES1GNATIONANDSERIALNUMBER:UTU-74972
6. IF INDIAN,ALLOTTEEOR TRIBENAMEWELL COMPLETION 011 RECOMPLETIONREPORT AND LOG N/A
ia. TYPE OF WELL: OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAMEWELL WELL JOHNSON BOTTOM
b. TYPE OF WORK: 8. WELLNAMEand NUMBER:N
LHL ENEEP-
RYF
R. OTHER Horizontal BBS 15G 22-7-212. NAMEOF OPERATOR: 9. API NUMBER:
QUESTAR EXPLORATION & PRODUCTIONCOMPANY 43047374433. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WILDCAT
11002 E. 17500 S. on y VERNAL STATE UT zie 84078 (435) 781-4342 BRENNAN BOTTOM4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP,RANGE,
ATSURFACE: 669' FSL 2022 FEL MERIDIAN:22
7SATTOP PRODUCING INTERVALREPORTED BELOW: 669' FSL 2022 FEL
12. COUNTY 13. STATEATTOTAL DEPTH: 2539 FSE 591 FEL NE EC 27-7S-R21EUINTAH UTAH
14. DATESPUDDED: 15 DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB,RT, GL):12/2/2009 12/17/2009 ABANDONED READYTOPRODUCE 2 15' KB
18. TOTALDEFTH: MD 10 054 19. PLUG BACKT.D.: MD 8,480 20. IF MULTlPLECOMPLETlONS, HOW MANY?* 21. DEPTH BRIDGE MD
TVD æ d4M Tvo oC ¥f PLUG SET:TVD
22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN (Submit copy of each) 23.
WAS WELLCORED? NO YES (Submit analysis)NO LOGSWAS DST RUN? NO YES (Submit report)DIRECTIONALSURVEY? NO YES (Submit copy)
24. CASINGAND LINERRECORD (Report all strings set in well)
HOLESIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM(MD) STAGEDCEMHENTERCNEMEONFS
KES VOLSUBBL) CEMENTTOP ** AMOUNTPULLED
4.875 2-7/8 10.4 6,181 10,054 n/a 0
26. TUBINGRECORD
SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKERSET (MD)2.875 6,154
28. PRODUCINGINTERVALS 27. PERFORATION RECORDFORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM(TVD) INTERVAL(ToplBot - MD) SIZE NO HOLES PERFORATIONSTATUS
(A) GREEN RIVER 6,795 8,300 6,795 8,300 open Squeezed
(B) Open Squeezed
(C) Open Squeezed
(D) Open Squeezed
ž8. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.
DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL
6795' - 8440' 23,000 gals 15% HCL
29. ENCLOSEDATTACHMENTS: 30. WELL STATUS:
O ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONALSURVEY CompletedO SUNDRY NOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER:
(5/2000) RECEIVED (CONTINUEDON BACK)
DEC3 1 2009DIV.0FOIL,GAS&MINING
31. INITIALPRODUCTION INTERVALA (As shown In Item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:
12/18/2009 12/21/2009 24 R^TES - 142 0 77 PumpingCHOKESIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:
75 22 RATES: ProducingINTERVALB (As shown in Item #28)
DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:RATES: -+
CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:RATES: ->
INTERVALC (As shown In item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER- BBL: PROD. METHOD:RATES: -*
CHOKESIZE: TBG.PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOlLRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: ->
INTERVALD (As shown in Item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: EST PRODUCTION OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:ATES: ->
CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GASIOILRATIO 4 HR PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:TES: ->
32. DISPOSITIONOF GAS (Sold, Used for Fuel, Vented, Etc.)
SOLD33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMAT10N(Log) MARKERS:
Show allimportant zones of porosity and contentsthereof:Cored Intervals and alldrill-stem tests, including deptit intervaltested, cushionused, timetool open, flowingand shut-in pressures and recoveries.
Formation o o m Descriptions, Contents, etc. Name(Measu
edpDepth)
36. ADDITIONALREMARK: (include plugg ig procedure)
Perfs 6795' - 8300' 4 spf -8 shots in every jointof liner. Stuck while drilling - left BHAin hole, used 2-7/8" drill pipe as liner.
36. I hereby certify that the foregoing and attached Information is completeand correct as determined from all availablerecords.
NAME(PLEASE PR ahn Caldwell TITLE OfficeAdministrator
SIGNATURE DATE 12/29/2009
This report must be submitted within 30 days of• completing or plugging a new well e reentering a previously plugged and abandoned well• drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation • drillinghydrocarbon exploratoryholes, such as core samples and stratigraphic tests
* ITEM20: Show thenumber of completions if production is measured separatelyfrom twoor more formations." ITEM24:Cement Top-Show how reported top(s)of cement were determined (circulated (CIR),calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).
Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940
(5/2000)
Salt Lake City, Utah 84114-5801
DEC3 1 2009 CONRDENTIADIV.OFOIL,GAS&
31. INITIALPRODUCTION INTERVALA (As shown In Item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:
12/18/2009 12/21/2009 24 R^TES - 142 0 77 PumpingCHOKESIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:
75 22 RATES: ProducingINTERVALB (As shown in Item #28)
DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:RATES: -+
CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:RATES: ->
INTERVALC (As shown In item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER- BBL: PROD. METHOD:RATES: -*
CHOKESIZE: TBG.PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOlLRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: ->
INTERVALD (As shown in Item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: EST PRODUCTION OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:ATES: ->
CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GASIOILRATIO 4 HR PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:TES: ->
32. DISPOSITIONOF GAS (Sold, Used for Fuel, Vented, Etc.)
SOLD33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMAT10N(Log) MARKERS:
Show allimportant zones of porosity and contentsthereof:Cored Intervals and alldrill-stem tests, including deptit intervaltested, cushionused, timetool open, flowingand shut-in pressures and recoveries.
Formation o o m Descriptions, Contents, etc. Name(Measu
edpDepth)
36. ADDITIONALREMARK: (include plugg ig procedure)
Perfs 6795' - 8300' 4 spf -8 shots in every jointof liner. Stuck while drilling - left BHAin hole, used 2-7/8" drill pipe as liner.
36. I hereby certify that the foregoing and attached Information is completeand correct as determined from all availablerecords.
NAME(PLEASE PR ahn Caldwell TITLE OfficeAdministrator
SIGNATURE DATE 12/29/2009
This report must be submitted within 30 days of• completing or plugging a new well e reentering a previously plugged and abandoned well• drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation • drillinghydrocarbon exploratoryholes, such as core samples and stratigraphic tests
* ITEM20: Show thenumber of completions if production is measured separatelyfrom twoor more formations." ITEM24:Cement Top-Show how reported top(s)of cement were determined (circulated (CIR),calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).
Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940
(5/2000)
Salt Lake City, Utah 84114-5801
DEC3 1 2009 CONRDENTIADIV.OFOIL,GAS&
31. INITIALPRODUCTION INTERVALA (As shown In Item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:
12/18/2009 12/21/2009 24 R^TES - 142 0 77 PumpingCHOKESIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:
75 22 RATES: ProducingINTERVALB (As shown in Item #28)
DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:RATES: -+
CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:RATES: ->
INTERVALC (As shown In item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER- BBL: PROD. METHOD:RATES: -*
CHOKESIZE: TBG.PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOlLRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: ->
INTERVALD (As shown in Item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: EST PRODUCTION OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:ATES: ->
CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GASIOILRATIO 4 HR PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:TES: ->
32. DISPOSITIONOF GAS (Sold, Used for Fuel, Vented, Etc.)
SOLD33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMAT10N(Log) MARKERS:
Show allimportant zones of porosity and contentsthereof:Cored Intervals and alldrill-stem tests, including deptit intervaltested, cushionused, timetool open, flowingand shut-in pressures and recoveries.
Formation o o m Descriptions, Contents, etc. Name(Measu
edpDepth)
36. ADDITIONALREMARK: (include plugg ig procedure)
Perfs 6795' - 8300' 4 spf -8 shots in every jointof liner. Stuck while drilling - left BHAin hole, used 2-7/8" drill pipe as liner.
36. I hereby certify that the foregoing and attached Information is completeand correct as determined from all availablerecords.
NAME(PLEASE PR ahn Caldwell TITLE OfficeAdministrator
SIGNATURE DATE 12/29/2009
This report must be submitted within 30 days of• completing or plugging a new well e reentering a previously plugged and abandoned well• drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation • drillinghydrocarbon exploratoryholes, such as core samples and stratigraphic tests
* ITEM20: Show thenumber of completions if production is measured separatelyfrom twoor more formations." ITEM24:Cement Top-Show how reported top(s)of cement were determined (circulated (CIR),calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).
Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940
(5/2000)
Salt Lake City, Utah 84114-5801
DEC3 1 2009 CONRDENTIADIV.OFOIL,GAS&
31. INITIALPRODUCTION INTERVALA (As shown In Item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:
12/18/2009 12/21/2009 24 R^TES - 142 0 77 PumpingCHOKESIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:
75 22 RATES: ProducingINTERVALB (As shown in Item #28)
DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:RATES: -+
CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:RATES: ->
INTERVALC (As shown In item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER- BBL: PROD. METHOD:RATES: -*
CHOKESIZE: TBG.PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOlLRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: ->
INTERVALD (As shown in Item #28)
DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: EST PRODUCTION OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:ATES: ->
CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GASIOILRATIO 4 HR PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:TES: ->
32. DISPOSITIONOF GAS (Sold, Used for Fuel, Vented, Etc.)
SOLD33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMAT10N(Log) MARKERS:
Show allimportant zones of porosity and contentsthereof:Cored Intervals and alldrill-stem tests, including deptit intervaltested, cushionused, timetool open, flowingand shut-in pressures and recoveries.
Formation o o m Descriptions, Contents, etc. Name(Measu
edpDepth)
36. ADDITIONALREMARK: (include plugg ig procedure)
Perfs 6795' - 8300' 4 spf -8 shots in every jointof liner. Stuck while drilling - left BHAin hole, used 2-7/8" drill pipe as liner.
36. I hereby certify that the foregoing and attached Information is completeand correct as determined from all availablerecords.
NAME(PLEASE PR ahn Caldwell TITLE OfficeAdministrator
SIGNATURE DATE 12/29/2009
This report must be submitted within 30 days of• completing or plugging a new well e reentering a previously plugged and abandoned well• drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation • drillinghydrocarbon exploratoryholes, such as core samples and stratigraphic tests
* ITEM20: Show thenumber of completions if production is measured separatelyfrom twoor more formations." ITEM24:Cement Top-Show how reported top(s)of cement were determined (circulated (CIR),calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).
Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940
(5/2000)
Salt Lake City, Utah 84114-5801
DEC3 1 2009 CONRDENTIADIV.OFOIL,GAS&
CONFIDENTIAL
Weatherford'Drilling Services
END OF WELL REPORT
ONESHRQUESTAR EXPLORATION AND PRODUCTION
QUESTAR_BBS-15G-22-7-21
UlNTAH COUNTY, UT
DECEMBER 3, 2009
Weatherford International Ltd.2000 Oil DriveCasper, Wyoming 82604+1.307.265.1413 Main+1.307.235.3958 Fax
CONFIDENTIAL
Weatherford'Drilling Services
END OF WELL REPORT
ONESHRQUESTAR EXPLORATION AND PRODUCTION
QUESTAR_BBS-15G-22-7-21
UlNTAH COUNTY, UT
DECEMBER 3, 2009
Weatherford International Ltd.2000 Oil DriveCasper, Wyoming 82604+1.307.265.1413 Main+1.307.235.3958 Fax
CONFIDENTIAL
Weatherford'Drilling Services
END OF WELL REPORT
ONESHRQUESTAR EXPLORATION AND PRODUCTION
QUESTAR_BBS-15G-22-7-21
UlNTAH COUNTY, UT
DECEMBER 3, 2009
Weatherford International Ltd.2000 Oil DriveCasper, Wyoming 82604+1.307.265.1413 Main+1.307.235.3958 Fax
CONFIDENTIAL
Weatherford'Drilling Services
END OF WELL REPORT
ONESHRQUESTAR EXPLORATION AND PRODUCTION
QUESTAR_BBS-15G-22-7-21
UlNTAH COUNTY, UT
DECEMBER 3, 2009
Weatherford International Ltd.2000 Oil DriveCasper, Wyoming 82604+1.307.265.1413 Main+1.307.235.3958 Fax
Weatherford'
OOOFINAL SURVEYS......................SEC.1
DAYSvs DEPTH.......................SEC.2
DAILYACTIVITY.......................SEC.3
BHA REPORTS........................SEC.4
MOTOR REPORTS ...................SEC.5
SLIDE REPORT........................SEC.6
DrillingServices-Casper,
Weatherford'
OOOFINAL SURVEYS......................SEC.1
DAYSvs DEPTH.......................SEC.2
DAILYACTIVITY.......................SEC.3
BHA REPORTS........................SEC.4
MOTOR REPORTS ...................SEC.5
SLIDE REPORT........................SEC.6
DrillingServices-Casper,
Weatherford'
OOOFINAL SURVEYS......................SEC.1
DAYSvs DEPTH.......................SEC.2
DAILYACTIVITY.......................SEC.3
BHA REPORTS........................SEC.4
MOTOR REPORTS ...................SEC.5
SLIDE REPORT........................SEC.6
DrillingServices-Casper,
Weatherford'
OOOFINAL SURVEYS......................SEC.1
DAYSvs DEPTH.......................SEC.2
DAILYACTIVITY.......................SEC.3
BHA REPORTS........................SEC.4
MOTOR REPORTS ...................SEC.5
SLIDE REPORT........................SEC.6
DrillingServices-Casper,
FINALFINALFINALFINAL
Project: UINTAH COUNTY, UTAHSite: BBS 15G-22-7-21
Ot/ES TAR ·ññë
Longitude: 109° 32' 20.960 WGL: 4909.00KB: [email protected] (AZTEC777)
SHLSECTION 22 669 FSL 2022'FEL
SECTION 22 T7S R21E oWELLBORE TARGET DETAILS(LATILONG)
Name TVD +NI-S +El-W Latitude Longitude Shape iPBHL BBS 15G-22-7-21 6379.61 -3911.80 1325.61 40* 10' 49.380 N 109° 32" 3.880 W Point
I Tiso:sis- I500- -
WELL DETAILS: BBS 15G-22-7-21 SECTION UNE
Ground Level: 4909.00+NI-S +El-W Northing Easting Latittude Longitude Slot0.00 0.00 7244345.81 2188149.36 40" 11' 28.040 N 109" 32' 20.960 W
ISECTION DETAILS
MD Inc Azi TVD +NI-S +El-W DLeg TFace VSec Annotation6160,00 2.67 176.67 6157.68 -139.89 1.25 0.00 0.00 13190 Start 42.00 hold at 6160.00 MD6202.00 2.67 176.67 6199.64 -141.85 1.37 0.00 0.00 134,78 Start DLS 15.34 TFO -16.07
6790.24 92.80 160.58 6565.95 -512.56 126.96 15.34 -16.07 526.20 Start 3608.70 hold at 6790.24 MD10398.93 92.80 160.58 6379.81 -3911.80 1325.61 0.00 0.00 4130,31 TD at 10398.93
I o
TMAzimulhs to True North
Lue Elio / \ Magnelic North: 11.36"
- 88515542.741 BBS1B22·T41 Designg1vo Magnetic Field- BBS 1¾22-741 Strangth: 52601 3srs I- sumayassT: Dip Angle: 66.08 LM Svs
Date: 10/28 2000Model: BGGM2009
|
-36 0-- PBHL2080' FSL 6806FEL3911.80° S, 1325.61' E
SECTlON 27
198ŒMRO UNE FS1
::: SECTlON 27
-1000 ·500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000Vertical Section at 179 39° (1000 ftlin)
Survey: Survey #3 ST2 (BBS 15G-22-7-21/BBS 15G-22-7-21)
CreatedBy: TRACYWILUAMS Date:
Project: UINTAH COUNTY, UTAHSite: BBS 15G-22-7-21
Ot/ES TAR ·ññë
Longitude: 109° 32' 20.960 WGL: 4909.00KB: [email protected] (AZTEC777)
SHLSECTION 22 669 FSL 2022'FEL
SECTION 22 T7S R21E oWELLBORE TARGET DETAILS(LATILONG)
Name TVD +NI-S +El-W Latitude Longitude Shape iPBHL BBS 15G-22-7-21 6379.61 -3911.80 1325.61 40* 10' 49.380 N 109° 32" 3.880 W Point
I Tiso:sis- I500- -
WELL DETAILS: BBS 15G-22-7-21 SECTION UNE
Ground Level: 4909.00+NI-S +El-W Northing Easting Latittude Longitude Slot0.00 0.00 7244345.81 2188149.36 40" 11' 28.040 N 109" 32' 20.960 W
ISECTION DETAILS
MD Inc Azi TVD +NI-S +El-W DLeg TFace VSec Annotation6160,00 2.67 176.67 6157.68 -139.89 1.25 0.00 0.00 13190 Start 42.00 hold at 6160.00 MD6202.00 2.67 176.67 6199.64 -141.85 1.37 0.00 0.00 134,78 Start DLS 15.34 TFO -16.07
6790.24 92.80 160.58 6565.95 -512.56 126.96 15.34 -16.07 526.20 Start 3608.70 hold at 6790.24 MD10398.93 92.80 160.58 6379.81 -3911.80 1325.61 0.00 0.00 4130,31 TD at 10398.93
I o
TMAzimulhs to True North
Lue Elio / \ Magnelic North: 11.36"
- 88515542.741 BBS1B22·T41 Designg1vo Magnetic Field- BBS 1¾22-741 Strangth: 52601 3srs I- sumayassT: Dip Angle: 66.08 LM Svs
Date: 10/28 2000Model: BGGM2009
|
-36 0-- PBHL2080' FSL 6806FEL3911.80° S, 1325.61' E
SECTlON 27
198ŒMRO UNE FS1
::: SECTlON 27
-1000 ·500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000Vertical Section at 179 39° (1000 ftlin)
Survey: Survey #3 ST2 (BBS 15G-22-7-21/BBS 15G-22-7-21)
CreatedBy: TRACYWILUAMS Date:
Project: UINTAH COUNTY, UTAHSite: BBS 15G-22-7-21
Ot/ES TAR ·ññë
Longitude: 109° 32' 20.960 WGL: 4909.00KB: [email protected] (AZTEC777)
SHLSECTION 22 669 FSL 2022'FEL
SECTION 22 T7S R21E oWELLBORE TARGET DETAILS(LATILONG)
Name TVD +NI-S +El-W Latitude Longitude Shape iPBHL BBS 15G-22-7-21 6379.61 -3911.80 1325.61 40* 10' 49.380 N 109° 32" 3.880 W Point
I Tiso:sis- I500- -
WELL DETAILS: BBS 15G-22-7-21 SECTION UNE
Ground Level: 4909.00+NI-S +El-W Northing Easting Latittude Longitude Slot0.00 0.00 7244345.81 2188149.36 40" 11' 28.040 N 109" 32' 20.960 W
ISECTION DETAILS
MD Inc Azi TVD +NI-S +El-W DLeg TFace VSec Annotation6160,00 2.67 176.67 6157.68 -139.89 1.25 0.00 0.00 13190 Start 42.00 hold at 6160.00 MD6202.00 2.67 176.67 6199.64 -141.85 1.37 0.00 0.00 134,78 Start DLS 15.34 TFO -16.07
6790.24 92.80 160.58 6565.95 -512.56 126.96 15.34 -16.07 526.20 Start 3608.70 hold at 6790.24 MD10398.93 92.80 160.58 6379.81 -3911.80 1325.61 0.00 0.00 4130,31 TD at 10398.93
I o
TMAzimulhs to True North
Lue Elio / \ Magnelic North: 11.36"
- Besium-naal ses9soneel onsionsivo Magnetic Field- Bas 1s>22441 Strangth: 52601 3srs I- sumayassT2 Dip Angle: 66.08 LM Svs
Date: 10/28 2000Model: BGGM2009
|
-36 0-- PBHL2080' FSL 6806FEL3911.80° S, 1325.61' E
SECTlON 27
198ŒMRO UNE FS1
::: SECTlON 27
-1000 ·500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000Vertical Section at 179 39° (1000 ftlin)
Survey: Survey #3 ST2 (BBS 15G-22-7-21/BBS 15G-22-7-21)
CreatedBy: TRACYWILUAMS Date:
Project: UINTAH COUNTY, UTAHSite: BBS 15G-22-7-21
Ot/ES TAR ·ññë
Longitude: 109° 32' 20.960 WGL: 4909.00KB: [email protected] (AZTEC777)
SHLSECTION 22 669 FSL 2022'FEL
SECTION 22 T7S R21E oWELLBORE TARGET DETAILS(LATILONG)
Name TVD +NI-S +El-W Latitude Longitude Shape iPBHL BBS 15G-22-7-21 6379.61 -3911.80 1325.61 40* 10' 49.380 N 109° 32" 3.880 W Point
I Tiso:sis- I500- -
WELL DETAILS: BBS 15G-22-7-21 SECTION UNE
Ground Level: 4909.00+NI-S +El-W Northing Easting Latittude Longitude Slot0.00 0.00 7244345.81 2188149.36 40" 11' 28.040 N 109" 32' 20.960 W
ISECTION DETAILS
MD Inc Azi TVD +NI-S +El-W DLeg TFace VSec Annotation6160,00 2.67 176.67 6157.68 -139.89 1.25 0.00 0.00 13190 Start 42.00 hold at 6160.00 MD6202.00 2.67 176.67 6199.64 -141.85 1.37 0.00 0.00 134,78 Start DLS 15.34 TFO -16.07
6790.24 92.80 160.58 6565.95 -512.56 126.96 15.34 -16.07 526.20 Start 3608.70 hold at 6790.24 MD10398.93 92.80 160.58 6379.81 -3911.80 1325.61 0.00 0.00 4130,31 TD at 10398.93
I o
TMAzimulhs to True North
Lue Elio / \ Magnelic North: 11.36"
- Besium-naal ses9soneel onsionsivo Magnetic Field- Bas 1s>22441 Strangth: 52601 3srs I- sumayassT2 Dip Angle: 66.08 LM Svs
Date: 10/28 2000Model: BGGM2009
|
-36 0-- PBHL2080' FSL 6806FEL3911.80° S, 1325.61' E
SECTlON 27
198ŒMRO UNE FS1
::: SECTlON 27
-1000 ·500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000Vertical Section at 179 39° (1000 ftlin)
Survey: Survey #3 ST2 (BBS 15G-22-7-21/BBS 15G-22-7-21)
CreatedBy: TRACYWILUAMS Date:
00NFIDERL necev oDFP3 1 2009
Questar E & PDROFO\L,GAS&MNNG Page 1 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (*)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 . OH 161.00Closure Distance: 3,698g(ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type
(ft) (°) (*) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
OH 6,160.0 2.67 176.70 NYN 6,157.68 -139.89 1.25 132.89 0.04 0.04
OH 6,211.0 6.94 160.00 YNN 6,208.49 -143.97 2.37 136.90 8.72 8.37
OH 6,247.0 13.83 148.60 YNN 6,243.88 -149.70 5.36 143.29 19.88 19.14
OH 6,279.0 19.60 151.39 YNN 6,274.52 -157.68 9.93 152.32 18.20 18.03
OH 6,310.0 24.44 154.86 YNN 6,303.25 -168.06 15.15 163.83 16.16 15.61 MWD
OH 6,342.0 29.30 157.91 YNN 6,331.79 -181.31 20.91 178.24 15.78 15.19 MWD
OH 6,374.0 33.69 161.36 YNN 6,359.07 -196.99 26.69 194.95 14.83 13.72 MWD
OH 6,405.0 37.56 160.74 YNN 6,384.26 -214.06 32.56 213.00 12.54 12.48 MWD
OH 6,437.0 41.88 161.49 YNN 6,408.87 -233.41 39.17 233.44 13.58 13.50 MWD
OH 6,468.0 44.94 161.49 YNN 6,431.39 -253.61 45.93 254.74 9.87 9.87 MWD
OH 6,496.0 49.44 162.79 YNN 6,450.41 -273.15 52.22 275.27 16.43 16.07 MWDOH 6,527.0 53.56 164.24 YNN 6,469.71 -296.41 59.10 299.50 13.78 13.29 MWD
OH 6,559.0 56.88 165.24 YNN 6,487.96 -321.77 66.01 325.73 10.69 10.38 MWD
OH 6,591.0 60.00 164.36 YNN 6,504.70 -348.08 73.16 352.93 10.03 9.75 MWD
OH 6,622.0 65.17 163.53 YNN 6,518.97 -374.51 80.77 380.40 16.85 16.68 MWD
OH 6,653.0 71.00 164.74 YNN 6,530.54 -402.16 88.63 409.11 19.15 18.81 MWD
OH 6,687.0 76.08 166.54 YNN 6,540.17 -433.74 96.70 441.59 15.78 14.94 MWDOH 6,719.0 78.92 167.09 YNN 6,547.10 -464.16 103.83 472.67 9.03 8.88 MWDOH 6,750.0 82.88 166.49 YNN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWDOH 6,782.0 85.31 165.24 YNN 6,555.29 -524.81 118.59 534.83 8.53 7.59 MWDOH 6,813.0 88.56 165.86 YNN 6,556.95 -554.79 126.32 565.69 10.67 10.48 MWDOH 6,845.0 88.63 166.86 YNN 6,557.73 -585.87 133.86 597.54 3.13 0.22 MWDOH 6,876.0 91.43 167.30 YNN 6,557.72 -616.09 140.79 628.36 9.14 9.03 MWDOH 6,908.0 91.88 165.86 YNN 6,556.79 -647.20 148.22 660.19 4.71 1.41 MWDOH 6,940.0 92.50 168.11 YNN 6,555.57 -678.35 155.42 691.99 7.29 1.94 MWD01 6,750.0 82.88 166.49 NYN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD01 6,782.0 83.29 167.17 YNN 6,555.85 -524.88 118.06 534.72 2.47 1.28 MWD01 6,844.0 93.00 169.99 YNN 6,557.86 -585.54 130.31 596.07 16.31 15.66 MWD01 6,876.0 89.50 170.11 YNN 6,557.16 -617.05 135.83 627.66 10.94 -10.94 MWD01 6,907.0 82.88 169.86 YNN 6,559.22 -647.49 141.21 658.19 21.37 -21.35 MWD01 6,939.0 86.30 169.22 YNN 6,562.24 -678.82 146.99 689.69 10.87 10.69 MWD01 6,971.0 93.50 167.49 YNN 6,562.29 -710.14 153.45 721.40 23.14 22.50 MWD01 7,002.0 90.88 165.86 YNN 6,561.11 -740.28 160.59 752.23 9.95 -8.45 MWD
00NRDENBarinted:12.28/2009 11:59:11
00NFIDERL necev oDFP3 1 2009
Questar E & PDROFO\L,GAS&MNNG Page 1 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (*)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 . OH 161.00Closure Distance: 3,698g(ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type
(ft) (°) (*) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
OH 6,160.0 2.67 176.70 NYN 6,157.68 -139.89 1.25 132.89 0.04 0.04
OH 6,211.0 6.94 160.00 YNN 6,208.49 -143.97 2.37 136.90 8.72 8.37
OH 6,247.0 13.83 148.60 YNN 6,243.88 -149.70 5.36 143.29 19.88 19.14
OH 6,279.0 19.60 151.39 YNN 6,274.52 -157.68 9.93 152.32 18.20 18.03
OH 6,310.0 24.44 154.86 YNN 6,303.25 -168.06 15.15 163.83 16.16 15.61 MWD
OH 6,342.0 29.30 157.91 YNN 6,331.79 -181.31 20.91 178.24 15.78 15.19 MWD
OH 6,374.0 33.69 161.36 YNN 6,359.07 -196.99 26.69 194.95 14.83 13.72 MWD
OH 6,405.0 37.56 160.74 YNN 6,384.26 -214.06 32.56 213.00 12.54 12.48 MWD
OH 6,437.0 41.88 161.49 YNN 6,408.87 -233.41 39.17 233.44 13.58 13.50 MWD
OH 6,468.0 44.94 161.49 YNN 6,431.39 -253.61 45.93 254.74 9.87 9.87 MWD
OH 6,496.0 49.44 162.79 YNN 6,450.41 -273.15 52.22 275.27 16.43 16.07 MWD
OH 6,527.0 53.56 164.24 YNN 6,469.71 -296.41 59.10 299.50 13.78 13.29 MWD
OH 6,559.0 56.88 165.24 YNN 6,487.96 -321.77 66.01 325.73 10.69 10.38 MWD
OH 6,591.0 60.00 164.36 YNN 6,504.70 -348.08 73.16 352.93 10.03 9.75 MWD
OH 6,622.0 65.17 163.53 YNN 6,518.97 -374.51 80.77 380.40 16.85 16.68 MWD
OH 6,653.0 71.00 164.74 YNN 6,530.54 -402.16 88.63 409.11 19.15 18.81 MWD
OH 6,687.0 76.08 166.54 YNN 6,540.17 -433.74 96.70 441.59 15.78 14.94 MWDOH 6,719.0 78.92 167.09 YNN 6,547.10 -464.16 103.83 472.67 9.03 8.88 MWDOH 6,750.0 82.88 166.49 YNN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD
OH 6,782.0 85.31 165.24 YNN 6,555.29 -524.81 118.59 534.83 8.53 7.59 MWD
OH 6,813.0 88.56 165.86 YNN 6,556.95 -554.79 126.32 565.69 10.67 10.48 MWDOH 6,845.0 88.63 166.86 YNN 6,557.73 -585.87 133.86 597.54 3.13 0.22 MWDOH 6,876.0 91.43 167.30 YNN 6,557.72 -616.09 140.79 628.36 9.14 9.03 MWDOH 6,908.0 91.88 165.86 YNN 6,556.79 -647.20 148.22 660.19 4.71 1.41 MWDOH 6,940.0 92.50 168.11 YNN 6,555.57 -678.35 155.42 691.99 7.29 1.94 MWD01 6,750.0 82.88 166.49 NYN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD
01 6,782.0 83.29 167.17 YNN 6,555.85 -524.88 118.06 534.72 2.47 1.28 MWD01 6,844.0 93.00 169.99 YNN 6,557.86 -585.54 130.31 596.07 16.31 15.66 MWD01 6,876.0 89.50 170.11 YNN 6,557.16 -617.05 135.83 627.66 10.94 -10.94 MWD01 6,907.0 82.88 169.86 YNN 6,559.22 -647.49 141.21 658.19 21.37 -21.35 MWD01 6,939.0 86.30 169.22 YNN 6,562.24 -678.82 146.99 689.69 10.87 10.69 MWD01 6,971.0 93.50 167.49 YNN 6,562.29 -710.14 153.45 721.40 23.14 22.50 MWD01 7,002.0 90.88 165.86 YNN 6,561.11 -740.28 160.59 752.23 9.95 -8.45 MWD
00NRDENBarinted:12.28/2009 11:59:11
00NFIDERL necev oDFP3 1 2009
Questar E & PDROFO\L,GAS&MNNG Page 1 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (*)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 . OH 161.00Closure Distance: 3,698g(ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type
(ft) (°) (*) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
OH 6,160.0 2.67 176.70 NYN 6,157.68 -139.89 1.25 132.89 0.04 0.04
OH 6,211.0 6.94 160.00 YNN 6,208.49 -143.97 2.37 136.90 8.72 8.37
OH 6,247.0 13.83 148.60 YNN 6,243.88 -149.70 5.36 143.29 19.88 19.14
OH 6,279.0 19.60 151.39 YNN 6,274.52 -157.68 9.93 152.32 18.20 18.03
OH 6,310.0 24.44 154.86 YNN 6,303.25 -168.06 15.15 163.83 16.16 15.61 MWD
OH 6,342.0 29.30 157.91 YNN 6,331.79 -181.31 20.91 178.24 15.78 15.19 MWD
OH 6,374.0 33.69 161.36 YNN 6,359.07 -196.99 26.69 194.95 14.83 13.72 MWD
OH 6,405.0 37.56 160.74 YNN 6,384.26 -214.06 32.56 213.00 12.54 12.48 MWD
OH 6,437.0 41.88 161.49 YNN 6,408.87 -233.41 39.17 233.44 13.58 13.50 MWD
OH 6,468.0 44.94 161.49 YNN 6,431.39 -253.61 45.93 254.74 9.87 9.87 MWD
OH 6,496.0 49.44 162.79 YNN 6,450.41 -273.15 52.22 275.27 16.43 16.07 MWDOH 6,527.0 53.56 164.24 YNN 6,469.71 -296.41 59.10 299.50 13.78 13.29 MWD
OH 6,559.0 56.88 165.24 YNN 6,487.96 -321.77 66.01 325.73 10.69 10.38 MWD
OH 6,591.0 60.00 164.36 YNN 6,504.70 -348.08 73.16 352.93 10.03 9.75 MWD
OH 6,622.0 65.17 163.53 YNN 6,518.97 -374.51 80.77 380.40 16.85 16.68 MWD
OH 6,653.0 71.00 164.74 YNN 6,530.54 -402.16 88.63 409.11 19.15 18.81 MWD
OH 6,687.0 76.08 166.54 YNN 6,540.17 -433.74 96.70 441.59 15.78 14.94 MWDOH 6,719.0 78.92 167.09 YNN 6,547.10 -464.16 103.83 472.67 9.03 8.88 MWDOH 6,750.0 82.88 166.49 YNN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWDOH 6,782.0 85.31 165.24 YNN 6,555.29 -524.81 118.59 534.83 8.53 7.59 MWDOH 6,813.0 88.56 165.86 YNN 6,556.95 -554.79 126.32 565.69 10.67 10.48 MWDOH 6,845.0 88.63 166.86 YNN 6,557.73 -585.87 133.86 597.54 3.13 0.22 MWDOH 6,876.0 91.43 167.30 YNN 6,557.72 -616.09 140.79 628.36 9.14 9.03 MWDOH 6,908.0 91.88 165.86 YNN 6,556.79 -647.20 148.22 660.19 4.71 1.41 MWDOH 6,940.0 92.50 168.11 YNN 6,555.57 -678.35 155.42 691.99 7.29 1.94 MWD01 6,750.0 82.88 166.49 NYN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD01 6,782.0 83.29 167.17 YNN 6,555.85 -524.88 118.06 534.72 2.47 1.28 MWD01 6,844.0 93.00 169.99 YNN 6,557.86 -585.54 130.31 596.07 16.31 15.66 MWD01 6,876.0 89.50 170.11 YNN 6,557.16 -617.05 135.83 627.66 10.94 -10.94 MWD01 6,907.0 82.88 169.86 YNN 6,559.22 -647.49 141.21 658.19 21.37 -21.35 MWD01 6,939.0 86.30 169.22 YNN 6,562.24 -678.82 146.99 689.69 10.87 10.69 MWD01 6,971.0 93.50 167.49 YNN 6,562.29 -710.14 153.45 721.40 23.14 22.50 MWD01 7,002.0 90.88 165.86 YNN 6,561.11 -740.28 160.59 752.23 9.95 -8.45 MWD
00NRDENBarinted:12.28/2009 11:59:11
00NFIDERL necev oDFP3 1 2009
Questar E & PDROFO\L,GAS&MNNG Page 1 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (*)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 . OH 161.00Closure Distance: 3,698g(ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type
(ft) (°) (*) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
OH 6,160.0 2.67 176.70 NYN 6,157.68 -139.89 1.25 132.89 0.04 0.04
OH 6,211.0 6.94 160.00 YNN 6,208.49 -143.97 2.37 136.90 8.72 8.37
OH 6,247.0 13.83 148.60 YNN 6,243.88 -149.70 5.36 143.29 19.88 19.14
OH 6,279.0 19.60 151.39 YNN 6,274.52 -157.68 9.93 152.32 18.20 18.03
OH 6,310.0 24.44 154.86 YNN 6,303.25 -168.06 15.15 163.83 16.16 15.61 MWD
OH 6,342.0 29.30 157.91 YNN 6,331.79 -181.31 20.91 178.24 15.78 15.19 MWD
OH 6,374.0 33.69 161.36 YNN 6,359.07 -196.99 26.69 194.95 14.83 13.72 MWD
OH 6,405.0 37.56 160.74 YNN 6,384.26 -214.06 32.56 213.00 12.54 12.48 MWD
OH 6,437.0 41.88 161.49 YNN 6,408.87 -233.41 39.17 233.44 13.58 13.50 MWD
OH 6,468.0 44.94 161.49 YNN 6,431.39 -253.61 45.93 254.74 9.87 9.87 MWD
OH 6,496.0 49.44 162.79 YNN 6,450.41 -273.15 52.22 275.27 16.43 16.07 MWDOH 6,527.0 53.56 164.24 YNN 6,469.71 -296.41 59.10 299.50 13.78 13.29 MWD
OH 6,559.0 56.88 165.24 YNN 6,487.96 -321.77 66.01 325.73 10.69 10.38 MWD
OH 6,591.0 60.00 164.36 YNN 6,504.70 -348.08 73.16 352.93 10.03 9.75 MWD
OH 6,622.0 65.17 163.53 YNN 6,518.97 -374.51 80.77 380.40 16.85 16.68 MWD
OH 6,653.0 71.00 164.74 YNN 6,530.54 -402.16 88.63 409.11 19.15 18.81 MWD
OH 6,687.0 76.08 166.54 YNN 6,540.17 -433.74 96.70 441.59 15.78 14.94 MWDOH 6,719.0 78.92 167.09 YNN 6,547.10 -464.16 103.83 472.67 9.03 8.88 MWDOH 6,750.0 82.88 166.49 YNN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWDOH 6,782.0 85.31 165.24 YNN 6,555.29 -524.81 118.59 534.83 8.53 7.59 MWDOH 6,813.0 88.56 165.86 YNN 6,556.95 -554.79 126.32 565.69 10.67 10.48 MWDOH 6,845.0 88.63 166.86 YNN 6,557.73 -585.87 133.86 597.54 3.13 0.22 MWDOH 6,876.0 91.43 167.30 YNN 6,557.72 -616.09 140.79 628.36 9.14 9.03 MWDOH 6,908.0 91.88 165.86 YNN 6,556.79 -647.20 148.22 660.19 4.71 1.41 MWDOH 6,940.0 92.50 168.11 YNN 6,555.57 -678.35 155.42 691.99 7.29 1.94 MWD01 6,750.0 82.88 166.49 NYN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD01 6,782.0 83.29 167.17 YNN 6,555.85 -524.88 118.06 534.72 2.47 1.28 MWD01 6,844.0 93.00 169.99 YNN 6,557.86 -585.54 130.31 596.07 16.31 15.66 MWD01 6,876.0 89.50 170.11 YNN 6,557.16 -617.05 135.83 627.66 10.94 -10.94 MWD01 6,907.0 82.88 169.86 YNN 6,559.22 -647.49 141.21 658.19 21.37 -21.35 MWD01 6,939.0 86.30 169.22 YNN 6,562.24 -678.82 146.99 689.69 10.87 10.69 MWD01 6,971.0 93.50 167.49 YNN 6,562.29 -710.14 153.45 721.40 23.14 22.50 MWD01 7,002.0 90.88 165.86 YNN 6,561.11 -740.28 160.59 752.23 9.95 -8.45 MWD
00NRDENBarinted:12.28/2009 11:59:11
RECElVED
Questar E & P DIV.0FOIL,GAS&MENGPage 2 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°l100ft) (°/100ft)
01 7,034.0 94.19 164.49 YNN 6,559.69 -771.18 168.77 784.11 11.19 10.34 MWD01 7,065.0 101.06 163.49 YNN 6,555.58 -800.69 177.23 814.77 22.39 22.16 MWD02 6,782.0 83.29 167.17 NYN 6,555.85 -524.87 118.04 534.26 0.00 0.00 MWD03 6,719.0 78.92 167.09 NYN 6,547.10 -464.00 103.81 472.77 0.00 0.00 MWD03 6,722.0 79.40 167.13 YNN 6,547.66 -466.87 104.47 475.45 16.05 16.00 MWD03 6,754.0 78.60 170.07 YNN 6,553.77 -497.66 110.68 506.58 9.36 -2.50 MWD03 6,786.0 83.62 168.34 YNN 6,558.72 -528.70 116.60 537.86 16.57 15.69 MWD03 6,817.0 85.22 168.49 YNN 6,561.73 -558.93 122.79 568.46 5.18 5.16 MWD03 6,848.0 90.20 168.18 YNN 6,562.97 -589.25 129.06 599.17 16.10 16.06 MWD03 6,879.0 92.55 169.34 YNN 6,562.22 -619.65 135.10 629.87 8.45 7.58 MWD03 6,911.0 91.06 168.40 YNN 6,561.22 -651.03 141.27 661.55 5.50 -4.66 MWD03 6,943.0 90.66 167.89 YNN 6,560.74 -682.34 147.84 693.30 2.03 -1.25 MWD03 6,974.0 92.15 167.62 YNN 6,559.98 -712.63 154.42 724.08 4.88 4.81 MWD03 7,006.0 93.86 167.90 YNN 6,558.30 -743.86 161.19 755.81 5.41 5.34 MWD03 7,037.0 93.05 167.91 YNN 6,556.43 -774.11 167.67 786.53 2.61 -2.61 MWD03 7,069.0 91.57 167.12 YNN 6,555.14 -805.33 174.59 818.29 5.24 -4.63 MWD03 7,100.0 90.71 167.20 YNN 6,554.52 -835.55 181.47 849.11 2.79 -2.77 MWD03 7,132.0 92.77 165.98 YNN 6,553.55 -866.66 188.89 880.94 7.48 6.44 MWD03 7,164.0 91.23 165.94 YNN 6,552.44 -897.68 196.65 912.80 4.81 -4.81 MWD03 7,195.0 94.71 165.12 YNN 6,550.83 -927.65 204.38 943.66 11.53 11.23 MWD03 7,226.0 95.47 165.97 YNN 6,548.08 -957.55 212.09 974.44 3.67 2.45 MWD03 7,258.0 92.49 164.84 YNN 6,545.86 -988.44 220.13 1,006.26 9.96 -9.31 MWD03 7,289.0 93.57 164.34 YNN 6,544.22 -1,018.29 228.36 1,037.16 3.84 3.48 MWD03 7,321.0 95.81 163.98 YNN 6,541.60 -1,048.97 237.07 1,069.00 7.09 7.00 MWD03 7,353.0 92.03 164.18 YNN 6,539.42 -1,079.66 245.82 1,100.87 11.83 -11.81 MWD03 7,384.0 89.74 162.71 YNN 6,538.94 -1,109.37 254.65 1,131.84 8.78 -7.39 MWD03 7,416.0 93.36 163.89 YNN 6,538.07 -1,140.00 263.84 1,163.79 11.90 11.31 MWD03 7,447.0 94.20 162.54 YNN 6,536.03 -1,169.62 272.77 1,194.70 5.12 2.71 MWD03 7,479.0 91.28 162.11 YNN 6,534.50 -1,200.07 282.48 1,226.65 9.22 -9.13 MWD03 7,497.0 91.51 161.82 YNN 6,534.06 -1,217.18 288.05 1,244.64 2.06 1.28 MWD03 7,528.0 91.46 161.45 YNN 6,533.26 -1,246.59 297.81 1,275.63 1.20 -0.16
03 7,560.0 92.60 161.60 YNN 6,532.12 -1,276.92 307.95 1,307.61 3.59 3.5603 7,592.0 93.34 162.16 YNN 6,530.46 -1,307.29 317.89 1,339.56
Printed: 12r28/2009 11:59:11
RECElVED
Questar E & P DIV.0FOIL,GAS&MENGPage 2 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°l100ft) (°/100ft)
01 7,034.0 94.19 164.49 YNN 6,559.69 -771.18 168.77 784.11 11.19 10.34 MWD01 7,065.0 101.06 163.49 YNN 6,555.58 -800.69 177.23 814.77 22.39 22.16 MWD02 6,782.0 83.29 167.17 NYN 6,555.85 -524.87 118.04 534.26 0.00 0.00 MWD03 6,719.0 78.92 167.09 NYN 6,547.10 -464.00 103.81 472.77 0.00 0.00 MWD03 6,722.0 79.40 167.13 YNN 6,547.66 -466.87 104.47 475.45 16.05 16.00 MWD03 6,754.0 78.60 170.07 YNN 6,553.77 -497.66 110.68 506.58 9.36 -2.50 MWD03 6,786.0 83.62 168.34 YNN 6,558.72 -528.70 116.60 537.86 16.57 15.69 MWD03 6,817.0 85.22 168.49 YNN 6,561.73 -558.93 122.79 568.46 5.18 5.16 MWD03 6,848.0 90.20 168.18 YNN 6,562.97 -589.25 129.06 599.17 16.10 16.06 MWD03 6,879.0 92.55 169.34 YNN 6,562.22 -619.65 135.10 629.87 8.45 7.58 MWD03 6,911.0 91.06 168.40 YNN 6,561.22 -651.03 141.27 661.55 5.50 -4.66 MWD03 6,943.0 90.66 167.89 YNN 6,560.74 -682.34 147.84 693.30 2.03 -1.25 MWD03 6,974.0 92.15 167.62 YNN 6,559.98 -712.63 154.42 724.08 4.88 4.81 MWD03 7,006.0 93.86 167.90 YNN 6,558.30 -743.86 161.19 755.81 5.41 5.34 MWD03 7,037.0 93.05 167.91 YNN 6,556.43 -774.11 167.67 786.53 2.61 -2.61 MWD03 7,069.0 91.57 167.12 YNN 6,555.14 -805.33 174.59 818.29 5.24 -4.63 MWD03 7,100.0 90.71 167.20 YNN 6,554.52 -835.55 181.47 849.11 2.79 -2.77 MWD03 7,132.0 92.77 165.98 YNN 6,553.55 -866.66 188.89 880.94 7.48 6.44 MWD03 7,164.0 91.23 165.94 YNN 6,552.44 -897.68 196.65 912.80 4.81 -4.81 MWD03 7,195.0 94.71 165.12 YNN 6,550.83 -927.65 204.38 943.66 11.53 11.23 MWD03 7,226.0 95.47 165.97 YNN 6,548.08 -957.55 212.09 974.44 3.67 2.45 MWD03 7,258.0 92.49 164.84 YNN 6,545.86 -988.44 220.13 1,006.26 9.96 -9.31 MWD03 7,289.0 93.57 164.34 YNN 6,544.22 -1,018.29 228.36 1,037.16 3.84 3.48 MWD03 7,321.0 95.81 163.98 YNN 6,541.60 -1,048.97 237.07 1,069.00 7.09 7.00 MWD03 7,353.0 92.03 164.18 YNN 6,539.42 -1,079.66 245.82 1,100.87 11.83 -11.81 MWD03 7,384.0 89.74 162.71 YNN 6,538.94 -1,109.37 254.65 1,131.84 8.78 -7.39 MWD03 7,416.0 93.36 163.89 YNN 6,538.07 -1,140.00 263.84 1,163.79 11.90 11.31 MWD03 7,447.0 94.20 162.54 YNN 6,536.03 -1,169.62 272.77 1,194.70 5.12 2.71 MWD03 7,479.0 91.28 162.11 YNN 6,534.50 -1,200.07 282.48 1,226.65 9.22 -9.13 MWD03 7,497.0 91.51 161.82 YNN 6,534.06 -1,217.18 288.05 1,244.64 2.06 1.28 MWD03 7,528.0 91.46 161.45 YNN 6,533.26 -1,246.59 297.81 1,275.63 1.20 -0.16
03 7,560.0 92.60 161.60 YNN 6,532.12 -1,276.92 307.95 1,307.61 3.59 3.5603 7,592.0 93.34 162.16 YNN 6,530.46 -1,307.29 317.89 1,339.56
Printed: 12r28/2009 11:59:11
RECElVED
Questar E & P DIV.0FOIL,GAS&MENGPage 2 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°l100ft) (°/100ft)
01 7,034.0 94.19 164.49 YNN 6,559.69 -771.18 168.77 784.11 11.19 10.34 MWD01 7,065.0 101.06 163.49 YNN 6,555.58 -800.69 177.23 814.77 22.39 22.16 MWD02 6,782.0 83.29 167.17 NYN 6,555.85 -524.87 118.04 534.26 0.00 0.00 MWD03 6,719.0 78.92 167.09 NYN 6,547.10 -464.00 103.81 472.77 0.00 0.00 MWD03 6,722.0 79.40 167.13 YNN 6,547.66 -466.87 104.47 475.45 16.05 16.00 MWD03 6,754.0 78.60 170.07 YNN 6,553.77 -497.66 110.68 506.58 9.36 -2.50 MWD03 6,786.0 83.62 168.34 YNN 6,558.72 -528.70 116.60 537.86 16.57 15.69 MWD03 6,817.0 85.22 168.49 YNN 6,561.73 -558.93 122.79 568.46 5.18 5.16 MWD03 6,848.0 90.20 168.18 YNN 6,562.97 -589.25 129.06 599.17 16.10 16.06 MWD03 6,879.0 92.55 169.34 YNN 6,562.22 -619.65 135.10 629.87 8.45 7.58 MWD03 6,911.0 91.06 168.40 YNN 6,561.22 -651.03 141.27 661.55 5.50 -4.66 MWD03 6,943.0 90.66 167.89 YNN 6,560.74 -682.34 147.84 693.30 2.03 -1.25 MWD03 6,974.0 92.15 167.62 YNN 6,559.98 -712.63 154.42 724.08 4.88 4.81 MWD03 7,006.0 93.86 167.90 YNN 6,558.30 -743.86 161.19 755.81 5.41 5.34 MWD03 7,037.0 93.05 167.91 YNN 6,556.43 -774.11 167.67 786.53 2.61 -2.61 MWD03 7,069.0 91.57 167.12 YNN 6,555.14 -805.33 174.59 818.29 5.24 -4.63 MWD03 7,100.0 90.71 167.20 YNN 6,554.52 -835.55 181.47 849.11 2.79 -2.77 MWD03 7,132.0 92.77 165.98 YNN 6,553.55 -866.66 188.89 880.94 7.48 6.44 MWD03 7,164.0 91.23 165.94 YNN 6,552.44 -897.68 196.65 912.80 4.81 -4.81 MWD03 7,195.0 94.71 165.12 YNN 6,550.83 -927.65 204.38 943.66 11.53 11.23 MWD03 7,226.0 95.47 165.97 YNN 6,548.08 -957.55 212.09 974.44 3.67 2.45 MWD03 7,258.0 92.49 164.84 YNN 6,545.86 -988.44 220.13 1,006.26 9.96 -9.31 MWD03 7,289.0 93.57 164.34 YNN 6,544.22 -1,018.29 228.36 1,037.16 3.84 3.48 MWD03 7,321.0 95.81 163.98 YNN 6,541.60 -1,048.97 237.07 1,069.00 7.09 7.00 MWD03 7,353.0 92.03 164.18 YNN 6,539.42 -1,079.66 245.82 1,100.87 11.83 -11.81 MWD03 7,384.0 89.74 162.71 YNN 6,538.94 -1,109.37 254.65 1,131.84 8.78 -7.39 MWD03 7,416.0 93.36 163.89 YNN 6,538.07 -1,140.00 263.84 1,163.79 11.90 11.31 MWD03 7,447.0 94.20 162.54 YNN 6,536.03 -1,169.62 272.77 1,194.70 5.12 2.71 MWD03 7,479.0 91.28 162.11 YNN 6,534.50 -1,200.07 282.48 1,226.65 9.22 -9.13 MWD03 7,497.0 91.51 161.82 YNN 6,534.06 -1,217.18 288.05 1,244.64 2.06 1.28 MWD03 7,528.0 91.46 161.45 YNN 6,533.26 -1,246.59 297.81 1,275.63 1.20 -0.16
03 7,560.0 92.60 161.60 YNN 6,532.12 -1,276.92 307.95 1,307.61 3.59 3.5603 7,592.0 93.34 162.16 YNN 6,530.46 -1,307.29 317.89 1,339.56
Printed: 12r28/2009 11:59:11
RECElVED
Questar E & P DIV.0FOIL,GAS&MENGPage 2 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°l100ft) (°/100ft)
01 7,034.0 94.19 164.49 YNN 6,559.69 -771.18 168.77 784.11 11.19 10.34 MWD01 7,065.0 101.06 163.49 YNN 6,555.58 -800.69 177.23 814.77 22.39 22.16 MWD02 6,782.0 83.29 167.17 NYN 6,555.85 -524.87 118.04 534.26 0.00 0.00 MWD03 6,719.0 78.92 167.09 NYN 6,547.10 -464.00 103.81 472.77 0.00 0.00 MWD03 6,722.0 79.40 167.13 YNN 6,547.66 -466.87 104.47 475.45 16.05 16.00 MWD03 6,754.0 78.60 170.07 YNN 6,553.77 -497.66 110.68 506.58 9.36 -2.50 MWD03 6,786.0 83.62 168.34 YNN 6,558.72 -528.70 116.60 537.86 16.57 15.69 MWD03 6,817.0 85.22 168.49 YNN 6,561.73 -558.93 122.79 568.46 5.18 5.16 MWD03 6,848.0 90.20 168.18 YNN 6,562.97 -589.25 129.06 599.17 16.10 16.06 MWD03 6,879.0 92.55 169.34 YNN 6,562.22 -619.65 135.10 629.87 8.45 7.58 MWD03 6,911.0 91.06 168.40 YNN 6,561.22 -651.03 141.27 661.55 5.50 -4.66 MWD03 6,943.0 90.66 167.89 YNN 6,560.74 -682.34 147.84 693.30 2.03 -1.25 MWD03 6,974.0 92.15 167.62 YNN 6,559.98 -712.63 154.42 724.08 4.88 4.81 MWD03 7,006.0 93.86 167.90 YNN 6,558.30 -743.86 161.19 755.81 5.41 5.34 MWD03 7,037.0 93.05 167.91 YNN 6,556.43 -774.11 167.67 786.53 2.61 -2.61 MWD03 7,069.0 91.57 167.12 YNN 6,555.14 -805.33 174.59 818.29 5.24 -4.63 MWD03 7,100.0 90.71 167.20 YNN 6,554.52 -835.55 181.47 849.11 2.79 -2.77 MWD03 7,132.0 92.77 165.98 YNN 6,553.55 -866.66 188.89 880.94 7.48 6.44 MWD03 7,164.0 91.23 165.94 YNN 6,552.44 -897.68 196.65 912.80 4.81 -4.81 MWD03 7,195.0 94.71 165.12 YNN 6,550.83 -927.65 204.38 943.66 11.53 11.23 MWD03 7,226.0 95.47 165.97 YNN 6,548.08 -957.55 212.09 974.44 3.67 2.45 MWD03 7,258.0 92.49 164.84 YNN 6,545.86 -988.44 220.13 1,006.26 9.96 -9.31 MWD03 7,289.0 93.57 164.34 YNN 6,544.22 -1,018.29 228.36 1,037.16 3.84 3.48 MWD03 7,321.0 95.81 163.98 YNN 6,541.60 -1,048.97 237.07 1,069.00 7.09 7.00 MWD03 7,353.0 92.03 164.18 YNN 6,539.42 -1,079.66 245.82 1,100.87 11.83 -11.81 MWD03 7,384.0 89.74 162.71 YNN 6,538.94 -1,109.37 254.65 1,131.84 8.78 -7.39 MWD03 7,416.0 93.36 163.89 YNN 6,538.07 -1,140.00 263.84 1,163.79 11.90 11.31 MWD03 7,447.0 94.20 162.54 YNN 6,536.03 -1,169.62 272.77 1,194.70 5.12 2.71 MWD03 7,479.0 91.28 162.11 YNN 6,534.50 -1,200.07 282.48 1,226.65 9.22 -9.13 MWD03 7,497.0 91.51 161.82 YNN 6,534.06 -1,217.18 288.05 1,244.64 2.06 1.28 MWD03 7,528.0 91.46 161.45 YNN 6,533.26 -1,246.59 297.81 1,275.63 1.20 -0.16
03 7,560.0 92.60 161.60 YNN 6,532.12 -1,276.92 307.95 1,307.61 3.59 3.5603 7,592.0 93.34 162.16 YNN 6,530.46 -1,307.29 317.89 1,339.56
Printed: 12r28/2009 11:59:11
DEC3 i USQuestar E & P Div.0FOIL,GAS&MONG Page 3 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.80 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direc ion: 157.23 (°) Calculation Method: Minimum Curvature 01 101.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert.Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 7,623.0 91.86 161.93 YNN 6,529.06 -1,336.75 327.43 1,370.53 4.83 -4.77
03 7,655.0 91.40 161.37 YNN 6,528.15 -1,367.11 337.50 1,402.51 2.26 -1.44
03 7,686.0 92.60 160.66 YNN 6,527.07 -1,396.41 347.58 1,433.49 4.50 3.8703 7,718.0 95.17 160.98 YNN 6,524.90 -1,426.56 358.07 1,465.41 8.09 8.0303 7,749.0 95.11 160.87 YNN 6,522.12 -1,455.74 368.16 1,496.29 0.40 -0.19
03 7,781.0 94.48 159.85 YNN 6,519.45 -1,485.77 378.88 1,528.17 3.74 -1.97
03 7,813.0 93.29 161.10 YNN 6,517.28 -1,515.86 389.55 1,560.10 5.39 -3.72
03 7,844.0 92.54 159.08 YNN 6,515.70 -1,544.97 400.09 1,591.05 6.94 -2.42
03 7,876.0 91.40 156.90 YNN 6,514.60 -1,574.62 412.07 1,622.99 7.68 -3.56
03 7,907.0 92.94 155.36 YNN 6,513.43 -1,602.94 424.61 1,653.85 7.02 4.97 MWD03 7,970.0 90.71 152.00 YNN 6,511.42 -1,659.37 452.52 1,716.29 6.40 -3.54
03 8,033.0 91.85 150.28 YNN 6,510.01 -1,714.53 482.92 1,778.34 3.27 1.8103 8,065.0 93.52 149.18 YNN 6,508.51 -1,742.14 499.03 1,809.69 6.25 5.2203 8,096.0 94.09 149.71 YNN 6,506.46 -1,768.77 514.76 1,840.00 2.51 1.8403 8,128.0 91.74 149.87 YNN 6,504.83 -1,796.39 530.84 1,871.34 7.36 -7.34
03 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 5.29 2.9703 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 0.00 0.00 MWD03 8,190.0 91.74 151.11 YNN 6,502.45 -1,850.50 561.01 I 1,932.33 2.99 -2.97 MWD03 8.222.0 91.57 151.37 YNN 6,501.53 -1,878.54 576.40 1,963.85 0.97 -0.53 MWD03 8,253.0 92.66 152.52 YNN 6,500.38 -1,905.88 590.96 1,994.44 5.11 3.52 MWD03 8,285.0 93.57 152.84 YNN 6,498.64 -1,934.27 605.63 2,026.06 3.01 2.84 MWD03 8,316.0 93.05 153.01 YNN 6,496.85 -1,961.82 619.72 2,056.70 1.76 -1.68 MWD03 8,348.0 95.06 154.92 YNN 6,494.59 -1,990.50 633.73 2,088.38 8.65 6.28 MWD03 8,380.0 91.57 154.94 YNN 6,492.74 -2,019.43 647.26 2,120.14 10.91 -10.91 MWD03 8,411.0 92.03 156.38 YNN 6,491.77 -2,047.66 660.03 2,150.99 4.87 1.48 MWD03 8,443.0 93.92 158.21 YNN 6,495 '
-2,077.14 672.36 2,182.87 8.22 5.9103 8,f75.0 91.57 159.83 YNN 6,488.57 -2,106.98 683.81 2,214.82 8.92 -7.34
03 8,506.0 89.12 161.93 YNN 6,488.39 -2,136.27 693.96 2,245.81 10.41 -7.90
03 8,538.0 88.77 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 1.12 -1.09
03 8,538.0 88.87 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 0.00 0.00 MWD03 8,601.0 94.25 160.14 YNN 6,487.26 -2,226.24 724.28 2,340.75 9.04 8.54 MWD03 8,632.0 95.86 157.84 YNN 6,484.53 -2,255.06 735.35 2,371.61 9.03 5.19 MWD03 8,664.0 94.02 157.50 YNN 6,481.77 -2,284.55 747.46 2,403.43 5.85 -5.75 MWD
rinted: 12,28/2009 11;59:11
DEC3 i USQuestar E & P Div.0FOIL,GAS&MONG Page 3 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.80 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direc ion: 157.23 (°) Calculation Method: Minimum Curvature 01 101.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert.Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 7,623.0 91.86 161.93 YNN 6,529.06 -1,336.75 327.43 1,370.53 4.83 -4.77
03 7,655.0 91.40 161.37 YNN 6,528.15 -1,367.11 337.50 1,402.51 2.26 -1.44
03 7,686.0 92.60 160.66 YNN 6,527.07 -1,396.41 347.58 1,433.49 4.50 3.8703 7,718.0 95.17 160.98 YNN 6,524.90 -1,426.56 358.07 1,465.41 8.09 8.0303 7,749.0 95.11 160.87 YNN 6,522.12 -1,455.74 368.16 1,496.29 0.40 -0.19
03 7,781.0 94.48 159.85 YNN 6,519.45 -1,485.77 378.88 1,528.17 3.74 -1.97
03 7,813.0 93.29 161.10 YNN 6,517.28 -1,515.86 389.55 1,560.10 5.39 -3.72
03 7,844.0 92.54 159.08 YNN 6,515.70 -1,544.97 400.09 1,591.05 6.94 -2.42
03 7,876.0 91.40 156.90 YNN 6,514.60 -1,574.62 412.07 1,622.99 7.68 -3.56
03 7,907.0 92.94 155.36 YNN 6,513.43 -1,602.94 424.61 1,653.85 7.02 4.97 MWD03 7,970.0 90.71 152.00 YNN 6,511.42 -1,659.37 452.52 1,716.29 6.40 -3.54
03 8,033.0 91.85 150.28 YNN 6,510.01 -1,714.53 482.92 1,778.34 3.27 1.8103 8,065.0 93.52 149.18 YNN 6,508.51 -1,742.14 499.03 1,809.69 6.25 5.2203 8,096.0 94.09 149.71 YNN 6,506.46 -1,768.77 514.76 1,840.00 2.51 1.8403 8,128.0 91.74 149.87 YNN 6,504.83 -1,796.39 530.84 1,871.34 7.36 -7.34
03 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 5.29 2.9703 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 0.00 0.00 MWD03 8,190.0 91.74 151.11 YNN 6,502.45 -1,850.50 561.01 I 1,932.33 2.99 -2.97 MWD03 8.222.0 91.57 151.37 YNN 6,501.53 -1,878.54 576.40 1,963.85 0.97 -0.53 MWD03 8,253.0 92.66 152.52 YNN 6,500.38 -1,905.88 590.96 1,994.44 5.11 3.52 MWD03 8,285.0 93.57 152.84 YNN 6,498.64 -1,934.27 605.63 2,026.06 3.01 2.84 MWD03 8,316.0 93.05 153.01 YNN 6,496.85 -1,961.82 619.72 2,056.70 1.76 -1.68 MWD03 8,348.0 95.06 154.92 YNN 6,494.59 -1,990.50 633.73 2,088.38 8.65 6.28 MWD03 8,380.0 91.57 154.94 YNN 6,492.74 -2,019.43 647.26 2,120.14 10.91 -10.91 MWD03 8,411.0 92.03 156.38 YNN 6,491.77 -2,047.66 660.03 2,150.99 4.87 1.48 MWD03 8,443.0 93.92 158.21 YNN 6,495 '
-2,077.14 672.36 2,182.87 8.22 5.9103 8,f75.0 91.57 159.83 YNN 6,488.57 -2,106.98 683.81 2,214.82 8.92 -7.34
03 8,506.0 89.12 161.93 YNN 6,488.39 -2,136.27 693.96 2,245.81 10.41 -7.90
03 8,538.0 88.77 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 1.12 -1.09
03 8,538.0 88.87 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 0.00 0.00 MWD03 8,601.0 94.25 160.14 YNN 6,487.26 -2,226.24 724.28 2,340.75 9.04 8.54 MWD03 8,632.0 95.86 157.84 YNN 6,484.53 -2,255.06 735.35 2,371.61 9.03 5.19 MWD03 8,664.0 94.02 157.50 YNN 6,481.77 -2,284.55 747.46 2,403.43 5.85 -5.75 MWD
rinted: 12,28/2009 11;59:11
DEC3 i USQuestar E & P Div.0FOIL,GAS&MONG Page 3 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.80 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direc ion: 157.23 (°) Calculation Method: Minimum Curvature 01 101.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert.Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 7,623.0 91.86 161.93 YNN 6,529.06 -1,336.75 327.43 1,370.53 4.83 -4.77
03 7,655.0 91.40 161.37 YNN 6,528.15 -1,367.11 337.50 1,402.51 2.26 -1.44
03 7,686.0 92.60 160.66 YNN 6,527.07 -1,396.41 347.58 1,433.49 4.50 3.8703 7,718.0 95.17 160.98 YNN 6,524.90 -1,426.56 358.07 1,465.41 8.09 8.0303 7,749.0 95.11 160.87 YNN 6,522.12 -1,455.74 368.16 1,496.29 0.40 -0.19
03 7,781.0 94.48 159.85 YNN 6,519.45 -1,485.77 378.88 1,528.17 3.74 -1.97
03 7,813.0 93.29 161.10 YNN 6,517.28 -1,515.86 389.55 1,560.10 5.39 -3.72
03 7,844.0 92.54 159.08 YNN 6,515.70 -1,544.97 400.09 1,591.05 6.94 -2.42
03 7,876.0 91.40 156.90 YNN 6,514.60 -1,574.62 412.07 1,622.99 7.68 -3.56
03 7,907.0 92.94 155.36 YNN 6,513.43 -1,602.94 424.61 1,653.85 7.02 4.97 MWD03 7,970.0 90.71 152.00 YNN 6,511.42 -1,659.37 452.52 1,716.29 6.40 -3.54
03 8,033.0 91.85 150.28 YNN 6,510.01 -1,714.53 482.92 1,778.34 3.27 1.8103 8,065.0 93.52 149.18 YNN 6,508.51 -1,742.14 499.03 1,809.69 6.25 5.2203 8,096.0 94.09 149.71 YNN 6,506.46 -1,768.77 514.76 1,840.00 2.51 1.8403 8,128.0 91.74 149.87 YNN 6,504.83 -1,796.39 530.84 1,871.34 7.36 -7.34
03 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 5.29 2.9703 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 0.00 0.00 MWD03 8,190.0 91.74 151.11 YNN 6,502.45 -1,850.50 561.01 I 1,932.33 2.99 -2.97 MWD03 8.222.0 91.57 151.37 YNN 6,501.53 -1,878.54 576.40 1,963.85 0.97 -0.53 MWD03 8,253.0 92.66 152.52 YNN 6,500.38 -1,905.88 590.96 1,994.44 5.11 3.52 MWD03 8,285.0 93.57 152.84 YNN 6,498.64 -1,934.27 605.63 2,026.06 3.01 2.84 MWD03 8,316.0 93.05 153.01 YNN 6,496.85 -1,961.82 619.72 2,056.70 1.76 -1.68 MWD03 8,348.0 95.06 154.92 YNN 6,494.59 -1,990.50 633.73 2,088.38 8.65 6.28 MWD03 8,380.0 91.57 154.94 YNN 6,492.74 -2,019.43 647.26 2,120.14 10.91 -10.91 MWD03 8,411.0 92.03 156.38 YNN 6,491.77 -2,047.66 660.03 2,150.99 4.87 1.48 MWD03 8,443.0 93.92 158.21 YNN 6,495 '
-2,077.14 672.36 2,182.87 8.22 5.9103 8,f75.0 91.57 159.83 YNN 6,488.57 -2,106.98 683.81 2,214.82 8.92 -7.34
03 8,506.0 89.12 161.93 YNN 6,488.39 -2,136.27 693.96 2,245.81 10.41 -7.90
03 8,538.0 88.77 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 1.12 -1.09
03 8,538.0 88.87 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 0.00 0.00 MWD03 8,601.0 94.25 160.14 YNN 6,487.26 -2,226.24 724.28 2,340.75 9.04 8.54 MWD03 8,632.0 95.86 157.84 YNN 6,484.53 -2,255.06 735.35 2,371.61 9.03 5.19 MWD03 8,664.0 94.02 157.50 YNN 6,481.77 -2,284.55 747.46 2,403.43 5.85 -5.75 MWD
rinted: 12,28/2009 11;59:11
DEC3 i USQuestar E & P Div.0FOIL,GAS&MONG Page 3 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.80 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direc ion: 157.23 (°) Calculation Method: Minimum Curvature 01 101.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert.Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 7,623.0 91.86 161.93 YNN 6,529.06 -1,336.75 327.43 1,370.53 4.83 -4.77
03 7,655.0 91.40 161.37 YNN 6,528.15 -1,367.11 337.50 1,402.51 2.26 -1.44
03 7,686.0 92.60 160.66 YNN 6,527.07 -1,396.41 347.58 1,433.49 4.50 3.8703 7,718.0 95.17 160.98 YNN 6,524.90 -1,426.56 358.07 1,465.41 8.09 8.0303 7,749.0 95.11 160.87 YNN 6,522.12 -1,455.74 368.16 1,496.29 0.40 -0.19
03 7,781.0 94.48 159.85 YNN 6,519.45 -1,485.77 378.88 1,528.17 3.74 -1.97
03 7,813.0 93.29 161.10 YNN 6,517.28 -1,515.86 389.55 1,560.10 5.39 -3.72
03 7,844.0 92.54 159.08 YNN 6,515.70 -1,544.97 400.09 1,591.05 6.94 -2.42
03 7,876.0 91.40 156.90 YNN 6,514.60 -1,574.62 412.07 1,622.99 7.68 -3.56
03 7,907.0 92.94 155.36 YNN 6,513.43 -1,602.94 424.61 1,653.85 7.02 4.97 MWD03 7,970.0 90.71 152.00 YNN 6,511.42 -1,659.37 452.52 1,716.29 6.40 -3.54
03 8,033.0 91.85 150.28 YNN 6,510.01 -1,714.53 482.92 1,778.34 3.27 1.8103 8,065.0 93.52 149.18 YNN 6,508.51 -1,742.14 499.03 1,809.69 6.25 5.2203 8,096.0 94.09 149.71 YNN 6,506.46 -1,768.77 514.76 1,840.00 2.51 1.8403 8,128.0 91.74 149.87 YNN 6,504.83 -1,796.39 530.84 1,871.34 7.36 -7.34
03 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 5.29 2.9703 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 0.00 0.00 MWD03 8,190.0 91.74 151.11 YNN 6,502.45 -1,850.50 561.01 I 1,932.33 2.99 -2.97 MWD03 8.222.0 91.57 151.37 YNN 6,501.53 -1,878.54 576.40 1,963.85 0.97 -0.53 MWD03 8,253.0 92.66 152.52 YNN 6,500.38 -1,905.88 590.96 1,994.44 5.11 3.52 MWD03 8,285.0 93.57 152.84 YNN 6,498.64 -1,934.27 605.63 2,026.06 3.01 2.84 MWD03 8,316.0 93.05 153.01 YNN 6,496.85 -1,961.82 619.72 2,056.70 1.76 -1.68 MWD03 8,348.0 95.06 154.92 YNN 6,494.59 -1,990.50 633.73 2,088.38 8.65 6.28 MWD03 8,380.0 91.57 154.94 YNN 6,492.74 -2,019.43 647.26 2,120.14 10.91 -10.91 MWD03 8,411.0 92.03 156.38 YNN 6,491.77 -2,047.66 660.03 2,150.99 4.87 1.48 MWD03 8,443.0 93.92 158.21 YNN 6,495 '
-2,077.14 672.36 2,182.87 8.22 5.9103 8,f75.0 91.57 159.83 YNN 6,488.57 -2,106.98 683.81 2,214.82 8.92 -7.34
03 8,506.0 89.12 161.93 YNN 6,488.39 -2,136.27 693.96 2,245.81 10.41 -7.90
03 8,538.0 88.77 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 1.12 -1.09
03 8,538.0 88.87 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 0.00 0.00 MWD03 8,601.0 94.25 160.14 YNN 6,487.26 -2,226.24 724.28 2,340.75 9.04 8.54 MWD03 8,632.0 95.86 157.84 YNN 6,484.53 -2,255.06 735.35 2,371.61 9.03 5.19 MWD03 8,664.0 94.02 157.50 YNN 6,481.77 -2,284.55 747.46 2,403.43 5.85 -5.75 MWD
rinted: 12,28/2009 11;59:11
RECEIVED
DEC31 2009Questar E & P Page 4 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T# V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161 00S/T # TMD Angle Azimuth CTM TVD N/-S E/-W Vert. Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 8,696.0 91.51 158.25 YNN 6,480.23 -2,314.16 759.50 2,435.35 8.19 -7.84 MWD03 8,727.0 92.59 157.34 YNN 6,479.12 -2,342.84 771.20 2,466.28 4.55 3.48 MWD03 8,759.0 92.43 156.55 YNN 6,477.72 -2,372.26 783.72 2,498.17 2.52 -0.50 MWD03 8,790.0 93.22 154.60 YNN 6,476.19 -2,400.45 796.53 2,528.99 6.78 2.55 MWD03 8,822.0 94.15 154.35 YNN 6,474.13 -2,429.26 810.29 2,560.72 3.01 2.91 MWD03 8,854.0 94.20 153.75 YNN 6,471.81 -2,457.96 824.25 2,592.40 1.88 0.16 MWD03 8,886.0 93.63 154.12 YNN 6,469.62 -2,486.64 838.28 2,624.08 2.12 -1.78 MWD03 8,917.0 93.46 154.26 YNN 6,467.70 -2,514.49 851.75 2,654.80 0.71 -0.55 MWD03 8,949.0 93.10 153.79 YNN 6,465.87 -2,543.21 865.74 2,686.51 1.85 -1.13 MWD03 8,990.0 92.65 154.67 YNN 6,463.82 -2,580.09 883.54 2,727.17 2.41 -1.10 MWD03 9,036.0 91.94 156.49 YNN 6,461.97 -2,621.94 902.55 2,772.93 4.24 -1.54 MWD03 9,068.0 91.50 157.74 YNN 6,461.01 -2,651.40 914.98 2,804.84 4.14 -1.38 MWD03 9,100.0 92.38 157.37 YNN 6,459.93 -2,680.96 927.19 2,836.76 2.98 2.75 MWD03 9,131.0 91.31 157.74 YNN 6,458.93 -2,709.60 939.02 2,867.69 3.65 -3.45 MWD03 9,163.0 90.75 157.99 YNN 6,458.36 -2,739.24 951.08 2,899.64 1.92 -1.75 MWD03 9,194.0 90.91 157.30 YNN 6,457.91 -2,767.90 962.87 2,930.58 2.28 0.52 MWD03 9,226.0 94.44 157.61 YNN 6,456.41 -2,797.42 975.12 2,962.48 11.07 11.03 MWD03 9,257.0 94.25 156.49 YNN 6,454.07 -2,825.88 987.18 2,993.32 3.65 -0.61 MWD03 9,289.0 93.06 155.74 YNN 6,452.03 -2,855.08 1,000.11 3,025.14 4.39 -3.72 MWD03 9,320.0 92.56 155.49 YNN 6,450.51 -2,883.28 1,012.89 3,055.96 1.80 -1.61
03 9,352.0 91.40 153.76 YNN 6,449.40 -2,912.18 1,026.59 3,087.74 6.51 -3.63
03 9,383.0 90.44 151.99 YNN 6,448.90 -2,939.76 1,040.73 3,118.43 6.49 -3.10
03 9,415.0 90.56 150.99 YNN 6,448.62 -2,967.88 1,056.00 3,149.99 3 15 0.3803 9,447.0 92.69 150.36 YNN 6,447.72 -2,995.77 1,071.66 3,181.45 6.94 6.6603 9,478.0 94.38 150.74 YNN 6,445.80 -3,022.71 1,086.88 3,211.88 5.59 5.4503 9,510.0 93.00 149.61 YNN 6,443.75 -3,050.41 1,102.76 3,243.24 5.57 -4.31
03 9,541.0 91.63 147.74 YNN 6,442.49 -3,076.87 1,118.86 3,273.50 7.47 -4.42
03 9,573.0 92.50 146.49 YNN 6,441.34 -3,103.72 1,136.22 3,304.55 4.76 2.7203 9,605.0 91.63 144.24 YNN 6,440.19 -3,130.03 1,154.40 3,335.34 7.53 -2.72 MWD03 9,636.0 93.13 142.61 YNN 6,438.90 -3,154.91 1,172.85 3,364.87 7.14 4.84 MWD03 9,668.0 92.63 141.61 YNN 6,437.29 -3,180.13 1,192.48 3,395.10 3.49 -1.56 MWD03 9,699.0 91.89 140.74 YNN 6,436.07 -3,204.26 1,211.90 3,424.24 3.68 -2.39 MWD03 9,731.0 92.19 138.24 YNN 6,434.93 -3,228.57 1,232.67 3,453.99 7.86 0.94 MWD
MDENTIALPrinted: 12,28/2009 11:59:11
RECEIVED
DEC31 2009Questar E & P Page 4 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T# V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161 00S/T # TMD Angle Azimuth CTM TVD N/-S E/-W Vert. Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 8,696.0 91.51 158.25 YNN 6,480.23 -2,314.16 759.50 2,435.35 8.19 -7.84 MWD03 8,727.0 92.59 157.34 YNN 6,479.12 -2,342.84 771.20 2,466.28 4.55 3.48 MWD03 8,759.0 92.43 156.55 YNN 6,477.72 -2,372.26 783.72 2,498.17 2.52 -0.50 MWD03 8,790.0 93.22 154.60 YNN 6,476.19 -2,400.45 796.53 2,528.99 6.78 2.55 MWD03 8,822.0 94.15 154.35 YNN 6,474.13 -2,429.26 810.29 2,560.72 3.01 2.91 MWD03 8,854.0 94.20 153.75 YNN 6,471.81 -2,457.96 824.25 2,592.40 1.88 0.16 MWD03 8,886.0 93.63 154.12 YNN 6,469.62 -2,486.64 838.28 2,624.08 2.12 -1.78 MWD03 8,917.0 93.46 154.26 YNN 6,467.70 -2,514.49 851.75 2,654.80 0.71 -0.55 MWD03 8,949.0 93.10 153.79 YNN 6,465.87 -2,543.21 865.74 2,686.51 1.85 -1.13 MWD03 8,990.0 92.65 154.67 YNN 6,463.82 -2,580.09 883.54 2,727.17 2.41 -1.10 MWD03 9,036.0 91.94 156.49 YNN 6,461.97 -2,621.94 902.55 2,772.93 4.24 -1.54 MWD03 9,068.0 91.50 157.74 YNN 6,461.01 -2,651.40 914.98 2,804.84 4.14 -1.38 MWD03 9,100.0 92.38 157.37 YNN 6,459.93 -2,680.96 927.19 2,836.76 2.98 2.75 MWD03 9,131.0 91.31 157.74 YNN 6,458.93 -2,709.60 939.02 2,867.69 3.65 -3.45 MWD03 9,163.0 90.75 157.99 YNN 6,458.36 -2,739.24 951.08 2,899.64 1.92 -1.75 MWD03 9,194.0 90.91 157.30 YNN 6,457.91 -2,767.90 962.87 2,930.58 2.28 0.52 MWD03 9,226.0 94.44 157.61 YNN 6,456.41 -2,797.42 975.12 2,962.48 11.07 11.03 MWD03 9,257.0 94.25 156.49 YNN 6,454.07 -2,825.88 987.18 2,993.32 3.65 -0.61 MWD03 9,289.0 93.06 155.74 YNN 6,452.03 -2,855.08 1,000.11 3,025.14 4.39 -3.72 MWD03 9,320.0 92.56 155.49 YNN 6,450.51 -2,883.28 1,012.89 3,055.96 1.80 -1.61
03 9,352.0 91.40 153.76 YNN 6,449.40 -2,912.18 1,026.59 3,087.74 6.51 -3.63
03 9,383.0 90.44 151.99 YNN 6,448.90 -2,939.76 1,040.73 3,118.43 6.49 -3.10
03 9,415.0 90.56 150.99 YNN 6,448.62 -2,967.88 1,056.00 3,149.99 3 15 0.3803 9,447.0 92.69 150.36 YNN 6,447.72 -2,995.77 1,071.66 3,181.45 6.94 6.6603 9,478.0 94.38 150.74 YNN 6,445.80 -3,022.71 1,086.88 3,211.88 5.59 5.4503 9,510.0 93.00 149.61 YNN 6,443.75 -3,050.41 1,102.76 3,243.24 5.57 -4.31
03 9,541.0 91.63 147.74 YNN 6,442.49 -3,076.87 1,118.86 3,273.50 7.47 -4.42
03 9,573.0 92.50 146.49 YNN 6,441.34 -3,103.72 1,136.22 3,304.55 4.76 2.7203 9,605.0 91.63 144.24 YNN 6,440.19 -3,130.03 1,154.40 3,335.34 7.53 -2.72 MWD03 9,636.0 93.13 142.61 YNN 6,438.90 -3,154.91 1,172.85 3,364.87 7.14 4.84 MWD03 9,668.0 92.63 141.61 YNN 6,437.29 -3,180.13 1,192.48 3,395.10 3.49 -1.56 MWD03 9,699.0 91.89 140.74 YNN 6,436.07 -3,204.26 1,211.90 3,424.24 3.68 -2.39 MWD03 9,731.0 92.19 138.24 YNN 6,434.93 -3,228.57 1,232.67 3,453.99 7.86 0.94 MWD
MDENTIALPrinted: 12,28/2009 11:59:11
RECEIVED
DEC31 2009Questar E & P Page 4 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T# V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161 00S/T # TMD Angle Azimuth CTM TVD N/-S E/-W Vert. Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 8,696.0 91.51 158.25 YNN 6,480.23 -2,314.16 759.50 2,435.35 8.19 -7.84 MWD03 8,727.0 92.59 157.34 YNN 6,479.12 -2,342.84 771.20 2,466.28 4.55 3.48 MWD03 8,759.0 92.43 156.55 YNN 6,477.72 -2,372.26 783.72 2,498.17 2.52 -0.50 MWD03 8,790.0 93.22 154.60 YNN 6,476.19 -2,400.45 796.53 2,528.99 6.78 2.55 MWD03 8,822.0 94.15 154.35 YNN 6,474.13 -2,429.26 810.29 2,560.72 3.01 2.91 MWD03 8,854.0 94.20 153.75 YNN 6,471.81 -2,457.96 824.25 2,592.40 1.88 0.16 MWD03 8,886.0 93.63 154.12 YNN 6,469.62 -2,486.64 838.28 2,624.08 2.12 -1.78 MWD03 8,917.0 93.46 154.26 YNN 6,467.70 -2,514.49 851.75 2,654.80 0.71 -0.55 MWD03 8,949.0 93.10 153.79 YNN 6,465.87 -2,543.21 865.74 2,686.51 1.85 -1.13 MWD03 8,990.0 92.65 154.67 YNN 6,463.82 -2,580.09 883.54 2,727.17 2.41 -1.10 MWD03 9,036.0 91.94 156.49 YNN 6,461.97 -2,621.94 902.55 2,772.93 4.24 -1.54 MWD03 9,068.0 91.50 157.74 YNN 6,461.01 -2,651.40 914.98 2,804.84 4.14 -1.38 MWD03 9,100.0 92.38 157.37 YNN 6,459.93 -2,680.96 927.19 2,836.76 2.98 2.75 MWD03 9,131.0 91.31 157.74 YNN 6,458.93 -2,709.60 939.02 2,867.69 3.65 -3.45 MWD03 9,163.0 90.75 157.99 YNN 6,458.36 -2,739.24 951.08 2,899.64 1.92 -1.75 MWD03 9,194.0 90.91 157.30 YNN 6,457.91 -2,767.90 962.87 2,930.58 2.28 0.52 MWD03 9,226.0 94.44 157.61 YNN 6,456.41 -2,797.42 975.12 2,962.48 11.07 11.03 MWD03 9,257.0 94.25 156.49 YNN 6,454.07 -2,825.88 987.18 2,993.32 3.65 -0.61 MWD03 9,289.0 93.06 155.74 YNN 6,452.03 -2,855.08 1,000.11 3,025.14 4.39 -3.72 MWD03 9,320.0 92.56 155.49 YNN 6,450.51 -2,883.28 1,012.89 3,055.96 1.80 -1.61
03 9,352.0 91.40 153.76 YNN 6,449.40 -2,912.18 1,026.59 3,087.74 6.51 -3.63
03 9,383.0 90.44 151.99 YNN 6,448.90 -2,939.76 1,040.73 3,118.43 6.49 -3.10
03 9,415.0 90.56 150.99 YNN 6,448.62 -2,967.88 1,056.00 3,149.99 3 15 0.3803 9,447.0 92.69 150.36 YNN 6,447.72 -2,995.77 1,071.66 3,181.45 6.94 6.6603 9,478.0 94.38 150.74 YNN 6,445.80 -3,022.71 1,086.88 3,211.88 5.59 5.4503 9,510.0 93.00 149.61 YNN 6,443.75 -3,050.41 1,102.76 3,243.24 5.57 -4.31
03 9,541.0 91.63 147.74 YNN 6,442.49 -3,076.87 1,118.86 3,273.50 7.47 -4.42
03 9,573.0 92.50 146.49 YNN 6,441.34 -3,103.72 1,136.22 3,304.55 4.76 2.7203 9,605.0 91.63 144.24 YNN 6,440.19 -3,130.03 1,154.40 3,335.34 7.53 -2.72 MWD03 9,636.0 93.13 142.61 YNN 6,438.90 -3,154.91 1,172.85 3,364.87 7.14 4.84 MWD03 9,668.0 92.63 141.61 YNN 6,437.29 -3,180.13 1,192.48 3,395.10 3.49 -1.56 MWD03 9,699.0 91.89 140.74 YNN 6,436.07 -3,204.26 1,211.90 3,424.24 3.68 -2.39 MWD03 9,731.0 92.19 138.24 YNN 6,434.93 -3,228.57 1,232.67 3,453.99 7.86 0.94 MWD
MDENTIALPrinted: 12,28/2009 11:59:11
RECEIVED
DEC31 2009Questar E & P Page 4 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T# V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161 00S/T # TMD Angle Azimuth CTM TVD N/-S E/-W Vert. Section DLS BUR Type
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 8,696.0 91.51 158.25 YNN 6,480.23 -2,314.16 759.50 2,435.35 8.19 -7.84 MWD03 8,727.0 92.59 157.34 YNN 6,479.12 -2,342.84 771.20 2,466.28 4.55 3.48 MWD03 8,759.0 92.43 156.55 YNN 6,477.72 -2,372.26 783.72 2,498.17 2.52 -0.50 MWD03 8,790.0 93.22 154.60 YNN 6,476.19 -2,400.45 796.53 2,528.99 6.78 2.55 MWD03 8,822.0 94.15 154.35 YNN 6,474.13 -2,429.26 810.29 2,560.72 3.01 2.91 MWD03 8,854.0 94.20 153.75 YNN 6,471.81 -2,457.96 824.25 2,592.40 1.88 0.16 MWD03 8,886.0 93.63 154.12 YNN 6,469.62 -2,486.64 838.28 2,624.08 2.12 -1.78 MWD03 8,917.0 93.46 154.26 YNN 6,467.70 -2,514.49 851.75 2,654.80 0.71 -0.55 MWD03 8,949.0 93.10 153.79 YNN 6,465.87 -2,543.21 865.74 2,686.51 1.85 -1.13 MWD03 8,990.0 92.65 154.67 YNN 6,463.82 -2,580.09 883.54 2,727.17 2.41 -1.10 MWD03 9,036.0 91.94 156.49 YNN 6,461.97 -2,621.94 902.55 2,772.93 4.24 -1.54 MWD03 9,068.0 91.50 157.74 YNN 6,461.01 -2,651.40 914.98 2,804.84 4.14 -1.38 MWD03 9,100.0 92.38 157.37 YNN 6,459.93 -2,680.96 927.19 2,836.76 2.98 2.75 MWD03 9,131.0 91.31 157.74 YNN 6,458.93 -2,709.60 939.02 2,867.69 3.65 -3.45 MWD03 9,163.0 90.75 157.99 YNN 6,458.36 -2,739.24 951.08 2,899.64 1.92 -1.75 MWD03 9,194.0 90.91 157.30 YNN 6,457.91 -2,767.90 962.87 2,930.58 2.28 0.52 MWD03 9,226.0 94.44 157.61 YNN 6,456.41 -2,797.42 975.12 2,962.48 11.07 11.03 MWD03 9,257.0 94.25 156.49 YNN 6,454.07 -2,825.88 987.18 2,993.32 3.65 -0.61 MWD03 9,289.0 93.06 155.74 YNN 6,452.03 -2,855.08 1,000.11 3,025.14 4.39 -3.72 MWD03 9,320.0 92.56 155.49 YNN 6,450.51 -2,883.28 1,012.89 3,055.96 1.80 -1.61
03 9,352.0 91.40 153.76 YNN 6,449.40 -2,912.18 1,026.59 3,087.74 6.51 -3.63
03 9,383.0 90.44 151.99 YNN 6,448.90 -2,939.76 1,040.73 3,118.43 6.49 -3.10
03 9,415.0 90.56 150.99 YNN 6,448.62 -2,967.88 1,056.00 3,149.99 3 15 0.3803 9,447.0 92.69 150.36 YNN 6,447.72 -2,995.77 1,071.66 3,181.45 6.94 6.6603 9,478.0 94.38 150.74 YNN 6,445.80 -3,022.71 1,086.88 3,211.88 5.59 5.4503 9,510.0 93.00 149.61 YNN 6,443.75 -3,050.41 1,102.76 3,243.24 5.57 -4.31
03 9,541.0 91.63 147.74 YNN 6,442.49 -3,076.87 1,118.86 3,273.50 7.47 -4.42
03 9,573.0 92.50 146.49 YNN 6,441.34 -3,103.72 1,136.22 3,304.55 4.76 2.7203 9,605.0 91.63 144.24 YNN 6,440.19 -3,130.03 1,154.40 3,335.34 7.53 -2.72 MWD03 9,636.0 93.13 142.61 YNN 6,438.90 -3,154.91 1,172.85 3,364.87 7.14 4.84 MWD03 9,668.0 92.63 141.61 YNN 6,437.29 -3,180.13 1,192.48 3,395.10 3.49 -1.56 MWD03 9,699.0 91.89 140.74 YNN 6,436.07 -3,204.26 1,211.90 3,424.24 3.68 -2.39 MWD03 9,731.0 92.19 138.24 YNN 6,434.93 -3,228.57 1,232.67 3,453.99 7.86 0.94 MWD
MDENTIALPrinted: 12,28/2009 11:59:11
Questar E & P Page 5 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR
. Type(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 9,762.0 93.00 135.74 YNN 6,433.53 -3,251.21 1,253.79 3,482.28 8.47 2.61 MWD03 9,794.0 91.19 132.99 YNN 6,432.36 -3,273.57 1,276.65 3,510.86 10.28 -5.66 MWD03 9,825.0 94.00 133.61 YNN 6,430.95 -3,294.81 1,299.19 3,538.28 9.28 9.06 MWD03 9,857.0 93.88 132.49 YNN 6,428.75 -3,316.60 1,322.52 3,566.48 3.51 -0.38i MWD03 9,888.0 91.50 132.11 YNN 6,427.30 -3,337.44 1,345.42 3,593.64 7.77 -7.68 MWD03 9,920.0 91.31 132.36 YNN 6,426.51 -3,358.94 1,369.10 3,621.68 0.98 -0.59 MWD03 9,951.0 92.06 129.86 YNN 6,425.60 -3,379.31 1,392.45 3,648.54 8.42 2.42 MWD03 9,983.0 93.31 127.74 YNN 6,424.10 -3,399.34 1,417.36 3,675.59 7.68 3.91 MWD03 10,001.0 94.50 126.99 YNN 6,422.88 -3,410,24 1,431.63 3,690.54 7.81 6.61 MWD
Printed: 12/28/2009 11:59:11
Questar E & P Page 5 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR
. Type(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 9,762.0 93.00 135.74 YNN 6,433.53 -3,251.21 1,253.79 3,482.28 8.47 2.61 MWD03 9,794.0 91.19 132.99 YNN 6,432.36 -3,273.57 1,276.65 3,510.86 10.28 -5.66 MWD03 9,825.0 94.00 133.61 YNN 6,430.95 -3,294.81 1,299.19 3,538.28 9.28 9.06 MWD03 9,857.0 93.88 132.49 YNN 6,428.75 -3,316.60 1,322.52 3,566.48 3.51 -0.38i MWD03 9,888.0 91.50 132.11 YNN 6,427.30 -3,337.44 1,345.42 3,593.64 7.77 -7.68 MWD03 9,920.0 91.31 132.36 YNN 6,426.51 -3,358.94 1,369.10 3,621.68 0.98 -0.59 MWD03 9,951.0 92.06 129.86 YNN 6,425.60 -3,379.31 1,392.45 3,648.54 8.42 2.42 MWD03 9,983.0 93.31 127.74 YNN 6,424.10 -3,399.34 1,417.36 3,675.59 7.68 3.91 MWD03 10,001.0 94.50 126.99 YNN 6,422.88 -3,410,24 1,431.63 3,690.54 7.81 6.61 MWD
Printed: 12/28/2009 11:59:11
Questar E & P Page 5 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR
. Type(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 9,762.0 93.00 135.74 YNN 6,433.53 -3,251.21 1,253.79 3,482.28 8.47 2.61 MWD03 9,794.0 91.19 132.99 YNN 6,432.36 -3,273.57 1,276.65 3,510.86 10.28 -5.66 MWD03 9,825.0 94.00 133.61 YNN 6,430.95 -3,294.81 1,299.19 3,538.28 9.28 9.06 MWD03 9,857.0 93.88 132.49 YNN 6,428.75 -3,316.60 1,322.52 3,566.48 3.51 -0.38i MWD03 9,888.0 91.50 132.11 YNN 6,427.30 -3,337.44 1,345.42 3,593.64 7.77 -7.68 MWD03 9,920.0 91.31 132.36 YNN 6,426.51 -3,358.94 1,369.10 3,621.68 0.98 -0.59 MWD03 9,951.0 92.06 129.86 YNN 6,425.60 -3,379.31 1,392.45 3,648.54 8.42 2.42 MWD03 9,983.0 93.31 127.74 YNN 6,424.10 -3,399.34 1,417.36 3,675.59 7.68 3.91 MWD03 10,001.0 94.50 126.99 YNN 6,422.88 -3,410,24 1,431.63 3,690.54 7.81 6.61 MWD
Printed: 12/28/2009 11:59:11
Questar E & P Page 5 of 5
Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR
. Type(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)
03 9,762.0 93.00 135.74 YNN 6,433.53 -3,251.21 1,253.79 3,482.28 8.47 2.61 MWD03 9,794.0 91.19 132.99 YNN 6,432.36 -3,273.57 1,276.65 3,510.86 10.28 -5.66 MWD03 9,825.0 94.00 133.61 YNN 6,430.95 -3,294.81 1,299.19 3,538.28 9.28 9.06 MWD03 9,857.0 93.88 132.49 YNN 6,428.75 -3,316.60 1,322.52 3,566.48 3.51 -0.38i MWD03 9,888.0 91.50 132.11 YNN 6,427.30 -3,337.44 1,345.42 3,593.64 7.77 -7.68 MWD03 9,920.0 91.31 132.36 YNN 6,426.51 -3,358.94 1,369.10 3,621.68 0.98 -0.59 MWD03 9,951.0 92.06 129.86 YNN 6,425.60 -3,379.31 1,392.45 3,648.54 8.42 2.42 MWD03 9,983.0 93.31 127.74 YNN 6,424.10 -3,399.34 1,417.36 3,675.59 7.68 3.91 MWD03 10,001.0 94.50 126.99 YNN 6,422.88 -3,410,24 1,431.63 3,690.54 7.81 6.61 MWD
Printed: 12/28/2009 11:59:11
Questar E & P Page 1 of 8
00NFllENTIALop.,,,,onsso...,,s.,,,, _ omeousWell Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
10/31/2009 06:00 - 16:30 10.50 LOC 3 MOVE 15 MILESWITH WEST ROC TRUCKING16:30 -06:00 13.50 LOC 4 GENERAL RIG UP BY HAND, WATER FUEL AND AIR SYSTEMS RIGGED UP.
WINTERIZING RAILS WELDED ON DERRICK BOARD. REPAIR GENERATORS,DERRICK NOT RAISED. RIG 100% MOVED AND 45% RIGGED UP
11/1/2009 06:00 -21:00 15.00 LOC 4 RIG UP AND PREPARE TO PICK UP B.H.A.21:00 -23:00 2.00 BOP 1 NIPPLE UP BOPE23:00 -02:00 3.00 BOP 2 TEST B.O.P ( PIPE RAMS, BLINDRAMS ALLKILLVALVES&CHOKE VALVES &
TOP DRIVE VALVES TO 250PSI LOW/ 5 MINUTES AND 3000 PSI HIGH / 10MINUTES ANNULAR250 LOW AND 1500 HIGH SAME TIME
02:00 -06:00 4.00 TRP 1 SET WEAR BUSHING AND LAYOUT AND STRAP WEIGHT PIPE( B.H.A.) ANDDRILLINGJARS,CASING SCRAPER, AND X.O. SUBS.HOLD PREJOB SAFETYMEETING RIG UP LAYDOWN MACHINEAND PICK UP B.H.A.
06:00 - SET TIME BACK@0200 FOR TIME CHANGE11/2/2009 06:00 -10:00 4.00 TRP i CONT TO PICK UP DRILLPIPE
10:00 -11:30 1.50 OTH RIG UP THE HOT OIL TRUCK AND HEAT THE WATER AND CIRC THE WELLCLEAN
11:30 - 12:00 0.50 RIG 1 RIG SERVICE ( CHECK THE BREAKS AND BREAK LINKAGE12:00 -15:00 3.00 TRP 2 TRIP OUT WITH THE CASING SCRAPER15:00-15:30 0.50 OTH HOLD PREJOB SAFETY MEETING WITH GYRO & KNIGHT PEOPLE15:30 -16:00 0.50 RIG 1 RIG SERVICE ( TROUBLE SHOOT THE RIGHT ANGLE DRIVE)16:00 -17:00 1.00 RIG 2 WORK ON THE RIGHT ANGLE DRIVE17:00 -18:00 1.00 TRP 1 PICK UP AND MAKE UP THE WHIPSTOCK ASSEMBLY & ORINATE THE MULE
SHOE FOR THE GYRO18:00 - 21:30 3.50 TRP 2 TRIP IN THE HOLE WITH THE WHIPSTOC ASSEMBLY21:30 -23:00 1.50 OTH HOLD PREJOB SAFETY MEETING AND TRIP INWITH CASED HOLE
SOLUTIONS WIRELINE23:00 -23:30 0.50 OTH ORINATE AND SET WHIP STOCK @ 162/163 DEGREES AND RIG DOWN
WIRELINE TRUCK23:30 -00:00 0.50 OTH SET DRILLINGTORQUE ON TOP DRIVE TO 1000-1400 FT. LBS TO MILLTHE
WINDOW00:00 -06:00 6.00 DRL 7 CUT THE WINDOW @6200.9
11/3/2009 06:00 -13:00 7.00 DRL 7 CONT TO CUT WINDOW FROM 6200.35 FEET TO 6209.85 FEET13:00 -14:00 1.00 CIRC 1 PUMP A HIGH VIS SWEEP AND A TRIP SLUG14:00 -16:00 2.00 TRP 10 TRIP OUT WITH THE MILLINGASSEMBLY16:00 -17:00 1.00 TRP 1 LAYDOWN AND LOAD OUT MILLINGASSEMBLY17:00 -17:30 0.50 RIG 1 RIG SERVICE17:30 -19:30 2.00 TRP i PICK UP WEATHERFORD DIRECTIONAL TOOLS & ORINATE TOOLS19:30 - 20:00 0.50 OTH SURFACE TEST MUD MOTOR20:00 -23:00 3.00 TRP 2 TRIP IN THE HOLE WITH DIRECTIONAL TOOLS23:00-00:00 1.00 OTH RIG UP PUMP IN SUB AND WIRELINE TRUCK, HANG SHIEVE IN THE DERRICK00:00 -01:00 1.00 DRL 3 RUN IN THE HOLE WITH THE GYRO AND WIRELINE ORINATE GYRO01:00 -06:00 5.00 DRL 2 TIME DRILLTO GET OUT OF THE WINDOW AND START THE BUILD SECTION
11/4/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILL FROM 6245 FEET TO 6249 FEET08:00-10:00 2.00 OTH TRIP OUT WITH WIRE LINEAND GYRO TOOLS RIG DOWN WIRE LINETRUCK10:00 -18:00 8.00 DRL 2 DIRECTIONAL DRILL FROM 6249 FEET TO 6363 FEET18:00 -06:00 12.00 DRL 2 DIRECTIONAL DRILL FROM 6363 FEET TO 6480
11/5/2009 06:00 -11:30 5.50 DRL 2 DIRECTIONAL DRILL F/6480 T/6517 3T 6.T/HRWOB 12/14 RPM 202/235 GPM 130
11:30-12:00 0.50 CIRC 1 CIRCULATE AND BUILDTRIP SLUG12:00-14:30 2.50 TRP 10 TRIPOUTOFHOLEWITHBIT#2 RECEIVED14:30 -15:00 0.50 TRP 1 CHANGE OUT BIT AND CHECK MOTOR AND MWD15:00-15:30 0.50 RIG 1 RIG SERVICE DEC3 1 20"915:30 - 18:30 3.00 TRP 10 TIH WITH BIT #3 TO 6470
DIV.OFOIL,GAS&
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 1 of 8
00NFllENTIALop.,,,,onsso...,,s.,,,, _ omeousWell Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
10/31/2009 06:00 - 16:30 10.50 LOC 3 MOVE 15 MILESWITH WEST ROC TRUCKING16:30 -06:00 13.50 LOC 4 GENERAL RIG UP BY HAND, WATER FUEL AND AIR SYSTEMS RIGGED UP.
WINTERIZING RAILS WELDED ON DERRICK BOARD. REPAIR GENERATORS,DERRICK NOT RAISED. RIG 100% MOVED AND 45% RIGGED UP
11/1/2009 06:00 -21:00 15.00 LOC 4 RIG UP AND PREPARE TO PICK UP B.H.A.21:00 -23:00 2.00 BOP 1 NIPPLE UP BOPE23:00 -02:00 3.00 BOP 2 TEST B.O.P ( PIPE RAMS, BLINDRAMS ALLKILLVALVES&CHOKE VALVES &
TOP DRIVE VALVES TO 250PSI LOW/ 5 MINUTES AND 3000 PSI HIGH / 10MINUTES ANNULAR250 LOW AND 1500 HIGH SAME TIME
02:00 -06:00 4.00 TRP 1 SET WEAR BUSHING AND LAYOUT AND STRAP WEIGHT PIPE( B.H.A.) ANDDRILLINGJARS,CASING SCRAPER, AND X.O. SUBS.HOLD PREJOB SAFETYMEETING RIG UP LAYDOWN MACHINEAND PICK UP B.H.A.
06:00 - SET TIME BACK@0200 FOR TIME CHANGE11/2/2009 06:00 -10:00 4.00 TRP i CONT TO PICK UP DRILLPIPE
10:00 -11:30 1.50 OTH RIG UP THE HOT OIL TRUCK AND HEAT THE WATER AND CIRC THE WELLCLEAN
11:30 - 12:00 0.50 RIG 1 RIG SERVICE ( CHECK THE BREAKS AND BREAK LINKAGE12:00 -15:00 3.00 TRP 2 TRIP OUT WITH THE CASING SCRAPER15:00-15:30 0.50 OTH HOLD PREJOB SAFETY MEETING WITH GYRO & KNIGHT PEOPLE15:30 -16:00 0.50 RIG 1 RIG SERVICE ( TROUBLE SHOOT THE RIGHT ANGLE DRIVE)16:00 -17:00 1.00 RIG 2 WORK ON THE RIGHT ANGLE DRIVE17:00 -18:00 1.00 TRP 1 PICK UP AND MAKE UP THE WHIPSTOCK ASSEMBLY & ORINATE THE MULE
SHOE FOR THE GYRO18:00 - 21:30 3.50 TRP 2 TRIP IN THE HOLE WITH THE WHIPSTOC ASSEMBLY21:30 -23:00 1.50 OTH HOLD PREJOB SAFETY MEETING AND TRIP INWITH CASED HOLE
SOLUTIONS WIRELINE23:00 -23:30 0.50 OTH ORINATE AND SET WHIP STOCK @ 162/163 DEGREES AND RIG DOWN
WIRELINE TRUCK23:30 -00:00 0.50 OTH SET DRILLINGTORQUE ON TOP DRIVE TO 1000-1400 FT. LBS TO MILLTHE
WINDOW00:00 -06:00 6.00 DRL 7 CUT THE WINDOW @6200.9
11/3/2009 06:00 -13:00 7.00 DRL 7 CONT TO CUT WINDOW FROM 6200.35 FEET TO 6209.85 FEET13:00 -14:00 1.00 CIRC 1 PUMP A HIGH VIS SWEEP AND A TRIP SLUG14:00 -16:00 2.00 TRP 10 TRIP OUT WITH THE MILLINGASSEMBLY16:00 -17:00 1.00 TRP 1 LAYDOWN AND LOAD OUT MILLINGASSEMBLY17:00 -17:30 0.50 RIG 1 RIG SERVICE17:30 -19:30 2.00 TRP i PICK UP WEATHERFORD DIRECTIONAL TOOLS & ORINATE TOOLS19:30 - 20:00 0.50 OTH SURFACE TEST MUD MOTOR20:00 -23:00 3.00 TRP 2 TRIP IN THE HOLE WITH DIRECTIONAL TOOLS23:00-00:00 1.00 OTH RIG UP PUMP IN SUB AND WIRELINE TRUCK, HANG SHIEVE IN THE DERRICK00:00 -01:00 1.00 DRL 3 RUN IN THE HOLE WITH THE GYRO AND WIRELINE ORINATE GYRO01:00 -06:00 5.00 DRL 2 TIME DRILLTO GET OUT OF THE WINDOW AND START THE BUILD SECTION
11/4/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILL FROM 6245 FEET TO 6249 FEET08:00-10:00 2.00 OTH TRIP OUT WITH WIRE LINEAND GYRO TOOLS RIG DOWN WIRE LINETRUCK10:00 -18:00 8.00 DRL 2 DIRECTIONAL DRILL FROM 6249 FEET TO 6363 FEET18:00 -06:00 12.00 DRL 2 DIRECTIONAL DRILL FROM 6363 FEET TO 6480
11/5/2009 06:00 -11:30 5.50 DRL 2 DIRECTIONAL DRILL F/6480 T/6517 3T 6.T/HRWOB 12/14 RPM 202/235 GPM 130
11:30-12:00 0.50 CIRC 1 CIRCULATE AND BUILDTRIP SLUG12:00-14:30 2.50 TRP 10 TRIPOUTOFHOLEWITHBIT#2 RECEIVED14:30 -15:00 0.50 TRP 1 CHANGE OUT BIT AND CHECK MOTOR AND MWD15:00-15:30 0.50 RIG 1 RIG SERVICE DEC3 1 20"915:30 - 18:30 3.00 TRP 10 TIH WITH BIT #3 TO 6470
DIV.OFOIL,GAS&
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 1 of 8
00NFllENTIALop.,,,,onsso...,,s.,,,, _ omeousWell Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
10/31/2009 06:00 - 16:30 10.50 LOC 3 MOVE 15 MILESWITH WEST ROC TRUCKING16:30 -06:00 13.50 LOC 4 GENERAL RIG UP BY HAND, WATER FUEL AND AIR SYSTEMS RIGGED UP.
WINTERIZING RAILS WELDED ON DERRICK BOARD. REPAIR GENERATORS,DERRICK NOT RAISED. RIG 100% MOVED AND 45% RIGGED UP
11/1/2009 06:00 -21:00 15.00 LOC 4 RIG UP AND PREPARE TO PICK UP B.H.A.21:00 -23:00 2.00 BOP 1 NIPPLE UP BOPE23:00 -02:00 3.00 BOP 2 TEST B.O.P ( PIPE RAMS, BLINDRAMS ALLKILLVALVES&CHOKE VALVES &
TOP DRIVE VALVES TO 250PSI LOW/ 5 MINUTES AND 3000 PSI HIGH / 10MINUTES ANNULAR250 LOW AND 1500 HIGH SAME TIME
02:00 -06:00 4.00 TRP 1 SET WEAR BUSHING AND LAYOUT AND STRAP WEIGHT PIPE( B.H.A.) ANDDRILLINGJARS,CASING SCRAPER, AND X.O. SUBS.HOLD PREJOB SAFETYMEETING RIG UP LAYDOWN MACHINEAND PICK UP B.H.A.
06:00 - SET TIME BACK@0200 FOR TIME CHANGE11/2/2009 06:00 -10:00 4.00 TRP i CONT TO PICK UP DRILLPIPE
10:00 -11:30 1.50 OTH RIG UP THE HOT OIL TRUCK AND HEAT THE WATER AND CIRC THE WELLCLEAN
11:30 - 12:00 0.50 RIG 1 RIG SERVICE ( CHECK THE BREAKS AND BREAK LINKAGE12:00 -15:00 3.00 TRP 2 TRIP OUT WITH THE CASING SCRAPER15:00-15:30 0.50 OTH HOLD PREJOB SAFETY MEETING WITH GYRO & KNIGHT PEOPLE15:30 -16:00 0.50 RIG 1 RIG SERVICE ( TROUBLE SHOOT THE RIGHT ANGLE DRIVE)16:00 -17:00 1.00 RIG 2 WORK ON THE RIGHT ANGLE DRIVE17:00 -18:00 1.00 TRP 1 PICK UP AND MAKE UP THE WHIPSTOCK ASSEMBLY & ORINATE THE MULE
SHOE FOR THE GYRO18:00 - 21:30 3.50 TRP 2 TRIP IN THE HOLE WITH THE WHIPSTOC ASSEMBLY21:30 -23:00 1.50 OTH HOLD PREJOB SAFETY MEETING AND TRIP INWITH CASED HOLE
SOLUTIONS WIRELINE23:00 -23:30 0.50 OTH ORINATE AND SET WHIP STOCK @ 162/163 DEGREES AND RIG DOWN
WIRELINE TRUCK23:30 -00:00 0.50 OTH SET DRILLINGTORQUE ON TOP DRIVE TO 1000-1400 FT. LBS TO MILLTHE
WINDOW00:00 -06:00 6.00 DRL 7 CUT THE WINDOW @6200.9
11/3/2009 06:00 -13:00 7.00 DRL 7 CONT TO CUT WINDOW FROM 6200.35 FEET TO 6209.85 FEET13:00 -14:00 1.00 CIRC 1 PUMP A HIGH VIS SWEEP AND A TRIP SLUG14:00 -16:00 2.00 TRP 10 TRIP OUT WITH THE MILLINGASSEMBLY16:00 -17:00 1.00 TRP 1 LAYDOWN AND LOAD OUT MILLINGASSEMBLY17:00 -17:30 0.50 RIG 1 RIG SERVICE17:30 -19:30 2.00 TRP i PICK UP WEATHERFORD DIRECTIONAL TOOLS & ORINATE TOOLS19:30 - 20:00 0.50 OTH SURFACE TEST MUD MOTOR20:00 -23:00 3.00 TRP 2 TRIP IN THE HOLE WITH DIRECTIONAL TOOLS23:00-00:00 1.00 OTH RIG UP PUMP IN SUB AND WIRELINE TRUCK, HANG SHIEVE IN THE DERRICK00:00 -01:00 1.00 DRL 3 RUN IN THE HOLE WITH THE GYRO AND WIRELINE ORINATE GYRO01:00 -06:00 5.00 DRL 2 TIME DRILLTO GET OUT OF THE WINDOW AND START THE BUILD SECTION
11/4/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILL FROM 6245 FEET TO 6249 FEET08:00-10:00 2.00 OTH TRIP OUT WITH WIRE LINEAND GYRO TOOLS RIG DOWN WIRE LINETRUCK10:00 -18:00 8.00 DRL 2 DIRECTIONAL DRILL FROM 6249 FEET TO 6363 FEET18:00 -06:00 12.00 DRL 2 DIRECTIONAL DRILL FROM 6363 FEET TO 6480
11/5/2009 06:00 -11:30 5.50 DRL 2 DIRECTIONAL DRILL F/6480 T/6517 3T 6.T/HRWOB 12/14 RPM 202/235 GPM 130
11:30-12:00 0.50 CIRC 1 CIRCULATE AND BUILDTRIP SLUG12:00-14:30 2.50 TRP 10 TRIPOUTOFHOLEWITHBIT#2 RECEIVED14:30 -15:00 0.50 TRP 1 CHANGE OUT BIT AND CHECK MOTOR AND MWD15:00-15:30 0.50 RIG 1 RIG SERVICE DEC3 1 20"915:30 - 18:30 3.00 TRP 10 TIH WITH BIT #3 TO 6470
DIV.OFOIL,GAS&
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 1 of 8
00NFllENTIALop.,,,,onsso...,,s.,,,, _ omeousWell Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
10/31/2009 06:00 - 16:30 10.50 LOC 3 MOVE 15 MILESWITH WEST ROC TRUCKING16:30 -06:00 13.50 LOC 4 GENERAL RIG UP BY HAND, WATER FUEL AND AIR SYSTEMS RIGGED UP.
WINTERIZING RAILS WELDED ON DERRICK BOARD. REPAIR GENERATORS,DERRICK NOT RAISED. RIG 100% MOVED AND 45% RIGGED UP
11/1/2009 06:00 -21:00 15.00 LOC 4 RIG UP AND PREPARE TO PICK UP B.H.A.21:00 -23:00 2.00 BOP 1 NIPPLE UP BOPE23:00 -02:00 3.00 BOP 2 TEST B.O.P ( PIPE RAMS, BLINDRAMS ALLKILLVALVES&CHOKE VALVES &
TOP DRIVE VALVES TO 250PSI LOW/ 5 MINUTES AND 3000 PSI HIGH / 10MINUTES ANNULAR250 LOW AND 1500 HIGH SAME TIME
02:00 -06:00 4.00 TRP 1 SET WEAR BUSHING AND LAYOUT AND STRAP WEIGHT PIPE( B.H.A.) ANDDRILLINGJARS,CASING SCRAPER, AND X.O. SUBS.HOLD PREJOB SAFETYMEETING RIG UP LAYDOWN MACHINEAND PICK UP B.H.A.
06:00 - SET TIME BACK@0200 FOR TIME CHANGE11/2/2009 06:00 -10:00 4.00 TRP i CONT TO PICK UP DRILLPIPE
10:00 -11:30 1.50 OTH RIG UP THE HOT OIL TRUCK AND HEAT THE WATER AND CIRC THE WELLCLEAN
11:30 - 12:00 0.50 RIG 1 RIG SERVICE ( CHECK THE BREAKS AND BREAK LINKAGE12:00 -15:00 3.00 TRP 2 TRIP OUT WITH THE CASING SCRAPER15:00-15:30 0.50 OTH HOLD PREJOB SAFETY MEETING WITH GYRO & KNIGHT PEOPLE15:30 -16:00 0.50 RIG 1 RIG SERVICE ( TROUBLE SHOOT THE RIGHT ANGLE DRIVE)16:00 -17:00 1.00 RIG 2 WORK ON THE RIGHT ANGLE DRIVE17:00 -18:00 1.00 TRP 1 PICK UP AND MAKE UP THE WHIPSTOCK ASSEMBLY & ORINATE THE MULE
SHOE FOR THE GYRO18:00 - 21:30 3.50 TRP 2 TRIP IN THE HOLE WITH THE WHIPSTOC ASSEMBLY21:30 -23:00 1.50 OTH HOLD PREJOB SAFETY MEETING AND TRIP INWITH CASED HOLE
SOLUTIONS WIRELINE23:00 -23:30 0.50 OTH ORINATE AND SET WHIP STOCK @ 162/163 DEGREES AND RIG DOWN
WIRELINE TRUCK23:30 -00:00 0.50 OTH SET DRILLINGTORQUE ON TOP DRIVE TO 1000-1400 FT. LBS TO MILLTHE
WINDOW00:00 -06:00 6.00 DRL 7 CUT THE WINDOW @6200.9
11/3/2009 06:00 -13:00 7.00 DRL 7 CONT TO CUT WINDOW FROM 6200.35 FEET TO 6209.85 FEET13:00 -14:00 1.00 CIRC 1 PUMP A HIGH VIS SWEEP AND A TRIP SLUG14:00 -16:00 2.00 TRP 10 TRIP OUT WITH THE MILLINGASSEMBLY16:00 -17:00 1.00 TRP 1 LAYDOWN AND LOAD OUT MILLINGASSEMBLY17:00 -17:30 0.50 RIG 1 RIG SERVICE17:30 -19:30 2.00 TRP i PICK UP WEATHERFORD DIRECTIONAL TOOLS & ORINATE TOOLS19:30 - 20:00 0.50 OTH SURFACE TEST MUD MOTOR20:00 -23:00 3.00 TRP 2 TRIP IN THE HOLE WITH DIRECTIONAL TOOLS23:00-00:00 1.00 OTH RIG UP PUMP IN SUB AND WIRELINE TRUCK, HANG SHIEVE IN THE DERRICK00:00 -01:00 1.00 DRL 3 RUN IN THE HOLE WITH THE GYRO AND WIRELINE ORINATE GYRO01:00 -06:00 5.00 DRL 2 TIME DRILLTO GET OUT OF THE WINDOW AND START THE BUILD SECTION
11/4/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILL FROM 6245 FEET TO 6249 FEET08:00-10:00 2.00 OTH TRIP OUT WITH WIRE LINEAND GYRO TOOLS RIG DOWN WIRE LINETRUCK10:00 -18:00 8.00 DRL 2 DIRECTIONAL DRILL FROM 6249 FEET TO 6363 FEET18:00 -06:00 12.00 DRL 2 DIRECTIONAL DRILL FROM 6363 FEET TO 6480
11/5/2009 06:00 -11:30 5.50 DRL 2 DIRECTIONAL DRILL F/6480 T/6517 3T 6.T/HRWOB 12/14 RPM 202/235 GPM 130
11:30-12:00 0.50 CIRC 1 CIRCULATE AND BUILDTRIP SLUG12:00-14:30 2.50 TRP 10 TRIPOUTOFHOLEWITHBIT#2 RECEIVED14:30 -15:00 0.50 TRP 1 CHANGE OUT BIT AND CHECK MOTOR AND MWD15:00-15:30 0.50 RIG 1 RIG SERVICE DEC3 1 20"915:30 - 18:30 3.00 TRP 10 TIH WITH BIT #3 TO 6470
DIV.OFOIL,GAS&
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 2 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
11/5/2009 18:30 - 19:00 0.50 REAM i WASH AND REAM 4T F/6470 Tl651719:00-06:00 11.00 DRL 2 DIRECTIONALDRILLF/6517T/6645 128' 11.6'/HR
WOB 12/14 RPM 257 GPM 12911/6/2009 06:00 -15:30 9.50 DRL 2 DIRECTIONAL DRILLF/6645 T/6721 76'
ROP-8'lHR GPM-129 WOB-10/1315:30-16:00 0.50 OTH TROUBLE SHOOT PRESSURE LOSS PROBLEMS16:00 - 19:00 3.00 TRP 13 T.O.O.H., TWISTED OFF AT X/O BETWEEN MONEL AND HWDP, 78.0T OF FISH
LEFT IN THE HOLE19:00 - 23:00 4.00 OTH WAIT ON FISHING TOOLS23:00 -02:00 3.00 TRP 13 STRAP AND P/U FISHING TOOLS02:00 -06:00 4.00 TRP 13 TRIP IN THE HOLE WITH FISHING TOOLS
11/7/2009 06:00 -11:30 5.50 TRP 13 SPEAR INTO FISH AND TRIP OUT OF HOLE WITH FISH.11:30 -14:30 3.00 TRP 1 LAYDOWN FISHING AND DIRECTIONAL TOOLS14:30 - 15:30 1.00 RIG 6 CUT DRILLINGLINE15:30 - 19:00 3.50 TRP 1 STRAP AND PICK UP DIRECTIONAL TOOLS , ORIENT AND TEST19:00 - 22:30 3.50 TRP 2 TRIP IN THE HOLE22:30 -23:00 0.50 REAM i WASH AND REAM 59' TO BOTTOM23:00 -06:00 7.00 DRL 2 DIRECTIONAL DRILLFROM 6721' TO 6803' 82'
ROP - 11.7'lHR WOB - 10/19 GPM - 12911/8/2009 06:00 - 23:00 17.00 DRL 2 DIRECTIONAL DRILLFROM 6803 TO 6989 186'
ROP-10.9'lHR WOB-10/20 GPM-129
23:00 -23:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG23:30 -02:30 3.00 TRP 10 TRIP OUT OF THE HOLE FOR BIT #502:30 -03:30 1.00 TRP 1 C/O BITS, CHECKOTOR, C/O FLOAT SUB, RE-SCRIBE AND ORIENT
DIRECTINALTOOLS03:30 -06:00 2.50 TRP 10 TRIP IN THE HOLE
11/9/2009 06:00 -10:00 4.00 DRL 7 TROUGH WELLBORE FROM 6760' TO 6770'10:00 - 20:00 10.00 DRL 7 TIME DRILLFROM 6770' TO 6786'20:00 -06:00 10.00 DRL 2 DIRECTIONAL DRILLFROM 6786' TO 6851' 65'
ROP-6.5'lHR WOB-10/20 GPM-12911/10/2009 06:00 -08:30 2.50 DRL 2 DIRECTIONAL DRILLF/6851 T/6861 10'
08:30 -09:30 1.00 CIRC 1 CIRCULATE SAMPLES AND PUMP TRIP SLUG09:30 -12:00 2.50 TRP 10 TRIP OUT OF HOLE FOR BIT12:00 -14:00 2.00 TRP 1 CHANGE OUT BIT, MOTOR, AND MULE SHOE SUB(WASHED OUT) ORIENT
AND TEST TOOLS14:00 - 17:00 3.00 TRP 10 TRIP IN HOLE WITH BIT#617:00 - 18:00 1.00 DRL 2 TROUGH WELL BORE FROM 6842 TO 686218:00 - 22:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 6862 TO 6898 (100% SLIDE) 36'
ROP-9'lHR WOB-18 GPM-12922:00 -22:30 0.50 CIRC 1 CIRCULATE UP SAMPLES - NO ZONE CONFIRMATION22:30 -06:00 7.50 DRL 2 DIRECTIONAL DRILLFROM 6898 TO 6966 68'
ROP-9.1 WOB-10/20 GPM-12911/11/2009 06:00 -22:30 16.50 DRL 2 DIRECTIONAL DRILLFROM 6966 TO 7078' 112'
ROP-6.8 WOB-18/20 GPM-12922:30 -23:30 1.00 CIRC 1 CIRCULATE SAMPLE, IN ZONE CONFIRMATION 75% LIMESTONE23:30 -01:30 2.00 DRL 2 DIRECTIONAL DRILLFROM 7078' TO 7092' 14'
ROP - T/HR WOB 10-20 GPM - 129
01:30 - 02:30 1.00 OTH TROUBLE SHOOT E-MAG PROBLEMS02:30-03:30 1.00 DRL 2 DIRECTIONALDRILLFROM7092'TO7104' 12 RECElV
ROP-12'lHR WOB-20-22 GPM-12903:30-04:30 1.00 CIRC 1 CIRCULATESAMPLES DEC3 1 20304:30 - 06:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 7104 TO 7107
DIV.0FOIL,GU
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 2 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
11/5/2009 18:30 - 19:00 0.50 REAM i WASH AND REAM 4T F/6470 Tl651719:00-06:00 11.00 DRL 2 DIRECTIONALDRILLF/6517T/6645 128' 11.6'/HR
WOB 12/14 RPM 257 GPM 12911/6/2009 06:00 -15:30 9.50 DRL 2 DIRECTIONAL DRILLF/6645 T/6721 76'
ROP-8'lHR GPM-129 WOB-10/1315:30-16:00 0.50 OTH TROUBLE SHOOT PRESSURE LOSS PROBLEMS16:00 - 19:00 3.00 TRP 13 T.O.O.H., TWISTED OFF AT X/O BETWEEN MONEL AND HWDP, 78.0T OF FISH
LEFT IN THE HOLE19:00 - 23:00 4.00 OTH WAIT ON FISHING TOOLS23:00 -02:00 3.00 TRP 13 STRAP AND P/U FISHING TOOLS02:00 -06:00 4.00 TRP 13 TRIP IN THE HOLE WITH FISHING TOOLS
11/7/2009 06:00 -11:30 5.50 TRP 13 SPEAR INTO FISH AND TRIP OUT OF HOLE WITH FISH.11:30 -14:30 3.00 TRP 1 LAYDOWN FISHING AND DIRECTIONAL TOOLS14:30 - 15:30 1.00 RIG 6 CUT DRILLINGLINE15:30 - 19:00 3.50 TRP 1 STRAP AND PICK UP DIRECTIONAL TOOLS , ORIENT AND TEST19:00 - 22:30 3.50 TRP 2 TRIP IN THE HOLE22:30 -23:00 0.50 REAM i WASH AND REAM 59' TO BOTTOM23:00 -06:00 7.00 DRL 2 DIRECTIONAL DRILLFROM 6721' TO 6803' 82'
ROP - 11.7'lHR WOB - 10/19 GPM - 12911/8/2009 06:00 - 23:00 17.00 DRL 2 DIRECTIONAL DRILLFROM 6803 TO 6989 186'
ROP-10.9'lHR WOB-10/20 GPM-129
23:00 -23:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG23:30 -02:30 3.00 TRP 10 TRIP OUT OF THE HOLE FOR BIT #502:30 -03:30 1.00 TRP 1 C/O BITS, CHECKOTOR, C/O FLOAT SUB, RE-SCRIBE AND ORIENT
DIRECTINALTOOLS03:30 -06:00 2.50 TRP 10 TRIP IN THE HOLE
11/9/2009 06:00 -10:00 4.00 DRL 7 TROUGH WELLBORE FROM 6760' TO 6770'10:00 - 20:00 10.00 DRL 7 TIME DRILLFROM 6770' TO 6786'20:00 -06:00 10.00 DRL 2 DIRECTIONAL DRILLFROM 6786' TO 6851' 65'
ROP-6.5'lHR WOB-10/20 GPM-129
11/10/2009 06:00 -08:30 2.50 DRL 2 DIRECTIONAL DRILLF/6851 T/6861 10'08:30 -09:30 1.00 CIRC 1 CIRCULATE SAMPLES AND PUMP TRIP SLUG09:30 -12:00 2.50 TRP 10 TRIP OUT OF HOLE FOR BIT12:00 -14:00 2.00 TRP 1 CHANGE OUT BIT, MOTOR, AND MULE SHOE SUB(WASHED OUT) ORIENT
AND TEST TOOLS14:00 - 17:00 3.00 TRP 10 TRIP IN HOLE WITH BIT#617:00 - 18:00 1.00 DRL 2 TROUGH WELL BORE FROM 6842 TO 686218:00 - 22:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 6862 TO 6898 (100% SLIDE) 36'
ROP-9'lHR WOB-18 GPM-12922:00 -22:30 0.50 CIRC 1 CIRCULATE UP SAMPLES - NO ZONE CONFIRMATION22:30 -06:00 7.50 DRL 2 DIRECTIONAL DRILLFROM 6898 TO 6966 68'
ROP-9.1 WOB-10/20 GPM-12911/11/2009 06:00 -22:30 16.50 DRL 2 DIRECTIONAL DRILLFROM 6966 TO 7078' 112'
ROP-6.8 WOB-18/20 GPM-12922:30 -23:30 1.00 CIRC 1 CIRCULATE SAMPLE, IN ZONE CONFIRMATION 75% LIMESTONE23:30 -01:30 2.00 DRL 2 DIRECTIONAL DRILLFROM 7078' TO 7092' 14'
ROP - T/HR WOB 10-20 GPM - 129
01:30 - 02:30 1.00 OTH TROUBLE SHOOT E-MAG PROBLEMS02:30-03:30 1.00 DRL 2 DIRECTIONALDRILLFROM7092'TO7104' 12 RECElV
ROP-12'lHR WOB-20-22 GPM-12903:30-04:30 1.00 CIRC 1 CIRCULATESAMPLES DEC3 1 20304:30 - 06:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 7104 TO 7107
DIV.0FOIL,GU
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 2 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
11/5/2009 18:30 - 19:00 0.50 REAM i WASH AND REAM 4T F/6470 Tl651719:00-06:00 11.00 DRL 2 DIRECTIONALDRILLF/6517T/6645 128' 11.6'/HR
WOB 12/14 RPM 257 GPM 12911/6/2009 06:00 -15:30 9.50 DRL 2 DIRECTIONAL DRILLF/6645 T/6721 76'
ROP-8'lHR GPM-129 WOB-10/1315:30-16:00 0.50 OTH TROUBLE SHOOT PRESSURE LOSS PROBLEMS16:00 - 19:00 3.00 TRP 13 T.O.O.H., TWISTED OFF AT X/O BETWEEN MONEL AND HWDP, 78.0T OF FISH
LEFT IN THE HOLE19:00 - 23:00 4.00 OTH WAIT ON FISHING TOOLS23:00 -02:00 3.00 TRP 13 STRAP AND P/U FISHING TOOLS02:00 -06:00 4.00 TRP 13 TRIP IN THE HOLE WITH FISHING TOOLS
11/7/2009 06:00 -11:30 5.50 TRP 13 SPEAR INTO FISH AND TRIP OUT OF HOLE WITH FISH.11:30 -14:30 3.00 TRP 1 LAYDOWN FISHING AND DIRECTIONAL TOOLS14:30 - 15:30 1.00 RIG 6 CUT DRILLINGLINE15:30 - 19:00 3.50 TRP 1 STRAP AND PICK UP DIRECTIONAL TOOLS , ORIENT AND TEST19:00 - 22:30 3.50 TRP 2 TRIP IN THE HOLE22:30 -23:00 0.50 REAM i WASH AND REAM 59' TO BOTTOM23:00 -06:00 7.00 DRL 2 DIRECTIONAL DRILLFROM 6721' TO 6803' 82'
ROP - 11.7'lHR WOB - 10/19 GPM - 12911/8/2009 06:00 - 23:00 17.00 DRL 2 DIRECTIONAL DRILLFROM 6803 TO 6989 186'
ROP-10.9'lHR WOB-10/20 GPM-129
23:00 -23:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG23:30 -02:30 3.00 TRP 10 TRIP OUT OF THE HOLE FOR BIT #502:30 -03:30 1.00 TRP 1 C/O BITS, CHECKOTOR, C/O FLOAT SUB, RE-SCRIBE AND ORIENT
DIRECTINALTOOLS03:30 -06:00 2.50 TRP 10 TRIP IN THE HOLE
11/9/2009 06:00 -10:00 4.00 DRL 7 TROUGH WELLBORE FROM 6760' TO 6770'10:00 - 20:00 10.00 DRL 7 TIME DRILLFROM 6770' TO 6786'20:00 -06:00 10.00 DRL 2 DIRECTIONAL DRILLFROM 6786' TO 6851' 65'
ROP-6.5'lHR WOB-10/20 GPM-12911/10/2009 06:00 -08:30 2.50 DRL 2 DIRECTIONAL DRILLF/6851 T/6861 10'
08:30 -09:30 1.00 CIRC 1 CIRCULATE SAMPLES AND PUMP TRIP SLUG09:30 -12:00 2.50 TRP 10 TRIP OUT OF HOLE FOR BIT12:00 -14:00 2.00 TRP 1 CHANGE OUT BIT, MOTOR, AND MULE SHOE SUB(WASHED OUT) ORIENT
AND TEST TOOLS14:00 - 17:00 3.00 TRP 10 TRIP IN HOLE WITH BIT#617:00 - 18:00 1.00 DRL 2 TROUGH WELL BORE FROM 6842 TO 686218:00 - 22:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 6862 TO 6898 (100% SLIDE) 36'
ROP-9'lHR WOB-18 GPM-12922:00 -22:30 0.50 CIRC 1 CIRCULATE UP SAMPLES - NO ZONE CONFIRMATION22:30 -06:00 7.50 DRL 2 DIRECTIONAL DRILLFROM 6898 TO 6966 68'
ROP-9.1 WOB-10/20 GPM-12911/11/2009 06:00 -22:30 16.50 DRL 2 DIRECTIONAL DRILLFROM 6966 TO 7078' 112'
ROP-6.8 WOB-18/20 GPM-12922:30 -23:30 1.00 CIRC 1 CIRCULATE SAMPLE, IN ZONE CONFIRMATION 75% LIMESTONE23:30 -01:30 2.00 DRL 2 DIRECTIONAL DRILLFROM 7078' TO 7092' 14'
ROP - T/HR WOB 10-20 GPM - 129
01:30 - 02:30 1.00 OTH TROUBLE SHOOT E-MAG PROBLEMS02:30-03:30 1.00 DRL 2 DIRECTIONALDRILLFROM7092'TO7104' 12 RECElV
ROP-12'lHR WOB-20-22 GPM-12903:30-04:30 1.00 CIRC 1 CIRCULATESAMPLES DEC3 1 20304:30 - 06:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 7104 TO 7107
DIV.0FOIL,GU
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 2 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
11/5/2009 18:30 - 19:00 0.50 REAM i WASH AND REAM 4T F/6470 Tl651719:00-06:00 11.00 DRL 2 DIRECTIONALDRILLF/6517T/6645 128' 11.6'/HR
WOB 12/14 RPM 257 GPM 12911/6/2009 06:00 -15:30 9.50 DRL 2 DIRECTIONAL DRILLF/6645 T/6721 76'
ROP-8'lHR GPM-129 WOB-10/1315:30-16:00 0.50 OTH TROUBLE SHOOT PRESSURE LOSS PROBLEMS16:00 - 19:00 3.00 TRP 13 T.O.O.H., TWISTED OFF AT X/O BETWEEN MONEL AND HWDP, 78.0T OF FISH
LEFT IN THE HOLE19:00 - 23:00 4.00 OTH WAIT ON FISHING TOOLS23:00 -02:00 3.00 TRP 13 STRAP AND P/U FISHING TOOLS02:00 -06:00 4.00 TRP 13 TRIP IN THE HOLE WITH FISHING TOOLS
11/7/2009 06:00 -11:30 5.50 TRP 13 SPEAR INTO FISH AND TRIP OUT OF HOLE WITH FISH.11:30 -14:30 3.00 TRP 1 LAYDOWN FISHING AND DIRECTIONAL TOOLS14:30 - 15:30 1.00 RIG 6 CUT DRILLINGLINE15:30 - 19:00 3.50 TRP 1 STRAP AND PICK UP DIRECTIONAL TOOLS , ORIENT AND TEST19:00 - 22:30 3.50 TRP 2 TRIP IN THE HOLE22:30 -23:00 0.50 REAM i WASH AND REAM 59' TO BOTTOM23:00 -06:00 7.00 DRL 2 DIRECTIONAL DRILLFROM 6721' TO 6803' 82'
ROP - 11.7'lHR WOB - 10/19 GPM - 12911/8/2009 06:00 - 23:00 17.00 DRL 2 DIRECTIONAL DRILLFROM 6803 TO 6989 186'
ROP-10.9'lHR WOB-10/20 GPM-129
23:00 -23:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG23:30 -02:30 3.00 TRP 10 TRIP OUT OF THE HOLE FOR BIT #502:30 -03:30 1.00 TRP 1 C/O BITS, CHECKOTOR, C/O FLOAT SUB, RE-SCRIBE AND ORIENT
DIRECTINALTOOLS03:30 -06:00 2.50 TRP 10 TRIP IN THE HOLE
11/9/2009 06:00 -10:00 4.00 DRL 7 TROUGH WELLBORE FROM 6760' TO 6770'10:00 - 20:00 10.00 DRL 7 TIME DRILLFROM 6770' TO 6786'20:00 -06:00 10.00 DRL 2 DIRECTIONAL DRILLFROM 6786' TO 6851' 65'
ROP-6.5'lHR WOB-10/20 GPM-12911/10/2009 06:00 -08:30 2.50 DRL 2 DIRECTIONAL DRILLF/6851 T/6861 10'
08:30 -09:30 1.00 CIRC 1 CIRCULATE SAMPLES AND PUMP TRIP SLUG09:30 -12:00 2.50 TRP 10 TRIP OUT OF HOLE FOR BIT12:00 -14:00 2.00 TRP 1 CHANGE OUT BIT, MOTOR, AND MULE SHOE SUB(WASHED OUT) ORIENT
AND TEST TOOLS14:00 - 17:00 3.00 TRP 10 TRIP IN HOLE WITH BIT#617:00 - 18:00 1.00 DRL 2 TROUGH WELL BORE FROM 6842 TO 686218:00 - 22:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 6862 TO 6898 (100% SLIDE) 36'
ROP-9'lHR WOB-18 GPM-12922:00 -22:30 0.50 CIRC 1 CIRCULATE UP SAMPLES - NO ZONE CONFIRMATION22:30 -06:00 7.50 DRL 2 DIRECTIONAL DRILLFROM 6898 TO 6966 68'
ROP-9.1 WOB-10/20 GPM-12911/11/2009 06:00 -22:30 16.50 DRL 2 DIRECTIONAL DRILLFROM 6966 TO 7078' 112'
ROP-6.8 WOB-18/20 GPM-12922:30 -23:30 1.00 CIRC 1 CIRCULATE SAMPLE, IN ZONE CONFIRMATION 75% LIMESTONE23:30 -01:30 2.00 DRL 2 DIRECTIONAL DRILLFROM 7078' TO 7092' 14'
ROP - T/HR WOB 10-20 GPM - 129
01:30 - 02:30 1.00 OTH TROUBLE SHOOT E-MAG PROBLEMS02:30-03:30 1.00 DRL 2 DIRECTIONALDRILLFROM7092'TO7104' 12 RECElV
ROP-12'lHR WOB-20-22 GPM-12903:30-04:30 1.00 CIRC 1 CIRCULATESAMPLES DEC3 1 20304:30 - 06:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 7104 TO 7107
DIV.0FOIL,GU
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 3 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Su Description of Operations
11/12/2009 06:00 -06:30 0.50 TRP 10 TRIP OUT OF THE HOLE TO 685206:30 -07:30 1.00 REAM 1 WASH AND REAM FROM 6852 TO 688307:30-08:00 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG08:00 -12:00 4.00 TRP 10 TRIP OUT OF THE HOLE, C/O DRILLINGJARS, FUNCTIONED BLINDRAMS12:00-16:00 4.00 TRP 1 C/O BIT, MOTOR, MUELSHOE SUB, MONELS, ORIENT AND TEST16:00 -16:30 0.50 RIG i RIG SERVICE16:30 - 19:30 3.00 TRP 10 TRIP IN THE HOLE WITH BIT#719:30 - 21:30 2.00 DRL 7 TROUGH WELLBORE FROM 6810' TO 6825'21:30 -06:00 8.50 DRL 7 TIME DRILLFROM 6825 TO 6838'
DRILLINGAT 5 MIN/INCH11/13/2009 06:00 -17:00 11.00 DRL 2 TIME DRILLINGF/6838 Tl6861
17:00 - 17:30 0.50 TRP 2 TRIP OUT OF HOLE TO 674417:30 - 20:30 3.00 REAM 1 WASH AND REAM HOLE FROM 6744 TO 680720:30 -00:00 3.50 TRP 2 PULL UP TO 6720 AND TROUGH Fl 6720 T/673500:00 -06:00 6.00 DRL 7 TIME DRILLFROM 6735 TO 6740 @5 MIN/INCH
11/14/2009 06:00 -09:30 3.50 DRL 7 TIME DRILLFROM 6740 TO 675009:30 -06:00 20.50 DRL 2 DIRECTIONAL DRILLFROM 6750 TO 6945
ENTERED ZONE AT 6821 MD, 6562 TVD11/15/2009 06:00 - 09:30 3.50 DRL 2 DIRECTIONAL DRILLF/6945 T/6981 36' 10.2'lHR
09:30 - 12:00 2.50 OTH WORK ON MWD AND PUMP PRESSURE PROBLEMS12:00 -16:00 4.00 TRP 13 TRIP OUT OF HOLE (TIGHT F/6935 T/6780)16:00 - 18:00 2.00 TRP 1 C/O BIT, MOTOR REMOVE MWD, INSPECT DIR. TOOLS FOR PACK-OFF.
18:00 - 18:30 0.50 RIG 1 RIG SERVICE18:30-19:00 0.50 RIG 2 WORK ON TOP DRIVE ROTARY GAGE19:00 -20:30 1.50 TRP 1 INSTALLMWD TOOL, ORIENT AND TEST20:30 - 23:30 3.00 TRP 2 TRIP IN THE HOLE23:30 - 01:30 2.00 REAM 1 WASH AND REAM F/ 6838 T/698101:30 - 06:00 4.50 DRL 2 DIRECTIONAL DRILLF/6981 T/6985 4' (SLIDING)
11/16/2009 06:00 - 13:30 7.50 DRL 2 DIRECTIONAL DRILLFROM 6985' TO 7083' 98'13.1 FT/HR WOB 15-22 GPM - 124
13:30-14:00 0.50 RIG i RIGSERVICE14:00 - 23:00 9.00 DRL 2 DIRECTIONAL DRILLFROM 7083' TO 7183' 100'
11.1 FTlHR WOB 15-22 GPM - 12423:00 - 00:00 1.00 OTH TROUBLE SHOOT MWD/PRESSURE PROBLEMS, RESET MWD WITH PUMPS
DOWN FOR 7 MINUTES TO RE-ACQUIRE MWD PULSE00:00 - DRL 2 DIRECTIONAL DRILLFROM 7183' TO 7215
11/17/2009 06:00 - 16:30 10.50 DRL 2 DIRECTIONAL DRILLFROM 7215' TO 7342' 12T12.1 FTlHR WOB - 15-22 GPM - 136DIFICULT TO SLIDE DOWN AT 7342'
16:30 - 17:30 1.00 DRL 2 TROUGH FROM 7327' TO 7342'17:30 - 18:00 0.50 DRL 2 DIRECTIONAL DRILLFROM 7342' TO 735T
GEOLOGY SAMPLE AT 7345' SHOWED 30% SHALE18:00 - 19:00 1.00 DRL 2 TROUGH FROM 7342' TO 735T19:00 -00:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 735T TO 7380'
SLID TO A PROJECTED ANGLE AT THE BIT OF90.5-91.O00:00-01:00 1.00 CIRC i CIRCULATE UP SAMPLE FROM7380'
SHOWED INZONE LIMESTONE WITH A TRACE OF SHALE01:00 -06:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 7380' TO 7420'
SLIDING TO DIP AS NEEDED )11/18/2009 06:00 - 11:00 5.00 DRL 1 DIRECTION DRILLF/7420' T/7496'
11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 - 13:00 1.50 DRL 2 DIRECTIONAL DRILLF/7496' T/7523, DEC3 1 2009
DN.0FOlk GM &EM
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 3 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Su Description of Operations
11/12/2009 06:00 -06:30 0.50 TRP 10 TRIP OUT OF THE HOLE TO 685206:30 -07:30 1.00 REAM 1 WASH AND REAM FROM 6852 TO 688307:30-08:00 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG08:00 -12:00 4.00 TRP 10 TRIP OUT OF THE HOLE, C/O DRILLINGJARS, FUNCTIONED BLINDRAMS12:00-16:00 4.00 TRP 1 C/O BIT, MOTOR, MUELSHOE SUB, MONELS, ORIENT AND TEST16:00 -16:30 0.50 RIG i RIG SERVICE16:30 - 19:30 3.00 TRP 10 TRIP IN THE HOLE WITH BIT#719:30 - 21:30 2.00 DRL 7 TROUGH WELLBORE FROM 6810' TO 6825'21:30 -06:00 8.50 DRL 7 TIME DRILLFROM 6825 TO 6838'
DRILLINGAT 5 MIN/INCH11/13/2009 06:00 -17:00 11.00 DRL 2 TIME DRILLINGF/6838 Tl6861
17:00 - 17:30 0.50 TRP 2 TRIP OUT OF HOLE TO 674417:30 - 20:30 3.00 REAM 1 WASH AND REAM HOLE FROM 6744 TO 680720:30 -00:00 3.50 TRP 2 PULL UP TO 6720 AND TROUGH Fl 6720 T/673500:00 -06:00 6.00 DRL 7 TIME DRILLFROM 6735 TO 6740 @5 MIN/INCH
11/14/2009 06:00 -09:30 3.50 DRL 7 TIME DRILLFROM 6740 TO 675009:30 -06:00 20.50 DRL 2 DIRECTIONAL DRILLFROM 6750 TO 6945
ENTERED ZONE AT 6821 MD, 6562 TVD11/15/2009 06:00 - 09:30 3.50 DRL 2 DIRECTIONAL DRILLF/6945 T/6981 36' 10.2'lHR
09:30 - 12:00 2.50 OTH WORK ON MWD AND PUMP PRESSURE PROBLEMS12:00 -16:00 4.00 TRP 13 TRIP OUT OF HOLE (TIGHT F/6935 T/6780)16:00 - 18:00 2.00 TRP 1 C/O BIT, MOTOR REMOVE MWD, INSPECT DIR. TOOLS FOR PACK-OFF.
18:00 - 18:30 0.50 RIG 1 RIG SERVICE18:30-19:00 0.50 RIG 2 WORK ON TOP DRIVE ROTARY GAGE19:00 -20:30 1.50 TRP 1 INSTALLMWD TOOL, ORIENT AND TEST20:30 - 23:30 3.00 TRP 2 TRIP IN THE HOLE23:30 - 01:30 2.00 REAM 1 WASH AND REAM F/ 6838 T/698101:30 - 06:00 4.50 DRL 2 DIRECTIONAL DRILLF/6981 T/6985 4' (SLIDING)
11/16/2009 06:00 - 13:30 7.50 DRL 2 DIRECTIONAL DRILLFROM 6985' TO 7083' 98'13.1 FT/HR WOB 15-22 GPM - 124
13:30-14:00 0.50 RIG i RIGSERVICE14:00 - 23:00 9.00 DRL 2 DIRECTIONAL DRILLFROM 7083' TO 7183' 100'
11.1 FTlHR WOB 15-22 GPM - 12423:00 - 00:00 1.00 OTH TROUBLE SHOOT MWD/PRESSURE PROBLEMS, RESET MWD WITH PUMPS
DOWN FOR 7 MINUTES TO RE-ACQUIRE MWD PULSE00:00 - DRL 2 DIRECTIONAL DRILLFROM 7183' TO 7215
11/17/2009 06:00 - 16:30 10.50 DRL 2 DIRECTIONAL DRILLFROM 7215' TO 7342' 12T12.1 FTlHR WOB - 15-22 GPM - 136DIFICULT TO SLIDE DOWN AT 7342'
16:30 - 17:30 1.00 DRL 2 TROUGH FROM 7327' TO 7342'17:30 - 18:00 0.50 DRL 2 DIRECTIONAL DRILLFROM 7342' TO 735T
GEOLOGY SAMPLE AT 7345' SHOWED 30% SHALE18:00 - 19:00 1.00 DRL 2 TROUGH FROM 7342' TO 735T19:00 -00:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 735T TO 7380'
SLID TO A PROJECTED ANGLE AT THE BIT OF90.5-91.O00:00-01:00 1.00 CIRC i CIRCULATE UP SAMPLE FROM7380'
SHOWED INZONE LIMESTONE WITH A TRACE OF SHALE01:00 -06:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 7380' TO 7420'
SLIDING TO DIP AS NEEDED )11/18/2009 06:00 - 11:00 5.00 DRL 1 DIRECTION DRILLF/7420' T/7496'
11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 - 13:00 1.50 DRL 2 DIRECTIONAL DRILLF/7496' T/7523, DEC3 1 2009
DN.0FOlk GM &EM
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 3 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Su Description of Operations
11/12/2009 06:00 -06:30 0.50 TRP 10 TRIP OUT OF THE HOLE TO 685206:30 -07:30 1.00 REAM 1 WASH AND REAM FROM 6852 TO 688307:30-08:00 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG08:00 -12:00 4.00 TRP 10 TRIP OUT OF THE HOLE, C/O DRILLINGJARS, FUNCTIONED BLINDRAMS12:00-16:00 4.00 TRP 1 C/O BIT, MOTOR, MUELSHOE SUB, MONELS, ORIENT AND TEST16:00 -16:30 0.50 RIG i RIG SERVICE16:30 - 19:30 3.00 TRP 10 TRIP IN THE HOLE WITH BIT#719:30 - 21:30 2.00 DRL 7 TROUGH WELLBORE FROM 6810' TO 6825'21:30 -06:00 8.50 DRL 7 TIME DRILLFROM 6825 TO 6838'
DRILLINGAT 5 MIN/INCH11/13/2009 06:00 -17:00 11.00 DRL 2 TIME DRILLINGF/6838 Tl6861
17:00 - 17:30 0.50 TRP 2 TRIP OUT OF HOLE TO 674417:30 - 20:30 3.00 REAM 1 WASH AND REAM HOLE FROM 6744 TO 680720:30 -00:00 3.50 TRP 2 PULL UP TO 6720 AND TROUGH Fl 6720 T/673500:00 -06:00 6.00 DRL 7 TIME DRILLFROM 6735 TO 6740 @5 MIN/INCH
11/14/2009 06:00 -09:30 3.50 DRL 7 TIME DRILLFROM 6740 TO 675009:30 -06:00 20.50 DRL 2 DIRECTIONAL DRILLFROM 6750 TO 6945
ENTERED ZONE AT 6821 MD, 6562 TVD11/15/2009 06:00 - 09:30 3.50 DRL 2 DIRECTIONAL DRILLF/6945 T/6981 36' 10.2'lHR
09:30 - 12:00 2.50 OTH WORK ON MWD AND PUMP PRESSURE PROBLEMS12:00 -16:00 4.00 TRP 13 TRIP OUT OF HOLE (TIGHT F/6935 T/6780)16:00 - 18:00 2.00 TRP 1 C/O BIT, MOTOR REMOVE MWD, INSPECT DIR. TOOLS FOR PACK-OFF.
18:00 - 18:30 0.50 RIG 1 RIG SERVICE18:30-19:00 0.50 RIG 2 WORK ON TOP DRIVE ROTARY GAGE19:00 -20:30 1.50 TRP 1 INSTALLMWD TOOL, ORIENT AND TEST20:30 - 23:30 3.00 TRP 2 TRIP IN THE HOLE23:30 - 01:30 2.00 REAM 1 WASH AND REAM F/ 6838 T/698101:30 - 06:00 4.50 DRL 2 DIRECTIONAL DRILLF/6981 T/6985 4' (SLIDING)
11/16/2009 06:00 - 13:30 7.50 DRL 2 DIRECTIONAL DRILLFROM 6985' TO 7083' 98'13.1 FT/HR WOB 15-22 GPM - 124
13:30-14:00 0.50 RIG i RIGSERVICE14:00 - 23:00 9.00 DRL 2 DIRECTIONAL DRILLFROM 7083' TO 7183' 100'
11.1 FTlHR WOB 15-22 GPM - 12423:00 - 00:00 1.00 OTH TROUBLE SHOOT MWD/PRESSURE PROBLEMS, RESET MWD WITH PUMPS
DOWN FOR 7 MINUTES TO RE-ACQUIRE MWD PULSE00:00 - DRL 2 DIRECTIONAL DRILLFROM 7183' TO 7215
11/17/2009 06:00 - 16:30 10.50 DRL 2 DIRECTIONAL DRILLFROM 7215' TO 7342' 12T12.1 FTlHR WOB - 15-22 GPM - 136DIFICULT TO SLIDE DOWN AT 7342'
16:30 - 17:30 1.00 DRL 2 TROUGH FROM 7327' TO 7342'17:30 - 18:00 0.50 DRL 2 DIRECTIONAL DRILLFROM 7342' TO 735T
GEOLOGY SAMPLE AT 7345' SHOWED 30% SHALE18:00 - 19:00 1.00 DRL 2 TROUGH FROM 7342' TO 735T19:00 -00:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 735T TO 7380'
SLID TO A PROJECTED ANGLE AT THE BIT OF90.5-91.O00:00-01:00 1.00 CIRC i CIRCULATE UP SAMPLE FROM7380'
SHOWED INZONE LIMESTONE WITH A TRACE OF SHALE01:00 -06:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 7380' TO 7420'
SLIDING TO DIP AS NEEDED )11/18/2009 06:00 - 11:00 5.00 DRL 1 DIRECTION DRILLF/7420' T/7496'
11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 - 13:00 1.50 DRL 2 DIRECTIONAL DRILLF/7496' T/7523, DEC3 1 2009
DN.0FOlk GM &EM
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 3 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Su Description of Operations
11/12/2009 06:00 -06:30 0.50 TRP 10 TRIP OUT OF THE HOLE TO 685206:30 -07:30 1.00 REAM 1 WASH AND REAM FROM 6852 TO 688307:30-08:00 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG08:00 -12:00 4.00 TRP 10 TRIP OUT OF THE HOLE, C/O DRILLINGJARS, FUNCTIONED BLINDRAMS12:00-16:00 4.00 TRP 1 C/O BIT, MOTOR, MUELSHOE SUB, MONELS, ORIENT AND TEST16:00 -16:30 0.50 RIG i RIG SERVICE16:30 - 19:30 3.00 TRP 10 TRIP IN THE HOLE WITH BIT#719:30 - 21:30 2.00 DRL 7 TROUGH WELLBORE FROM 6810' TO 6825'21:30 -06:00 8.50 DRL 7 TIME DRILLFROM 6825 TO 6838'
DRILLINGAT 5 MIN/INCH11/13/2009 06:00 -17:00 11.00 DRL 2 TIME DRILLINGF/6838 Tl6861
17:00 - 17:30 0.50 TRP 2 TRIP OUT OF HOLE TO 674417:30 - 20:30 3.00 REAM 1 WASH AND REAM HOLE FROM 6744 TO 680720:30 -00:00 3.50 TRP 2 PULL UP TO 6720 AND TROUGH Fl 6720 T/673500:00 -06:00 6.00 DRL 7 TIME DRILLFROM 6735 TO 6740 @5 MIN/INCH
11/14/2009 06:00 -09:30 3.50 DRL 7 TIME DRILLFROM 6740 TO 675009:30 -06:00 20.50 DRL 2 DIRECTIONAL DRILLFROM 6750 TO 6945
ENTERED ZONE AT 6821 MD, 6562 TVD11/15/2009 06:00 - 09:30 3.50 DRL 2 DIRECTIONAL DRILLF/6945 T/6981 36' 10.2'lHR
09:30 - 12:00 2.50 OTH WORK ON MWD AND PUMP PRESSURE PROBLEMS12:00 -16:00 4.00 TRP 13 TRIP OUT OF HOLE (TIGHT F/6935 T/6780)16:00 - 18:00 2.00 TRP 1 C/O BIT, MOTOR REMOVE MWD, INSPECT DIR. TOOLS FOR PACK-OFF.
18:00 - 18:30 0.50 RIG 1 RIG SERVICE18:30-19:00 0.50 RIG 2 WORK ON TOP DRIVE ROTARY GAGE19:00 -20:30 1.50 TRP 1 INSTALLMWD TOOL, ORIENT AND TEST20:30 - 23:30 3.00 TRP 2 TRIP IN THE HOLE23:30 - 01:30 2.00 REAM 1 WASH AND REAM F/ 6838 T/698101:30 - 06:00 4.50 DRL 2 DIRECTIONAL DRILLF/6981 T/6985 4' (SLIDING)
11/16/2009 06:00 - 13:30 7.50 DRL 2 DIRECTIONAL DRILLFROM 6985' TO 7083' 98'13.1 FT/HR WOB 15-22 GPM - 124
13:30-14:00 0.50 RIG i RIGSERVICE14:00 - 23:00 9.00 DRL 2 DIRECTIONAL DRILLFROM 7083' TO 7183' 100'
11.1 FTlHR WOB 15-22 GPM - 12423:00 - 00:00 1.00 OTH TROUBLE SHOOT MWD/PRESSURE PROBLEMS, RESET MWD WITH PUMPS
DOWN FOR 7 MINUTES TO RE-ACQUIRE MWD PULSE00:00 - DRL 2 DIRECTIONAL DRILLFROM 7183' TO 7215
11/17/2009 06:00 - 16:30 10.50 DRL 2 DIRECTIONAL DRILLFROM 7215' TO 7342' 12T12.1 FTlHR WOB - 15-22 GPM - 136DIFICULT TO SLIDE DOWN AT 7342'
16:30 - 17:30 1.00 DRL 2 TROUGH FROM 7327' TO 7342'17:30 - 18:00 0.50 DRL 2 DIRECTIONAL DRILLFROM 7342' TO 735T
GEOLOGY SAMPLE AT 7345' SHOWED 30% SHALE18:00 - 19:00 1.00 DRL 2 TROUGH FROM 7342' TO 735T19:00 -00:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 735T TO 7380'
SLID TO A PROJECTED ANGLE AT THE BIT OF90.5-91.O00:00-01:00 1.00 CIRC i CIRCULATE UP SAMPLE FROM7380'
SHOWED INZONE LIMESTONE WITH A TRACE OF SHALE01:00 -06:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 7380' TO 7420'
SLIDING TO DIP AS NEEDED )11/18/2009 06:00 - 11:00 5.00 DRL 1 DIRECTION DRILLF/7420' T/7496'
11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 - 13:00 1.50 DRL 2 DIRECTIONAL DRILLF/7496' T/7523, DEC3 1 2009
DN.0FOlk GM &EM
Printed: 12/28/2009 11:59:15 AM
Questar E & P Page 4 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
11/18/2009 13:00 -13:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG13:30 -16:30 3.00 TRP 10 TRIP OUT OF HOLE, TIGHT FROM 7523' TO 6965'16:30 -17:30 1.00 OTH CIRCULATE, WORK ON PASON AND PUMP SECOND TRIP SLUG17:30 - 18:30 1.00 TRP 10 TRIP OUT OF THE HOLE18:30 - 04:00 9.50 TRIP CHECK BHA , L/D 1 JOINT HWDP - BAD PIN NEEDS REFACED, C/O JARS04:00 -06:00 2.00 TRP 1 C/O BIT AND MOTOR, (MOTOR BENT AT 1.5), L/D MWD AND RE-PROGRAM
FOR ADJITATOR,ORIENT DIRRECTIONAL TOOLS AND TEST
11/19/2009 06:00 -07:00 1.00 OTH WORK ON MWD, WOULD NOT PULSE ON SURFACE TEST07:00 -08:00 1.00 TRP 1 FINISH PICKING UP B.H.A. ( TEST MOTOR & MW.D. O.K.)08:00 -12:00 4.00 TRP 2 TRIP IN THE HOLE TO 6692 FEET12:00 -13:00 1.00 TRP 2 TRIP INTO OLD HOLE (CONFORMED)13:00-14:00 1.00 TRP 2 TRIP OUT AND ORIENTATE MOTOR AND TRIP BACK INTO THE NEW HOLE
SURVEY TO CONFORM BACK IN THE NEW HOLE14:00 - 15:30 1.50 REAM i WASH & REAM FROM 7240 FEET TO 7500 FEET RELOG GAMA FROM 7500
FEET TO 7523 FEET15:30 -16:00 0.50 DRL 2 ESTABLISH DRILLINGRATES & DRILLFROM 7523 TO 7538 FEET16:00 - 17:30 1.50 OTH TROUBLE SHOOT M.W.D. TOOLS17:30 -00:00 6.50 TRP 13 TRIP OUT FOR M.W.D. TOOLS00:00 -01:00 1.00 OTH WORK ON M.W.D. TOOLS PICK UP TOOLS AND SURFACE TEST (O.K.)01:00 -06:00 5.00 TRP 2 TRIP IN THE HOLE AND TEST M.W.D. TOOLS @ 1635 FEET , 3981 FEET
11/20/2009 06:00 -08:00 2.00 REAM i WASH AND REAM FROM 7203 TO 7538 FEET08:00 -06:00 22.00 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7538 FEET TO
11/21/2009 06:00 - 22:30 16.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7920 FEET TO 8212 FEET22:30 -23:00 0.50 CIRC 1 CIRC SWEEPS OUT OF THE HOLE23:00 -03:00 4.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE BACK REAM & PUMP OUT OF THE HOLE
FROM 8212 FEET TO 7476 FEET ( TIGHT FROM 7853 TO 7801 FEET)03:00-06:00 3.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE
11/22/2009 06:00 -11:00 5.00 TRP 2 TRIP IN THE HOLE TO 8022 FEET11:00 - 11:30 0.50 REAM i WASH & REAM FROM 8022 FEET TO 5212 FEET11:30 - 12:30 1.00 DRL 2 ESTABLISH FLOW RATES AND TRY TO DRILLCOULD NOT GET ANY
DIFFERENTAL PRES.12:30 -14:00 1.50 TRP 13 TRIP OUT BACK REAM FROM 8212 FEET TO 8022 FEET ( PUMP TRIP SLUG)14:00 -17:00 3.00 TRP 13 TRIP OUT OF THE HOLE17:00 - 18:00 1.00 TRP 12 BREAK OUT AND LAYDOWN DAMAGEDMOTOR AND BIT PICK UP NEW
MOTOR AND NEW BIT #10 & ORIENATE TOOLS18:00 -19:00 1.00 OTH TEST MWD TOOLS AND MUD MOTOR @SURFACE19:00 -22:30 3.50 TRP 2 TRIP IN THE HOLE & TEST MWD TOOLS @ 1380 & 4675 FEET22:30 - 23:30 1.00 SUR 1 ORINATE TOOL FACE TO 170* TO GET PAST SIDE TRACK@6696 FEET23:30 -00:00 0.50 TRP 2 TRIP IN 6 STANDS STOPED @7110 FEET TRIP OUT 6 STANDS TO 6696 FEET00:00-01:00 1.00 SUR 1 REORINATE TOOL FACE & TRIP INTHE HOLE01:00 -02:00 1.00 TRP 2 TRIP IN THE HOLE TO 7612 FEET02:00 -04:00 2.00 REAM 1 WASH & REAM FROM 7612 FEET TO 8212 FEET04:00 -06:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO
11/23/2009 06:00 -06:00 24.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO 844511/24/2009 06:00 -07:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8453 FEET TO 8461 FEET
07:00 -07:30 0.50 OTH TROUGH HOLE FROM 8486 FEET TO 8461 FEET07:30 - 10:30 3.00 DRL 2 DIRECTIONAL DRILLFROM 8461 FEET TO 8473 FEET10:30 - 11:00 0.50 CIRC 1 CIRC UP SAMPLES @8473 FEET11:00 - 12:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8473 FEET TO 8483 FEET12:00 - 13:00 1.00 CIRC 1 CIRC. UP SAMPLES @8473 FEET13:00 -18:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 8483 FEET TO 8528 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8528 FEET TO 8591 FEET
DEC3 1 2009 ÛÛ$¶gn : 12/28/2009 11:59:15AM
DN.0FOIL,GAS&
Questar E & P Page 4 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
11/18/2009 13:00 -13:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG13:30 -16:30 3.00 TRP 10 TRIP OUT OF HOLE, TIGHT FROM 7523' TO 6965'16:30 -17:30 1.00 OTH CIRCULATE, WORK ON PASON AND PUMP SECOND TRIP SLUG17:30 - 18:30 1.00 TRP 10 TRIP OUT OF THE HOLE18:30 - 04:00 9.50 TRIP CHECK BHA , L/D 1 JOINT HWDP - BAD PIN NEEDS REFACED, C/O JARS04:00 -06:00 2.00 TRP 1 C/O BIT AND MOTOR, (MOTOR BENT AT 1.5), L/D MWD AND RE-PROGRAM
FOR ADJITATOR,ORIENT DIRRECTIONAL TOOLS AND TEST
11/19/2009 06:00 -07:00 1.00 OTH WORK ON MWD, WOULD NOT PULSE ON SURFACE TEST07:00 -08:00 1.00 TRP 1 FINISH PICKING UP B.H.A. ( TEST MOTOR & MW.D. O.K.)08:00 -12:00 4.00 TRP 2 TRIP IN THE HOLE TO 6692 FEET12:00 -13:00 1.00 TRP 2 TRIP INTO OLD HOLE (CONFORMED)13:00-14:00 1.00 TRP 2 TRIP OUT AND ORIENTATE MOTOR AND TRIP BACK INTO THE NEW HOLE
SURVEY TO CONFORM BACK IN THE NEW HOLE14:00 - 15:30 1.50 REAM i WASH & REAM FROM 7240 FEET TO 7500 FEET RELOG GAMA FROM 7500
FEET TO 7523 FEET15:30 -16:00 0.50 DRL 2 ESTABLISH DRILLINGRATES & DRILLFROM 7523 TO 7538 FEET16:00 - 17:30 1.50 OTH TROUBLE SHOOT M.W.D. TOOLS17:30 -00:00 6.50 TRP 13 TRIP OUT FOR M.W.D. TOOLS00:00 -01:00 1.00 OTH WORK ON M.W.D. TOOLS PICK UP TOOLS AND SURFACE TEST (O.K.)01:00 -06:00 5.00 TRP 2 TRIP IN THE HOLE AND TEST M.W.D. TOOLS @ 1635 FEET , 3981 FEET
11/20/2009 06:00 -08:00 2.00 REAM i WASH AND REAM FROM 7203 TO 7538 FEET08:00 -06:00 22.00 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7538 FEET TO
11/21/2009 06:00 - 22:30 16.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7920 FEET TO 8212 FEET22:30 -23:00 0.50 CIRC 1 CIRC SWEEPS OUT OF THE HOLE23:00 -03:00 4.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE BACK REAM & PUMP OUT OF THE HOLE
FROM 8212 FEET TO 7476 FEET ( TIGHT FROM 7853 TO 7801 FEET)03:00-06:00 3.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE
11/22/2009 06:00 -11:00 5.00 TRP 2 TRIP IN THE HOLE TO 8022 FEET11:00 - 11:30 0.50 REAM i WASH & REAM FROM 8022 FEET TO 5212 FEET11:30 - 12:30 1.00 DRL 2 ESTABLISH FLOW RATES AND TRY TO DRILLCOULD NOT GET ANY
DIFFERENTAL PRES.12:30 -14:00 1.50 TRP 13 TRIP OUT BACK REAM FROM 8212 FEET TO 8022 FEET ( PUMP TRIP SLUG)14:00 -17:00 3.00 TRP 13 TRIP OUT OF THE HOLE17:00 - 18:00 1.00 TRP 12 BREAK OUT AND LAYDOWN DAMAGEDMOTOR AND BIT PICK UP NEW
MOTOR AND NEW BIT #10 & ORIENATE TOOLS18:00 -19:00 1.00 OTH TEST MWD TOOLS AND MUD MOTOR @SURFACE19:00 -22:30 3.50 TRP 2 TRIP IN THE HOLE & TEST MWD TOOLS @ 1380 & 4675 FEET22:30 - 23:30 1.00 SUR 1 ORINATE TOOL FACE TO 170* TO GET PAST SIDE TRACK@6696 FEET23:30 -00:00 0.50 TRP 2 TRIP IN 6 STANDS STOPED @7110 FEET TRIP OUT 6 STANDS TO 6696 FEET00:00-01:00 1.00 SUR 1 REORINATE TOOL FACE & TRIP INTHE HOLE01:00 -02:00 1.00 TRP 2 TRIP IN THE HOLE TO 7612 FEET02:00 -04:00 2.00 REAM 1 WASH & REAM FROM 7612 FEET TO 8212 FEET04:00 -06:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO
11/23/2009 06:00 -06:00 24.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO 844511/24/2009 06:00 -07:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8453 FEET TO 8461 FEET
07:00 -07:30 0.50 OTH TROUGH HOLE FROM 8486 FEET TO 8461 FEET07:30 - 10:30 3.00 DRL 2 DIRECTIONAL DRILLFROM 8461 FEET TO 8473 FEET10:30 - 11:00 0.50 CIRC 1 CIRC UP SAMPLES @8473 FEET11:00 - 12:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8473 FEET TO 8483 FEET12:00 - 13:00 1.00 CIRC 1 CIRC. UP SAMPLES @8473 FEET13:00 -18:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 8483 FEET TO 8528 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8528 FEET TO 8591 FEET
DEC3 1 2009 ÛÛ$¶gn : 12/28/2009 11:59:15AM
DN.0FOIL,GAS&
Questar E & P Page 4 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
11/18/2009 13:00 -13:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG13:30 -16:30 3.00 TRP 10 TRIP OUT OF HOLE, TIGHT FROM 7523' TO 6965'16:30 -17:30 1.00 OTH CIRCULATE, WORK ON PASON AND PUMP SECOND TRIP SLUG17:30 - 18:30 1.00 TRP 10 TRIP OUT OF THE HOLE18:30 - 04:00 9.50 TRIP CHECK BHA , L/D 1 JOINT HWDP - BAD PIN NEEDS REFACED, C/O JARS04:00 -06:00 2.00 TRP 1 C/O BIT AND MOTOR, (MOTOR BENT AT 1.5), L/D MWD AND RE-PROGRAM
FOR ADJITATOR,ORIENT DIRRECTIONAL TOOLS AND TEST
11/19/2009 06:00 -07:00 1.00 OTH WORK ON MWD, WOULD NOT PULSE ON SURFACE TEST07:00 -08:00 1.00 TRP 1 FINISH PICKING UP B.H.A. ( TEST MOTOR & MW.D. O.K.)08:00 -12:00 4.00 TRP 2 TRIP IN THE HOLE TO 6692 FEET12:00 -13:00 1.00 TRP 2 TRIP INTO OLD HOLE (CONFORMED)13:00-14:00 1.00 TRP 2 TRIP OUT AND ORIENTATE MOTOR AND TRIP BACK INTO THE NEW HOLE
SURVEY TO CONFORM BACK IN THE NEW HOLE14:00 - 15:30 1.50 REAM i WASH & REAM FROM 7240 FEET TO 7500 FEET RELOG GAMA FROM 7500
FEET TO 7523 FEET15:30 -16:00 0.50 DRL 2 ESTABLISH DRILLINGRATES & DRILLFROM 7523 TO 7538 FEET16:00 - 17:30 1.50 OTH TROUBLE SHOOT M.W.D. TOOLS17:30 -00:00 6.50 TRP 13 TRIP OUT FOR M.W.D. TOOLS00:00 -01:00 1.00 OTH WORK ON M.W.D. TOOLS PICK UP TOOLS AND SURFACE TEST (O.K.)01:00 -06:00 5.00 TRP 2 TRIP IN THE HOLE AND TEST M.W.D. TOOLS @ 1635 FEET , 3981 FEET
11/20/2009 06:00 -08:00 2.00 REAM i WASH AND REAM FROM 7203 TO 7538 FEET08:00 -06:00 22.00 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7538 FEET TO
11/21/2009 06:00 - 22:30 16.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7920 FEET TO 8212 FEET22:30 -23:00 0.50 CIRC 1 CIRC SWEEPS OUT OF THE HOLE23:00 -03:00 4.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE BACK REAM & PUMP OUT OF THE HOLE
FROM 8212 FEET TO 7476 FEET ( TIGHT FROM 7853 TO 7801 FEET)03:00-06:00 3.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE
11/22/2009 06:00 -11:00 5.00 TRP 2 TRIP IN THE HOLE TO 8022 FEET11:00 - 11:30 0.50 REAM i WASH & REAM FROM 8022 FEET TO 5212 FEET11:30 - 12:30 1.00 DRL 2 ESTABLISH FLOW RATES AND TRY TO DRILLCOULD NOT GET ANY
DIFFERENTAL PRES.12:30 -14:00 1.50 TRP 13 TRIP OUT BACK REAM FROM 8212 FEET TO 8022 FEET ( PUMP TRIP SLUG)14:00 -17:00 3.00 TRP 13 TRIP OUT OF THE HOLE17:00 - 18:00 1.00 TRP 12 BREAK OUT AND LAYDOWN DAMAGEDMOTOR AND BIT PICK UP NEW
MOTOR AND NEW BIT #10 & ORIENATE TOOLS18:00 -19:00 1.00 OTH TEST MWD TOOLS AND MUD MOTOR @SURFACE19:00 -22:30 3.50 TRP 2 TRIP IN THE HOLE & TEST MWD TOOLS @ 1380 & 4675 FEET22:30 - 23:30 1.00 SUR 1 ORINATE TOOL FACE TO 170* TO GET PAST SIDE TRACK@6696 FEET23:30 -00:00 0.50 TRP 2 TRIP IN 6 STANDS STOPED @7110 FEET TRIP OUT 6 STANDS TO 6696 FEET00:00-01:00 1.00 SUR 1 REORINATE TOOL FACE & TRIP INTHE HOLE01:00 -02:00 1.00 TRP 2 TRIP IN THE HOLE TO 7612 FEET02:00 -04:00 2.00 REAM 1 WASH & REAM FROM 7612 FEET TO 8212 FEET04:00 -06:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO
11/23/2009 06:00 -06:00 24.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO 844511/24/2009 06:00 -07:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8453 FEET TO 8461 FEET
07:00 -07:30 0.50 OTH TROUGH HOLE FROM 8486 FEET TO 8461 FEET07:30 - 10:30 3.00 DRL 2 DIRECTIONAL DRILLFROM 8461 FEET TO 8473 FEET10:30 - 11:00 0.50 CIRC 1 CIRC UP SAMPLES @8473 FEET11:00 - 12:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8473 FEET TO 8483 FEET12:00 - 13:00 1.00 CIRC 1 CIRC. UP SAMPLES @8473 FEET13:00 -18:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 8483 FEET TO 8528 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8528 FEET TO 8591 FEET
DEC3 1 2009 ÛÛ$¶gn : 12/28/2009 11:59:15AM
DN.0FOIL,GAS&
Questar E & P Page 4 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
11/18/2009 13:00 -13:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG13:30 -16:30 3.00 TRP 10 TRIP OUT OF HOLE, TIGHT FROM 7523' TO 6965'16:30 -17:30 1.00 OTH CIRCULATE, WORK ON PASON AND PUMP SECOND TRIP SLUG17:30 - 18:30 1.00 TRP 10 TRIP OUT OF THE HOLE18:30 - 04:00 9.50 TRIP CHECK BHA , L/D 1 JOINT HWDP - BAD PIN NEEDS REFACED, C/O JARS04:00 -06:00 2.00 TRP 1 C/O BIT AND MOTOR, (MOTOR BENT AT 1.5), L/D MWD AND RE-PROGRAM
FOR ADJITATOR,ORIENT DIRRECTIONAL TOOLS AND TEST
11/19/2009 06:00 -07:00 1.00 OTH WORK ON MWD, WOULD NOT PULSE ON SURFACE TEST07:00 -08:00 1.00 TRP 1 FINISH PICKING UP B.H.A. ( TEST MOTOR & MW.D. O.K.)08:00 -12:00 4.00 TRP 2 TRIP IN THE HOLE TO 6692 FEET12:00 -13:00 1.00 TRP 2 TRIP INTO OLD HOLE (CONFORMED)13:00-14:00 1.00 TRP 2 TRIP OUT AND ORIENTATE MOTOR AND TRIP BACK INTO THE NEW HOLE
SURVEY TO CONFORM BACK IN THE NEW HOLE14:00 - 15:30 1.50 REAM i WASH & REAM FROM 7240 FEET TO 7500 FEET RELOG GAMA FROM 7500
FEET TO 7523 FEET15:30 -16:00 0.50 DRL 2 ESTABLISH DRILLINGRATES & DRILLFROM 7523 TO 7538 FEET16:00 - 17:30 1.50 OTH TROUBLE SHOOT M.W.D. TOOLS17:30 -00:00 6.50 TRP 13 TRIP OUT FOR M.W.D. TOOLS00:00 -01:00 1.00 OTH WORK ON M.W.D. TOOLS PICK UP TOOLS AND SURFACE TEST (O.K.)01:00 -06:00 5.00 TRP 2 TRIP IN THE HOLE AND TEST M.W.D. TOOLS @ 1635 FEET , 3981 FEET
11/20/2009 06:00 -08:00 2.00 REAM i WASH AND REAM FROM 7203 TO 7538 FEET08:00 -06:00 22.00 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7538 FEET TO
11/21/2009 06:00 - 22:30 16.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7920 FEET TO 8212 FEET22:30 -23:00 0.50 CIRC 1 CIRC SWEEPS OUT OF THE HOLE23:00 -03:00 4.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE BACK REAM & PUMP OUT OF THE HOLE
FROM 8212 FEET TO 7476 FEET ( TIGHT FROM 7853 TO 7801 FEET)03:00-06:00 3.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE
11/22/2009 06:00 -11:00 5.00 TRP 2 TRIP IN THE HOLE TO 8022 FEET11:00 - 11:30 0.50 REAM i WASH & REAM FROM 8022 FEET TO 5212 FEET11:30 - 12:30 1.00 DRL 2 ESTABLISH FLOW RATES AND TRY TO DRILLCOULD NOT GET ANY
DIFFERENTAL PRES.12:30 -14:00 1.50 TRP 13 TRIP OUT BACK REAM FROM 8212 FEET TO 8022 FEET ( PUMP TRIP SLUG)14:00 -17:00 3.00 TRP 13 TRIP OUT OF THE HOLE17:00 - 18:00 1.00 TRP 12 BREAK OUT AND LAYDOWN DAMAGEDMOTOR AND BIT PICK UP NEW
MOTOR AND NEW BIT #10 & ORIENATE TOOLS18:00 -19:00 1.00 OTH TEST MWD TOOLS AND MUD MOTOR @SURFACE19:00 -22:30 3.50 TRP 2 TRIP IN THE HOLE & TEST MWD TOOLS @ 1380 & 4675 FEET22:30 - 23:30 1.00 SUR 1 ORINATE TOOL FACE TO 170* TO GET PAST SIDE TRACK@6696 FEET23:30 -00:00 0.50 TRP 2 TRIP IN 6 STANDS STOPED @7110 FEET TRIP OUT 6 STANDS TO 6696 FEET00:00-01:00 1.00 SUR 1 REORINATE TOOL FACE & TRIP INTHE HOLE01:00 -02:00 1.00 TRP 2 TRIP IN THE HOLE TO 7612 FEET02:00 -04:00 2.00 REAM 1 WASH & REAM FROM 7612 FEET TO 8212 FEET04:00 -06:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO
11/23/2009 06:00 -06:00 24.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO 844511/24/2009 06:00 -07:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8453 FEET TO 8461 FEET
07:00 -07:30 0.50 OTH TROUGH HOLE FROM 8486 FEET TO 8461 FEET07:30 - 10:30 3.00 DRL 2 DIRECTIONAL DRILLFROM 8461 FEET TO 8473 FEET10:30 - 11:00 0.50 CIRC 1 CIRC UP SAMPLES @8473 FEET11:00 - 12:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8473 FEET TO 8483 FEET12:00 - 13:00 1.00 CIRC 1 CIRC. UP SAMPLES @8473 FEET13:00 -18:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 8483 FEET TO 8528 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8528 FEET TO 8591 FEET
DEC3 1 2009 ÛÛ$¶gn : 12/28/2009 11:59:15AM
DN.0FOIL,GAS&
Questar E & P Page 5 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Description of Operations
11/24/2009 02:00 -02:30 0.50 CIRC 1 CIRC UP SAMPLES @8591 FEET02:30 -06:00 3.50 DRL 2 DIRECTIONAL DRILLFROM 8591 FEET TO
11/25/2009 06:00 -13:30 7.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 8606 FEET TO 8680 FEET13:30 - 14:00 0.50 CIRC 1 CIRC UP SAMPLES14:00 -18:00 4.00 DRL 2 DRILLLFROM 8680 FEET TO 8777 FEET18:00 -18:30 0.50 CIRC 1 CIRC 2 HIGH VIS SWEEPS TO SURFACE18:30 - 20:30 2.00 TRP 14 SHORT TRIP 11 STANDS FROM 8777 FEET TO 8085 FEET20:30 -21:00 0.50 TRP 14 TRIP IN THE HOLE TO 8275 FEET21:00 -22:00 1.00 REAM 1 WASH & REAM FROM 8275 FEET TO 8777 FEET22:00 -06:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8777 FEET TO 8870
11/26/2009 06:00 - 14:30 8.50 DRL 2 DIRECTIONAL DRILLFROM 8866 FEET TO 8939 FEET14:30 - 15:00 0.50 CIRC 1 CIRC SAMPLE @8937 FEET15:00 - 16:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8939 FEET TO 8967 FEET16:00-16:30 0.50 RIG 1 RIGSERVICE16:30 -18:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 8967 FEET TO 8977 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8977 FEET TO 906802:00 -03:00 1.00 SUR 1 REBOOT M.W.D. TOOLS03:00 -06:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9068 FEET TO 9090 FEET
11/27/2009 06:00 -11:00 5.00 TRP 10 TRIP OUT FOR BIT & MUD MOTOR11:00 -12:30 1.50 OTH TROUGH HOLE FROM 6728 FEET TO 6755 FEET (SIDE TRACK)12:30 -14:00 1.50 RIG 6 CUT 495 FEET OF DRILLINGLINE14:00 - 14:30 0.50 RIG 1 RIG SERVICE14:30 - 17:30 3.00 TRP 10 TRIP OUT FOR BIT & MOTOR17:30 -18:00 0.50 TRP 1 LAYOUT BIT, MOTOR, ADJITATOR,SHOCK SUB18:00-20:00 2.00 TRP 1 PICK UP NEW MUD MOTOR, BIT, ADJIATOR & SHOCH SUB TRIP IN THE HOLE20:00 - 22:30 2.50 TRP 2 TRIP IN THE HOLE TO 5433 FEET22:30 - 23:30 1.00 CIRC 1 FILLTHE PIPE (PRESURED UP TO 3000 PSI WITH VERY LITTLERETURNES)
ATTEMPT TO CIRC WITH BAD RESULTS23:30 -03:30 4.00 TRP 2 TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THE ADJlTATOR TRY TO
CIRC COULD NOT ! TRIP OUT TO THE BIT03:30-06:00 2.50 DRL 2 TROUBLE SHOOT PRESURE INCREASE AT THE MWD TOOLS &THE MOTOR
(PULLED THE MWD TOOLS OUT AND WE COULD CIRC THE MOTOR AND THEMONELS (MWD FAILURE)
11/28/2009 06:00 -07:00 1.00 DRL 2 REPROGRAM M.W.D. TOOLS07:00 - 08:30 1.50 DRL 2 SURFACE TEST MWD TOOLS = 80 SPM= 953 PSI08:30 - 10:30 2.00 TRP 2 TRIP IN THE HOLE TESTING MWD TOOLS10:30 - 11:00 0.50 RIG 2 REPLACE TOP DRIVE SWIVEL PACKING11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 -18:00 6.50 TRP 2 TRIP IN THE HOLE TO 7509 FEET18:00-21:00 3.00 REAM i WASH AND REAM FROM 7501 FEET TO 8619 FEET. STRING PRESURED UP
WE WERE UNABLETO GET HIGH STAND PIPE PRESURE BACK DOWN (77STKS= 2450 TO 3500 PSI)
21:00 -00:00 3.00 REAM 1 BACK REAM OUT OF THE HOLE FROM 8619 FEET TO 7907 FEET TRIP OUTOF THE HOLE
00:00 -00:30 0.50 OTH LOAD OUT DIRECTIONAL TOOLS00:30 -03:00 2.50 TRP 2 TRIP OUT FOR MWD FAILURE. SURFACE TEST TOOLS WITH #2 PUMP
PRESURE WENT TO 2500 + PSI03:00 -04:00 1.00 TRP 2 CONT TO TRIP OUT TO THE MWD TOOLS04:00 -04:30 0.50 TRP 2 SURFACE TEST MWD TOOL @2PUMP PSI= 900 FOR 34 MINUTED THEN
WENT UP TO 2000 PSI04:30 -05:00 0.50 TRP 1 TRIP OUT TO THE M.W.D. TOOLS05:00 -06:00 1.00 DRL 2 EVALUATEMWD TOOLS
11/29/2009 06:00 -11:00 5.00 DRL 3 PICK UP NEW DIRECTIONAL TOOLS AND SURFACE TEST TOOLS
RECOVEDDEC3 1 2009 Printed: 12/28/2009
Questar E & P Page 5 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Description of Operations
11/24/2009 02:00 -02:30 0.50 CIRC 1 CIRC UP SAMPLES @8591 FEET02:30 -06:00 3.50 DRL 2 DIRECTIONAL DRILLFROM 8591 FEET TO
11/25/2009 06:00 -13:30 7.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 8606 FEET TO 8680 FEET
13:30 - 14:00 0.50 CIRC 1 CIRC UP SAMPLES14:00 -18:00 4.00 DRL 2 DRILLLFROM 8680 FEET TO 8777 FEET18:00 -18:30 0.50 CIRC 1 CIRC 2 HIGH VIS SWEEPS TO SURFACE18:30 - 20:30 2.00 TRP 14 SHORT TRIP 11 STANDS FROM 8777 FEET TO 8085 FEET20:30 -21:00 0.50 TRP 14 TRIP IN THE HOLE TO 8275 FEET21:00 -22:00 1.00 REAM 1 WASH & REAM FROM 8275 FEET TO 8777 FEET22:00 -06:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8777 FEET TO 8870
11/26/2009 06:00 - 14:30 8.50 DRL 2 DIRECTIONAL DRILLFROM 8866 FEET TO 8939 FEET14:30 - 15:00 0.50 CIRC 1 CIRC SAMPLE @8937 FEET15:00 - 16:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8939 FEET TO 8967 FEET16:00-16:30 0.50 RIG 1 RIGSERVICE16:30 -18:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 8967 FEET TO 8977 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8977 FEET TO 906802:00 -03:00 1.00 SUR 1 REBOOT M.W.D. TOOLS03:00 -06:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9068 FEET TO 9090 FEET
11/27/2009 06:00 -11:00 5.00 TRP 10 TRIP OUT FOR BIT & MUD MOTOR11:00 -12:30 1.50 OTH TROUGH HOLE FROM 6728 FEET TO 6755 FEET (SIDE TRACK)12:30 -14:00 1.50 RIG 6 CUT 495 FEET OF DRILLINGLINE14:00 - 14:30 0.50 RIG 1 RIG SERVICE14:30 - 17:30 3.00 TRP 10 TRIP OUT FOR BIT & MOTOR17:30 -18:00 0.50 TRP 1 LAYOUT BIT, MOTOR, ADJITATOR,SHOCK SUB18:00-20:00 2.00 TRP 1 PICK UP NEW MUD MOTOR, BIT, ADJIATOR & SHOCH SUB TRIP IN THE HOLE20:00 - 22:30 2.50 TRP 2 TRIP IN THE HOLE TO 5433 FEET22:30 - 23:30 1.00 CIRC 1 FILLTHE PIPE (PRESURED UP TO 3000 PSI WITH VERY LITTLERETURNES)
ATTEMPT TO CIRC WITH BAD RESULTS23:30 -03:30 4.00 TRP 2 TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THE ADJlTATOR TRY TO
CIRC COULD NOT ! TRIP OUT TO THE BIT03:30-06:00 2.50 DRL 2 TROUBLE SHOOT PRESURE INCREASE AT THE MWD TOOLS &THE MOTOR
(PULLED THE MWD TOOLS OUT AND WE COULD CIRC THE MOTOR AND THEMONELS (MWD FAILURE)
11/28/2009 06:00 -07:00 1.00 DRL 2 REPROGRAM M.W.D. TOOLS07:00 - 08:30 1.50 DRL 2 SURFACE TEST MWD TOOLS = 80 SPM= 953 PSI08:30 - 10:30 2.00 TRP 2 TRIP IN THE HOLE TESTING MWD TOOLS10:30 - 11:00 0.50 RIG 2 REPLACE TOP DRIVE SWIVEL PACKING11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 -18:00 6.50 TRP 2 TRIP IN THE HOLE TO 7509 FEET18:00-21:00 3.00 REAM i WASH AND REAM FROM 7501 FEET TO 8619 FEET. STRING PRESURED UP
WE WERE UNABLETO GET HIGH STAND PIPE PRESURE BACK DOWN (77STKS= 2450 TO 3500 PSI)
21:00 -00:00 3.00 REAM 1 BACK REAM OUT OF THE HOLE FROM 8619 FEET TO 7907 FEET TRIP OUTOF THE HOLE
00:00 -00:30 0.50 OTH LOAD OUT DIRECTIONAL TOOLS00:30 -03:00 2.50 TRP 2 TRIP OUT FOR MWD FAILURE. SURFACE TEST TOOLS WITH #2 PUMP
PRESURE WENT TO 2500 + PSI03:00 -04:00 1.00 TRP 2 CONT TO TRIP OUT TO THE MWD TOOLS04:00 -04:30 0.50 TRP 2 SURFACE TEST MWD TOOL @2PUMP PSI= 900 FOR 34 MINUTED THEN
WENT UP TO 2000 PSI04:30 -05:00 0.50 TRP 1 TRIP OUT TO THE M.W.D. TOOLS05:00 -06:00 1.00 DRL 2 EVALUATEMWD TOOLS
11/29/2009 06:00 -11:00 5.00 DRL 3 PICK UP NEW DIRECTIONAL TOOLS AND SURFACE TEST TOOLS
RECOVEDDEC3 1 2009 Printed: 12/28/2009
Questar E & P Page 5 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Description of Operations
11/24/2009 02:00 -02:30 0.50 CIRC 1 CIRC UP SAMPLES @8591 FEET02:30 -06:00 3.50 DRL 2 DIRECTIONAL DRILLFROM 8591 FEET TO
11/25/2009 06:00 -13:30 7.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 8606 FEET TO 8680 FEET13:30 - 14:00 0.50 CIRC 1 CIRC UP SAMPLES14:00 -18:00 4.00 DRL 2 DRILLLFROM 8680 FEET TO 8777 FEET18:00 -18:30 0.50 CIRC 1 CIRC 2 HIGH VIS SWEEPS TO SURFACE18:30 - 20:30 2.00 TRP 14 SHORT TRIP 11 STANDS FROM 8777 FEET TO 8085 FEET20:30 -21:00 0.50 TRP 14 TRIP IN THE HOLE TO 8275 FEET21:00 -22:00 1.00 REAM 1 WASH & REAM FROM 8275 FEET TO 8777 FEET22:00 -06:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8777 FEET TO 8870
11/26/2009 06:00 - 14:30 8.50 DRL 2 DIRECTIONAL DRILLFROM 8866 FEET TO 8939 FEET14:30 - 15:00 0.50 CIRC 1 CIRC SAMPLE @8937 FEET15:00 - 16:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8939 FEET TO 8967 FEET16:00-16:30 0.50 RIG 1 RIGSERVICE16:30 -18:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 8967 FEET TO 8977 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8977 FEET TO 906802:00 -03:00 1.00 SUR 1 REBOOT M.W.D. TOOLS03:00 -06:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9068 FEET TO 9090 FEET
11/27/2009 06:00 -11:00 5.00 TRP 10 TRIP OUT FOR BIT & MUD MOTOR11:00 -12:30 1.50 OTH TROUGH HOLE FROM 6728 FEET TO 6755 FEET (SIDE TRACK)12:30 -14:00 1.50 RIG 6 CUT 495 FEET OF DRILLINGLINE14:00 - 14:30 0.50 RIG 1 RIG SERVICE14:30 - 17:30 3.00 TRP 10 TRIP OUT FOR BIT & MOTOR17:30 -18:00 0.50 TRP 1 LAYOUT BIT, MOTOR, ADJITATOR,SHOCK SUB18:00-20:00 2.00 TRP 1 PICK UP NEW MUD MOTOR, BIT, ADJIATOR & SHOCH SUB TRIP IN THE HOLE20:00 - 22:30 2.50 TRP 2 TRIP IN THE HOLE TO 5433 FEET22:30 - 23:30 1.00 CIRC 1 FILLTHE PIPE (PRESURED UP TO 3000 PSI WITH VERY LITTLERETURNES)
ATTEMPT TO CIRC WITH BAD RESULTS23:30 -03:30 4.00 TRP 2 TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THE ADJlTATOR TRY TO
CIRC COULD NOT ! TRIP OUT TO THE BIT03:30-06:00 2.50 DRL 2 TROUBLE SHOOT PRESURE INCREASE AT THE MWD TOOLS &THE MOTOR
(PULLED THE MWD TOOLS OUT AND WE COULD CIRC THE MOTOR AND THEMONELS (MWD FAILURE)
11/28/2009 06:00 -07:00 1.00 DRL 2 REPROGRAM M.W.D. TOOLS07:00 - 08:30 1.50 DRL 2 SURFACE TEST MWD TOOLS = 80 SPM= 953 PSI08:30 - 10:30 2.00 TRP 2 TRIP IN THE HOLE TESTING MWD TOOLS10:30 - 11:00 0.50 RIG 2 REPLACE TOP DRIVE SWIVEL PACKING11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 -18:00 6.50 TRP 2 TRIP IN THE HOLE TO 7509 FEET18:00-21:00 3.00 REAM i WASH AND REAM FROM 7501 FEET TO 8619 FEET. STRING PRESURED UP
WE WERE UNABLETO GET HIGH STAND PIPE PRESURE BACK DOWN (77STKS= 2450 TO 3500 PSI)
21:00 -00:00 3.00 REAM 1 BACK REAM OUT OF THE HOLE FROM 8619 FEET TO 7907 FEET TRIP OUTOF THE HOLE
00:00 -00:30 0.50 OTH LOAD OUT DIRECTIONAL TOOLS00:30 -03:00 2.50 TRP 2 TRIP OUT FOR MWD FAILURE. SURFACE TEST TOOLS WITH #2 PUMP
PRESURE WENT TO 2500 + PSI03:00 -04:00 1.00 TRP 2 CONT TO TRIP OUT TO THE MWD TOOLS04:00 -04:30 0.50 TRP 2 SURFACE TEST MWD TOOL @2PUMP PSI= 900 FOR 34 MINUTED THEN
WENT UP TO 2000 PSI04:30 -05:00 0.50 TRP 1 TRIP OUT TO THE M.W.D. TOOLS05:00 -06:00 1.00 DRL 2 EVALUATEMWD TOOLS
11/29/2009 06:00 -11:00 5.00 DRL 3 PICK UP NEW DIRECTIONAL TOOLS AND SURFACE TEST TOOLS
RECOVEDDEC3 1 2009 Printed: 12/28/2009
Questar E & P Page 5 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Description of Operations
11/24/2009 02:00 -02:30 0.50 CIRC 1 CIRC UP SAMPLES @8591 FEET02:30 -06:00 3.50 DRL 2 DIRECTIONAL DRILLFROM 8591 FEET TO
11/25/2009 06:00 -13:30 7.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 8606 FEET TO 8680 FEET13:30 - 14:00 0.50 CIRC 1 CIRC UP SAMPLES14:00 -18:00 4.00 DRL 2 DRILLLFROM 8680 FEET TO 8777 FEET18:00 -18:30 0.50 CIRC 1 CIRC 2 HIGH VIS SWEEPS TO SURFACE18:30 - 20:30 2.00 TRP 14 SHORT TRIP 11 STANDS FROM 8777 FEET TO 8085 FEET20:30 -21:00 0.50 TRP 14 TRIP IN THE HOLE TO 8275 FEET21:00 -22:00 1.00 REAM 1 WASH & REAM FROM 8275 FEET TO 8777 FEET22:00 -06:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8777 FEET TO 8870
11/26/2009 06:00 - 14:30 8.50 DRL 2 DIRECTIONAL DRILLFROM 8866 FEET TO 8939 FEET14:30 - 15:00 0.50 CIRC 1 CIRC SAMPLE @8937 FEET15:00 - 16:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8939 FEET TO 8967 FEET16:00-16:30 0.50 RIG 1 RIGSERVICE16:30 -18:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 8967 FEET TO 8977 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8977 FEET TO 906802:00 -03:00 1.00 SUR 1 REBOOT M.W.D. TOOLS03:00 -06:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9068 FEET TO 9090 FEET
11/27/2009 06:00 -11:00 5.00 TRP 10 TRIP OUT FOR BIT & MUD MOTOR11:00 -12:30 1.50 OTH TROUGH HOLE FROM 6728 FEET TO 6755 FEET (SIDE TRACK)12:30 -14:00 1.50 RIG 6 CUT 495 FEET OF DRILLINGLINE14:00 - 14:30 0.50 RIG 1 RIG SERVICE14:30 - 17:30 3.00 TRP 10 TRIP OUT FOR BIT & MOTOR17:30 -18:00 0.50 TRP 1 LAYOUT BIT, MOTOR, ADJITATOR,SHOCK SUB18:00-20:00 2.00 TRP 1 PICK UP NEW MUD MOTOR, BIT, ADJIATOR & SHOCH SUB TRIP IN THE HOLE20:00 - 22:30 2.50 TRP 2 TRIP IN THE HOLE TO 5433 FEET22:30 - 23:30 1.00 CIRC 1 FILLTHE PIPE (PRESURED UP TO 3000 PSI WITH VERY LITTLERETURNES)
ATTEMPT TO CIRC WITH BAD RESULTS23:30 -03:30 4.00 TRP 2 TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THE ADJlTATOR TRY TO
CIRC COULD NOT ! TRIP OUT TO THE BIT03:30-06:00 2.50 DRL 2 TROUBLE SHOOT PRESURE INCREASE AT THE MWD TOOLS &THE MOTOR
(PULLED THE MWD TOOLS OUT AND WE COULD CIRC THE MOTOR AND THEMONELS (MWD FAILURE)
11/28/2009 06:00 -07:00 1.00 DRL 2 REPROGRAM M.W.D. TOOLS07:00 - 08:30 1.50 DRL 2 SURFACE TEST MWD TOOLS = 80 SPM= 953 PSI08:30 - 10:30 2.00 TRP 2 TRIP IN THE HOLE TESTING MWD TOOLS10:30 - 11:00 0.50 RIG 2 REPLACE TOP DRIVE SWIVEL PACKING11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 -18:00 6.50 TRP 2 TRIP IN THE HOLE TO 7509 FEET18:00-21:00 3.00 REAM i WASH AND REAM FROM 7501 FEET TO 8619 FEET. STRING PRESURED UP
WE WERE UNABLETO GET HIGH STAND PIPE PRESURE BACK DOWN (77STKS= 2450 TO 3500 PSI)
21:00 -00:00 3.00 REAM 1 BACK REAM OUT OF THE HOLE FROM 8619 FEET TO 7907 FEET TRIP OUTOF THE HOLE
00:00 -00:30 0.50 OTH LOAD OUT DIRECTIONAL TOOLS00:30 -03:00 2.50 TRP 2 TRIP OUT FOR MWD FAILURE. SURFACE TEST TOOLS WITH #2 PUMP
PRESURE WENT TO 2500 + PSI03:00 -04:00 1.00 TRP 2 CONT TO TRIP OUT TO THE MWD TOOLS04:00 -04:30 0.50 TRP 2 SURFACE TEST MWD TOOL @2PUMP PSI= 900 FOR 34 MINUTED THEN
WENT UP TO 2000 PSI04:30 -05:00 0.50 TRP 1 TRIP OUT TO THE M.W.D. TOOLS05:00 -06:00 1.00 DRL 2 EVALUATEMWD TOOLS
11/29/2009 06:00 -11:00 5.00 DRL 3 PICK UP NEW DIRECTIONAL TOOLS AND SURFACE TEST TOOLS
RECOVEDDEC3 1 2009 Printed: 12/28/2009
Questar E & P Page 6 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
11/29/2009 11:00 - 15:30 4.50 TRP 2 TRIP IN THE HOLE, ORIENT INTO SIDE TRACK AT 671515:30 - 19:30 4.00 REAM 1 WASH AND REAM FROM 7900 FEET TO 9080 FEET19:30 - 20:00 0.50 CIRC 1 CIRC AND COND HOLE FOR SURVEY20:00 -20:30 0.50 SUR 1 SURVEY AND CIRC. FOR TOOL FACE20:30 -03:00 6.50 TRP 2 BRIDGE OFF AND PRESURE SPIKE TO 3500/3600 PSI COULD NOT CIRC
(PLUGED PIPE) TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THEAGITATOR LAYTHEM DOWN TRY TO PUMP ON THE STRING COULD NOTCIRC.
03:00-03:30 0.50 TRP 1 LAYDOWN SHOCK SUB AND AGITATOR INTHE V DOOR03:30 -04:00 0.50 TRP 2 TRIP OUT OF THE HOLE TO THE MOTOR04:00 -06:00 2.00 DRL 3 CHANGE OUT, ADJUST AND ORIENT MOTOR. (MUD MOTOR WOULD NOT
ROTATE TO DRAIN)11/30/2009 06:00-07:00 1.00 TRP i CHANGE OUT ADJITATOR AND SURFACE TEST (O.K.)
07:00 -08:30 1.50 TRP 2 TRIP IN THE HOLE08:30 -09:00 0.50 RIG 1 RIG SERVICE AND REMOVE MIDDLELSUCTION VAVLEFROM #2 MUD PUMP09:00 - 11:30 2.50 TRP 2 TRIP IN THE HOLE TO 7964 FEET11:30 - 16:30 5.00 REAM i WASH AND REAM FROM 7964 FEET TO 9080 FEET16:30 - 18:00 1.50 SUR 1 SURVEY & MIX2 SX OF SUN BEADS ON BOTTOM TO REDUCE DRAG &
TORQUE18:00 - 20:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9080 FEET TO 9131 FEET20:00 - 20:30 0.50 CIRC 1 PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING20:30 -01:00 4.50 DRL 2 DIRECTIONAL DRILLFROM 9131 FEET TO 9163 FEET01:00-01:30 0.50 CIRC i PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING01:30 -06:00 4.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 9163 FEET TO 9250
12/1/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9269 FEET TO 9300 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & TOP DRIVE (PUMP HIGH VIS SWEEP AROUND THE PIPE08:30 - 15:00 6.50 DRL 2 DIRECTIONAL DRILLFROM 9300 FEET TO 9412 FEET15:00 - 15:30 0.50 CIRC i PUMP 30 BBL'S OF SUN BEAD SWEEP AND DISPLACE15:30 - 18:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9412 FEET TO 9441 FEET18:00 -20:30 2.50 DRL 2 DIRECTIONAL DRILLFROM 9441 FEET TO 9505 FEET20:30 -21:00 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEAD FOR AN SWEEP AROUND THE PIPE21:00 -03:00 6.00 DRL 2 DIRECTIONAL DRILLFROM 9505 FEET TO 963003:00-03:30 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEADS FOR A SWEEP AROUND THE PlPE03:30 - 06:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9630 FEET TO 9650 FEET
12/2/2009 06:00 - 08:00 2.00 TRP 14 SHORT TRIP FROM9645 FEET TO 9060 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & FIX HYDRO LEAK08:30 -09:00 0.50 TRP 14 FINISH TRIP OUT TO 9060 FEET09:00 - 12:30 3.50 REAM 1 WASH & REAM FROM 9060 FEET TO 9645 FEET12:30 - 13:30 1.00 DRL 2 DIRECTIONAL DRILLFROM 9645 TO 968013:30-14:00 0.50 CIRC 1 PUMP AND DISPLACE A SUN BEAD SWEEP14:00 - 18:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 9680 TO 9788 FEET18:00 - 21:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9788 TO 9880 FEET21:00 - 21:30 0.50 CIRC 1 CIRC AND PUMP A SUN BEAD SWEEP21:30 -06:00 8.50 DRL 2 DIRECTIONAL DRILLFROM 9880 FEET TO
12/3/2009 06:00 - 09:00 3.00 DRL 2 DIRECTIONAL DRILLF/10005 T/10054 - TD09:00 - 10:00 1.00 CIRC 1 CIRCULATE AND CONDITION HOLE FOR SHORT TRIP10:00 - 16:00 6.00 FISH 6 WORK TIGHT HOLE F/9985 T/9965,16:00 - 17:30 1.50 CIRC 1 CIRCULATE AND CONDITION, RAISE MUD WT TO 9 .6 PPG17:30 -06:00 12.50 FISH 6 WORK TIGHT HOLE FROM 9742 TO 9711 AND RAISE MUD WT TO 9.9
12/4/2009 06:00 -06:30 0.50 FISH 6 HOLD SAFETY MEETING, RIG UP HALLIBURTONAND TEST LINES TO 3000 PSI06:30 -07:30 1.00 FISH 6 PUMP 35 BBLS OF ACID WITH HALLIBURTONAND DISPLACE07:30 -10:00 2.50 FISH 6 WORK TIGHT HOLE @9711, STRING PARTED @ 175,000 STRING WEIGHT. (10
BBLS ACID LEFT IN PIPE)
RECEi EDDK jj 2009 Printed: 12/28/2009
Questar E & P Page 6 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
11/29/2009 11:00 - 15:30 4.50 TRP 2 TRIP IN THE HOLE, ORIENT INTO SIDE TRACK AT 671515:30 - 19:30 4.00 REAM 1 WASH AND REAM FROM 7900 FEET TO 9080 FEET19:30 - 20:00 0.50 CIRC 1 CIRC AND COND HOLE FOR SURVEY20:00 -20:30 0.50 SUR 1 SURVEY AND CIRC. FOR TOOL FACE20:30 -03:00 6.50 TRP 2 BRIDGE OFF AND PRESURE SPIKE TO 3500/3600 PSI COULD NOT CIRC
(PLUGED PIPE) TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THEAGITATOR LAYTHEM DOWN TRY TO PUMP ON THE STRING COULD NOTCIRC.
03:00-03:30 0.50 TRP 1 LAYDOWN SHOCK SUB AND AGITATOR INTHE V DOOR03:30 -04:00 0.50 TRP 2 TRIP OUT OF THE HOLE TO THE MOTOR04:00 -06:00 2.00 DRL 3 CHANGE OUT, ADJUST AND ORIENT MOTOR. (MUD MOTOR WOULD NOT
ROTATE TO DRAIN)11/30/2009 06:00-07:00 1.00 TRP i CHANGE OUT ADJITATOR AND SURFACE TEST (O.K.)
07:00 -08:30 1.50 TRP 2 TRIP IN THE HOLE08:30 -09:00 0.50 RIG 1 RIG SERVICE AND REMOVE MIDDLELSUCTION VAVLEFROM #2 MUD PUMP09:00 - 11:30 2.50 TRP 2 TRIP IN THE HOLE TO 7964 FEET11:30 - 16:30 5.00 REAM i WASH AND REAM FROM 7964 FEET TO 9080 FEET16:30 - 18:00 1.50 SUR 1 SURVEY & MIX2 SX OF SUN BEADS ON BOTTOM TO REDUCE DRAG &
TORQUE18:00 - 20:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9080 FEET TO 9131 FEET20:00 - 20:30 0.50 CIRC 1 PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING20:30 -01:00 4.50 DRL 2 DIRECTIONAL DRILLFROM 9131 FEET TO 9163 FEET01:00-01:30 0.50 CIRC i PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING01:30 -06:00 4.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 9163 FEET TO 9250
12/1/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9269 FEET TO 9300 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & TOP DRIVE (PUMP HIGH VIS SWEEP AROUND THE PIPE08:30 - 15:00 6.50 DRL 2 DIRECTIONAL DRILLFROM 9300 FEET TO 9412 FEET15:00 - 15:30 0.50 CIRC i PUMP 30 BBL'S OF SUN BEAD SWEEP AND DISPLACE15:30 - 18:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9412 FEET TO 9441 FEET18:00 -20:30 2.50 DRL 2 DIRECTIONAL DRILLFROM 9441 FEET TO 9505 FEET20:30 -21:00 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEAD FOR AN SWEEP AROUND THE PIPE21:00 -03:00 6.00 DRL 2 DIRECTIONAL DRILLFROM 9505 FEET TO 963003:00-03:30 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEADS FOR A SWEEP AROUND THE PlPE03:30 - 06:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9630 FEET TO 9650 FEET
12/2/2009 06:00 - 08:00 2.00 TRP 14 SHORT TRIP FROM9645 FEET TO 9060 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & FIX HYDRO LEAK08:30 -09:00 0.50 TRP 14 FINISH TRIP OUT TO 9060 FEET09:00 - 12:30 3.50 REAM 1 WASH & REAM FROM 9060 FEET TO 9645 FEET12:30 - 13:30 1.00 DRL 2 DIRECTIONAL DRILLFROM 9645 TO 968013:30-14:00 0.50 CIRC 1 PUMP AND DISPLACE A SUN BEAD SWEEP14:00 - 18:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 9680 TO 9788 FEET18:00 - 21:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9788 TO 9880 FEET21:00 - 21:30 0.50 CIRC 1 CIRC AND PUMP A SUN BEAD SWEEP21:30 -06:00 8.50 DRL 2 DIRECTIONAL DRILLFROM 9880 FEET TO
12/3/2009 06:00 - 09:00 3.00 DRL 2 DIRECTIONAL DRILLF/10005 T/10054 - TD09:00 - 10:00 1.00 CIRC 1 CIRCULATE AND CONDITION HOLE FOR SHORT TRIP10:00 - 16:00 6.00 FISH 6 WORK TIGHT HOLE F/9985 T/9965,16:00 - 17:30 1.50 CIRC 1 CIRCULATE AND CONDITION, RAISE MUD WT TO 9 .6 PPG17:30 -06:00 12.50 FISH 6 WORK TIGHT HOLE FROM 9742 TO 9711 AND RAISE MUD WT TO 9.9
12/4/2009 06:00 -06:30 0.50 FISH 6 HOLD SAFETY MEETING, RIG UP HALLIBURTONAND TEST LINES TO 3000 PSI06:30 -07:30 1.00 FISH 6 PUMP 35 BBLS OF ACID WITH HALLIBURTONAND DISPLACE07:30 -10:00 2.50 FISH 6 WORK TIGHT HOLE @9711, STRING PARTED @ 175,000 STRING WEIGHT. (10
BBLS ACID LEFT IN PIPE)
RECEi EDDK jj 2009 Printed: 12/28/2009
Questar E & P Page 6 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
11/29/2009 11:00 - 15:30 4.50 TRP 2 TRIP IN THE HOLE, ORIENT INTO SIDE TRACK AT 671515:30 - 19:30 4.00 REAM 1 WASH AND REAM FROM 7900 FEET TO 9080 FEET19:30 - 20:00 0.50 CIRC 1 CIRC AND COND HOLE FOR SURVEY20:00 -20:30 0.50 SUR 1 SURVEY AND CIRC. FOR TOOL FACE20:30 -03:00 6.50 TRP 2 BRIDGE OFF AND PRESURE SPIKE TO 3500/3600 PSI COULD NOT CIRC
(PLUGED PIPE) TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THEAGITATOR LAYTHEM DOWN TRY TO PUMP ON THE STRING COULD NOTCIRC.
03:00-03:30 0.50 TRP 1 LAYDOWN SHOCK SUB AND AGITATOR INTHE V DOOR03:30 -04:00 0.50 TRP 2 TRIP OUT OF THE HOLE TO THE MOTOR04:00 -06:00 2.00 DRL 3 CHANGE OUT, ADJUST AND ORIENT MOTOR. (MUD MOTOR WOULD NOT
ROTATE TO DRAIN)11/30/2009 06:00-07:00 1.00 TRP i CHANGE OUT ADJITATOR AND SURFACE TEST (O.K.)
07:00 -08:30 1.50 TRP 2 TRIP IN THE HOLE08:30 -09:00 0.50 RIG 1 RIG SERVICE AND REMOVE MIDDLELSUCTION VAVLEFROM #2 MUD PUMP09:00 - 11:30 2.50 TRP 2 TRIP IN THE HOLE TO 7964 FEET11:30 - 16:30 5.00 REAM i WASH AND REAM FROM 7964 FEET TO 9080 FEET16:30 - 18:00 1.50 SUR 1 SURVEY & MIX2 SX OF SUN BEADS ON BOTTOM TO REDUCE DRAG &
TORQUE18:00 - 20:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9080 FEET TO 9131 FEET20:00 - 20:30 0.50 CIRC 1 PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING20:30 -01:00 4.50 DRL 2 DIRECTIONAL DRILLFROM 9131 FEET TO 9163 FEET01:00-01:30 0.50 CIRC i PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING01:30 -06:00 4.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 9163 FEET TO 9250
12/1/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9269 FEET TO 9300 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & TOP DRIVE (PUMP HIGH VIS SWEEP AROUND THE PIPE08:30 - 15:00 6.50 DRL 2 DIRECTIONAL DRILLFROM 9300 FEET TO 9412 FEET15:00 - 15:30 0.50 CIRC i PUMP 30 BBL'S OF SUN BEAD SWEEP AND DISPLACE15:30 - 18:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9412 FEET TO 9441 FEET18:00 -20:30 2.50 DRL 2 DIRECTIONAL DRILLFROM 9441 FEET TO 9505 FEET20:30 -21:00 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEAD FOR AN SWEEP AROUND THE PIPE21:00 -03:00 6.00 DRL 2 DIRECTIONAL DRILLFROM 9505 FEET TO 963003:00-03:30 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEADS FOR A SWEEP AROUND THE PlPE03:30 - 06:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9630 FEET TO 9650 FEET
12/2/2009 06:00 - 08:00 2.00 TRP 14 SHORT TRIP FROM9645 FEET TO 9060 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & FIX HYDRO LEAK08:30 -09:00 0.50 TRP 14 FINISH TRIP OUT TO 9060 FEET09:00 - 12:30 3.50 REAM 1 WASH & REAM FROM 9060 FEET TO 9645 FEET12:30 - 13:30 1.00 DRL 2 DIRECTIONAL DRILLFROM 9645 TO 968013:30-14:00 0.50 CIRC 1 PUMP AND DISPLACE A SUN BEAD SWEEP14:00 - 18:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 9680 TO 9788 FEET18:00 - 21:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9788 TO 9880 FEET21:00 - 21:30 0.50 CIRC 1 CIRC AND PUMP A SUN BEAD SWEEP21:30 -06:00 8.50 DRL 2 DIRECTIONAL DRILLFROM 9880 FEET TO
12/3/2009 06:00 - 09:00 3.00 DRL 2 DIRECTIONAL DRILLF/10005 T/10054 - TD09:00 - 10:00 1.00 CIRC 1 CIRCULATE AND CONDITION HOLE FOR SHORT TRIP10:00 - 16:00 6.00 FISH 6 WORK TIGHT HOLE F/9985 T/9965,16:00 - 17:30 1.50 CIRC 1 CIRCULATE AND CONDITION, RAISE MUD WT TO 9 .6 PPG17:30 -06:00 12.50 FISH 6 WORK TIGHT HOLE FROM 9742 TO 9711 AND RAISE MUD WT TO 9.9
12/4/2009 06:00 -06:30 0.50 FISH 6 HOLD SAFETY MEETING, RIG UP HALLIBURTONAND TEST LINES TO 3000 PSI06:30 -07:30 1.00 FISH 6 PUMP 35 BBLS OF ACID WITH HALLIBURTONAND DISPLACE07:30 -10:00 2.50 FISH 6 WORK TIGHT HOLE @9711, STRING PARTED @ 175,000 STRING WEIGHT. (10
BBLS ACID LEFT IN PIPE)
RECEi EDDK jj 2009 Printed: 12/28/2009
Questar E & P Page 6 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
11/29/2009 11:00 - 15:30 4.50 TRP 2 TRIP IN THE HOLE, ORIENT INTO SIDE TRACK AT 671515:30 - 19:30 4.00 REAM 1 WASH AND REAM FROM 7900 FEET TO 9080 FEET19:30 - 20:00 0.50 CIRC 1 CIRC AND COND HOLE FOR SURVEY20:00 -20:30 0.50 SUR 1 SURVEY AND CIRC. FOR TOOL FACE20:30 -03:00 6.50 TRP 2 BRIDGE OFF AND PRESURE SPIKE TO 3500/3600 PSI COULD NOT CIRC
(PLUGED PIPE) TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THEAGITATOR LAYTHEM DOWN TRY TO PUMP ON THE STRING COULD NOTCIRC.
03:00-03:30 0.50 TRP 1 LAYDOWN SHOCK SUB AND AGITATOR INTHE V DOOR03:30 -04:00 0.50 TRP 2 TRIP OUT OF THE HOLE TO THE MOTOR04:00 -06:00 2.00 DRL 3 CHANGE OUT, ADJUST AND ORIENT MOTOR. (MUD MOTOR WOULD NOT
ROTATE TO DRAIN)11/30/2009 06:00-07:00 1.00 TRP i CHANGE OUT ADJITATOR AND SURFACE TEST (O.K.)
07:00 -08:30 1.50 TRP 2 TRIP IN THE HOLE08:30 -09:00 0.50 RIG 1 RIG SERVICE AND REMOVE MIDDLELSUCTION VAVLEFROM #2 MUD PUMP09:00 - 11:30 2.50 TRP 2 TRIP IN THE HOLE TO 7964 FEET11:30 - 16:30 5.00 REAM i WASH AND REAM FROM 7964 FEET TO 9080 FEET16:30 - 18:00 1.50 SUR 1 SURVEY & MIX2 SX OF SUN BEADS ON BOTTOM TO REDUCE DRAG &
TORQUE18:00 - 20:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9080 FEET TO 9131 FEET20:00 - 20:30 0.50 CIRC 1 PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING20:30 -01:00 4.50 DRL 2 DIRECTIONAL DRILLFROM 9131 FEET TO 9163 FEET01:00-01:30 0.50 CIRC i PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING01:30 -06:00 4.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 9163 FEET TO 9250
12/1/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9269 FEET TO 9300 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & TOP DRIVE (PUMP HIGH VIS SWEEP AROUND THE PIPE08:30 - 15:00 6.50 DRL 2 DIRECTIONAL DRILLFROM 9300 FEET TO 9412 FEET15:00 - 15:30 0.50 CIRC i PUMP 30 BBL'S OF SUN BEAD SWEEP AND DISPLACE15:30 - 18:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9412 FEET TO 9441 FEET18:00 -20:30 2.50 DRL 2 DIRECTIONAL DRILLFROM 9441 FEET TO 9505 FEET20:30 -21:00 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEAD FOR AN SWEEP AROUND THE PIPE21:00 -03:00 6.00 DRL 2 DIRECTIONAL DRILLFROM 9505 FEET TO 963003:00-03:30 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEADS FOR A SWEEP AROUND THE PlPE03:30 - 06:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9630 FEET TO 9650 FEET
12/2/2009 06:00 - 08:00 2.00 TRP 14 SHORT TRIP FROM9645 FEET TO 9060 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & FIX HYDRO LEAK08:30 -09:00 0.50 TRP 14 FINISH TRIP OUT TO 9060 FEET09:00 - 12:30 3.50 REAM 1 WASH & REAM FROM 9060 FEET TO 9645 FEET12:30 - 13:30 1.00 DRL 2 DIRECTIONAL DRILLFROM 9645 TO 968013:30-14:00 0.50 CIRC 1 PUMP AND DISPLACE A SUN BEAD SWEEP14:00 - 18:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 9680 TO 9788 FEET18:00 - 21:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9788 TO 9880 FEET21:00 - 21:30 0.50 CIRC 1 CIRC AND PUMP A SUN BEAD SWEEP21:30 -06:00 8.50 DRL 2 DIRECTIONAL DRILLFROM 9880 FEET TO
12/3/2009 06:00 - 09:00 3.00 DRL 2 DIRECTIONAL DRILLF/10005 T/10054 - TD09:00 - 10:00 1.00 CIRC 1 CIRCULATE AND CONDITION HOLE FOR SHORT TRIP10:00 - 16:00 6.00 FISH 6 WORK TIGHT HOLE F/9985 T/9965,16:00 - 17:30 1.50 CIRC 1 CIRCULATE AND CONDITION, RAISE MUD WT TO 9 .6 PPG17:30 -06:00 12.50 FISH 6 WORK TIGHT HOLE FROM 9742 TO 9711 AND RAISE MUD WT TO 9.9
12/4/2009 06:00 -06:30 0.50 FISH 6 HOLD SAFETY MEETING, RIG UP HALLIBURTONAND TEST LINES TO 3000 PSI06:30 -07:30 1.00 FISH 6 PUMP 35 BBLS OF ACID WITH HALLIBURTONAND DISPLACE07:30 -10:00 2.50 FISH 6 WORK TIGHT HOLE @9711, STRING PARTED @ 175,000 STRING WEIGHT. (10
BBLS ACID LEFT IN PIPE)
RECEi EDDK jj 2009 Printed: 12/28/2009
Questar E & P Page 7 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Description of Operations
12/4/2009 10:00 -11:00 1.00 OTH INSPECT RIG AND FIX HYDRAULICLINES ON TOP DRIVE11:00 -14:00 3.00 TRP 2 TRIP OUT OF HOLE. STRING PULLED APART AT BOTTOM OF JARS. LEFT 7.00'
OF JARS IN HOLE, TOTAL FISH LENGTH = 4621', TOP OF FISH AT 5075'14:00 -18:00 4.00 TRP 1 LAYDOWN JARS, PICK UP FISHING TOOLS18:00 - 22:00 4.00 TRP 2 T.I.H. TO 5075'22:00 -23:00 1.00 FISH 5 LATCH ONTO FISH, ESTABLISH CIRCULATION, LOST FISH @25K OVER
STRING WT, UNABLETO RE-ENGAGE FISH23:00-03:00 4.00 TRP 2 T.O.O.H. TO CHANGE OUT GRAPPLE03:00 -04:00 1.00 OTH BREAK DOWN OVERSHOT AND EVALUATE04:00 -06:00 2.00 WOT 4 WAIT ON FISHING TOOLS - OVERSHOT EXTENSIONS
12/5/2009 06:00 -10:30 4.50 TRP 2 TRIP IN THE HOLE WITH FISHING TOOLS10:30 - 12:30 2.00 OTH THAW OUT TOP DRIVE12:30 -13:00 0.50 FISH 5 WORK TOOLS ON TOP OF FISH, LATCH ONTO FISH, WORK STUCK PIPE13:00 - 16:00 3.00 FISH 3 JARRING FROM 120K TO 175K, WORK FISH, CIRCULATE OUT ACID16:00 -17:00 1.00 FISH 4 HOLD SAFETY MEETING AND RIGUP WIRELINE TRUCK17:00 - 21:00 4.00 FISH 4 RUN IN THE HOLE WITH WIRELINE, ATTEMPT TO BACK OFF AT 5786'-
UNSUCSESSFUL, POOH AND RIG UP NEW SHOT, RUN INTHE HOLE TO 5755AND BACKOFF FISH, P.O.O.H., RIG DOWN WIRELINE TRUCK
21:00 -02:00 5.00 TRP 2 TRIP OUT OF THE HOLE, C/O 1 HWDP - PULLED THREADS, RETRIEVED 22JOINTS HWDP FROM FISH, L/D BOTTOM JOINT
02:00 -03:30 1.50 TRP 4 L/D OVERSHOT, PARTED JAR AND X/O SUB, P/U FISHING ASSEMBLY WITHSCREW IN SUB
03:30-06:00 2.50 TRP 2 TRIP IN THE HOLE WITH SCREW IN SUB12/6/2009 06:00 -10:00 4.00 TRP 2 TRIP IN THE HOLE
10:00 -10:30 0.50 FISH 5 BREAK CIRCULATIONAND SCREW INTO FISH10:30 -00:00 13.50 FISH 6 WORK STUCK PIPE00:00 -03:30 3.50 FISH 5 HOLD SAFETY MEETING, RIG UP HALLIBURTON,PRESURE TEST LINES TO
3000 PSI, PUMP 5000 GALONS OF 15% HCL ACID AND DISPLACE WITH 33BBLS OF MUD TO 6800' AT 2 BBLS/MIN
03:30 -05:30 2.00 FISH 6 WORK STUCK PIPE05:30 -06:00 0.50 CIRC i CIRCULATE OUT ACID
12/7/2009 06:00 -08:00 2.00 CIRC 1 CIRCULATE OUT ACID08:00-08:30 0.50 RIG 1 RIG SERVICE, INSPECT BREAKS AND TOP DRIVE TRACK08:30-10:00 1.50 FISH 4 HELD SAFETY MEETING, RIG UP WIRELINE, RUN INAND BACK OFF AT 601310:00 - 13:00 3.00 TRP 2 TRIP OUT OF THE HOLE13:00 -15:00 2.00 TRP 1 LAYDOWN FISHING BHA15:00-16:00 1.00 RIG 6 SLIP AND CUT DRILLINGLINE16:00-17:00 1.00 RIG 2 CHANGESWlVELPACKING17:00 - 20:00 3.00 TRP 2 TRIP IN THE HOLE TO 601320:00 -20:30 0.50 FISH 5 WASH ON TOP OF AND SCREW INTO FISH20:30 - 21:30 1.00 RIG 1 WORK ON SWIVEL PACKING21:30 -22:30 1.00 FISH 6 BREAK CIRCULATIONAND WORK STUCK PIPE22:30-02:00 3.50 FISH 5 HELD SAFETY MEETING, RIG UP HALLIBURTON, PRESSURE TEST LINES TO
3500 PSI, PUMP 4000 GALONS 15% HCL ACID, DISPLACE TO 6800' WITH 33BBLS OF MUD, LOST 95 BBLS DURING ACID JOB
02:00 -06:00 4.00 FISH 6 WORK STUCK PIPE12/8/2009 06:00 -09:30 3.50 FISH 4 RIG UP WlRELINE TRUCK AND RUN IN WITH FREE POINT, 70% MOVEMENT
@6865'09:30 - 12:30 3.00 FISH 4 RUN IN WlHT PERF GUN AND SHOOT PIPE FROM 8402' TO8408'12:30 - 14:00 1.50 FISH 4 RUN IN WITH RCT AND CUT PIPE @8404'14:00 -00:30 10.50 FISH 6 WORK STUCK PIPE00:30 -06:00 5.50 PERF 2 RIG UP WIRELINE TRUCK, PICK UP 12 -2' PERF GUNS, RUN IN THE HOLE
AND PERFORATE THE MIDDLE OF EVERY JOINT FROM 8300' TO 7655'
RECEIVEDPrinted: 12/28/2009 11:59:15 AM
DIV.0F0lL,GAS&MINING
Questar E & P Page 7 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Description of Operations
12/4/2009 10:00 -11:00 1.00 OTH INSPECT RIG AND FIX HYDRAULICLINES ON TOP DRIVE11:00 -14:00 3.00 TRP 2 TRIP OUT OF HOLE. STRING PULLED APART AT BOTTOM OF JARS. LEFT 7.00'
OF JARS IN HOLE, TOTAL FISH LENGTH = 4621', TOP OF FISH AT 5075'14:00 -18:00 4.00 TRP 1 LAYDOWN JARS, PICK UP FISHING TOOLS18:00 - 22:00 4.00 TRP 2 T.I.H. TO 5075'22:00 -23:00 1.00 FISH 5 LATCH ONTO FISH, ESTABLISH CIRCULATION, LOST FISH @25K OVER
STRING WT, UNABLETO RE-ENGAGE FISH23:00-03:00 4.00 TRP 2 T.O.O.H. TO CHANGE OUT GRAPPLE03:00 -04:00 1.00 OTH BREAK DOWN OVERSHOT AND EVALUATE04:00 -06:00 2.00 WOT 4 WAIT ON FISHING TOOLS - OVERSHOT EXTENSIONS
12/5/2009 06:00 -10:30 4.50 TRP 2 TRIP IN THE HOLE WITH FISHING TOOLS10:30 - 12:30 2.00 OTH THAW OUT TOP DRIVE12:30 -13:00 0.50 FISH 5 WORK TOOLS ON TOP OF FISH, LATCH ONTO FISH, WORK STUCK PIPE13:00 - 16:00 3.00 FISH 3 JARRING FROM 120K TO 175K, WORK FISH, CIRCULATE OUT ACID16:00 -17:00 1.00 FISH 4 HOLD SAFETY MEETING AND RIGUP WIRELINE TRUCK17:00 - 21:00 4.00 FISH 4 RUN IN THE HOLE WITH WIRELINE, ATTEMPT TO BACK OFF AT 5786'-
UNSUCSESSFUL, POOH AND RIG UP NEW SHOT, RUN INTHE HOLE TO 5755AND BACKOFF FISH, P.O.O.H., RIG DOWN WIRELINE TRUCK
21:00 -02:00 5.00 TRP 2 TRIP OUT OF THE HOLE, C/O 1 HWDP - PULLED THREADS, RETRIEVED 22JOINTS HWDP FROM FISH, L/D BOTTOM JOINT
02:00 -03:30 1.50 TRP 4 L/D OVERSHOT, PARTED JAR AND X/O SUB, P/U FISHING ASSEMBLY WITHSCREW IN SUB
03:30-06:00 2.50 TRP 2 TRIP IN THE HOLE WITH SCREW IN SUB12/6/2009 06:00 -10:00 4.00 TRP 2 TRIP IN THE HOLE
10:00 -10:30 0.50 FISH 5 BREAK CIRCULATIONAND SCREW INTO FISH10:30 -00:00 13.50 FISH 6 WORK STUCK PIPE00:00 -03:30 3.50 FISH 5 HOLD SAFETY MEETING, RIG UP HALLIBURTON,PRESURE TEST LINES TO
3000 PSI, PUMP 5000 GALONS OF 15% HCL ACID AND DISPLACE WITH 33BBLS OF MUD TO 6800' AT 2 BBLS/MIN
03:30 -05:30 2.00 FISH 6 WORK STUCK PIPE05:30 -06:00 0.50 CIRC i CIRCULATE OUT ACID
12/7/2009 06:00 -08:00 2.00 CIRC 1 CIRCULATE OUT ACID08:00-08:30 0.50 RIG 1 RIG SERVICE, INSPECT BREAKS AND TOP DRIVE TRACK08:30-10:00 1.50 FISH 4 HELD SAFETY MEETING, RIG UP WIRELINE, RUN INAND BACK OFF AT 601310:00 - 13:00 3.00 TRP 2 TRIP OUT OF THE HOLE13:00 -15:00 2.00 TRP 1 LAYDOWN FISHING BHA15:00-16:00 1.00 RIG 6 SLIP AND CUT DRILLINGLINE16:00-17:00 1.00 RIG 2 CHANGESWlVELPACKING17:00 - 20:00 3.00 TRP 2 TRIP IN THE HOLE TO 601320:00 -20:30 0.50 FISH 5 WASH ON TOP OF AND SCREW INTO FISH20:30 - 21:30 1.00 RIG 1 WORK ON SWIVEL PACKING21:30 -22:30 1.00 FISH 6 BREAK CIRCULATIONAND WORK STUCK PIPE22:30-02:00 3.50 FISH 5 HELD SAFETY MEETING, RIG UP HALLIBURTON, PRESSURE TEST LINES TO
3500 PSI, PUMP 4000 GALONS 15% HCL ACID, DISPLACE TO 6800' WITH 33BBLS OF MUD, LOST 95 BBLS DURING ACID JOB
02:00 -06:00 4.00 FISH 6 WORK STUCK PIPE12/8/2009 06:00 -09:30 3.50 FISH 4 RIG UP WlRELINE TRUCK AND RUN IN WITH FREE POINT, 70% MOVEMENT
@6865'09:30 - 12:30 3.00 FISH 4 RUN IN WlHT PERF GUN AND SHOOT PIPE FROM 8402' TO8408'12:30 - 14:00 1.50 FISH 4 RUN IN WITH RCT AND CUT PIPE @8404'14:00 -00:30 10.50 FISH 6 WORK STUCK PIPE00:30 -06:00 5.50 PERF 2 RIG UP WIRELINE TRUCK, PICK UP 12 -2' PERF GUNS, RUN IN THE HOLE
AND PERFORATE THE MIDDLE OF EVERY JOINT FROM 8300' TO 7655'
RECEIVEDPrinted: 12/28/2009 11:59:15 AM
DIV.0F0lL,GAS&MINING
Questar E & P Page 7 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Description of Operations
12/4/2009 10:00 -11:00 1.00 OTH INSPECT RIG AND FIX HYDRAULICLINES ON TOP DRIVE11:00 -14:00 3.00 TRP 2 TRIP OUT OF HOLE. STRING PULLED APART AT BOTTOM OF JARS. LEFT 7.00'
OF JARS IN HOLE, TOTAL FISH LENGTH = 4621', TOP OF FISH AT 5075'14:00 -18:00 4.00 TRP 1 LAYDOWN JARS, PICK UP FISHING TOOLS18:00 - 22:00 4.00 TRP 2 T.I.H. TO 5075'22:00 -23:00 1.00 FISH 5 LATCH ONTO FISH, ESTABLISH CIRCULATION, LOST FISH @25K OVER
STRING WT, UNABLETO RE-ENGAGE FISH23:00-03:00 4.00 TRP 2 T.O.O.H. TO CHANGE OUT GRAPPLE03:00 -04:00 1.00 OTH BREAK DOWN OVERSHOT AND EVALUATE04:00 -06:00 2.00 WOT 4 WAIT ON FISHING TOOLS - OVERSHOT EXTENSIONS
12/5/2009 06:00 -10:30 4.50 TRP 2 TRIP IN THE HOLE WITH FISHING TOOLS10:30 - 12:30 2.00 OTH THAW OUT TOP DRIVE12:30 -13:00 0.50 FISH 5 WORK TOOLS ON TOP OF FISH, LATCH ONTO FISH, WORK STUCK PIPE13:00 - 16:00 3.00 FISH 3 JARRING FROM 120K TO 175K, WORK FISH, CIRCULATE OUT ACID16:00 -17:00 1.00 FISH 4 HOLD SAFETY MEETING AND RIGUP WIRELINE TRUCK17:00 - 21:00 4.00 FISH 4 RUN IN THE HOLE WITH WIRELINE, ATTEMPT TO BACK OFF AT 5786'-
UNSUCSESSFUL, POOH AND RIG UP NEW SHOT, RUN INTHE HOLE TO 5755AND BACKOFF FISH, P.O.O.H., RIG DOWN WIRELINE TRUCK
21:00 -02:00 5.00 TRP 2 TRIP OUT OF THE HOLE, C/O 1 HWDP - PULLED THREADS, RETRIEVED 22JOINTS HWDP FROM FISH, L/D BOTTOM JOINT
02:00 -03:30 1.50 TRP 4 L/D OVERSHOT, PARTED JAR AND X/O SUB, P/U FISHING ASSEMBLY WITHSCREW IN SUB
03:30-06:00 2.50 TRP 2 TRIP IN THE HOLE WITH SCREW IN SUB12/6/2009 06:00 -10:00 4.00 TRP 2 TRIP IN THE HOLE
10:00 -10:30 0.50 FISH 5 BREAK CIRCULATIONAND SCREW INTO FISH10:30 -00:00 13.50 FISH 6 WORK STUCK PIPE00:00 -03:30 3.50 FISH 5 HOLD SAFETY MEETING, RIG UP HALLIBURTON,PRESURE TEST LINES TO
3000 PSI, PUMP 5000 GALONS OF 15% HCL ACID AND DISPLACE WITH 33BBLS OF MUD TO 6800' AT 2 BBLS/MIN
03:30 -05:30 2.00 FISH 6 WORK STUCK PIPE05:30 -06:00 0.50 CIRC i CIRCULATE OUT ACID
12/7/2009 06:00 -08:00 2.00 CIRC 1 CIRCULATE OUT ACID08:00-08:30 0.50 RIG 1 RIG SERVICE, INSPECT BREAKS AND TOP DRIVE TRACK08:30-10:00 1.50 FISH 4 HELD SAFETY MEETING, RIG UP WIRELINE, RUN INAND BACK OFF AT 601310:00 - 13:00 3.00 TRP 2 TRIP OUT OF THE HOLE13:00 -15:00 2.00 TRP 1 LAYDOWN FISHING BHA15:00-16:00 1.00 RIG 6 SLIP AND CUT DRILLINGLINE16:00-17:00 1.00 RIG 2 CHANGESWlVELPACKING17:00 - 20:00 3.00 TRP 2 TRIP IN THE HOLE TO 601320:00 -20:30 0.50 FISH 5 WASH ON TOP OF AND SCREW INTO FISH20:30 - 21:30 1.00 RIG 1 WORK ON SWIVEL PACKING21:30 -22:30 1.00 FISH 6 BREAK CIRCULATIONAND WORK STUCK PIPE22:30-02:00 3.50 FISH 5 HELD SAFETY MEETING, RIG UP HALLIBURTON, PRESSURE TEST LINES TO
3500 PSI, PUMP 4000 GALONS 15% HCL ACID, DISPLACE TO 6800' WITH 33BBLS OF MUD, LOST 95 BBLS DURING ACID JOB
02:00 -06:00 4.00 FISH 6 WORK STUCK PIPE12/8/2009 06:00 -09:30 3.50 FISH 4 RIG UP WlRELINE TRUCK AND RUN IN WITH FREE POINT, 70% MOVEMENT
@6865'09:30 - 12:30 3.00 FISH 4 RUN IN WlHT PERF GUN AND SHOOT PIPE FROM 8402' TO8408'12:30 - 14:00 1.50 FISH 4 RUN IN WITH RCT AND CUT PIPE @8404'14:00 -00:30 10.50 FISH 6 WORK STUCK PIPE00:30 -06:00 5.50 PERF 2 RIG UP WIRELINE TRUCK, PICK UP 12 -2' PERF GUNS, RUN IN THE HOLE
AND PERFORATE THE MIDDLE OF EVERY JOINT FROM 8300' TO 7655'
RECEIVEDPrinted: 12/28/2009 11:59:15 AM
DIV.0F0lL,GAS&MINING
Questar E & P Page 7 of 8
Operations Summary Report
Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Description of Operations
12/4/2009 10:00 -11:00 1.00 OTH INSPECT RIG AND FIX HYDRAULICLINES ON TOP DRIVE11:00 -14:00 3.00 TRP 2 TRIP OUT OF HOLE. STRING PULLED APART AT BOTTOM OF JARS. LEFT 7.00'
OF JARS IN HOLE, TOTAL FISH LENGTH = 4621', TOP OF FISH AT 5075'14:00 -18:00 4.00 TRP 1 LAYDOWN JARS, PICK UP FISHING TOOLS18:00 - 22:00 4.00 TRP 2 T.I.H. TO 5075'22:00 -23:00 1.00 FISH 5 LATCH ONTO FISH, ESTABLISH CIRCULATION, LOST FISH @25K OVER
STRING WT, UNABLETO RE-ENGAGE FISH23:00-03:00 4.00 TRP 2 T.O.O.H. TO CHANGE OUT GRAPPLE03:00 -04:00 1.00 OTH BREAK DOWN OVERSHOT AND EVALUATE04:00 -06:00 2.00 WOT 4 WAIT ON FISHING TOOLS - OVERSHOT EXTENSIONS
12/5/2009 06:00 -10:30 4.50 TRP 2 TRIP IN THE HOLE WITH FISHING TOOLS10:30 - 12:30 2.00 OTH THAW OUT TOP DRIVE12:30 -13:00 0.50 FISH 5 WORK TOOLS ON TOP OF FISH, LATCH ONTO FISH, WORK STUCK PIPE13:00 - 16:00 3.00 FISH 3 JARRING FROM 120K TO 175K, WORK FISH, CIRCULATE OUT ACID16:00 -17:00 1.00 FISH 4 HOLD SAFETY MEETING AND RIGUP WIRELINE TRUCK17:00 - 21:00 4.00 FISH 4 RUN IN THE HOLE WITH WIRELINE, ATTEMPT TO BACK OFF AT 5786'-
UNSUCSESSFUL, POOH AND RIG UP NEW SHOT, RUN INTHE HOLE TO 5755AND BACKOFF FISH, P.O.O.H., RIG DOWN WIRELINE TRUCK
21:00 -02:00 5.00 TRP 2 TRIP OUT OF THE HOLE, C/O 1 HWDP - PULLED THREADS, RETRIEVED 22JOINTS HWDP FROM FISH, L/D BOTTOM JOINT
02:00 -03:30 1.50 TRP 4 L/D OVERSHOT, PARTED JAR AND X/O SUB, P/U FISHING ASSEMBLY WITHSCREW IN SUB
03:30-06:00 2.50 TRP 2 TRIP IN THE HOLE WITH SCREW IN SUB12/6/2009 06:00 -10:00 4.00 TRP 2 TRIP IN THE HOLE
10:00 -10:30 0.50 FISH 5 BREAK CIRCULATIONAND SCREW INTO FISH10:30 -00:00 13.50 FISH 6 WORK STUCK PIPE00:00 -03:30 3.50 FISH 5 HOLD SAFETY MEETING, RIG UP HALLIBURTON,PRESURE TEST LINES TO
3000 PSI, PUMP 5000 GALONS OF 15% HCL ACID AND DISPLACE WITH 33BBLS OF MUD TO 6800' AT 2 BBLS/MIN
03:30 -05:30 2.00 FISH 6 WORK STUCK PIPE05:30 -06:00 0.50 CIRC i CIRCULATE OUT ACID
12/7/2009 06:00 -08:00 2.00 CIRC 1 CIRCULATE OUT ACID08:00-08:30 0.50 RIG 1 RIG SERVICE, INSPECT BREAKS AND TOP DRIVE TRACK08:30-10:00 1.50 FISH 4 HELD SAFETY MEETING, RIG UP WIRELINE, RUN INAND BACK OFF AT 601310:00 - 13:00 3.00 TRP 2 TRIP OUT OF THE HOLE13:00 -15:00 2.00 TRP 1 LAYDOWN FISHING BHA15:00-16:00 1.00 RIG 6 SLIP AND CUT DRILLINGLINE16:00-17:00 1.00 RIG 2 CHANGESWlVELPACKING17:00 - 20:00 3.00 TRP 2 TRIP IN THE HOLE TO 601320:00 -20:30 0.50 FISH 5 WASH ON TOP OF AND SCREW INTO FISH20:30 - 21:30 1.00 RIG 1 WORK ON SWIVEL PACKING21:30 -22:30 1.00 FISH 6 BREAK CIRCULATIONAND WORK STUCK PIPE22:30-02:00 3.50 FISH 5 HELD SAFETY MEETING, RIG UP HALLIBURTON, PRESSURE TEST LINES TO
3500 PSI, PUMP 4000 GALONS 15% HCL ACID, DISPLACE TO 6800' WITH 33BBLS OF MUD, LOST 95 BBLS DURING ACID JOB
02:00 -06:00 4.00 FISH 6 WORK STUCK PIPE12/8/2009 06:00 -09:30 3.50 FISH 4 RIG UP WlRELINE TRUCK AND RUN IN WITH FREE POINT, 70% MOVEMENT
@6865'09:30 - 12:30 3.00 FISH 4 RUN IN WlHT PERF GUN AND SHOOT PIPE FROM 8402' TO8408'12:30 - 14:00 1.50 FISH 4 RUN IN WITH RCT AND CUT PIPE @8404'14:00 -00:30 10.50 FISH 6 WORK STUCK PIPE00:30 -06:00 5.50 PERF 2 RIG UP WIRELINE TRUCK, PICK UP 12 -2' PERF GUNS, RUN IN THE HOLE
AND PERFORATE THE MIDDLE OF EVERY JOINT FROM 8300' TO 7655'
RECEIVEDPrinted: 12/28/2009 11:59:15 AM
DIV.0F0lL,GAS&MINING
Questar E & P Page 8 of 8
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Cb Description of Operations
12/8/2009 00:30 -06:00 5.50 PERF 2 PERFORATIONS @WIRELINE DEPTHS OF:FROM 8298 TO 7190
RECEivED
DEC3 i 2003
D\v.0FOL U
Printed: 12/28/2009 11:59:15
Questar E & P Page 8 of 8
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Cb Description of Operations
12/8/2009 00:30 -06:00 5.50 PERF 2 PERFORATIONS @WIRELINE DEPTHS OF:FROM 8298 TO 7190
RECEivED
DEC3 i 2003
D\v.0FOL U
Printed: 12/28/2009 11:59:15
Questar E & P Page 8 of 8
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Cb Description of Operations
12/8/2009 00:30 -06:00 5.50 PERF 2 PERFORATIONS @WIRELINE DEPTHS OF:FROM 8298 TO 7190
RECEivED
DEC3 i 2003
D\v.0FOL U
Printed: 12/28/2009 11:59:15
Questar E & P Page 8 of 8
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code Cb Description of Operations
12/8/2009 00:30 -06:00 5.50 PERF 2 PERFORATIONS @WIRELINE DEPTHS OF:FROM 8298 TO 7190
RECEivED
DEC3 i 2003
D\v.0FOL U
Printed: 12/28/2009 11:59:15
Questar E & P Page 1 of 2
00NF\DEN11ALOperafons Summag Repod - N
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
12/9/2009 06:00 - 12:30 6.50 PERF 2 PERFERATE DRILLPIPE FROM 7170 TO 679512:30 -06:00 17.50 OTH WIAT ON HALLIBURTONTO DO ACID JOB
12/10/2009 06:00 -13:00 7.00 WOT 4 WAIT ON HALLIBURTONTO DO ACID JOB13:00 -15:00 2.00 STIM 1 HOLD SAFETY MEETING AND RIG UP HALLIBURTON15:00 - 17:30 2.50 STIM i PUMP 357 BBLS OF 15% HCL ACID AND FLUSH WITH 40 BBLS 2% KCL
WATER. MAXPUMP RATE WAS 7 BPM @3700 PSI, AVERAGE PUMP RATEWAS 5.4 BPM @2500 PSI.
17:30 -01:30 8.00 LOG 4 RIG UP WIRELINE TRUCK AND RUN INTHE HOLE TO BACK OFF DRILLPIPEAT 6181', 3 ATTEMPTS UNSUCCESFULL, RUN INWITH FREE POINT, FREE @BACK OFF POINT, RUN INWIHT DRY PIPE ROLL SHOT - UNSUCCESSFUL,RUN IN WITH SEVERING TOOL AND PART DRILLSTRING @6181'
01:30 -05:00 3.50 TRP 3 HOLD SAFETY MEETING, RIG UP LAYDOWN MACHINEAND LAY DOWN DRILLPIPE
05:00 -06:00 1.00 RIG 2 WORK ON TOP DRIVE12/11/2009 06:00 -08:30 2.50 TRP 3 LAYDOWN DRILLSTRING
08:30- 11:00 2.50 LOG 4 HOLD SAFETY MEETING, RIG UP WIRE LINEAND RUN GAUGE RING ANDJUNK BASKET. 2 ND RUN SET RETRIEVABLE BRIDGE PLUG @5700'
11:00 - 14:00 3.00 BOP 1 NIPPLE DOWN BOPRIG RELEASED @ 14:00 HRS ON 12/10/2009
14:00-06:00 16.00 LOC 4 RIGDOWN12/15/2009 06:00 - 17:00 11.00 BOP 1 This is to finish the completion that was started by Drilling.
On 12/14/09 MIRU Basin WS to finish the completion of this well. NU BOP's. Tallytop row of tbg trailer& SIFN.
24 Hour Forecast: Willtally& rabbit in the hole w/ ret head &2-7/8" tbg &attempt topull RBP @5700'.
12/16/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/15/09 SITP & SICP = 0#. Tally & rabbit & RIH wl ret head & 2-7/8" tbg &tag &latch onto & release RBP @5700'. Well went on a vacuum. POOH w/ plug & tbg.RIH w/ production string to 6145' & SIFN.
24 Hour Forecast: Will land production string & RIH w/ rods & pump.
12/17/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/16/09 SITP & SICP = 20#. Bled off. ND BOP's. Attempt to set tbg anchor andanchor would not set @6118'. Attempt to set @6088' & 6060' &would not set.POOH wl tbg & anchor catcher. Anchor was locked up. RIH w/ new anchor catcher &production string. ND BOP's. Set anchor wl 14M# tension@6118'; tbg tail@6154'& SN @6120'. Change over to rod equipment.
24 Hour Forecast: Will run rods.
12/18/2009 06:00 - 17:00 11.00 TRP 18 This is to finish the completion that was started by Drilling.On 12/17/09 SITP & SICP = 0#. RU hot oiler & flush tbg w/ 60 bbis of productionwater w/ snake oil. Bucket test new pump & RIH wl pump & rods as listed below. Seatpump after loading water w/ 21 bbis of production waterw/ snake oil. Pressure testpump & tbg to 700# & held OK. Clamp off polish rod& RDMO Basin Well Service.Tum wellover to production department.
REC VEDI I
rinted: 12/28/2009 11:59:24 AM
CONRDENTlÁLDIV.0FOIL,GASå
Questar E & P Page 1 of 2
00NF\DEN11ALOperafons Summag Repod - N
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
12/9/2009 06:00 - 12:30 6.50 PERF 2 PERFERATE DRILLPIPE FROM 7170 TO 679512:30 -06:00 17.50 OTH WIAT ON HALLIBURTONTO DO ACID JOB
12/10/2009 06:00 -13:00 7.00 WOT 4 WAIT ON HALLIBURTONTO DO ACID JOB13:00 -15:00 2.00 STIM 1 HOLD SAFETY MEETING AND RIG UP HALLIBURTON15:00 - 17:30 2.50 STIM i PUMP 357 BBLS OF 15% HCL ACID AND FLUSH WITH 40 BBLS 2% KCL
WATER. MAXPUMP RATE WAS 7 BPM @3700 PSI, AVERAGE PUMP RATEWAS 5.4 BPM @2500 PSI.
17:30 -01:30 8.00 LOG 4 RIG UP WIRELINE TRUCK AND RUN INTHE HOLE TO BACK OFF DRILLPIPEAT 6181', 3 ATTEMPTS UNSUCCESFULL, RUN INWITH FREE POINT, FREE @BACK OFF POINT, RUN INWIHT DRY PIPE ROLL SHOT - UNSUCCESSFUL,RUN IN WITH SEVERING TOOL AND PART DRILLSTRING @6181'
01:30 -05:00 3.50 TRP 3 HOLD SAFETY MEETING, RIG UP LAYDOWN MACHINEAND LAY DOWN DRILLPIPE
05:00 -06:00 1.00 RIG 2 WORK ON TOP DRIVE12/11/2009 06:00 -08:30 2.50 TRP 3 LAYDOWN DRILLSTRING
08:30- 11:00 2.50 LOG 4 HOLD SAFETY MEETING, RIG UP WIRE LINEAND RUN GAUGE RING ANDJUNK BASKET. 2 ND RUN SET RETRIEVABLE BRIDGE PLUG @5700'
11:00 - 14:00 3.00 BOP 1 NIPPLE DOWN BOPRIG RELEASED @ 14:00 HRS ON 12/10/2009
14:00-06:00 16.00 LOC 4 RIGDOWN12/15/2009 06:00 - 17:00 11.00 BOP 1 This is to finish the completion that was started by Drilling.
On 12/14/09 MIRU Basin WS to finish the completion of this well. NU BOP's. Tallytop row of tbg trailer& SIFN.
24 Hour Forecast: Willtally& rabbit in the hole w/ ret head &2-7/8" tbg &attempt topull RBP @5700'.
12/16/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/15/09 SITP & SICP = 0#. Tally & rabbit & RIH wl ret head & 2-7/8" tbg &tag &latch onto & release RBP @5700'. Well went on a vacuum. POOH w/ plug & tbg.RIH w/ production string to 6145' & SIFN.
24 Hour Forecast: Will land production string & RIH w/ rods & pump.
12/17/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/16/09 SITP & SICP = 20#. Bled off. ND BOP's. Attempt to set tbg anchor andanchor would not set @6118'. Attempt to set @6088' & 6060' &would not set.POOH wl tbg & anchor catcher. Anchor was locked up. RIH w/ new anchor catcher &production string. ND BOP's. Set anchor wl 14M# tension@6118'; tbg tail@6154'& SN @6120'. Change over to rod equipment.
24 Hour Forecast: Will run rods.
12/18/2009 06:00 - 17:00 11.00 TRP 18 This is to finish the completion that was started by Drilling.On 12/17/09 SITP & SICP = 0#. RU hot oiler & flush tbg w/ 60 bbis of productionwater w/ snake oil. Bucket test new pump & RIH wl pump & rods as listed below. Seatpump after loading water w/ 21 bbis of production waterw/ snake oil. Pressure testpump & tbg to 700# & held OK. Clamp off polish rod& RDMO Basin Well Service.Tum wellover to production department.
REC VEDI I
rinted: 12/28/2009 11:59:24 AM
CONRDENTlÁLDIV.0FOIL,GASå
Questar E & P Page 1 of 2
00NF\DEN11ALOperafons Summag Repod - N
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
12/9/2009 06:00 - 12:30 6.50 PERF 2 PERFERATE DRILLPIPE FROM 7170 TO 679512:30 -06:00 17.50 OTH WIAT ON HALLIBURTONTO DO ACID JOB
12/10/2009 06:00 -13:00 7.00 WOT 4 WAIT ON HALLIBURTONTO DO ACID JOB13:00 -15:00 2.00 STIM 1 HOLD SAFETY MEETING AND RIG UP HALLIBURTON15:00 - 17:30 2.50 STIM i PUMP 357 BBLS OF 15% HCL ACID AND FLUSH WITH 40 BBLS 2% KCL
WATER. MAXPUMP RATE WAS 7 BPM @3700 PSI, AVERAGE PUMP RATEWAS 5.4 BPM @2500 PSI.
17:30 -01:30 8.00 LOG 4 RIG UP WIRELINE TRUCK AND RUN INTHE HOLE TO BACK OFF DRILLPIPEAT 6181', 3 ATTEMPTS UNSUCCESFULL, RUN INWITH FREE POINT, FREE @BACK OFF POINT, RUN INWIHT DRY PIPE ROLL SHOT - UNSUCCESSFUL,RUN IN WITH SEVERING TOOL AND PART DRILLSTRING @6181'
01:30 -05:00 3.50 TRP 3 HOLD SAFETY MEETING, RIG UP LAYDOWN MACHINEAND LAY DOWN DRILLPIPE
05:00 -06:00 1.00 RIG 2 WORK ON TOP DRIVE12/11/2009 06:00 -08:30 2.50 TRP 3 LAYDOWN DRILLSTRING
08:30- 11:00 2.50 LOG 4 HOLD SAFETY MEETING, RIG UP WIRE LINEAND RUN GAUGE RING ANDJUNK BASKET. 2 ND RUN SET RETRIEVABLE BRIDGE PLUG @5700'
11:00 - 14:00 3.00 BOP 1 NIPPLE DOWN BOPRIG RELEASED @ 14:00 HRS ON 12/10/2009
14:00-06:00 16.00 LOC 4 RIGDOWN12/15/2009 06:00 - 17:00 11.00 BOP 1 This is to finish the completion that was started by Drilling.
On 12/14/09 MIRU Basin WS to finish the completion of this well. NU BOP's. Tallytop row of tbg trailer& SIFN.
24 Hour Forecast: Willtally& rabbit in the hole w/ ret head &2-7/8" tbg &attempt topull RBP @5700'.
12/16/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/15/09 SITP & SICP = 0#. Tally & rabbit & RIH wl ret head & 2-7/8" tbg &tag &latch onto & release RBP @5700'. Well went on a vacuum. POOH w/ plug & tbg.RIH w/ production string to 6145' & SIFN.
24 Hour Forecast: Will land production string & RIH w/ rods & pump.
12/17/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/16/09 SITP & SICP = 20#. Bled off. ND BOP's. Attempt to set tbg anchor andanchor would not set @6118'. Attempt to set @6088' & 6060' &would not set.POOH wl tbg & anchor catcher. Anchor was locked up. RIH w/ new anchor catcher &production string. ND BOP's. Set anchor wl 14M# tension@6118'; tbg tail@6154'& SN @6120'. Change over to rod equipment.
24 Hour Forecast: Will run rods.
12/18/2009 06:00 - 17:00 11.00 TRP 18 This is to finish the completion that was started by Drilling.On 12/17/09 SITP & SICP = 0#. RU hot oiler & flush tbg w/ 60 bbis of productionwater w/ snake oil. Bucket test new pump & RIH wl pump & rods as listed below. Seatpump after loading water w/ 21 bbis of production waterw/ snake oil. Pressure testpump & tbg to 700# & held OK. Clamp off polish rod& RDMO Basin Well Service.Tum wellover to production department.
REC VEDI I
rinted: 12/28/2009 11:59:24 AM
CONRDENTlÁLDIV.0FOIL,GASå
Questar E & P Page 1 of 2
00NF\DEN11ALOperafons Summag Repod - N
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
SubDate From - To Hours Code Code Description of Operations
12/9/2009 06:00 - 12:30 6.50 PERF 2 PERFERATE DRILLPIPE FROM 7170 TO 679512:30 -06:00 17.50 OTH WIAT ON HALLIBURTONTO DO ACID JOB
12/10/2009 06:00 -13:00 7.00 WOT 4 WAIT ON HALLIBURTONTO DO ACID JOB13:00 -15:00 2.00 STIM 1 HOLD SAFETY MEETING AND RIG UP HALLIBURTON15:00 - 17:30 2.50 STIM i PUMP 357 BBLS OF 15% HCL ACID AND FLUSH WITH 40 BBLS 2% KCL
WATER. MAXPUMP RATE WAS 7 BPM @3700 PSI, AVERAGE PUMP RATEWAS 5.4 BPM @2500 PSI.
17:30 -01:30 8.00 LOG 4 RIG UP WIRELINE TRUCK AND RUN INTHE HOLE TO BACK OFF DRILLPIPEAT 6181', 3 ATTEMPTS UNSUCCESFULL, RUN INWITH FREE POINT, FREE @BACK OFF POINT, RUN INWIHT DRY PIPE ROLL SHOT - UNSUCCESSFUL,RUN IN WITH SEVERING TOOL AND PART DRILLSTRING @6181'
01:30 -05:00 3.50 TRP 3 HOLD SAFETY MEETING, RIG UP LAYDOWN MACHINEAND LAY DOWN DRILLPIPE
05:00 -06:00 1.00 RIG 2 WORK ON TOP DRIVE12/11/2009 06:00 -08:30 2.50 TRP 3 LAYDOWN DRILLSTRING
08:30- 11:00 2.50 LOG 4 HOLD SAFETY MEETING, RIG UP WIRE LINEAND RUN GAUGE RING ANDJUNK BASKET. 2 ND RUN SET RETRIEVABLE BRIDGE PLUG @5700'
11:00 - 14:00 3.00 BOP 1 NIPPLE DOWN BOPRIG RELEASED @ 14:00 HRS ON 12/10/2009
14:00-06:00 16.00 LOC 4 RIGDOWN12/15/2009 06:00 - 17:00 11.00 BOP 1 This is to finish the completion that was started by Drilling.
On 12/14/09 MIRU Basin WS to finish the completion of this well. NU BOP's. Tallytop row of tbg trailer& SIFN.
24 Hour Forecast: Willtally& rabbit in the hole w/ ret head &2-7/8" tbg &attempt topull RBP @5700'.
12/16/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/15/09 SITP & SICP = 0#. Tally & rabbit & RIH wl ret head & 2-7/8" tbg &tag &latch onto & release RBP @5700'. Well went on a vacuum. POOH w/ plug & tbg.RIH w/ production string to 6145' & SIFN.
24 Hour Forecast: Will land production string & RIH w/ rods & pump.
12/17/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/16/09 SITP & SICP = 20#. Bled off. ND BOP's. Attempt to set tbg anchor andanchor would not set @6118'. Attempt to set @6088' & 6060' &would not set.POOH wl tbg & anchor catcher. Anchor was locked up. RIH w/ new anchor catcher &production string. ND BOP's. Set anchor wl 14M# tension@6118'; tbg tail@6154'& SN @6120'. Change over to rod equipment.
24 Hour Forecast: Will run rods.
12/18/2009 06:00 - 17:00 11.00 TRP 18 This is to finish the completion that was started by Drilling.On 12/17/09 SITP & SICP = 0#. RU hot oiler & flush tbg w/ 60 bbis of productionwater w/ snake oil. Bucket test new pump & RIH wl pump & rods as listed below. Seatpump after loading water w/ 21 bbis of production waterw/ snake oil. Pressure testpump & tbg to 700# & held OK. Clamp off polish rod& RDMO Basin Well Service.Tum wellover to production department.
REC VEDI I
rinted: 12/28/2009 11:59:24 AM
CONRDENTlÁLDIV.0FOIL,GASå
Questar E & P Page 2 of 2
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
12/18/2009 06:00 -17:00 11.00 TRP 18 FINAL REPORT OF WELL WORK.
LLTR: 81 BBLS
Tbg Detail (12/16/09):Pinned NC = 0.44'i jt of tbg = 31.98'SN = 1.10'B-2 Anchor Catcher = 2.69'190 jts of 2-7/8" tbg ='6102.01'
Stretch = 1.25'KB = 15'Tbg Tail @6154.47'; SN @6120.95'.B-2 Anchor Catcher w/ 14M# Tension @6118.28'. AIItbg is 2-7/8" EUE 8RD J-55,6.5#.
Rod & Pump Detail (12/17/09):Pump = 2-1/2" x 1-3/4" x 20 x 20-1/2 x 21' RHAC Weatherford #2545Rods:150 - 3/4" Plain 'D'92 - 7/8" Plain 'D'1-8'; 1-6'; 1-2' x 7/8" Ponies1-1/2" x 26' Polish Rod
RECEIVEDDEC3 1 2009
Div.0FOIL,GA3&T
CONRDENTIAËnted:12/28/2009
Questar E & P Page 2 of 2
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
12/18/2009 06:00 -17:00 11.00 TRP 18 FINAL REPORT OF WELL WORK.
LLTR: 81 BBLS
Tbg Detail (12/16/09):Pinned NC = 0.44'i jt of tbg = 31.98'SN = 1.10'B-2 Anchor Catcher = 2.69'190 jts of 2-7/8" tbg ='6102.01'
Stretch = 1.25'KB = 15'Tbg Tail @6154.47'; SN @6120.95'.B-2 Anchor Catcher w/ 14M# Tension @6118.28'. AIItbg is 2-7/8" EUE 8RD J-55,6.5#.
Rod & Pump Detail (12/17/09):Pump = 2-1/2" x 1-3/4" x 20 x 20-1/2 x 21' RHAC Weatherford #2545Rods:150 - 3/4" Plain 'D'92 - 7/8" Plain 'D'1-8'; 1-6'; 1-2' x 7/8" Ponies1-1/2" x 26' Polish Rod
RECEIVED
DEC3 1 2009
Div.0FOIL,GA3&T
CONRDENTIAËnted:12/28/2009
Questar E & P Page 2 of 2
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
12/18/2009 06:00 -17:00 11.00 TRP 18 FINAL REPORT OF WELL WORK.
LLTR: 81 BBLS
Tbg Detail (12/16/09):Pinned NC = 0.44'i jt of tbg = 31.98'SN = 1.10'B-2 Anchor Catcher = 2.69'190 jts of 2-7/8" tbg ='6102.01'
Stretch = 1.25'KB = 15'Tbg Tail @6154.47'; SN @6120.95'.B-2 Anchor Catcher w/ 14M# Tension @6118.28'. AIItbg is 2-7/8" EUE 8RD J-55,6.5#.
Rod & Pump Detail (12/17/09):Pump = 2-1/2" x 1-3/4" x 20 x 20-1/2 x 21' RHAC Weatherford #2545Rods:150 - 3/4" Plain 'D'92 - 7/8" Plain 'D'1-8'; 1-6'; 1-2' x 7/8" Ponies1-1/2" x 26' Polish Rod
RECEIVEDDEC3 1 2009
Div.0FOIL,GA3&T
CONRDENTIAËnted:12/28/2009
Questar E & P Page 2 of 2
Operations Summary Report
Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777
Date From - To Hours Code CSu Description of Operations
12/18/2009 06:00 -17:00 11.00 TRP 18 FINAL REPORT OF WELL WORK.
LLTR: 81 BBLS
Tbg Detail (12/16/09):Pinned NC = 0.44'i jt of tbg = 31.98'SN = 1.10'B-2 Anchor Catcher = 2.69'190 jts of 2-7/8" tbg ='6102.01'
Stretch = 1.25'KB = 15'Tbg Tail @6154.47'; SN @6120.95'.B-2 Anchor Catcher w/ 14M# Tension @6118.28'. AIItbg is 2-7/8" EUE 8RD J-55,6.5#.
Rod & Pump Detail (12/17/09):Pump = 2-1/2" x 1-3/4" x 20 x 20-1/2 x 21' RHAC Weatherford #2545Rods:150 - 3/4" Plain 'D'92 - 7/8" Plain 'D'1-8'; 1-6'; 1-2' x 7/8" Ponies1-1/2" x 26' Polish Rod
RECEIVEDDEC3 1 2009
Div.0FOIL,GA3&T
CONRDENTIAËnted:12/28/2009
CONFilENTIR
UESER
QUESTAR EXPLORATION ANDPRODUCTIONUINTAH COUNTY, UTAHBBS 15G-22-7-21BBS 15G-22-7-21
BBS 15G-22-7-21
Survey: Survey #3 ST2
Standard Survey Report03 December, 2009
RECEIVEDJAN26 2010
DIV.0FOIL,GAS&MINING
CONFilENTIR
UESER
QUESTAR EXPLORATION ANDPRODUCTIONUINTAH COUNTY, UTAHBBS 15G-22-7-21BBS 15G-22-7-21
BBS 15G-22-7-21
Survey: Survey #3 ST2
Standard Survey Report03 December, 2009
RECEIVEDJAN26 2010
DIV.0FOIL,GAS&MINING
CONFilENTIR
UESER
QUESTAR EXPLORATION ANDPRODUCTIONUINTAH COUNTY, UTAHBBS 15G-22-7-21BBS 15G-22-7-21
BBS 15G-22-7-21
Survey: Survey #3 ST2
Standard Survey Report03 December, 2009
RECEIVEDJAN26 2010
DIV.0FOIL,GAS&MINING
CONFilENTIR
UESER
QUESTAR EXPLORATION ANDPRODUCTIONUINTAH COUNTY, UTAHBBS 15G-22-7-21BBS 15G-22-7-21
BBS 15G-22-7-21
Survey: Survey #3 ST2
Standard Survey Report03 December, 2009
RECEIVEDJAN26 2010
DIV.0FOIL,GAS&MINING
CONFilENTIALWeatherford International Ltd. gONEMAR Survey Report Weatherford
Company: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAHCOUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db
Project UINTAH COUNTY, UTAH RECEIVEDMap System: US State Plane 1983 System Datum: Mean Sea Level ¡ 4 e gaggGeo Datum: North American Datum 1983 J (-0 LUIUMap Zone: Utah Central Zone
UMOFOlL,GM ã MlllllKSite BBS 1SG-22-7-21
Site Position: Northing: 7,244,345.81ft Latitude: 40° 11'28.040 NFrom: Lat/Long Easting: 2,188,149.35ft Longitude: 109° 32' 20.960 WPosition Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 1.26 °
Well BBS 15G-22-7-21
Well Position +NI-S 0.00 ft Northing: 7,244,345.81 ft Latitude: 40° 11' 28.040 N+El-W 0.00 ft Easting: 2,188,149.35 ft Longitude: 109° 32' 20.960 W
Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 4,909.00ft
Wellbore BBS 15G-22-7-21
Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)BGGM2009 10/28/2009 11.36 66.08 52,601
Design BBS 15G-22-7-21
Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00
Vertical Section: Depth From (TVD) +NI-S +El-W Direction(ft) (ft) (ft) (*)
0.00 0.00 0.00 179.39
Survey Program Date 12/3/2009From To
(ft) (ft) Survey (Wellbore) Tool Name Description
100.00 6,160.00 Survey#1 (BBS15G-22-7-21) NS-GYRO-MS North sensing gyrocompassing m/s6,211.00 6,653.00 Survey #2 (BBS15G-22-7-21) MWD MWD - Standard6,687.00 7,065.00 Survey #3 ST1 (BBS15G-22-7-21) MWD MWD - Standard
Survey
Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate
(ft) (°) (°) (It) (ft) (ft) (ft) (°l100ft) (°I100ft) (°l100ft)
TIE ON ST#26,719.00 78.92 167.09 6,547.10 -464.15 103.81 465.24 0.00 0.00 0.006,722.00 79.40 167.13 6,547.66 -467.02 104.47 468.11 16.05 16.00 1.336,754.00 78.60 170.07 6,553.77 -497.81 110.68 498.97 9.36 -2.50 9.196,786.00 83.62 168.34 6,558.72 -528.85 116.60 530.07 16.57 15.69 -5.41
6,817.00 85.22 168.49 6,561.73 -559.08 122.79 560.36 5.18 5.16 0.48
6,848.00 90.20 168.18 6,562.97 -589.40 129.06 590.75 16.10 16.06 -1.00
6,879.00 92.55 169.34 6,562.22 -619.80 135.10 621.21 8.45 7.58 3.746,911.00 91.06 168.40 6,561.22 -651.18 141.27 652.66 5.50 -4.66 -2.94
6,943.00 90.66 167.89 6,560.74 -682.49 147.84 684.04 2.03 -1.25 -1.59
6,974.00 92.15 167.62 6,559.98 -712.78 154.42 714.39 4.88 4.81 -0.87
12/3/2009 8:26:32AM Page 2 COMPASS 2003.21 Build
CONFilENTIALWeatherford International Ltd. gONEMAR Survey Report Weatherford
Company: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAHCOUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db
Project UINTAH COUNTY, UTAH RECEIVEDMap System: US State Plane 1983 System Datum: Mean Sea Level ¡ 4 e gaggGeo Datum: North American Datum 1983 J (-0 LUIUMap Zone: Utah Central Zone
UMOFOlL,GM ã MlllllKSite BBS 1SG-22-7-21
Site Position: Northing: 7,244,345.81ft Latitude: 40° 11'28.040 NFrom: Lat/Long Easting: 2,188,149.35ft Longitude: 109° 32' 20.960 WPosition Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 1.26 °
Well BBS 15G-22-7-21
Well Position +NI-S 0.00 ft Northing: 7,244,345.81 ft Latitude: 40° 11' 28.040 N+El-W 0.00 ft Easting: 2,188,149.35 ft Longitude: 109° 32' 20.960 W
Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 4,909.00ft
Wellbore BBS 15G-22-7-21
Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)
BGGM2009 10/28/2009 11.36 66.08 52,601
Design BBS 15G-22-7-21
Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00
Vertical Section: Depth From (TVD) +NI-S +El-W Direction(ft) (ft) (ft) (*)
0.00 0.00 0.00 179.39
Survey Program Date 12/3/2009
From To(ft) (ft) Survey (Wellbore) Tool Name Description
100.00 6,160.00 Survey#1 (BBS15G-22-7-21) NS-GYRO-MS North sensing gyrocompassing m/s6,211.00 6,653.00 Survey #2 (BBS15G-22-7-21) MWD MWD - Standard6,687.00 7,065.00 Survey #3 ST1 (BBS15G-22-7-21) MWD MWD - Standard
Survey
Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate
(ft) (°) (°) (It) (ft) (ft) (ft) (°l100ft) (°I100ft) (°l100ft)
TIE ON ST#26,719.00 78.92 167.09 6,547.10 -464.15 103.81 465.24 0.00 0.00 0.006,722.00 79.40 167.13 6,547.66 -467.02 104.47 468.11 16.05 16.00 1.336,754.00 78.60 170.07 6,553.77 -497.81 110.68 498.97 9.36 -2.50 9.196,786.00 83.62 168.34 6,558.72 -528.85 116.60 530.07 16.57 15.69 -5.41
6,817.00 85.22 168.49 6,561.73 -559.08 122.79 560.36 5.18 5.16 0.48
6,848.00 90.20 168.18 6,562.97 -589.40 129.06 590.75 16.10 16.06 -1.00
6,879.00 92.55 169.34 6,562.22 -619.80 135.10 621.21 8.45 7.58 3.746,911.00 91.06 168.40 6,561.22 -651.18 141.27 652.66 5.50 -4.66 -2.94
6,943.00 90.66 167.89 6,560.74 -682.49 147.84 684.04 2.03 -1.25 -1.59
6,974.00 92.15 167.62 6,559.98 -712.78 154.42 714.39 4.88 4.81 -0.87
12/3/2009 8:26:32AM Page 2 COMPASS 2003.21 Build
CONFilENTIALWeatherford International Ltd. gONEMAR Survey Report Weatherford
Company: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAHCOUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db
Project UINTAH COUNTY, UTAH RECEIVEDMap System: US State Plane 1983 System Datum: Mean Sea Level ¡ 4 e gaggGeo Datum: North American Datum 1983 J (-0 LUIUMap Zone: Utah Central Zone
UMOFOlL,GM ã MlllllKSite BBS 1SG-22-7-21
Site Position: Northing: 7,244,345.81ft Latitude: 40° 11'28.040 NFrom: Lat/Long Easting: 2,188,149.35ft Longitude: 109° 32' 20.960 WPosition Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 1.26 °
Well BBS 15G-22-7-21
Well Position +NI-S 0.00 ft Northing: 7,244,345.81 ft Latitude: 40° 11' 28.040 N+El-W 0.00 ft Easting: 2,188,149.35 ft Longitude: 109° 32' 20.960 W
Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 4,909.00ft
Wellbore BBS 15G-22-7-21
Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)BGGM2009 10/28/2009 11.36 66.08 52,601
Design BBS 15G-22-7-21
Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00
Vertical Section: Depth From (TVD) +NI-S +El-W Direction(ft) (ft) (ft) (*)
0.00 0.00 0.00 179.39
Survey Program Date 12/3/2009From To
(ft) (ft) Survey (Wellbore) Tool Name Description
100.00 6,160.00 Survey#1 (BBS15G-22-7-21) NS-GYRO-MS North sensing gyrocompassing m/s6,211.00 6,653.00 Survey #2 (BBS15G-22-7-21) MWD MWD - Standard6,687.00 7,065.00 Survey #3 ST1 (BBS15G-22-7-21) MWD MWD - Standard
Survey
Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate
(ft) (°) (°) (It) (ft) (ft) (ft) (°l100ft) (°I100ft) (°l100ft)
TIE ON ST#26,719.00 78.92 167.09 6,547.10 -464.15 103.81 465.24 0.00 0.00 0.006,722.00 79.40 167.13 6,547.66 -467.02 104.47 468.11 16.05 16.00 1.336,754.00 78.60 170.07 6,553.77 -497.81 110.68 498.97 9.36 -2.50 9.196,786.00 83.62 168.34 6,558.72 -528.85 116.60 530.07 16.57 15.69 -5.41
6,817.00 85.22 168.49 6,561.73 -559.08 122.79 560.36 5.18 5.16 0.48
6,848.00 90.20 168.18 6,562.97 -589.40 129.06 590.75 16.10 16.06 -1.00
6,879.00 92.55 169.34 6,562.22 -619.80 135.10 621.21 8.45 7.58 3.746,911.00 91.06 168.40 6,561.22 -651.18 141.27 652.66 5.50 -4.66 -2.94
6,943.00 90.66 167.89 6,560.74 -682.49 147.84 684.04 2.03 -1.25 -1.59
6,974.00 92.15 167.62 6,559.98 -712.78 154.42 714.39 4.88 4.81 -0.87
12/3/2009 8:26:32AM Page 2 COMPASS 2003.21 Build
CONFilENTIALWeatherford International Ltd. gONEMAR Survey Report Weatherford
Company: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAHCOUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db
Project UINTAH COUNTY, UTAH RECEIVEDMap System: US State Plane 1983 System Datum: Mean Sea Level ¡ 4 e gaggGeo Datum: North American Datum 1983 J (-0 LUIUMap Zone: Utah Central Zone
UMOFOlL,GM ã MlllllKSite BBS 1SG-22-7-21
Site Position: Northing: 7,244,345.81ft Latitude: 40° 11'28.040 NFrom: Lat/Long Easting: 2,188,149.35ft Longitude: 109° 32' 20.960 WPosition Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 1.26 °
Well BBS 15G-22-7-21
Well Position +NI-S 0.00 ft Northing: 7,244,345.81 ft Latitude: 40° 11' 28.040 N+El-W 0.00 ft Easting: 2,188,149.35 ft Longitude: 109° 32' 20.960 W
Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 4,909.00ft
Wellbore BBS 15G-22-7-21
Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)BGGM2009 10/28/2009 11.36 66.08 52,601
Design BBS 15G-22-7-21
Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00
Vertical Section: Depth From (TVD) +NI-S +El-W Direction(ft) (ft) (ft) (*)
0.00 0.00 0.00 179.39
Survey Program Date 12/3/2009From To
(ft) (ft) Survey (Wellbore) Tool Name Description
100.00 6,160.00 Survey#1 (BBS15G-22-7-21) NS-GYRO-MS North sensing gyrocompassing m/s6,211.00 6,653.00 Survey #2 (BBS15G-22-7-21) MWD MWD - Standard6,687.00 7,065.00 Survey #3 ST1 (BBS15G-22-7-21) MWD MWD - Standard
Survey
Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate
(ft) (°) (°) (It) (ft) (ft) (ft) (°l100ft) (°I100ft) (°l100ft)
TIE ON ST#26,719.00 78.92 167.09 6,547.10 -464.15 103.81 465.24 0.00 0.00 0.006,722.00 79.40 167.13 6,547.66 -467.02 104.47 468.11 16.05 16.00 1.336,754.00 78.60 170.07 6,553.77 -497.81 110.68 498.97 9.36 -2.50 9.196,786.00 83.62 168.34 6,558.72 -528.85 116.60 530.07 16.57 15.69 -5.41
6,817.00 85.22 168.49 6,561.73 -559.08 122.79 560.36 5.18 5.16 0.48
6,848.00 90.20 168.18 6,562.97 -589.40 129.06 590.75 16.10 16.06 -1.00
6,879.00 92.55 169.34 6,562.22 -619.80 135.10 621.21 8.45 7.58 3.746,911.00 91.06 168.40 6,561.22 -651.18 141.27 652.66 5.50 -4.66 -2.94
6,943.00 90.66 167.89 6,560.74 -682.49 147.84 684.04 2.03 -1.25 -1.59
6,974.00 92.15 167.62 6,559.98 -712.78 154.42 714.39 4.88 4.81 -0.87
12/3/2009 8:26:32AM Page 2 COMPASS 2003.21 Build
Weatherford International Ltd. gUEXAR Survey Report .WeatherlordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVDReference: WELL @4924.00ft (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db
Survey
Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate
(II) (°) (°) (II) (ft) (ft) (ft) (°ITOOft) (°I100ft) (*Ii00ft)
7,006.00 93.86 167.90 6,558.30 -744.01 161.19 745.69 5.41 5.34 0.887,037.00 93.05 167.91 6,556.43 -774.26 167.67 776.02 2.61 -2.61 0.037,069.00 91.57 167.12 6,555.14 -805.48 174.59 807.30 5.24 -4.63 -2.47
7,100.00 90.71 167.20 6,554.52 -835.70 181.47 837.59 2.79 -2.77 0.267,132.00 92.77 165.98 6,553.55 -866.81 188.89 868.78 7.48 6.44 -3.81
7,164.00 91.23 165.94 6,552.44 -897.83 196.65 899.89 4.81 -4.81 -0.13
7,195.00 94.71 165.12 6,550.83 -927.80 204.38 929.94 11.53 11.23 -2.65
7,226.00 95.47 165.97 6,548.08 -957.70 212.09 959.92 3.67 2.45 2.747,258.00 92.49 164.84 6,545.86 -988.59 220.13 990.90 9.96 -9.31 -3.53
7,289.00 93.57 164.34 6,544.22 -1,018.44 228.36 1,020.83 3.84 3.48 -1.61
7,321.00 95.81 163.98 6,541.60 -1,049.12 237.07 1,051.60 7.09 7.00 -1.13
7,353.00 92.03 164.18 6,539.42 -1,079.81 245.82 1,082.38 11.83 -11.81 0.637,384.00 89.74 162.71 6,538.94 -1,109.52 254.65 1,112.19 8.78 -7.39 -4.74
7,416.00 93.46 163.89 6,538.04 -1,140.15 263.84 1,142.91 12.20 11.63 3.697,447.00 94.20 162.54 6,535.97 -1,169.76 272.77 1,172.62 4.96 2.39 -4.35
7,479.00 91.28 162.11 6,534.44 -1,200.22 282.48 1,203.17 9.22 -9.13 -1.34
7,497.00 91.51 161.82 6,534.00 -1,217.33 288.05 1,220.34 2.06 1.28 -1.61
7,528.00 91.46 161.45 6,533.20 -1,246.74 297.81 1,249.86 1.20 -0.16 -1.19
7,560.00 92.60 161.60 6,532.07 -1,277.07 307.95 1,280.30 3.59 3.56 0.477,592.00 93.34 162.16 6,530.41 -1,307.44 317.89 1,310.77 2.90 2.31 1.75
7,623.00 91.86 161.93 6,529.00 -1,336.90 327.43 1,340.33 4.83 -4.77 -0.74
7,655.00 91.40 161.37 6,528.09 -1,367.26 337.50 1,370.80 2.26 -1.44 -1.75
7,686.00 92.60 160.66 6,527.01 -1,396.55 347.58 1,400.20 4.50 3.87 -2.29
7,718.00 95.17 160.98 6,524.84 -1,426.71 358.07 1,430.46 8.09 8.03 1.007,749.00 95.11 160.87 6,522.07 -1,455.89 368.16 1,459.75 0.40 -0.19 -0.35
7,781.00 94.48 159.85 6,519.39 -1,485.92 378.88 1,489.89 3.74 -1.97 -3.19
7,813.00 93.29 161.10 6,517.22 -1,516.01 389.55 1,520.10 5.39 -3.72 3.917,844.00 92.54 159.08 6,515.65 -1,545.12 400.09 1,549.31 6.94 -2.42 -6.52
7,876.00 91.40 156.90 6,514.55 -1,574.76 412.07 1,579.09 7.68 -3.56 -6.81
7,907.00 92.94 155.36 6,513.37 -1,603.09 424.61 1,607.55 7.02 4.97 -4.97
7,970.00 90.71 152.00 6,511.37 -1,659.52 452.52 1,664.27 6.40 -3.54 -5.33
8,033.00 91.85 150.28 6,509.96 -1,714.68 482.92 1,719.75 3.27 1.81 -2.73
8,065.00 93.52 149.18 6,508.46 -1,742.28 499.03 1,747.53 6.25 5.22 -3.44
8,096.00 94.09 149.71 6,506.40 -1,768.92 514.76 1,774.33 2.51 1.84 1.718,128.00 91.74 149.87 6,504.78 -1,796.54 530.84 1,802.12 7.36 -7.34 0.508,159.00 92.66 151.23 6,503.59 -1,823.51 546.07 1,829.26 5.29 2.97 4.398,190.00 91.74 151.11 6,502.39 -1,850.65 561.00 1,856.55 2.99 -2.97 -0.39
8,222.00 91.57 151.37 6,501.47 -1,878.69 576.39 1,884.76 0.97 -0.53 0.818,253.00 92.66 152.52 6,500.33 -1,906.02 590.96 1,912.25 5.11 3.52 3.718,285.00 93.57 152.84 6,498.59 -1,934.41 605.63 1,940.79 3.01 2.84 1.00
8,316.00 93.05 153.01 6,496.80 -1,961.97 619.72 1,968.50 1.76 -1.68 0.558,348.00 95.06 154.92 6,494.54 -1,990.65 633.72 1,997.32 8.65 6.28 5.978,380.00 91.57 154.94 6,492.68 -2,019.58 647.26 2,026.40 10.91 -10.91 0.068,411.00 92.03 156.38 6,491.71 -2,047.81 660.03 2,054.77 4.87 1.48 4.658,443.00 93.92 158.21 6,490.05 -2,077.29 672.36 2,084.37 8.22 5.91 5.72
8,475.00 91.57 159.83 6,488.52 -2,107.13 683.81 2,114.34 8.92 -7.34 5.068,506.00 89.12 161.93 6,488.33 -2,136.41 693.96 2,143.73 10.41 -7.90 6.778,538.00 88.77 162.01 6,488.92 -2,166.84 703.86 2,174.26 1.12 -1.09 0.258,569.00 90.94 159.83 6,489.00 -2,196.13 713.99 2,203.66 9.92 7.00 -7.03
8,601.00 94.25 160.14 6,487.55 -2,226.16 724.93 2,233.80 10.39 10.34 0.978,632.00 95.86 157.84 6,484.82 -2,254.99 736.00 2,262.74 9.03 5.19 -7.42
8,664.00 94.02 157.50 6,482.06 -2,284.48 748.12 2,292.36 5.85 -5.75 -1.06
8,696.00 91.51 158.25 6,480.52 -2,314.08 760.15 2,322.10 8.19 -7.84 2.348,727.00 92.59 157.34 6,479.41 -2,342.76 771.86 2,350.90 4.55 3.48 -2.94
12/3/2009 8:26:32AM Page 3 COMPASS 2003.21 Build
Weatherford International Ltd. gUEXAR Survey Report .WeatherlordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVDReference: WELL @4924.00ft (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db
Survey
Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate
(II) (°) (°) (II) (ft) (ft) (ft) (°ITOOft) (°I100ft) (*Ii00ft)
7,006.00 93.86 167.90 6,558.30 -744.01 161.19 745.69 5.41 5.34 0.887,037.00 93.05 167.91 6,556.43 -774.26 167.67 776.02 2.61 -2.61 0.037,069.00 91.57 167.12 6,555.14 -805.48 174.59 807.30 5.24 -4.63 -2.47
7,100.00 90.71 167.20 6,554.52 -835.70 181.47 837.59 2.79 -2.77 0.267,132.00 92.77 165.98 6,553.55 -866.81 188.89 868.78 7.48 6.44 -3.81
7,164.00 91.23 165.94 6,552.44 -897.83 196.65 899.89 4.81 -4.81 -0.13
7,195.00 94.71 165.12 6,550.83 -927.80 204.38 929.94 11.53 11.23 -2.65
7,226.00 95.47 165.97 6,548.08 -957.70 212.09 959.92 3.67 2.45 2.747,258.00 92.49 164.84 6,545.86 -988.59 220.13 990.90 9.96 -9.31 -3.53
7,289.00 93.57 164.34 6,544.22 -1,018.44 228.36 1,020.83 3.84 3.48 -1.61
7,321.00 95.81 163.98 6,541.60 -1,049.12 237.07 1,051.60 7.09 7.00 -1.13
7,353.00 92.03 164.18 6,539.42 -1,079.81 245.82 1,082.38 11.83 -11.81 0.637,384.00 89.74 162.71 6,538.94 -1,109.52 254.65 1,112.19 8.78 -7.39 -4.74
7,416.00 93.46 163.89 6,538.04 -1,140.15 263.84 1,142.91 12.20 11.63 3.697,447.00 94.20 162.54 6,535.97 -1,169.76 272.77 1,172.62 4.96 2.39 -4.35
7,479.00 91.28 162.11 6,534.44 -1,200.22 282.48 1,203.17 9.22 -9.13 -1.34
7,497.00 91.51 161.82 6,534.00 -1,217.33 288.05 1,220.34 2.06 1.28 -1.61
7,528.00 91.46 161.45 6,533.20 -1,246.74 297.81 1,249.86 1.20 -0.16 -1.19
7,560.00 92.60 161.60 6,532.07 -1,277.07 307.95 1,280.30 3.59 3.56 0.477,592.00 93.34 162.16 6,530.41 -1,307.44 317.89 1,310.77 2.90 2.31 1.75
7,623.00 91.86 161.93 6,529.00 -1,336.90 327.43 1,340.33 4.83 -4.77 -0.74
7,655.00 91.40 161.37 6,528.09 -1,367.26 337.50 1,370.80 2.26 -1.44 -1.75
7,686.00 92.60 160.66 6,527.01 -1,396.55 347.58 1,400.20 4.50 3.87 -2.29
7,718.00 95.17 160.98 6,524.84 -1,426.71 358.07 1,430.46 8.09 8.03 1.007,749.00 95.11 160.87 6,522.07 -1,455.89 368.16 1,459.75 0.40 -0.19 -0.35
7,781.00 94.48 159.85 6,519.39 -1,485.92 378.88 1,489.89 3.74 -1.97 -3.19
7,813.00 93.29 161.10 6,517.22 -1,516.01 389.55 1,520.10 5.39 -3.72 3.917,844.00 92.54 159.08 6,515.65 -1,545.12 400.09 1,549.31 6.94 -2.42 -6.52
7,876.00 91.40 156.90 6,514.55 -1,574.76 412.07 1,579.09 7.68 -3.56 -6.81
7,907.00 92.94 155.36 6,513.37 -1,603.09 424.61 1,607.55 7.02 4.97 -4.97
7,970.00 90.71 152.00 6,511.37 -1,659.52 452.52 1,664.27 6.40 -3.54 -5.33
8,033.00 91.85 150.28 6,509.96 -1,714.68 482.92 1,719.75 3.27 1.81 -2.73
8,065.00 93.52 149.18 6,508.46 -1,742.28 499.03 1,747.53 6.25 5.22 -3.44
8,096.00 94.09 149.71 6,506.40 -1,768.92 514.76 1,774.33 2.51 1.84 1.718,128.00 91.74 149.87 6,504.78 -1,796.54 530.84 1,802.12 7.36 -7.34 0.508,159.00 92.66 151.23 6,503.59 -1,823.51 546.07 1,829.26 5.29 2.97 4.398,190.00 91.74 151.11 6,502.39 -1,850.65 561.00 1,856.55 2.99 -2.97 -0.39
8,222.00 91.57 151.37 6,501.47 -1,878.69 576.39 1,884.76 0.97 -0.53 0.818,253.00 92.66 152.52 6,500.33 -1,906.02 590.96 1,912.25 5.11 3.52 3.718,285.00 93.57 152.84 6,498.59 -1,934.41 605.63 1,940.79 3.01 2.84 1.00
8,316.00 93.05 153.01 6,496.80 -1,961.97 619.72 1,968.50 1.76 -1.68 0.558,348.00 95.06 154.92 6,494.54 -1,990.65 633.72 1,997.32 8.65 6.28 5.978,380.00 91.57 154.94 6,492.68 -2,019.58 647.26 2,026.40 10.91 -10.91 0.068,411.00 92.03 156.38 6,491.71 -2,047.81 660.03 2,054.77 4.87 1.48 4.658,443.00 93.92 158.21 6,490.05 -2,077.29 672.36 2,084.37 8.22 5.91 5.72
8,475.00 91.57 159.83 6,488.52 -2,107.13 683.81 2,114.34 8.92 -7.34 5.068,506.00 89.12 161.93 6,488.33 -2,136.41 693.96 2,143.73 10.41 -7.90 6.778,538.00 88.77 162.01 6,488.92 -2,166.84 703.86 2,174.26 1.12 -1.09 0.258,569.00 90.94 159.83 6,489.00 -2,196.13 713.99 2,203.66 9.92 7.00 -7.03
8,601.00 94.25 160.14 6,487.55 -2,226.16 724.93 2,233.80 10.39 10.34 0.978,632.00 95.86 157.84 6,484.82 -2,254.99 736.00 2,262.74 9.03 5.19 -7.42
8,664.00 94.02 157.50 6,482.06 -2,284.48 748.12 2,292.36 5.85 -5.75 -1.06
8,696.00 91.51 158.25 6,480.52 -2,314.08 760.15 2,322.10 8.19 -7.84 2.348,727.00 92.59 157.34 6,479.41 -2,342.76 771.86 2,350.90 4.55 3.48 -2.94
12/3/2009 8:26:32AM Page 3 COMPASS 2003.21 Build
Weatherford International Ltd. gUEXAR Survey Report .WeatherlordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVDReference: WELL @4924.00ft (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db
Survey
Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate
(II) (°) (°) (II) (ft) (ft) (ft) (°ITOOft) (°I100ft) (*Ii00ft)
7,006.00 93.86 167.90 6,558.30 -744.01 161.19 745.69 5.41 5.34 0.887,037.00 93.05 167.91 6,556.43 -774.26 167.67 776.02 2.61 -2.61 0.037,069.00 91.57 167.12 6,555.14 -805.48 174.59 807.30 5.24 -4.63 -2.47
7,100.00 90.71 167.20 6,554.52 -835.70 181.47 837.59 2.79 -2.77 0.267,132.00 92.77 165.98 6,553.55 -866.81 188.89 868.78 7.48 6.44 -3.81
7,164.00 91.23 165.94 6,552.44 -897.83 196.65 899.89 4.81 -4.81 -0.13
7,195.00 94.71 165.12 6,550.83 -927.80 204.38 929.94 11.53 11.23 -2.65
7,226.00 95.47 165.97 6,548.08 -957.70 212.09 959.92 3.67 2.45 2.747,258.00 92.49 164.84 6,545.86 -988.59 220.13 990.90 9.96 -9.31 -3.53
7,289.00 93.57 164.34 6,544.22 -1,018.44 228.36 1,020.83 3.84 3.48 -1.61
7,321.00 95.81 163.98 6,541.60 -1,049.12 237.07 1,051.60 7.09 7.00 -1.13
7,353.00 92.03 164.18 6,539.42 -1,079.81 245.82 1,082.38 11.83 -11.81 0.637,384.00 89.74 162.71 6,538.94 -1,109.52 254.65 1,112.19 8.78 -7.39 -4.74
7,416.00 93.46 163.89 6,538.04 -1,140.15 263.84 1,142.91 12.20 11.63 3.697,447.00 94.20 162.54 6,535.97 -1,169.76 272.77 1,172.62 4.96 2.39 -4.35
7,479.00 91.28 162.11 6,534.44 -1,200.22 282.48 1,203.17 9.22 -9.13 -1.34
7,497.00 91.51 161.82 6,534.00 -1,217.33 288.05 1,220.34 2.06 1.28 -1.61
7,528.00 91.46 161.45 6,533.20 -1,246.74 297.81 1,249.86 1.20 -0.16 -1.19
7,560.00 92.60 161.60 6,532.07 -1,277.07 307.95 1,280.30 3.59 3.56 0.477,592.00 93.34 162.16 6,530.41 -1,307.44 317.89 1,310.77 2.90 2.31 1.75
7,623.00 91.86 161.93 6,529.00 -1,336.90 327.43 1,340.33 4.83 -4.77 -0.74
7,655.00 91.40 161.37 6,528.09 -1,367.26 337.50 1,370.80 2.26 -1.44 -1.75
7,686.00 92.60 160.66 6,527.01 -1,396.55 347.58 1,400.20 4.50 3.87 -2.29
7,718.00 95.17 160.98 6,524.84 -1,426.71 358.07 1,430.46 8.09 8.03 1.007,749.00 95.11 160.87 6,522.07 -1,455.89 368.16 1,459.75 0.40 -0.19 -0.35
7,781.00 94.48 159.85 6,519.39 -1,485.92 378.88 1,489.89 3.74 -1.97 -3.19
7,813.00 93.29 161.10 6,517.22 -1,516.01 389.55 1,520.10 5.39 -3.72 3.917,844.00 92.54 159.08 6,515.65 -1,545.12 400.09 1,549.31 6.94 -2.42 -6.52
7,876.00 91.40 156.90 6,514.55 -1,574.76 412.07 1,579.09 7.68 -3.56 -6.81
7,907.00 92.94 155.36 6,513.37 -1,603.09 424.61 1,607.55 7.02 4.97 -4.97
7,970.00 90.71 152.00 6,511.37 -1,659.52 452.52 1,664.27 6.40 -3.54 -5.33
8,033.00 91.85 150.28 6,509.96 -1,714.68 482.92 1,719.75 3.27 1.81 -2.73
8,065.00 93.52 149.18 6,508.46 -1,742.28 499.03 1,747.53 6.25 5.22 -3.44
8,096.00 94.09 149.71 6,506.40 -1,768.92 514.76 1,774.33 2.51 1.84 1.718,128.00 91.74 149.87 6,504.78 -1,796.54 530.84 1,802.12 7.36 -7.34 0.508,159.00 92.66 151.23 6,503.59 -1,823.51 546.07 1,829.26 5.29 2.97 4.398,190.00 91.74 151.11 6,502.39 -1,850.65 561.00 1,856.55 2.99 -2.97 -0.39
8,222.00 91.57 151.37 6,501.47 -1,878.69 576.39 1,884.76 0.97 -0.53 0.818,253.00 92.66 152.52 6,500.33 -1,906.02 590.96 1,912.25 5.11 3.52 3.718,285.00 93.57 152.84 6,498.59 -1,934.41 605.63 1,940.79 3.01 2.84 1.00
8,316.00 93.05 153.01 6,496.80 -1,961.97 619.72 1,968.50 1.76 -1.68 0.558,348.00 95.06 154.92 6,494.54 -1,990.65 633.72 1,997.32 8.65 6.28 5.978,380.00 91.57 154.94 6,492.68 -2,019.58 647.26 2,026.40 10.91 -10.91 0.068,411.00 92.03 156.38 6,491.71 -2,047.81 660.03 2,054.77 4.87 1.48 4.658,443.00 93.92 158.21 6,490.05 -2,077.29 672.36 2,084.37 8.22 5.91 5.72
8,475.00 91.57 159.83 6,488.52 -2,107.13 683.81 2,114.34 8.92 -7.34 5.068,506.00 89.12 161.93 6,488.33 -2,136.41 693.96 2,143.73 10.41 -7.90 6.778,538.00 88.77 162.01 6,488.92 -2,166.84 703.86 2,174.26 1.12 -1.09 0.258,569.00 90.94 159.83 6,489.00 -2,196.13 713.99 2,203.66 9.92 7.00 -7.03
8,601.00 94.25 160.14 6,487.55 -2,226.16 724.93 2,233.80 10.39 10.34 0.978,632.00 95.86 157.84 6,484.82 -2,254.99 736.00 2,262.74 9.03 5.19 -7.42
8,664.00 94.02 157.50 6,482.06 -2,284.48 748.12 2,292.36 5.85 -5.75 -1.06
8,696.00 91.51 158.25 6,480.52 -2,314.08 760.15 2,322.10 8.19 -7.84 2.348,727.00 92.59 157.34 6,479.41 -2,342.76 771.86 2,350.90 4.55 3.48 -2.94
12/3/2009 8:26:32AM Page 3 COMPASS 2003.21 Build
Weatherford International Ltd. gUEXAR Survey Report .WeatherlordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVDReference: WELL @4924.00ft (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db
Survey
Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate
(II) (°) (°) (II) (ft) (ft) (ft) (°ITOOft) (°I100ft) (*Ii00ft)
7,006.00 93.86 167.90 6,558.30 -744.01 161.19 745.69 5.41 5.34 0.887,037.00 93.05 167.91 6,556.43 -774.26 167.67 776.02 2.61 -2.61 0.037,069.00 91.57 167.12 6,555.14 -805.48 174.59 807.30 5.24 -4.63 -2.47
7,100.00 90.71 167.20 6,554.52 -835.70 181.47 837.59 2.79 -2.77 0.267,132.00 92.77 165.98 6,553.55 -866.81 188.89 868.78 7.48 6.44 -3.81
7,164.00 91.23 165.94 6,552.44 -897.83 196.65 899.89 4.81 -4.81 -0.13
7,195.00 94.71 165.12 6,550.83 -927.80 204.38 929.94 11.53 11.23 -2.65
7,226.00 95.47 165.97 6,548.08 -957.70 212.09 959.92 3.67 2.45 2.747,258.00 92.49 164.84 6,545.86 -988.59 220.13 990.90 9.96 -9.31 -3.53
7,289.00 93.57 164.34 6,544.22 -1,018.44 228.36 1,020.83 3.84 3.48 -1.61
7,321.00 95.81 163.98 6,541.60 -1,049.12 237.07 1,051.60 7.09 7.00 -1.13
7,353.00 92.03 164.18 6,539.42 -1,079.81 245.82 1,082.38 11.83 -11.81 0.637,384.00 89.74 162.71 6,538.94 -1,109.52 254.65 1,112.19 8.78 -7.39 -4.74
7,416.00 93.46 163.89 6,538.04 -1,140.15 263.84 1,142.91 12.20 11.63 3.697,447.00 94.20 162.54 6,535.97 -1,169.76 272.77 1,172.62 4.96 2.39 -4.35
7,479.00 91.28 162.11 6,534.44 -1,200.22 282.48 1,203.17 9.22 -9.13 -1.34
7,497.00 91.51 161.82 6,534.00 -1,217.33 288.05 1,220.34 2.06 1.28 -1.61
7,528.00 91.46 161.45 6,533.20 -1,246.74 297.81 1,249.86 1.20 -0.16 -1.19
7,560.00 92.60 161.60 6,532.07 -1,277.07 307.95 1,280.30 3.59 3.56 0.477,592.00 93.34 162.16 6,530.41 -1,307.44 317.89 1,310.77 2.90 2.31 1.75
7,623.00 91.86 161.93 6,529.00 -1,336.90 327.43 1,340.33 4.83 -4.77 -0.74
7,655.00 91.40 161.37 6,528.09 -1,367.26 337.50 1,370.80 2.26 -1.44 -1.75
7,686.00 92.60 160.66 6,527.01 -1,396.55 347.58 1,400.20 4.50 3.87 -2.29
7,718.00 95.17 160.98 6,524.84 -1,426.71 358.07 1,430.46 8.09 8.03 1.007,749.00 95.11 160.87 6,522.07 -1,455.89 368.16 1,459.75 0.40 -0.19 -0.35
7,781.00 94.48 159.85 6,519.39 -1,485.92 378.88 1,489.89 3.74 -1.97 -3.19
7,813.00 93.29 161.10 6,517.22 -1,516.01 389.55 1,520.10 5.39 -3.72 3.917,844.00 92.54 159.08 6,515.65 -1,545.12 400.09 1,549.31 6.94 -2.42 -6.52
7,876.00 91.40 156.90 6,514.55 -1,574.76 412.07 1,579.09 7.68 -3.56 -6.81
7,907.00 92.94 155.36 6,513.37 -1,603.09 424.61 1,607.55 7.02 4.97 -4.97
7,970.00 90.71 152.00 6,511.37 -1,659.52 452.52 1,664.27 6.40 -3.54 -5.33
8,033.00 91.85 150.28 6,509.96 -1,714.68 482.92 1,719.75 3.27 1.81 -2.73
8,065.00 93.52 149.18 6,508.46 -1,742.28 499.03 1,747.53 6.25 5.22 -3.44
8,096.00 94.09 149.71 6,506.40 -1,768.92 514.76 1,774.33 2.51 1.84 1.718,128.00 91.74 149.87 6,504.78 -1,796.54 530.84 1,802.12 7.36 -7.34 0.508,159.00 92.66 151.23 6,503.59 -1,823.51 546.07 1,829.26 5.29 2.97 4.398,190.00 91.74 151.11 6,502.39 -1,850.65 561.00 1,856.55 2.99 -2.97 -0.39
8,222.00 91.57 151.37 6,501.47 -1,878.69 576.39 1,884.76 0.97 -0.53 0.818,253.00 92.66 152.52 6,500.33 -1,906.02 590.96 1,912.25 5.11 3.52 3.718,285.00 93.57 152.84 6,498.59 -1,934.41 605.63 1,940.79 3.01 2.84 1.00
8,316.00 93.05 153.01 6,496.80 -1,961.97 619.72 1,968.50 1.76 -1.68 0.558,348.00 95.06 154.92 6,494.54 -1,990.65 633.72 1,997.32 8.65 6.28 5.978,380.00 91.57 154.94 6,492.68 -2,019.58 647.26 2,026.40 10.91 -10.91 0.068,411.00 92.03 156.38 6,491.71 -2,047.81 660.03 2,054.77 4.87 1.48 4.658,443.00 93.92 158.21 6,490.05 -2,077.29 672.36 2,084.37 8.22 5.91 5.72
8,475.00 91.57 159.83 6,488.52 -2,107.13 683.81 2,114.34 8.92 -7.34 5.068,506.00 89.12 161.93 6,488.33 -2,136.41 693.96 2,143.73 10.41 -7.90 6.778,538.00 88.77 162.01 6,488.92 -2,166.84 703.86 2,174.26 1.12 -1.09 0.258,569.00 90.94 159.83 6,489.00 -2,196.13 713.99 2,203.66 9.92 7.00 -7.03
8,601.00 94.25 160.14 6,487.55 -2,226.16 724.93 2,233.80 10.39 10.34 0.978,632.00 95.86 157.84 6,484.82 -2,254.99 736.00 2,262.74 9.03 5.19 -7.42
8,664.00 94.02 157.50 6,482.06 -2,284.48 748.12 2,292.36 5.85 -5.75 -1.06
8,696.00 91.51 158.25 6,480.52 -2,314.08 760.15 2,322.10 8.19 -7.84 2.348,727.00 92.59 157.34 6,479.41 -2,342.76 771.86 2,350.90 4.55 3.48 -2.94
12/3/2009 8:26:32AM Page 3 COMPASS 2003.21 Build
Weatherford International Ltd. gOt/ESHR Sume Report WeatherlortCompany: QUESTAR EXPLORATIONAND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC 777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC 777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db
Survey
Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate
(II) (°) (°) (II) (ft) (ft) (ft) (°I100ft) (*Ii00ft) (*Ii00ft)
8,759.00 92.43 156.55 6,478.01 -2,372.18 784.38 2,380.45 2.52 -0.50 -2.47
8,790.00 93.22 154.60 6,476.48 -2,400.37 797.18 2,408.77 6.78 2.55 -6.29
8,822.00 94.15 154.35 6,474.42 -2,429.19 810.94 2,437.74 3.01 2.91 -0.78
8,854.00 94.20 153.75 6,472.09 -2,457.88 824.91 2,466.58 1.88 0.16 -1.88
8,886.00 93.63 154.12 6,469.91 -2,486.56 838.93 2,495.41 2.12 -1.78 1.168,917.00 93.46 154.26 6,467.99 -2,514.42 852.41 2,523.41 0.71 -0.55 0.45
8,949.00 93.10 153.79 6,466.16 -2,543.14 866.40 2,552.27 1.85 -1.13 -1.47
8,980.00 92.65 154.67 6,464.61 -2,571.02 879.86 2,580.30 3.19 -1.45 2.849,012.00 92.71 157.24 6,463.11 -2,600.21 892.88 2,609.63 8.02 0.19 8.039,036.00 91.94 156.49 6,462.14 -2,622.26 902.30 2,631.78 4.48 -3.21 -3.13
9,068.00 91.50 157.74 6,461.18 -2,651.73 914.74 2,661.38 4.14 -1.38 3.91
9,100.00 92.38 157.37 6,460.09 -2,681.28 926.95 2,691.06 2.98 2.75 -1.16
9,131.00 91.31 157.74 6,459.10 -2,709.92 938.78 2,719.82 3.65 -3.45 1.199,163.00 90.75 157.99 6,458.52 -2,739.56 950.84 2,749.59 1.92 -1.75 0.789,194.00 90.91 157.30 6,458.07 -2,768.22 962.63 2,778.38 2.28 0.52 -2.23
9,226.00 94.44 157.61 6,456.58 -2,797.74 974.88 2,808.03 11.07 11.03 0.97
9,257.00 94.25 156.49 6,454.23 -2,826.21 986.93 2,836.62 3.65 -0.61 -3.61
9,289.00 93.06 155.74 6,452.19 -2,855.40 999.86 2,865.96 4.39 -3.72 -2.34
9,320.00 92.56 155.49 6,450.67 -2,883.60 1,012.65 2,894.29 1.80 -1.61 -0.81
9,352.00 91.40 153.76 6,449.56 -2,912.50 1,026.35 2,923.33 6.51 -3.63 -5.41
9,383.00 90.44 151.99 6,449.07 -2,940.08 1,040.48 2,951.07 6.49 -3.10 -5.71
9,415.00 90.56 150.99 6,448.79 -2,968.20 1,055.76 2,979.35 3.15 0.38 -3.13
9,447.00 92.69 150.36 6,447.88 -2,996.09 1,071.42 3,007.40 6.94 6.66 -1.97
9,478.00 94.38 150.74 6,445.97 -3,023.03 1,086.63 3,034.50 5.59 5.45 1.239,510.00 93.00 149.61 6,443.91 -3,050.73 1,102.51 3,062.37 5.57 -4.31 -3.53
9,541.00 91.63 147.74 6,442.66 -3,077.19 1,118.62 3,089.00 7.47 -4.42 -6.03
9,573.00 92.50 146.49 6,441.50 -3,104.05 1,135.98 3,116.04 4.76 2.72 -3.91
9,605.00 91.63 144.24 6,440.35 -3,130.36 1,154.15 3,142.54 7.53 -2.72 -7.03
9,636.00 93.13 142.61 6,439.06 -3,155.23 1,172.61 3,167.61 7.14 4.84 -5.26
9,668.00 92.63 141.61 6,437.45 -3,180.45 1,192.24 3,193.04 3.49 -1.56 -3.13
9,699.00 91.89 140.74 6,436.23 -3,204.58 1,211.66 3,217.38 3.68 -2.39 -2.81
9,731.00 92.19 138.24 6,435.09 -3,228.89 1,232.43 3,241.91 7.86 0.94 -7.81
9,762.00 93.00 135.74 6,433.69 -3,251.54 1,253.55 3,264.78 8.47 2.61 -8.06
9,794.00 91.19 132.99 6,432.52 -3,273.89 1,276.41 3,287.38 10.28 -5.66 -8.59
9,825.00 94.00 133.61 6,431.12 -3,295.13 1,298.94 3,308.86 9.28 9.06 2.009,857.00 93.88 132.49 6,428.92 -3,316.92 1,322.27 3,330.90 3.51 -0.38 -3.50
9,888.00 91.50 132.11 6,427.46 -3,337.76 1,345.17 3,351.98 7.77 -7.68 -1.23
9,920.00 91.31 132.36 6,426.68 -3,359.26 1,368.86 3,373.74 0.98 -0.59 0.789,951.00 92.06 129.86 6,425.77 -3,379.64 1,392.21 3,394.36 8.42 2.42 -8.06
9,983.00 93.31 127.74 6,424.27 -3,399.66 1,417.11 3,414.65 7.68 3.91 -6.63
LAST SVY10,011.00 94.50 126.99 6,422.36 -3,416.62 1,439.32 3,431.85 5.02 4.25 -2.68
PROJ SVY - PBHL BBS 15G-22-7-2110,054.00 94.50 126.99 6,418.99 -3,442.41 1,473.56 3,458.00 0.00 0.00 0.00
12/3/2009 8:26:32AM Page 4 COMPASS 2003.21 Build
Weatherford International Ltd. gOt/ESHR Sume Report WeatherlortCompany: QUESTAR EXPLORATIONAND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC 777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC 777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db
Survey
Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate
(II) (°) (°) (II) (ft) (ft) (ft) (°I100ft) (*Ii00ft) (*Ii00ft)
8,759.00 92.43 156.55 6,478.01 -2,372.18 784.38 2,380.45 2.52 -0.50 -2.47
8,790.00 93.22 154.60 6,476.48 -2,400.37 797.18 2,408.77 6.78 2.55 -6.29
8,822.00 94.15 154.35 6,474.42 -2,429.19 810.94 2,437.74 3.01 2.91 -0.78
8,854.00 94.20 153.75 6,472.09 -2,457.88 824.91 2,466.58 1.88 0.16 -1.88
8,886.00 93.63 154.12 6,469.91 -2,486.56 838.93 2,495.41 2.12 -1.78 1.168,917.00 93.46 154.26 6,467.99 -2,514.42 852.41 2,523.41 0.71 -0.55 0.45
8,949.00 93.10 153.79 6,466.16 -2,543.14 866.40 2,552.27 1.85 -1.13 -1.47
8,980.00 92.65 154.67 6,464.61 -2,571.02 879.86 2,580.30 3.19 -1.45 2.849,012.00 92.71 157.24 6,463.11 -2,600.21 892.88 2,609.63 8.02 0.19 8.039,036.00 91.94 156.49 6,462.14 -2,622.26 902.30 2,631.78 4.48 -3.21 -3.13
9,068.00 91.50 157.74 6,461.18 -2,651.73 914.74 2,661.38 4.14 -1.38 3.91
9,100.00 92.38 157.37 6,460.09 -2,681.28 926.95 2,691.06 2.98 2.75 -1.16
9,131.00 91.31 157.74 6,459.10 -2,709.92 938.78 2,719.82 3.65 -3.45 1.199,163.00 90.75 157.99 6,458.52 -2,739.56 950.84 2,749.59 1.92 -1.75 0.789,194.00 90.91 157.30 6,458.07 -2,768.22 962.63 2,778.38 2.28 0.52 -2.23
9,226.00 94.44 157.61 6,456.58 -2,797.74 974.88 2,808.03 11.07 11.03 0.97
9,257.00 94.25 156.49 6,454.23 -2,826.21 986.93 2,836.62 3.65 -0.61 -3.61
9,289.00 93.06 155.74 6,452.19 -2,855.40 999.86 2,865.96 4.39 -3.72 -2.34
9,320.00 92.56 155.49 6,450.67 -2,883.60 1,012.65 2,894.29 1.80 -1.61 -0.81
9,352.00 91.40 153.76 6,449.56 -2,912.50 1,026.35 2,923.33 6.51 -3.63 -5.41
9,383.00 90.44 151.99 6,449.07 -2,940.08 1,040.48 2,951.07 6.49 -3.10 -5.71
9,415.00 90.56 150.99 6,448.79 -2,968.20 1,055.76 2,979.35 3.15 0.38 -3.13
9,447.00 92.69 150.36 6,447.88 -2,996.09 1,071.42 3,007.40 6.94 6.66 -1.97
9,478.00 94.38 150.74 6,445.97 -3,023.03 1,086.63 3,034.50 5.59 5.45 1.239,510.00 93.00 149.61 6,443.91 -3,050.73 1,102.51 3,062.37 5.57 -4.31 -3.53
9,541.00 91.63 147.74 6,442.66 -3,077.19 1,118.62 3,089.00 7.47 -4.42 -6.03
9,573.00 92.50 146.49 6,441.50 -3,104.05 1,135.98 3,116.04 4.76 2.72 -3.91
9,605.00 91.63 144.24 6,440.35 -3,130.36 1,154.15 3,142.54 7.53 -2.72 -7.03
9,636.00 93.13 142.61 6,439.06 -3,155.23 1,172.61 3,167.61 7.14 4.84 -5.26
9,668.00 92.63 141.61 6,437.45 -3,180.45 1,192.24 3,193.04 3.49 -1.56 -3.13
9,699.00 91.89 140.74 6,436.23 -3,204.58 1,211.66 3,217.38 3.68 -2.39 -2.81
9,731.00 92.19 138.24 6,435.09 -3,228.89 1,232.43 3,241.91 7.86 0.94 -7.81
9,762.00 93.00 135.74 6,433.69 -3,251.54 1,253.55 3,264.78 8.47 2.61 -8.06
9,794.00 91.19 132.99 6,432.52 -3,273.89 1,276.41 3,287.38 10.28 -5.66 -8.59
9,825.00 94.00 133.61 6,431.12 -3,295.13 1,298.94 3,308.86 9.28 9.06 2.009,857.00 93.88 132.49 6,428.92 -3,316.92 1,322.27 3,330.90 3.51 -0.38 -3.50
9,888.00 91.50 132.11 6,427.46 -3,337.76 1,345.17 3,351.98 7.77 -7.68 -1.23
9,920.00 91.31 132.36 6,426.68 -3,359.26 1,368.86 3,373.74 0.98 -0.59 0.789,951.00 92.06 129.86 6,425.77 -3,379.64 1,392.21 3,394.36 8.42 2.42 -8.06
9,983.00 93.31 127.74 6,424.27 -3,399.66 1,417.11 3,414.65 7.68 3.91 -6.63
LAST SVY10,011.00 94.50 126.99 6,422.36 -3,416.62 1,439.32 3,431.85 5.02 4.25 -2.68
PROJ SVY - PBHL BBS 15G-22-7-2110,054.00 94.50 126.99 6,418.99 -3,442.41 1,473.56 3,458.00 0.00 0.00 0.00
12/3/2009 8:26:32AM Page 4 COMPASS 2003.21 Build
Weatherford International Ltd. gOt/ESHR Sume Report WeatherlortCompany: QUESTAR EXPLORATIONAND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC 777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC 777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db
Survey
Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate
(II) (°) (°) (II) (ft) (ft) (ft) (°I100ft) (*Ii00ft) (*Ii00ft)
8,759.00 92.43 156.55 6,478.01 -2,372.18 784.38 2,380.45 2.52 -0.50 -2.47
8,790.00 93.22 154.60 6,476.48 -2,400.37 797.18 2,408.77 6.78 2.55 -6.29
8,822.00 94.15 154.35 6,474.42 -2,429.19 810.94 2,437.74 3.01 2.91 -0.78
8,854.00 94.20 153.75 6,472.09 -2,457.88 824.91 2,466.58 1.88 0.16 -1.88
8,886.00 93.63 154.12 6,469.91 -2,486.56 838.93 2,495.41 2.12 -1.78 1.168,917.00 93.46 154.26 6,467.99 -2,514.42 852.41 2,523.41 0.71 -0.55 0.45
8,949.00 93.10 153.79 6,466.16 -2,543.14 866.40 2,552.27 1.85 -1.13 -1.47
8,980.00 92.65 154.67 6,464.61 -2,571.02 879.86 2,580.30 3.19 -1.45 2.849,012.00 92.71 157.24 6,463.11 -2,600.21 892.88 2,609.63 8.02 0.19 8.039,036.00 91.94 156.49 6,462.14 -2,622.26 902.30 2,631.78 4.48 -3.21 -3.13
9,068.00 91.50 157.74 6,461.18 -2,651.73 914.74 2,661.38 4.14 -1.38 3.91
9,100.00 92.38 157.37 6,460.09 -2,681.28 926.95 2,691.06 2.98 2.75 -1.16
9,131.00 91.31 157.74 6,459.10 -2,709.92 938.78 2,719.82 3.65 -3.45 1.199,163.00 90.75 157.99 6,458.52 -2,739.56 950.84 2,749.59 1.92 -1.75 0.789,194.00 90.91 157.30 6,458.07 -2,768.22 962.63 2,778.38 2.28 0.52 -2.23
9,226.00 94.44 157.61 6,456.58 -2,797.74 974.88 2,808.03 11.07 11.03 0.97
9,257.00 94.25 156.49 6,454.23 -2,826.21 986.93 2,836.62 3.65 -0.61 -3.61
9,289.00 93.06 155.74 6,452.19 -2,855.40 999.86 2,865.96 4.39 -3.72 -2.34
9,320.00 92.56 155.49 6,450.67 -2,883.60 1,012.65 2,894.29 1.80 -1.61 -0.81
9,352.00 91.40 153.76 6,449.56 -2,912.50 1,026.35 2,923.33 6.51 -3.63 -5.41
9,383.00 90.44 151.99 6,449.07 -2,940.08 1,040.48 2,951.07 6.49 -3.10 -5.71
9,415.00 90.56 150.99 6,448.79 -2,968.20 1,055.76 2,979.35 3.15 0.38 -3.13
9,447.00 92.69 150.36 6,447.88 -2,996.09 1,071.42 3,007.40 6.94 6.66 -1.97
9,478.00 94.38 150.74 6,445.97 -3,023.03 1,086.63 3,034.50 5.59 5.45 1.239,510.00 93.00 149.61 6,443.91 -3,050.73 1,102.51 3,062.37 5.57 -4.31 -3.53
9,541.00 91.63 147.74 6,442.66 -3,077.19 1,118.62 3,089.00 7.47 -4.42 -6.03
9,573.00 92.50 146.49 6,441.50 -3,104.05 1,135.98 3,116.04 4.76 2.72 -3.91
9,605.00 91.63 144.24 6,440.35 -3,130.36 1,154.15 3,142.54 7.53 -2.72 -7.03
9,636.00 93.13 142.61 6,439.06 -3,155.23 1,172.61 3,167.61 7.14 4.84 -5.26
9,668.00 92.63 141.61 6,437.45 -3,180.45 1,192.24 3,193.04 3.49 -1.56 -3.13
9,699.00 91.89 140.74 6,436.23 -3,204.58 1,211.66 3,217.38 3.68 -2.39 -2.81
9,731.00 92.19 138.24 6,435.09 -3,228.89 1,232.43 3,241.91 7.86 0.94 -7.81
9,762.00 93.00 135.74 6,433.69 -3,251.54 1,253.55 3,264.78 8.47 2.61 -8.06
9,794.00 91.19 132.99 6,432.52 -3,273.89 1,276.41 3,287.38 10.28 -5.66 -8.59
9,825.00 94.00 133.61 6,431.12 -3,295.13 1,298.94 3,308.86 9.28 9.06 2.009,857.00 93.88 132.49 6,428.92 -3,316.92 1,322.27 3,330.90 3.51 -0.38 -3.50
9,888.00 91.50 132.11 6,427.46 -3,337.76 1,345.17 3,351.98 7.77 -7.68 -1.23
9,920.00 91.31 132.36 6,426.68 -3,359.26 1,368.86 3,373.74 0.98 -0.59 0.789,951.00 92.06 129.86 6,425.77 -3,379.64 1,392.21 3,394.36 8.42 2.42 -8.06
9,983.00 93.31 127.74 6,424.27 -3,399.66 1,417.11 3,414.65 7.68 3.91 -6.63
LAST SVY10,011.00 94.50 126.99 6,422.36 -3,416.62 1,439.32 3,431.85 5.02 4.25 -2.68
PROJ SVY - PBHL BBS 15G-22-7-2110,054.00 94.50 126.99 6,418.99 -3,442.41 1,473.56 3,458.00 0.00 0.00 0.00
12/3/2009 8:26:32AM Page 4 COMPASS 2003.21 Build
Weatherford International Ltd. gOt/ESHR Sume Report WeatherlortCompany: QUESTAR EXPLORATIONAND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC 777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC 777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db
Survey
Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate
(II) (°) (°) (II) (ft) (ft) (ft) (°I100ft) (*Ii00ft) (*Ii00ft)
8,759.00 92.43 156.55 6,478.01 -2,372.18 784.38 2,380.45 2.52 -0.50 -2.47
8,790.00 93.22 154.60 6,476.48 -2,400.37 797.18 2,408.77 6.78 2.55 -6.29
8,822.00 94.15 154.35 6,474.42 -2,429.19 810.94 2,437.74 3.01 2.91 -0.78
8,854.00 94.20 153.75 6,472.09 -2,457.88 824.91 2,466.58 1.88 0.16 -1.88
8,886.00 93.63 154.12 6,469.91 -2,486.56 838.93 2,495.41 2.12 -1.78 1.168,917.00 93.46 154.26 6,467.99 -2,514.42 852.41 2,523.41 0.71 -0.55 0.45
8,949.00 93.10 153.79 6,466.16 -2,543.14 866.40 2,552.27 1.85 -1.13 -1.47
8,980.00 92.65 154.67 6,464.61 -2,571.02 879.86 2,580.30 3.19 -1.45 2.849,012.00 92.71 157.24 6,463.11 -2,600.21 892.88 2,609.63 8.02 0.19 8.039,036.00 91.94 156.49 6,462.14 -2,622.26 902.30 2,631.78 4.48 -3.21 -3.13
9,068.00 91.50 157.74 6,461.18 -2,651.73 914.74 2,661.38 4.14 -1.38 3.91
9,100.00 92.38 157.37 6,460.09 -2,681.28 926.95 2,691.06 2.98 2.75 -1.16
9,131.00 91.31 157.74 6,459.10 -2,709.92 938.78 2,719.82 3.65 -3.45 1.199,163.00 90.75 157.99 6,458.52 -2,739.56 950.84 2,749.59 1.92 -1.75 0.789,194.00 90.91 157.30 6,458.07 -2,768.22 962.63 2,778.38 2.28 0.52 -2.23
9,226.00 94.44 157.61 6,456.58 -2,797.74 974.88 2,808.03 11.07 11.03 0.97
9,257.00 94.25 156.49 6,454.23 -2,826.21 986.93 2,836.62 3.65 -0.61 -3.61
9,289.00 93.06 155.74 6,452.19 -2,855.40 999.86 2,865.96 4.39 -3.72 -2.34
9,320.00 92.56 155.49 6,450.67 -2,883.60 1,012.65 2,894.29 1.80 -1.61 -0.81
9,352.00 91.40 153.76 6,449.56 -2,912.50 1,026.35 2,923.33 6.51 -3.63 -5.41
9,383.00 90.44 151.99 6,449.07 -2,940.08 1,040.48 2,951.07 6.49 -3.10 -5.71
9,415.00 90.56 150.99 6,448.79 -2,968.20 1,055.76 2,979.35 3.15 0.38 -3.13
9,447.00 92.69 150.36 6,447.88 -2,996.09 1,071.42 3,007.40 6.94 6.66 -1.97
9,478.00 94.38 150.74 6,445.97 -3,023.03 1,086.63 3,034.50 5.59 5.45 1.239,510.00 93.00 149.61 6,443.91 -3,050.73 1,102.51 3,062.37 5.57 -4.31 -3.53
9,541.00 91.63 147.74 6,442.66 -3,077.19 1,118.62 3,089.00 7.47 -4.42 -6.03
9,573.00 92.50 146.49 6,441.50 -3,104.05 1,135.98 3,116.04 4.76 2.72 -3.91
9,605.00 91.63 144.24 6,440.35 -3,130.36 1,154.15 3,142.54 7.53 -2.72 -7.03
9,636.00 93.13 142.61 6,439.06 -3,155.23 1,172.61 3,167.61 7.14 4.84 -5.26
9,668.00 92.63 141.61 6,437.45 -3,180.45 1,192.24 3,193.04 3.49 -1.56 -3.13
9,699.00 91.89 140.74 6,436.23 -3,204.58 1,211.66 3,217.38 3.68 -2.39 -2.81
9,731.00 92.19 138.24 6,435.09 -3,228.89 1,232.43 3,241.91 7.86 0.94 -7.81
9,762.00 93.00 135.74 6,433.69 -3,251.54 1,253.55 3,264.78 8.47 2.61 -8.06
9,794.00 91.19 132.99 6,432.52 -3,273.89 1,276.41 3,287.38 10.28 -5.66 -8.59
9,825.00 94.00 133.61 6,431.12 -3,295.13 1,298.94 3,308.86 9.28 9.06 2.009,857.00 93.88 132.49 6,428.92 -3,316.92 1,322.27 3,330.90 3.51 -0.38 -3.50
9,888.00 91.50 132.11 6,427.46 -3,337.76 1,345.17 3,351.98 7.77 -7.68 -1.23
9,920.00 91.31 132.36 6,426.68 -3,359.26 1,368.86 3,373.74 0.98 -0.59 0.789,951.00 92.06 129.86 6,425.77 -3,379.64 1,392.21 3,394.36 8.42 2.42 -8.06
9,983.00 93.31 127.74 6,424.27 -3,399.66 1,417.11 3,414.65 7.68 3.91 -6.63
LAST SVY10,011.00 94.50 126.99 6,422.36 -3,416.62 1,439.32 3,431.85 5.02 4.25 -2.68
PROJ SVY - PBHL BBS 15G-22-7-2110,054.00 94.50 126.99 6,418.99 -3,442.41 1,473.56 3,458.00 0.00 0.00 0.00
12/3/2009 8:26:32AM Page 4 COMPASS 2003.21 Build
Weatherford International Ltd. gGUEMAR Survey Report WeatherfordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db
Wellbore Targets
Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (*) (ft) (ft) (ft) (ft) (ft) Latitude Longitude
PBHL BBS 15G-22-7- 0.00 0.00 6,379.61 -3,911.80 1,325.61 7,240,464.01 2,189,560.39 40° 10' 49.380 N 109° 32' 3.880 W- survey misses target center by 493.73ft at 10054.00ft MD (6418.99 TVD, -3442.41 N, 1473.56 E)- Point
Survey Annotations
Measured Vertical Local CoordinatesDepth Depth +N/-S +El-W
(ft) (ft) (ft) (ft) Comment6,719.00 6,547.10 -464.15 103.81 TIE ON ST#2
10,011.00 6,422.36 -3,416.62 1,439.32 LAST SVY10,054.00 6,418.99 -3,442.41 1,473.56 PROJ SVY
Checked By: Approved By: Date:
12/3/2009 8:26:32AM Page 5 COMPASS 2003 21 Build
Weatherford International Ltd. gGUEMAR Survey Report WeatherfordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db
Wellbore Targets
Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (*) (ft) (ft) (ft) (ft) (ft) Latitude Longitude
PBHL BBS 15G-22-7- 0.00 0.00 6,379.61 -3,911.80 1,325.61 7,240,464.01 2,189,560.39 40° 10' 49.380 N 109° 32' 3.880 W- survey misses target center by 493.73ft at 10054.00ft MD (6418.99 TVD, -3442.41 N, 1473.56 E)- Point
Survey Annotations
Measured Vertical Local CoordinatesDepth Depth +N/-S +El-W
(ft) (ft) (ft) (ft) Comment6,719.00 6,547.10 -464.15 103.81 TIE ON ST#2
10,011.00 6,422.36 -3,416.62 1,439.32 LAST SVY10,054.00 6,418.99 -3,442.41 1,473.56 PROJ SVY
Checked By: Approved By: Date:
12/3/2009 8:26:32AM Page 5 COMPASS 2003 21 Build
Weatherford International Ltd. gGUEMAR Survey Report WeatherfordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db
Wellbore Targets
Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (*) (ft) (ft) (ft) (ft) (ft) Latitude Longitude
PBHL BBS 15G-22-7- 0.00 0.00 6,379.61 -3,911.80 1,325.61 7,240,464.01 2,189,560.39 40° 10' 49.380 N 109° 32' 3.880 W- survey misses target center by 493.73ft at 10054.00ft MD (6418.99 TVD, -3442.41 N, 1473.56 E)- Point
Survey Annotations
Measured Vertical Local CoordinatesDepth Depth +N/-S +El-W
(ft) (ft) (ft) (ft) Comment6,719.00 6,547.10 -464.15 103.81 TIE ON ST#2
10,011.00 6,422.36 -3,416.62 1,439.32 LAST SVY10,054.00 6,418.99 -3,442.41 1,473.56 PROJ SVY
Checked By: Approved By: Date:
12/3/2009 8:26:32AM Page 5 COMPASS 2003 21 Build
Weatherford International Ltd. gGUEMAR Survey Report WeatherfordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db
Wellbore Targets
Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (*) (ft) (ft) (ft) (ft) (ft) Latitude Longitude
PBHL BBS 15G-22-7- 0.00 0.00 6,379.61 -3,911.80 1,325.61 7,240,464.01 2,189,560.39 40° 10' 49.380 N 109° 32' 3.880 W- survey misses target center by 493.73ft at 10054.00ft MD (6418.99 TVD, -3442.41 N, 1473.56 E)- Point
Survey Annotations
Measured Vertical Local CoordinatesDepth Depth +N/-S +El-W
(ft) (ft) (ft) (ft) Comment6,719.00 6,547.10 -464.15 103.81 TIE ON ST#2
10,011.00 6,422.36 -3,416.62 1,439.32 LAST SVY10,054.00 6,418.99 -3,442.41 1,473.56 PROJ SVY
Checked By: Approved By: Date:
12/3/2009 8:26:32AM Page 5 COMPASS 2003 21 Build
DAYS vsDAYS vsDAYS vsDAYS vs
Questar Exploration_BBS-15G-22-7-21 Uintah County, UT
CONFilEGL w..n.n.nrDAYSVS FEET DRILLED I24 HOURS
600 ,
500 i I || |
0 400 ------- - - ------ ----r ------- -----< \I- i
300 -- --- --- --
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334DAY
DAYS VS DEPTH
5000
6000I H
I I I i
I- 7000 -
8000 - --- --
9000 -- --
10000
110001 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435
Questar Exploration_BBS-15G-22-7-21 Uintah County, UT
CONFilEGL w..n.n.nrDAYSVS FEET DRILLED I24 HOURS
600 ,
500 i I || |
0 400 ------- - - ------ ----r ------- -----< \I- i
300 -- --- --- --
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334DAY
DAYS VS DEPTH
5000
6000I H
I I I i
I- 7000 -
8000 - --- --
9000 -- --
10000
110001 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435
Questar Exploration_BBS-15G-22-7-21 Uintah County, UT
CONFilEGL w..n.n.nrDAYSVS FEET DRILLED I24 HOURS
600 ,
500 i I || |
0 400 ------- - - ------ ----r ------- -----< \I- i
300 -- --- --- --
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334DAY
DAYS VS DEPTH
5000
6000I H
I I I i
I- 7000 -
8000 - --- --
9000 -- --
10000
110001 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435
Questar Exploration_BBS-15G-22-7-21 Uintah County, UT
CONFilEGL w..n.n.nrDAYSVS FEET DRILLED I24 HOURS
600 ,
500 i I || |
0 400 ------- - - ------ ----r ------- -----< \I- i
300 -- --- --- --
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334DAY
DAYS VS DEPTH
5000
6000I H
I I I i
I- 7000 -
8000 - --- --
9000 -- --
10000
110001 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435
Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET (for state use only) CDW
Change of Operator (Well Sold) X - Operator Name ChangeThe operator of the well(s) listed below has changed, effective: 6/14/2010
FROM: (Old Operator): TO: ( New Operator):N5085-QuestarExploration and Production Company N3700-QEP Energy Company
1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265
Phone: 1 (303) 308-3048 Phone: 1 (303) 308-3048
CA No. Unit: JOHNSON BOTTOMWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL
NO TYPE STATUSSEE ATTACHED
OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 6/28/20102. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 6/28/20103. The new company was checked on the Department of Commerce, Division of Corporations Database on: 6/24/20104a. Is the new operator registered in the State of Utah: Business Number: 764611-01435a. (R649-9-2)Waste Management Plan has been received on: Requested5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,
or operator change for all wells listed on Federal or Indian leases on: BLM 8/16/2010 BIA not yet7. Federal and Indian Units:
The BLM or BIA has approved the successor of unit operator for wells listed on: 8/16/20108. Federal and Indian Communization Agreements ("CA"):
The BLM or BIA has approved the operator for all wells listed within a CA on: N/A9. Underground Injection Control ("UIC") Division has approved UIC Form 5 Transfer of Authority to
Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on: 6/29/2010DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 6/30/20102. Changes have been entered on the Monthly Operator Change Spread Sheet on: 6/30/20103. Bond information entered in RBDMS on: 6/30/20104. Fee/State wells attached to bond in RBDMS on: 6/30/20105. Injection Projects to new operator in RBDMS on: 6/30/20106. Receipt of Acceptance of Drilling Procedures for APD/New on: n/aBOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESBOOOO242. Indian well(s) covered by Bond Number: 9650106933a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 9650106953b. The FORMER operator has requested a release of liability from their bond on: n/aLEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division
of their responsibility to notify all interest owners of this change on: n/aCOMMENTS:
QEP Energy (Johnson Bottom) FORM A.xls
Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET (for state use only) CDW
Change of Operator (Well Sold) X - Operator Name ChangeThe operator of the well(s) listed below has changed, effective: 6/14/2010
FROM: (Old Operator): TO: ( New Operator):N5085-QuestarExploration and Production Company N3700-QEP Energy Company
1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265
Phone: 1 (303) 308-3048 Phone: 1 (303) 308-3048
CA No. Unit: JOHNSON BOTTOMWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL
NO TYPE STATUSSEE ATTACHED
OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 6/28/20102. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 6/28/20103. The new company was checked on the Department of Commerce, Division of Corporations Database on: 6/24/20104a. Is the new operator registered in the State of Utah: Business Number: 764611-01435a. (R649-9-2)Waste Management Plan has been received on: Requested5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,
or operator change for all wells listed on Federal or Indian leases on: BLM 8/16/2010 BIA not yet7. Federal and Indian Units:
The BLM or BIA has approved the successor of unit operator for wells listed on: 8/16/20108. Federal and Indian Communization Agreements ("CA"):
The BLM or BIA has approved the operator for all wells listed within a CA on: N/A9. Underground Injection Control ("UIC") Division has approved UIC Form 5 Transfer of Authority to
Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on: 6/29/2010DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 6/30/20102. Changes have been entered on the Monthly Operator Change Spread Sheet on: 6/30/20103. Bond information entered in RBDMS on: 6/30/20104. Fee/State wells attached to bond in RBDMS on: 6/30/20105. Injection Projects to new operator in RBDMS on: 6/30/20106. Receipt of Acceptance of Drilling Procedures for APD/New on: n/aBOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESBOOOO242. Indian well(s) covered by Bond Number: 9650106933a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 9650106953b. The FORMER operator has requested a release of liability from their bond on: n/aLEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division
of their responsibility to notify all interest owners of this change on: n/aCOMMENTS:
QEP Energy (Johnson Bottom) FORM A.xls
Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET (for state use only) CDW
Change of Operator (Well Sold) X - Operator Name ChangeThe operator of the well(s) listed below has changed, effective: 6/14/2010
FROM: (Old Operator): TO: ( New Operator):N5085-QuestarExploration and Production Company N3700-QEP Energy Company
1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265
Phone: 1 (303) 308-3048 Phone: 1 (303) 308-3048
CA No. Unit: JOHNSON BOTTOMWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL
NO TYPE STATUSSEE ATTACHED
OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 6/28/20102. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 6/28/20103. The new company was checked on the Department of Commerce, Division of Corporations Database on: 6/24/20104a. Is the new operator registered in the State of Utah: Business Number: 764611-01435a. (R649-9-2)Waste Management Plan has been received on: Requested5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,
or operator change for all wells listed on Federal or Indian leases on: BLM 8/16/2010 BIA not yet7. Federal and Indian Units:
The BLM or BIA has approved the successor of unit operator for wells listed on: 8/16/20108. Federal and Indian Communization Agreements ("CA"):
The BLM or BIA has approved the operator for all wells listed within a CA on: N/A9. Underground Injection Control ("UIC") Division has approved UIC Form 5 Transfer of Authority to
Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on: 6/29/2010DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 6/30/20102. Changes have been entered on the Monthly Operator Change Spread Sheet on: 6/30/20103. Bond information entered in RBDMS on: 6/30/20104. Fee/State wells attached to bond in RBDMS on: 6/30/20105. Injection Projects to new operator in RBDMS on: 6/30/20106. Receipt of Acceptance of Drilling Procedures for APD/New on: n/aBOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESBOOOO242. Indian well(s) covered by Bond Number: 9650106933a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 9650106953b. The FORMER operator has requested a release of liability from their bond on: n/aLEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division
of their responsibility to notify all interest owners of this change on: n/aCOMMENTS:
QEP Energy (Johnson Bottom) FORM A.xls
Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET (for state use only) CDW
Change of Operator (Well Sold) X - Operator Name ChangeThe operator of the well(s) listed below has changed, effective: 6/14/2010
FROM: (Old Operator): TO: ( New Operator):N5085-QuestarExploration and Production Company N3700-QEP Energy Company
1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265
Phone: 1 (303) 308-3048 Phone: 1 (303) 308-3048
CA No. Unit: JOHNSON BOTTOMWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL
NO TYPE STATUSSEE ATTACHED
OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 6/28/20102. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 6/28/20103. The new company was checked on the Department of Commerce, Division of Corporations Database on: 6/24/20104a. Is the new operator registered in the State of Utah: Business Number: 764611-01435a. (R649-9-2)Waste Management Plan has been received on: Requested5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,
or operator change for all wells listed on Federal or Indian leases on: BLM 8/16/2010 BIA not yet7. Federal and Indian Units:
The BLM or BIA has approved the successor of unit operator for wells listed on: 8/16/20108. Federal and Indian Communization Agreements ("CA"):
The BLM or BIA has approved the operator for all wells listed within a CA on: N/A9. Underground Injection Control ("UIC") Division has approved UIC Form 5 Transfer of Authority to
Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on: 6/29/2010DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 6/30/20102. Changes have been entered on the Monthly Operator Change Spread Sheet on: 6/30/20103. Bond information entered in RBDMS on: 6/30/20104. Fee/State wells attached to bond in RBDMS on: 6/30/20105. Injection Projects to new operator in RBDMS on: 6/30/20106. Receipt of Acceptance of Drilling Procedures for APD/New on: n/aBOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESBOOOO242. Indian well(s) covered by Bond Number: 9650106933a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 9650106953b. The FORMER operator has requested a release of liability from their bond on: n/aLEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division
of their responsibility to notify all interest owners of this change on: n/aCOMMENTS:
QEP Energy (Johnson Bottom) FORM A.xls
STATE OF UTAH FORM 9DEPARTMENTOF NATURALRESOURCES
DIVISION OF OIL,GAS ANDMINING 5. LEASEDESIGNATIONANDSERIALNUMBER
See attached6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICESAND REPORTS ON WELLS See attached7. UNIT or CA AGREEMENT NAME:Do not use this form for proposals to drill newwells, significantlydeepen existing wells below current bottom-hole depth, reenterplugged wells, or t° See attacheddriff horizontal laterais. Use APPLICATIONFOR PERMIT TO DRILLform for suchproposats.
1 TYPE OF WELL 8. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHERSee attached
2 NAeMEOF O ERp
o tionand Production Company ÑÊÊ$ Att che3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDANDPOOL, OR WILDCAT:1050 17th Street, Suite 500 Denver CO z,80265 (303) 672-6900 See attached
4 LOCATION OF WELL
FOOTAGES AT SURFACE: See attached COUNTY: Attached
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH
n CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATECURRENT FORMATIONNOTICEOF INTENT(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIRWELL
Approximate date work willstart: CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
6/14/2010 CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGETUBING PLUG AND ABANDON VENTOR FLAREO SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATERDISPOSAL(Submit Original Form Only)
O CHANGE WELLSTATUS PRODUCTION(STARTIRESUME) WATERSHUT-OFFDate of work completion:
O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELLTYPE RECOMPLETE - DIFFERENTFORMATION Change
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Effective June 14, 2010 Questar Exploration and Production Company changed its name to QEP Energy Company. This namechange involves only an internal corporate name change and no thirdparty change of operator is involved. The sameemployees will continue to be responsible for operations of the properties described on the attached list. AIIoperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965008638Fee Land Bond Number:BIA Bond Number: 79944€r Ñ# 0/O (o 3The attached document is an all inclusive list of the wells operated by Questar Exploration and Production Company. As ofJune 14, 2010 QEP Energy Company assumes all rights, duties and obligations as operator of the properties as described onthe list
NAME(PLEASE P Morgan AndersonTITLE Regulatory AffairsAnalyst
SIGNATUR DATE 6/23/2010
(This space for State use only)
RECElVED APPROVED /2/ gJUN2 8 2010(5/2000) (See Instructionson Reverse Side)
DÎVÎSÎOH Of Oil,GasandMining'DIV.0F0lL,GAS&MINING EarleneRussell, Engineering
STATE OF UTAH FORM 9DEPARTMENTOF NATURALRESOURCES
DIVISION OF OIL,GAS ANDMINING 5. LEASEDESIGNATIONANDSERIALNUMBER
See attached6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICESAND REPORTS ON WELLS See attached7. UNIT or CA AGREEMENT NAME:Do not use this form for proposals to drill newwells, significantlydeepen existing wells below current bottom-hole depth, reenterplugged wells, or t° See attacheddriff horizontal laterais. Use APPLICATIONFOR PERMIT TO DRILLform for suchproposats.
1 TYPE OF WELL 8. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHERSee attached
2 NAeMEOF O ERp
o tionand Production Company ÑÊÊ$ Att che3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDANDPOOL, OR WILDCAT:1050 17th Street, Suite 500 Denver CO z,80265 (303) 672-6900 See attached
4 LOCATION OF WELL
FOOTAGES AT SURFACE: See attached COUNTY: Attached
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH
n CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATECURRENT FORMATIONNOTICEOF INTENT(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIRWELL
Approximate date work willstart: CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
6/14/2010 CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGETUBING PLUG AND ABANDON VENTOR FLAREO SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATERDISPOSAL(Submit Original Form Only)
O CHANGE WELLSTATUS PRODUCTION(STARTIRESUME) WATERSHUT-OFFDate of work completion:
O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELLTYPE RECOMPLETE - DIFFERENTFORMATION Change
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Effective June 14, 2010 Questar Exploration and Production Company changed its name to QEP Energy Company. This namechange involves only an internal corporate name change and no thirdparty change of operator is involved. The sameemployees will continue to be responsible for operations of the properties described on the attached list. AIIoperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965008638Fee Land Bond Number:BIA Bond Number: 79944€r Ñ# 0/O (o 3The attached document is an all inclusive list of the wells operated by Questar Exploration and Production Company. As ofJune 14, 2010 QEP Energy Company assumes all rights, duties and obligations as operator of the properties as described onthe list
NAME(PLEASE P Morgan AndersonTITLE Regulatory AffairsAnalyst
SIGNATUR DATE 6/23/2010
(This space for State use only)
RECElVED APPROVED /2/ gJUN2 8 2010(5/2000) (See Instructionson Reverse Side)
DÎVÎSÎOH Of Oil,GasandMining'DIV.0F0lL,GAS&MINING EarleneRussell, Engineering
STATE OF UTAH FORM 9DEPARTMENTOF NATURALRESOURCES
DIVISION OF OIL,GAS ANDMINING 5. LEASEDESIGNATIONANDSERIALNUMBER
See attached6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICESAND REPORTS ON WELLS See attached7. UNIT or CA AGREEMENT NAME:Do not use this form for proposals to drill newwells, significantlydeepen existing wells below current bottom-hole depth, reenterplugged wells, or t° See attacheddriff horizontal laterais. Use APPLICATIONFOR PERMIT TO DRILLform for suchproposats.
1 TYPE OF WELL 8. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHERSee attached
2 NAeMEOF O ERp
o tionand Production Company ÑÊÊ$ Att che3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDANDPOOL, OR WILDCAT:1050 17th Street, Suite 500 Denver CO z,80265 (303) 672-6900 See attached
4 LOCATION OF WELL
FOOTAGES AT SURFACE: See attached COUNTY: Attached
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH
n CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATECURRENT FORMATIONNOTICEOF INTENT(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIRWELL
Approximate date work willstart: CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
6/14/2010 CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGETUBING PLUG AND ABANDON VENTOR FLAREO SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATERDISPOSAL(Submit Original Form Only)
O CHANGE WELLSTATUS PRODUCTION(STARTIRESUME) WATERSHUT-OFFDate of work completion:
O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELLTYPE RECOMPLETE - DIFFERENTFORMATION Change
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Effective June 14, 2010 Questar Exploration and Production Company changed its name to QEP Energy Company. This namechange involves only an internal corporate name change and no thirdparty change of operator is involved. The sameemployees will continue to be responsible for operations of the properties described on the attached list. AIIoperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965008638Fee Land Bond Number:BIA Bond Number: 79944€r Ñ# 0/O (o 3The attached document is an all inclusive list of the wells operated by Questar Exploration and Production Company. As ofJune 14, 2010 QEP Energy Company assumes all rights, duties and obligations as operator of the properties as described onthe list
NAME(PLEASE P Morgan AndersonTITLE Regulatory AffairsAnalyst
SIGNATUR DATE 6/23/2010
(This space for State use only)
RECElVED APPROVED /2/ gJUN2 8 2010(5/2000) (See Instructionson Reverse Side)
DÎVÎSÎOH Of Oil,GasandMining'DIV.0F0lL,GAS&MINING EarleneRussell, Engineering
STATE OF UTAH FORM 9DEPARTMENTOF NATURALRESOURCES
DIVISION OF OIL,GAS ANDMINING 5. LEASEDESIGNATIONANDSERIALNUMBER
See attached6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICESAND REPORTS ON WELLS See attached7. UNIT or CA AGREEMENT NAME:Do not use this form for proposals to drill newwells, significantlydeepen existing wells below current bottom-hole depth, reenterplugged wells, or t° See attacheddriff horizontal laterais. Use APPLICATIONFOR PERMIT TO DRILLform for suchproposats.
1 TYPE OF WELL 8. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHERSee attached
2 NAeMEOF O ERp
o tionand Production Company ÑÊÊ$ Att che3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDANDPOOL, OR WILDCAT:1050 17th Street, Suite 500 Denver CO z,80265 (303) 672-6900 See attached
4 LOCATION OF WELL
FOOTAGES AT SURFACE: See attached COUNTY: Attached
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH
n CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN REPERFORATECURRENT FORMATIONNOTICEOF INTENT(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIRWELL
Approximate date work willstart: CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
6/14/2010 CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
CHANGETUBING PLUG AND ABANDON VENTOR FLAREO SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATERDISPOSAL(Submit Original Form Only)
O CHANGE WELLSTATUS PRODUCTION(STARTIRESUME) WATERSHUT-OFFDate of work completion:
O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELLTYPE RECOMPLETE - DIFFERENTFORMATION Change
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Effective June 14, 2010 Questar Exploration and Production Company changed its name to QEP Energy Company. This namechange involves only an internal corporate name change and no thirdparty change of operator is involved. The sameemployees will continue to be responsible for operations of the properties described on the attached list. AIIoperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965008638Fee Land Bond Number:BIA Bond Number: 79944€r Ñ# 0/O (o 3The attached document is an all inclusive list of the wells operated by Questar Exploration and Production Company. As ofJune 14, 2010 QEP Energy Company assumes all rights, duties and obligations as operator of the properties as described onthe list
NAME(PLEASE P Morgan AndersonTITLE Regulatory AffairsAnalyst
SIGNATUR DATE 6/23/2010
(This space for State use only)
RECElVED APPROVED /2/ gJUN2 8 2010(5/2000) (See Instructionson Reverse Side)
DÎVÎSÎOH Of Oil,GasandMining'DIV.0F0lL,GAS&MINING EarleneRussell, Engineering
Questar Exploration Production Company (N5085) to QEP Energy Company (N3700)JOHNSON BOTTOM
effective June 14, 2010
well_name sec twp rng api entity mineral type stat Clease
LEOTA 1-34-2B 34 070S 210E 4304730879 5420 Federal OW PWV 7W-36-7-21 36 070S 210E 4304734065 13334 State D PAWV 9W-36-7-21 36 070S 210E 4304734066 13331 State D PAWV 11W-36-7-21 36 070S 210E 4304734067 13678 State GW PAWV 5W-36-7-21 36 070S 210E 4304734099 13807 State GW OPS CWV 13W-36-7-21 36 070S 210E 4304734100 13678 State GW PSU PURDY 7W-34-7-21 34 070S 210E 4304734380 13679 Federal GW PBBE 15G-16-7-21 16 070S 210E 4304735408 14070 State OW PBBS 15G-22-7-21 22 070S 210E 4304737443 15688 Federal OW P CTU 3-35-7-21 35 070S 210E 4304738995 16512 Federal GW PSU PURDY 3M-25-7-21 25 070S
. 210E 4304739179 Federal OW APD CJB 4G-27-7-21 27 070S 210E 4304739180 Federal OW APD CSU PURDY 10G-27-7-21 27 070S 210E 4304739181 Federal OW APD CJB 8G-21-7-21 21 070S 210E 4304740613 17595 Federal OW DRL CJB 12G-27-7-21 27 070S 210E 4304740614 Federal OW APD CJB 1G-28-7-21 28 070S 210E 4304740615 Federal OW APD CJB 15G-34-7-21 34 070S. 210E 4304740616 Federal OW APD C
Bonds: BLM = ESBOOOO24BIA = 956010693
State = 965010695 1 of
Questar Exploration Production Company (N5085) to QEP Energy Company (N3700)JOHNSON BOTTOM
effective June 14, 2010
well_name sec twp rng api entity mineral type stat Clease
LEOTA 1-34-2B 34 070S 210E 4304730879 5420 Federal OW PWV 7W-36-7-21 36 070S 210E 4304734065 13334 State D PAWV 9W-36-7-21 36 070S 210E 4304734066 13331 State D PAWV 11W-36-7-21 36 070S 210E 4304734067 13678 State GW PAWV 5W-36-7-21 36 070S 210E 4304734099 13807 State GW OPS CWV 13W-36-7-21 36 070S 210E 4304734100 13678 State GW PSU PURDY 7W-34-7-21 34 070S 210E 4304734380 13679 Federal GW PBBE 15G-16-7-21 16 070S 210E 4304735408 14070 State OW PBBS 15G-22-7-21 22 070S 210E 4304737443 15688 Federal OW P CTU 3-35-7-21 35 070S 210E 4304738995 16512 Federal GW PSU PURDY 3M-25-7-21 25 070S
. 210E 4304739179 Federal OW APD CJB 4G-27-7-21 27 070S 210E 4304739180 Federal OW APD CSU PURDY 10G-27-7-21 27 070S 210E 4304739181 Federal OW APD CJB 8G-21-7-21 21 070S 210E 4304740613 17595 Federal OW DRL CJB 12G-27-7-21 27 070S 210E 4304740614 Federal OW APD CJB 1G-28-7-21 28 070S 210E 4304740615 Federal OW APD CJB 15G-34-7-21 34 070S. 210E 4304740616 Federal OW APD C
Bonds: BLM = ESBOOOO24BIA = 956010693
State = 965010695 1 of
Questar Exploration Production Company (N5085) to QEP Energy Company (N3700)JOHNSON BOTTOM
effective June 14, 2010
well_name sec twp rng api entity mineral type stat Clease
LEOTA 1-34-2B 34 070S 210E 4304730879 5420 Federal OW PWV 7W-36-7-21 36 070S 210E 4304734065 13334 State D PAWV 9W-36-7-21 36 070S 210E 4304734066 13331 State D PAWV 11W-36-7-21 36 070S 210E 4304734067 13678 State GW PAWV 5W-36-7-21 36 070S 210E 4304734099 13807 State GW OPS CWV 13W-36-7-21 36 070S 210E 4304734100 13678 State GW PSU PURDY 7W-34-7-21 34 070S 210E 4304734380 13679 Federal GW PBBE 15G-16-7-21 16 070S 210E 4304735408 14070 State OW PBBS 15G-22-7-21 22 070S 210E 4304737443 15688 Federal OW P CTU 3-35-7-21 35 070S 210E 4304738995 16512 Federal GW PSU PURDY 3M-25-7-21 25 070S
. 210E 4304739179 Federal OW APD CJB 4G-27-7-21 27 070S 210E 4304739180 Federal OW APD CSU PURDY 10G-27-7-21 27 070S 210E 4304739181 Federal OW APD CJB 8G-21-7-21 21 070S 210E 4304740613 17595 Federal OW DRL CJB 12G-27-7-21 27 070S 210E 4304740614 Federal OW APD CJB 1G-28-7-21 28 070S 210E 4304740615 Federal OW APD CJB 15G-34-7-21 34 070S. 210E 4304740616 Federal OW APD C
Bonds: BLM = ESBOOOO24BIA = 956010693
State = 965010695 1 of
Questar Exploration Production Company (N5085) to QEP Energy Company (N3700)JOHNSON BOTTOM
effective June 14, 2010
well_name sec twp rng api entity mineral type stat Clease
LEOTA 1-34-2B 34 070S 210E 4304730879 5420 Federal OW PWV 7W-36-7-21 36 070S 210E 4304734065 13334 State D PAWV 9W-36-7-21 36 070S 210E 4304734066 13331 State D PAWV 11W-36-7-21 36 070S 210E 4304734067 13678 State GW PAWV 5W-36-7-21 36 070S 210E 4304734099 13807 State GW OPS CWV 13W-36-7-21 36 070S 210E 4304734100 13678 State GW PSU PURDY 7W-34-7-21 34 070S 210E 4304734380 13679 Federal GW PBBE 15G-16-7-21 16 070S 210E 4304735408 14070 State OW PBBS 15G-22-7-21 22 070S 210E 4304737443 15688 Federal OW P CTU 3-35-7-21 35 070S 210E 4304738995 16512 Federal GW PSU PURDY 3M-25-7-21 25 070S
. 210E 4304739179 Federal OW APD CJB 4G-27-7-21 27 070S 210E 4304739180 Federal OW APD CSU PURDY 10G-27-7-21 27 070S 210E 4304739181 Federal OW APD CJB 8G-21-7-21 21 070S 210E 4304740613 17595 Federal OW DRL CJB 12G-27-7-21 27 070S 210E 4304740614 Federal OW APD CJB 1G-28-7-21 28 070S 210E 4304740615 Federal OW APD CJB 15G-34-7-21 34 070S. 210E 4304740616 Federal OW APD C
Bonds: BLM = ESBOOOO24BIA = 956010693
State = 965010695 1 of
'a United States Department of the Interior
. BUREAU OF LAND MANAGEMENTTAKE PatcE*
CH # Utah State Office IN M ERICAP.O. Box 45155
Salt Lake City, UT 84145-0155http://www.b1m.gov/ut/st/en.html
IN REPLY REFER TO:3100(UT-922)
JUL2 8 2010
Memorandum
Fr m:
1FrieldOffice PriaceFie ce Mo Fi
Subject: Name Change Recognized
Attached is a copy of the Certificate of Name Change issued by the Texas Secretary of State anda decision letter recognizing the name change from the Eastern States Office. We have updatedour records to reflect the name change in the attached list of leases.
The name change from QuestarExploration and Production Company into QEP EnergyCompany is effective June 8, 2010.
cc: MMSUDOGM
RECEIVEDAUGl 6 2:
'a United States Department of the Interior
. BUREAU OF LAND MANAGEMENTTAKE PatcE*
CH # Utah State Office IN M ERICAP.O. Box 45155
Salt Lake City, UT 84145-0155http://www.b1m.gov/ut/st/en.html
IN REPLY REFER TO:3100(UT-922)
JUL2 8 2010
Memorandum
Fr m:
1FrieldOffice PriaceFie ce Mo Fi
Subject: Name Change Recognized
Attached is a copy of the Certificate of Name Change issued by the Texas Secretary of State anda decision letter recognizing the name change from the Eastern States Office. We have updatedour records to reflect the name change in the attached list of leases.
The name change from QuestarExploration and Production Company into QEP EnergyCompany is effective June 8, 2010.
cc: MMSUDOGM
RECEIVEDAUGl 6 2:
'a United States Department of the Interior
. BUREAU OF LAND MANAGEMENTTAKE PatcE*
CH # Utah State Office IN M ERICAP.O. Box 45155
Salt Lake City, UT 84145-0155http://www.b1m.gov/ut/st/en.html
IN REPLY REFER TO:3100(UT-922)
JUL2 8 2010
Memorandum
Fr m:
1FrieldOffice PriaceFie ce Mo Fi
Subject: Name Change Recognized
Attached is a copy of the Certificate of Name Change issued by the Texas Secretary of State anda decision letter recognizing the name change from the Eastern States Office. We have updatedour records to reflect the name change in the attached list of leases.
The name change from QuestarExploration and Production Company into QEP EnergyCompany is effective June 8, 2010.
cc: MMSUDOGM
RECEIVEDAUGl 6 2:
'a United States Department of the Interior
. BUREAU OF LAND MANAGEMENTTAKE PatcE*
CH # Utah State Office IN M ERICAP.O. Box 45155
Salt Lake City, UT 84145-0155http://www.b1m.gov/ut/st/en.html
IN REPLY REFER TO:3100(UT-922)
JUL2 8 2010
Memorandum
Fr m:
1FrieldOffice PriaceFie ce Mo Fi
Subject: Name Change Recognized
Attached is a copy of the Certificate of Name Change issued by the Texas Secretary of State anda decision letter recognizing the name change from the Eastern States Office. We have updatedour records to reflect the name change in the attached list of leases.
The name change from QuestarExploration and Production Company into QEP EnergyCompany is effective June 8, 2010.
cc: MMSUDOGM
RECEIVEDAUGl 6 2:
United States Department of the InteriorBUREAU OF LAND MANAGEMENT TAKE Pynor*
hoH Utah State Office Û ""ÀMERICA
P.O. Box 45155Salt Lake City, UT 84145-0155
http://www.blm.gov/ut/st/en.html
IN REPLY REFER TO g QFÛ3180 (UTU86617A)UT-922 DEC0 5 2011
Nathan C. KoenigerQEP Energy Company1050 17 Street, Suite 500Denver, Colorado 80265
Re: Initial PA "A"Johnson Bottom (GR) UnitUintah County, Utah
Dear Mr. Koeniger:
The Initial Participating Area "A", Johnson Bottom (GR) Unit, UTU86617A, is hereby approvedeffective as of December 17, 2009, pursuant to Section 11 of the Johnson Bottom (GR) UnitAgreement, Uintah County, Utah.
The Initial Participating Area "A"results in 320.00 acres and is based upon the completion of WellNo. BBS 15G-22-7-21, API No. 43-047,37443, surface located in the SW¼SE¼, of Section 22,Township 7 South, Range 21 East, SLB&M, Federal UnitTract No. 10, Lease No. UTU74972, withthe horizontal lateral terminatingin the NE¼SE¼ ofSection 27, Township 7 South, Range 21 East,SLB&M, Federal Unit Tract No. 3, Lease No. UTU16551, as being a well capable of producingunitized substances in paying quantities.
For production and accouriting reporting purposes, all submissions pertaining to the InitialParticipating Area "A"shall refer to UTU86617A.
A Copy of the approved request is being distributed to the appropriate agencies and one copy isreturned herewith. Please advise all interested parties of the establishment of the InitialParticipating Area "A",Johnson Bottom (GR) Unit, and the effective
United States Department of the InteriorBUREAU OF LAND MANAGEMENT TAKE Pynor*
hoH Utah State Office Û ""ÀMERICA
P.O. Box 45155Salt Lake City, UT 84145-0155
http://www.blm.gov/ut/st/en.html
IN REPLY REFER TO g QFÛ3180 (UTU86617A)UT-922 DEC0 5 2011
Nathan C. KoenigerQEP Energy Company1050 17 Street, Suite 500Denver, Colorado 80265
Re: Initial PA "A"Johnson Bottom (GR) UnitUintah County, Utah
Dear Mr. Koeniger:
The Initial Participating Area "A", Johnson Bottom (GR) Unit, UTU86617A, is hereby approvedeffective as of December 17, 2009, pursuant to Section 11 of the Johnson Bottom (GR) UnitAgreement, Uintah County, Utah.
The Initial Participating Area "A"results in 320.00 acres and is based upon the completion of WellNo. BBS 15G-22-7-21, API No. 43-047,37443, surface located in the SW¼SE¼, of Section 22,Township 7 South, Range 21 East, SLB&M, Federal UnitTract No. 10, Lease No. UTU74972, withthe horizontal lateral terminatingin the NE¼SE¼ ofSection 27, Township 7 South, Range 21 East,SLB&M, Federal Unit Tract No. 3, Lease No. UTU16551, as being a well capable of producingunitized substances in paying quantities.
For production and accouriting reporting purposes, all submissions pertaining to the InitialParticipating Area "A"shall refer to UTU86617A.
A Copy of the approved request is being distributed to the appropriate agencies and one copy isreturned herewith. Please advise all interested parties of the establishment of the InitialParticipating Area "A",Johnson Bottom (GR) Unit, and the effective
United States Department of the InteriorBUREAU OF LAND MANAGEMENT TAKE Pynor*
hoH Utah State Office Û ""ÀMERICA
P.O. Box 45155Salt Lake City, UT 84145-0155
http://www.blm.gov/ut/st/en.html
IN REPLY REFER TO g QFÛ3180 (UTU86617A)UT-922 DEC0 5 2011
Nathan C. KoenigerQEP Energy Company1050 17 Street, Suite 500Denver, Colorado 80265
Re: Initial PA "A"Johnson Bottom (GR) UnitUintah County, Utah
Dear Mr. Koeniger:
The Initial Participating Area "A", Johnson Bottom (GR) Unit, UTU86617A, is hereby approvedeffective as of December 17, 2009, pursuant to Section 11 of the Johnson Bottom (GR) UnitAgreement, Uintah County, Utah.
The Initial Participating Area "A"results in 320.00 acres and is based upon the completion of WellNo. BBS 15G-22-7-21, API No. 43-047,37443, surface located in the SW¼SE¼, of Section 22,Township 7 South, Range 21 East, SLB&M, Federal UnitTract No. 10, Lease No. UTU74972, withthe horizontal lateral terminatingin the NE¼SE¼ ofSection 27, Township 7 South, Range 21 East,SLB&M, Federal Unit Tract No. 3, Lease No. UTU16551, as being a well capable of producingunitized substances in paying quantities.
For production and accouriting reporting purposes, all submissions pertaining to the InitialParticipating Area "A"shall refer to UTU86617A.
A Copy of the approved request is being distributed to the appropriate agencies and one copy isreturned herewith. Please advise all interested parties of the establishment of the InitialParticipating Area "A",Johnson Bottom (GR) Unit, and the effective
United States Department of the InteriorBUREAU OF LAND MANAGEMENT TAKE Pynor*
hoH Utah State Office Û ""ÀMERICA
P.O. Box 45155Salt Lake City, UT 84145-0155
http://www.blm.gov/ut/st/en.html
IN REPLY REFER TO g QFÛ3180 (UTU86617A)UT-922 DEC0 5 2011
Nathan C. KoenigerQEP Energy Company1050 17 Street, Suite 500Denver, Colorado 80265
Re: Initial PA "A"Johnson Bottom (GR) UnitUintah County, Utah
Dear Mr. Koeniger:
The Initial Participating Area "A", Johnson Bottom (GR) Unit, UTU86617A, is hereby approvedeffective as of December 17, 2009, pursuant to Section 11 of the Johnson Bottom (GR) UnitAgreement, Uintah County, Utah.
The Initial Participating Area "A"results in 320.00 acres and is based upon the completion of WellNo. BBS 15G-22-7-21, API No. 43-047,37443, surface located in the SW¼SE¼, of Section 22,Township 7 South, Range 21 East, SLB&M, Federal UnitTract No. 10, Lease No. UTU74972, withthe horizontal lateral terminatingin the NE¼SE¼ ofSection 27, Township 7 South, Range 21 East,SLB&M, Federal Unit Tract No. 3, Lease No. UTU16551, as being a well capable of producingunitized substances in paying quantities.
For production and accouriting reporting purposes, all submissions pertaining to the InitialParticipating Area "A"shall refer to UTU86617A.
A Copy of the approved request is being distributed to the appropriate agencies and one copy isreturned herewith. Please advise all interested parties of the establishment of the InitialParticipating Area "A",Johnson Bottom (GR) Unit, and the effective
RECEIVED: Nov. 25, 2014
FEDERAL APPROVAL OF THIS ACTION IS NECESSARY
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
5.LEASE DESIGNATION AND SERIAL NUMBER: UTU-16551
SUNDRY NOTICES AND REPORTS ON WELLS
Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATIONFOR PERMIT TO DRILL form for such proposals.
6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
7.UNIT or CA AGREEMENT NAME: JOHNSON BOTTOM
1. TYPE OF WELL Oil Well
8. WELL NAME and NUMBER: BBS 15G-22-7-21
2. NAME OF OPERATOR: QEP ENERGY COMPANY
9. API NUMBER: 43047374430000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 11002 East 17500 South , Vernal, Ut, 84078 303 308-3068 Ext
9. FIELD and POOL or WILDCAT: BRENNAN BOTTOM
4. LOCATION OF WELL FOOTAGES AT SURFACE: 0669 FSL 2022 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: SWSE Section: 22 Township: 07.0S Range: 21.0E Meridian: S
COUNTY: UINTAH
STATE: UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENTApproximate date work will start:
11/25 /2014
SUBSEQUENT REPORTDate of Work Completion:
SPUD REPORTDate of Spud:
DRILLING REPORTReport Date:
ACIDIZE ALTER CASING CASING REPAIR
CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
DEEPEN FRACTURE TREAT NEW CONSTRUCTION
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION
REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
QEP ENERGY COMPANY REQUESTS APPROVAL TO RECOMPLETE THE BBS15G-22-7-21 BY ADDING ADDITIONAL PERFORATIONS TO THE GREEN
RIVER FORMATION. SEE ATTACHED PROCEDURES.
NAME (PLEASE PRINT) PHONE NUMBER Benna Muth 435 781-4320
TITLE Regulatory Assistant
SIGNATURE N/A
DATE 11/25/2014
December 30, 2014
Sundry Number: 58225 API Well Number: 43047374430000Sundry Number: 58225 API Well Number: 43047374430000FEDERAL APPROVAL OF THIS ACTION IS NECESSARY
FORM 9STATE OF UTAH
DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING UTU-16551
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:
FOR PERMIT TO DRILL form for such proposals. JOHNSON BOTTOM
1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well BBS 15G-22-7-21
2. NAME OF OPERATOR: 9. API NUMBER:QEP ENERGY COMPANY 43047374430000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:11002 East 17500 South , Vernal, Ut, 84078 303 308-3068 Ext BRENNAN BOTTOM
4. LOCATION OF WELL COUNTY:FOOTAGESAT SURFACE: UINTAH
0669 FSL 2022 FELQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:
QtrlQtr: SWSE Section: 22 Township: 07.0S Range: 21.0E Meridian: S UTAH
CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACI DIZE ALTER CASING CASING REPAIRNOTICE OF INTENT
Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
11/25/2014CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT
Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:
WILDCATWELLDETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
QEP ENERGYCOMPANYREQUESTS APPROVALTO RECOMPLETETHE BBS Accepted by the15G-22-7-21 BY ADDING ADDITIONAL PERFORATIONS TO THE GREEN utah Division of
RIVER FORMATION.SEE ATTACHEDPROCEDURES. Oil, Gas and Mining
Date:
NAME (PLEASE PRINT) PHONE NUMBER TITLEBenna Muth 435 781-4320 Regulatory Assistant
SIGNATURE DATEN/A 11/25/2014
RECEIVED: Nov. 25,
Sundry Number: 58225 API Well Number: 43047374430000FEDERAL APPROVAL OF THIS ACTION IS NECESSARY
FORM 9STATE OF UTAH
DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING UTU-16551
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:
FOR PERMIT TO DRILL form for such proposals. JOHNSON BOTTOM
1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well BBS 15G-22-7-21
2. NAME OF OPERATOR: 9. API NUMBER:QEP ENERGY COMPANY 43047374430000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:11002 East 17500 South , Vernal, Ut, 84078 303 308-3068 Ext BRENNAN BOTTOM
4. LOCATION OF WELL COUNTY:FOOTAGESAT SURFACE: UINTAH
0669 FSL 2022 FELQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:
QtrlQtr: SWSE Section: 22 Township: 07.0S Range: 21.0E Meridian: S UTAH
CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACI DIZE ALTER CASING CASING REPAIRNOTICE OF INTENT
Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
11/25/2014CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT
Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:
WILDCATWELLDETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
QEP ENERGYCOMPANYREQUESTS APPROVALTO RECOMPLETETHE BBS Accepted by the15G-22-7-21 BY ADDING ADDITIONAL PERFORATIONS TO THE GREEN utah Division of
RIVER FORMATION.SEE ATTACHEDPROCEDURES. Oil, Gas and Mining
Date:
NAME (PLEASE PRINT) PHONE NUMBER TITLEBenna Muth 435 781-4320 Regulatory Assistant
SIGNATURE DATEN/A 11/25/2014
RECEIVED: Nov. 25,
Sundry Number: 58225 API Well Number: 43047374430000FEDERAL APPROVAL OF THIS ACTION IS NECESSARY
FORM 9STATE OF UTAH
DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING UTU-16551
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:
FOR PERMIT TO DRILL form for such proposals. JOHNSON BOTTOM
1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well BBS 15G-22-7-21
2. NAME OF OPERATOR: 9. API NUMBER:QEP ENERGY COMPANY 43047374430000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:11002 East 17500 South , Vernal, Ut, 84078 303 308-3068 Ext BRENNAN BOTTOM
4. LOCATION OF WELL COUNTY:FOOTAGESAT SURFACE: UINTAH
0669 FSL 2022 FELQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:
QtrlQtr: SWSE Section: 22 Township: 07.0S Range: 21.0E Meridian: S UTAH
CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACI DIZE ALTER CASING CASING REPAIRNOTICE OF INTENT
Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
11/25/2014CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT
Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:
WILDCATWELLDETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
QEP ENERGYCOMPANYREQUESTS APPROVALTO RECOMPLETETHE BBS Accepted by the15G-22-7-21 BY ADDING ADDITIONAL PERFORATIONS TO THE GREEN utah Division of
RIVER FORMATION.SEE ATTACHEDPROCEDURES. Oil, Gas and Mining
Date:
NAME (PLEASE PRINT) PHONE NUMBER TITLEBenna Muth 435 781-4320 Regulatory Assistant
SIGNATURE DATEN/A 11/25/2014
RECEIVED: Nov. 25,
RECEIVED: Nov. 25, 2014
QEP Energy requests approval to recomplete the BB 15G-22-7-21 by adding additional perforations to the Green River Formation as follows:
1. Set a CFP at 6180’. 2. Stage 1:
a. 6139’-6143’, 3spf, frac with crosslink fluid. b. 6104’-6105’, 3spf, frac with crosslink fluid. c. 6055’-6056’, 3spf, frac with crosslink fluid. d. 6021’-6023’, 3spf, frac with crosslink fluid. e. 5973’-5974’, 3spf, frac with crosslink fluid. f. 5923’-5924’, 3spf, frac with crosslink fluid. g. 5896’-5897’, 3spf, frac with crosslink fluid. h. 5857’-5860’, 3spf, frac with crosslink fluid. i. 5828’-5830’, 3spf, frac with crosslink fluid.
3. Set a CFP at 5750’. 4. Stage 2:
a. 5710’-5712’, 3spf, frac with crosslink fluid. b. 5692’-5694’, 3spf, frac with crosslink fluid. c. 5660’-5661’, 3spf, frac with crosslink fluid. d. 5651’-5653’, 3spf, frac with crosslink fluid. e. 5595’-5597’, 3spf, frac with crosslink fluid. f. 5583’-5585’, 3spf, frac with crosslink fluid. g. 5561’-5563’, 3spf, frac with crosslink fluid. h. 5509’-5511’, 3spf, frac with crosslink fluid. i. 5499’-5500’, 3spf, frac with crosslink fluid.
5. Drill up both plugs and return well to production.
Sundry Number: 58225 API Well Number: 43047374430000Sundry Number: 58225 API Well Number: 43047374430000
O.EP Energy requests approval to recomplete the BB 15G-22-7-21 by adding additional perforations tothe Green River Formation as follows:
1. Set a CFP at 6180'.2. Stage 1:
a. 6139'-6143', 3spf, frac with crosslink fluid.b. 6104'-6105', 3spf, frac with crosslink fluid.c. 6055'-6056', 3spf, frac with crosslink fluid.d. 6021'-6023', 3spf, frac with crosslink fluid.e. 5973'-5974', 3spf, frac with crosslink fluid.f. 5923'-5924', 3spf, frac with crosslink fluid.g. 5896'-5897', 3spf, frac with crosslink fluid.h. 5857'-5860', 3spf, frac with crosslink fluid.i. 5828'-5830', 3spf, frac with crosslink fluid.
3. Set a CFP at 5750'.4. Stage 2:
a. 5710'-5712', 3spf, frac with crosslink fluid.b. 5692'-5694', 3spf, frac with crosslink fluid.c. 5660'-5661', 3spf, frac with crosslink fluid.d. 5651'-5653', 3spf, frac with crosslink fluid.e. 5595'-5597', 3spf, frac with crosslink fluid.f. 5583'-5585', 3spf, frac with crosslink fluid.g. 5561'-5563', 3spf, frac with crosslink fluid.h. 5509'-5511', 3spf, frac with crosslink fluid.i. 5499'-5500', 3spf, frac with crosslink fluid.
5. Drill up both plugs and return well to production.
RECEIVED: Nov. 25,
Sundry Number: 58225 API Well Number: 43047374430000
O.EP Energy requests approval to recomplete the BB 15G-22-7-21 by adding additional perforations tothe Green River Formation as follows:
1. Set a CFP at 6180'.2. Stage 1:
a. 6139'-6143', 3spf, frac with crosslink fluid.b. 6104'-6105', 3spf, frac with crosslink fluid.c. 6055'-6056', 3spf, frac with crosslink fluid.d. 6021'-6023', 3spf, frac with crosslink fluid.e. 5973'-5974', 3spf, frac with crosslink fluid.f. 5923'-5924', 3spf, frac with crosslink fluid.g. 5896'-5897', 3spf, frac with crosslink fluid.h. 5857'-5860', 3spf, frac with crosslink fluid.i. 5828'-5830', 3spf, frac with crosslink fluid.
3. Set a CFP at 5750'.4. Stage 2:
a. 5710'-5712', 3spf, frac with crosslink fluid.b. 5692'-5694', 3spf, frac with crosslink fluid.c. 5660'-5661', 3spf, frac with crosslink fluid.d. 5651'-5653', 3spf, frac with crosslink fluid.e. 5595'-5597', 3spf, frac with crosslink fluid.f. 5583'-5585', 3spf, frac with crosslink fluid.g. 5561'-5563', 3spf, frac with crosslink fluid.h. 5509'-5511', 3spf, frac with crosslink fluid.i. 5499'-5500', 3spf, frac with crosslink fluid.
5. Drill up both plugs and return well to production.
RECEIVED: Nov. 25,
Sundry Number: 58225 API Well Number: 43047374430000
O.EP Energy requests approval to recomplete the BB 15G-22-7-21 by adding additional perforations tothe Green River Formation as follows:
1. Set a CFP at 6180'.2. Stage 1:
a. 6139'-6143', 3spf, frac with crosslink fluid.b. 6104'-6105', 3spf, frac with crosslink fluid.c. 6055'-6056', 3spf, frac with crosslink fluid.d. 6021'-6023', 3spf, frac with crosslink fluid.e. 5973'-5974', 3spf, frac with crosslink fluid.f. 5923'-5924', 3spf, frac with crosslink fluid.g. 5896'-5897', 3spf, frac with crosslink fluid.h. 5857'-5860', 3spf, frac with crosslink fluid.i. 5828'-5830', 3spf, frac with crosslink fluid.
3. Set a CFP at 5750'.4. Stage 2:
a. 5710'-5712', 3spf, frac with crosslink fluid.b. 5692'-5694', 3spf, frac with crosslink fluid.c. 5660'-5661', 3spf, frac with crosslink fluid.d. 5651'-5653', 3spf, frac with crosslink fluid.e. 5595'-5597', 3spf, frac with crosslink fluid.f. 5583'-5585', 3spf, frac with crosslink fluid.g. 5561'-5563', 3spf, frac with crosslink fluid.h. 5509'-5511', 3spf, frac with crosslink fluid.i. 5499'-5500', 3spf, frac with crosslink fluid.
5. Drill up both plugs and return well to production.
RECEIVED: Nov. 25,
Division of Oil, Gas and MiningOperator Change/Name Change Worksheet-for State use only
Effective Date: 9/6t2017FORMER OPERATOR: NEW OPERATOR:QEP Energy Company1050 17th Street, Suite 800
Denver, CO 80265
Finley Resources, Inc.PO Box 2200Fort Worth, T){76113
Bottom-E0R
WELL INFOR]VIATION:Well Name Sec IWN RNG API Entitv Mineral Surface Type StatusSee Attached List
OPERATOR CHANGES DOCUMENTATION:L Sundry or legal documentation was received from the FORIVIER operator on:2. Sundry or legal documentation was received from the NEW operator on:3. New operator Division of corporations Business Number: 740glsl-0146
9lt8/2017
9l18/20179tr8tzafi
N/A
REVIEW:Receipt of Acceptance of Drilling Procedures for APD on:Reports current for Production/Disposition & Sundries:OPS/SI/TA well(s) reviewed for full cost bonding:UIC5 on all disposal/injection/storage well(s) approved on:
Surface Facility(s) included in operator change: Nonelnspections of PA state/fee well sites complete on (only upon operators request):
9lt8l20t7N/AComing
NEW OPERATOR BOND VERIFICATION:State/fee well(s) covered by Bond Number(s):
DATA ENTRY:Well(s) update in the RBDMS on:
Group(s) update in RDBMS on:
Surface Facilities update in RBDMS on:
RLBooI 1264
t0lt3t20l7N/AN/A
COMMENTS:Injection wells will be moved in another operator change when UIC 5's are submitted and approved.
LOl7612077
Division of Oil, Gas and MiningOperator Change/Name Change Worksheet-for State use only
Effective Date: 9/6/2017FORMER OPERATOR: NEW OPERATOR:QEP Energy Company Finley Resources, Inc.1050 17th Street, Suite 800 PO Box 2200Denver, CO 80265 Fort Worth, TX 76113
Groups:Brennan Bottom-EOR
WELL INFORMATION:Well Name See TWN RNG API Entity Mineral Surface Type StatusSee Attached List
OPERATOR CHANGES DOCUMENTATION:1. Sundry or legal documentation was received from the FORMER operator on: 9/18/20172. Sundry or legal documentation was received from the NEW operator on: 9/18/20173. New operator Division of Corporations Business Number: 7409151-0146
REVIEW:Receipt of Acceptance of Drilling Procedures for APD on: 9/18/2017Reports current for Production/Disposition & Sundries: 9/18/2017OPS/SI/TA well(s) reviewed for full cost bonding: N/AUIC5 on all disposal/injection/storage well(s) approved on: ComingSurface Facility(s) included in operator change: NoneInspections of PA state/fee well sites complete on (only upon operators request): N/A
NEW OPERATOR BOND VERIFICATION:State/fee well(s) covered by Bond Number(s): RLB0011264
DATA ENTRY:Well(s) update in the RBDMS on: 10/13/2017Group(s) update in RDBMS on: N/ASurface Facilities update in RBDMS on: N/A
COMMENTS:Injection wells will be moved in another operator change when UIC 5's are submitted and approved.
Division of Oil, Gas and MiningOperator Change/Name Change Worksheet-for State use only
Effective Date: 9/6/2017FORMER OPERATOR: NEW OPERATOR:QEP Energy Company Finley Resources, Inc.1050 17th Street, Suite 800 PO Box 2200Denver, CO 80265 Fort Worth, TX 76113
Groups:Brennan Bottom-EOR
WELL INFORMATION:Well Name See TWN RNG API Entity Mineral Surface Type StatusSee Attached List
OPERATOR CHANGES DOCUMENTATION:1. Sundry or legal documentation was received from the FORMER operator on: 9/18/20172. Sundry or legal documentation was received from the NEW operator on: 9/18/20173. New operator Division of Corporations Business Number: 7409151-0146
REVIEW:Receipt of Acceptance of Drilling Procedures for APD on: 9/18/2017Reports current for Production/Disposition & Sundries: 9/18/2017OPS/SI/TA well(s) reviewed for full cost bonding: N/AUIC5 on all disposal/injection/storage well(s) approved on: ComingSurface Facility(s) included in operator change: NoneInspections of PA state/fee well sites complete on (only upon operators request): N/A
NEW OPERATOR BOND VERIFICATION:State/fee well(s) covered by Bond Number(s): RLB0011264
DATA ENTRY:Well(s) update in the RBDMS on: 10/13/2017Group(s) update in RDBMS on: N/ASurface Facilities update in RBDMS on: N/A
COMMENTS:Injection wells will be moved in another operator change when UIC 5's are submitted and approved.
From: QEP Energy CompanyTo: Finley Resources, lnc.
WellName _ APIBRENNAN 2R -43U740125gl2cag.z-zo - r49q{qqqsoP 2G-3-7-20 i43O4754?70oP 4G-1-7-20 4304754371OP 6G-1'l-720 Wu{tzqPAqf. A - @q-usnoP 13G-1-7-20 ';4304754374oP't6G-1-7-20 i43%7il3756p ac:ti-t-zo 43o4tus76qLLG--!r"q---laso4rs43?8oP 5G-3-7-20oP 9G-14-7-20otr'15G{-720
lrtrytr7TF7
J7
V-a7E77-7
TWl.r D
Elql9iS+
lsS
ESS
EtrSgSSS
RNG21Ininw20lzoInwPqtralzo20)zo
,rueE Eecle i!lg 10E3E-_ IElrlE 1E- irlE lrE12
PermitPermit
PermitiE
trlEle
l3tq114
3oP 10G-1-7-20
"43047il3827 20 E 1
oP 1G-1-7-20 43U7il3% 7 20 E 1
oP 14G-12-7-20 43047il385 7 20 E 12 OilWell Approved Permit)P'l6G-11-7-20 14304754386 7 S 20E11 OilWell Approved Permit)P 4G-3-7-20 ,43047U387 7 S 20E3 OilWell Aooroved PermiloP 6G-3-7-20 4304754388 7 S )zoes OilWell Aooroved PermitoP 1G-12-7-20 4304754389 7 S 20 E 12 OilWell Aooroved PermitoP 13G-11-7-20 i43c475/;625 7 S 20 E 11
-,-ffiApproved Permit
oP 1c-10-7-20 43447il894 7 S 20 E 10 OilWell Aooroved PermitoP 7G-2-7-20 4304754909 7 S 20 E 2 OilWell Aooroved PermitoP 16G-2-t-20 ,4304754910oP 5ci2-7-iooP 9c-2-720 i4gri54g12oP 11G-2-7-20 4304754913OP 3G-2-7-20 Wusuoe tse+-t-zo -$oa7sas,ts
oP 13C2-7-n :4sc/rs4s1?
20
@@,@20
trq-izo206
2-22
2222
T:11
Approved PermitApproved PermitApproved PermitAooroved PermitApproved PermitApproved PermitAooroved Permit
oP 1G-2-7-20 430475,4i927 Approved PermitoP 15G-11-7-20 430/.755162 Aooroved PermitoP 9G-11-7-20 4304755163oe tzett-t--zo 430475518gP 2G-11-7-n -- l€0475s169oP 3c-11-720 - ?rrrr,ss1?o
7771
sIqS
2020
420
E
E--E-E
11
11
1L
OilWell]e{wq!l
OilWell
Approved PermitApproved Permit
{pproved PermitApproved Permit
E 11 Oil WelloP 8G-11-7-20 4304755174 7 S 20 E 11 OilWell Aooroved PermitcP 4G-11-7-20 )4304755175 7 S 20 E 11 OilWell Approved PermitSU PURDY 1Oc-27-7-21 'A30p739181 S 21 E 27 18256 OilWell Drillino Ooerations SusoendedBRENNAN 1 4304715417 7 S 20 E 3 5261 lOilWell Producing3RENNAN 3 4304715419 S 21 E 17 5261 iOilWell Producino3RENNAN 6 ,4304730109 7 S 21 E 9 5261 OilWell ProducinoLEOTA 1-U-28 4304730879 7 S 1 E 34 il2o lOilWellBRENNAN FED 15€ 4304731272 7 S 21
1121
E 8 84055261526',1
OilWellBRENNAN 9 4304732477BRENNAN 10 4304732771
7 S E 118E19S
BRENNAN 14 4304732774BREttNAt',t 12 4n4n277g
BBW 11G-20-7-21 ,4304736516BBS 15G-22-7-21 11444q3741ru 3-35-7-21 _EgAqlqgg!JB 4G-27-7-21 14304739180BRENNAN 15BRENNAN 15 i4304740198oP 16G-12-7-20 $;,O474U81oP 16G-12-7-20 430474cp,81oP 4c-1r-t-?o :4so4t4o4},JB 8G-21-7-21 t4304740613
\ ru 13\ /€G7-X l43o47341oolsu PURDY 7W-U-7-21 4304734380BBE 15G-16-7-21 4304735408
77'1il7,7l7
21 !21 I
^121 I2',t I
2121
L
21
^i^l20 120i
^-
5261 OilWell5261 OitWeq17UO _- ]Gas Well13Q29 Gas Well14O7O OilWell5261 OilWell
16512 Gas Well
17948 iOilWell17595 OilWell
Produging
ryqqeee[
Producing .
?rolqg4g'roducing .)roducing)roducing
)rod-ucingrroducino
352?-l13i12
1
12
E 1
oP 16G-3-7-20 4304751 7 S 20 E 3 9553 OilWell )roducinooP 7G-11-7-20 4304751504B ac-26-t-21 4304752468ffisaatBRENNANffi3RENNAN 7R 4go474o1|gl
S 20 E 1 9554 OilWell I8755 OilWell ,Lr _t19555 OilWell5261 - -oitl /eil5261 OilWell
1tIt'lr
,rgduq!ng)roduci49)roducing
ihut-in;nut-in
S 21 E 26Ss_- 20
21EhE-1 17
13
F om: QEP Energy CompanyT3: Finley Resources, IncEffective 9/6/2017Well Name API TWN TWN D RNG RNG_D Sec Entity Number Well Type Well StatusBRENNAN 2R 4304740125 7 S 21 E Oil Well Approved PermitOP 2G-10-7-20 304754369 7 S E 10 Oil Well Approved PermitOP 2G-3-7-20 4304754370 7 S 20 3 Oil Well Approved PermitOP 4G-1-7-20 4304754371 7 S O E 1 Oil Well roved PermitOP 6G-11-7-20 4304754372 7 S 20 E 1 ÖilWe11 roved PermitOP 6G-1-7-20 4304754373 7 S 20 E 1 Oil Well roved PermitOP 13G-1-7-20 4304754374 7 Oil Well Approved PermitOP 16G-1-7-20 4304754375 7 20 1 Oil Well Approved PermitOP 6G-12-7-20 4304754376 7 S 20 E 12 Oil Well Approved PermitOP 7G-3-7-20 4304754378 7 20 Oil Well d PermitOP 5G-3-7-20 4304754379 7 S 20 E OilWell Approved PermitOP 9G-14-7-20 4304754380 7 S 20 E 14 Oil Well Approved PermitOP 15G-3-7-20 4304754381 7 S 20 E 3 Oil Well Approved PermitOP 10G-1-7-20 4304754382 7 S E 1 Oil Well Approved PermitOP 1G-1-7-20 4304754384 7 S 20 E 1 Oil Well Approved PermitOP 14G-12-7-20 4304754385 7 S 20 E 12 Oil Well Approved PermitOP 16G-11-7-20 4304754386 7 S 20 E 11 Oil Well Approved PermitOP 4G-3-7-20 4304754387 7 S 20 E 3 Oil Well Approved PermitOP 6G-3-7-20 4304754388 7 S 20 E 3 Oil Well Approved PermitOP 1G-12-7-20 4304754389 7 S 20 E 12 Oil Well Approved PermitOP 13G-11-7-20 4304754625 7 S 20 E 11 Oil Well Approved PermitOP 1G-10-7-20 4304754894 7 S 20 E 10 Oil Well Approved PermitOP 7G-2-7-20 4304754909 7 S 20 E 2 Oil Well Approved PermitOP 16G-2-7-20 4304754910 7 20 E 2 Oil Well Approved PermitOP 5G-2-7-20 4304754911 7 S 20 E 2 Oil Well Approved PermitOP 9G-2-7-20 4304754912 7 S E 2 Oil Well Approved PermitOP 11G-2-7-20 304754913 7 S 20 E 2 Oil Well Approved PermitOP 3G-2-7-20 4304754914 7 S 20 E 2 Oil Well Approved PermitOP 15G-2-7-20 4304754915 7 S 20 E Oil We11 Approved PermitOP 13G-2-7-20 4304754917 7 S 20 E 2 Oil Well Approved PermitOP 1G-2-7-20 4304754927 7 S 20 E 2 Oil Well pproved PermitOP 15G-11-7-20 4304755162 7 S 20 E 11 Oil Well pproved PermitOP 9G-11-7-20 4304755163 7 S 20 E 11 Oil Well pproved PermitOP 12G-11-7-20 4304755164 7 20 E 11 Oil Well pproved PermitOP 2G-11-7-20 43047 S 20 E 11 Oil Approved PermitOP 3G-11-7-20 4304755170 7 S 20 _ E 11 Oil Well Approved PermitOP 10G-11-7-20 4304755172 7 S 20 E 11 Oil Well Approved PermitOP SG-11-7-20 4304755174 7 S 20 E 11 Oil Well Approved PermitOP 4G-11-7-20 4304755175 7 S 20 E 11 Oil Well Approved PermitSU PURDY 10G-27-7-2i 4304739181 7 S 21 E 27 18256 Oil Well DrillingOperations SuspendedBRENNAN 1 4304715417 7 S 20 E 13 5261 Oil Well ProducingBRENNAN 3 304715419 7 S 21 E 17 5261 Oil Well ProducingBRENNAN 6 4304730109 7 S 21 E 19 5261 Oil Well ProducingLEOTA 1-34-2B 4304730879 7 S 21 E 34 5420 Oil Well ProducingBRENNAN FED 15-8 4304731272 7 S 21 E 8 8405 Oil Well ProducingBRENNAN 9 4304732477 7 S 21 i E 18 5261 Oil Well ProducingBRENNAN 10 4304732771 7 S 21 E 19 5261 Oil Well ProducingBRENNAN 14 4304732774 7 S 21 _ E_ 5261 Oil Well ProducingBRENNAN 12 4304732779 7 S 21 IE 18 5261 Oil Well ProducingWV 13W-36-7-21 4304734100 7 S 21 E N 17646 Gas Well ProducingSU PURDY 7W-34-7-21 4304734380 7 S 21 E 34 13679 Gas Well ProducingBBE 15G-16-7-21 4304735408 7 21 E 16 14070 Oil Well ProducingBBW 11G-20-7-21 4304736516 7 S_ 21 E 5261 Oil Well ProducingBBS 15G-22-7-21 4304737443 7 S 21 E 22 15688 Oil Well ProducingTU 3-35-7-21 4304738995 7 21 E 35 16512 Gas Well ProducingJB 4G-27-7-21 4304739180 7 S 21 E 27 18255 Oil Well ProducingBRENNAN 15 4304740198 7 S 20 E 13 5261 Oil Well ProducingOP 16G-12-7-20 4304740481 7 S 20 E 12 17527 Oil Well POP 4G-12-7-20 4304740482 7 S 20 E 12 17948 Oil Well ProducingJB 8G-21-7-21 04740613 7 S 21 E 17595 Oil Well ProducingOP 16G-3-7-20 4304751503 7 S 20 E 19553 Oil Well ProducingOP 7G-11-7-20 4304751504 7 S 20 E 11 19554 Oil Well ProducingJB 4G-26-7-21 4304752468 7 S 21 E 26 18755 Oil Well ProducingOP 4G-2-7-20 4304753641 7 S 20 19555 ilWell ProducingBRENNAN 8 4304731509 7 S 21 E 17 5261 Oil Well Shut-inBRENNAN 7R 4304740197 7 S |20 E 13 5261 Oil Well
F om: QEP Energy CompanyT3: Finley Resources, IncEffective 9/6/2017Well Name API TWN TWN D RNG RNG_D Sec Entity Number Well Type Well StatusBRENNAN 2R 4304740125 7 S 21 E Oil Well Approved PermitOP 2G-10-7-20 304754369 7 S E 10 Oil Well Approved PermitOP 2G-3-7-20 4304754370 7 S 20 3 Oil Well Approved PermitOP 4G-1-7-20 4304754371 7 S O E 1 Oil Well roved PermitOP 6G-11-7-20 4304754372 7 S 20 E 1 ÖilWe11 roved PermitOP 6G-1-7-20 4304754373 7 S 20 E 1 Oil Well roved PermitOP 13G-1-7-20 4304754374 7 Oil Well Approved PermitOP 16G-1-7-20 4304754375 7 20 1 Oil Well Approved PermitOP 6G-12-7-20 4304754376 7 S 20 E 12 Oil Well Approved PermitOP 7G-3-7-20 4304754378 7 20 Oil Well d PermitOP 5G-3-7-20 4304754379 7 S 20 E OilWell Approved PermitOP 9G-14-7-20 4304754380 7 S 20 E 14 Oil Well Approved PermitOP 15G-3-7-20 4304754381 7 S 20 E 3 Oil Well Approved PermitOP 10G-1-7-20 4304754382 7 S E 1 Oil Well Approved PermitOP 1G-1-7-20 4304754384 7 S 20 E 1 Oil Well Approved PermitOP 14G-12-7-20 4304754385 7 S 20 E 12 Oil Well Approved PermitOP 16G-11-7-20 4304754386 7 S 20 E 11 Oil Well Approved PermitOP 4G-3-7-20 4304754387 7 S 20 E 3 Oil Well Approved PermitOP 6G-3-7-20 4304754388 7 S 20 E 3 Oil Well Approved PermitOP 1G-12-7-20 4304754389 7 S 20 E 12 Oil Well Approved PermitOP 13G-11-7-20 4304754625 7 S 20 E 11 Oil Well Approved PermitOP 1G-10-7-20 4304754894 7 S 20 E 10 Oil Well Approved PermitOP 7G-2-7-20 4304754909 7 S 20 E 2 Oil Well Approved PermitOP 16G-2-7-20 4304754910 7 20 E 2 Oil Well Approved PermitOP 5G-2-7-20 4304754911 7 S 20 E 2 Oil Well Approved PermitOP 9G-2-7-20 4304754912 7 S E 2 Oil Well Approved PermitOP 11G-2-7-20 304754913 7 S 20 E 2 Oil Well Approved PermitOP 3G-2-7-20 4304754914 7 S 20 E 2 Oil Well Approved PermitOP 15G-2-7-20 4304754915 7 S 20 E Oil We11 Approved PermitOP 13G-2-7-20 4304754917 7 S 20 E 2 Oil Well Approved PermitOP 1G-2-7-20 4304754927 7 S 20 E 2 Oil Well pproved PermitOP 15G-11-7-20 4304755162 7 S 20 E 11 Oil Well pproved PermitOP 9G-11-7-20 4304755163 7 S 20 E 11 Oil Well pproved PermitOP 12G-11-7-20 4304755164 7 20 E 11 Oil Well pproved PermitOP 2G-11-7-20 43047 S 20 E 11 Oil Approved PermitOP 3G-11-7-20 4304755170 7 S 20 _ E 11 Oil Well Approved PermitOP 10G-11-7-20 4304755172 7 S 20 E 11 Oil Well Approved PermitOP SG-11-7-20 4304755174 7 S 20 E 11 Oil Well Approved PermitOP 4G-11-7-20 4304755175 7 S 20 E 11 Oil Well Approved PermitSU PURDY 10G-27-7-2i 4304739181 7 S 21 E 27 18256 Oil Well DrillingOperations SuspendedBRENNAN 1 4304715417 7 S 20 E 13 5261 Oil Well ProducingBRENNAN 3 304715419 7 S 21 E 17 5261 Oil Well ProducingBRENNAN 6 4304730109 7 S 21 E 19 5261 Oil Well ProducingLEOTA 1-34-2B 4304730879 7 S 21 E 34 5420 Oil Well ProducingBRENNAN FED 15-8 4304731272 7 S 21 E 8 8405 Oil Well ProducingBRENNAN 9 4304732477 7 S 21 i E 18 5261 Oil Well ProducingBRENNAN 10 4304732771 7 S 21 E 19 5261 Oil Well ProducingBRENNAN 14 4304732774 7 S 21 _ E_ 5261 Oil Well ProducingBRENNAN 12 4304732779 7 S 21 IE 18 5261 Oil Well ProducingWV 13W-36-7-21 4304734100 7 S 21 E N 17646 Gas Well ProducingSU PURDY 7W-34-7-21 4304734380 7 S 21 E 34 13679 Gas Well ProducingBBE 15G-16-7-21 4304735408 7 21 E 16 14070 Oil Well ProducingBBW 11G-20-7-21 4304736516 7 S_ 21 E 5261 Oil Well ProducingBBS 15G-22-7-21 4304737443 7 S 21 E 22 15688 Oil Well ProducingTU 3-35-7-21 4304738995 7 21 E 35 16512 Gas Well ProducingJB 4G-27-7-21 4304739180 7 S 21 E 27 18255 Oil Well ProducingBRENNAN 15 4304740198 7 S 20 E 13 5261 Oil Well ProducingOP 16G-12-7-20 4304740481 7 S 20 E 12 17527 Oil Well POP 4G-12-7-20 4304740482 7 S 20 E 12 17948 Oil Well ProducingJB 8G-21-7-21 04740613 7 S 21 E 17595 Oil Well ProducingOP 16G-3-7-20 4304751503 7 S 20 E 19553 Oil Well ProducingOP 7G-11-7-20 4304751504 7 S 20 E 11 19554 Oil Well ProducingJB 4G-26-7-21 4304752468 7 S 21 E 26 18755 Oil Well ProducingOP 4G-2-7-20 4304753641 7 S 20 19555 ilWell ProducingBRENNAN 8 4304731509 7 S 21 E 17 5261 Oil Well Shut-inBRENNAN 7R 4304740197 7 S |20 E 13 5261 Oil Well
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS AND MINING
SUNDRY NOTICES AND REPORTS ON WELLS
Do not use this form for proposals to dritl nsw wells, signilicantly deepen existing wells belorv clnent bottom-hole depth, retrter plugged w6lls, ortodriil horizontat tatarals. USeAPPLICATION FOR PERMIT TO DRILL form for such ProPosals.
OILWELL E GASWELL Z OTHER X
Finley Resources lnc.
FORM 9
2
3.
5. LEASE DESIGNATION AND
See Attachment AALLOTTEE OR TRIBE MME:
See Attachment A8. WELL
See Attachment A9. API NUMBER:
See Attachment A10. FIELDANO
Brennan Boftom
COUNTY: UiNtAh
STATE:
P.O. Box 2200 FortWorth
4. LOGATIONOFWELL
FOOTAGES AT SURFACE: SCE AftAChMENt A
QTRTOrR, sEcTloN, TOVVNSHIP, MNGE, MERIDIAN: See AftaChmgnt A
TX 76113
CHECKAPPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
aTYPE OF SUBMISSION
NOTICE OF INTENT(submit in DuPli€te)
Apprcximata date work wlll start:
tr SUBSEQUENTREPORT(Submit Original Fom Only)
Oate of wqk comPletion:
! nr-ren cnsnc
n cesrHcRepetn
I crnuoeroeREvrousPLANs
fl cneuceruatrc
I cnnruoeweu-ueue
I cxeruceweLLSTATUS
l-l conaurncle pRoDUcrNG FoRMATtoNS
n convenrweuwpe
TYPE OF ACTION
n rmcrunerneer
! r.rewcorsrRucroN
I oeeneroncnar'ree
I eluceruoaartoott
l-l pr-uo eAcx
! enooucloN (sTARTiRESUME)
n nEcr-nuartoNoFwELLsrrE
l-l necouplerE - DTFFERENT FoRMATIoN
REPERFOMTE CURRENT FORMATION
SIDETRACK TO REPAIR VIELL
TEMPOMRILY ABANDON
TUBING REPAIR
VENT OR FLARE
WATER DISPOSAL
WATER SHUTOFF
orHER: Transfer of operator
trtruutrtra
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
eEp Energy Company respectfully requests that the operator be transfened to Finley Resources lnc. for all wells referenced
on Aftachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.
Finley Resources lnc. will operate the wells under Federal Bond No. RLB001 1262 or State Bond No. RLB001 1264 and will
comptywithalltheConditionsof ApprovalwithintheoriginallyapprovedApplicationsforPermittoDrill. ';{[[]Fiil,tli ,
stP 1 e ?017
L' i,lil.,it r/\1l
Vice President, Land
Brent D. Talbot PresidentNAME (PLEASE PRINT)
oor. 9-13- taSIGNATURE
(Ihb space for State use only)
ocl I 3 2ol7
DIV. UIL. GAS & iVitNtNG
(5/2000) (See lnsfudons on Reverse Side)
BY QrtahJtq fnr'rti.na'
STATEOFUTAH FORM9
DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERIALNUMBER:
See Attachment A6. IF INDIAN,ALLOTTEEOR TRIBE NAME
SUNDRY NOTICES AND REPORTS ON WELLS7. UNITorCA AGREEMENT NAME:
Do not use thisform for proposals to drillnewwells, significantlydeepen existingwells below currentbottom-hole depth, reenterplugged wells,ort° See Attachment Adrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for such proposals.
1. TYPE OF WELL v 8. WELL NAMEand NUMBER:OIL WELL / GAS WELL / OTHER ^ See Attachment A
2. NAMEOF OPERATOR: 9. API NUMBER:
Finley Resources Inc. See Attachment A3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELD AND POOL, OR WILDCAT:
P.O. Box 2200 ce Fort Worth STATE TX ZIP76113 (817) 231-8732 Brennan Bottom4 LOCATIONOF WELL
FOOTAGESATSURFACE: See Attachment A COUNTY: Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: See Attachment A STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT
(Submit in Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL
Approximate date work wlli start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
CHANGETO PREVIOUSPLANS OPERATOR CHANGE TUBING REPAIR
O CHANGETUBING PLUG ANDABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
O CHANGE WELL STATUS PRODUCTION (STARTIRESUME) WATER SHUT-OFF
Date ofworkcompletion:COMMINGLE PRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Transfer of OperatorCONVERT WELLTYPE RECOMPLETE - DIFFERENT FORMATION
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
QEP Energy Company respectfully requests that the operator be transferred to Finley Resources Inc. for all wells referencedon Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.
Finley Resources Inc. willoperate the wells under Federal Bond No. RLBOO11262or State Bond No. RLBOO11264and willcomply with all the Conditions of Approval within the originally approved Applications for Permit to Drill.
SEP 19 20
Michael K. Watanabe Brent D. TalbotVice President, Land President
Brent D. Talbot PresidentSNAME(PULREEASEPRIN TITLEE
OCT13 2017Div IL GAS & MINING
(5/2000) (See Instructions on Reverse
STATEOFUTAH FORM9
DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERIALNUMBER:
See Attachment A6. IF INDIAN,ALLOTTEEOR TRIBE NAME
SUNDRY NOTICES AND REPORTS ON WELLS7. UNITorCA AGREEMENT NAME:
Do not use thisform for proposals to drillnewwells, significantlydeepen existingwells below currentbottom-hole depth, reenterplugged wells,ort° See Attachment Adrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for such proposals.
1. TYPE OF WELL v 8. WELL NAMEand NUMBER:OIL WELL / GAS WELL / OTHER ^ See Attachment A
2. NAMEOF OPERATOR: 9. API NUMBER:
Finley Resources Inc. See Attachment A3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELD AND POOL, OR WILDCAT:
P.O. Box 2200 ce Fort Worth STATE TX ZIP76113 (817) 231-8732 Brennan Bottom4 LOCATIONOF WELL
FOOTAGESATSURFACE: See Attachment A COUNTY: Uintah
QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: See Attachment A STATE:UTAH
CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT
(Submit in Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL
Approximate date work wlli start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON
CHANGETO PREVIOUSPLANS OPERATOR CHANGE TUBING REPAIR
O CHANGETUBING PLUG ANDABANDON VENT OR FLARE
SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)
O CHANGE WELL STATUS PRODUCTION (STARTIRESUME) WATER SHUT-OFF
Date ofworkcompletion:COMMINGLE PRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Transfer of OperatorCONVERT WELLTYPE RECOMPLETE - DIFFERENT FORMATION
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
QEP Energy Company respectfully requests that the operator be transferred to Finley Resources Inc. for all wells referencedon Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.
Finley Resources Inc. willoperate the wells under Federal Bond No. RLBOO11262or State Bond No. RLBOO11264and willcomply with all the Conditions of Approval within the originally approved Applications for Permit to Drill.
SEP 19 20
Michael K. Watanabe Brent D. TalbotVice President, Land President
Brent D. Talbot PresidentSNAME(PULREEASEPRIN TITLEE
OCT13 2017Div IL GAS & MINING
(5/2000) (See Instructions on Reverse
Attachment A - Well Transfer of Operator - Brennan Bottom Field09l06l20l7
Federal WellsAPI No. Well Name Lease No, Section Townshlp Range County
43-047-34380 SU PURDY 7W-34-7-21 uTU15551 34 7S ztE Uintah
43-047-39181 SU PURDY TOG.27-7-2L uru16551 21 7S 2tE Uintah
43-047-32477 BRENNAN 9 uTs1071745 18 7S ztE Uintah
43-047-32779 BRENNAN 12 UTUO45 18 7S 2IE Uintah
43-047-t5419 BRENNAN 3 uTsL056409A L7 7S zLE Uintah
43-047-L5417 BRENNAN 1 uTsL06s342 13 7S 20E Uintah
43-047-32774 BRENNAN 14 UTU046 18 7S zLE Uintah
43-047-31509 BRENNAN 8 UTSLO664O9A t7 7S 2LE Uintah
43-047-30479 LEOTA 1-34-28 uru15551 34 7S zLE Uintah
43-047-38995 TU 3-3s-7-21 (ML) uTU73681 35 7S 2tE Uintah
43-047-36516 BBW 11G-2G7-21 vru74479 20 7S zLE Uintah
43-047-39L80 JB4G-27-7-27 uTU16551 27 7S 21E Uintah
43-047-40673 JBAG-27-7-27 uTU30290 2t 7S 21E Uintah
4?-047-37272 BRENNAN FEDERAL 1',8-7.21 uTU49656 8 7S 21E Uintah
43-047-40482 oP 4G-12-7-20 uTU88140 t2 7S 20E Uintah
43-047-40L97 BRENNAN BOTTOM 7R uTs1055342 13 7S 20E Uintah
43-047-40t98 BRENNAN 15 uTs1065342 13 7S 20E Uintah
43-047-40487 oP t6G-L2-7-20 uTU88140 t2 7S 20E Uintah
43-047-37443 BBSLSG-22-7-2L uTUl4972 22 7S zrE Uintah
43-047-52468 JB 4G-26-7-21 uru73680 26 7S 2LE Uintah
43-047-51503 oP 16G-3-7-20 (GR) uTU90216 3 7S 20E Uintah
43-047-5L504 oP 7G-1t-7-20 uTU86331 LL 7S 20E Uintah
43-047-32772 BRENNAN 11 (iniection) uTs1071745 18 7S 21E Uintah
43-047-t5420 BRENNAN 5 (iniectionI uTs1071745 18 7S 21E Uintah
43-047-40L25 BRENNAN 2R uTs1071745 18 7S 20E Uintah
43-047-54382 oP 10G-1-7-20 uTU88140 1 7S 20E Uintah
43-047-54375 oP 16G-1-7-20 uTU88140 1 7S 20E Uintah
43-047-54344 oP rc-r-7-20 uTU88140 1 7S 20E Uintah
43-047-54383 oP 2G-1-7-20 uTU88140 1 7S 20E Uintah
43-047-54371 oP 4G-t-7-20 uru88140 1 7S 20E Uintah
43-047-54373 oP 6G-1-7-20 uTU88140 t 7S 20E Uintah
43-047-54625 oP 7?G-Lt-7-20 uru86331 t1 7S 20E Uintah
43-047-54386 oP 16G-11-7-20 uru86331 17 7S 20E Uintah
43-047-54372 oP 6c-tt-7-20 uTU86331 11 7S 20E Uintah
43-047-54380 oP 9G-t4-7-20 uTU86331 t4 7S 20E Uintah
43-047-55172 oP LOG-tl-7-20 uTU85331 11 7S 20E Uintah
43:047-55164 oP 12G-LL-7-20 uTU86331 TL 7S 20E Uintah
43-047-55162 oP 15G-11-7-20 uTU86331 11 7S 20E Uintah
43-047-55169 oP 2G-Lt-7-20 uru86331 11 7S 20E Uintah
43-047-55L70 oP 3G-11-7-20 uru86331 11 7S 20E Uintah
43-047-55L75 oP 4G-LL-7-20 uTU86331 11 7S 20E Uintah
43-047-55t74 oP 8G-11-7-20 uTU86331 11 7S 20E Uintah
43-047-55L63 oP 9G-11-7-20 uTU86331 tt 7S 20E Uintah
43-047-54345 oP 14G-72-7-20 uru86331 L2 7S 20E Uintah
43-047-54374 oP 73G-t-7-20 uTU88140 1 7S 20E Uintah
43-047-54349 oP 7G-72-7-20 uTU88140 t2 7S 20E Uintah
43-047-54376 oP 6G-t2-7-20 uru88140 t2 7S 20E Uintah
43-047-54381 oP 15G-3-7-20 uTU14639 3 7S 20E Uintah
43-047-54894 oP 1G-1G.7-20 uTU86331 10 7S 20E Uintah
43-047-54369 oP 2G-7G'7-20 uTU86331 10 7S 20E Uintah
43-047-s4370 oP 2G-3-7-20 uTU14639 3 7S 20E Uintah
Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017
Federal WellsAPI No. Well Name Lease No. Section Township Range County
43-047-34380 SU PURDY7W-34-7-21 UTU16551 34 7S 21E Uintah
43-047-39181 SU PURDY10G-27-7-21 UTU16551 27 7S 21E Uintah
43-047-32477 BRENNAN9 UTSLO71745 18 7S 21E Uintah
43-047-32779 BRENNAN12 UTUO46 18 75 21E Uintah
43-047-15419 BRENNAN3 UTSLO66409A 17 7S 21E Uintah
43-047-15417 BRENNAN1 UTSLO65342 13 7S 20E Uintah
43-047-32774 BRENNAN14 UTUO46 18 7S 21E Uintah43-047-31509 BRENNAN8 UTSLO66409A 17 7S 21E Uintah
43-047-30879 LEOTA1-34-2B UTU16551 34 7S 21E Uintah
43-047-38995 TU 3-35-7-21(ML) UTU73681 35 7S 21E Uintah
43-047-36516 BBW 11G-20-7-21 UTU74419 20 7S 21E Uintah
43-047-39180 JB 4G-27-7-21 UTU16551 27 7S 21E Uintah
43-047-40613 JB 8G-21-7-21 UTU30290 21 7S 21E Uintah43-047-31272 BRENNANFEDERAL15-8-7-21 UTU49656 8 7S 21E Uintah
43-047-40482 OP 4G-12-7-20 UTU88140 12 7S 20E Uintah43-047-40197 BRENNANBOTTOM 7R UTSLO65342 13 7S 20E Uintah
43-047-40198 BRENNAN15 UTSLO65342 13 7S 20E Uintah
43-047-40481 OP 16G-12-7-20 UTU88140 12 7S 20E Uintah
43-047-37443 BBS 15G-22-7-21 UTU74972 22 75 21E Uintah
43-047-52468 JB 4G-26-7-21 UTU73680 26 7S 21E Uintah43-047-51503 OP 16G-3-7-20 (GR) UTU90216 3 7S 20E Uintah43-047-51504 OP 7G-11-7-20 UTU86331 11 7S 20E Uintah43-047-32772 BRENNAN11(injection) UTSLO71745 18 7S 21E Uintah
43-047-15420 BRENNAN5 (injection) UTSLO71745 18 75 21E Uintah
43-047-40125 BRENNAN2R UTSLO71745 18 7S 20E Uintah43-047-54382 OP 10G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54375 OP 16G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54384 OP 1G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54383 OP 2G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54371 OP 4G-1-7-20 UTU88140 1 7S 20E Uintah
43-047-54373 OP 6G-1-7-20 UTU88140 1 7S 20E Uintah
43-047-54625 OP 13G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-54386 OP 16G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-54372 OP 6G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-54380 OP 9G-14-7-20 UTU86331 14 7S 20E Uintah
43-047-55172 OP 10G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55164 OP 12G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-55162 OP 15G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55169 OP 2G-11-7-20 UTU86331 11 75 20E Uintah
43-047-55170 OP 3G-11-7-20 UTU86331 11 75 20E Uintah43-047-55175 OP 4G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55174 OP 8G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55163 OP 9G-11-7-20 UTU86331 11 7S 20E Uintah43-047-54385 OP 14G-12-7-20 UTU86331 12 75 20E Uintah43-047-54374 OP 13G-1-7-20 UTU88140 1 75 20E Uintah43-047-54389 OP 1G-12-7-20 UTU88140 12 75 20E Uintah
43-047-54376 OP 6G-12-7-20 UTU88140 12 7S 20E Uintah
43-047-54381 OP 15G-3-7-20 UTU14639 3 7S 20E Uintah
43-047-54894 OP 1G-10-7-20 UTU86331 10 7S 20E Uintah
43-047-54369 OP 2G-10-7-20 UTU86331 10 7S 20E Uintah
43-047-54370 OP 2G-3-7-20 UTU14639 3 7S 20E
Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017
Federal WellsAPI No. Well Name Lease No. Section Township Range County
43-047-34380 SU PURDY7W-34-7-21 UTU16551 34 7S 21E Uintah
43-047-39181 SU PURDY10G-27-7-21 UTU16551 27 7S 21E Uintah
43-047-32477 BRENNAN9 UTSLO71745 18 7S 21E Uintah
43-047-32779 BRENNAN12 UTUO46 18 75 21E Uintah
43-047-15419 BRENNAN3 UTSLO66409A 17 7S 21E Uintah
43-047-15417 BRENNAN1 UTSLO65342 13 7S 20E Uintah
43-047-32774 BRENNAN14 UTUO46 18 7S 21E Uintah43-047-31509 BRENNAN8 UTSLO66409A 17 7S 21E Uintah
43-047-30879 LEOTA1-34-2B UTU16551 34 7S 21E Uintah
43-047-38995 TU 3-35-7-21(ML) UTU73681 35 7S 21E Uintah
43-047-36516 BBW 11G-20-7-21 UTU74419 20 7S 21E Uintah
43-047-39180 JB 4G-27-7-21 UTU16551 27 7S 21E Uintah
43-047-40613 JB 8G-21-7-21 UTU30290 21 7S 21E Uintah43-047-31272 BRENNANFEDERAL15-8-7-21 UTU49656 8 7S 21E Uintah
43-047-40482 OP 4G-12-7-20 UTU88140 12 7S 20E Uintah43-047-40197 BRENNANBOTTOM 7R UTSLO65342 13 7S 20E Uintah
43-047-40198 BRENNAN15 UTSLO65342 13 7S 20E Uintah
43-047-40481 OP 16G-12-7-20 UTU88140 12 7S 20E Uintah
43-047-37443 BBS 15G-22-7-21 UTU74972 22 75 21E Uintah
43-047-52468 JB 4G-26-7-21 UTU73680 26 7S 21E Uintah43-047-51503 OP 16G-3-7-20 (GR) UTU90216 3 7S 20E Uintah43-047-51504 OP 7G-11-7-20 UTU86331 11 7S 20E Uintah43-047-32772 BRENNAN11(injection) UTSLO71745 18 7S 21E Uintah
43-047-15420 BRENNAN5 (injection) UTSLO71745 18 75 21E Uintah
43-047-40125 BRENNAN2R UTSLO71745 18 7S 20E Uintah43-047-54382 OP 10G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54375 OP 16G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54384 OP 1G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54383 OP 2G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54371 OP 4G-1-7-20 UTU88140 1 7S 20E Uintah
43-047-54373 OP 6G-1-7-20 UTU88140 1 7S 20E Uintah
43-047-54625 OP 13G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-54386 OP 16G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-54372 OP 6G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-54380 OP 9G-14-7-20 UTU86331 14 7S 20E Uintah
43-047-55172 OP 10G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55164 OP 12G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-55162 OP 15G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55169 OP 2G-11-7-20 UTU86331 11 75 20E Uintah
43-047-55170 OP 3G-11-7-20 UTU86331 11 75 20E Uintah43-047-55175 OP 4G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55174 OP 8G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55163 OP 9G-11-7-20 UTU86331 11 7S 20E Uintah43-047-54385 OP 14G-12-7-20 UTU86331 12 75 20E Uintah43-047-54374 OP 13G-1-7-20 UTU88140 1 75 20E Uintah43-047-54389 OP 1G-12-7-20 UTU88140 12 75 20E Uintah
43-047-54376 OP 6G-12-7-20 UTU88140 12 7S 20E Uintah
43-047-54381 OP 15G-3-7-20 UTU14639 3 7S 20E Uintah
43-047-54894 OP 1G-10-7-20 UTU86331 10 7S 20E Uintah
43-047-54369 OP 2G-10-7-20 UTU86331 10 7S 20E Uintah
43-047-54370 OP 2G-3-7-20 UTU14639 3 7S 20E
43-047-54387 oP 4G-3-7-20 uru14639 3 7S 20E Uintah
43-047-54379 oP 5G-3-7-20 uTU14639 3 7S 20E Uintah
43-047-54388 oP 6G-3-7-20 uTU14639 3 7S 20E Uintah
43-047-54378 oP 7G-3-7-20 uTU14539 3 7S 20E Uintah
State and FEE WellsAPI No. Well Name Lease No. Section Townshlp Range County
43-047-5364L oP 4G-2-7-20 M149758 2 7S 20E Uintah
43-047-3277L BRENNAN 10 M[]068 L9 7S zLE Uintah
43-047-34t@ wv 13w-36-7-21 M147040 36 7S zLE Uintah
43-O47-35408 BBE 15G-1G7-21 ML46292 16 7S ztE Uintah
43-047-54912 oP 9G-2-7-20 M149758 2 7S 20E Uintah
43-047-54913 oP ttc-2-7-20 ML497s8 2 7S 20E Uintah
43-047-54917 oP t3G-2-7-20 M149758 2 7S 20E Uintah
43-047-s49ts oP LsG-2-7-20 M149758 2 7S 20E Uintah
43-047-54970 oP 16G-2-7-20 M149758 2 7S 20E Uintah
43-047-54927 oP tG-2-7-20 M149758 2 7S 20E LJintah
43-047-54914 oP 3G-2-7-20 M149758 2 7S 20E Uintah
43-047-549!L oP 5G-2-7-20 M149758 2 7S 20E Uintah
43-047-54909 oP 7G-2-7-20 M149758 2 7S 20E Uintah
43-047-30109 BRENNAN 6 FEE 19 7S zTE Uintah
43-047-54387 OP 4G-3-7-20 UTU14639 3 75 20E Uintah43-047-54379 OP 5G-3-7-20 UTU14639 3 7S 20E Uintah
43-047-54388 OP 6G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54378 OP 7G-3-7-20 UTU14639 3 7S 20E Uintah
State and FEl WellsAPI No. Well Name Lease No. Section Township Range County
43-047-53641 OP 4G-2-7-20 ML49758 2 75 20E Uintah43-047-32771 BRENNAN10 ML3068 19 7S 21E Uintah43-047-34100 WV 13W-36-7-21 ML47040 36 7S 21E Uintah
43-047-35408 BBE15G-16-7-21 ML46292 16 7S 21E Uintah43-047-54912 OP 9G-2-7-20 ML49758 2 7S 20E Uintah43-047-54913 OP 11G-2-7-20 ML49758 2 7S 20E Uintah43-047-54917 OP 13G-2-7-20 ML49758 2 7S 20E Uintah43-047-54915 OP 15G-2-7-20 ML49758 2 7S 20E Uintah43-047-54910 OP 16G-2-7-20 ML49758 2 7S 20E Uintah43-047-54927 OP 1G-2-7-20 ML49758 2 7S 20E Uintah43-047-54914 OP 3G-2-7-20 ML49758 2 7S 20E Uintah43-047-54911 OP 5G-2-7-20 ML49758 2 7S 20E Uintah43-047-54909 OP 7G-2-7-20 ML49758 2 75 20E Uintah43-047-30109 BRENNAN6 FEE 19 7S 21E
43-047-54387 OP 4G-3-7-20 UTU14639 3 75 20E Uintah43-047-54379 OP 5G-3-7-20 UTU14639 3 7S 20E Uintah
43-047-54388 OP 6G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54378 OP 7G-3-7-20 UTU14639 3 7S 20E Uintah
State and FEl WellsAPI No. Well Name Lease No. Section Township Range County
43-047-53641 OP 4G-2-7-20 ML49758 2 75 20E Uintah43-047-32771 BRENNAN10 ML3068 19 7S 21E Uintah43-047-34100 WV 13W-36-7-21 ML47040 36 7S 21E Uintah
43-047-35408 BBE15G-16-7-21 ML46292 16 7S 21E Uintah43-047-54912 OP 9G-2-7-20 ML49758 2 7S 20E Uintah43-047-54913 OP 11G-2-7-20 ML49758 2 7S 20E Uintah43-047-54917 OP 13G-2-7-20 ML49758 2 7S 20E Uintah43-047-54915 OP 15G-2-7-20 ML49758 2 7S 20E Uintah43-047-54910 OP 16G-2-7-20 ML49758 2 7S 20E Uintah43-047-54927 OP 1G-2-7-20 ML49758 2 7S 20E Uintah43-047-54914 OP 3G-2-7-20 ML49758 2 7S 20E Uintah43-047-54911 OP 5G-2-7-20 ML49758 2 7S 20E Uintah43-047-54909 OP 7G-2-7-20 ML49758 2 75 20E Uintah43-047-30109 BRENNAN6 FEE 19 7S 21E
STATE OF UTAHDEPARTMENT OF NATUML RESOURCES
DIVISION OF O!1, GASAND MINING
Request to Transfer Application or Permit to Drill
Well name: BBS15G-22-7-21
API number: 4304737443
Location: Qtr-Qtr: SWSE Section: 22 Township:75 Range: 21E
Gompany that filed original appllcation: QEP Uinta Basin, lnc.
Date original permitwas issued: 12t0512005
Company that permitwas issued to: QEP Uinta Basin, lnc.
(l'his form should accompany a Sundry Notice, Form g, requesting APD transfer)
Any desired or necessary changes to either a pending or approved Application for Permit to Drillthat is being transfened,should be filed on a Sundry Notice, Form 9, or amended Application for Permit to Drill, Form 3, as appropriate, withne,cessary supportin g i nformation as requ i red.
Signature
Title
Date
Representing (company name) Finlev Resources lnc'
The person signing this form must have legal authority to represent the company or individual(s) to be listed as the new operator on the Application forPermitto Drill.
(3t20Ml
017
Transfer pending (unapproved) Application for Permit to Drill to new operator GAS &
The undersigned as ownerwith legal rights to drill on the propefi, hereby verifies that the info"nh.ation assubmitted in the pending Application for Permit to Drill, remains valid and does not require revision. The newowner of the application accepts and agrees to the information and procedures as stated in the application.
Transfer approved Application for Permit to Drill to new operator
The undersigned as orner with legal rights to drill on the property as permitted, hereby verifies that theinformation as submitted in the previously approved application to drill, remains valid and does not requirerevision.
Following is a checklist of some items related to the application, whlch should be verified.
lf located on private land, has the ownership changed?
lf so, has the surface agreement been updated?
Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or siting
Have there been any unit or other agreements put in place that could affect the permitting or operation of thisproposed well?
Have there been any changes to the access route including ownership or right-of-way, which could affect the
Has the approved source of water for drilling changed?
Have there been any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation?
ts bonding still in place, which covers this proposed well? Bond 1e. RLB0011262
STATE OF UTAHDEPARTMENT OF NATURALRESOURCES
DIVISIONOF OIL, GAS AND MINING
Request to Transfer Application or Permit to Drill
(This form should accompanya Sundry Notice, Form 9, requestingAPD transfer)
Well name: BBS 15G-22-7-21
API number: 4304737443
Location: Qtr-Qtr:SWSE Section: 22 Township: 7S Range: 21E
Company that filed original application: QEP Uinta Basin, Inc.
Date original permit was issued: 12/05/2005
Company that permit was issued to: QEP Uinta Basin, Inc.
Transfer pending (unapproved) Application for Permit to Drill to new operator QF0\L, GASThe undersigned as ownerwith legal rightsto drillon the property, hereby verifies that the information assubmitted in the pending Application for Permit to Drill,remains valid and does not require revision. The newownerof the applicationaccepts and agrees to the information and procedures as stated in the application.
/ Transfer approved Application for Permit to Drill to new operator
The undersigned as ownerwith legal rightsto drillon the property as permitted, hereby verifies thattheinformation as submitted in the previously approved applicationto drill, remains valid and does not requirerevision.
Following is a checklist of some items related to the application, which should be verified. Yes No
If located on private land, has the ownershipchanged?
Ifso, has the surface agreement been updated?Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or sitingrequirementsfor this location?Have therebeen any unitor other agreements put in place thatcouldaffectthe permitting or operation of thisproposed well?Have therebeen any changes to the access route including ownershipor right-of-way, which could affecttheproposed location?
Has theapproved source ofwater for drilling changed7Have therebeen any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation?Is bonding stillin place, which covers thisproposed well? Bond No. RLBOO11262
Any desired or necessary changes to either a pending or approved Application for Permit to Drillthat is being transferred,should be filed on a Sundry Notice, Form 9, or amended Application for Permit to Drill,Form 3, as appropriate,withnecessary supporting information as required.
ame ( ease pr alb Datee Presi t
Representing (companyname) Finley Resources Inc.
The person signingthisform must have legal authorityto represent thecompanyor individual(s) tobe listed as thenew operator on theApplication forPermit toDrill.
STATE OF UTAHDEPARTMENT OF NATURALRESOURCES
DIVISIONOF OIL, GAS AND MINING
Request to Transfer Application or Permit to Drill
(This form should accompanya Sundry Notice, Form 9, requestingAPD transfer)
Well name: BBS 15G-22-7-21
API number: 4304737443
Location: Qtr-Qtr:SWSE Section: 22 Township: 7S Range: 21E
Company that filed original application: QEP Uinta Basin, Inc.
Date original permit was issued: 12/05/2005
Company that permit was issued to: QEP Uinta Basin, Inc.
Transfer pending (unapproved) Application for Permit to Drill to new operator QF0\L, GASThe undersigned as ownerwith legal rightsto drillon the property, hereby verifies that the information assubmitted in the pending Application for Permit to Drill,remains valid and does not require revision. The newownerof the applicationaccepts and agrees to the information and procedures as stated in the application.
/ Transfer approved Application for Permit to Drill to new operator
The undersigned as ownerwith legal rightsto drillon the property as permitted, hereby verifies thattheinformation as submitted in the previously approved applicationto drill, remains valid and does not requirerevision.
Following is a checklist of some items related to the application, which should be verified. Yes No
If located on private land, has the ownershipchanged?
Ifso, has the surface agreement been updated?Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or sitingrequirementsfor this location?Have therebeen any unitor other agreements put in place thatcouldaffectthe permitting or operation of thisproposed well?Have therebeen any changes to the access route including ownershipor right-of-way, which could affecttheproposed location?
Has theapproved source ofwater for drilling changed7Have therebeen any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation?Is bonding stillin place, which covers thisproposed well? Bond No. RLBOO11262
Any desired or necessary changes to either a pending or approved Application for Permit to Drillthat is being transferred,should be filed on a Sundry Notice, Form 9, or amended Application for Permit to Drill,Form 3, as appropriate,withnecessary supporting information as required.
ame ( ease pr alb Datee Presi t
Representing (companyname) Finley Resources Inc.
The person signingthisform must have legal authorityto represent thecompanyor individual(s) tobe listed as thenew operator on theApplication forPermit toDrill.
Ii. _ . ... Form316~S UNITED STATES FORM APPROVED
OMB No. 1004-0137 (June 201S>' DEPARTMENT OF THE INTERIOR Expires: January 31, 2018
BUREAU OF LAND MANAGEMENT s. Lease Serial No. See Attachmeat A
6. If Indian, Allottee or tribe 'Name SUNDRY NOTICES AND REPORTS ON WELL~ECEWED Do not use this form for proposals to drill or to re-e ter an 9 L \J \ ~
abandoned well. Use Form 316()-3 (APD) for such proPJ#A/i
SUBMIT IN TRlPUCATE - Other Instructions on page 2 ,...\\ C;(>..S & ~\l(1.\ltIiPOfCAfA~ Name and/or No.
I. Type of Well D\\/. V, v ,
~ Attaehmeat A
f.i]OilWeIl rnOasWell [IDOther 8. Well Name ind No. See Attachment A
2. Name of Operator 9. API Well No. Finley Resources Inc. See Attachment A 3a.Address I ~b. Phone No. (include area code) 10. Field and Pool or Exploratory Arca P.O. Box 2200, Fort Worth, TX 76113 (817) 231-8732
BreilIWI Bottom 4. Location of Well (Footage. Sec .• T..R..M.. or Survey Description) II. Country or Parish, State
See. A Uintab Conaty, UT
12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
IXINoticeofIntent o Acidize o Deepen o Production (StartlReswne) o Water Shut-Off o Alter Casing 0 Hydraulic Fracturing 0 Reclamation 0 Well Integrity
o Subsequent Report 0 Casing Repair 0 New Construction 0 Recomplete (X] Other o Change Plans 0 Plug and Abandon 0 Temporarily Abandon Transfer of
o Final Abandonment Notice 0 Convert to Injection 0 Plug Back 0 Water Disposal 0 erator
13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. If the proposal is to deepen directionally or recomplete horizontally, give subsurface Ipcations and measured and true vertical depths of all pertinent markers and zones. Attach the Bond under which the work will be performed or provide the Bond No. on tile with BLMlBIA. Required subsequent reports must be filed within 30 days following completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 316~ must be filed once testing has been completed. Final Abandonment Notices must be tiled only after all requirements, including reclamation, have been completed and the operator has determined that the site is ready for final inspection.)
QEP Energy Company respectfully requests that the operator be transferred to Finley Resources Inc. for all wells referenced on Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.
Finley Resources Inc. will operate the wells under Federal Bond No. RLBOOl1262 or State Bond No. RLBOOl1264 and will comply with all Conditions of Approval within the originally approved Applications for Pennit to Drill.
g;:£DC/Q2 Michael K. Watanabe Vice President, Land
Signature
President Title
Date -\/ THE SPACE FOR FEDERAL OR STATE OFFICE USE
Acting Assistant Field Manager Tttllnds & Mineral Resources Date lEe 2 9 2017
val. if MY, are attached. Approval of this notice does not warrant or certify that plicant holds legal or equitable title to those rights in the subject lease which wou Otitle the applicant to conduct operations thereon.
Office VERNAL FIELD OFFICE
Title 18 U.S.C Section 1001 and Title 43 U.S.C Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States
:.:::::~"::_,,_~ro~~';fum~_m •
Form 3160-5 UNITED STATES(June 2015) DEPARTMENTOF THE INTERIOR Expires: January31,2018
BUREAU OF LAND MANAGEMENT 3.LeaseSerialNo. See Atlachment A
SUNDRYNOTICESAND REPORTS ONWELLg1 6. If indian,Attoilee or TribeNameDo not use this form for proposals to cirillor to re-enter an
abandoned welL Use Form 3160-3 (AÞD)for suchpropplSUBMITIN TRIPLICATE - Otherinstrucfons onpage 2 oÈCA/Agreement, Nameand/or No.
1.Type of Well g ,y 0 ,,,,
Oil Well Gas Well Other 8.WeliNameanttachmentA
i. Nameof Operator 9. API WellNo.Finley Resources Inc. See Attachment A3a.Address 3b.PhoneNo. (include area co ) 10.Fieldandfool orËxploratoryAreaP.O. Box 2200, Fort Worth, TX 76113 (817) 231-8732
Breanan Bottom4. I»eationof Well(Footage, Sec., T,R,M, or SwveyDescription) 11.Coimtryor Parish,State
See AttaflimentA Uintah County, UT
12. CHECK THE APPROPRIATEBOX(ES) TO INDICATENATUREOF NOTICE,REPORTOROTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
Notice of Intent Acidize Deepen Produedon(StardResume) WaterShm-Off
O anerc=ins O Hydraulic Fracturing Reclamation WeßIntegrity
Subsequent Report Casing Repair New Construction Recomplete Other
O Change Plans Plug and Abandon TemporarilyAbandon Transfer ofO FinalAbandonmentNotice Convert toInjection Plug Back WaterDisposal Operator
13. Describe Proposedor Completed Operation: Clearly state allpertinentdetails,includingestimatedstartingdateof anyproposed work andapproximatedurationthereof.Iftheproposalisto deependirectionallyor recomplete horizontally, give subsurface (peations andmeasured andtruevertical depthsof all pertinentmarkersand zones.AttachtheBond underwhich thework will be performed or provide theBond No. on filewithBLM/BIA. Required subsequent reportsmust be filed within 30 days followingcompletion of theinvolvedoperations.If theoperation results in a multiple completion or recompletion in a new interval,a Form 3160-4 must be filedonce testinghasbeencompleted. Final Abandonment Notices must be filed onlyafter all requirements, includingreclamation, havebeencompleted and theoperator hasdetermined thatthe siteis ready forfinal inspection.)
QEP Energy Company respectfully requests that the operator be transferred to Finley Resources Inc. for all wells referenced onAttachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.
Finley Resources Inc. will operate the wells under Federal Bond No. RLB0011262 or State Bond No. RLBOOll264 and will comply withall in ly approved Application
iccee et
aanbderes d ENt:t /2/21// c
GEOLE.8.
14.I herebycertifythattheforegoingis trueand correct.Brent D. Talbot President
Signature Date
THE SPACE FOR FEDERALOR STATEOFFICE USEApproved
ActingAssistantFieldManageraq TMands&MineralResourceS Date
C of val, if any,are attached.Approvalof thisnotice does not warrant orcertify that plicant holdslegal or equitabletitleto thoserights in the subject lease Omce VERNALRELD0FRCEwhich wou atitletheapplicant toconduct operationsthereon.
Title18 U.S.C Section 1001and Title43 0.8.0 Šection1212,make it a crime for any personknowingly and willfully to make to any departmènioragencyof theUnited Statesanyfalse,fictitiousor fraudulentstatementsor representations astoanymatterwithin itsjurisdiction.
(Instructions onpage
• .I ... .• "'t
Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017
Federal Wells API No. Well Name Lease No. Section Township Range County
43-047-34380 5U PURDY 7W-34-7-21 UTU16551 34 75 21E Uintah
43-047-39181 5U PURDY 10G-27-7-21 UTU16551 27 75 21E Uintah
43-047-32477 BRENNAN 9 UT5L071745 18 75 21E Uintah
43-047-32779 BRENNAN 12 UTU046 18 75 21E Uintah
43-047-15419 BRENNAN 3 UT5L066409A 17 75 21E Uintah
43-047-15417 BRENNAN 1 UT5L065342 13 75 20E Uintah
43-047-32774 BRENNAN 14 UTU046 18 75 21E Uintah
43-047-31509 BRENNAN 8 UT5L066409A 17 75 21E Uintah
43-047-30879 LEOTA 1-34-2B UTU16551 34 75 21E Uintah
43-047-38995 TU 3-35-7-21 (ML) UTU73681 35 75 21E Uintah
43-047-36516 BBW 11G-20-7-21 UTU74419 20 75 21E Uintah
43-047-39180 JB 4G-27-7-21 UTU16551 27 75 21E Uintah
43-047-40613 JB 8G-21-7-21 UTU30290 21 75 21E Uintah
43-047-31272 BRENNAN FEDERAL 15-8-7-21 UTU49656 8 75 21E Uintah
43-047-40482 OP 4G-12-7-20 UTU88140 12 75 20E Uintah
43-047-40197 BRENNAN BOTTOM 7R UT5L065342 13 75 20E Uintah
43-047-40198 BRENNAN 15 UT5L065342 13 75 20E Uintah
43-047-40481 OP 16G-12-7-20 UTU88140 12 75 20E Uintah
43-047-37443 BBS 15G-22-7-21 UTU74972 22 75 21E Uintah
43-047-5246.8 JB 4G-26-7-21 UTU73680 26 75 21E Uintah
43-047-51503 OP 16G-3-7-20 (GR) UTU90216 3 75 20E Uintah
43-047-51504 OP 7G-11-7-20 UTU86331 11 75 20E Uintah
43-047-32772 BRENNAN 11 (injection) UTSL071745 18 75 21E Uintah
43-047-15420 BRENNAN 5 (injection) UT5L071745 18 75 21E Uintah
43-.047-40125 BRENNAN 2R UT5L071745 18 75 20E Uintah
43-047-54382 OP 10G-1-7-20 UTU88140 1 75 20E Uintah
43-047-54375 OP 16G-1-7-20 UTU88140 1 75 20E Uintah
43-047-54384 OP 1G-1-7-20 UTU88140 1 75 20E Uintah
43-047-54383 OP 2G-1-7-20 UTU88140 1 75 20E Uintah
43-047-54371 OP 4G-1-7-20 UTU88140 1 75 20E Uintah
. 43-047-54373 OP 6G-1-7-20 UTU88140 1 75 20E Uintah
43-047-54625 OP 13G-11-7-20 UTU86331 11 75 20E Uintah
43-047-54386 OP 16G-11-7-20 UTU86331 11 75 20E Uintah
43-047-54372 OP 6G-11-7-20 UTU86331 11 75 20E Uintah
43-047-54380 OP 9G-14-7-20 UTU86331 14 75 20E Uintah
43-047-55172 OP 10G-11-7-20 UTU86331 11 75 20E Uintah
43-047-55164 OP 12G-11-7-20 UTU86331 11 75 20E Uintah
.·43-047-55162 OP 15G-11-7-20 UTU86331 11 75 20E Uintah
43-047-55169 OP 2G-11-7-20 UTU86331 11 75 20E Uintah
43-047-55170 OP 3G-11-7-20 UTU86331 11 75 20E Uintah
43-047-55175 OP 4G-11-7-20 UTU86331 11 75 20E Uintah
43-047-55174 OP 8G-11-7-20 UTU86331 11 75 20E Uintah
43-047-55163 OP 9G-11-7-20 UTU86331 11 75 20E Uintah
43-047-54385 OP 14G-12-7-20 UTU86331 12 75 20E Uintah
43-047-54374 OP 13G-1-7-20 UTU88140 1 75 20E Uintah
43-047-54389 OP 1G-12-7-20 UTU88140 12 75 20E Uintah
43-047-54376 OP 6G-12c7-20 UTU88140 12 75 20E Uintah
43-047-54381 OP 15G-3-7-20 UTU14639 3 75 20E Uintah
43-047-54894 OP 1G-10-7-20 UTU86331 10 75 20E Uintah
43-047-54369 OP 2G-10-7-20 UTU86331 10 75 20E Uintah
43-047-54370 OP 2G-3-7-20 UTU14639 3 75 20E Uintah
Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017
Federal WellsAPI No. Well Name Lease No. Section Township Range County
43-047-34380 SUPURDY7W-34-7-21 UTU16551 34 7S 21E Uintah43-047-39181 SU PURDY10G-27-7-21 UTU16551 27 7S 21E Uintah
43-047-32477 BRENNAN9 UTSLO71745 18 7S 21E Uintah
43-047-32779 BRENNAN12 UTUO46 18 7S 21E Uintah43-047-15419 BRENNAN3 UTSLO66409A 17 7S 21E Uintah43-047-15417 BRENNAN 1 UTSLO65342 13 7S 20E Uintah43-047-32774 BRENNAN14 UTUO46 18 7S 21E Uintah43-047-31509 BRENNAN8 UTSLO66409A 17 7S 21E Uintah
43-047-30879 LEOTA1-34-28 UTU16551 34 7S 21E Uintah43-047-38995 TU 3-35-7-21 (ML) UTU73681 35 75 21E Uintah43-047-36516 BBW 11G-20-7-21 UTU74419 20 75 21E Uintah43-047-39180 JB 4G-27-7-21 UTU16551 27 75 21E Uintah43-047-40613 JB 8G-21-7-21 UTU30290 21 7S 21E Uintah43-047-31272 BRENNANFEDERAL15-8-7-21 UTU49656 8 7S 21E Uintah43-047-40482 OP 4G-12-7-20 UTU88140 12 7S 20E Uintah43-047-40197 BRENNANBOTTOM 7R UTSLO65342 13 7S 20E Uintah
43-047-40198 BRENNAN15 UTSLO65342 13 7S 20E Uintah43-047-40481 OP 16G-12-7-20 UTU88140 12 7S 20E Uintah43-Q47-37443 BBSi5G-22-7-21 UTU74972 22 7S 21E Uintah43-047-52468 JB 4G-26-7-21 UTU73680 26 7S 21E Uintah43-047-51503 OP 16G-3-7-20(GR) UTU90216 3 75 20E Uintah43-047-51504 OP7G-11-7-20 UTU86331 11 7S 20E Uintah43-047-32772 BRENNAN11(injection) UTSLO71745 18 7S 21E Uintah43-047-15420 BRENNAN5 (InJection) UTSLO71745 18 7S 21E Uintah
43-047-40125 BRENNAN2R UTSLO71745 18 7S 20E Dintah43-047-54382 OP 10G-1-7-20 UTU88140 1 7S 20E Uintah43-047 54375 OP 16G-1-7720 UTU88140 1 7S 20E Uintah43-047-54384 OP 1G-1-7-20 UTU88140 1 75 20E Uintah43-047-54383 OP 2G-1-7-20 UTU88140 1 75 20E Uintàh43-047-54371 OP 4G-1-7-20 UTU88140 1 7S 20E Uintah
43 047-54373 OP 6G-1-7-20 UTU88140 1 7S 20E Uintah
43 047-54625 OP 13G-i1-7-20 UTU86331 11 7S 20E Uintah43-047-54386 OP 16G 11-7-20 UTUS6331 11 7S 20E Uintah43-047-54372 OP 6G-11-7-20 UTU86331 11 7S 20E Uintah43-047-54380 OP 90-14-7-20 UTU86331 14 7S 20E Uintah43-047-55172 OP 10G-11-7-20 UTU86331 11 75 20E Uintah43-047-55164
. OP 12G-11-7-20 UTUS6331 11 7S 20E Uintab43-047-55162 OP 15G-11-7-20 UTUS6331 11 7S 20E Uintah
43-047-55169 OP 2G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55170 OP3G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55175 OP 4G-11-7-20 UTU86331 11 7S 20E Uintah
43-047-55174 OP 8G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55163 OP 9G-11-7 20 UTUS6331 11 7S 20E Uintah43-047-54385 OP 14G-12-7-20 UTU86331 12 7S 20E Uintah43-047-54374 OP13G-1-7-20 UTU88140 1 7S 20E Uintah
4 047:54389 OP 1G-12-7 20 UTU88140 12 7S 20E Uintah43-047-54376 OP 6G-12-7-20 UTU88140 12 7S 20E Uintah43-047-54381 OP 15G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54894 OP 1G-10-7-20 UTU86331 10 7S 20E Uintah43447-54369 OP 2G-10-7-20 UTU86331 10 7S 20E Uintah43-047-54370 OP 2G-3-7,20 UTU14639 3 7S 20E
43-047-54387 OP 4G-3-7-20 UTU14639 3 75 20E Uintah
43-047-54379 OP 5G-3-7-20 UTU14639 3 75 20E Uintah
43-047-54388 OP 6G-3-7-20 UTU14639 3 75 20E Uintah
43-047-54378 OP 7G-3-7-20 UTU14639 3 75 20E Uintah
St ate an d FEE W II 'th' th 0 e SWI ill e uray P kF d IU't ar e era DI
API No. Well Name Lease No. Section Township Range County
43-047-53641 OP 4G-2-7-20 ML49758 2 75 20E Uintah
43-047-32771 BRENNAN 10 ML3068 19 75 21E Uintah
43-047-34100 WV 13W-36-7-21 ML47040 36 75 21E Uintah
43-047-35408 BBE 15G-16-7-21 ML46292 16 75 21E Uintah
43-047-54912 OP 9G-2-7-20 ML49758 2 75 20E Uintah
43-047-54913 OP 11G-2-7-20 ML49758 2 75 20E Uintah
43-047-54917 OP 13G-2-7-20 ML49758 2 75 20E Uintah
43-047-54915 OP 15G-2-7-20 ML49758 2 75 20E Uintah
43-047-54910 OP 16G-2-7-20 ML49758 2 75 20E Uintah
43-047-54927 OP 1G-2-7-20 ML49758 2 75 20E Uintah
43-047-54914 OP 3G-2-7-20 ML49758 2 75 20E Uintah
43-047-54911 OP 5G-2-7-20 ML49758 2 75 20E Uintah
43-047-54909 OP 7G-2-7-20 ML49758 2 75 20E Uintah
43-047-30109 BRENNAN 6 FEE 19 75 21E Uintah
43-047-54387 OP 4G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54379 OP 5G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54388 OP 6G-3-7-20 UTU14639 3 7S 20E Ulntah43-047-54378 OP 7G-3-7-20 UTU14639 3 7S 20E Uintah
State and FEL Wells within the Ouray l'ark Federal UnitAPI No. Well Name Lease No. Section Township Range County
43-047-53641 OP 4G-2-7-20 ML49758 2 7S 20E Uintah43-047-32771 BRENNAN 10 ML3068 19 7S 21E Uintah43-047-34100 WV 13W-36-7-21 ML47040 36 7S 21E Uintah
43-047-35408 BBE15G-16,7-21 ML46292 16 75 21E Uintah43-047-54912 OP9G-2-7-20 ML49758 2 7S 20E Uintah43-047-54913 OP 11G-2-7-20 ML49758 2 7S 20E Uintah43-047-54917 OP 13G-2-7-20 ML49758 2 7S 20E Uintah43-047-54915 OP 15G-2-7-20 ML49758 2 7S 20E Uintah43-047-54910 OP 16G-2-7-20 ML49758 2 7S 20E Uintah43-047-54927 OP 1G-2-7-20 ML49758 2 7S 20E Uintah43-047-54914 OP 3G-2-7-20 ML49758 2 7S 20E Uintah43-047-54911 OP 5G-2-7-20 ML49758 2 7S 20E Uintah43-047-54909 OP 7G-2-7-20 ML49758 2 7S 20E Uintah43-047-30109 BRENNAN6 FEE 19 7S 21E