13
water.europa.eu 9th meeting of the Floods Working Group -Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011 Budapest, Hungary. Maria Brättemark, WFD Team, DG ENV.D.1, European Commission

9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

  • Upload
    gerald

  • View
    31

  • Download
    1

Embed Size (px)

DESCRIPTION

9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011 Budapest, Hungary. Maria Brättemark, WFD Team, DG ENV.D.1, European Commission. Preliminary Flood Risk Assessment (art 4-5). Reporting deadline 22.3.2012 - PowerPoint PPT Presentation

Citation preview

Page 1: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

water.europa.eu

9th meeting of the Floods Working Group

-Agenda point 10 “Reporting”

WGF 9, 31.3.1.4.2011

Budapest, Hungary.

Maria Brättemark, WFD Team, DG ENV.D.1, European Commission

Page 2: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Preliminary Flood Risk Assessment (art 4-5)

• Reporting deadline 22.3.2012 • Schemas, GIS Guidance, tools drafted and 1 round of testing

finalised. • 2nd round testing starting early April to early May 2011.• Testing includes final enumeration lists for types of floods and

consequences.• All WG F members are invited to take part in testing and comment

in writing on the schemas, lists and GIS Guidance.• Finalisation at the FDRDG June 2011. • Tools to be finalised and operational July 2011.

• Reporting deadline 22.3.2012 • Schemas, GIS Guidance, tools drafted and 1 round of testing

finalised. • 2nd round testing starting early April to early May 2011.• Testing includes final enumeration lists for types of floods and

consequences.• All WG F members are invited to take part in testing and comment

in writing on the schemas, lists and GIS Guidance.• Finalisation at the FDRDG June 2011. • Tools to be finalised and operational July 2011.

Page 3: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Preliminary Flood Risk Assessment – Enumeration lists

• Types of floods, divided into :• A: 1 sources of floods (obligatory level)

• Fluvial, pluvial, groundwater, sea water, artificial water bearing infrastructure, other, no data available

• A:2 Mechanism of flooding• A:3 characteristics of flooding

• Types of consequence, divided into : • Human health (Human health, community)• Environemnt (waterbody status, protected areas, pollution

sources)• Cultural heritage (Cultural assets, Landscape)• Economic (Property, infrastructure, rural land use, economic

activity)

• Part of the testing, final round of written comments from other WGF Members , Drafting group to finalise in June.

• Types of floods, divided into :• A: 1 sources of floods (obligatory level)

• Fluvial, pluvial, groundwater, sea water, artificial water bearing infrastructure, other, no data available

• A:2 Mechanism of flooding• A:3 characteristics of flooding

• Types of consequence, divided into : • Human health (Human health, community)• Environemnt (waterbody status, protected areas, pollution

sources)• Cultural heritage (Cultural assets, Landscape)• Economic (Property, infrastructure, rural land use, economic

activity)

• Part of the testing, final round of written comments from other WGF Members , Drafting group to finalise in June.

Page 4: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Reporting - testing phase• •

http://icm.eionet.europa.eu/schemas/dir200760ec/resources/

Page 5: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Visualisation Information basis (art 4)

Past or potential future flood – examples of visualisation

Page 6: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Visualisation art 5

- Which assessment is used - Areas of potential significant flood risk APSFR (art 5)

– examples of visualisation

Page 7: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Flood Hazard and Flood Risk maps (art 6)

• Reporting deadline 22.3.2014 • Reporting sheets approved in November 2010.• Schemas, GIS Guidance, tools to be issued to the FDRDG end of

April, for written comments until the next meeting• One first round of testing fore seen over the summer.• This step is expected to be more technically complex than

previous reporting steps, so an early start to develop technical formats foreseen.

• The role of INSPIRE obligations will be important and will be taken into account in this process.

• Reporting deadline 22.3.2014 • Reporting sheets approved in November 2010.• Schemas, GIS Guidance, tools to be issued to the FDRDG end of

April, for written comments until the next meeting• One first round of testing fore seen over the summer.• This step is expected to be more technically complex than

previous reporting steps, so an early start to develop technical formats foreseen.

• The role of INSPIRE obligations will be important and will be taken into account in this process.

Page 8: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Flood Risk Management Plans – reporting sheet

• Reporting deadline 22.3.2016• Flood Risk Management Plan Reporting Sheet Version 9 submitted

to FDRDG 8 (16.2)• Further consideration of appropriate links with WFD reporting

deemed necessary in 2011:• including the WFD-FD questionnaire • further developments on the Reporting sheets for the interim WFD report

(2012) , which includes a component of reporting progress on specific measures

• Proposal to present this for adoption in the Autumn Water Directors• Next steps :

• Comments on the Enumeration lists for types of measures from WG F • Presentation of progress from WG F to WG D (8.4.2011), with emphasis

on the need to coordinate the reporting of the two set of plans in 2016.• Commission to propose version 10 of the draft reporting sheet to next

FDRDG (scheduled mid-June)• Reporting sheet to be presented to WG F, SCG and WD in the autumn.

• Reporting deadline 22.3.2016• Flood Risk Management Plan Reporting Sheet Version 9 submitted

to FDRDG 8 (16.2)• Further consideration of appropriate links with WFD reporting

deemed necessary in 2011:• including the WFD-FD questionnaire • further developments on the Reporting sheets for the interim WFD report

(2012) , which includes a component of reporting progress on specific measures

• Proposal to present this for adoption in the Autumn Water Directors• Next steps :

• Comments on the Enumeration lists for types of measures from WG F • Presentation of progress from WG F to WG D (8.4.2011), with emphasis

on the need to coordinate the reporting of the two set of plans in 2016.• Commission to propose version 10 of the draft reporting sheet to next

FDRDG (scheduled mid-June)• Reporting sheet to be presented to WG F, SCG and WD in the autumn.

Page 9: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

WISE Developments

• New WISE portal launched 22.3.2011 : water.europa.eu• New Wise viewer launched same day with interactive

maps• 2nd WISE implementation plan in production, to be

discussed next week by WG D• The WISE IP can then be sent to WG F/drafting group for

comments

• New WISE portal launched 22.3.2011 : water.europa.eu• New Wise viewer launched same day with interactive

maps• 2nd WISE implementation plan in production, to be

discussed next week by WG D• The WISE IP can then be sent to WG F/drafting group for

comments

Page 10: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

INSPIRE

• Inspire Annex I technical specifications adopted in 2010• Includes Hydrology, technical specifications and also a

guidance document • Annex II and III TS expected to be sent for consultation in

the summer, and after that testing at the end of the year• M Pfeiffer has made a progress report, available on

CIRCA Drafting group

• Inspire Annex I technical specifications adopted in 2010• Includes Hydrology, technical specifications and also a

guidance document • Annex II and III TS expected to be sent for consultation in

the summer, and after that testing at the end of the year• M Pfeiffer has made a progress report, available on

CIRCA Drafting group

Page 11: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Next drafting group

• 8-9 or 15-16 June – Doodle link circulated today• Hope to have INSPIRE experts present – chair of the

TWG NZ • Finalisation PFRA tools• Progress Map schema and GIS guidance• Progress FRMP Reporting sheets

• 8-9 or 15-16 June – Doodle link circulated today• Hope to have INSPIRE experts present – chair of the

TWG NZ • Finalisation PFRA tools• Progress Map schema and GIS guidance• Progress FRMP Reporting sheets

Page 12: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

Reporting –Key links

• CIRCA : http://circa.europa.eu/Members/irc/env/wfd/library?l=/floods_programme_1/d-drafting_groups/reporting_grafting&vm=detailed&sb=Title

• Example of resources available here : • Drafting group meetings • Compilation of Reporting sheets agreed so far • INSPIRE resources, including progress report by M. Pfeiffer,

focus Thematic Working Group on Natural Risk Zones : http://circa.europa.eu/Members/irc/env/wfd/library?l=/floods_programme_1/d-drafting_groups/reporting_grafting/inspire&vm=detailed&sb=Title

• Report net : • Including draft PFRA schemas and GIS Guidance :

• http://icm.eionet.europa.eu/schemas/dir200760ec/resources/

• CIRCA : http://circa.europa.eu/Members/irc/env/wfd/library?l=/floods_programme_1/d-drafting_groups/reporting_grafting&vm=detailed&sb=Title

• Example of resources available here : • Drafting group meetings • Compilation of Reporting sheets agreed so far • INSPIRE resources, including progress report by M. Pfeiffer,

focus Thematic Working Group on Natural Risk Zones : http://circa.europa.eu/Members/irc/env/wfd/library?l=/floods_programme_1/d-drafting_groups/reporting_grafting/inspire&vm=detailed&sb=Title

• Report net : • Including draft PFRA schemas and GIS Guidance :

• http://icm.eionet.europa.eu/schemas/dir200760ec/resources/

Page 13: 9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

Directive 2007/60/EC on the assessment and management of flood risks

More informationhttp://ec.europa.eu/environment/water/flood_risk/index.htm

Maria Brättemark, Desk officer Floods/WFD, European Commission, DG ENV.D.1

Thank you for your attention !