APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sl. No. Item Details 1. Name of the project/s Validity extension of EC for expansion project of M/s. Maithan Steel & Power Ltd at Nakrajoria, PO.-Salanpur, Dist: Paschim Burdwan, West Bengal. 2. S. No. in the schedule 3(a) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled 0.465 MTPA Steel plant 4. New/Expansion/Modernization Validity Extension of Environmental Clearance. 5. Existing Capacity/Area etc. As per obtained Environmental Clearance (Letter No. J-11011/679/2008-IA II (I) on dated 27th August, 2010) of proposed project some units have already been commissioned and the details of existing plant facilities are given in Annexure-I. 6. Category of Project i.e. ‘A’ or ‘B’ ‘A’ 7. Does it attract the general condition? If yes, please specify. No 8. Does it attract the specific condition? If yes, please specify. No 9. Location Latitude: 23 0 4639.90’’ N Longitude: 86 0 5204.23’’ E Plot/Survey/Khasra No. 994,995,996,998,1002,1003,1005,1006,1007,1009 1025,1026,1028,1029 Village Nakrajoria, Tehsil Salanpur District Burdwan State West Bengal 10. Nearest railway station/airport along with distance in kms. Salanpur Railway Station:- 1.83 km. Burnpur Airport, Asansol:- 20.50 km. 11. Nearest Town, City, District Headquarters along with distance in kms. Nearest Town:- Asansol (14.8 km.) District Headquater:- Asansol (15 km.) 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) Village- Nakrajori, PO.-Salanpur, Dist: Paschim Burdwan, West Bengal. 13. Name of the applicant Sri Madhur Agarwala

6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: [email protected] Telephone No

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

APPENDIX I

(See paragraph – 6) FORM 1

(I) Basic Information

Sl. No.

Item Details

1. Name of the project/s Validity extension of EC for expansion project of M/s. Maithan Steel & Power Ltd at Nakrajoria, PO.-Salanpur, Dist: Paschim Burdwan, West Bengal.

2. S. No. in the schedule 3(a)

3. Proposed

capacity/area/length/tonnage to

be handled/command

area/lease area/number of wells

to be drilled

0.465 MTPA Steel plant

4. New/Expansion/Modernization Validity Extension of Environmental Clearance.

5. Existing Capacity/Area etc. As per obtained Environmental Clearance (Letter No. J-11011/679/2008-IA II (I) on dated 27th August, 2010) of proposed project some units have already been commissioned and the details of existing plant facilities are given in Annexure-I.

6. Category of Project i.e. ‘A’ or

‘B’

‘A’

7. Does it attract the general

condition? If yes, please

specify.

No

8. Does it attract the specific

condition? If yes, please

specify.

No

9. Location Latitude: 230 46’ 39.90’’ N

Longitude: 860 52’ 04.23’’ E

Plot/Survey/Khasra No. 994,995,996,998,1002,1003,1005,1006,1007,1009 1025,1026,1028,1029

Village Nakrajoria,

Tehsil Salanpur

District Burdwan

State West Bengal

10. Nearest railway station/airport

along with distance in kms.

Salanpur Railway Station:- 1.83 km. Burnpur Airport, Asansol:- 20.50 km.

11. Nearest Town, City, District

Headquarters along with

distance in kms.

Nearest Town:- Asansol (14.8 km.) District Headquater:- Asansol (15 km.)

12. Village Panchayats, Zilla

Parishad, Municipal

Corporation, Local body

(complete postal address with

telephone nos. to be given)

Village- Nakrajori, PO.-Salanpur, Dist: Paschim Burdwan, West Bengal.

13. Name of the applicant Sri Madhur Agarwala

Page 2: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

14. Registered Address 9 A.J.C Bose Road, Ideal Center, 6th Floor Kolkata-700017

15. Address for correspondence 104, G.T.Road (East), Asansol-713303, Dist-Burdwan, West Bengal

Name Sri Madhur Agarwala

Designation

(Owner/Partner/CEO)

Director

Address 104, G.T.Road (East), Asansol, Dist-Burdwan, West Bengal

Pin Code 713303

E-mail Email: [email protected]

Telephone No. 9933087103

Fax No. 033-39877220

16. Details of Alternative Sites

examined, if any. Location of

these sites should be shown on

a topo sheet.

No

17. Interlinked Projects No

18. Whether separate application

of interlinked project has been

submitted?

No

19. If yes, date of submission NA

20. If no, reason NA

21. Whether the proposal involves

approval/clearance under: if

yes, details of the same and

their status to be given.

(a) The Forest (Conservation)

Act, 1980?

(b) The Wildlife (Protection)

Act, 1972?

(c) The C.R.Z Notification,

1991?

No

22. Whether there is any

Government Order/Policy

relevant/relating to the site?

No

23. Forest land involved (hectares) No

24. Whether there is any litigation

pending against the project

and/or land in which the

project is propose to be set up?

(a) Name of the Court

(b) Case no.

(c) Orders/directions of the

Court, if any and its relevant

with the proposed project.

No

25. Expected Project Cost 9258.96 Lakhs

Page 3: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No
Page 4: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions,

which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sl.No. Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

1.1 Permanent or temporary change

in land use, land cover or

topography including increase in

intensity of land use (with respect

to local land use plan)

Yes The existing land is used as industrial land and our proposed expansion project will be planned at the existing premises. Total Land available is 25.4 acres

1.2 Clearance of existing land,

vegetation and buildings?

No Not applicable, as the existing & proposed project is situated at the same premises.

1.3 Creation of new land uses? No Expansion will be accommodated inside existing plant boundary.

1.4 Pre-construction investigations

e.g. bore houses, soil testing?

Yes Soil testing already done for the existing project.

1.5 Construction works? Yes Construction will be made as per requirement of the proposed project.

1.6 Demolition works? No Not applicable

1.7 Temporary sites used for

construction works or housing of

construction workers?

No Not applicable

1.8 Above ground buildings,

structures or earthworks

including linear structures, cut

and fill or excavations

Yes Shades above ground will be made to accommodate the proposed expansion cum modification units. The amount of excavations found during construction will be used for filling the low lying area.

1.9 Underground works including

mining or tunneling?

No Not applicable

1.10 Reclamation works? No Not applicable

1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable

1.13 Production and manufacturing

processes?

Yes Product details are given in Annexure-I.

1.14 Facilities for storage of goods or

materials?

Yes As this is an expansion project so, storage shed already exists for the project.

1.15 Facilities for treatment or

disposal of solid waste or liquid

effluents?

Yes ETP/STP is available for the existing plant which will be used for treatment of waste water.

1.16 Facilities for long term housing

of operational workers?

Yes Already available for the existing project.

1.17 New road, rail or sea traffic

during const. or operation?

No Existing road & railways facilities are being utilized.

1.18 New road, rail, air waterborne or

other transport infrastructure

No Existing road & railways facilities are being utilized.

Page 5: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

including new or altered routes

and stations, ports, airports etc?

1.19 Closure or diversion of existing

transport routes or infrastructure

leading to changes in traffic

movements?

No Not applicable

1.20 New or diverted transmission

lines or pipelines?

No Not applicable

1.21 Impoundment, damming,

culverting, realignment or other

changes to the hydrology of

watercourses or aquifers?

No Not applicable

1.22 Stream crossings? No Not required

1.23 Abstraction or transfers of water

form ground or surface waters?

Yes 4838 m3/day of Water will be met from the water supply by PHE (Kalyaneshwari Water Works)

1.24 Changes in water bodies or the

land surface affecting drainage or

run-off?

No No effluent will be discharged. Storm water will be collected and stored in water harvesting pond.

1.25 Transport of personnel or

materials for construction,

operation or decommissioning?

Yes Existing facilities are being utilized.

1.26 Long-term dismantling or

decommissioning or restoration

works?

No Not applicable

1.27 Ongoing activity during

decommissioning which could

have an impact on the

environment?

No Not applicable

1.28 Influx of people to an area in

either temporarily or

permanently?

No Mostly local people are employed.

1.29 Introduction of alien species? No Only natural species are shown in that area.

1.30 Loss of native species or genetic

diversity?

No There is no proposal of clearing of vegetation

1.31 Any other actions? No Not applicable

Page 6: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

2. Use of Natural resources for construction or operation of the Project (such as

land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sl.No. Information/checklist confirmation

Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or

agricultural land (ha)

No 25.4 Acres of Land is available for the proposed expansion.

2.2 Water (expected source &

competing users) unit: KLD

Yes About 4,838 m3/day of water is being supplied by PHE from Barakar river. Makeup water requirement is given in Annexure-II.

2.3 Minerals (MT) Yes 0.33 MTPA Sponge Iron, 0.028 MTPA

Scrap, 0.022 MTPA Pig Iron will be used as raw materials.

2.4 Construction material – stone,

aggregates, sand / soil (expected

source – MT)

Yes Construction materials are used from Local Source.

2.5 Forests and timber (source –

MT)

No Not applicable.

2.6 Energy including electricity and

fuels (source, competing users)

Unit: fuel (MT), energy (MW)

Yes After expansion, total power requirement will be 54 MW which will be sourced from DVC power Supply.

2.7 Any other natural resources (use

appropriate standard units)

No Not applicable

3. Use, storage, transport, handling or production of substances or materials,

which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sl.No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health or

the environment (flora, fauna,

and water supplies)

Yes Hazardous materials are H2SO4, Lubricant, Ash etc. Adequate mitigating measures will be adapted.

3.2 Changes in occurrence of disease

or affect disease vectors (e.g.

insect or water borne diseases)

No No such problems are seen.

3.3 Affect the welfare of people e.g.

by changing living conditions?

No Neither any effect on the wellbeing of people nor on their living conditions.

3.4 Vulnerable groups of people who

could be affected by the project

e.g. hospital patients, children,

the elderly etc.,

No None

3.5 Any other causes No None

Page 7: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sl.No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine

wastes

No Not applicable.

4.2 Municipal waste (domestic and

or commercial wastes)

Yes Only small amount of municipal waste will be generated and will be used as manure in green belt area.

4.3 Hazardous wastes (as per

Hazardous Waste

Management Rules)

Yes Hazardous waste like ETP Sludge, Transformer oil, Used oil will be sold to authorized dealers.

4.4 Other industrial process wastes Yes IF & EAF Slag. Small amount of non process wastes like Solid waste generation is given in Annexure- III.

4.5 Surplus product No Not applicable

4.6 Sewage sludge or other sludge

from effluent treatment

No Not applicable

4.7 Construction or demolition

wastes

Yes Small amount of non hazardous waste is generated and being used for land filling of low lying areas.

4.8 Redundant machinery or

equipment

No Not applicable

4.9 Contaminated soils or other

materials

No Not applicable

4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air

(Kg/hr)

Sl.No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

5.1 Emissions from combustion of

fossil fuels from stationary or

mobile sources

Yes Emissions from RMHP will be controlled through Bag filters and by use of sprinklers.

5.2 Emissions from production

processes

Yes Emissions from IF and EAF will be controlled through Bag filters

5.3 Emissions from materials

handling including storage or

transport

Yes Fugitive emissions from Raw Material handling, storage & transportation site.

5.4 Emissions from construction

activities including plant and

equipment

Yes Negligible amount of fumes during metal fabrication work is generated. Fugitive emissions due to transportation are generated.

5.5 Dust or odours from handling of

materials including construction

No Not applicable

Page 8: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

materials, sewage and waste

5.6 Emissions from incineration of

waste

No Not applicable

5.7 Emissions from burning of waste

in open air (e.g. slash materials,

construction debris)

No Not applicable

5.8 Emissions from any other

sources

No Nil

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sl.No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

6.1 From operation of equipment e.g.

engines, ventilation plant,

crushers

Yes Adequate mitigating measures have been taken existing plant & will be carried out for the proposed project.

6.2 From industrial or similar

processes

Yes There will be small amount of noise generated because of acoustic guard provided. Heat will generated from IF & EAF. Adequate mitigating measures will be provided.

6.3 From construction or demolition Yes Noise will be generated for temporarily.

6.4 From blasting or piling No Not applicable

6.5 From construction or operational

traffic

Yes Small localized temporary noise up to 75dB-80dB.

6.6 From lighting or cooling systems No Not applicable

6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the

ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sl.No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

7.1 From handling, storage, use or

spillage of hazardous materials

Yes Used Hazardous material will be handed over to Authorized Dealer.

7.2 From discharge of sewage or

other effluents to water or the

land (expected mode and place of

discharge)

No Zero discharge norms are planned with no risk of contamination.

7.3 By deposition of pollutants

emitted to air into the land or into

water

No Pollutant emission control is adequate enough to have the GLC under NAAQS norm. Hence the deposition effects will be minimum.

7.4 From any other sources No Nil

Page 9: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

7.5 Is there a risk of long term build

up of pollutants in the

environment from these

sources?

No Nil

8. Risk of accidents during construction or operation of the Project, which could

affect human health or the environment

Sl.No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires

etc from storage, handling, use or

production of hazardous

substances

No Adequate safety & fire protection measures are being taken up.

8.2 From any other causes No Nil

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc)?

No Not such past records.

9. Factors which should be considered (such as consequential development)

which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Sl.No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

9.1 Lead to development of

supporting facilities, ancillary

development or development

stimulated by the project which

could have impact on the

environment e.g.:

• Supporting infrastructure

(roads, power supply, waste or

waste water treatment, etc.)

• housing development

• extractive industries

• supply industries

• other

Yes Yes

Employment opportunity and business opportunity is improving the socio-economic aspects of the people. There is overall development of the region with respect to transportation, communication, education, health etc and other socioeconomic aspects. There is growth of extractive and supply industries which will improve the socioeconomic of the region.

9.2 Lead to after-use of the site,

which could have an impact on

the environment

No No such adverse impact is predicted for the environment.

9.3 Set a precedent for later

developments

Yes This is leading to series of development activities, remove the backwardness and improve the socioeconomic condition of the people. As this area is under ADDA Industrial Estate area, so the development of this

Page 10: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

area are done by the authority.

9.4 Have cumulative effects due to

proximity to other existing or

planned projects with similar

effects

No It has a beneficial cumulative effect.

(III) Environmental Sensitivity

Sl.No. Areas Name/ Identity

Aerial distance (within 15 km.) Proposed project location boundary

1 Areas protected under international

conventions, national or local

legislation for their ecological,

landscape, cultural or other related

value

Nil Nil

2 Areas which are important or

sensitive for ecological reasons -

Wetlands, watercourses or other

water bodies, coastal zone,

biospheres, mountains, forests

Maithan Dam 5 Km

3 Areas used by protected, important

or sensitive species of flora or

fauna for breeding, nesting,

foraging, resting, over wintering,

migration

No Nil

4 Inland, coastal, marine or

underground waters

No Nil

5 State, National boundaries Jharkhand- West Bengal State boundary.

4.5 km.

6 Routes or facilities used by the

public for access to recreation or

other tourist, pilgrim areas

No No such route presents within 15 km. radius

7 Defense installations No Not existing

8 Densely populated or built-up area Chittaranjan village 7.8 km

9 Areas occupied by sensitive man-

made land uses (hospitals, schools,

places of worship, community

facilities)

BSK College SHMS Inter College Akbari Masjid Kulti Jamia Masjid

7.7 km 8.7 km 6.7 km 4.9 km

10 Areas containing important, high

quality or scarce resources

(ground water resources, surface

resources, forestry, agriculture,

fisheries, tourism, minerals)

No No adverse effect

11 Areas already subjected to

pollution or environmental damage.

(those where existing legal

environmental standards are

exceeded)

No Nil

Page 11: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

12 Areas susceptible to natural hazard

which could cause the project to

present environmental problems

(earthquakes, subsidence,

landslides, erosion, flooding or

extreme or adverse climatic

conditions)

No No such Past record

Page 12: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

ANNEXURE-I

PROJECT CONFIGURATION

Units Plants/Facilities as per EC-J-

11011/679/2008-IA II (I)

Production in TPA

Products Facilities Commissioned

with CTE & CTO

End Use

IF with LF & CCM

2x15 T & 2x25 T 1,35,000 Billets 3x15 T Billets for Sale

EAF with LF, VD &

CCM

1x20 T & 1x40 T 3,30,000 Billets Nil Billets to Rolling mill & Sale

Rolling Mill with Producer Gas Plant

2 x 300 TPD 1,80,000 TMT 1x300 TPD TMT Sale

Page 13: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

ANNEXURE-II

WATER BALANCE

Page 14: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

ANNEXURE-III

SOLID WASTE GENERATION

Solid waste Quantity in TPA Utilization Measures

EAF slag 25250 To be used in construction/filling low lying areas

EAF dust 17485 To be used in construction/filling low lying areas

IF slag 29835 To be used in construction/filling low lying areas

IF Dust 19890 To be used in construction/filling low

lying areas

Billet Caster Scrap 7425 To be Used in EAF/IF

Billet Caster Scale 4950 To be Used in EAF/IF

Mill Scale 5000 To be Used in EAF/IF

Mill Scrap 5000 To be Used in EAF/IF

Page 15: 6. ‘A’ Category of Project i.e. ‘A’ or ‘B’environmentclearance.nic.in/writereaddata/modification/PreviousTOR… · E-mail Email: madhur@maithangroup.com Telephone No

ANNEXURE-IV RAW MATERIAL REQUIREMENT

Sl no Item Requirement in TPA

1 Return Scrap 13,300

2 DRI 2,24,000

3 Hot Metal 1,58,000

4 Ferro Alloys 6,400

5 Calcined Lime 33,600

6 Burnt Dolo 9,500

7 Pet Coke 800

8 Flourspar 560

9 Refractories 7,500

10 Oxygen Lance 56

11 Electrodes 1,305