A Feasibility Study for the Automated Monitoring and Control of Mine Water Discharges

2017 WV Mine Drainage Taskforce Chris Vass Aaron Noble, PhD Mining Engineering West Virginia University Morgantown, WV April 11, 2017

Chris Vass 2017 2

Presentation Outline 1 2

5

3

4

BACKGROUND BENCH-SCALE SYSTEM

PROOF-OF-CONCEPT RESULTS

ONGOING WORK & CONCLUSIONS

MAMDANI CONTROLLER

Chris Vass 2017 3

MOTIVATION Automated Outlet Treatment

Chris Vass 2017 4

Challenges in CAPP

Remote Locations No Utilities Area/Access Limited by Topography Several parameter limits: pH TSS, Fe, Al, Mn, etc. Lab Results Take Time

Chris Vass 2017 5

Traditional Practices in CAPP Rob

Can get to the remote locations, but takes time.

May make it to problematic sites once or twice per day.

Not available 24/7/365.

Not an environmental chemist, but knows practical water treatment.

Will eventually retire or find another job.

Chris Vass 2017 6

Research Objectives Problem Statements:

Given the unique environmental challenges in CAPP, traditional methods of water monitoring and treatment are costly and inefficient.

The current and future regulatory trajectory may deem many of these practices cost prohibitive.

Research Objectives:

Evaluate the technical and economic feasibility of automated monitoring and advanced control algorithms for chemical treatment of mine water discharges

Chris Vass 2017 7

Generic Controller

Generic pH Control Diagram

AMD Treatment System

Process Set Point (pH = 7)

Outlet pH

Process Disturbances: -Incoming pH -Flow Rate -Atmospheric Conditions

Current System Conditions

Treatment Flow Rate

Control

Algorithm

3

5

7

9

11

0 250 500 750 1000 1250

Stea

dy S

tate

pH

Base Treatment Flowrate (ml/min)

Titration of HCl with Na2CO3

Problem: pH Treatment is Nonlinear!

Chris Vass 2017 8

BENCH-SCALE SYSTEM CONSTRUCTION

Automated Outlet Treatment

Chris Vass 2017 9

Components

Reactor

Conductivity Sensor

pH Sensor

Chris Vass 2017 10

Components

Transmitters/Power Supply DAQ Unit

Chris Vass 2017 11

Components

Supply Pump Treatment Pump

Chris Vass 2017 12

Components

Baffle Installed Baffle

Chris Vass 2017 13

Bench Scale Model

Chris Vass 2017 14

MAMDANI FUZZY CONTROLLER Automated Outlet Treatment

Chris Vass 2017 15

Advanced Control Techniques

MF1 MF2 MF3 MF4

ANN’s Fuzzy Logic ANFIS

Several advanced pH control techniques exist; however, they are currently unproven in a mine environmental setting.

Chris Vass 2017 16

Modeling Approach

Chris Vass 2017 17

Fuzzy Logic - Basics

Chris Vass 2017 18

Fuzzy Logic – Membership Functions

Use of non-precise classes to segment process behavior

Error

MF1 MF2 MF3 MF4

MF1 MF2 MF3 MF4

Chris Vass 2017 19

Membership Functions

Doesn’t neglect “Rob’s” intuition, 30+ years of AMD research, or the real-time data…

3

4

5

6

7

8

9

10

11

0 250 500 750 1000 1250

pH

Base Treatment Flowrate (cc/min)

High pH

Low pH

Neutral pH

Chris Vass 2017 20

RESULTS & DISCUSSION Automated Outlet Treatment

Chris Vass 2017 21

pH Control – Experimental Tests

Test No. Simulated Condition 1 Normal field Operations under steady state conditions

2 Unsteady flow rate

3 Changing pH set point

4 Large surge in flow rate that interrupts flow recording device

5 Change in feed water pH

6 Removal of pond baffle

7 Multiple disturbances/perturbations

Define acceptable range as ±0.5 pH point.

Chris Vass 2017 22

pH Control – Steady State

Chris Vass 2017 23

pH Control – Varying Flow Rates & Set Point

Chris Vass 2017 24

pH Control – Change in Feed pH

Chris Vass 2017 25

ONGOING WORK & CONCLUSIONS

Automated Outlet Treatment

Chris Vass 2017 26

Ongoing Work Implementation of control scheme at AMD treatment site

Chris Vass 2017 27

Summary & Conclusions Environmental monitoring and treatment costs can be significant

and require perpetual attention. Laboratory tests have shown that fuzzy logic is a feasible control

option. The controller used in this testing was able to withstand multiple

perturbations and maintain pH within ±0.5.