  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    1/18

    Client :Non-Process Buildings Package ofRuwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi OilRefining Company Ed. Zblin AG

    Project Management Consultant: SANITARY SEWER CALCULATIONFOR EPC-6 BUILDINGS

    Rev. A

    COMPANY Doc. No. 5578-E6-VR-PU-00003Zublin Document No: VR-P-245-01-0A 08 March 2011

    RUWAIS REFINERY EXPANSION PROJECTPROJECT NO. 5578EPC PACKAGE 6

    (NON PROCESS BUILDING)

    SANITARY SEWER CALCULATION

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    2/18

    Client :Non-Process Buildings Package ofRuwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi OilRefining Company Ed. Zblin AG

    Project Management Consultant:

    SANITARY SEWER CALCULATIONFOR EPC-6 BUILDINGS

    Rev. A

    COMPANY Doc. No. 5578-E6-VR-PU-00003Zublin Document No: VR-P-245-01-0A 08 March 2011

    This page is a record of all revisions of this document. All previous issues are herebysuperseded and are to be destroyed.

    REV DATEREASON

    FOR ISSUEBY CHKD REVD

    APPROVED

    PEM PMC COMPANY

    A 08 MAR 11 Issue for Review ST SS GS SAK

    SIGNED (Init ials)

    NOTES:

    (a) By a vertical line in the right-hand margin against the revised text.(b) By a triangle symbol for graphics, the revision number being denoted withinthe symbol.Revision symbols are positioned adjacent to the revision.

    (c) CHKD = Checked by, REVD = Reviewed by, PEM = Project EngineeringManager, PMC = Project Management Consultant

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    3/18

    Client :Non-Process Buildings Package ofRuwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi OilRefining Company Ed. Zblin AG

    Project Management Consultant:

    SANITARY SEWER CALCULATIONFOR EPC-6 BUILDINGS

    Rev. A

    COMPANY Doc. No. 5578-E6-VR-PU-00003Zublin Document No: VR-P-245-01-0A 08 March 2011

    PARAGRAPHS REVISED THIS ISSUE

    Para. No. Para. No. Para. No. Para. No.

    NOTES:

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    4/18

    Client :Non-Process Buildings Package ofRuwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi OilRefining Company Ed. Zblin AG

    Project Management Consultant:

    SANITARY SEWER CALCULATIONFOR EPC-6 BUILDINGSRev. A

    COMPANY Doc. No. 5578-E6-VR-PU-00003Zublin Document No: VR-P-245-01-0A 08 March 2011

    TABLE OF CONTENTS

    1 Scope of Work 5

    2 Standards and Codes 5

    3 Units of Measurement 5

    4 Analysis and Design 5

    5 Conclusion 6

    Append ix A 7

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    5/18

    Client :Non-Process Buildings Package ofRuwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi OilRefining Company Ed. Zblin AG

    Project Management Consultant:

    SANITARY SEWER CALCULATIONFOR EPC-6 BUILDINGSRev. A

    COMPANY Doc. No. 5578-E6-VR-PU-00003Zublin Document No: VR-P-245-01-0A 08 March 2011

    1 Scope of Work

    The intention of this document is to provide Sanitary sewer calculations for the EPC-6 contract buildings. This document covers particularly the sanitary sewercalculations for the EPC-6 as per the design basis for drainage for the EPC-6contract

    2 Standards and Codes

    The sanitary sewer design shall be based on the following documents and standards:

    Design basis for drainage 5578-TEC-HU-013

    Waste water engineering- Metcalf and Eddy.

    3 Units of Measurement

    Units of measurement are in litres and cubic. Meters.

    4 Analysis and Design

    The sewer quantities are based on the following generation rate per capita

    Facili ty Flow rateLitres/person/day

    Offices without shower 60

    Offices with shower 100

    Workshop/Warehousewith shower

    100

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    6/18

    Client :Non-Process Buildings Package ofRuwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi OilRefining Company Ed. Zblin AG

    Project Management Consultant:

    SANITARY SEWER CALCULATIONFOR EPC-6 BUILDINGSRev. A

    COMPANY Doc. No. 5578-E6-VR-PU-00003Zublin Document No: VR-P-245-01-0A 08 March 2011

    The peak occupancy for the each building is taken from the Architectural designbasis. The peak occupancy is multiplied with the peak flowrate to obtain the sewageflow per day for each building.

    The sump pit volumes are based on 8 hours storage and the pump flowrates arecalculated based on pumping time of 2 hours.

    5 Conclusion

    The sanitary sewer calculations have been prepared for every building individually as

    per the above description. The calculations results are attached in appendix A.

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    7/18

    Client :Non-Process Buildings Package ofRuwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi OilRefining Company Ed. Zblin AG

    Project Management Consultant:

    SANITARY SEWER CALCULATIONFOR EPC-6 BUILDINGSRev. A

    COMPANY Doc. No. 5578-E6-VR-PU-00003Zublin Document No: VR-P-245-01-0A 08 March 2011

    Appendix A

    Sanitary sewer calculation for EPC-6 Buildings

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    8/18

    Client :Non-Process Buildings Package ofRuwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi OilRefining Company Ed. Zblin AG

    Project Management Consultant:

    SANITARY SEWER CALCULATIONFOR EPC-6 BUILDINGSRev. A

    COMPANY Doc. No. 5578-E6-VR-PU-00003Zublin Document No: VR-P-245-01-0A 08 March 2011

    APPENDIX-ATABLE OF CONTENTS

    1. Summary- Sanitary sewer calculation2. Sump pit sizing3. Pump flow rate calculation4. Backup

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    9/18

    1. SUMMARY- SANITARY SEWER CALCULATION

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    10/18

    SANITARYSEWERFLOWRATECALCULATION

    Sl.No NameofBuilding Noofpeople

    Restaurant

    meals

    Packed

    meals Sewageflow Sewageflow Remarks Sumppitreference

    Liters/person/day Liters/Building/Day

    1 Technicalbuilding 170 60 10200 Officebuilding 1046F401

    2 Fire&saftybuilding 60 100 6000 Buildingwithshower 1046F403

    3 Archivesbuilding 12 60 720 Officebuilding 1046F401

    4 Canteenbuilding 25 250 900

    150peremployeeand

    25litersperrestaurant

    meal,5litersforpacked

    meal 14500 Canteen 1046F401

    5 Telecombuilding 4 60 240 Officebuilding 1046F402

    6 Maintenancebuilding 118 100 11800 Building

    with

    shower 1046

    F404

    7 Generalservicesbuilding 35 60 2100 Officebuilding 1046F402

    8 Refinerygatehouse 10 60 600 Officebuilding 1046F402

    9 Chemicalwarehouse 37 60 2220 Officebuilding 1046F405

    10 Mainworkshop 60 100 6000 Others 1046F404

    11 MainWarehouse 37 100 3700 Others 1046F405

    12 Vehicleworkshop&tyrestore 8 60 480 Officebuilding 1046F404

    8Hourssewagegeneration TOTAL 58860

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    11/18

    2. SUMP PIT SIZING

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    12/18

    SUMPPITCALCULATION

    Sumppit

    reference BuildingsServed

    Sanitarysewer

    collectedin

    liters

    Depthof

    incomingpipe

    (m)

    Sumppitsize

    (LXWXD)m1046F401 Technicalbuilding,Archivebuilding,Canteenbuildin 25420 2.3 4X4.2X4

    1046F402 Telecombuilding,Generalservicebuilding,Refinerygatehouse 2940 1.4 1.5X1.5X3

    1046F403 Fireandsafetybuilding 6000 3 2.3X2X4.5

    1046F404 Maintenancebuilding,Mainworkshop,Vehicleworkshop 18280 1.7 4X3X3.5

    1046F405 Mainwarehouse,Chemicalwarehouse 5920 2.7 2.7X2X4

    1046F406 Entireplotmastersumppit 58560 1 4X5X4

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    13/18

    3. PUMP FLOWRATE CALCULATION

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    14/18

    SANITARYSEWERSUMPPITPUMPSCHEDULE

    PUMPREFERENCE SUMPPITTAG Liquid

    SUMPPIT

    VOLUME

    CALCULATED

    FLOWRATE

    SELECTED

    FLOWRATE

    l/s l/s1052E6G98001A/B 1046F401 Sewage 25420 3.5 3.5

    1052E6G98002A/B 1046F402 Sewage 2940 0.4 1.5

    1052E6G98003A/B 1046F403 Sewage 6000 0.8 1.5

    1052E6G98004A/B 1046F404 Sewage 18280 2.5 2.5

    1052E6G98005A/B 1046F405 Sewage 2220 0.3 1.5

    1052E6G98006A/B 1046F406 Sewage 58860 8.2 8.2

    NOTE PUMPFLOWRATEISBASEDONAPUMPINGTIMEOF2HOURS

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    15/18

    4. BACK UP

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    16/18

    COMPANYPROJECT DESIGN BASIS FOR

    DRAINAGE

    COMPANY

    PROJECT No 5578

    Agreement no 07-5578-F-1

    RUWAIS REFINERYEXPANSION PROJECT

    COMPANY Doc. No. 5578-TEC-HU-013DOC N: 25418-1046-V0R-H000-V0002

    Rev.1

    The sumps shall be physically located in the catchment area which they serve.

    4.5. Sanitary Sewer System (SS)

    4.5.1.

    Flow Rates

    The average wastewater quantities shall be estimated based on the following generation rate per capita: .

    -

    canteens with shower facilities: 150 litres/person/day

    -

    buildings with shower facilities: 100 litres/person/day-

    others: 60 litres/person/day

    The above figures are based on 8 hours operation per day and obtained from Reference 9, which providestypical water use for industrial, commercial and institutional facilities. These rates combined with the

    occupancy in the buildings will result in very high flows.

    The peak occupancy and period of operation for each building is taken from the Architectural Design

    Basis (Reference 6). Peaking factor of 3 shall be used to derive the design flow.

    4.5.2. Lift Stations

    Sanitary wastewater shall be collected by lift stations or septic tanks. In the case of lift stations, these shallbe located next to the building or group of buildings that they serve. The volume collected shall be

    pumped to the STP for treatment.

    The effluents shall enter the sumps by gravity flow in underground pipes.

    The sump pump set shall consist of a minimum of two pumps (one duty and one standby) of equaloperating capacity.

    The pumps shall be macerator type. Under normal operation, these pumps will be automaticallycontrolled by level settings.

    Septic tanks may be installed in distant low population areas.

    The sumps shall be covered to reduce the odour emissions, and vented to a safe location.

    5. SPARING

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    17/18

    Client : Non-Process Buildings Package of

    Ruwais Refinery Expansion Project

    (RRE-EPC-6)

    Contractor :

    Abu Dhabi Oil

    Refining CompanyEd. Zblin AG

    Project Management Consultant: ARCHITECTURAL DESIGN BASISRev. C

    COMPANY Doc. No. 5578-E6-AMD-AU-050

    Zublin Doc. No. VR-A-999-01

    20 October 2010

    AMENDMENT TO APPENDIX B STAFFING AT RUWAIS REFINERY

    EXPANSION

    AMEDNMENT TO SUMMARY STAFFING PLAN FOR RUWAIS REFINERY EXPANSION

    Building name

    RRD ( for

    reference only)

    RRE Staffing ( for

    use at EPC)

    Incremental

    percentage Remarks

    CNIA GATE HOUSE 3 5 67%

    TECHNICAL BUILDING 108 170 57%

    CANTEEN BUILDING 0 25 NA

    ARCHIVE BUILDING 4 12 200%

    REFINERY GATE HOUSE 9 10 11%

    MAINTENANCE BUILDING 67 118 76%

    GENERAL SERVICES BUILDING 25 35 40%

    MAIN WORKSHOP 43 60 40%

    WAREHOUSES (MAIN & CHEMICAL) 27 37 37%

    VEHICLE WORKSHOP 6 8 33%

    FIRE AND SAFETY BUILDING 44 60 36%RRD staffing is based on newbuilding at RRD

    CENTRAL CHILLER PLANT

    BUILDING 0 2 NIL

    TELECOM BUILDING

    Unmanned, managed by

    Maintenance Department

    PAINT SHOP

    Unmanned, managed by Main

    workshop

    TOTAL 336 542

  • 7/21/2019 5578-E6-VR-PU-00003_RA (1).pdf

    18/18

    CANTEEN BUILDING - Concept

    LOADING /

    UNLOADING

    The kitchen is designed to serve 900

    meals in two shi fts in wrapped packs to be

    del ivered to the staff in their workin

    STAFF

    ER

    COLDKITCHEN

    locations.

    Restaurant area of capacity up to 250

    person on two dining periods

    FREE

    MAIN / HOT

    100 seats in employee dining hall and 25

    VIP / visi tor seats

    -

    DININGVIP /

    VISITOR

    KITCHEN

    to be served A la carte.

    Various menu selection covering salads,

    starters main courses rices astasDINING

    HALLdesserts.

    Compliance with HACCP, ADFCA - Abu

    Dhabi Food Control Authority, NSF, UL (for

    2

    equ pmen .

    MAIN ENTRANCE