a. Conceptual plan as per approved mining plan.

The Conceptual Mining Plan as per approved Mining Plan is enclosed as Annexture-I.

b. Access route/road from each mine to crusher (along with dimension of the road viz.length, width etc.)

A 400 TPH Crusher and screening system is installed at Mahewa-Saipura-BhilampurLimestone Mine.

Mineral Transortation within lease area shall be carried out by Haul roads.

From Badhreta lease to Mahewa-Saipura-Bhilampur Limestone Mine, where Crusher isproposed a dedicated Pakka road of 1km (approx) with 5 meter width shall be constructedhaving a Bridge over the Cannel.

From Sehadpur Itoura mine to Crusher (Mahewa Mine) existing road shall beused, strenghting and widening of the road shall be done and approch road shall beconstracted.

For the Mineral transportation outside the lease area,for road widening/construction andBridge over Cannel all the necessary permissions/ NOCs from the Govt. shall be taken.The land required shall be purchased from land owners.

A google image with cruser location and transportation route is enclosed as an Annexure–II.

c. Area already explored (area and depth) and time frame within which the geologicalexploration will be completed.

The area is explored by the DGM, M.P. The approved Mining plan contains the exploration /future exploration details. The relevant section of the approved mining plan is enclosed as anAnnexure –III.

d. Year-wise green belt development and afforestation planning,

A plantation shall be carried out within mining lease in a non-mining zone at lease boundary,along the haul roads and along transportation routs outside lease. Also company shall takepart in mass plantation drive in nearby villages. The plantation shall be carried out inconsultation with the local forest department. A separate arrangement (Tanker) shall be madefor watering and maintaining the plantation. The collected top soil shall be utilized for plantationin rocky area. The yearwise plantation details are as under.

Year No. of Saplings1st 5002nd 10003rd 15004th 20005th 20006th year onwords 1000

Page 4: a. Conceptual plan as per approved mining plan

e. Proposed route for laying down the conveyor belt from crusher to plant and mine tocrusher if any.

It is proposed to transport the crushed mineral from crusher to Identified plant site by layingdown the conveyor belt approximate 1km. All the necessary permissions/ NOCs from the Govt.shall be taken. The land required shall be purchased/ leased from land owners. A google mapshowing conveyor route is enclosed.

f. Copy of letter No. 2-1/2008/12/1 dated 7/1/2009 issued by Govt. of Madhya Pradesh.

Allocation letter issued by Govt. of Madhya Pradesh is enclosed as an Annexure-IV.

Page 5: a. Conceptual plan as per approved mining plan

PLATE NO-VII

C5

C3

C1

200

215

276

210220

230240

250260

270

210

210

210

313

210

213

C

C

C

4

2

6

200

220

240210 230

250 260

270 280 290300

APPLICANT :-

rdM/S ABHIJEET CEMENT LTD.WHITE TOWER, 3 FLOOR115 COLLAGE STREET,KOLKATA-700012(WEST BENGAL)

(AREA - 268.520 HA.)

SCALE :- 1:5000

CERTIFIED THAT THE PLAN IS UP TO DATE & CORRECT.

DATE OF SURVEY : 10-08-2008

REGD. NO. RQP/NGP/302/2003/AGeoSolutions (P) LTD.HIG-21, AMDI NAGAR, BHILAI

PHONE NO.- 0788-5531233,2242913

VILLAGE - MOHEWA-SAIPURA-BHILAMPUR-BADHRETA

DIST-DURG (C.G)

TEHSIL-KAILARAS, DISTRICT- MORENA (M.P.)

BADHRETA

210

APPLIED AREA

MINE LIMIT ZONE

VILLAGE SHALY LIMESTONE

CONTOUR

LIMESTONE

SANDSTONE

ALLUVIUM SOILGRID LINE

276 BANCH MARK

CROSS SECTION LINEC1 C2

SHALE

SCALE (in meters.)

S

N

W E

00-50 50 100 150 200 250 300 350

CANAL

26°15'00"

26°15'15"

26°15'30"

26°15'45" 77°31

'00"

77°30

'15"

77°30

'30"

77°30

'45"

77°31

'15"

MAHEWA

BHILAMPUR

SAIPUR

26°14'45"

77°31

'30"

77°31

'45"

MINING PLAN

GRID INTERVAL-200 M.

1000

500

00

1500

1000

00 500

500

1500

2000

PLATE NO-VII

1st YEARW

ORKING

FIVE YEARS WORKING

1 Year Plantationst

2 Year Plantationnd

3 Year Plnatationrd

5 Year Plantationth

4 Year Plantationth

1 Year Dumpst

2 Year Dumpnd

3 Year Dumprd

5 Year Dumpth

4 Year Dumpth

1st YEAR PLANTATION & DUMP

2nd YEAR PLANTATION & DUMP

3rd YEAR PLANTATION & DUMP

4th YEAR PLANTATION & DUMP

5th YEAR PLANTATION & DUMP

L1

L2

CONCEPTUAL DEVELOPMENT PLAN

CONCEPTUAL WORKING

CONCEPTUAL WORKINGCONCEPTUAL WORKING

5 Year Dumpth

FIVE YEARS WORKING

Page 6: a. Conceptual plan as per approved mining plan
Page 7: a. Conceptual plan as per approved mining plan
Page 8: a. Conceptual plan as per approved mining plan
Page 9: a. Conceptual plan as per approved mining plan
Page 10: a. Conceptual plan as per approved mining plan
Page 11: a. Conceptual plan as per approved mining plan
Page 12: a. Conceptual plan as per approved mining plan
Page 13: a. Conceptual plan as per approved mining plan
Page 14: a. Conceptual plan as per approved mining plan
Page 15: a. Conceptual plan as per approved mining plan
Page 16: a. Conceptual plan as per approved mining plan
Page 17: a. Conceptual plan as per approved mining plan
Page 18: a. Conceptual plan as per approved mining plan
Page 19: a. Conceptual plan as per approved mining plan
Page 20: a. Conceptual plan as per approved mining plan
Page 21: a. Conceptual plan as per approved mining plan
Page 22: a. Conceptual plan as per approved mining plan
Page 23: a. Conceptual plan as per approved mining plan
Page 24: a. Conceptual plan as per approved mining plan
Page 25: a. Conceptual plan as per approved mining plan
Page 26: a. Conceptual plan as per approved mining plan
Page 27: a. Conceptual plan as per approved mining plan
Page 28: a. Conceptual plan as per approved mining plan

ML

B

PL

AT

EN

O-IV

C21

C19

C17

C13

C11

C9

L1

L2

200

215

276

210

2202

302402

50260

270

210

210

210

313

210

213

C15

12

10

16

C1

C3

5C

C

C7

C2

C4

C6

C8

C

C

C

14

C

C

C

20

18

22

200

220

240

210

230

250

260 2

702

802

903

00

ML

BM

LZ

LS

T/S

HL

Y

SH

AL

Y/S

ST

/230

240

24023

0,S

ST

,SHL

Y

SH

AL

Y/L

ST

LS

T/S

HA

LE

220

ML

ZML

B

ML

BML

Z

LS

T/S

HA

LE

/210

220

SH

AL

E/L

ST

LS

T/S

HA

LE

220

ML

ZM

LB

ML

BM

LZ

SO

IL/L

ST/200

ML

ZML

B

ML

BML

B

SO

IL/L

ST/200

210

210

200

200

ML

ZML

B

LS

T/S

OIL

/200

ML

BM

LZ

SO

IL/L

ST/200

LS

T/S

HA

LE

/210

SH

AL

E/L

ST

220

220

LS

T/S

HA

LE

SH

AL

EL

ST

/210

LS

T/S

OIL

200

ML

ZM

LB

ML

BML

Z

ML

BML

Z

ML

BML

Z/S

HA

LE

/LS

T

ML

B/S

OIL

/LS

TML

Z

ML

BM

LZ

ML

BM

LZ

/LS

T/2

00

SH

AL

E/L

ST

/210

LS

T/S

HA

LE

/210

SH

AL

E/L

ST

220L

ST

/SH

AL

Y

/SH

AL

Y/S

ST/230

240

250

250

240

23

0/S

ST

/SHA

LY

SH

AL

Y/L

ST

220

LS

T/S

HA

LE

SH

AL

E/L

ST

/210

LS

T/S

OIL

200

ML

ZM

LB

SO

IL/L

ST

/200

LS

T/S

HA

LE

/21

0

SH

AL

E/L

ST

220

LS

T/S

HA

LY

SH

AL

Y/S

ST

/230

240

250

26

0

27

0

270

260

25

0

240

SS

T/S

HA

LY

/23

0S

HA

LY

/LS

T220

LS

T/S

HA

LE

SH

AL

E/L

ST

/210

LS

T/S

OIL

200

ML

ZM

LB

220L

ST

/SH

AL

YS

HA

LY

/SS

T/2

30

240

240

SS

T/S

HA

LY

/230

SH

AL

Y/L

ST

220

LS

T/S

HA

LE

SH

AL

E/L

ST

/210

LS

T/S

OIL

200ML

ZML

B

LS

T/S

OIL

/200

SO

IL/L

ST

/200

LS

T/S

HA

LE

/210

SH

AL

E/L

ST

LS

T/S

HA

LE

SH

AL

EL

LS

T/2

10

LS

T/S

HA

LE

/210

SH

AL

E/L

ST

220

220

LS

T/S

HA

LE

SH

AL

E/L

ST

/210

210

210

LS

T/S

OIL

ML

B/200

ML

Z

ML

BM

LZ

LS

T/S

OIL

210

210

21

0

21

0

SO

IL/L

ST

/200

LS

T/S

OIL

/20

0

SO

IL/L

ST/2

00

ML

ZM

LZ

LS

T/S

OIL

/20

0

ML

ZS

OIL

/LS

T/20

0M

LB

ML

BML

ZL

ML

BM

LZ

ML

BM

LZ

210

LS

T/S

OIL

20

0

21

0

ML

ZM

LB

ML

BML

B

ML

B

ML

B

ML

BM

LB

ML

BM

LZ

SO

IL/L

ST

/200

LS

T/S

HA

LE

/210

SH

AL

E/L

ST

220

22

0

LS

T/S

HA

LE

SH

AL

E/L

ST

/210

LS

T/S

OIL

200

200

200

SO

IL/L

ST/2

00

LS

T/S

HA

LE

/210

220

SH

AL

E/L

ST

LS

T/S

HA

LY

SH

AL

Y/S

ST

/230

ML

ZM

LB

GE

OL

OG

ICA

LP

LA

N

AP

PL

ICA

NT

:-

rdM

/SA

BH

IJEE

TC

EM

EN

TL

TD

.W

HIT

ET

OW

ER

,3F

LO

OR

11

5C

OL

LA

GE

ST

RE

ET

,K

OL

KA

TA

-700

012(W

ES

TB

EN

GA

L)

(AR

EA

-2

68.5

20H

A.)

SC

AL

E:-

1:5000

CE

RT

IFIE

DT

HA

TT

HE

PL

AN

ISU

PT

OD

AT

E&

CO

RR

EC

T.

DA

TE

OF

SU

RV

EY

:10

-08-20

08

VIL

LA

GE

-M

OH

EW

A-S

AIP

UR

A-B

HIL

AM

PU

R-B

AD

HR

ET

AT

EH

SIL

-KA

ILA

RA

S,

DIS

TR

ICT

-M

OR

EN

A(M

.P.)

BA

DH

RE

TA

21

0

AP

PL

IED

AR

EA

MIN

EL

IMIT

ZO

NE

VIL

LA

GE

SH

AL

YL

IME

ST

ON

E

CO

NT

OU

R

LIM

ES

TO

NE

SA

ND

ST

ON

E

AL

LU

VIU

MS

OIL

GR

IDL

INE

2 76B

AN

CH

MA

RK

CR

OS

SS

EC

TIO

NL

INE

LO

NG

ITU

DA

LL

INE

C1

C2

L1

L2

PR

OP

OS

ED

BO

RE

HO

LE

P.B

.H.

SH

AL

ES

CA

LE

(inm

eters.)

S N

WE

00

-505

01

001

502

002

503

003

50

P.B

.H.-1

P.B

.H.-3

P.B

.H.-4

P.B

.H.-5

P.B

.H.-6

P.B

.H.-7

P.B

.H.-8

P.B

.H.-9

P.B

.H.-10

P.B

.H.-11

P.B

.H.-2

CA

NA

L

26

°15

'00"

26

°15

'15"

26

°15

'30"

26

°15

'45"

77°31'00"

77°30'15"

77°30'30"

77°30'45"

77°31'15"

MA

HE

WA

BH

ILA

MP

UR

SA

IPU

R

26

°14

'45"

77°31'30"

77°31'45"

MIN

ING

PL

AN

GR

IDIN

TE

RV

AL

-200

M.

10

00

50

0

00

15

00

1000

00

500

500

1500

2000

PL

AT

EN

O-IV

Page 29: a. Conceptual plan as per approved mining plan
Page 30: a. Conceptual plan as per approved mining plan
Page 31: a. Conceptual plan as per approved mining plan