4.2-MW&MUX Hardware Installation Quality

Embed Size (px)

Citation preview

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    1/39

    MW & MUX Hardware Installation Quality

    Engineering service department

    2009-7-9

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    2/39

    MW installation

    Installation material

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    3/39

    MW installation

    IF connector

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    4/39

    MW installation

    IF cable connector

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    5/39

    MW installation

    Power cable connector

    Power connector

    GND

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    6/39

    MW installation

    Installation material

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    7/39

    MW installation

    Installation material

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    8/39

    MW installation

    Installation material

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    9/39

    MW installation

    Installation material

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    10/39

    MW installation

    Installation material

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    11/39

    MW installation

    Antenna installationThe antenna and

    ODU polarization

    should be consistent

    with the engineering

    design document

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    12/39

    MW installation

    Antenna installation

    The fixation of antenna and

    pole are reliable. For the more

    than 1.2m antenna, the side

    strut must be installed and

    fixed position is correct.

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    13/39

    MW installation

    Antenna installation

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    14/39

    MW installation

    Antenna polarization

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    15/39

    MW installation

    ODU polarization

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    16/39

    MW installation

    ODU Check

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    17/39

    MW installation

    Hybrid installation

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    18/39

    MW installation

    Hybrid installation

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    19/39

    MW installation

    Hybrid installation

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    20/39

    MW installation

    Hybrid installation for 6/7/8G

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    21/39

    MW installation

    Hybrid polarization

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    22/39

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    23/39

    MW installation

    ODU installation

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    24/39

    MW installation

    IF cable routingIF redundant: Leave enough

    slack when connecting cables

    to the ODU to facilitate

    future maintenance, and IF

    cable should be fixed tightly

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    25/39

    MW installation

    IF cable routing

    The IF cable route and position for thecabling should be designed beforehand

    and arranged neatly. IF cable turns

    should be smooth, and the bending

    radius should be larger than 30 cm.

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    26/39

    MW installation

    IF cable routing

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    27/39

    MW installation

    Rack installation

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    28/39

    MW installation

    Rack installation

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    29/39

    MW installation

    IDU installationIF cable

    Power cable: red

    to 0;Blue to -48V

    E1 cableGrounding

    cable

    Every cable should be labeled

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    30/39

    MUX Installation

    The MUX has two power input.

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    31/39

    MW installation

    IDU installation

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    32/39

    MW installation

    IDU Power cable

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    33/39

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    34/39

    MUX Installation

    Keep 1U distance at least between MUX and IDU.

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    35/39

    Firber Routing

    The fiber connection lines should be routed as required by the design

    and engineering drawings (or the user);

    Redundant length of fiber connection lines at both ends should be

    identical and compliant with the technical requirements.

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    36/39

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    37/39

    E1 Cable

    Redundant length of cables at end should be bended.

    The route and direction of E1 cables should comply with the design.

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    38/39

    E1 Cable

    The cables in the aisle must be

    bounded. The bundled cables

    should be tightly against each with

    straight appearance.

  • 7/31/2019 4.2-MW&MUX Hardware Installation Quality

    39/39