Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 94
Feasibility Status Monitoring
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 95
Feasibility Status Monitoring
Developed by: Tech Mahindra Ltd
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 96
Table of Contents
1 MODULE DESCRIPTION.......................................................................................................................... 98
2 BASIC DEFINITIONS ............................................................................................................................... 98
3 PROCESS DIAGRAM............................................................................................................................... 98
4 MODULE FEATURES ............................................................................................................................ 101
4.1 SECURITY FEATURE .................................................................................................................... 101
4.2 SEARCH ..................................................................................................................................... 101
4.3 IMPORT/EXPORT UTILITIES: ......................................................................................................... 101
4.4 HINDI/ENGLISH SUPPORT ............................................................................................................ 102
4.5 VIEW/UPDATE SCHEME DETAILS. ................................................................................................. 102
4.6 REPORTING FEATURE.................................................................................................................. 102
4.6.1 Public Reports .......................................................................................................................................... 102
5 ROLES AND PERMISSIONS ................................................................................................................... 102
6 HOW TO ACCESS FEASIBILITY MODULE ................................................................................................. 103
6.1 STARTUP PORTAL (WWW.MPWRD.GOV.IN)..................................................................................... 103
6.2 USING A DIRECT LINK ................................................................................................................... 104
6.3 ROLE BASED SCREEN ACCESS .................................................................................................... 104
6.3.1 Module Admin ......................................................................................................................................... 105
6.3.1.1 Screen: Remove Scheme and Update Status of Scheme. .................................................................. 105
6.3.2 Data Entry User ........................................................................................................................................ 105
6.3.2.1 Screen: Register Scheme .......................................................................................................................... 106
6.3.2.2 Screen: Modify/Update Scheme ............................................................................................................... 106
6.3.2.3 Screen: Fill Rejection Form 151 for Scheme Reject Proposal ...................................................................... 107
6.3.3 Office Head or Office-in-Charge (Supervisory Role) .............................................................................. 108
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 97
6.3.3.1 Screen: Review and Forward Scheme ....................................................................................................... 108
6.3.3.2 Screen: E-In-C Approved New scheme ...................................................................................................... 109
6.3.3.3 Screen: E-In-C DPR Received .................................................................................................................... 110
6.3.3.4 Screen: E-In-C Review .............................................................................................................................. 110
6.3.3.5 Screen: OSD Analysis Sheet ...................................................................................................................... 111
6.3.3.6 Screen: OSD Approval .............................................................................................................................. 112
6.3.4 Monitoring Officer ................................................................................................................................... 112
6.3.4.1 Screen: Feasibility approval Report........................................................................................................... 112
6.3.4.2 Screen: Feasibility Status .......................................................................................................................... 113
6.3.5 Public Access ............................................................................................................................................ 114
6.3.5.1 Screen: New Scheme Status Report .......................................................................................................... 114
6.3.5.2 Screen: Old Surveyed Scheme Status Report............................................................................................. 114
6.3.5.3 Screen: NVDA Scheme Status Report ........................................................................................................ 115
7 CASE STUDY........................................................................................................................................ 115
7.1 STEPS IN FEASIBILITY STATUS MONITORING (FSM) ....................................................................... 115
7.1.1 Register New Scheme .............................................................................................................................. 116
7.1.2 Forward Scheme for Approval ................................................................................................................ 117
7.1.3 Review/Comment for New/NVDA/Old Surveyed Scheme ................................................................... 118
7.1.4 Pin-Pointed Approval............................................................................................................................... 119
7.1.5 Feasibility Approve Schemes for Approval ............................................................................................ 120
7.1.6 DPR Received and Pending for Approval ............................................................................................... 121
8 REFERENCES ....................................................................................................................................... 123
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 98
1 Module Description
Feasibility Status Monitoring module provides WRD a monitoring tool for entering details of proposed schemes, assessing feasibility of schemes, manage work flow and approval process and the monitoring of such schemes and preparation of the necessary documentation in the work flow.
The overall process flow is described in the following sections.
Module has following facilities
Login Facility by EE,SE,CE, E-In-C, OSD (Officer on Special Duty)
New Proposed Schemes Registration
New Proposed NVDA Schemes Registration
RRR Schemes Registration
Old Surveyed Schemes Registration
Review and Comments by SE/CE/E-In-C on proposed Schemes
Feasibility reports preparation
Analysis Report – As per Analysis Report OSD sanctions particular scheme.
Approval/Sanction Facility by OSD.
Rejection Facility
151 Rejection Form – This form capture reasons to reject any scheme.
Public Report for MPWRD and NVDA Users.
Various reports like feasibility reports for RRR/New Schemes/NVDA/Old Surveyed.
Export /Print facility.
2 Basic Definitions
Pin-Pointed Schemes: Any new schemes to be proposed are a Pin-Pointed Scheme.
RRR Scheme: Completed Schemes which need restructuring repair, renovation works.
Old Surveyed Scheme: A Planned scheme which was surveyed before but not sanctioned due to some reason.
Approve Scheme: Approval is an action which performs on Scheme for sending it to various stages (Pin-Pointed, Feasibility etc.) by OSD (Mantralaya).
Reject Scheme: If Proposed Scheme is not feasible in context of feasibility criteria like CCA, Cost,
Area etc then competent Authority may reject proposal any time. Back to Division: If OSD and E-In-C are not satisfied with the proposed schemes features or CCA,
Cost etc., or if Prepared DPR report is not appropriate according to standards then OSD & E-In-C might take decision to send it back to proposer for improvements suggested by OSD & E-In-C on the basis of Analysis Report results.
3 Process Diagram
The stages of various schemes are listed below:
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 99
Feasibility Approval Stages for pin-pointed schemes/RRR schemes/Old surveyed schemes are listed below:
Process Stages for Pin-Pointed Scheme are:
1. Pin-Pointed 2. Feasibility Approve 3. DPR Received 4. Sanctioned/Rejected
Stages of RRR Scheme are given below –
1. RRR 2. Feasibility Approve 3. DPR Received 4. Sanctioned
Stages of Old Surveyed Scheme are given below –
1. Surveyed 2. Feasibility Approve 3. DPR Received 4. Sanctioned
For overall understanding of the module and its sub-component, the following process chart is useful.
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 100
EE
SE
OSD
E-in-C
CE
Proposed Scheme IF Feasible ?
Process 151
Process For
Approve Prepare DPR
Process For
Approved
Process For
Approved
Process For
Approved
Process 151
Process 151
Reject Feasibility
Is DPR Approved ?
Is Sanction ?Feasibility Approve
Process for DPR
Approved
Process for DPR
Approved
Ba
ck
To
Div
isio
n
NO
NO
Stop Process
Yes
Yes
No
Yes
Yes
Yes
NO
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 101
4 Module Features
The key features of the modules are listed below:
4.1 Security Feature
The module has login based permissions and access. It means one user can‟t access or remove/update the information created by EIMS user. Also some of the screens or facilities in the modules are extended as per the roles.
Note to the user:
Please do not share your login and passwords with other users. Please update your passwords regularly
4.2 Search
EIMS gives search facilities for retrieval of data. On the search screen the user is required to enter key phrases to enable search. The various search screens available in Feasibility status monitoring modules are as follows:
Search New Scheme details: facility to search New Scheme details
o Scheme Name wise search.
o Office wise Search.
o Scheme Status (Feasibility Approved, DPR Received, Rejected etc.) wise search.
o Search NVDA & Non NVDA Schemes
o Project Category wise search (Major/Medium/Minor)
Search Old Surveyed Scheme details: facility to search Old Surveyed Scheme details.
o Scheme Name wise search.
o Office wise Search.
o Scheme Status (Feasibility Approved, DPR Received, Rejected etc.) wise search.
o Project Category wise search (Major/Medium/Minor)
Search RRR Scheme details: facility to search RRR Scheme details.
o Scheme Name wise search.
o Office wise Search.
o Scheme Status (Feasibility Approved, DPR Received, Rejected etc.) wise search.
o Project Category wise search (Major/Medium/Minor)
4.3 Import/Export Utilities:
EIMS provides facilities for:
Importing scheme data in correct excel format
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 102
Note to the user:
For Importing of data please ensure that the excel sheet in required format is used and the data is verified before upload. Wrong data or erroneous entries in the import excel sheet will cause the application to throw an error. In such a case, please ensure correctness of excel fields, excel format.
Exporting data of Feasibility status details to an excel/pdf format
4.4 Hindi/English Support
The module has provision to switch between Hindi and English. For data entry forms, the data entry is possible in English only. The form fields can toggle between Hindi and English.
4.5 View/Update Scheme Details.
This feature allows view and update of scheme Data
4.6 Reporting Feature
4.6.1 Public Reports
These are customized reports and are available publicly (i.e. anybody can access it over internet). The module has the following public reports
Master Report – Master report shows Basin, Circle, Division Wise Approval Status Report,
Sanction Status Report, and DPR Status Report in their hierarchy.
Status Report. - Report shows the Pinpointed, Surveyed and RRR Scheme status.
OSD Approved Report - Report shows Sanction Status Report, DPR Status, Surveyed,
RRR Report etc.
Note to the user:
The reports can be downloaded in pdf/excel format for taking print outs or keeping office records.
5 Roles and Permissions
This module has role based access and permissions and the permissions for the screens are listed below for reference:
Screen/Process
Permission
Provisioned Roles
EE SE CE E-In-C OSD Administrator
Register Scheme Register, Update, View
View / Forward
View / Forward
View / Forward
View / Forward
View/Update/ Remove
Approve View View View View Approve View
Reports Generate, View
Generate, View
Generate, View
Generate, View
Generate, View
Generate, View
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 103
Note to the user:
Please note that based on the user privileges some screens may or may not be visible
6 How to Access Feasibility Module
6.1 Startup Portal (www.mpwrd.gov.in)
EIMS ds varxZr Feasibility Status Monitoring Module Access djus ds fy;s fuEu steps dk vuqlj.k djsa&
Address box esa www.mpwrd.gov.in type djsa vkSj enter button nck;saA (In the address bar type
www.mpwrd.gov.in then press enter button to visit Water Resources Department's Web Site).
EIMS Portal fuEukuqlkj open gks tkrk gS&
Portal ds home page esa EIMS Login option click djsa ,oa vkusokyh screen esa Feasibility Status
Monitoring Module ds link ij click dj nsaA
Click Here
Address box
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 104
vFkok
Portal esa home page ij Latest Application ds varxZr Feasibility status Monitoring option ij click djsasaA
fuEukuqlkj open screen esa Login ID ,oa Password Enter djsa ,oa login button ij click djsaA
lQyrk iwoZd y‚fxu gksus ij] home ist uhps nh xbZ Ldzhu dh rjg çnf'kZr gksrk gSA (Upon Successful
Login, home page of module is displayed.)
6.2 Using a direct link
Feasibility Status Monitoring Module dks mi;ksxdrkZ lh/ks uhps fn;s x;s link dk mi;ksx dj open dj
ldrs gSaA
Click on this link to access module https://eims1.mpwrd.gov.in/scmmtr/control/main You see
6.3 Role Based Screen Access
The roles in EIMS can be any of the following:
Admin role - is for provisioning of basic/master data of an module
Data Entry role – for entering of basic form data
Supervisory role – for review/approval/rejection/modification of data
Decision making role – viewing of report and decision making
Click Here
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 105
Feasibility Status Monitoring Module esa mi;ksxdrkZ lacaf/kr Roles ds vk/kkj ij dk;Z dj ldrs gSa blls
lacaf/kr fofHkUu screen dks uhps n’kkZ;k tk jgk gS&
The various screens as per role are listed in the sections below.
6.3.1 Module Admin
The module admin role has access to the following screens:
6.3.1.1 Screen: Remove Scheme and Update Status of Scheme.
Similarly, Old Surveyed and RRR Scheme can be remove and update.
6.3.2 Data Entry User
The following screens are available in the Feasibility Status Monitoring module for making form based data entry:
Role EE Administrator
Access Permission Create, Update, View
Create , Update, View, Remove
Click here for Remove Scheme.
Use this dropdown for update Project Status.
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 106
6.3.2.1 Screen: Register Scheme
Similarly, Old Surveyed and RRR Scheme can register.
6.3.2.2 Screen: Modify/Update Scheme
Role EE Administrator
Access Permission Create, Update, View
Create , Update, View, Remove
Role EE Administrator
Access Permission Create, Update, View
Create , Update, View, Remove
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 107
Similarly, Old Surveyed and RRR Scheme can be update.
6.3.2.3 Screen: Fill Rejection Form 151 for Scheme Reject Proposal
Role EE Administrator
Access Permission Create, Update, View
Create , Update, View, Remove
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 108
6.3.3 Office Head or Office-in-Charge (Supervisory Role)
This role is of an reviewing officer (SE, CE and E-In-C) who can:
Review and comment on the data entered in a given Review form.
Forward data for review to his/her higher officer.
6.3.3.1 Screen: Review and Forward Scheme
Role SE CE OSD E-In-C Administrator
Access Permission
Review, Forward
Review , Forward
Review, Forward
Review, Forward
Update, View, Remove
Click here.
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 109
6.3.3.2 Screen: E-In-C Approved New scheme
Role OSD E-In-C Administrator
Access Permission
Approve/View Approve/View Update, View, Remove
First click on forward button.
Second click on Ok button. For Forward scheme to higher rank officer
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 110
6.3.3.3 Screen: E-In-C DPR Received
6.3.3.4 Screen: E-In-C Review
Role E-In-C Administrator
Access Permission Review/View Update, View, Remove
Role E-In-C Administrator
Access Permission Review, View Update, View, Remove
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 111
6.3.3.5 Screen: OSD Analysis Sheet
Role OSD
Access Permission View/Review
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 112
6.3.3.6 Screen: OSD Approval
Similar operations can be on Old Surveyed and RRR Schemes.
6.3.4 Monitoring Officer
6.3.4.1 Screen: Feasibility approval Report
Role OSD
Access Permission View/Review
Role SDO EE SE CE OSD E-In-C Administrator
Access Permission
View View View View View View View
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 113
6.3.4.2 Screen: Feasibility Status
Role SDO EE SE CE OSD E-In-C Administrator
Access Permission
View View View View View View View
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 114
6.3.5 Public Access
These are EIMS content that can be accessed by anybody accessing the EIMS portal
6.3.5.1 Screen: New Scheme Status Report
6.3.5.2 Screen: Old Surveyed Scheme Status Report
Role SDO EE SE CE OSD E-In-C Administrator
Access Permission
View View View View View View View
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 115
6.3.5.3 Screen: NVDA Scheme Status Report
7 Case Study
7.1 Steps in Feasibility Status Monitoring (FSM)
Steps to be taken for are:
1. Registration of Scheme
Role SDO EE SE CE OSD E-In-C Administrator
Access Permission
View View View View View View View
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 116
2. Forward for Approval
3. Fill Comments by authority
4. Review By SE or CE or E-In-C
5. Pin-pointed Approval
6. DPR Received Approval
7. Sanction Approval
7.1.1 Register New Scheme
Primary Role/Assigned Role: Executive Engineer
Operations:
1. Login as EE
2. Go to main Menu>Register New Scheme (for new Record)
3. Click on Register New scheme Tab
4. Select Radio button either „Yes‟ or no for NVDA schemes
5. Fill all Mandatory Fields of form and Enter Comments
6. To save the record Click on Submit button, after clicking on Submit Button “Arohi” Scheme is
registered successfully 7. Below Screen Shot are showing Expected Steps-
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 117
On Save See the following Screen
After submit data, user can search same record by below Screen
7.1.2 Forward Scheme for Approval
For Approval or any review comments from superior authorities, EE may forward created scheme but this is optional
Primary Role/Assigned Role: Executive Engineer
Operations:
1. Login as EE
2. Go to main Menu>New Scheme Monitoring
3. Enter Created Scheme Name “Arohi” in Scheme Name Field
4. Clicks on Forward Button
5. After clicking on Forward Button “Arohi” Scheme will be forwarded to Concern Superintendent
Engineer for Review.
6. Below Screen Shot are showing Expected Steps
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 118
7.1.3 Review/Comment for New/NVDA/Old Surveyed Scheme
Primary Role/Assigned Role: SE/CE/E-In-C
Operations:
1. Login as SE
2. Go to main Menu > New Scheme Monitoring
3. Enter Created Scheme Name “Arohi” in Scheme Name Field
4. Clicks on Search Button
5. Review and fill comments and all mandatory fields against proposal
6. Click on submit Button
7. After filling comments from SE and click on submit button
8. Below Screen Shot are showing Expected Steps
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 119
Note to the user:
After doing above steps, CE, E-In-C will follow same above mentioned process. After completing this process same 7.1.2 section follow by SE/CE/E-In-C
7.1.4 Pin-Pointed Approval
Primary Role: Administrator
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 120
Assigned Role: OSD (Office on special Duty)
Operations:
1. Login as OSD
2. Go to main Menu > Approve Pin-Pointed>Approve Pin-Pointed Tab
3. Enter reviewed scheme Name “Arohi” in Scheme Name Field
4. Clicks on Search Button
5. click on check box and select project status as Feasibility Approve
6. Fill mandatory fields like OSD Name, Order number, Remark, Date of approval
7. Below Screen Shot are showing Expected Steps
After filling all fields click on Submit Button and in this case proposed schemes are Pin-Pointed
Approved
7.1.5 Feasibility Approve Schemes for Approval
Primary Role: Administrator
Assigned Role: E-In-C (Engineer-in-Chief)
Operations:
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 121
1. Login as E-In-C
2. Go to main Menu > Approve New-Scheme> Feasibility Approved New Schemes
3. Enter Pin-Pointed approved scheme Name “Arohi” in Scheme Name Field
4. Clicks on Search Button
5. click on check box and select project status as DPR Received
6. Fill mandatory fields like OSD Name, Order number, Remark, Date of approval, upload
Document
7. Below Screen Shot are showing Expected Steps
After filling all fields click on Submit Button and in this case proposed schemes are Feasibility Approved.
7.1.6 DPR Received and Pending for Approval
Primary Role: Administrator
Assigned Role: OSD
Operations:
1. Login as OSD
2. Go to main Menu > Approve New-Scheme> DPR Received and Pending for Approval tab
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 122
3. Enter Feasibility approved scheme Name “Arohi” in Scheme Name Field
4. Clicks on Search Button
5. click on check box and select project status as Sanctioned
6. Fill mandatory fields like OSD Name, Order number, Remark, Date of approval, upload
Document
7. Below Screen Shot are showing Expected Steps
After clicking on Submit Button, Scheme is sanctioned successfully
Note to the user:
Same operations can be performed on following schemes:
1. NVDA Scheme 2. Old Surveyed Scheme 3. RRR Scheme
After approval process of New and Old Surveyed Scheme is considered as Asset for MPWRD with On-going Status and this will also Reflects in Asset management module
Feasibility Status Monitoring
Ver. 1.2 Enterprise Information Management System (EIMS) Training Manual 123
8 References
S. No. Reference Document
1 EIMS Task 1 – 4 Reports, TechM
2 MTR I – III, DHV
3 A Compilation of Technical Circulars for Irrigation Works in Madhya Pradesh, B.R. Banga.
4 Department Structure, Proposal Documents provided by WRD
5 Discussions and Minutes of Meetings from various discussions and suggestions.
6 Feedback received from online Trac <www.mpwrd.gov.in/itmgmt>
7 SRS and Design Documents of the module.