SAPience.be TECHday 2011Modeling tomorrow’s technology
Lamot, MechelenApril 6, 2011
Your logo
Controlling your SAP Business Processes in a complex IT environment:
Umicore does it!
Wouter DanielsBusiness Analyst
Oliver BuyssensComptence Lead SAP SolMan
Agenda Agenda
13/12/2012 Page 2
Your logo
1. Speaker and Company Presentation
2. Scope of the project ASQ
3. SAP Landscape
4. Project ASQ2
5. Link with ChaRM
6. Specific concept for BI
7. Lessons Learned
8. Q&A
Agenda
13/12/2012 Page 3
Agenda Your logo
Oliver Buyssens
• SAP Solution Manager Competence Team Lead at Expertum• Active participant at SAP Solution Manager introduction in BeLux• Numerous implementations of SAP Solution Manager in following areas
• Project documentation and Business Process Modeling• Implementation Methodology• Service Desk / ChaRM / ITIL• Monitoring• Application Lifecycle Management
• Solution Manager trainer at SAP (+5 years)• Co-Chairman of SAP Solution Manager Task Force of the SAPience
Technology commission• Member of the SIGS (Special Interest Group Solution Manager)
1. Speaker Presentation
Agenda
13/12/2012 Page 4
Agenda Your logo
• Founded begin 2006• Team of +45 SAP Experts and Project Managers• Mission : Providing superior long-term customer and employee value • Offering expertise in following domains
– Finance– Supply Chain Management– Business Intelligence– Product Lifecycle Management– Project Management– SAP Solution Manager– GRC and Security– Netweaver– Own SME Solution: Value4SME
• SAP Service Partner, Channel Partner, Value Circle Partner• SAPience.be Partner
1. Presenting Expertum
Agenda
13/12/2012 Page 5
Agenda Your logo
Wouter Daniëls
• Business Analyst for Umicore Information Systems • Working for Umicore since 2008
• Umicore Business Projects in SAP• Large Procurement Project (SRM, Netweaver Portal, ECC..)• Participation in Finance Projects (ECC) and Reporting (BI)• Specific business Units: Electro-Optic Materials & Technical Materials
• Internal Projects regarding Application, Standards and Quality• Project documentation and Business Process Modeling• Change Management (ChaRM)
1. Speaker Presentation
Agenda
13/12/2012 Page 6
Agenda Your logo
• We are a global materials technology company • Our mission is to make “materials for a better life”• The majority of our growth comes from clean technologies:
– Technologies that are specifically designed to optimize the use of natural resources and to reduce environmental impact
• We are listed on NYSE / Euronext Brussels with a market capitalization of some €4.5 billion
• Global presence: 14,400 people in 80 industrial sites
1. Presenting Umicore
Agenda
13/12/2012 Page 7
Agenda Your logo1. Presenting Umicore
Performance Materials
Catalysis
Recycling
Energy Materials
· We develop materials which enable the clean production and storage of energy
· The business is driven by the demand for clean, low-carbon energy solutions
· We develop technologies to treat automotive emissions
· The business is driven by increasingly stringent emission norms to promote clean air
· We produce a range of essential materials and chemicals based on precious metals and zinc
· Diverse applications:e.g. high-purity glass, construction, pharma, electrics/electronics
· We operate a unique recycling process to deal with complex industrial residues and end-of-life materials
· The business is driven by materials scarcity and recycling legislation
Agenda
13/12/2012 Page 8
Agenda Your logo
• The future of SAP at Umicore is the set-up of a global SAP environment valid for all of the Umicore activities with a focus on standardization, re-usability and audit-compliancy
• The ASQ project will lead to a governance model to guide and support this new environment in terms of – Change and Release Management ( project ASQ )
• SolMan ChaRM– Business Process Model ( project ASQ2 )
• SolMan BPML– BI documentation ( project ASQ-BI )
• SolMan BPML
• Templates and Roll Out Scenarios are key elements (Master-Slave Concept)
• SAP Solution Manager as supporting tool.
2. Scope of the SAP project
Agenda
13/12/2012 Page 9
Agenda Your logo
• Goal: Evolving towards more transparent / re-usable documentation by using Solution Manager
• Support SAP template / roll-out concept
• Support introduced Business Process Model
• Support hand-over of documentation from Project mode to Support
• Support introduced ChaRM process
2. Scope of the project
Agenda
13/12/2012 Page 10
Agenda Your logo3. SAP Landscape
FINANCIAL CONSOLIDATIONNON SAP SYSTEMS
P66 (100)SAP 4.7
P12 (multiple)SAP 4.5
ASSISTASSIST
EASY ARCHIVEASY
ARCHIV
MULTI CASHMULTI CASH
ADPTRAVELLINE
ADPTRAVELLINE
COGLASCOGLAS
COGNOSCOGNOS ICSCARTESIS
ICSCARTESIS
LOTUS NOTESLOTUS NOTES
PC UPLOADS
PC UPLOADS
SRMSRM 7.0
P58 (500)SAP 4.0B
Umicore SAP Systems
REUTERSREUTERS
P02 (001)SAP 4.0B
BWO (100)SAP BW 3.1
P63 (99)SAP ECC
6.0
FINANCIAL SYSTEMSNON SAP SYSTEMS
NON UMICORE SAP Systems
P27 SAP 4.6EH&S
PM1SAP 4.6
PM1SAP 4.6
LOGISTIC SYSTEMSNON SAP SYSTEMS
OTHER TECHNICAL
NON SAP SYSTEMS
CRM SYSTEMNON SAP SYSTEMS
Fax Retarus
Fax Retarus
Fax Faxination
Fax Faxination
Print Server
Mail Server(Outlook)
Mail Server(Outlook)
PENELOPE(Logitruck)
PORTAL
HRRSAP BW
3.1
PRDSAP 4.6B
KARDEXKARDEX
SRM- MDMMDM 3.0
LIMSLIMS
Global Process PlatformSAP ECC 6.0
TASTAS
STREAMSTREAM
MSDSdBaseMSDSdBase
ADCOP
SAP 6.0
LOTUS NOTES
B2B
SYSTEMSEXTERNAL SYSTEMS
HRP
SAP 4.6CADS
IPW, T-Mobile, WKS, Matthes, Evonik, ...
Agenda
13/12/2012 Page 11
Agenda Your logo5. Master-Slave Concept
The Master-Slave Concept is a reusable standardized process and IT solution integrating the enterprise requirements
The global part (Master) is used enterprise-wide as predefined settings for the implementation of local production systems.
All templates reside in a reference system, which can be composed of several physical distributed systems.
Global elements - no changes allowed -
Local elements - full authorization for changes -
Harmonized elements(standard complete / standard partial / harmonized) - some changes allowed -
Documen-tation
Countryversions
Local develop- ments
IMG structuresand settings
Global customerdevelopments
Organiza- tional structure
Master datadocuments
Global and inte- grated processes
Local processes
Agenda
13/12/2012 Page 12
Agenda Your logo5. Templates in SolMan
There are 3 levels of global vs. local elements at UmicoreGlobal elements on the Global Platform
These elements, like customizing, developments, interfaces, master data, etc., with their respective specification are valid for Umicore globally as an enterprise
Global Business Type elementsThese elements with their respective specification a valid across the Business Type for which it was defined. Valid for all Business Units group under the Business Type. Standard case would be operational requirements.
Local elementsOn regional level
are valid for the region/country only. Main occurrence iswithin the Financial Template for legal or tax requirements.
Only in very exceptional cases this should be the case for operational/logistics requirements
On Business Unit levelare valid across the Business Unit for all plants, DC's, sites, offices, … the whole BU organization
On plant/site levelFollowing Umicore's business and IS vision for harmonization & standardization this should be strictly avoided
Agenda
13/12/2012 Page 13
Agenda Your logo5. Templates in SolMan
Template
A ‘template’ is a standardized, reusable process, data and IT solution considering global and local requirements
Master
A ‘master’ environment is a pre-configured system where the pre-defined settings serve in other parts of the company / systems as template for the implementation
Slave
A ‘slave’ environment is a system taking over the central settings from the master environment and localize it where needed
Roll-out
A ‘roll-out’ is the process where a de-central team(s) is implementing the template within the slave environment
Agenda
13/12/2012 Page 14
Agenda Your logo5. Templates in SolMan
Complete Solution
Core template
BU, local, legal
Enhancements
Umicore has introduced a template concept for SAP projects
BU, local or legal enhancements• can cover additional locally
required functionality via a strictly controlled change request procedure.
Core Template• The major functionalities of the organizational
entity processes will be incorporated into the Core template
• The Core template will have• a core functionality mandatory for all locations
and• an optional part available for all local
requirements
Agenda
13/12/2012 Page 15
Agenda Your logo5. Umicore Approach
Template 1
Template Project 1
Template 2
Template 3
Template 4
Template Project 2
Template 5
Template 1.1
Impl. 1
Implement. Project 1
Impl. 2
Local 1
Impl. 4
Implement. Project 2
Impl. 1.1
Local 2
Solution 1
Template 1
Template 2
Template 3
Impl. 1
Impl. 2
Local 1
Solution 2
Template 4
Template 5
Template 1.1
Impl. 4
Impl. 1.1
Local 2
Maintenance Project System 1
Maintenance Project System 2
Agenda
13/12/2012 Page 16
Agenda Your logo
• Reference model for the Business Scenarios and Processes
6. Umicore Process Model
Agenda
13/12/2012 Page 17
Agenda Your logo
• Template Projects for Finance, Procurement, Transformations
6. Template projects
Agenda
13/12/2012 Page 18
Agenda Your logo
• Implementation projects
6. Implementation projects
Agenda
13/12/2012 Page 19
Agenda Your logo
• Slave Template/Implementation projects for Business Types
6. COmpaNIon Slave
Agenda
13/12/2012 Page 20
Agenda Your logo
• One Solution per Expertise Center for Maintenance
6. Operations
Agenda
13/12/2012 Page 21
Agenda Your logo5. Link with ChaRM
Agenda
13/12/2012 Page 22
Agenda Your logo
• Documents :– Extraction :
• Interface document (Functional Specification + Technical specification) : this document describes the data extraction from the source system and the load into the DSO-object in BW.
• Process Chain description : This document describes the sequence and the timings/frequencies when data is pulled from the source systems.
– Business Transformation :• Technical specification infoprovider : This document describes the structure of
the infoprovider (infocube), and the dataflow• Technical specification multiprovider : This document describes the structure
and the build-up of a multiprovider (multicube)• Data Flow Diagram : shows the data flow relations between datasources,
DSO’s, infoproviders and multiproviders.
– Report• Report document (Functional Specification + Technical specification) : this
document describes the lay-out and the build-up of the report.
6. Specific concept for BI
Agenda
13/12/2012 Page 23
Agenda Your logo6. Specific Concept for BI
BW TemplateTemplate Global
Processes
PIM-PO
Approve PReq
Release PReq
Create PO
Inter-face
Doc.
Vendor eval. (OSRE_VE)
Report 1
Report 2
Report 3
PROCUREMENTSCENARIOPIM
Process
Process Step
Data Flow Diagram
Infoprovider spec.
Report specs.
Procurement Overview
(OSR_MC01)
Report 4
Multiprovider spec.
Report specs.
Process Chain
description
Agenda
13/12/2012 Page 24
Agenda Your logo
• Procedures are very important
• Good governance is needed
• Ownership of SolMan is a must
• Start of a new project should follow the structure from the start
6. Lessons Learned
Agenda
13/12/2012 Page 25
Agenda Your logo
• Q&A
6. Questions
Thank you!