8
S Mazhar Ali Zaidi R E S U M E NAME PRESENT EMPLOYERS'S NAME DATE OF BIRTH LAST FIRST MIDDLE QATAR PETROLEUM (seconded by Velosi) QATAR MONTH DAY YEAR ZAIDI SYED MAZHAR ALI 04 12 1967 NATIONALITY PAKISTAN PRESENT POSITION Welding, Plant Equip. Engineer / Inspector (Welding, Plant Equipment &, NDT) POSTAL ADDRESS House # 88/3, Madni Colony, Shalimar Link Road Mughalpura Lahore, Punjab, Pakistan. Tel. # +92-42-6853797 (Line Land) Mobile. +974-6078192 (QATAR); Pakistan +92-302-4435688 E-mail: ([email protected] ) ([email protected] ) OBJECTIVE Highly organized and self-motivated with an intelligent and progressive attitude. Remain calm and work well under pressure, as part of team, alone or a team leader. Enjoy meeting deadlines and always committed to self-improvement. Good team player and use own initiative to achieve company objectives. Use my initiative to build strong working relationships with colleagues, clients & contractors. QUALIFICATION Bachelor in Mechanical Technology (B-Tech Pass) Associate Engineering in Mechanical From PBTE Lahore Pakistan PERSONAL QUALIFICATION CSWIP - 3.1 Certified Welding Inspector from TWI-UK CSWIP CERT NO. 7027/3. API-510 Pressure Vessel Inspector (CERT NO. 29991) Diploma of European Welding Inspection Practitioner from European Welding Federation, TWI, UK Short course of welding techniques from PITAC (A Govern. Institute) ARAMCO Approved Welding & Mechanical Inspector Certification for Visual & Assembling Inspection of Fiberglass Reinforced Thermosetting Resin (RTR) Pipe system from Bond strand LTD. KSA NDT QUALIFICATION Certified since 2000 and re-certification are updated. NON-DESTRUCTIVE TESTING (ASNT) LEVEL-II RADIOGRAPHIC TESTING LEVEL-II DYE PENETRANT TESTING LEVEL-II MAGNETIC PARTICLE TESTING LEVEL-II LEAK TESTING Qualified according Written Practice-I, in accordance with the requirements of ASNT Recommended Practice No.SNT-TC-1A. S Mazhar A Zaidi Page 1 of 8 Inspection Engineer

662009124616S Mazhar a Zaidi Welding & Plant Equip

Embed Size (px)

DESCRIPTION

662009124616S Mazhar a Zaidi Welding & Plant Equip662009124616S Mazhar a Zaidi Welding & Plant Equip

Citation preview

MUHAMMAD TARIQ

S Mazhar Ali Zaidi

R E S U M E

NAMEPRESENT EMPLOYERS'S NAMEDATE OF BIRTH

LASTFIRSTMIDDLEQATAR PETROLEUM(seconded by Velosi)

QATARMONTHDAYYEAR

ZAIDISYEDMAZHAR ALI04121967

NATIONALITY

PAKISTAN

PRESENT POSITIONWelding, Plant Equip. Engineer / Inspector (Welding, Plant Equipment &, NDT)

POSTAL ADDRESSHouse # 88/3, Madni Colony, Shalimar Link Road MughalpuraLahore, Punjab, Pakistan. Tel. # +92-42-6853797 (Line Land)Mobile. +974-6078192 (QATAR); Pakistan +92-302-4435688 E-mail: ([email protected]) ([email protected])

OBJECTIVEHighly organized and self-motivated with an intelligent and progressive attitude. Remain calm and work well under pressure, as part of team, alone or a team leader. Enjoy meeting deadlines and always committed to self-improvement. Good team player and use own initiative to achieve company objectives. Use my initiative to build strong working relationships with colleagues, clients & contractors.

QUALIFICATION Bachelor in Mechanical Technology (B-Tech Pass)

Associate Engineering in Mechanical From PBTE Lahore Pakistan

PERSONAL QUALIFICATION CSWIP - 3.1 Certified Welding Inspector from TWI-UK

CSWIP CERT NO. 7027/3. API-510 Pressure Vessel Inspector (CERT NO. 29991) Diploma of European Welding Inspection Practitioner from European Welding Federation, TWI, UK Short course of welding techniques from PITAC (A Govern. Institute) ARAMCO Approved Welding & Mechanical Inspector

Certification for Visual & Assembling Inspection of Fiberglass Reinforced Thermosetting Resin (RTR) Pipe system from Bond strand LTD. KSA

NDT QUALIFICATIONCertified since 2000 and re-certification are updated.NON-DESTRUCTIVE TESTING (ASNT) LEVEL-II RADIOGRAPHIC TESTING LEVEL-II DYE PENETRANT TESTING LEVEL-II MAGNETIC PARTICLE TESTING LEVEL-II LEAK TESTINGQualified according Written Practice-I, in accordance with the requirements of ASNT Recommended Practice No.SNT-TC-1A.

COMPUTER LITRACY Microsoft Windows and its relevant office program. Microsoft Excel, Microsoft Word, Live link, Outlook, power point, PACER (RBI related Software)

MISCELLANEOUS H2S & ESCAPE TRAINING COURSE by PDO JOB HAZARD ANALYSIS COURSE BY PDO An per HEMP (Hazard & Effect Management Process) to Identifying the Hazard & Effect, Assess the Risk considering the severity and probability then Control and Recovery.

PERMIT TO WORK SIGNATORY COURSE by PDO DEFENSIVE DRIVING COURSE by PDO

KNOWLEDGE OF

CODES, SPECIFICATION & PROCEDURE.Familiar with the following International Codes, Specification & Procedures:-

ASME B31.1, 3,4 & 8, AWS D1.1,ASME SEC I, V, VIII & IX, ASTM Specs, API 1104, 510,570, 579, 580, 581, 610, 620, 650 & 653, NACE, BS, Aramco and PDO Standards, Procedures & Specifications, Wide knowledge of current International, National & Client Standards and Procedures.

SUMMARY OF PROFESSIONAL EXPERIENCE

Piping, Steel Structure, Equipments & Tanks16 Year Quality Assurance/Quality Control, Preparation & Review of method statements, Procedures, QIP, PQR, WPS, WQT, material inspection, Piping Fabrication & Erection (Experienced in P1,P4,P5,P8, P9,P11, P45 DSS, SDSS, & other Alloy Steels materials using by SMAW,GMAW,GTAW, FCAW, SAW. Welding Inspection. NDT (VT,PT,MT,RT&UT) Inspection, Steel Structure Fabrication & Erection, Static Equipments Fabrication & Erection, Ducts, Stacks, HRSG Boiler, Rotating Equipments Erection & Alignments, Plant Equipments, Storage Tanks (Single/Double Deck) Fabrication, Erection & Bottom Repairing, Hot Tapping, ASME Jobs (U, U2, S, PP, A, & R) with ASME AI. GRE Piping, Pre-Commissioning / Commissioning activities.Welding Plant & Equipment Inspection (06) Years Covering Risk Based Inspection (RBI), On-stream Inspection (OSI). Corrosion engineering, include : corrosion treatment, prevention and upgrading of plants, equipment, installations and structures in Fields and onIsland corrosion, including Cathodic protection, corrosion monitoring and inhibiting Thickness monitoring with DM-2 (thickness monitor) furnaces tubes, heat exchanger, boilers tubes vessel, pipelines, piping, Stripper & absorber modification work. Internal inspection of vessels, furnaces tubes replacement, welding inspection & dye penetrate test. Inspection of pressure vessel, Hydro Crackers, Vaporizer heat exchanger, boiler, and stripper absorber modifies work replacement of trays. Witness hydro testing of exchange, pneumatic test. Covering planned & Unplanned Shut Downs. MFL of Piping & Tanks Bottom Plants. Testing & Inspections of Offshore facilities, Marine Hoses, Bottom Loading Hoses, Control Valves, Safety Relief Valves, Pressure & Temperature Relief Valves, Temperature Gauges, Thermocouples, Flow Meters, Density Meter, Pressure Gauges etcCross-Country Pipe LinesClass-1 & Flow lines Fabrication & Installation From Launching To Receiving End. Bending/Gauging, Stringing & Welding, Trenching, Road Crossings/Pipe Crossing/Ramp Crossing/ Loops Fabrication & Welding, Cathodic Protection, Sandblasting & Painting, Coating, Insulating, PE-Coating/Lining, Holiday Testing, Lowering, Backfilling, Pigging/Gauging/Cleaning, Water Filling, Hydro testing, Drying, Nitrogen Filling, Marking Post/Sign Boards and Reinstatement with According to API 1104.

Painting & CoatingSand/Shot/Grid Blasting, Painting/Coating, FBE-P Coating, GRE Coating, Epoxy filling, Wrapping, Insulation/Cladding, Sleeve Joints of Piping, Internal cast able Lining, Refectories.

WORK EXPERIENCE IN OPERATION INSPECTION OF OIL, GAS & PETROCHEMICAL

Petroleum Development Oman (PDO), Oman From May 2007 to September 2008 (14 Months)Working with Petroleum Development Oman (PDO) as Welding & Plant Equip. Supervisor at different plants & Projects located South & North part of country Duties/Responsibilities: (Operation Inspection) Inspection & Testing of Control Valves, Safety Relief Valves, Pressure & Temperature Relief Valves, Temperature Gauges, Thermocouples, Flow Meters, Density Meter, Pressure Gauges etc Inspection of level indicators (High level & low level), Inspection of sight glass functionally. Inspection & Monitoring of corrosion under insulation for vessels drums etc (CUI)

Internal inspection for deterioration mechanism of pressure vessels by different NDE methods as per API-510-API, API-571, API-572, API-576, API-577.

On Stream Inspection of piping and Flow lines by UT & FML techniques and evaluating of results.

Inspection of Lining repair work inside of reactor R-4101, Heaters inspection for firing (To check flame normal or abnormal), burners tips, refectory and inlet outlet.

Inspection of roof primary & secondary seal, roof rim vent, roof foam dam, and fire fighting system for the Tank under operation. Maintenance and overhauling inspection of foam chambers.

Inspection of breather and vacuum breaker valves during shot down.

Inspection of internal floating roof & replacement inspection of deteriorated roof during shot down.

Reviewed of the Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) as per specifications and ASME SEC IX for different materials.

Duties/Responsibilities: (Engineering Construction Inspection) Expansion of Sail Rawl Depletion Compression Plant (SRDC) & Combine Cycle Power Plant:

Coordination, meetings with Contractor QA/QC Representative.

Reviewed of WPS and PQR for Duplex A790 (22% Cr), A333, A106 Gr. B & API 5L X60 Materials.

Witnessed of Procedure Qualification & destructive test (Tensile, Bend, Hardness, & Charpy Test) Reviewed of radiographs as per SP-1173, ASME B31.3, & ASME Section V & witness of MPI & DPT. Ensuring implementation of project quality plan and Reviewed of method statement and approval.

Monitored of piping fabrication, erection, and tanks erection activities in work shop and at site.

Issuance non-conformance reports, Final review of inspection reports and QC dossier.

Saudi Aramco, Saudi Arabia From January 2003 to March 2007(4 Years & 2 Months)Worked with Saudi Aramco as Sr. Project Engineering Inspector Welding Plant & Equip. for different plants located western Region of country under Operation Inspection Unit/Engg Division/WRDD DUTIES/RESPONSIBILITIES: Attending meeting & coordination with Operations, Maintenance & Engineering (OME) group.

Arrangement and Make the necessary planning for upcoming plan shutdown and maintenance.

Prepare job lists of shutdown testing and inspection (T&I) requirements for all equipments and piping circuits and participate to finalize the T&I scope of work including materials requirements.

Identify the type of corrosion/deterioration to the equipment or piping & initiate appropriate monitoring methods in consultation with Process & Corrosion Groups.

Conducting Process Equipments inspection like Exchangers, Heaters, Columns, Hydro Crackers internal / external condition evaluation and preparing inspection reports as per ASME & API Codes.

Witnessed MFL/Eddy Current, Hydro blasting/Jetting and hydro testing of Exchangers & Heaters.

Exchangers & Heaters shell internal inspection to check pitting/condition, witnessed weld build up and PWHT as required as per API-510.

Columns inspection for trays and shell (internal). UT measurement for shell and internal cladding.

Conducting Utilities Equipment inspection like Boiler, Tanks, Gas Turbine, steam piping system. Tanks inspection for external & internal, witness T&I (Test & Inspection) activities as per API- 653.

Inspection and of roof drain system and integrating of the system by hydro testing.

Anticipate equipment and piping retirements and initiate appropriate steps of renewal.

Observation / Recommendation, Repairs as per International & Aramco Standards and procedures and preparing details investigation reports (Inspection Work Sheet).

Conducting & witnessed NDT methods (PT, MT, RT, LT & UT) and reviewing radiographic films according to ASME SEC V and witnessed the hydro testing.

To attend QA/QC meetings contractors, ensuring implementation of project quality plan (PQP).

Conducting Annual self Assessment & Plant Inspection Unit Assessment (Plant Inspection Index) of Inspection Unit. Audits of subcontractor activities and reviews quality control system.

WORK EXPERIENCE IN ENGINEERING CONSTRUCTION OF OIL, GAS & POWERName of Organization :Qatar Petroleum (EDL Depat.) Qatar (Seconded by Velosi)Duration

: October 15, 2008 to-Date

Position

:Inspection Engineer

Project

:1) Doha Urban Pipeline Relocation Project (DUPRP) 36" Pipeline

2) Multi-Product Pipeline Project (MPPL) 18" inch Pipeline

3) SGTP Strategic Gas Transmission Project (36" inch Pipeline) EPIC Contractor

:PUNJ LLOYD Contracting Company Name of Organization :Descon Engineering Ltd, UAE.Duration

: October 2000 ~ October 2001

Position

:QA/QC Inspector (Mech. Equipment & Welding)

Project

:Borouge Petrochemicals (Ethylene unit) at UAE

Clint

:Abu Dhabi Polymers Company Limited (Borouge)

Name of Organization :SGS PakistanDuration

: January 1992 ~ April 2000

Position

:Inspection Engineer (Third Party/Seconded)

Project

:Worked at different Project as Follows

Worked with SGS Pakistan (A worldwide international inspection agency) as seconded & third party inspection Engineer with different organizations at different following projects as

Marubeni Corporation, Japan: Mid-Country PAK-ARAB (PARCO) oil refinery in Pakistan. Worked as Piping & Welding Inspector piping/Tanks/Welding)

Owner PARCO (Pak-Arab Oil Refinery)

Insalo, Italy: Liberty Power Plant (Combine Cycle Unit 362X2 MW)

As QA/QC Engineering Inspector (Piping/Welding/Tanks)

Siemens Germany & Nem Holland: Roush Power Plant (Combine Cycle Unit 350X2) As QA/QC Third Party Inspector (Piping/Welding)

UNICEF Pakistan : Inspection of Pumps, GI Pipe, UPVC Pipe & Fitt. on behalf of

&

UNICEF & Pakistan Local Governments

Local Government of Pakistan Governments of Pakistan as a third party inspector

SNGPL & SSGC :SUI Northern Gas Pipeline Ltd & SUI Southern

Gas Company of Pakistan (Gas distribution companies of government of Pakistan)

100% Inspection of Gas pipeline materials e. g Line pipe, Valves, Gas regulators, Gas meters, and forge fittings (Elbow, Tees, Valves) as per API-5L Specification & codes/standards during manufacturing at Manufacturers premises as a third party inspector on behalf of SSGC & SNGPL at various factories.Name of Organization :Progressive Steel Industries (PVT) Ltd, PakistanDuration

: January 1991 ~ December 1991

Position

:QC Inspector Detail of Work Performed/AchievementsGeneral Attending Pre- Inspection meeting with contractors, vender/suppliers and client representative.

Conducting quality audits of vender/suppliers and sub-contractors.

Reviewed of the Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) as per specifications and standards for different materials.

Witnessed the Welder Qualification Test as per ASME SEC IX, AWS D 1.1, API 1104.

Witnessed the destructive testing for welding procedures according to ASME SEC. IX.

Reviewed the QA/QC procedures, Quality Plan as per project specification and standards.

Materials inspections and verifications with MTC certificates and project specifications.

Responsible for reviewing requisition & purchase order as per specification requirements. Inspection at vendors premises and Preparation of vendor evaluation reports.

Reviewing project specs compliance at the quotation stage.

Coordination with NDT group for carrying-out of non-destructive testing.Process Piping & Pipe Line (as per ASME 31.3, 31.4, 31.8 & API 1104) Material Inspection of incoming pipe and CS Plates for pipe supports against Mill Test Certificates Reviewed of WPS and PQR for Duplex A790 (22% Cr), A333, A106 Gr. B & API 5L X60, API 5LC 13Cr Materials.

Inspection of piping fabrication, fit up, dimensional and orientation as per construction drawings

Identifying and confirming of all the NDT requirements e.g. Hardness Testing, RT, DPT, MPI & PWHT against piping material line class and service

Dimensional and fabrication inspection of pipe supports as per drawings. Checking of welding parameters, volts, amperes, speed & heat input against approved WPS.

Interpretation of radiography film and review of reports including welding reports Witnessing & Monitoring of PWHT, hardness, DPT, MPI and reviewing NDT reports. For Pipeline; Monitor Pipeline activities, trenching, stringing, welding, lowering, tie-in, coating, holiday test and hydro test. Inspections of heat shrink sleeve installation and Inspection of temperature Tie-in joints

Test pack preparations and review all related documents and Punch list preparations.

Witness of hydro testing, pneumatic and leak testing.

Internal cleaning by water flashing, air blowing, pigging, and drying.

Storage Tank (as per API 650, API 653) Inspection for different types of tanks including cone roof, dome roof, internal floating roof, single/double deck floating roof, Hemi Spheroid and Spherical tanks

Foundation level check, tank bottom plates laying inspection. Material traceability

Inspections of marking, cutting, fabrications and erections of shell plates.

Witness of welder and welding operator qualification test for SAW and SMAW welding procedures.

Shell plates erection, fit-up of vertical & horizontal joints, stair & structure related to tank.

Welding inspection, peaking, banding check of vertical & horizontal joints.

Nozzles orientation, fit-up, alignment, level & welding inspection.

Witnessing of Vacuum box testing of bottom plates.

Bottom test (Vacuum box test), oil penetrant test (OPT), and pneumatic test of nozzles pad.

Hydro test and NDT according to Code API 650 & ASME SEC V. Inspection of GRE Coating application and existing condition of tank bottom plates.Rotary and Stationary Equipment Inspection of orientation, levelness, center alignment and verticality.

Inspection of the jackscrews and slide plates.

Centering and reverse alignment prior to piping connections.

Centering and reverse alignment after piping connections.

Inspection of belt tensioning.

Painting and sand blasting as per SSPC, SIS 05 59 00 and Hemple Inspection of weather condition, relative humidity and dew point. Inspection of Surface temperature, and ambient temperature Inspection of abrasive material and size (sand, grit, copper slag silica free, steel shot, garnet, aluminum oxide) by laboratory. Inspection of surface preparation and profile as per SSPC, SIS 05 59 00

Inspections of wet film thickness and dry film thickness.

Adhesion test by X-cut, V-cut, tape, and pull off test.

Inspection of coating and wrapping of C.S piping.

Inspection of holiday test (Pin hole test)Steel Structure Marking, cutting and Fit-up inspection.

Visual welding inspection and NDT inspection by MPI & DPT Dimensional inspection according to approved construction drawings. Erection inspection, to make sure all the bolting are properly tightened, fixing and matching properly with out stresses.Vessels Inspection of fabrication and erection of pressure vessels as per ASME Sec. VIII Div 1 & 2

Dimensional inspections for marking & cutting.

Fit-up & welding inspection.

Hydro test for vessels for new and after re-rating or alteration.

Gas Line Materials (Line Pipe, Gas Regulators, Gas meters, and Forged Fitting during Manufacturing)

Inspection of in coming materials (HR Coils, Aluminum ingots, MS iron bar)

Dimensional and Physical Inspections.

Verifying the chemical composition reports by Mill test Certificates and independent laboratory.

Witness the destructives test (mechanical/physical properties) at independent laboratory. Monitoring the process during manufacturing.

Visual welding inspection and NDT inspections by Eddy Current of Line pipe during manufacturing.

Dimensional inspection. (Length, Diameter, wall thickness, Ovality, Squire ness, roundness and bevel angle)

Witness of Flatting test, bend test of line pipe

Hydro test of line pipe and Leak test of forged fitting and gas regulators.

UPVC Pipe

Inspection of UPVC pipes as per BS-3505

Dimensional Inspection (Length, wall thickness, diameter)

Witness of Impact, opacity, Acetone test.

Witness of hydro test and blast testing.

Heat resistance test.

S Mazhar A Zaidi Page 1 of 6 Inspection Engineer