30
Score Condition Observed Score (check 0 1 2 4 3 Good (1-2 problems) 2 OK (3-4 problems) 1 Bad (5-6 problems) 0 Date :_____________________________ Number Category Score 0 1 2 1 Equipments-Health & Safety? 2 Facilities 3 Floors & Gangways 4 5 6 Awareness Building 7 Workbenches & surfaces Very Good (perfect condition) Very Bad (above 7 problems), or non existant Sort(Organization) Distinguish between what is needed and not needed extinguishers, fire exits clear, PPE, Smoke detector , Hose pipes, Sand bag, Eye wash stations and first aid equipment are available Are facility items in the area broken, damaged Free of obstructions, fire exits clear Visual Control System / Visual Mgt All information is current and necessary ? Storage(trims Accessories , sessior & Trimmer ) No material storage areas are overflowing all information related to awareness building are current & Necessary? No un-necessary items on workbenches or work surfaces

5s Check List Make

Embed Size (px)

DESCRIPTION

5s

Citation preview

Sheet1ScoreCondition ObservedScore (check box)PRODUCTION 5S CHECKSHEET012344Very Good (perfect condition)3Good (1-2 problems)2OK (3-4 problems)1Bad (5-6 problems)0Very Bad (above 7 problems), or non existantDate :_____________________________Audited By :_________________________Area Audited : _________________________NumberCategorySort(Organization) Distinguish between what is needed and not neededScoreSet in Order (Orderliness) A place for everything and everything in its placeScoreShine(Cleanliness)Cleaning and looking for ways to keep it clean and organizedScoreStandardize (Adherence) Maintain and monitor the first three categoriesScoreSustain (Self-discipline) Make habit of obedience to the rulesScore01234012340123401234012341Equipments-Health & Safety?Whether Fire extinguishers, fire exits clear, PPE, Smoke detector , Hose pipes, Sand bag, Eye wash stations and first aid equipment are available in the floorAll fire extinguishers are charged, eye wash stations labelled, Smoke detector Hose pipe and first aid equipment available and labelledAre safety glasses & Hose Pipes clean and in good conditionArea plan identifies eye wash stations, fire extinguishers, and fire exitsAre PPE and safety standards being adhered to by all employees in the area2FacilitiesAre facility items in the area broken, damagedHave items in the area been identified that are broken or damaged ?The area has floors swept, machinery clean and generally cleanHas maintenance request been raised ?Does an area have a planned maintenance schedule for all facilities issues ?3Floors & GangwaysFree of obstructions, fire exits clearFloor Marked per plant standardClean (No Dirst, No Spills, No Oil)Floor marking standard created and posted in the areaDaily checksheet in place with sign off & date with improvement action items4Visual Control System / Visual MgtAll information is current and necessary ?Floor visual tracking board layout constant with plant standardAll postings are neat & orderly in appearanceArea standard exists and is posted to define layout and formatAre all visual tracking board standards adhered to at all times ?5Storage(trims Accessories , sessior & Trimmer )No material storage areas are overflowingAll material storage areas are clearly designated and labeledMaterial storage areas only contain WIP and/or pre-kitted itemsArea plan identifies location of material storageItems are returned to designated area when not in use6Awareness Buildingall information related to awareness building are current & Necessary?All information are available according to their placementAll Information is orderly place able and OrganizeAll information are monitored according to SOP`7Workbenches & surfacesNo un-necessary items on workbenches or work surfacesWorkbenches and work surfaces are organizedWorkbenches and work surfaces are clean and in good conditionDoes a standard exist in the area that describes what the workbenches and surfaces should requireAre all workbenches & surfaces standards adhered to at all times ?8Wires , Cabiling & HosesAre all Wires, Cabling & Hoses item(Electrical panel board, Bus bar, Hoses) are current & Necessary?Are all Wires, Cabling & Hoses item (Electrical panel board, Bus bar, Hoses) are in Quarantine area9Machine Guards, Windows & InterlocksAll interlocks are operationalGuards and shields in place where requiredAll machine windows are cleaned regularly to area standardMachine guards, interlocks have planned maintenance standard and scheduleMachine guards, interlocks are maintained to planned maintenance standard10Duty Technician11Emergency12Work Place Distribution13Sharp Tools14Tooling, Fixtures, JigsNo Tools, fixtures & jigs on workstations unless in usePoint of use Items have designated and clearly organized storage locationNo tooling (measuring equipment, torque wrenches, pressure gauges) in area out of calibrationArea plan identifies location of tooling, fixtures & jigsAre all tooling standards adhered to at all times ?1516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061626364656667686970
Standarization Checklist SewingStandarization - ChecklistZone: Sewing Team: T-130-Bad, 1-Ok, 2- Good, 3-very GoodMonthSI- No5S JOBS1st 3 pillar4th pillar- standardizePOINTSSORTSET IN ORDERSHINECONTINOUSLYTWICE PER DAYONCE PER DAYONCE PER TWO DAYSONCE PER WEEKONCE PER MONTHONCE PER ORDERRESPONSIBLE1ST WEEK2ND WEEK3RD WEEK4TH WEEK5TH WEEK1Keep trolley are in correct placeOperators/ Feeding helper/ IE2Keep Machice in Right AngleM/c/ Operators / IE3Keep machine cables in Proper hanging positionElectrician/ Machine/ IE4Keep Trimmers Hook To sewing MachineOperators5Keep Work Place Area Clean (Machine, Helpers table , iron Table, Under machine)Operators/ Supervisor6Keep Accessories cup boar clean & keep materials in allocated spaceFeeding Helper/ Supervisor/ IE7Keep Passage FreeSupervisor/ IE8Keep Trolley CleanOperators/ Supervisor9keep cutting loading trolley clean & Pieces to be in proper placeFeeding helper / Supervisor10Isolate The old style materials & keep in respective areaFeeding helper / Supervisor11Keep Production Document In Proper placeFeeding helper12keep Clean the operation waste tagOperators13Keep Operators Launch bags In Respective racks & CleanOperators14keep Necessary Information In QC tableQC15Keep Proper Info like Style sample pieces , OB layout , Trims card, Critical Operations Moke up & Bundle integrity in DisplayIE/ Supervisors/ QC16Keep Drinking Water Tank CleanHouse Keeping17Keep Floor & Window & Cabins CleanHouse Keeping18Keep Toilet CleanHouse KeepingTTL
Record SheetRecord SheetZoneDateLeaderMemberItemNecessityRefCodeInventory ItemRequirementPhysical AreaNeededRed tagUn needed
Visual Requirement Of SIOVisual Requirements For SeitonOrganize flow & connect WorkersChampionTeam LeadersStartDueFactory:Visuals/3s for the Floor TeamDesign poka-yoke (Mistake Proffing) To Ensure That Workers follow 3s1All tables must be at same sight2All Trimmers/ Scissors / Pencils Must be attached To the machine3Design an area to post the necessary instruction on machines the same way4Allocating a place for the side tables (painted)5Marking the kanban level on the side table (Minimum & Maximum)6Implement Pipeline Table for feeding parts at same frequency7Modular have to have a designated place & visually identified to;aKeep the foldersbKeep tools such as (screw drivers, extra foots etc)cKeep input (Name what will be there)dKeep packed cartonseKeep empty cartonsfKeep maintenance log bookgKeep the key drivers visually8At each work stationaPlanning the point-of-use boards with simbala instructions needed for each work stationbOrganize the machine lockers (A place to keep the extra Bobbin ect)cA place to keep thing needed for clean up activitiesdA place to keep a scrap materials to adjust the machineeA place to put the size tag9Display Decesion making support cadre allocated for the floor10Display the leaders role / members role in local language (Convert into a pledge)11Display the lean objectives with regard to the new floor12Display Picture of the team13A list of all colors used unside the floor (Legend for size colors, other indications used)14Floor name board and picture , style, buyer, and number of weeks style is in process152 Bulbs for Break-down and input kanban indentiofication (Make sure you name it)16Machine should have a identification no related to TPM17A bin for putting rejects at the end line and a place allocated for keeping it ( Separate the bin for 5 types of rejects )18Audit can use Visual controls for indicating the pass/fail19Allocate a parking area for the trolley20Display 'Meters'21Cover- Up Wires / Nuts etc
KnittingStandarization - ChecklistZone: Sewing Team: T-130-Bad, 1-Ok, 2- Good, 3-very GoodMonthSI- No5S JOBS1st 3 pillar4th pillar- standardizePOINTSSORTSET IN ORDERSHINECONTINUESLYTWICE PER DAYONCE PER DAYONCE PER TWO DAYSONCE PER WEEKONCE PER MONTHONCE PER ORDERRESPONSIBLE1ST WEEK2ND WEEK3RD WEEK4TH WEEK5TH WEEK1Keep Yarn & fabric in correct place2Keep fabric according to style & Dia wise3Keep machine cables in Proper hanging position4Keep Secissors in hanging Position5Keep Work Place Area Clean (Machine, Helpers table , Uner Table, Under machine)6Keep machine , Globes & Clips in Allocated Space7Keep Passage Free8Keep Table cleankeep cutting loading trolley clean & Bundle to be in Proper place9Isolate The old style Fabric & keep in respective area10Keep Production Document In Proper place11keep Clean the operation waste tag12Keep Workers Launch bags In Respective racks & Clean13keep Necessary Information In QC table14Keep Proper Info like Style , fabric quality fabric Composition & quality Check Description15Keep Drinking Water Tank Clean16Keep Floor & Window & Cabins Clean17Keep Toilet Clean
Standarization Checklist CuttinStandarization - ChecklistZone: Sewing Team: T-130-Bad, 1-Ok, 2- Good, 3-very GoodMonthSI- No5S JOBS1st 3 pillar4th pillar- standardizePOINTSSORTSET IN ORDERSHINECONTINUESLYTWICE PER DAYONCE PER DAYONCE PER TWO DAYSONCE PER WEEKONCE PER MONTHONCE PER ORDERRESPONSIBLE1ST WEEK2ND WEEK3RD WEEK4TH WEEK5TH WEEK1Keep fabric in correct placeOperators/ Feeding helper/ IE2Keep fabric according to style wiseM/c/ Operators / IE3Keep machine cables in Proper hanging positionElectrician/ Machine/ IE4Keep Secissors in hanging PositionOperators5Keep Work Place Area Clean (Machine, Helpers table , Uner Table, Under machine)Operators/ Supervisor6Keep machine , Globes & Clips in Allocated SpaceFeeding Helper/ Supervisor/ IE7Keep Passage FreeSupervisor/ IE8Keep Table cleanOperators/ Supervisorkeep cutting loading trolley clean & Bundle to be in Proper placeFeeding helper / Supervisor9Isolate The old style Fabric & keep in respective areaFeeding helper / Supervisor10Keep Production Document In Proper placeFeeding helper11keep Clean the operation waste tagOperators12Keep Workers Launch bags In Respective racks & CleanOperators13keep Necessary Information In QC tableQC14Keep Proper Info like Style , fabric quality fabric Composition & quality Check DescriptionIE/ Supervisors/ QC15Keep Drinking Water Tank CleanHouse Keeping16Keep Floor & Window & Cabins CleanHouse Keeping17Keep Toilet CleanHouse KeepingTTL
DyeingStandarization - ChecklistZone: Sewing Team: T-130-Bad, 1-Ok, 2- Good, 3-very GoodMonthSI- No5S JOBS1st 3 pillar4th pillar- standardizePOINTSSORTSET IN ORDERSHINECONTINUESLYTWICE PER DAYONCE PER DAYONCE PER TWO DAYSONCE PER WEEKONCE PER MONTHONCE PER ORDERRESPONSIBLE1ST WEEK2ND WEEK3RD WEEK4TH WEEK5TH WEEK1Keep Yarn & fabric in correct placeOperators/ Feeding helper/ IE2Keep fabric according to style & Dia wiseM/c/ Operators / IE3Keep machine cables in Proper hanging positionElectrician/ Machine/ IE4Keep Secissors in hanging PositionOperators5Keep Work Place Area Clean (Machine, Helpers table , Uner Table, Under machine)Operators/ Supervisor6Keep machine , Globes & Clips in Allocated SpaceFeeding Helper/ Supervisor/ IE7Keep Passage FreeSupervisor/ IE8Keep Table cleanOperators/ Supervisorkeep cutting loading trolley clean & Bundle to be in Proper placeFeeding helper / Supervisor9Isolate The old style Fabric & keep in respective areaFeeding helper / Supervisor10Keep Production Document In Proper placeFeeding helper11keep Clean the operation waste tagOperators12Keep Workers Launch bags In Respective racks & CleanOperators13keep Necessary Information In QC tableQC14Keep Proper Info like Style , fabric quality fabric Composition & quality Check DescriptionIE/ Supervisors/ QC15Keep Drinking Water Tank CleanHouse Keeping16Keep Floor & Window & Cabins CleanHouse Keeping17Keep Toilet CleanHouse KeepingTTL
OfficeStandarization - ChecklistZone: Sewing Team: T-130-Bad, 1-Ok, 2- Good, 3-very GoodMonthSI- No5S JOBS1st 3 pillar4th pillar- standardizePOINTSSORTSET IN ORDERSHINECONTINUESLYTWICE PER DAYONCE PER DAYONCE PER TWO DAYSONCE PER WEEKONCE PER MONTHONCE PER ORDERRESPONSIBLE1ST WEEK2ND WEEK3RD WEEK4TH WEEK5TH WEEK1LockersNo irrelevant reference materials, such as documents, drawings, meeting materials, etc.2DeskNo excess pieces of equipment or reference materials on desk or in3Visual Controlrrelevan items or documents can be identified at a glance.4Standards for DisposalStandards are fixed for disposal of documents and equipment.5ExhibitsDisplays are up-to-date, tidy, and well-balanced.6Storage labelsLabeling of lockers and equipment allows immediate identification.7Labels for documents and equipmentEverything is clearly identified.8Ease of useStorage is designed for ease of use.9Orderly storageEverything is stored in a fixed place.10Aisles and display areasAll dividing lines and bulletin boards are clearly indicated11FloorThe floor is clean12Dust and DirtWindows, window sills and shelves are clean13Cleaning responsibilitiesThere is a rotation or shift system for cleaning14WastebasketsThere is a system for getting rid of dirt and waste paper15Habitual cleaningSweeping and dusting are regarded as habitual activities16VentilationThe air is clean, odorless, and free of cigarette smoke17LightingThe angle and intensity of illumination are appropriate.18UniformsNo body is wearing a dirty uniform.19EnvironmentThe general environment is good, including color, air, lighting, etc.20The first 3 stepsThere is a system for maintaing clearing up, organizing, and cleaning.21Clothing rulesThe rules are adhered to.22Interaction of peopleThere is a pleasant general atmoshere, people exchange greetings, etc.23Meeting times and break timesEveryone makes an effort to be punctual.24Telephone MannersEveryone states their business clearly, politely, and succinctly.25Rules and RegulationsAll rules and regulations are strictly observed.
Red Tag Evaluation sheetRed tag Evaluation SheetRed tag Item MovementRefItem nameMnf NoWhenTo whereWhich PurposeHow manyBy Whom