Upload
norman-ecija
View
213
Download
0
Embed Size (px)
Citation preview
8/10/2019 703845main Bal-cal Loan Letter
1/3
Sample of a Request for Loan Letter:
5 July 2012
From: Mr.xxx xxxxxxx
AmesSupersonicsProject
To: Mr.FrancisJ.Kmak
Chief,WindTunnelDivision
MS227-5
NASAAmesResearch CenterMoffettField,CA94035
Subject:RequestforLoanofNASAAmes1.00inchMK14CStrain-gaugeBalance
1.Request
TheNASASupersonicsProjectrequeststhe loanoftheNASAAMES1.00inch
MK14C6-componentinternalstrain-gauge balance, itsrelated checkloadinghardware,anda
dummybalancefortheBoeingSonicBoomTestintheGRC8x6WindTunnel.The loan
periodshallbefrom 5July2012through17 September2012.Thisbalancewillbe usedasthe
PrimaryTestBalance.
2.FinancialLiability
TheNASASupersonicsProjectacceptsresponsibility for repairingor replacing
thebalance and associatedequipment shoulddamageoccurwhileinourpossession(this
includesallmechanicalandelectricalaspectsofthebalanceincludingthetaperandouter
sleeve).TheSupersonicsProjectunderstands thereplacementcostofabalanceis
approximately $250Kandrefurbishmentcostsvarywidelydepending on thedamage (e.g.
cable repairs/replacementscan be$2Kor greater,flexurereplacementscan be$20Kor more,
andfullrecalibrations ofbalanceafter repairsare made can be inthe orderof$25k).
3. ItemsRequested
Balance -Thebalancetobeloaned shallbe theAmes1.00" diameterMK14C6-
componentinternalstrain-gauge balanceequippedwitha29-foot, permanentlyattached cable
terminated intaper pins.Each balance bridgeiswiredwith fourwires(apair for excitationand
a pairforsignal)-thereareno independentsenselines. Also, allfourthermocouplesare not
working.Thebalance waslast calibratedatTriumph in March2008. Thecalibrationassumes
8/10/2019 703845main Bal-cal Loan Letter
2/3
theexcitationsenseis made at the taperpins.
CheckLoadHardware-The check load hardwareassociatedwiththe1.00"MK14Cbalance will also bepartoftheloan.This willconsistofa 1.00" calibration body,roll
arms,relatedfasteners, andabalance-to-calibration-bodyrollpin.
DummyBalance-The loaned hardwarewillalsoincludeone#6672dummybalance.
4. StaticandDynamic LoadingLimits
The balanceloadswillbemonitoredso asnot toviolateatheoretical-infinite-life
criterionforthebalanceby limitingthe staticanddynamicloadsto values determinedbythe
Ames-providedModifiedGoodman diagramfor the1.00"MKI4Cbalance.
5.ObjectiveEvidenceoftheStateofthe Balance
Amesshall supply "as shipped" mechanicalandelectricalinspection report sheet
withthebalance.TheSupersonicsProject shall supply toNASAAmessimilar"as shipped"
mechanicalandelectricalinspection report sheet upon the return of the balance.
Thebalance and associatedequipment istobe shippedto:
ATTN:
Telephone:
Address:
TheNASASupersonicsProjectpoint ofcontactis:
Name
Title
Telephone
Requester
Mr.xxx xxxxxxxAmesSupersonicsProject
8/10/2019 703845main Bal-cal Loan Letter
3/3
Signature
Approval
Mr.FrancisJ.Kmak
Chief,WindTunnelDivision
Signature