3ft Antenna SP3 Reflector Installation (NMT535-01)

Embed Size (px)

Citation preview

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    1/9

    Sales department : Radio Frequency Systems GmbH

    Kabelkamp 20, D-30179 Hannover (Germany) Tel. +49-511 676-25 20 Fax +49-511 676-25 21

    Plant: RFS France Trignac Fax +33 02 40 90 41 43 1/9

    Installation Instructions3 ft Antennas (with E-Mount)PA, PAL, PAXSP, SPF, SPX NMT 535-01(e)

    These Installation Instructions are valid for antennas in the following version :

    Reflector 0.9 m (3 ft)

    Pipe mount for installation on pipe 114 mm ( 89 mm optional)

    Antenna offset to the left or to the right

    Standard installation on 114 mm pipe with of fset to the left

    Safety collar for easy installation

    2 spindles for fine adjustment of Elevation 15andAzimuth 5 Reflector without shroud

    200 km/hversion : No sway bar

    250 km/hversion : With sway bar 33 mm x 1 m(mandatory)

    It is important to mount the antenna exactly as described in this installation ins truct ion.The installed antenna shall be inspected once per year by qualified personnel.

    RFS disclaims any responsibility for the result of improper or unsafe installation.This installation instruct ion has been written for qualified, skilled personnel.

    We reserve the right to alter details, especially with respect to technical improvement

    200 km/hsurvival windspeed

    antenna version

    250 km/hsurvival windspeed

    antenna version

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    2/9

    NMT 535-01e 2/9

    1. Tools required for installation (Tools are not included with antenna)

    Hoisting device for 100 daN Shackle(s), roll(s), pulley(s) and lifting accessories

    Torque wrench from 0 to 50 Nm 2 strong ropes (approx. length 1.5x tower high)

    Wrenches for hexagon bolts : 1 strong rope or cable (approx. length 2.5 tower high)

    M5(8), M6(10), M8(13), M10(17) Water balance, compass, cutter, tape measure

    M12(19) Key for socket screw : M3(2.5)

    (values in brackets = openings of spanners)

    2. Antenna offset

    Offset left

    Offset right

    ReflectorTOP at theantenna top

    Reflector TOPat the antenna

    bottom

    Holes for feedsystems equipped

    with guy wires

    Azimuth fine

    adjustment spindle

    Elevation fineadjustment spindle

    Antenna OffsetOverview

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    3/9

    NMT 535-01e 3/9

    3. Pre-assembly of the mount

    Cardb

    oard

    3.2

    3.3

    3.4

    3.5

    ConnectingSupport 3 ftE-Mount

    SteelU-Mount

    3 ft

    6 screws M8x256 SL washers 86 nuts M8(Torque tighten)

    3 screws M10x253 SL washer 10

    3 washers 10.5 30(Torque tighten)

    Eye spindle M10x1002 brass nuts M102 washers 10.5

    Install the reflectoron the packing

    cardboard

    3.1For easy operation of the bolted joints,and correct torque tightening, AntiSeize installation paste must beapplied to all threads of bolts and fineadjustment spindles. After this, keep thelubricated threads free of dust and dirt!(a Torque Table is attached forspecifications)

    Do not takesupport on the

    reflector during assembly

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    4/9

    NMT 535-01e 4/9

    4. Sway bar clamp installation (Only for antenna provided with a sway bar)

    5. Feed system installation (refer to Feed Installation Instructions joined)

    6. Safety collar installation and orientation on pipe support

    Sway bar clamp 33

    (L-Profil 40x40)

    Sway bar terminal

    Washer 10.5 30Screw M10x30

    SL nut M10Washer 10.5

    For an antennaOffset Left

    (Tighten the assembly, keeping thesway bar clamp 33 and the sway barterminal free in rotation without gap)

    Minimumspace 340 mm

    Minimumspace 35 mm

    Minimumspace 340 mm

    MinimumSpace 35 mmV-Bolt M10Steel clamp

    2 washers 10.5 304 M10 nuts

    For an antennaOffset Right

    Packing

    cardbo

    ard

    Screw M8x25Washer 8.4 24

    SL nut M8Washer 8.4 24

    Take care to not dust ordamage the elevation spindle

    during manipulation

    Pre-assembledSway bar clamp

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    5/9

    NMT 535-01e 5/9

    Strong rope orcable fixed toantenna steel

    mount to avoidcollision with the

    tower structure

    during hoisting

    Strong rope fixed at the towertop.

    The rope is slipping through asteel ring attached with 2

    To winch

    Shackle

    2 shackleswith steel

    ring

    Steelmount

    Strong rope attachedon the reflector

    casting eye (8.5

    mm)with a shackle,

    and linkedto winch

    Principle foran antenna

    with a left offset

    7. Hoisting on the tower (Feed system not shown)

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    6/9

    NMT 535-01e 6/9

    8. Antenna instal lat ion on pipe support (Feed system not shown)

    2 U-Bolts M12

    4 washers 13 374 nuts M12

    (handtigthen theV-bolts to permitthe antenna freerotation aroundthe pipe, for theazimuth spindleinstallation)

    Principle foran antenna

    with a left offset

    Azimuth safetycollar installedon pipe support

    Azimuth spindle Instal lat ion

    M10 nut

    SL washer 10Screw M10x30

    Eye spindleM10x130

    2 M10 brass nuts2 washers 10.5

    (Rear view)After Azimuth

    spindle installation,torque tigthen the2 M12 bolts (see

    torque table joined)

    Principle fora left offset

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    7/9

    NMT 535-01e 7/9

    9. Azimuth fine adjustment

    10. Elevat ion fine adjustment

    After complete elevationfine adjustment, torquetigthen the 3 M10 bolts,and lock the 2 M10brass nuts on the steelmount

    Loosen turn the3 M10 bolts

    Loosen or tightenM10 brass nuts toadjust the elevationof the antennaPrinciple for

    a left offset

    Loosen M12nuts turn

    Loosen or tightenM10 brass nuts to

    adjust the azimuth ofthe antenna

    After complete

    azimuth adjustment,torque tighten the 4

    first M12 nuts(V-bolts must have

    been greased)

    4 M12 nuts(tighten with

    an usual

    Lock the 2 M10 brassnuts on the steel clamp

    Steelclamp

    Principle fora left offset

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    8/9

    NMT 535-01e 8/9

    11. Sway bar instal lat ion (Only for antenna provided with a sway bar)

    Sway Bar / Towerfixation configurations

    8 nuts M62 U-Bolts M6x33

    Fixing platesway bar 33

    Sway barextremity

    Typical config.for direct mounton angle tower

    structure

    Optional interface

    SMA-SKO-48-114

    Alternative config. withoptional interfaceSMA-SKO-48-114

    for installation on pipetower structure

    2 screws M10x25

    Fixing clampsway bar(L-Profil 60x60)

    Fixing clampsway bar(L-Profil 60x60)

    2 washers 10.52 SL nuts M10

    Washer 10.5SL nut M10

    Screw M12x30

    Washer 13 24SL nut M12

    Screw M10x25

    Screw M10x70

    Washer 10.5SL nut M10

    OffsetLeft

    OffsetRight

    Feed systemnot shown

    For antennas provided with a sway bar,the sway bar installation is mandatory !

  • 8/13/2019 3ft Antenna SP3 Reflector Installation (NMT535-01)

    9/9

    NMT 535-01e 9/9

    12. Final Check

    Offset

    Left

    Offset

    Right

    25 25

    When the installation of the antenna has been completed, it is necessary to makesure that the installation instructions have been followed in all aspects. It isespecially important to check that all bolted joints are torque tightly locked(mandatory).

    Sway Bar orientation

    After completesway bar orientation,

    torque tighten all bolted joints

    Torque wrench