2
MANDATORY SPARE PARTS ROTATING EQUIPMENT BALANCE OF PLANT PACKAGE PHASE-III REFINERY PROJECT, MRPL SECTION: E-3 6782-334-16-45-E3-01-A Page 1 of 2 Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved E STANDARD SPECIFICATION E-3 ROTATING EQUIPMENT BALANCE OF PLANT PACKAGE FOR DELAYED COKER UNIT PROJECT : PHASE-III REFINERY PROJECT OWNER : MANGALORE REFINERY AND PETROCHEMICALS LTD PMC : ENGINEERS INDIA LTD. JOB NO. : 6782 A 29/01/09 Issued with the Bid Package AG SM SM Rev. No Date Purpose Prepared by Checked by Approved by

6782

Embed Size (px)

DESCRIPTION

fyki

Citation preview

Page 1: 6782

MANDATORY SPARE PARTSROTATING EQUIPMENT

BALANCE OF PLANT PACKAGE PHASE-III REFINERY PROJECT, MRPL

SECTION: E-3 6782-334-16-45-E3-01-A Page 1 of 2

Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved

E STANDARD SPECIFICATION

E-3 ROTATING EQUIPMENT

BALANCE OF PLANT PACKAGE FOR

DELAYED COKER UNIT

PROJECT : PHASE-III REFINERY PROJECT OWNER : MANGALORE REFINERY AND PETROCHEMICALS LTD PMC : ENGINEERS INDIA LTD. JOB NO. : 6782

A 29/01/09 Issued with the Bid Package AG SM SM

Rev. No Date Purpose Prepared

by Checked

by Approved

by

Page 2: 6782

MANDATORY SPARE PARTSROTATING EQUIPMENT

BALANCE OF PLANT PACKAGE PHASE-III REFINERY PROJECT, MRPL

SECTION: E-3 6782-334-16-45-E3-01-A Page 2 of 2

Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved

There is no attachment in this section.