    BUMI Resources

    Presentasi Paparan Publik Tahunan

    Investor Summit 2012

    Jakarta, 28 Nopember 2012

    www.bumiresources.com

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    2/36

    2

     Agenda

    1. Sekilas tentang Perusahaan

    2. Kinerja Produksi dan Penjualan

    3. Rencana Ekspansi4. Kinerja Keuangan

    - Laba & Rugi Perusahaan

    - Neraca Keuangan

    - Sejarah Dividen

    5. Bumi Resources Minerals

    6. Isu Terkini Perusahaan

    7. Apendiks

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    3/36

    Sekilas Perusahaan

    3

    Salah satu pengekspor batubara terbesar di dunia KPC merupakan tambang batubara bertujuan ekspor terbesar di dunia

    Perusahaan berbasis sumber daya alam dan penghasil batubara termal terbesar di Indonesia(KPC dan Arutmin) dengan penguasaan pasar batubara sebesar 26,6% (2009) dari seluruh

    produksi batubara Indonesia

    memproduksi batubara sebanyak 66 juta metrik ton pada tahun 2011, dengan proyeksiproduksi di tahun 2012 sebanyak 73 – 75 juta ton

    Memiliki 2,9 miliar metrik ton cadangan batubara yang siap dipasarkan dan 10,0 miliar metrik tonsumberdaya batubara (di luar cadangan)(1)

    Masih terdapat potensi yang sangat besar untuk mengembangkan cadangan; tambang

    KPC baru sebagian yang dieksplorasi

    Memililki lokasi yang ideal untuk pasar batubara utama di Asia, Eropa dan Amerika Selatan

    Memiliki pertambangan terbuka dengan fasilitas pengolahan batubara yang kompleks

    Memiliki terminal bongkar muat batubara dilengkapi dengan fasilitas pelabuhan yang lengkap

    Membagi bisnis menjadi batubara dan non batubara Menciptakan nilai dengan pemisahan bisnis batubara dengan bisnis metal

    - BUMI akan memfokuskan diri pada dominasi batubara termal

    - BRM menjadi perusahaan terbuka yang fokus pada industri metal

    (1) Laporan The Minerals Expert yang disusun oleh PT Runge Indonesia

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    4/36

    4

    PT BUMI RESOURCES Tbk

    Bumi Mauritania –

    Iron Ore(in exploration stage)

    Gorontalo Minerals –

    Gold & Copper Mining(in exploration stage)

    Citra Palu Minerals –

    Gold Mining(in exploration stage)

    Dairi Prima Minerals–Zinc ,Lead(in exploitation stage)

    Bumi Japan –

    Marketing Services

    80%

    60%

    100%

    80%

    96.97%

    Newmont Nusa

    Tenggara – Gold

    (associated company)

    (Mineral/Non-Batubara)

    Effective~18%

    KPC65%

    Batubara, Minyak & Gas

     Arutmin

    Gallo Oil (Jersey) – Oil

    Production (in exploration stage)

    IndoCoalResources

    70%

    100%

    70%

    Effective

    ~31,43%

    Effective~84,55%

    Darma Henwa –Mining Service

    Company (associated company)

    Pendopo Energi Batubara –

    Coal (in exploration stage)

    Struktur Kepemilikan BUMIMenuju Perusahaan Tambang Terdiversifikasi

    PT Sarkea Prima Minerals–

    Mining

    (exploration stage)

    Konblo Bumi IncDiamond, precious metal

    (exploration stage)

    PT Tamagot Bumi SA–Iron Ore

    (exploitation stage)

    89,6%

    100%

    94,1%

    PT Bumi ResourcesMinerals Tbk87,09%

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    5/36

    5

    66

    104 (E)

    Estimasi Kapasitas

    TahunanEstimasi Produksi

    Estimasi Kapasitas

    TahunanEstimasi Produksi

    KPC 51 45 75 65 Arutmin 33 30 40 35

    Pendopo 1 - 7 4

    Total 85 75 122 104

    2012Perusahaan

    2014

    Produksi Batubara

    Total Produksi

    KPC/Arutmin 100m tons+ potensi kenaikan (upsides) Pendopo

    Batubara (juta ton)

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    6/36

    6

    • Cadangan saat ini sebesar 2.6 miliar ton, meningkat 85% dari 1.4 miliar ton pada bulan September2007 dan sebesar 1.1 miliar ton pada bulan September 2005.

    • Cadangan dan Sumberdaya keduanya meningkat menjadi 13.1 miliar ton.

    Dalam Juta Ton

    KPC:Sangatta 120 6.166 6.286

    Melawan 310 - 310

    North Pinang   773 - 773

    Subtotal Sangatta Region   1.203 6.166 7.369

    Bengalon   220 1.341 1.561

    1.423 7.507 8.930

     Arutmin:

    Senakin 30 382 412

    Satui 72 180 252

    Batulicin   54 129 183

    Sub Bituminious Coal   156 691 847

    Mulia & Asam-Asam 310 604 914

    Other Areas   - 501 501466 1.796 2.262

    PEB   687 1.263 1.950

    TOTAL 2.576 10.566 13.142

    Cadangan

    BatubaraTotal

    Sumberdaya

    Batubara

    Cadangan dan Sumber Daya Batubara – Terbesar di Indonesia

    Rata-ratanilai kalori

    ca 5,600 gar 

    Catatan : angka-angka tercantum di atas saat ini sedang dalam tahap penilaian kembali dan rencananya akan dikeluarkan pada akhir tahun

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    7/36

    7

    Pengupasan Tanah PenutupJuta bcm

    Rasio Pengupasanbcm/t

    360   359

    2010 2011 H1'11 H1'12KPC Arut min F BS

    633

    759

    10,5x 11,5x 12,1x 11,1x

    2010 2011 H1'11 H1'12

     Volume Produksi & Penjualan Batubara

    • Dalam beberapa tahun terakhir produksi batubara perusahaan terus meningkat hal inididukung oleh kinerja armada penambangan perusahaan dan kontraktor yang handal

    • Perusahaan memiliki jaringan pemasaran yang luas dan partner pemasaran denganreputasi internasional. Disamping itu, KPC dan Arutmin memiliki produksi batubaradengan berbagai kualitas berdasarkan klasifikasi kandungan kalori, sehingga memberikanfleksibilitas memenuhi permintaan dan kebutuhan pelanggan yang bervariasi (productblending)

    Volume Batubara DitambangJuta ton

    3033

    2010 2011 H1'11 H1'12

    KPC Arutmin FBS

    60

    66

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    8/36

    8

    Ekspektasi atas peningkatan kebutuhan batubara tersebut akan terus berlanjut seiringdengan pertumbuhan ekonomi, terutama di negara Cina dan India

    Indonesia merupakan salah satu negara eksportir batubara terbesar di dunia didukung olehkualitas dan cadangan yang signifikan untuk memenuhi kebutuhan batubara internasional

    Harga Jual Batubara

    2008 2009 2010 2011 H1'11 H1'12

     ASPs (exc. Ecocoal) 78.7$ 65.1$ 76.3$ 99.8$ 99.4$ 97.2$

    Ecocoal 33.2$ 38.1$ 41.5$ 61.4$ 56.8$ 59.6$

     ASPs KPC+AI 73.3$ 61.7$ 70.9$ 92.3$ 91.3$ 88.5$

     ASPs - all 73.3$ 63.1$ 71.0$ 92.3$ 91.3$ 88.5$

    (dalam US$ per ton)

    Catatan: Harga rata-rata penjualan berdasarkan harga FOB sebelum adanya pembayaran royalti kepada pemerintah

    Harga Rata-rata Tertimbang Penjualan Batubara

    Destinasi Penjualanper Desember 2010

    Negara-negara Asia

    (91%)~ Pembangkit Listrik

    ~ Pabrik Baja dan lainnya

    Eropa (9%)

    ~ Pembangkit List rik

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    9/36

    9

    Biaya Tunai Produksi Batubara

    Biaya tunai produksi perusahaan meningkat terutama karena meningkatnya kegiatanoperasional dan kenaikan harga bahan bakar, serta tingkat curah hujan yang tinggi

    Komposisi Biaya-biaya Kas Produksi(dalam USD per ton) FY09 FY10 FY11* H1’11* H1’12*

    Bumi 28.0 33.9 42.1 44.7 48.7

    KPC 28.0 34.0 45.5 49.6 53.1

     Arutmin 28.0 33.9 36.3 36.7 43.3

    Catatan: (1) Dihitung dengan cara membagi biaya kas produksi dengan produksi batu bara

    yang ditambang; tidak termasuk FBS

    (2) Dihitung dengan cara mengurangi biaya kas produksi dari harga rata-rata penjualan

    *Included Deferred Stripping Cost (Perubahan dalam Kebijakan Akuntansi 2011 )

    Biaya Bahan Bakar per Ton (USD) 5.6 8.6 11.4 12.3 12.9

    Rasio Pengupasan 10.4x 10.5x 11.5x 12.1x 11.1x

    Margin Kas(2) 34.8 36.9 50.6 46.6 39.8

    Biaya-biaya Kas Produksi(1)

    0

    100

    200

    300

           1       /       1       0

           4       /       1       0

           7       /       1       0

           1       0       /       1       0

           1       /       1       1

           4       /       1       1

           7       /       1       1

           1       0       /       1       1

           1       /       1       2

           4       /       1       2

    Curah Hujan

    (mm) Rata-rata Jangka Panjang

    0

    2.500

    5.000

    7.500

    10.000

    12.500

           1       /       0       5

           5       /       0       5

           9       /       0       5

           1       /       0       6

           5       /       0       6

           9       /       0       6

           1       /       0       7

           5       /       0       7

           9       /       0       7

           1       /       0       8

           5       /       0       8

           9       /       0       8

           1       /       0       9

           5       /       0       9

           9       /       0       9

           1       /       1       0

           5       /       1       0

           9       /       1       0

           1       /       1       1

    Harga Diesel untuk Keperluan Industr i di Indonesia

    (Rp)

    Harga Diesel menurunsecara signifikan bersamaan

    dengan turunnya harga

    minyak bumi

    Kontraktor Tambang50%

    Biaya BahanBakar 26%

    Pemeliharaan10%

    Biaya TenagaKerja 5%

    H1 2012

    Penyewaan Alat Berat2%

    Bahan-bahanLainnya 6%

    Biaya BahanBakar 

    28%

    Pemeliharaan10%

    Biaya TenagaKerja 5%

    Penyewaan Alat Berat1%

    H1 2011

    Bahan-bahanLainnya 5%

    Kontraktor 

    Tambang51%

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    10/36

    10

    KPC: Program Ekspansi yang Berjalan

       M   i   l   l   i  o  n   t  o  n  n  e  s

       J  u   t  a   t  o  n

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    11/36

    11

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    1  9  8  8 

    1  9  8  9 

    1  9  9  0 

    1  9  9 1 

    1  9  9 2 

    1  9  9  3 

    1  9  9 4 

    1  9  9  5 

    1  9  9  6 

    1  9  9 7 

    1  9  9  8 

    1  9  9  9 

    2  0  0  0 

    2  0  0 1 

    2  0  0 2 

    2  0  0  3 

    2  0  0 4 

    2  0  0  5 

    2  0  0  6 

    2  0  0 7 

    2  0  0  8 

    2  0  0  9 

    2  0 1  0 

    2  0 1 1 

    2  0 1 4 

       M   i   l   l   i  o  n   t  o  n  n  e  s

    2  0 1  5 

    2  0 1 2 

    2  0 1  3 

     Arutmin: Ekspansi Volume yang Signifikan

       J

      u   t  a   t  o  n

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    12/36

    12

    Ekspansi Perseroan Menuju Pada Produksi 110 mtpa – 2015

    BengalonInfrastructure +15mtpa

    Duplicate OLC +

    Stacker 

    reclaimer

    +32 

    mtpa

    Melawan

    Crusher + OLC

    +25 mtpa

    Additional 

    Mobile 

    Equipment

    Sangatta

    Additional 

    Power

    18 

    mw 

    Power 

    Stations

    Asam Asam crusher 

    OLC

    mtpa

    West Mulia Crusher + OLC

    + 9 mtpa

    KPC

     Arutmin

    2011 2012 2013 2014 2015

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    13/36

    13

    KPC - Ekspansi

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    14/36

    14

    Kinerja Keuangan

    PT Bumi Resources Tbk.

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    15/36

    15

    1H -2011(Sebagaimana Disajikan Kembali)

    1H -2012 %

    Pendapatan 1.792,4 1.946,4 9%

    Beban Pokok Pendapatan (1.143,1) (1.392,3) 22%

    Laba Bruto 649,4 554,1 -15%

    Laba Operasional 461,4 239,2 -48%

    Laba (Rugi) Bersih 231,7 (322,0) -239%

    Dalam US$ juta

    Laporan Rugi Laba

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    16/36

    16

    Neraca Keuangan

     

    FY ‐

    2011 

    (Sebagaimana Disajikan 

    Kembali) 

    Kas dan setara kas   69,09  121,85  76%

    Aset derivatif    459,55  310,44  ‐32%

    Tagihan pajak pertambahan nilai   717,55  758,65  6%

    Aset lancar lainnya   1.335,33  1.049,79  ‐21%

    Aset 

    Lancar 

    2.581,52 

    2.240,74  ‐

    13%Aset tetap   1.646,04  1.704,94  4%

    Investasi pada entitas asosiasi   1.239,28  1.210,24  ‐2%

    Aset tidak lancar lainnya   1.955,25  2.090,33  7%

    Aset Tidak Lancar  4.840,56  5.005,51  3%

    Total Aset  7.422,08  7.246,25  ‐2%

    Pinjaman  jangka pendek   666,40  122,24  ‐82%

    Hutang 

    kepada 

    Pemerintah 

    785,80 

    837,68 

    7%

    Beban yang masih harus dibayar   266,13  219,32  ‐18%

    Pinjaman  jangka panjang (yang  jatuh 

    tempo dalam waktu 1 tahun)  35,32  71,26  102%

    Liabilitas  jangka pendek lainnya   585,89  542,55  ‐7%

    Liabilitas Jangka Pendek  2.339,54  1.793,06  ‐23%

    Pinjaman  jangka panjang   2.954,73  3.554,82  20%

    Obligasi 

    Konversi 

    362,58 

    364,71 

    1%Liabilitas  jangka panjang lainnya   673,82  802,48  19%

    Liabilitas Jangka Panjang  3.991,13  4.722,01  18%

    Total Liabilitas  6.330,68  6.515,07  3%

    Ekuitas Pemegang Saham  1.091,41  731,18  ‐33%

    Total Liabilitas Dan Ekuitas  7.422,08  7.246,25  ‐2%

     1H

     ‐2012

     

    %

    Dalam Juta US$

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    17/36

    17

    No. ACCOUNTING POLICY REFERENCE ACCOUNT IMPACT

    1.

    The Group changed its accounting policy in recognizing its in the Coal

    Companies from full consolidation method to proportionate consolidation method 

    due to adoption of PSAK no. 12 (Revised 2009), which is effective starting

    January 1, 2011, Based on the new standard, a venturer shall recognize its interest

    in a jointly controlled entity using proportionate consolidation or equity method in

    accordance with PSAK No. 12 (Revised 2009). With the adoption of the revised 

    PSAK, the Group adopted proportionate consolidation for its interests in the Coal

    Companies. The change in recognition from full consolidation to consider the

    change to proportionate consolidation method.

     New PSAK   B/S, P/L, CASH FLOW

    (Proportionate)

    2.Effective January I, 2011, the Group adopted PSAK No. 22 (Revised 2010),

    “Business Combinations”. The revised PSAK is applied prospectively for 

     business combination on and after January I, 2011 which requires no adjustment

    for assets and liabilities of business combination entered prior to January I, 2011.

    It also provides guidance on the accounting for transaction costs, other than those

    associated with the issue of debt of equity securities, and for goodwill.

     New PSAK Goodwill (B/S)

    3. The Group changed its accounting policy for deferred exploration costs to adopt amore conservative approach in line with internationally accepted best practices,following a review of the accounting treatment for deferred exploration costs in

    2007 and deferred exploration costs will be capitalized only when certain

    conditions are fulfilled in accordance with the Group’s internal guideslines. Prior 

    to January I, 2011, the Group capitalized deferred exploration costs for all costs

    related to the exploration and evaluation activities.

    Management Policy

    Deferred Exploration and

    Deferred Exploration &

    Development (Exploration and

    Evaluation) – see Statement of

    Change in Equity

    4.

    Effective January I, 2011, the Group changed its method of amortization of 

    deferred exploration and development costs for PT Kaltim Prima Coal (KPC) and 

    PT Arutmin Indonesia (Arutmin) from straight-line method to unit of production

    method, which is deemed to be a more reasonable basis from the expected pattern

    of the future economic benefits of such expenditures as assessed by the

    management. The effect of the change in the amortization method is treated as a

    change in accounting estimate under PSAK No. 25 (Revised 2009), “Accounting

    Policies, Change in Accounting Estimates and Errors”.

     New PSAK 

    Amortization Deferred

    Exploration & Development

    (Exploration and Evaluation)

     – KPC & AI

    Penerapan Standar Akuntansi Baru dan Kebijakan Manajemen

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    18/36

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    19/36

    19

    30 % maksimal dari pendapatan bersih atas persetujuan pemegang saham

    Tahun Total Saham

    Dividend per

    Saham (Rp) Keterangan

    2000 1,0 

    2001 -

    2002 2,5 

    2003 -

    2005 Interim 5,0 

    2005 Final 10,0 

    2006 Final 16,0  Dibayarkan pada tanggal 25 Juni 2007

    2007 Interim 66.0 *

    Pertama dibayarkan 50% pada tanggal 2

    Juli 2007, sisa 50% dibayarkan pada 5

    September 20072007 Final 45,0  Dibayarkan pada tanggal 7 Agustus 2008

    2008 Final 50,60  Dibayarkan pada tanggal 18 Agustus 2009

    2009 Final 27,68  Dibayarkan pada tanggal 16 Agustus 2010

    2010 Final 41,78 Dibayarkan pada tanggal 15 Agustus 20112011 Final 14,31  Dibayarkan pada tanggal 6 Juli 2012

    19.404.000 

    20.773.400 

    Sejarah Dividen – Stabil Sejak 2005

    *Mewakili 30% Dividend atas pendapatan luar biasa sebesar USD 472 juta dari transaksi Tata pada bukan Juni 2007

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    20/36

    20

    Bumi Resources Minerals (“ BRM” )

    PT Bumi Resources Tbk.

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    21/36

    21

    Roadmap

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    22/36

    22

    Gorontalo MineralsPertumbuhan Jangka Menengah pada Aset Tembaga & Emas

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    23/36

    23

    Citra Palu MineralsPertumbuhan Jangka Menengah pada Aset Tembaga, Emas dan Moly

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    24/36

    24

    Isu Terkini

    PT Bumi Resources Tbk.

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    25/36

    Jadwal Jatuh Tempo Pembayaran Pinjaman

    101.3  # 100.5  100.9  98.6  95.9  # 94.8  95.0  85.0  62.8  # 60.7  59.5  57.9  34.8  # 33.1  31.2  30.8  25.6  # 17.2 

    q4 q1 q2 q3 q4 q1 q2 q3 q4 q1 q2 q3 q4 q1 q2 q3 q4 q3

    2014 2015 2016 201720132012

    US$ 600  juta

    US$ 

    650 

     juta

    US$ 700  juta

    US$ 450  juta

    US$ 500  juta

    US$ 550  juta

    US$ 400  juta

    US$ 200  juta

    US$ 250  juta

    US$ 300  juta

    US$ 

    350 

     juta

    US$ 50  juta

    US$ 100  juta

    US$ 150  juta

    US$ 750  juta

        J    U    M    L    A    H    P    E    M    B    A

        Y    A    R    A    N    P    I    N    J    A    M    A    N

    *Tidak termasuk pinjaman Entitas Anak 

    25

    US$ 254,5 juta US$ 1.230,5 juta US$ 1.062,5 juta US$ 530 jutaUS$ 17 juta US$ 700 juta

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    26/36

    Penjelasan Penurunan Peringkat Hutang

    Moody’s dan S&P menurunkan outlook hutang Bumi dari BB- menjadi B+

    Strategi yang akan dilakukan Perseroan :1. Mencapai produksi batubara 100 juta ton pada tahun 2014 yang diharapkan

    mampu meningkatkan EBITDA dalam rangka proses penurunan utang.

    2. Penurunan utang (deleveraging) hingga mencapai tingkat EBITDA sekitar 1xselama 2 tahun ke depan.

    3. Memonetisasi aset-aset non-core untuk memperkuat arus dana dan mempercepatperkembangan aset-aset tersebut dan proses penurunan utang (deleveraging).

    4. Mengurangi beban bunga atas pinjaman secara cepat

    26

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    27/36

    27

    Keterbukaan InformasiTanggal Paparan Publik dan Informasi Perusahaan

    3 April 2012 Siaran Pers

    Siaran Media atas Kinerja PT Bumi Resources Tbk (BUMI) Tahun Fiskal 2011

    Mengumumkan Peningkatan Tajam pada Kinerja Operasi, Tata Kelola Perseroan

    4 Juli 2012 Siaran Pers

    Bumi Mencapai Harga Jual yang Lebih Tinggi dan Kegiatan Operasi yang Lebih

    Kuat di Triwulan Pertama

    25 Juli 2012 Siaran Pers

     Bumi Menerima "Asia’s Best CSR Practices Awards" dari CMO Asia, Singapore

    27 Agustus 2012 Siaran Pers

    Bumi Membukukan Kerugian Bersih Pada Semester Pertama Kendati Pendapatan

    Meningkat Secara Signifikan

    26 September 2012 Siaran Pers

    Pengumuman Perusahaan - Terkait Rencana Investigasi Bumi Plc

    2 Oktober 2012 Paparan Publik Insidentil Perseroan

    4 Oktober 2012 Siaran PersPT Bumi Resources Tbk Penerbitan Saham baru - Mengakhiri Spekulasi

    9 Nopember 2012 Siaran Pers

    Perseroan bersama-sama dengan Komite Audit Berkomitmen Mengklarifikasi

    Berbagai Isu

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    28/36

    28

    Tanggal

    24 Agustus 2012

    26 Sept 2012

    26 Sept 2012

    2 Oktober 2012

    Penjelasan mengenai performa keuangan & operasional

    Konfirmasi terkait rencana audit investigasi oleh Bumi Plc

    Informasi hutang/fasilitas pinjaman

    Transaksi pelepasan anak perusahaan PT MP

    9 Nopember 2012

    Perseroan Bersama-sama dengan Komite Audit Berkomitmen Mengklarifikasi Berbagai Isu

    - Pengadilan menyetujui proses penyelidikan oleh para ahli yang ditunjuk- Laporan akan disampaikan dalam jangka waktu 90 hari

    - Perseroan tidak dapat memberikan komentar selama proses penyelidikan/investigasi

    Siaran Pers

    Penjelasan terkait dengan penurunan peringkat hutang

    Paparan Publik Insidentil Perseroan

    Pertemuan Perseroan dengan Bapepam-LK terkait Rencana Investigasi Bumi Plc

    Pertemuan

    Pengumuman Perseroan - Isu Rencana Investigasi Bumi Plc

    Siaran Pers

    Penjualan PT Mitratama Perkasa ("PTMP")

    Keterbukaan Informasi

    Korespondensi dengan Regulator terkait Isu Terkini

    Keterbukaan Informasi

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    29/36

    29

     APENDIKS

    PT Bumi Resources Tbk.

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    30/36

    30

    Strategic Partnership with Tata Power:Provides synergy and counterbalance to management

    International Contractors and Marketing Agents:Facilitates efficient production and competitive marketing

    Substantial Reserves and Resources:

    Strong potential for upside and production growth

    Low Cost Coal Producer:Provides ability to weather coal cycles

    Natural Hedge wi th Dollar Denominated Revenues and Expenses:Provides natural hedge against currency fluctuations

    High Quality Customer Base with Contracts In-Place:

    Provides pricing and volume stability

    Diversified Coal Mining Operations and Products:Competitive portfolio of high demand products from multiple mine sites

    Stable and Established Concession Structure:Significant incentives for continued government support

    Experienced Management Team:Proven track record of expanding production platform and profitability

    Strong Revenue Growth and Stable Profitability:Expanding cash flow profile

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    Meninjau Kembali Kekuatan Fundamental BUMI

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    31/36

    31

    Prestasi dan Penghargaan Terkini

    1. Peringkat 11th untuk Coal & Consumable Fuels di Asia, per ingkat 15th untuk Coal & Consumable Fuels secaraglobal, peringkat 68th untuk Overall Performance di Asia dan per ingkat 234th untuk overall global performance

    oleh Platts Top 250 Global Energy Company 2012, Singapore, 23 Oktober 2012

    2. Mener ima dua penghargaan pada Asia's Best CSR Practices Awards pada kategori Best CSR Practice Overall danDeveloping Sustainable Strategies pada the Award Ceremony Event di Hotel Park Royal, Singapore, 20 Jul i 2012

    3. Menerima penghargaan “ t he Best Asian Company” pada 8th Corporate Governance Asia Annual Recognition Awards 2012 untuk kategor i Tata Kelola Perusahaan 2012. Penghargaan tersebut d iber ikan oleh CorporateGovernance Asia – Jurnal Tata Kelola Perusahaan di Asia, Hongkong, 20 Juni 2012

    4. Meraih Gold Award untuk kategori CSR Leadership dari The Pinnacle Group International pada 4th

     Annual GlobalCSR Summit di Hotel Shangri-La Boracay, Fil ipina, 19 April 2012

    5. Meraih penghargaan the 2nd  Asian Excellence Recognit ion Awards 2011 untuk Best Investor Relat ions olehPerusahaan Indonesia PT Bumi Resources Tbk. dan Best Investor Relat ions Professional  – Bapak DileepSrivastava dari Asian Excel lence Awards dan 9th Years of Corporate Governance Asia di Hongkong, 30 March2012

    * Termasuk penghargaan CSR Perseroan

    T h R kl i

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    32/36

    32

    Tahapan ReklamasiKaltim Prima Coal & Arutmin Indonesia

    RECONTOURING

    TOP SOILING PLANTATION

    ½ – 1 YEAR

    2 YEARS3 YEARS5 YEARS

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    33/36

    33

    Catatan Keselamatan

    PT Arutmin Indonesia

    39

    3635 35

    2523

    22

    1918

    31

    22

    1412

    32

    20 17

    11

    2.86

    2.592.43

    2.31

    1.511.36

    1.11

    0.93

    0.76 0.80

    0.50

    0.32 0.23

    0.56

    0.34 0.26 0.180.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    3.50

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

        1    9    9    6

        1    9    9    7

        1    9    9    8

        1    9    9    9

        2    0    0    0

        2    0    0    1

        2    0    0    2

        2    0    0    3

        2    0    0    4

        2    0    0    5

        2    0    0    6

        2    0    0    7

        2    0    0    8

        2    0    0    9

        2    0    1    0

        2    0    1    1

        Y    T    D

        O   c    t    '    1    2

       L   T   I   F   R

       (  p  e  r   1 ,   0

       0   0 ,   0

       0   0   M  a  n   h  o  u  r  s   )

       N  o .  o

       f   L   T   I

    LTI

    LTIFR

    Prima Nirbhaya/NOSAImplementation

    FPE & New Golden RulesImplementation

    LTIFR Threshold 2012 : 0,25

    2000

    2001

    2002

    2003

    2004

    2005

    2006

    2007

    2008

    2009

    2010

    2011

    2012

    No. of LTI   8 4 5 3 3 13 3 6 1 7 3 1 2

    LTI-FR   0,97 0,41 0,48 0,24 0,18 0,61 0,12 0,27 0,04 0,23 0,10 0,03 0,05

    0,97

    0,41

    0,48

    0,24

    0,18

    0,61

    0,12

    0,27

    0,04

    0,23

    0,10

    0,03 0,05

    0,00

    0,20

    0,40

    0,60

    0,80

    1,00

    1,20

    0

    2

    4

    6

    8

    10

    12

    14

       L   T   I  -   F   R

       N  o .  o   f   L   T   I

    Hingga bulan October 2012

    PT Kaltim Prima Coal PT Arutmin Indonesia

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    34/36

    34

    Pengelolaan Lingkungan

    • Mendapatkan akreditasi SMK3 & OHSAS18001:2007- NPLCT dari Sucofindo

    • Pengolahan air 

    • Pengolahan debu

    • Pengelolaan bahan berbahaya

    • Mendapatkan akreditasi ISO14001 – NPLCTdari Sucofindo

    • Penghargaan Keselamatan 2011 dariKementerian Energi dan Sumber Daya Mineral

    • Mendapatkan Green Proper 2010 – 2011 dariKementerian Energi dan Sumber Daya Mineraldan Kementerian Lingkungan

    PT Kaltim Prima Coal PT Arutmin Indonesia• Rehabilitasi tambang

    • Pengawasan air asam tambang

    • Kendali zat padat tersuspensi

    • Pengelolaan limbah dan hydrocarbon

    •  Audi t mandi ri pengawasan lingkungan

    • Mendapatkan akreditasi ISO14001 dari SGS

    • Penghargaan dalam Pengelolaan Lingkungan (2006-2008) oleh Dirjen Mineral, Batubara dan Panas BumiDepartemen ESDM, Indonesia

    • Memperoleh Green Proper Periode 2010 – 2011 dariKementerian Lingkungan

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    35/36

    35

    Penghargaan CSR

    Tanggal Penghargaan

    30 Mei 2012

    20 Juni 2012

    - THE BEST of RKAB PERFORMANCE Awards pada RKAB 2011 kategori Aspek

    Community Development- THE BEST of RKAB PERFORMANCE Awards pada RKAB 2011 kategori Aspek

    28 September 2012

    - Orange Agribusiness Development Program in Rantau Pulung District

    - Prevention of Malnourished and Severe-Malnourished Children Under 5 years with

    Community Empowerment Based Through Nutritional Education and Rehabilitation

    Program (Pergizi)

    28 September 2012

    - Micro Empowerment for Poor Households through Independent Business Group in

    - Microfinance Institutions “Rakat Bersama” in Senakin Site

    - Maternal and Child Health Service & Integrated Health and Early Childhood

    Education in Asam-asam Site- Rural Financial Institution “Bulurejo” in Batulicin Site

    - Rural Financial Institution “Sungai Baru” in Asam-asam Site

    - “Koperasi Madani” in NPLCT Site

    Gelar Karya Pemberdayaan Masyarakat ("GKPM") Award 2012

    PLATINUM

    Gelar Karya Pemberdayaan Masyarakat ("GKPM") Award 2012

    PLATINUM

    The 3rd Tambang Award

    The Best Mining Company in Good Mining Practices

    RKAB Award 2011

  • 8/16/2019 34 Presentation Annual Public Expose Bahasa

    36/36

    Terima kasih

    Disclaimer: Forward-Looking Statements

    This communication contains forward-looking financial projections and estimates with respect to the future operations and performance of PTBumi Resources Tbk and its affiliates.

    Investors and security holders are cautioned that forward-looking statements are subject to various risks and uncertainties, many of whichare difficult to predict and are generally beyond the control of the company. Such risks and uncertainties could cause actual results anddevelopments to differ materially from those expressed in or implied by the forward-looking statements. Factors that could cause actualresults to differ materially from those estimated by the forward-looking statements include, but are not limited to, fuel prices and internationalcoal demand and supply position.

    Neither PT Bumi Resources Tbk. or any other person assumes responsibility for the accuracy and completeness of the forward-lookingstatement in this communication. The forward-looking statements speak only as of the date of this communication. PT Bumi Resources Tbk is under no duty to update any of the forward-looking statements after this date to conform such statements to actual results or to reflect theoccurrence of anticipated results or otherwise.