6th Consortium meeting, Aveiro, 8-9 November, 2005
Project Status Update
Carlos Díaz, FIMIM
6th Consortium meeting, Aveiro, 8-9 November, 20055th CM
Status as of last meeting
Coord. & manag.Pilot evaluation guidelines
Development/extension of tools
Implementation of Action Plan
Implementation of Action Plan
Publication ofSOA
Publication ofSOA
Implementation of Work plans
Selected developments
Selected developments
D11
D14
D13
D10 D12 D15
D18
D19
D16
D17
Validation of conclusions
by all
Specific actions for gender equity, links with other NoEs, indicators
Reinforced cooperation within and
between pilots
Outreach plan
Multilingual thesauri?
6th Consortium meeting, Aveiro, 8-9 November, 20056th CM
Current project status
Coord. & manag.Pilot evaluation guidelines
Development/extension of tools
Implementation of Action Plan
Implementation of Action Plan
Publication ofSOA
Publication ofSOA
Implementation of Work plans
Selected developments
Selected developments
D11
D14
D13
D10 D12 D15
D18
D19
D16
D17
Validation of conclusions
by all
Specific actions for gender equity, links with other NoEs, indicators
Reinforced cooperation within and
between pilots
Outreach plan
Multilingual thesauri?
6th Consortium meeting, Aveiro, 8-9 November, 2005
Regarding deliverables...
Del. no. 1
Deliverable name WP no.
Lead participant
Estimated indicative person months
Nature2
Dissemi-nation level3
Delivery date4
(proj. month)
D10 Quarterly Management Report #4
1 FIMIM 8,0 R CO 15
D11 State of the art on data interoperability and management
4 UPM 54,6 R PU 16
D12 Quarterly Management Report #5
1 FIMIM 8,0 R CO 18
D13 State of the art on systems for data analysis, information retrieval and decision support
5 FORTH 69,5 R PU 19
D14 First report on pilot applications
6 ISCIII 188,9 R RE 19
D15 Quarterly Management Report #6
1 FIMIM 8,0 R CO 21
D16 First report on dissemination activities
2 ISCIII 41,2 R PU 24
D17 First report on training and mobility activities
3 IMIM 54,1 R PU 24
D18 Periodic activity report #2 1 FIMIM 8,5 R RE 24
D19 Management report #2 1 FIMIM 8,5 R CO 24
1 Deliverable numbers in order of delivery dates: D1 – Dn 2 Please indicate the nature of the deliverable using one of the following codes: R = Report P = Prototype D = Demonstrator O = Other 3 Please indicate the dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services). RE = Restricted to a group specified by the consortium (including the Commission Services). CO = Confidential, only for members of the consortium (including the Commission Services). 4 Month in which the deliverables will be available. Month 1 marking the start of the project, and all delivery dates being relative to this start date.
6th Consortium meeting, Aveiro, 8-9 November, 2005
Annual Technical Review #1: Brussels, 16 March, 2005
Recommendations:
o Ensure a more balanced participation of partners in the Network in strategic planning (WP2 & WP3 biased towards Spain, unbalanced participation in surveys thorough validation process needed to ensure endorsement by all participants).
o Indicate explicitly progress on every individual milestone of the DoW.
o Provide explicit networking progress assessment in the next reporting period based on benchmarking indicators, particularly on collaborative activities (and integration).
Provide due justification of any deviations in costs and efforts and assure that the intensity of participation for the remaining period will be sustained.
o Propose specific actions in favour of gender equity and assess their impact.
Establish links with other FP6 relevant projects, like SEMANTICMINING and BIOPATTERN.
o Develop an outreach plan to ensure that future results will target important audiences, like clinicians, regulatory authorities and the public.
o Consider multilingual approach to the different thesauri developed in the consortium
o Pilots acknowledged as ‘cornerstone’, but no specific comments made and not mentioned in achievements. “Reinforcement of collaboration in and between pilots requires special attention”.
Regarding review recommendations...
6th Consortium meeting, Aveiro, 8-9 November, 2005
Results officially delivered:
• D10: Quarterly management report (without efforts)
Other results (visible):
• First INFOBIOMED Training Challenge
• Web site, BMI gateway - continuously updated
• MBS prototype
• Final versions of SoA reports for WP4 and WP5
• Several dissemination activities, initial concertation activities with other NoEs
Other results, visibility/completion pending:
• Prototype of training database & thesaurus
• Newsletter
• Generic developments by individual partners for WP4, WP5
• Progress on pilots
• Specific contributions from WP4 and WP5 to pilots
Project status update: Results in period
6th Consortium meeting, Aveiro, 8-9 November, 2005
All of this indicates a low level of activity during the last 6 months
• Failure to deliver results
• Failure to make results visible
• Failure to consider review recommendations
• Failure to communicate
• Problems in reporting work and estimating efforts
BUT:
• The most difficult, initial phase has been overcome - teams are ‘normalised’• There is a huge potential for the project to make a difference in the BMI area• There is a huge potential for meaningful scientific results• There are specific work plans for most activities • Cash-flow problems will now be solved (payment from EC has arrived!)
The project needs now a strong push to recover delays and be on track again
Current situation
6th Consortium meeting, Aveiro, 8-9 November, 2005
Problems in reporting efforts
• Effort figures may not correspond to work reported
• Trend towards overestimation due to finances
• Trend towards overestimation for some academic organisations
• Lack of visibility of results, lack of details in reporting
• Lack of experience in estimating efforts: errors in reporting
• Create delays in management reports
• Create huge distortions at the Consortium level
• Create distortions at the financial level345 pm reported in year 1
6th Consortium meeting, Aveiro, 8-9 November, 2005
Financial status
DO WE NEED A CHANGE OF PARADIGM?
• Two options:
• Continue with dependency of effort figures reported and planned
• Depends on correct and timely effort estimation, both for actual and
planned figures
• May lead to temporarily uneven budget distribution among partners
• Theoretically makes work and money received more correlated
• Difficult to follow-up, generates overhead
• Return to calculation based on original funding
• Depends on commitment to intensively work for project
• Effort figures would only serve as basis for justification
• Eases cash-flow for partners, helps avoid vicious circles
• Danger of generating ‘passive’ behaviour
• Requires stronger internal audit
6th Consortium meeting, Aveiro, 8-9 November, 2005
Financial management: new option
• Paid so far: A
• Complete payment year 1: A’
• Complementary payment up to 70%
of original funding: B
• Reduction for non-justification of A
+ A’: C
Total payments: A+ A’ + B - C
B
A’
Year 1:
accepted
budget
(effort)
A
Original
budget
whole
project
70%
budget
C
Justified
year 1
6th Consortium meeting, Aveiro, 8-9 November, 2005
Financial management: new option
6th Consortium meeting, Aveiro, 8-9 November, 20056th CM
Current project status reminder
Coord. & manag.Pilot evaluation guidelines
Development/extension of tools
Implementation of Action Plan
Implementation of Action Plan
Publication ofSOA
Publication ofSOA
Implementation of Work plans
Selected developments
Selected developments
D11
D14
D13
D10 D12 D15
D18
D19
D16
D17
Validation of conclusions
by all
Specific actions for gender equity, links with other NoEs, indicators
Reinforced cooperation within and
between pilots
Outreach plan
Multilingual thesauri?
• Need to work intensively to recover delays
• There are solid grounds for great results, essential for network survival
• Forthcoming review in March is deemed crucial for the project
• Presentations to clarify:
A) Brief reminder of the WP objectives and work done during the first year (5
minutes). This is especially useful to orientate the members of the Scientific
Advisory Board (SAB) attending the meeting.
B) Work done and results obtained during the second year (2005), up to now,
with special emphasis on the progress obtained since the last meeting in
Sweden (15 minutes).
C) SPECIFIC and TANGIBLE results (prototypes, scientific papers, databases,
tools, etc.) that are foreseen to be available and presented at the Commission
review next March 2006 (10 minutes).
D) Prospects of work and proposals for the period March - December 2006 (5
minutes).
E) Discussion (15 minutes). Please note that you can address questions to the SAB