28
STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY GAVIN NEWSOM, GOVERNOR CALIFORNIA COASTAL COMMISSION South Coast District Office 301 E Ocean Blvd., Suite 300 Long Beach, CA 90802-4302 (562) 590-5071 W12a A-5-DPT-18-0046 (Joe Lancor, AIA) FEBRUARY 10, 2021 EXHIBITS Table of Contents EXHIBIT 1 – LOCATION MAP ....................................................................... 2 EXHIBIT 2 – SITE PLAN ................................................................................ 4 EXHIBIT 3 – PROJECT PLANS..................................................................... 5 EXHIBIT 4 – PROJECT SITE PLAN INDICATING THE FOUR (4) SECTORS THAT COMPRISE THE BLUFF.............................................................. 15 EXHIBIT 5 – DRAFT FOUNDATION EXHIBIT PREPARED BY GEOFIRM DATED NOVEMBER 5, 2020 AND REVISED JANUARY 6, 2021 ......... 16 EXHIBIT 6 – DPSP/LCP FIGURE 8: PROPOSED ACCESS ....................... 17 EXHIBIT 7 – PROPOSED 10 FT. WIDE BY APPROXIMATELY 360 FT. LONG PAVED BLUFFTOP PUBLIC WALKWAY .................................. 18 EXHIBIT 8 – ALTERNATIVES ANALYSIS VIEW SIMULATIONS FROM GAINES & STACEY, LLP SUBMITTED ON OCTOBER 6, 2020 ........... 19 EXHIBIT 9 – VIEW ANALYSES FROM GAINES & STACEY, LLP SUBMITTED ON SEPTEMBER 4, 2020 AND OCTOBER 9, 2020 ......... 23 EXHIBIT 10 – DRAFT REVISED PROJECT EXHIBITS PREPARED BY GAINES & STACEY, LLP SUBMITTED ON NOVEMBER 30, 2020 AND JANUARY 19, 2021................................................................................ 25

A-5-DPT-18-0046 (Joe Lancor, AIA) · 2021. 1. 22. · STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY GAVIN NEWSOM, GOVERNOR CALIFORNIA COASTAL COMMISSION South Coast District Office

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY GAVIN NEWSOM, GOVERNOR

    CALIFORNIA COASTAL COMMISSION South Coast District Office 301 E Ocean Blvd., Suite 300 Long Beach, CA 90802-4302 (562) 590-5071

    W12a A-5-DPT-18-0046 (Joe Lancor, AIA)

    FEBRUARY 10, 2021

    EXHIBITS

    Table of Contents EXHIBIT 1 – LOCATION MAP ....................................................................... 2 EXHIBIT 2 – SITE PLAN ................................................................................ 4 EXHIBIT 3 – PROJECT PLANS ..................................................................... 5 EXHIBIT 4 – PROJECT SITE PLAN INDICATING THE FOUR (4) SECTORS

    THAT COMPRISE THE BLUFF .............................................................. 15 EXHIBIT 5 – DRAFT FOUNDATION EXHIBIT PREPARED BY GEOFIRM

    DATED NOVEMBER 5, 2020 AND REVISED JANUARY 6, 2021 ......... 16 EXHIBIT 6 – DPSP/LCP FIGURE 8: PROPOSED ACCESS ....................... 17 EXHIBIT 7 – PROPOSED 10 FT. WIDE BY APPROXIMATELY 360 FT.

    LONG PAVED BLUFFTOP PUBLIC WALKWAY .................................. 18 EXHIBIT 8 – ALTERNATIVES ANALYSIS VIEW SIMULATIONS FROM

    GAINES & STACEY, LLP SUBMITTED ON OCTOBER 6, 2020 ........... 19 EXHIBIT 9 – VIEW ANALYSES FROM GAINES & STACEY, LLP

    SUBMITTED ON SEPTEMBER 4, 2020 AND OCTOBER 9, 2020 ......... 23 EXHIBIT 10 – DRAFT REVISED PROJECT EXHIBITS PREPARED BY

    GAINES & STACEY, LLP SUBMITTED ON NOVEMBER 30, 2020 AND JANUARY 19, 2021 ................................................................................ 25

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    2

    Exhibit 1 – Location Map

    N

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    3

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    4

    Exhibit 2 – Site Plan

    N

    Proposed Public View Area

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    5

    Exhibit 3 – Project Plans

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    6

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    7

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    8

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    9

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    10

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    11

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    12

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    13

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    14

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    15

    Exhibit 4 – Project Site Plan indicating the four (4) sectors that comprise the bluff

    N

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    16

    Exhibit 5 – Draft Foundation Exhibit prepared by Geofirm dated November 5, 2020 and Revised January 6, 2021

    N

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    17

    Exhibit 6 – DPSP/LCP Figure 8: Proposed Access

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    18

    Exhibit 7 – Proposed 10 ft. wide by approximately 360 ft. long paved blufftop public walkway

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    19

    Exhibit 8 – Alternatives analysis view simulations from Gaines & Stacey, LLP submitted on October 6, 2020

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    20

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    21

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    22

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    23

    Exhibit 9 – View analyses from Gaines & Stacey, LLP submitted on September 4, 2020 and October 9, 2020

    Outline of Existing Cannons Restaurant

    Street of the Green Lantern

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    24

    Outline of Existing Cannons Restaurant

    Outline of Existing Trash Enclosure

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    25

    Exhibit 10 – Draft revised project exhibits prepared by Gaines & Stacey, LLP submitted on November 30, 2020 and January 19, 2021 CANNONS HOTEL – View across southern end of property

    Revised view with 7 rooms on third level removed and elevator relocated north of existing site.

    Street of the Green Lantern

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    26

    Original View with third level.

    Street of the Green Lantern

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    27

    View from the intersection of Santa Clara Avenue and Street of the Green Lantern.

    Street of the Green Lantern

    Santa Clara Avenue

  • A-5-DPT-18-0046 (Joe Lancor, AIA)

    28

    View from Street of the Green Lantern further north from the site towards Pacific Coast Highway.

    Exhibit 1 – Location MapExhibit 2 – Site PlanExhibit 3 – Project PlansExhibit 4 – Project Site Plan indicating the four (4) sectors that comprise the bluffExhibit 5 – Draft Foundation Exhibit prepared by Geofirm dated November 5, 2020 and Revised January 6, 2021Exhibit 6 – DPSP/LCP Figure 8: Proposed AccessExhibit 7 – Proposed 10 ft. wide by approximately 360 ft. long paved blufftop public walkwayExhibit 8 – Alternatives analysis view simulations from Gaines & Stacey, LLP submitted on October 6, 2020Exhibit 9 – View analyses from Gaines & Stacey, LLP submitted on September 4, 2020 and October 9, 2020Exhibit 10 – Draft revised project exhibits prepared by Gaines & Stacey, LLP submitted on November 30, 2020 and January 19, 2021