April 15, 201940’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION
Existing Olds StationSubstation
FutureOhme
Substation
Location of Proposed
40’ Purchase
Proposed PropertyLine
April 15, 2019
TOPOGRAPHY OF PROPOSED 40’ AQUISITION
Neighboring Property
ExistingSubstation Property
Current Status• Additional property needed
Site Work Required• Build 4’ X 300’ retaining wall• Relocate existing waterline• 1200 cubic feet soils removal• Grading• Sum of work ~ $326K
• 2019- Targeted construction
OhmeSubstation Layout
Olds Station