A Documentary Film Projectto Commemorate the
75th Anniversary of the
Construction of the Golden Gate Bridge
Kristen Elena
Alex Orlando
John
Project Background
Sponsored by the Art Commission of the City
of San Francisco, to produce a documentary in commemoration of the 75th Anniversary on the construction of the Golden Gate Bridge
Project Objective
Produce a 30 minute documentary on the
construction of the Golden Gate Bridge in commemoration of the 75th Anniversary of its completion. The documentary will be completed on January 5, 2012 within a budget of $200,000.
Stakeholders
GG Bridge Authority
S.F. City Art Commission
City AuthorityGG Bridge
Documentary Film Group
S.F. City Residents
Cast & Crew Contractors Film
DirectorFilm
Producers
Procure-ment Team
Safety &
Service
Assumptions
• SFCAC will be providing the funding for overall production
• Interviewees will be available as planned and scheduled
• Script will be provided• Filming takes place during summer and fall months,
thus avoiding weather related issues• All equipment will be fully functioning • Access permits will be made available prior to filming
Inclusion & Exclusion• Inclusion
– Concept Design– Storyboards Development– Production
• Crew:• Film Crew and equipment rental
• Location Scouting:• secure permits and permissions, studio rental
• Setup, service coordinator, janitorial, dismantling crews must be scheduled prior to the beginning of shooting:• Character Interviews – interview script, travel accommodations• B-Roll Filming
• Filming:• HD quality
• Interviewees will be available as planned and scheduled• All equipment is selected and on hand• Location and time agreed upon by crew and guests• Contingency plan for weather-related issues when shooting outdoors
• Post Production (Editing, Motion Graphics, Sound):• Editing- includes one rough cut and one final edit• Motion Graphics- includes animations and graphics• Sound- includes voice enhancement and music development
Inclusion & Exclusion
• Exclusion– Media Promotion or advertising– Not to exceed 30 minutes– Script – provided by San Francisco City Arts
Commission
Acceptance Criteria
• Film is 30 minutes long.• Film features all the people selected by the
SFCAC for interviews.• Film follows scripting and sequencing put
forth by SFCAC• Content is PG rated• Must be of HD quality
The Marin Tower (north side) was built from November 1933 to October 1934 followed by the San Francisco Tower(southside) from January 1935 to June 1935
Bridge main span, which supports the roadway, was assembled in sections that were constructed concurrently from the south side and the north side.
On November 18, 1936, the two sections were joined in the middle.
Golden Gate Bridge Chief Engineer Joseph B. Strauss
The Golden Gate Bridge opened to traffic on May 28, 1937
It takes 17 painters a whole year to repaint the bridge from one end to the other.
Perhaps the most secured job in the world?
Metric Goal Rationale How we’ll do it SFCAC Satisfaction Ensure that all five
points of the acceptance criteria are met.
This will allow for the city to primer the film during the anniversary gala.
Work directly with the city and production crew by checking in at each milestone to ensure everyone is on the same page.
Conformance to Requirements
Ensure that production and film crew adhere to all the SFCAC requirements.
The film must fulfill all five major requirements set forth by SFCAC
Production team will story board the script, all permits will be acquired and interviews scheduled prior to shooting.
Film Quality Documentary must be of HD quality.
This film is intended to be screened using the latest HD projection on a wide, theater screen.
Confer with production and film crew prior to filming in order to ensure correct equipment is used.
Film Content Content must reflect script, relevance and historical accuracy.
Due to the nature of this film, there is not a lot of room for reinterpretation or revision. Film must be relevant to the occasion, as well as historically accurate.
Review script and sequencing pre-production, do follow-up research when needed.
Golden Gate Bridge DocumentaryQuality Management Plan
Resource Hours Hourly Rate Total Cost
Project Manager 67 $130 $8,710
Writer 28 $180 $5,040
Art Director 16 $180 $2,880
Production Artist 24 $100 $2,400
Producer 119 $150 $17,850
Director 64 $180 $11,520
Video Editor 24 $140 $4,320
Compositor 56 $150 $8,400
MG Artist 72 $150 $10,800
Sound Engineer 24 $150 $3,600
Accounting 5 $110 $550
TOTAL Resources $76,070
Hard Costs
Crew $30,000
Studio Rental $25,000
Equitment $20,000
Permits $2,000
TOTAL Hard costs $77,000
TOTAL 77,000
TOTAL Resources 76,070
Baseline Total 153,070
Risk Costs 46,930
Total Cost After Risk Planning $200,000
Golden Gate Bridge Documentary Cost Management Plan (After Risk Planning)
WBS Structure