Page 1: 7th Annual Supplier Conference - PG&E

7th Annual

Supplier Conference October 24, 2012

Page 2: 7th Annual Supplier Conference - PG&E

Energy Supply Overview

2012 Supplier Conference

Steve Royall

Director, Fossil and Solar, Operations &

Maintenance

October 24, 2012

Page 3: 7th Annual Supplier Conference - PG&E

Items To Discuss:

• What We Value

• 2012 Successes

• 2013 Work & Future Opportunities

Page 4: 7th Annual Supplier Conference - PG&E

• Safety

• Partnerships

• Quality Work / Products

• Reliable Operation

• On Plan / On Budget

• Total Cost of Ownership vs. First Cost

• Supplier Diversity

What We Value

Page 5: 7th Annual Supplier Conference - PG&E

2012 Successes

Page 6: 7th Annual Supplier Conference - PG&E

Resumed operation of all 3 units (1,212 MW)

Helms Pumped Storage Facility

Page 7: 7th Annual Supplier Conference - PG&E

Crane Valley Dam

Seismic upgrades in final completion stage

Page 8: 7th Annual Supplier Conference - PG&E

Utility Owned Photovoltaic (PV) Program

Placed another 50 MW into commercial operations

Cantua Solar Station (20 MW)

Page 9: 7th Annual Supplier Conference - PG&E

Diablo Canyon Power Plant (DCPP)

INPO#1 Rating Successful 1R17 Outage Major modifications completed (Process Control and Chemical Management Systems)

Page 10: 7th Annual Supplier Conference - PG&E

Gateway Generating Station (GGS)

First major outage in progress

Page 11: 7th Annual Supplier Conference - PG&E

Safety and Security Work

Reflecting changing industry regulations

Significant Work in Hydro Watersheds

• Bear river canals

• Rock Creek

• Helms rotor replacement

• Crane Valley Dam Seismic Upgrades

• Kern Canyon Facility Upgrade

Post-Fukushima modifications at DCPP

Security upgrades at Fuel Cell Sites

Page 12: 7th Annual Supplier Conference - PG&E

• Post-Fukushima modifications (DCPP) • Nuclear security modifications

• Utility owned PV – Construction of year 3 projects for commercial operation

• O&M of PV sites

• Significant work in Hydro watersheds • Penstocks

• Canals

• Other civil, electrical and mechanical work

• Continued Diverse Supplier Development = Increased Diverse Spend

2013 - Future Opportunities