7/31/2019 4.2-MW&MUX Hardware Installation Quality
1/39
MW & MUX Hardware Installation Quality
Engineering service department
2009-7-9
7/31/2019 4.2-MW&MUX Hardware Installation Quality
2/39
MW installation
Installation material
7/31/2019 4.2-MW&MUX Hardware Installation Quality
3/39
MW installation
IF connector
7/31/2019 4.2-MW&MUX Hardware Installation Quality
4/39
MW installation
IF cable connector
7/31/2019 4.2-MW&MUX Hardware Installation Quality
5/39
MW installation
Power cable connector
Power connector
GND
7/31/2019 4.2-MW&MUX Hardware Installation Quality
6/39
MW installation
Installation material
7/31/2019 4.2-MW&MUX Hardware Installation Quality
7/39
MW installation
Installation material
7/31/2019 4.2-MW&MUX Hardware Installation Quality
8/39
MW installation
Installation material
7/31/2019 4.2-MW&MUX Hardware Installation Quality
9/39
MW installation
Installation material
7/31/2019 4.2-MW&MUX Hardware Installation Quality
10/39
MW installation
Installation material
7/31/2019 4.2-MW&MUX Hardware Installation Quality
11/39
MW installation
Antenna installationThe antenna and
ODU polarization
should be consistent
with the engineering
design document
7/31/2019 4.2-MW&MUX Hardware Installation Quality
12/39
MW installation
Antenna installation
The fixation of antenna and
pole are reliable. For the more
than 1.2m antenna, the side
strut must be installed and
fixed position is correct.
7/31/2019 4.2-MW&MUX Hardware Installation Quality
13/39
MW installation
Antenna installation
7/31/2019 4.2-MW&MUX Hardware Installation Quality
14/39
MW installation
Antenna polarization
7/31/2019 4.2-MW&MUX Hardware Installation Quality
15/39
MW installation
ODU polarization
7/31/2019 4.2-MW&MUX Hardware Installation Quality
16/39
MW installation
ODU Check
7/31/2019 4.2-MW&MUX Hardware Installation Quality
17/39
MW installation
Hybrid installation
7/31/2019 4.2-MW&MUX Hardware Installation Quality
18/39
MW installation
Hybrid installation
7/31/2019 4.2-MW&MUX Hardware Installation Quality
19/39
MW installation
Hybrid installation
7/31/2019 4.2-MW&MUX Hardware Installation Quality
20/39
MW installation
Hybrid installation for 6/7/8G
7/31/2019 4.2-MW&MUX Hardware Installation Quality
21/39
MW installation
Hybrid polarization
7/31/2019 4.2-MW&MUX Hardware Installation Quality
22/39
7/31/2019 4.2-MW&MUX Hardware Installation Quality
23/39
MW installation
ODU installation
7/31/2019 4.2-MW&MUX Hardware Installation Quality
24/39
MW installation
IF cable routingIF redundant: Leave enough
slack when connecting cables
to the ODU to facilitate
future maintenance, and IF
cable should be fixed tightly
7/31/2019 4.2-MW&MUX Hardware Installation Quality
25/39
MW installation
IF cable routing
The IF cable route and position for thecabling should be designed beforehand
and arranged neatly. IF cable turns
should be smooth, and the bending
radius should be larger than 30 cm.
7/31/2019 4.2-MW&MUX Hardware Installation Quality
26/39
MW installation
IF cable routing
7/31/2019 4.2-MW&MUX Hardware Installation Quality
27/39
MW installation
Rack installation
7/31/2019 4.2-MW&MUX Hardware Installation Quality
28/39
MW installation
Rack installation
7/31/2019 4.2-MW&MUX Hardware Installation Quality
29/39
MW installation
IDU installationIF cable
Power cable: red
to 0;Blue to -48V
E1 cableGrounding
cable
Every cable should be labeled
7/31/2019 4.2-MW&MUX Hardware Installation Quality
30/39
MUX Installation
The MUX has two power input.
7/31/2019 4.2-MW&MUX Hardware Installation Quality
31/39
MW installation
IDU installation
7/31/2019 4.2-MW&MUX Hardware Installation Quality
32/39
MW installation
IDU Power cable
7/31/2019 4.2-MW&MUX Hardware Installation Quality
33/39
7/31/2019 4.2-MW&MUX Hardware Installation Quality
34/39
MUX Installation
Keep 1U distance at least between MUX and IDU.
7/31/2019 4.2-MW&MUX Hardware Installation Quality
35/39
Firber Routing
The fiber connection lines should be routed as required by the design
and engineering drawings (or the user);
Redundant length of fiber connection lines at both ends should be
identical and compliant with the technical requirements.
7/31/2019 4.2-MW&MUX Hardware Installation Quality
36/39
7/31/2019 4.2-MW&MUX Hardware Installation Quality
37/39
E1 Cable
Redundant length of cables at end should be bended.
The route and direction of E1 cables should comply with the design.
7/31/2019 4.2-MW&MUX Hardware Installation Quality
38/39
E1 Cable
The cables in the aisle must be
bounded. The bundled cables
should be tightly against each with
straight appearance.
7/31/2019 4.2-MW&MUX Hardware Installation Quality
39/39