a. Conceptual plan as per approved mining plan.
The Conceptual Mining Plan as per approved Mining Plan is enclosed as Annexture-I.
b. Access route/road from each mine to crusher (along with dimension of the road viz.length, width etc.)
A 400 TPH Crusher and screening system is installed at Mahewa-Saipura-BhilampurLimestone Mine.
Mineral Transortation within lease area shall be carried out by Haul roads.
From Badhreta lease to Mahewa-Saipura-Bhilampur Limestone Mine, where Crusher isproposed a dedicated Pakka road of 1km (approx) with 5 meter width shall be constructedhaving a Bridge over the Cannel.
From Sehadpur Itoura mine to Crusher (Mahewa Mine) existing road shall beused, strenghting and widening of the road shall be done and approch road shall beconstracted.
For the Mineral transportation outside the lease area,for road widening/construction andBridge over Cannel all the necessary permissions/ NOCs from the Govt. shall be taken.The land required shall be purchased from land owners.
A google image with cruser location and transportation route is enclosed as an Annexure–II.
c. Area already explored (area and depth) and time frame within which the geologicalexploration will be completed.
The area is explored by the DGM, M.P. The approved Mining plan contains the exploration /future exploration details. The relevant section of the approved mining plan is enclosed as anAnnexure –III.
d. Year-wise green belt development and afforestation planning,
A plantation shall be carried out within mining lease in a non-mining zone at lease boundary,along the haul roads and along transportation routs outside lease. Also company shall takepart in mass plantation drive in nearby villages. The plantation shall be carried out inconsultation with the local forest department. A separate arrangement (Tanker) shall be madefor watering and maintaining the plantation. The collected top soil shall be utilized for plantationin rocky area. The yearwise plantation details are as under.
Year No. of Saplings1st 5002nd 10003rd 15004th 20005th 20006th year onwords 1000
e. Proposed route for laying down the conveyor belt from crusher to plant and mine tocrusher if any.
It is proposed to transport the crushed mineral from crusher to Identified plant site by layingdown the conveyor belt approximate 1km. All the necessary permissions/ NOCs from the Govt.shall be taken. The land required shall be purchased/ leased from land owners. A google mapshowing conveyor route is enclosed.
f. Copy of letter No. 2-1/2008/12/1 dated 7/1/2009 issued by Govt. of Madhya Pradesh.
Allocation letter issued by Govt. of Madhya Pradesh is enclosed as an Annexure-IV.
PLATE NO-VII
C5
C3
C1
200
215
276
210220
230240
250260
270
210
210
210
313
210
213
C
C
C
4
2
6
200
220
240210 230
250 260
270 280 290300
APPLICANT :-
rdM/S ABHIJEET CEMENT LTD.WHITE TOWER, 3 FLOOR115 COLLAGE STREET,KOLKATA-700012(WEST BENGAL)
(AREA - 268.520 HA.)
SCALE :- 1:5000
CERTIFIED THAT THE PLAN IS UP TO DATE & CORRECT.
DATE OF SURVEY : 10-08-2008
REGD. NO. RQP/NGP/302/2003/AGeoSolutions (P) LTD.HIG-21, AMDI NAGAR, BHILAI
PHONE NO.- 0788-5531233,2242913
VILLAGE - MOHEWA-SAIPURA-BHILAMPUR-BADHRETA
DIST-DURG (C.G)
TEHSIL-KAILARAS, DISTRICT- MORENA (M.P.)
BADHRETA
210
APPLIED AREA
MINE LIMIT ZONE
VILLAGE SHALY LIMESTONE
CONTOUR
LIMESTONE
SANDSTONE
ALLUVIUM SOILGRID LINE
276 BANCH MARK
CROSS SECTION LINEC1 C2
SHALE
SCALE (in meters.)
S
N
W E
00-50 50 100 150 200 250 300 350
CANAL
26°15'00"
26°15'15"
26°15'30"
26°15'45" 77°31
'00"
77°30
'15"
77°30
'30"
77°30
'45"
77°31
'15"
MAHEWA
BHILAMPUR
SAIPUR
26°14'45"
77°31
'30"
77°31
'45"
MINING PLAN
GRID INTERVAL-200 M.
1000
500
00
1500
1000
00 500
500
1500
2000
PLATE NO-VII
1st YEARW
ORKING
FIVE YEARS WORKING
1 Year Plantationst
2 Year Plantationnd
3 Year Plnatationrd
5 Year Plantationth
4 Year Plantationth
1 Year Dumpst
2 Year Dumpnd
3 Year Dumprd
5 Year Dumpth
4 Year Dumpth
1st YEAR PLANTATION & DUMP
2nd YEAR PLANTATION & DUMP
3rd YEAR PLANTATION & DUMP
4th YEAR PLANTATION & DUMP
5th YEAR PLANTATION & DUMP
L1
L2
CONCEPTUAL DEVELOPMENT PLAN
CONCEPTUAL WORKING
CONCEPTUAL WORKINGCONCEPTUAL WORKING
5 Year Dumpth
FIVE YEARS WORKING
ML
B
PL
AT
EN
O-IV
C21
C19
C17
C13
C11
C9
L1
L2
200
215
276
210
2202
302402
50260
270
210
210
210
313
210
213
C15
12
10
16
C1
C3
5C
C
C7
C2
C4
C6
C8
C
C
C
14
C
C
C
20
18
22
200
220
240
210
230
250
260 2
702
802
903
00
ML
BM
LZ
LS
T/S
HL
Y
SH
AL
Y/S
ST
/230
240
24023
0,S
ST
,SHL
Y
SH
AL
Y/L
ST
LS
T/S
HA
LE
220
ML
ZML
B
ML
BML
Z
LS
T/S
HA
LE
/210
220
SH
AL
E/L
ST
LS
T/S
HA
LE
220
ML
ZM
LB
ML
BM
LZ
SO
IL/L
ST/200
ML
ZML
B
ML
BML
B
SO
IL/L
ST/200
210
210
200
200
ML
ZML
B
LS
T/S
OIL
/200
ML
BM
LZ
SO
IL/L
ST/200
LS
T/S
HA
LE
/210
SH
AL
E/L
ST
220
220
LS
T/S
HA
LE
SH
AL
EL
ST
/210
LS
T/S
OIL
200
ML
ZM
LB
ML
BML
Z
ML
BML
Z
ML
BML
Z/S
HA
LE
/LS
T
ML
B/S
OIL
/LS
TML
Z
ML
BM
LZ
ML
BM
LZ
/LS
T/2
00
SH
AL
E/L
ST
/210
LS
T/S
HA
LE
/210
SH
AL
E/L
ST
220L
ST
/SH
AL
Y
/SH
AL
Y/S
ST/230
240
250
250
240
23
0/S
ST
/SHA
LY
SH
AL
Y/L
ST
220
LS
T/S
HA
LE
SH
AL
E/L
ST
/210
LS
T/S
OIL
200
ML
ZM
LB
SO
IL/L
ST
/200
LS
T/S
HA
LE
/21
0
SH
AL
E/L
ST
220
LS
T/S
HA
LY
SH
AL
Y/S
ST
/230
240
250
26
0
27
0
270
260
25
0
240
SS
T/S
HA
LY
/23
0S
HA
LY
/LS
T220
LS
T/S
HA
LE
SH
AL
E/L
ST
/210
LS
T/S
OIL
200
ML
ZM
LB
220L
ST
/SH
AL
YS
HA
LY
/SS
T/2
30
240
240
SS
T/S
HA
LY
/230
SH
AL
Y/L
ST
220
LS
T/S
HA
LE
SH
AL
E/L
ST
/210
LS
T/S
OIL
200ML
ZML
B
LS
T/S
OIL
/200
SO
IL/L
ST
/200
LS
T/S
HA
LE
/210
SH
AL
E/L
ST
LS
T/S
HA
LE
SH
AL
EL
LS
T/2
10
LS
T/S
HA
LE
/210
SH
AL
E/L
ST
220
220
LS
T/S
HA
LE
SH
AL
E/L
ST
/210
210
210
LS
T/S
OIL
ML
B/200
ML
Z
ML
BM
LZ
LS
T/S
OIL
210
210
21
0
21
0
SO
IL/L
ST
/200
LS
T/S
OIL
/20
0
SO
IL/L
ST/2
00
ML
ZM
LZ
LS
T/S
OIL
/20
0
ML
ZS
OIL
/LS
T/20
0M
LB
ML
BML
ZL
ML
BM
LZ
ML
BM
LZ
210
LS
T/S
OIL
20
0
21
0
ML
ZM
LB
ML
BML
B
ML
B
ML
B
ML
BM
LB
ML
BM
LZ
SO
IL/L
ST
/200
LS
T/S
HA
LE
/210
SH
AL
E/L
ST
220
22
0
LS
T/S
HA
LE
SH
AL
E/L
ST
/210
LS
T/S
OIL
200
200
200
SO
IL/L
ST/2
00
LS
T/S
HA
LE
/210
220
SH
AL
E/L
ST
LS
T/S
HA
LY
SH
AL
Y/S
ST
/230
ML
ZM
LB
GE
OL
OG
ICA
LP
LA
N
AP
PL
ICA
NT
:-
rdM
/SA
BH
IJEE
TC
EM
EN
TL
TD
.W
HIT
ET
OW
ER
,3F
LO
OR
11
5C
OL
LA
GE
ST
RE
ET
,K
OL
KA
TA
-700
012(W
ES
TB
EN
GA
L)
(AR
EA
-2
68.5
20H
A.)
SC
AL
E:-
1:5000
CE
RT
IFIE
DT
HA
TT
HE
PL
AN
ISU
PT
OD
AT
E&
CO
RR
EC
T.
DA
TE
OF
SU
RV
EY
:10
-08-20
08
VIL
LA
GE
-M
OH
EW
A-S
AIP
UR
A-B
HIL
AM
PU
R-B
AD
HR
ET
AT
EH
SIL
-KA
ILA
RA
S,
DIS
TR
ICT
-M
OR
EN
A(M
.P.)
BA
DH
RE
TA
21
0
AP
PL
IED
AR
EA
MIN
EL
IMIT
ZO
NE
VIL
LA
GE
SH
AL
YL
IME
ST
ON
E
CO
NT
OU
R
LIM
ES
TO
NE
SA
ND
ST
ON
E
AL
LU
VIU
MS
OIL
GR
IDL
INE
2 76B
AN
CH
MA
RK
CR
OS
SS
EC
TIO
NL
INE
LO
NG
ITU
DA
LL
INE
C1
C2
L1
L2
PR
OP
OS
ED
BO
RE
HO
LE
P.B
.H.
SH
AL
ES
CA
LE
(inm
eters.)
S N
WE
00
-505
01
001
502
002
503
003
50
P.B
.H.-1
P.B
.H.-3
P.B
.H.-4
P.B
.H.-5
P.B
.H.-6
P.B
.H.-7
P.B
.H.-8
P.B
.H.-9
P.B
.H.-10
P.B
.H.-11
P.B
.H.-2
CA
NA
L
26
°15
'00"
26
°15
'15"
26
°15
'30"
26
°15
'45"
77°31'00"
77°30'15"
77°30'30"
77°30'45"
77°31'15"
MA
HE
WA
BH
ILA
MP
UR
SA
IPU
R
26
°14
'45"
77°31'30"
77°31'45"
MIN
ING
PL
AN
GR
IDIN
TE
RV
AL
-200
M.
10
00
50
0
00
15
00
1000
00
500
500
1500
2000
PL
AT
EN
O-IV