30
Feasibility Status Monitoring Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 94 Feasibility Status Monitoring

Feasibility Status Monitoring - MPWRD

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 94

Feasibility Status Monitoring

Page 2: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 95

Feasibility Status Monitoring

Developed by: Tech Mahindra Ltd

Page 3: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 96

Table of Contents

1 MODULE DESCRIPTION.......................................................................................................................... 98

2 BASIC DEFINITIONS ............................................................................................................................... 98

3 PROCESS DIAGRAM............................................................................................................................... 98

4 MODULE FEATURES ............................................................................................................................ 101

4.1 SECURITY FEATURE .................................................................................................................... 101

4.2 SEARCH ..................................................................................................................................... 101

4.3 IMPORT/EXPORT UTILITIES: ......................................................................................................... 101

4.4 HINDI/ENGLISH SUPPORT ............................................................................................................ 102

4.5 VIEW/UPDATE SCHEME DETAILS. ................................................................................................. 102

4.6 REPORTING FEATURE.................................................................................................................. 102

4.6.1 Public Reports .......................................................................................................................................... 102

5 ROLES AND PERMISSIONS ................................................................................................................... 102

6 HOW TO ACCESS FEASIBILITY MODULE ................................................................................................. 103

6.1 STARTUP PORTAL (WWW.MPWRD.GOV.IN)..................................................................................... 103

6.2 USING A DIRECT LINK ................................................................................................................... 104

6.3 ROLE BASED SCREEN ACCESS .................................................................................................... 104

6.3.1 Module Admin ......................................................................................................................................... 105

6.3.1.1 Screen: Remove Scheme and Update Status of Scheme. .................................................................. 105

6.3.2 Data Entry User ........................................................................................................................................ 105

6.3.2.1 Screen: Register Scheme .......................................................................................................................... 106

6.3.2.2 Screen: Modify/Update Scheme ............................................................................................................... 106

6.3.2.3 Screen: Fill Rejection Form 151 for Scheme Reject Proposal ...................................................................... 107

6.3.3 Office Head or Office-in-Charge (Supervisory Role) .............................................................................. 108

Page 4: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 97

6.3.3.1 Screen: Review and Forward Scheme ....................................................................................................... 108

6.3.3.2 Screen: E-In-C Approved New scheme ...................................................................................................... 109

6.3.3.3 Screen: E-In-C DPR Received .................................................................................................................... 110

6.3.3.4 Screen: E-In-C Review .............................................................................................................................. 110

6.3.3.5 Screen: OSD Analysis Sheet ...................................................................................................................... 111

6.3.3.6 Screen: OSD Approval .............................................................................................................................. 112

6.3.4 Monitoring Officer ................................................................................................................................... 112

6.3.4.1 Screen: Feasibility approval Report........................................................................................................... 112

6.3.4.2 Screen: Feasibility Status .......................................................................................................................... 113

6.3.5 Public Access ............................................................................................................................................ 114

6.3.5.1 Screen: New Scheme Status Report .......................................................................................................... 114

6.3.5.2 Screen: Old Surveyed Scheme Status Report............................................................................................. 114

6.3.5.3 Screen: NVDA Scheme Status Report ........................................................................................................ 115

7 CASE STUDY........................................................................................................................................ 115

7.1 STEPS IN FEASIBILITY STATUS MONITORING (FSM) ....................................................................... 115

7.1.1 Register New Scheme .............................................................................................................................. 116

7.1.2 Forward Scheme for Approval ................................................................................................................ 117

7.1.3 Review/Comment for New/NVDA/Old Surveyed Scheme ................................................................... 118

7.1.4 Pin-Pointed Approval............................................................................................................................... 119

7.1.5 Feasibility Approve Schemes for Approval ............................................................................................ 120

7.1.6 DPR Received and Pending for Approval ............................................................................................... 121

8 REFERENCES ....................................................................................................................................... 123

Page 5: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 98

1 Module Description

Feasibility Status Monitoring module provides WRD a monitoring tool for entering details of proposed schemes, assessing feasibility of schemes, manage work flow and approval process and the monitoring of such schemes and preparation of the necessary documentation in the work flow.

The overall process flow is described in the following sections.

Module has following facilities

Login Facility by EE,SE,CE, E-In-C, OSD (Officer on Special Duty)

New Proposed Schemes Registration

New Proposed NVDA Schemes Registration

RRR Schemes Registration

Old Surveyed Schemes Registration

Review and Comments by SE/CE/E-In-C on proposed Schemes

Feasibility reports preparation

Analysis Report – As per Analysis Report OSD sanctions particular scheme.

Approval/Sanction Facility by OSD.

Rejection Facility

151 Rejection Form – This form capture reasons to reject any scheme.

Public Report for MPWRD and NVDA Users.

Various reports like feasibility reports for RRR/New Schemes/NVDA/Old Surveyed.

Export /Print facility.

2 Basic Definitions

Pin-Pointed Schemes: Any new schemes to be proposed are a Pin-Pointed Scheme.

RRR Scheme: Completed Schemes which need restructuring repair, renovation works.

Old Surveyed Scheme: A Planned scheme which was surveyed before but not sanctioned due to some reason.

Approve Scheme: Approval is an action which performs on Scheme for sending it to various stages (Pin-Pointed, Feasibility etc.) by OSD (Mantralaya).

Reject Scheme: If Proposed Scheme is not feasible in context of feasibility criteria like CCA, Cost,

Area etc then competent Authority may reject proposal any time. Back to Division: If OSD and E-In-C are not satisfied with the proposed schemes features or CCA,

Cost etc., or if Prepared DPR report is not appropriate according to standards then OSD & E-In-C might take decision to send it back to proposer for improvements suggested by OSD & E-In-C on the basis of Analysis Report results.

3 Process Diagram

The stages of various schemes are listed below:

Page 6: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 99

Feasibility Approval Stages for pin-pointed schemes/RRR schemes/Old surveyed schemes are listed below:

Process Stages for Pin-Pointed Scheme are:

1. Pin-Pointed 2. Feasibility Approve 3. DPR Received 4. Sanctioned/Rejected

Stages of RRR Scheme are given below –

1. RRR 2. Feasibility Approve 3. DPR Received 4. Sanctioned

Stages of Old Surveyed Scheme are given below –

1. Surveyed 2. Feasibility Approve 3. DPR Received 4. Sanctioned

For overall understanding of the module and its sub-component, the following process chart is useful.

Page 7: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 100

EE

SE

OSD

E-in-C

CE

Proposed Scheme IF Feasible ?

Process 151

Process For

Approve Prepare DPR

Process For

Approved

Process For

Approved

Process For

Approved

Process 151

Process 151

Reject Feasibility

Is DPR Approved ?

Is Sanction ?Feasibility Approve

Process for DPR

Approved

Process for DPR

Approved

Ba

ck

To

Div

isio

n

NO

NO

Stop Process

Yes

Yes

No

Yes

Yes

Yes

NO

Page 8: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 101

4 Module Features

The key features of the modules are listed below:

4.1 Security Feature

The module has login based permissions and access. It means one user can‟t access or remove/update the information created by EIMS user. Also some of the screens or facilities in the modules are extended as per the roles.

Note to the user:

Please do not share your login and passwords with other users. Please update your passwords regularly

4.2 Search

EIMS gives search facilities for retrieval of data. On the search screen the user is required to enter key phrases to enable search. The various search screens available in Feasibility status monitoring modules are as follows:

Search New Scheme details: facility to search New Scheme details

o Scheme Name wise search.

o Office wise Search.

o Scheme Status (Feasibility Approved, DPR Received, Rejected etc.) wise search.

o Search NVDA & Non NVDA Schemes

o Project Category wise search (Major/Medium/Minor)

Search Old Surveyed Scheme details: facility to search Old Surveyed Scheme details.

o Scheme Name wise search.

o Office wise Search.

o Scheme Status (Feasibility Approved, DPR Received, Rejected etc.) wise search.

o Project Category wise search (Major/Medium/Minor)

Search RRR Scheme details: facility to search RRR Scheme details.

o Scheme Name wise search.

o Office wise Search.

o Scheme Status (Feasibility Approved, DPR Received, Rejected etc.) wise search.

o Project Category wise search (Major/Medium/Minor)

4.3 Import/Export Utilities:

EIMS provides facilities for:

Importing scheme data in correct excel format

Page 9: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 102

Note to the user:

For Importing of data please ensure that the excel sheet in required format is used and the data is verified before upload. Wrong data or erroneous entries in the import excel sheet will cause the application to throw an error. In such a case, please ensure correctness of excel fields, excel format.

Exporting data of Feasibility status details to an excel/pdf format

4.4 Hindi/English Support

The module has provision to switch between Hindi and English. For data entry forms, the data entry is possible in English only. The form fields can toggle between Hindi and English.

4.5 View/Update Scheme Details.

This feature allows view and update of scheme Data

4.6 Reporting Feature

4.6.1 Public Reports

These are customized reports and are available publicly (i.e. anybody can access it over internet). The module has the following public reports

Master Report – Master report shows Basin, Circle, Division Wise Approval Status Report,

Sanction Status Report, and DPR Status Report in their hierarchy.

Status Report. - Report shows the Pinpointed, Surveyed and RRR Scheme status.

OSD Approved Report - Report shows Sanction Status Report, DPR Status, Surveyed,

RRR Report etc.

Note to the user:

The reports can be downloaded in pdf/excel format for taking print outs or keeping office records.

5 Roles and Permissions

This module has role based access and permissions and the permissions for the screens are listed below for reference:

Screen/Process

Permission

Provisioned Roles

EE SE CE E-In-C OSD Administrator

Register Scheme Register, Update, View

View / Forward

View / Forward

View / Forward

View / Forward

View/Update/ Remove

Approve View View View View Approve View

Reports Generate, View

Generate, View

Generate, View

Generate, View

Generate, View

Generate, View

Page 10: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 103

Note to the user:

Please note that based on the user privileges some screens may or may not be visible

6 How to Access Feasibility Module

6.1 Startup Portal (www.mpwrd.gov.in)

EIMS ds varxZr Feasibility Status Monitoring Module Access djus ds fy;s fuEu steps dk vuqlj.k djsa&

Address box esa www.mpwrd.gov.in type djsa vkSj enter button nck;saA (In the address bar type

www.mpwrd.gov.in then press enter button to visit Water Resources Department's Web Site).

EIMS Portal fuEukuqlkj open gks tkrk gS&

Portal ds home page esa EIMS Login option click djsa ,oa vkusokyh screen esa Feasibility Status

Monitoring Module ds link ij click dj nsaA

Click Here

Address box

Page 11: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 104

vFkok

Portal esa home page ij Latest Application ds varxZr Feasibility status Monitoring option ij click djsasaA

fuEukuqlkj open screen esa Login ID ,oa Password Enter djsa ,oa login button ij click djsaA

lQyrk iwoZd y‚fxu gksus ij] home ist uhps nh xbZ Ldzhu dh rjg çnf'kZr gksrk gSA (Upon Successful

Login, home page of module is displayed.)

6.2 Using a direct link

Feasibility Status Monitoring Module dks mi;ksxdrkZ lh/ks uhps fn;s x;s link dk mi;ksx dj open dj

ldrs gSaA

Click on this link to access module https://eims1.mpwrd.gov.in/scmmtr/control/main You see

6.3 Role Based Screen Access

The roles in EIMS can be any of the following:

Admin role - is for provisioning of basic/master data of an module

Data Entry role – for entering of basic form data

Supervisory role – for review/approval/rejection/modification of data

Decision making role – viewing of report and decision making

Click Here

Page 12: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 105

Feasibility Status Monitoring Module esa mi;ksxdrkZ lacaf/kr Roles ds vk/kkj ij dk;Z dj ldrs gSa blls

lacaf/kr fofHkUu screen dks uhps n’kkZ;k tk jgk gS&

The various screens as per role are listed in the sections below.

6.3.1 Module Admin

The module admin role has access to the following screens:

6.3.1.1 Screen: Remove Scheme and Update Status of Scheme.

Similarly, Old Surveyed and RRR Scheme can be remove and update.

6.3.2 Data Entry User

The following screens are available in the Feasibility Status Monitoring module for making form based data entry:

Role EE Administrator

Access Permission Create, Update, View

Create , Update, View, Remove

Click here for Remove Scheme.

Use this dropdown for update Project Status.

Page 13: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 106

6.3.2.1 Screen: Register Scheme

Similarly, Old Surveyed and RRR Scheme can register.

6.3.2.2 Screen: Modify/Update Scheme

Role EE Administrator

Access Permission Create, Update, View

Create , Update, View, Remove

Role EE Administrator

Access Permission Create, Update, View

Create , Update, View, Remove

Page 14: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 107

Similarly, Old Surveyed and RRR Scheme can be update.

6.3.2.3 Screen: Fill Rejection Form 151 for Scheme Reject Proposal

Role EE Administrator

Access Permission Create, Update, View

Create , Update, View, Remove

Page 15: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 108

6.3.3 Office Head or Office-in-Charge (Supervisory Role)

This role is of an reviewing officer (SE, CE and E-In-C) who can:

Review and comment on the data entered in a given Review form.

Forward data for review to his/her higher officer.

6.3.3.1 Screen: Review and Forward Scheme

Role SE CE OSD E-In-C Administrator

Access Permission

Review, Forward

Review , Forward

Review, Forward

Review, Forward

Update, View, Remove

Click here.

Page 16: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 109

6.3.3.2 Screen: E-In-C Approved New scheme

Role OSD E-In-C Administrator

Access Permission

Approve/View Approve/View Update, View, Remove

First click on forward button.

Second click on Ok button. For Forward scheme to higher rank officer

Page 17: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 110

6.3.3.3 Screen: E-In-C DPR Received

6.3.3.4 Screen: E-In-C Review

Role E-In-C Administrator

Access Permission Review/View Update, View, Remove

Role E-In-C Administrator

Access Permission Review, View Update, View, Remove

Page 18: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 111

6.3.3.5 Screen: OSD Analysis Sheet

Role OSD

Access Permission View/Review

Page 19: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 112

6.3.3.6 Screen: OSD Approval

Similar operations can be on Old Surveyed and RRR Schemes.

6.3.4 Monitoring Officer

6.3.4.1 Screen: Feasibility approval Report

Role OSD

Access Permission View/Review

Role SDO EE SE CE OSD E-In-C Administrator

Access Permission

View View View View View View View

Page 20: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 113

6.3.4.2 Screen: Feasibility Status

Role SDO EE SE CE OSD E-In-C Administrator

Access Permission

View View View View View View View

Page 21: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 114

6.3.5 Public Access

These are EIMS content that can be accessed by anybody accessing the EIMS portal

6.3.5.1 Screen: New Scheme Status Report

6.3.5.2 Screen: Old Surveyed Scheme Status Report

Role SDO EE SE CE OSD E-In-C Administrator

Access Permission

View View View View View View View

Page 22: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 115

6.3.5.3 Screen: NVDA Scheme Status Report

7 Case Study

7.1 Steps in Feasibility Status Monitoring (FSM)

Steps to be taken for are:

1. Registration of Scheme

Role SDO EE SE CE OSD E-In-C Administrator

Access Permission

View View View View View View View

Page 23: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 116

2. Forward for Approval

3. Fill Comments by authority

4. Review By SE or CE or E-In-C

5. Pin-pointed Approval

6. DPR Received Approval

7. Sanction Approval

7.1.1 Register New Scheme

Primary Role/Assigned Role: Executive Engineer

Operations:

1. Login as EE

2. Go to main Menu>Register New Scheme (for new Record)

3. Click on Register New scheme Tab

4. Select Radio button either „Yes‟ or no for NVDA schemes

5. Fill all Mandatory Fields of form and Enter Comments

6. To save the record Click on Submit button, after clicking on Submit Button “Arohi” Scheme is

registered successfully 7. Below Screen Shot are showing Expected Steps-

Page 24: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 117

On Save See the following Screen

After submit data, user can search same record by below Screen

7.1.2 Forward Scheme for Approval

For Approval or any review comments from superior authorities, EE may forward created scheme but this is optional

Primary Role/Assigned Role: Executive Engineer

Operations:

1. Login as EE

2. Go to main Menu>New Scheme Monitoring

3. Enter Created Scheme Name “Arohi” in Scheme Name Field

4. Clicks on Forward Button

5. After clicking on Forward Button “Arohi” Scheme will be forwarded to Concern Superintendent

Engineer for Review.

6. Below Screen Shot are showing Expected Steps

Page 25: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 118

7.1.3 Review/Comment for New/NVDA/Old Surveyed Scheme

Primary Role/Assigned Role: SE/CE/E-In-C

Operations:

1. Login as SE

2. Go to main Menu > New Scheme Monitoring

3. Enter Created Scheme Name “Arohi” in Scheme Name Field

4. Clicks on Search Button

5. Review and fill comments and all mandatory fields against proposal

6. Click on submit Button

7. After filling comments from SE and click on submit button

8. Below Screen Shot are showing Expected Steps

Page 26: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 119

Note to the user:

After doing above steps, CE, E-In-C will follow same above mentioned process. After completing this process same 7.1.2 section follow by SE/CE/E-In-C

7.1.4 Pin-Pointed Approval

Primary Role: Administrator

Page 27: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 120

Assigned Role: OSD (Office on special Duty)

Operations:

1. Login as OSD

2. Go to main Menu > Approve Pin-Pointed>Approve Pin-Pointed Tab

3. Enter reviewed scheme Name “Arohi” in Scheme Name Field

4. Clicks on Search Button

5. click on check box and select project status as Feasibility Approve

6. Fill mandatory fields like OSD Name, Order number, Remark, Date of approval

7. Below Screen Shot are showing Expected Steps

After filling all fields click on Submit Button and in this case proposed schemes are Pin-Pointed

Approved

7.1.5 Feasibility Approve Schemes for Approval

Primary Role: Administrator

Assigned Role: E-In-C (Engineer-in-Chief)

Operations:

Page 28: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 121

1. Login as E-In-C

2. Go to main Menu > Approve New-Scheme> Feasibility Approved New Schemes

3. Enter Pin-Pointed approved scheme Name “Arohi” in Scheme Name Field

4. Clicks on Search Button

5. click on check box and select project status as DPR Received

6. Fill mandatory fields like OSD Name, Order number, Remark, Date of approval, upload

Document

7. Below Screen Shot are showing Expected Steps

After filling all fields click on Submit Button and in this case proposed schemes are Feasibility Approved.

7.1.6 DPR Received and Pending for Approval

Primary Role: Administrator

Assigned Role: OSD

Operations:

1. Login as OSD

2. Go to main Menu > Approve New-Scheme> DPR Received and Pending for Approval tab

Page 29: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 122

3. Enter Feasibility approved scheme Name “Arohi” in Scheme Name Field

4. Clicks on Search Button

5. click on check box and select project status as Sanctioned

6. Fill mandatory fields like OSD Name, Order number, Remark, Date of approval, upload

Document

7. Below Screen Shot are showing Expected Steps

After clicking on Submit Button, Scheme is sanctioned successfully

Note to the user:

Same operations can be performed on following schemes:

1. NVDA Scheme 2. Old Surveyed Scheme 3. RRR Scheme

After approval process of New and Old Surveyed Scheme is considered as Asset for MPWRD with On-going Status and this will also Reflects in Asset management module

Page 30: Feasibility Status Monitoring - MPWRD

Feasibility Status Monitoring

Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 123

8 References

S. No. Reference Document

1 EIMS Task 1 – 4 Reports, TechM

2 MTR I – III, DHV

3 A Compilation of Technical Circulars for Irrigation Works in Madhya Pradesh, B.R. Banga.

4 Department Structure, Proposal Documents provided by WRD

5 Discussions and Minutes of Meetings from various discussions and suggestions.

6 Feedback received from online Trac <www.mpwrd.gov.in/itmgmt>

7 SRS and Design Documents of the module.