KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 1 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
Offshore Platform HAZID/ENVID Report Table of Contents 1. Introduction ......................................................................................................................... 2
1.1. Document Purpose and Scope ................................................................................. 2 1.2. Objective ................................................................................................................... 2 1.3. Scope ........................................................................................................................ 3 1.4. Abbreviations ............................................................................................................ 3
2. Methodology ....................................................................................................................... 4 2.1. Overview ................................................................................................................... 4 2.2. HAZID/ENVID Nodes ................................................................................................ 4 2.3. HAZID/ENVID Process ............................................................................................. 4 2.4. Reference Materials .................................................................................................. 5 2.5. Meeting Attendees .................................................................................................... 5
3. Main Findings and Actions Arising ..................................................................................... 6 4. Supporting References ....................................................................................................... 7 Appendix List of Appendices ................................................................................................... 8 Appendix A: HAZID/ENVID Guidewords ................................................................................. 9 Appendix B: HAZID/ENVID Reference Materials .................................................................. 13 Appendix C: Completed HAZID/ENVID Worksheets ............................................................ 21 Table of Tables Table 2.1 List of HAZID/ENVID Reference Materials ............................................................. 5 Table 2.2 List of HAZID/ENVID Attendees ............................................................................. 5 Table 3.1 HAZID/ENVID Actions ............................................................................................ 6 Table of Figures Figure 1-1: Outline System Schematic ................................................................................... 2
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 2 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
1. Introduction
1.1. Document Purpose and Scope E.ON UK has commissioned Genesis Oil and Gas Consultants Ltd. (GOGC) to perform the Front End Engineering Design (FEED 1a) for the pipeline and offshore facility associated with the E.ON Kingsnorth Carbon Capture and Storage (CCS) development project. An outline system schematic of the development is presented in Figure 1-1.
Kingsnorth Power Station
CCS Pig Launcher
ESDV
Meter
Compressor
Kingsnorth Platform
CCS Pig Receiver
ESDV
Landfall Valve
Onshore Pipeline
Landfall Offshore Pipeline
Figure 1-1: Outline System Schematic
As required by both E.ON UK and GOGC risk management processes, the potential hazards associated with the system require identification by a hazard and environmental identification (HAZID/ENVID) process.
This document details the output from a HAZID/ENVID meeting that took place on the 21st September at GOGC Aberdeen Offices.
1.2. Objective
The purpose of the meeting was to identify key safety, health and environmental (SHE) hazards that have the potential to significantly impact upon or influence the subsequent project design phases. Where such hazards were identified, the proposed measures to prevent, control or mitigate them were reviewed. Where necessary, further or alternative measures were actioned.
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 3 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
The overall objective of the HAZID/ENVID was to, wherever possible; ensure that the inherent safety, health and environmental principles are applied to the project design and to prescribe philosophies or controls to manage residual risks.
1.3. Scope
The HAZID/ENVID meeting covered both the Kingsnorth Platform structure as well as the process equipment. The scope of the process equipment review started at the riser base connection, through the filters, meters and heaters and ended at the CO2 injection master well valve.
Due to the lack of detail design definition at the time of the meeting, decommissioning of the platform was outside of the HAZID/ENVID review scope.
SHE issues not impacting upon or influencing the FEED 1a design or its operating philosophy were outside the scope of the HAZID/ENVID meeting.
1.4. Abbreviations
CCS Carbon Capture and Storage ENVID Environmental Hazard Identification GOGC Genesis Oil and Gas Consultants Ltd HAZID Hazard Identification SHE Safety, Health and Environmental TOR Terms of Reference
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 4 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
2. Methodology
2.1. Overview The HAZID/ENVID Terms of Reference (TOR) [Ref. S1] was used as the methodology basis for the meeting.
2.2. HAZID/ENVID Nodes The study scope was divided into the following nodes to facilitate appropriate examination:
Node 1: The Kingsnorth Platform including the civil structure, process equipment, riser and CO2 injection lines.
Node 1.1: Construction;
Node 1.2: Commissioning and Operation, including drilling activities.
The TOR detailed Node 2 as the onshore and offshore pipeline. Node 2 was not examined during the HAZID/ENVID due to insufficient time remaining after studying the aforementioned nodes.
2.3. HAZID/ENVID Process The HAZID/ENVID guidewords were systematically applied to each of the study nodes to identify hazards that have the potential to give rise to safety, health or environmental consequences of concern.
The proposed prevention, control and associated mitigation measures were explored for each hazard that has the potential to give rise to consequences of concern. Further or alternative measures were proposed where the team were of the opinion that the proposed prevention, control or mitigation measures are not sufficient to reduce the associated risks to as low as is reasonably practicable levels.
Meeting attendees were reminded that the project was in FEED 1A. The focus of the meeting was therefore upon the identification of key safety, health and environmental hazards that had the potential to significantly impact upon or influence the subsequent design phases.
An E.ON UK provided HAZID/ENVID worksheet was used to record the minutes of the meeting. The worksheet was projected on a screen such that all participants could see its development during the meeting. Worksheet entries were made by exception, i.e. only HAZID/ENVID guidewords that gave rise to consequence of concern were recorded.
Several drawings were referenced during the meeting and are listed in Table 2.1.
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 5 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
2.4. Reference Materials The materials referenced during the meeting are summarised in Table 2.1 and presented in Appendix B.
Document /Drawing Title Document Reference Rev
Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 1 Layout
J71584-A/ L-DW-sk1 A1
Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 2 Layout
J71584-A/ L-DW-sk2 A1
Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 3 Layout
J71584-A/ L-DW-sk3 A1
Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Level 4 Layout
J71584-A/ L-DW-sk4 A1
Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Weather Deck Layout
J71584-A/ L-DW-sk5 A1
Kingsnorth Carbon Capture And Storage Project Hewitt Offshore Platform Elevation Looking East
J71584-A/ L-DW-sk6 A1
Kingsnorth Carbon Capture And Storage – PFD Platform & Pipeline Material Selection Diagram (Gaseous Phase)
KCP-GNS-PCD-PFD-0010 01
Table 2.1 List of HAZID/ENVID Reference Materials
2.5. Meeting Attendees Table 2.2 details the meeting attendees. The range of personnel ensured that the necessary skills, knowledge and experience were available to perform a thorough and accurate HAZID/ ENVID.
Name Role Company
Name Deleted HAZID/ ENVID Meeting Chairman GOGC
Name Deleted Safety Lead and Meeting Secretary GOGC
Name Deleted Safety Consultant E.ON UK
Name Deleted Process Lead GOGC
Name Deleted Facilities Lead Civil and Structural GOGC
Name Deleted Environmental Lead GOGC
Name Deleted Environmental Consultant E.ON NT
Name Deleted Production Technologist Baker RDS
Name Deleted Completion Engineer Baker RDS
Name Deleted Client Representative E.ON
Table 2.2 List of HAZID/ENVID Attendees # Part time.
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 6 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
3. Main Findings and Actions Arising
The completed HAZID/ENVID worksheets are presented in Appendix C.
The HAZID/ENVID did not raise any issues that were likely to significantly affect the design of the Kingsnorth topsides process or structure. The six actions that arose during the HAZID/ENVID are detailed in Table 3.1.
Action No.
Action Actionee Action Due Date
1 Take cognisance of environmental report KCP-GNS-SHE-REP-0007 when determining the pile size
Name Deleted
End FEED 1B
2 Devise security philosophy for construction and NUI operation
Name Deleted
End FEED 2
3 Provide justification of a temperature lower than -50C will not be experienced at the wellhead during depressurisation of the topsides facilities
Name Deleted
31 Oct 2010
4 Confirm onshore compression has pressure protection to prevent exceeding 60 barg during gas phase operation
Name Deleted
30 Sept 2010
5 Reconfigure well arrangement to minimise distance between tree and wellhead valves and provide ready access to both
Name Deleted
30 Sept 2010
6 Produce integrated plan, to ensure drilling schedule identifies this hazard [drilling after pressurisation of topsides] and safeguard to manage risks
Name Deleted
End FEED 2
Table 3.1 HAZID/ENVID Actions
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 7 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
4. Supporting References
[S1] Kingsnorth Carbon Capture & Storage Project - Kingsnorth Platform and Pipeline HAZID/ENVID Meeting Terms of Reference - KCP-GNS-SHE-TOR-0001 Draft.
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 8 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
Appendix List of Appendices
Appendix A HAZID/ENVID Guidewords
Appendix B HAZID/ENVID Reference Materials
Appendix C Completed HAZID/ENVID Worksheets
Appendix D HAZID/ENVID Action Sheets
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 9 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
Appendix A: HAZID/ENVID Guidewords
1 Process Parameters
Temperature Pressure Flow
Level Inventory Compositions
Flash point Toxicity Corrosivity
Solid deposition Wax / hydrates Chemical reaction
Materials of construction/compatibility
Kinetic Energy Potential Energy
2 Operating methods
Black start Start up Shutdown
Normal operation SIMOPS Sampling
Calibrating Testing Service failure (air, water, etc)
Emergency shutdown Blowdown Isolation
Draining / venting Purging / filling Winterisation
Maintenance
3 Access / egress
Operational access Maintenance access Confined spaces
Means of escape Means of evacuation Life saving appliances
4 Environment
Liquid effluent Solid effluent Venting
Noise level Flaring Air intakes / exhausts
Ventilation Pressurisation Gas / Oxygen enrichment
Extreme weather Humidity Illumination
Discharges to Air Discharges to Water Odour
Environmental Receptors (including Population).
Energy Efficiency Lightening
5 Loss prevention
Fire / head detection Smoke / gas detection Active fire protection
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 10 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
Fire areas Area classification Passive fire protection
Blast overpressure HP / LP interfaces Deluge drains
Ignition sources Leak sources
6 Plant and equipment
Design pressure Design temperature Materials of construction
Vibration Thermal stress Pressure cycling
Hydraulic shock Static electricity Ionising radiation
Mechanical seals Liquid seals Vacuum protection
Galvanic corrosion By-pass valves Hazardous areas
7 Structures
Loads on / strength of Structure / foundations / equipment supports
Type of loads Static / dynamic / environmental
Creep Scour Fire / blast walls
Impact protection Weights limits Platforms
Handrails Bunds / Drains Stairs / Ladders
Walkways Airlocks / doors Floors / Hatches
8 Control systems
ESD, F+G logic Control software DCS failure
Failure modes System reliability Alarms and trips
High integrity systems Overrides and resets Control room ergonomics
9 Electrical systems
Power supplies DC supplies Battery supplies / UPS
Distribution boards Cable routes Inductive effects
Load shedding Overload protection Heat tracing
Motor start frequency Emergency lighting EMC
10 Communication
Radios PA system Signs
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 11 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
Beacons / klaxons Nav Aids
11 Installation
Temporary supports Sequence of events Rigging
Lifting points Scaffolding Hot work
Hot tap / line freeze Specialist welding Tie-in points
12 Personnel / Occupational Hazards
Slips / trips / falls Electrocution Hot / cold environment
Hand tools Manual handling Equipment failure
Hazardous chemicals Machine tools High level working
Rigging lines Ionising radiation Toxic gases / fume
Inert gases Smoke Steam
Asbestos Crew change Roles and responsibilities
Overboard working Human Factors
13 Dropped objects
Containers Gas bottle Swinging loads
Small overhead objects Drill pipe / casing Drill collars
Scaffolding Anchors Special lifts
14 Marine
Shuttle tanker Supply vessel Standby boat
Shipping lanes Drilling rig Diving support vessel
Anchor handling vessel Helicopter Fishing vessel
DP System Anchors Pipelines
Chains / cables Work < 500 m Buoys
15 Emergency Response
Temporary Refuge Command Structure Special procedures
Fire and Explosion H2S Gas TEMPSC
EER Helicopters Vessels
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 12 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
Isolation
16 Drilling
Drilling Workover Wirelining
Mechanical problems Well control problems Drillstring problems
Formation problems Shallow gas Mud weight
17 Diving
Dropped objects Life support DSV
Breaking containment Process operation Maintenance
18 Site operations
Security access Vehicles Drains
Cranes Excavations Earth moving
Temporary facilities Third party contractors
KCP-GNS-IFS-HAZ-0001
Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 13 of 26
Document Title: Offshore Platform HAZID/ENVID Report
Kingsnorth CCS Demonstration Project
The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, aff i l iates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or warranty as to the accuracy, reliabil ity or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, aff i l iates, employees, advisers or DECC shall have any l iabi l ity whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.
Appendix B: HAZID/ENVID Reference Materials
Appendix Document /Drawing Title Document Reference Rev
B1 Kingsnorth Offshore Platform Level 1 Layout J71584-A/ L-DW-sk1 A1
B2 Kingsnorth Hewitt Offshore Platform Level 2 Layout
J71584-A/ L-DW-sk2 A1
B3 Kingsnorth Offshore Platform Level 3 Layout J71584-A/ L-DW-sk3 A1
B4 Kingsnorth Offshore Platform Level 4 Layout J71584-A/ L-DW-sk4 A1
B5 Kingsnorth Platform Weather Deck Layout J71584-A/ L-DW-sk5 A1
B6 Kingsnorth Offshore Platform Elevation Looking East
J71584-A/ L-DW-sk6 A1
B7 Kingsnorth Platform & Pipeline Material Selection Diagram (Gaseous Phase)
KCP-GNS-PCD-PFD-0010 01
KCP-GNS-IFS-HAZ-0001 Revision: 03
Projec 6 t Title: Kingsnorth Carbon Capture & Storage Project Page 14 of 2
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
Appendix B1 - Kingsnorth Offshore Platform Level 1 Layout
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: 6 Kingsnorth Carbon Capture & Storage Project Page 15 of 2
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
Appendix B2 - Kingsnorth Offshore Platform Level 2 Layout
KCP-GNS-IFS-HAZ-0001 Revision: 03
Projec 6 t Title: Kingsnorth Carbon Capture & Storage Project Page 16 of 2
Document Title: Offshore Platform HAZID/ENVID Report
Appendix B3 - Kingsnorth Offshore Platform Level 3 Layout
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Projec 6 t Title: Kingsnorth Carbon Capture & Storage Project Page 17 of 2
Document Title: Offshore Platform HAZID/ENVID Report
Appendix B4 - Kingsnorth Offshore Platform Level 4 Layout
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Projec 6 t Title: Kingsnorth Carbon Capture & Storage Project Page 18 of 2
Document Title: Offshore Platform HAZID/ENVID Report
Appendix B5 - Kingsnorth Offshore Platform Level 5 Layout
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
KCP-GNS-IFS-HAZ-0001 Revision: 03
Projec 6 t Title: Kingsnorth Carbon Capture & Storage Project Page 19 of 2
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc
Print Date: 25 March 2011
Appendix B6 - Kingsnorth Offshore Platform Elevation Looking East
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: Kingsno Page 20 of 26 rth Carbon Capture & Storage Project
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS-IFS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZID-ENV D Report.doc Print Date: 25 March 2011
Appendix B7 - Kingsnorth PFD Platform & Pipeline Material Selection Diagram (Gaseous Phase)
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 21 of 26
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc Print Date: 25 March 2011
Appendix C: Completed HAZID/ENVID Worksheets
HAZARD SCENARIO CAUSES CONSEQUENCES POTENTIAL IMPACT TO PEOPLE ON AND
OFFSITE
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS ACTIONS/ COMMENTS (No)
Node 1.1: Kingsnorth Platform (construction) – including civil structures, process equipment, riser and CO2 injection
1 Operational access – potential diver access required during installation
Design requires diver intervention
Potential for diver injury/incident
Diver injury Design jacket for installation without diver intervention (pipeline connection to riser to be considered as part of pipeline HAZID)
2 Construction access – working at height and overside working.
Necessity to complete jacket-topsides connection
Requirement for access to potentially elevated or difficult to reach areas including overside working
Potential for personnel injury Provision of temporary access structures for completion of jacket- topsides connection, Access from ESDV deck may be considered as an option..
3 Noise/v bration Piliing activities Potential requirement for Disturbance Licence.
Occupational noise in excess of first action limit
Potential effect on protected species – possible damage or hearing loss.
Minimise size of pile consistent with platform structural integrity and stability. See KCP-GNS-SHE-REP-0007
(1) Take cognisance of environmental report KCP-GNS-SHE-REP-0007 when determining the pile size – ?? - FEED 1B
4 Nav Aids – vessel collision due to absence of navigational aids
Marine obstruction – unmarked by Nav Aids
Increased risk of passing vessel collision
Potential for personnel injury on both vessel and platform
Potential loss of containment of vessel cargo or fuel.
Nav Aids to be installed in accordance with regulatory requirements – at the installation stage of jacket and topsides. Note that temporary support for Nav Aids on the jacket will be required if it is to be left without topsides after installation.
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 22 of 26
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc Print Date: 25 March 2011
HAZARD SCENARIO CAUSES CONSEQUENCES POTENTIAL IMPACT TO PEOPLE ON AND
OFFSITE
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS ACTIONS/ COMMENTS (No)
5 Third Party intervention
Unauthorised third party gaining access to platform (possibly when unattended)
Potential project delay Potential personnel injury (to third parties or any personnel onboard)
Consideration of standby vessel during construction phase and CCTV on topsides.
(2) Devise security philosophy for construction and NUI operation – ?? – FEED 2.
6 Decommissioning Inability to remove completely the facility during decommissioning
Delay to project due to rejection of FDP because of inadequate decommissioning plans. Risk to shipping as a result of structures left subsea.
Potential;impact to vessel crew
Potential loss of containment of vessel cargo or fuel.
Installation is designed to be removed, as a reversal of installation.
All guidewords checked: Y
Base case and variation considered: N
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 23 of 26
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc Print Date: 25 March 2011
HAZARD SCENARIO CAUSES CONSEQUENCES POTENTIAL IMPACT TO PEOPLE ON AND
OFFSITE
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS ACTIONS/ COMMENTS
Node 1.2: Kingsnorth Platform (Commissioning and operation) – including drilling activities, operational process equipment, riser and CO2 injection
1 Low Temperature Heater failure during early dense phase operations (low reservoir pressure)
Potential Xmas tree failure causing loss of containment. Loss of tubing integrity
Toxic/asphyxiation impact of CO2
Wellhead specification (-50 C) is adequate to deal with heater failure and JT effect with maximum upstream pressure – during dense phase Ref KCP-GNS-PCD-REP-0007. Low temperature trip downstream of heaters isolates the well stream. Isolation of loss of containment – DHSV and flowline SDV.
Gaseous operation to continue long enough for wellhead pressure to be sufficiently high to obviate this scenario.
2 Low Temperature Blowdown of topsides results in low temperature in topsides pipework, up to Xmas trees – minimum achievable temperature is -79C.
Brittle failure to pipework due low temperature, leading to loss of containment
Toxic/asphyxiation impact of CO2
Material specification is rated for the lowest temperature likely to occur.
(3) Provide justification of a temperature lower than -50C will not be experienced at the wellhead during depressurisation of the topsides facilities – ?? – Oct 10
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 24 of 26
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc Print Date: 25 March 2011
HAZARD SCENARIO CAUSES CONSEQUENCES POTENTIAL IMPACT TO PEOPLE ON AND
OFFSITE
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS ACTIONS/ COMMENTS
3 Low Temperature Pipework failure on topsides
Low temperature CO2 release (gas and dry ice), ultimately causing structural failure and large temperatures gradients leading to buckling and failure.
Toxic/asphyxiation impact of CO2 plus personnel injury resulting from structural failure.
Material specification is rated for the lowest temperature likely to occur. Construction to reduce flanges and use all welded design where possible. Orientation of tappings, flanges etc . to minimise the effects of LOC incidents. Shielding (for structure and escapeways) to be provided where needed. Covered in layout review report.
4 High temperature Continued heating of trapped inventory (gaseous and dense phases)
Exceedence of pressure/temperature rating of pipework.
Toxic/asphyxiation impact of CO2
Multiple high temperature trips – gaseous phase.
Dense phase includes pressure relief to provide adequate protection.
5 High Pressure Pipeline/topsides packing due to continued CO2 compression with wells closed in (no other topsides isolations closed)
Topsides heaters rated at 60 barg, so will fail when pressure exceeds this. Other equipment is rated to 150 barg.
Toxic/asphyxiation impact of CO2
CO2 leak detection to be installed and executive action to isolate topsides and curtail leak.
(4) Confirm onshore compression has pressure protection to prevent exceeding 60 barg during gas phase operation – ?? 30 Sept 10.
6 Composition High water content in CO2
Increased rate of corrosion – topsides is stainless steel so main effect is on riser/pipelines and wellheads. Increased risk of hydrate formation
Toxic/asphyxiation impact of CO2
Possible CO2 release into sea
Water content monitoring at onshore dehydration. (automatic with manual back-up) PIMS and wellheads integrity management system.
Hydrate inhibition package to protect against topsides choke blockage.
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 25 of 26
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc Print Date: 25 March 2011
HAZARD SCENARIO CAUSES CONSEQUENCES POTENTIAL IMPACT TO PEOPLE ON AND
OFFSITE
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS ACTIONS/ COMMENTS
7 Composition Extraneous matter in pipeline
Contamination of well, leading to decreased injectivity. Filter blinding, requiring frequent filter changes.
Potential need for additional workovers, resulting in increased personnel risk exposure
Increased personnel presence on platform.
Environmental footprint due to the need to drill additional well.
Rigorous cleaning programme for pipeline during commissioning. Water content monitoring at onshore dehydration.
Filters installed topsides as final layer of protection for wells with differential pressure monitoring.
8 Flash point Methanol storage and use
Potential flammable atmosphere and fire if ignited
Potential for personnel injury – fire invisible to personnel
Hazardous area classification process and selection of appropriate ATEX equipment. Nitrogen blanket on storage. Fire detection provided and portable AFFF for firefighting.
9 Reverse flow Fractured flowline results in backflow from well, potentially containing hydrocarbons.
Potential fire if concentration of hydrocarbon above LFL.
Potential for personnel injury from fire and from release.
Head of CO2 in well column inhibits flow of hydrocarbon gas up to the wellhead. Check valve on flowline linlet. Xmas tree valve and DHSV to isolate reservoir and mitigate release.
During well completion, base of production tubing would contain completion fluid and brine, with low top hole pressure. Perforation into the reservoir would result in completion fluid flowing into the reservoir. Some hydrocarbons may flow into the production tubing, but with low pressure at the top of the tubing. Once CO2 injection commences, any fluid in the well column and in the near wellbore section of the reservoir would be displaced. Any well startup would be with a positive pressure into the welll (2.5 bar or more) thus ensuring no reverse flow case is credible during startup.
10 Reverse flow Fractured flowline results in backflow from well.
Release of CO2 from well Toxic CO2 impact on personnel
CO2 leak detection to be installed and executive action to isolate topsides and curtail leak, along with Xmas tree valves and DHSV.
KCP-GNS-IFS-HAZ-0001 Revision: 03
Project Title: Kingsnorth Carbon Capture & Storage Project Page 26 of 26
Document Title: Offshore Platform HAZID/ENVID Report
KCP-GNS- FS-HAZ-0001_03-ktKKDoc1--Offshore Platform HAZ D-ENVID Report doc Print Date: 25 March 2011
HAZARD SCENARIO CAUSES CONSEQUENCES POTENTIAL IMPACT TO PEOPLE ON AND
OFFSITE
POTENTIAL IMPACT TO THE ENVIRONMENT
RECOMMENDED SAFEGUARDS ACTIONS/ COMMENTS
11 Startup Initial startup results filters requiring frequent changeout.
Personnel presence on platform increased for changeout operations, resulting in increased associated risk
Personnel injury, manual handling and potential impact of CO2 release if inadequately isolated.
Filter replacement will include positive isolation, venting and pressure confirmation, with safe system of work to control operations.
12 Well Arrangement Operational access to wellhead and tree valving with minimised conductor riser height to allow direct connection at a low a level as can be achieved. Spool piece section introduces additional leak path
Ready access to wellhead valves for pressure monitoring and for workover activities.
Additional leak path introduced by use of spool piece below tree.
Increased risk of loss of containment events
Increased risk of loss of containment events
(5) Reconfigure well arrangement to minimise distance between tree and wellhead valves and provide ready access to both- ?? – 30 Sept 10.
13 Drilling Drilling activity results in dropped object that damages process pipework
Potential loss of containment resulting in CO2 release should the topsides be pressured.
Potential harm to personnel in the event of a LOC, including impact to drilling rig and crew.
Undertake initial drilling of wells prior to pressurisation of topsides process.
(6) Integrated Plan, to ensure drilling schedule identifies this hazard and safeguard to manage risks – E.ON FEED 2.
14 Vehicles (fishing and other vessels)
Concurrent significant CO2 release and vessels within effect radii.
Build-up of cold CO2 at sea surface around platform.
Potential for harm to vessel crew.
CO2 detection with appropriate executive action maybe combined with warning of shipping in vicinity by radio and/or General Alarm.
All guidewords checked: Y