A Documentary Film Projectto Commemorate the

75th Anniversary of the

Construction of the Golden Gate Bridge

Kristen Elena

Alex Orlando

John

Page 2: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Project Background

Sponsored by the Art Commission of the City

of San Francisco, to produce a documentary in commemoration of the 75th Anniversary on the construction of the Golden Gate Bridge

Page 3: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Project Objective

Produce a 30 minute documentary on the

construction of the Golden Gate Bridge in commemoration of the 75th Anniversary of its completion. The documentary will be completed on January 5, 2012 within a budget of $200,000.

Page 4: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Stakeholders

GG Bridge Authority

S.F. City Art Commission

City AuthorityGG Bridge

Documentary Film Group

S.F. City Residents

Cast & Crew Contractors Film

DirectorFilm

Producers

Procure-ment Team

Safety &

Service

Page 5: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Assumptions

• SFCAC will be providing the funding for overall production

• Interviewees will be available as planned and scheduled

• Script will be provided• Filming takes place during summer and fall months,

thus avoiding weather related issues• All equipment will be fully functioning • Access permits will be made available prior to filming

Page 6: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Inclusion & Exclusion• Inclusion

– Concept Design– Storyboards Development– Production

• Crew:• Film Crew and equipment rental

• Location Scouting:• secure permits and permissions, studio rental

• Setup, service coordinator, janitorial, dismantling crews must be scheduled prior to the beginning of shooting:• Character Interviews – interview script, travel accommodations• B-Roll Filming

• Filming:• HD quality

• Interviewees will be available as planned and scheduled• All equipment is selected and on hand• Location and time agreed upon by crew and guests• Contingency plan for weather-related issues when shooting outdoors

• Post Production (Editing, Motion Graphics, Sound):• Editing- includes one rough cut and one final edit• Motion Graphics- includes animations and graphics• Sound- includes voice enhancement and music development

Page 7: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Inclusion & Exclusion

• Exclusion– Media Promotion or advertising– Not to exceed 30 minutes– Script – provided by San Francisco City Arts

Commission

Page 8: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Acceptance Criteria

• Film is 30 minutes long.• Film features all the people selected by the

SFCAC for interviews.• Film follows scripting and sequencing put

forth by SFCAC• Content is PG rated• Must be of HD quality

Page 9: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

The Marin Tower (north side) was built from November 1933 to October 1934 followed by the San Francisco Tower(southside) from January 1935 to June 1935

Page 10: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Bridge main span, which supports the roadway, was assembled in sections that were constructed concurrently from the south side and the north side.

On November 18, 1936, the two sections were joined in the middle.

Page 11: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Golden Gate Bridge Chief Engineer Joseph B. Strauss

Page 12: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

The Golden Gate Bridge opened to traffic on May 28, 1937

Page 13: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

It takes 17 painters a whole year to repaint the bridge from one end to the other.

Perhaps the most secured job in the world?

Page 14: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Metric Goal Rationale How we’ll do it SFCAC Satisfaction Ensure that all five

points of the acceptance criteria are met.

This will allow for the city to primer the film during the anniversary gala.

Work directly with the city and production crew by checking in at each milestone to ensure everyone is on the same page.

Conformance to Requirements

Ensure that production and film crew adhere to all the SFCAC requirements.

The film must fulfill all five major requirements set forth by SFCAC

Production team will story board the script, all permits will be acquired and interviews scheduled prior to shooting.

Film Quality Documentary must be of HD quality.

This film is intended to be screened using the latest HD projection on a wide, theater screen.

Confer with production and film crew prior to filming in order to ensure correct equipment is used.

Film Content Content must reflect script, relevance and historical accuracy.

Due to the nature of this film, there is not a lot of room for reinterpretation or revision. Film must be relevant to the occasion, as well as historically accurate.

Review script and sequencing pre-production, do follow-up research when needed.

Golden Gate Bridge DocumentaryQuality Management Plan

Page 15: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

Resource Hours Hourly Rate Total Cost

Project Manager 67 $130 $8,710

Writer 28 $180 $5,040

Art Director 16 $180 $2,880

Production Artist 24 $100 $2,400

Producer 119 $150 $17,850

Director 64 $180 $11,520

Video Editor 24 $140 $4,320

Compositor 56 $150 $8,400

MG Artist 72 $150 $10,800

Sound Engineer 24 $150 $3,600

Accounting 5 $110 $550

TOTAL Resources $76,070

Hard Costs

Crew $30,000

Studio Rental $25,000

Equitment $20,000

Permits $2,000

TOTAL Hard costs $77,000

TOTAL 77,000

TOTAL Resources 76,070

Baseline Total 153,070

Risk Costs 46,930

Total Cost After Risk Planning $200,000

Golden Gate Bridge Documentary Cost Management Plan (After Risk Planning)

Page 16: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John
Page 17: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John
Page 18: A Documentary Film Project to Commemorate the 75 th Anniversary of the Construction of the Golden Gate Bridge Kristen Elena Alex Orlando John

WBS Structure