AA RD 20211 - Equipment Performance Metrics

Embed Size (px)

Citation preview

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    1/15

    FT

    A RD 20 21

    O ENSUREOCUMENT

    or more inel: +27 11

    QUI

    1 A23 A4 D5 R

    5.

    5.

    5.

    Appendix

    Appendix

    Appendix

    Appendix

    Appendix

    Appendix

    Appendix

    1

    THAT YOU, Pages - Te

    ormation o38 2815

    MEN

    im

    otivation

    pplication

    efinitions

    equireme

    .1 Pla

    .2 Sys

    .3 PeA: Refere

    B: Recor

    C: Calcul

    D: Target

    E: Calcul

    F: Time A

    G: Downti

    CO

    EQUIP

    REFER TOchnical Do

    r to give fe

    PER

    ts

    t and Eq

    tem and

    ple Requi

    nced docu

    of Amen

    tion Exa

    Setting

    ting Cons

    llocation

    me Descr

    PANY CON

    ENT PERF

    THE MOSTuments Se

    edback on

    OR

    ipment R

    rocedural

    ements

    ments

    ments

    ple

    equential

    escision

    iption

    IDENTIAL

    ORMANCE

    CURRENTarch

    this docu

    ANC

    quiremen

    Requirem

    own Tim

    ree

    APPR

    METRICS

    VERSION

    ent, pleas

    MET

    s

    ents

    e

    VED

    F THIS

    contact M

    RICS

    VERSI

    03 Oct

    COPY

    &T Risk a

    Page1 of 1

    N 2

    ber 2012

    IGHT

    d Assuran

    2223667899

    1011121313

    5

    e

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    2/15

    1

    A RD 20 21

    AI

    Th

    a)

    b)

    c)

    d)

    M

    It is

    like

    Thiincl

    A

    ApAs

    An

    foll

    a)

    b)

    c)

    d)

    1

    M

    aims of thi

    To provi

    Standar

    To enha

    Allow th

    TIVAT

    required t

    benchmar

    Documeuding contr

    PLICA

    lication ofet Manage

    request f

    ws:

    The Opeand any

    The Busiexempti

    Approval

    If the exrequirem

    CO

    EQUIP

    s Docume

    e the basi

    isation of t

    ce perfor

    developm

    ON

    have a c

    king.

    t applies tactors whe

    ION

    his Requirment.

    r exempti

    ration shallproposed a

    ness Unitn to the T

    of the exe

    mption isents.

    PANY CON

    ENT PERF

    t are:

    for a com

    e availabil

    ance moni

    ent of com

    mmon mo

    o all Anglon involved i

    ments Do

    n from th

    prepare alternative

    iscipline Hchnical Dis

    ption shal

    ot approve

    IDENTIAL

    ORMANCE

    on Group

    ities and d

    toring, man

    on proced

    el adopte

    Americann controlle

    ument su

    requirem

    motivationeasures

    ead shall rcipline Cou

    l be record

    d, the Ope

    APPR

    METRICS

    wide avail

    wntime co

    agement c

    ures and

    across th

    Group maactivities.

    ports the r

    nts in this

    or the exe

    view andncil for app

    ed in the T

    ation shall

    VED

    bility / dow

    es

    ntrols and

    onitoring

    Group wh

    naged bus

    quirement

    document

    ption, incl

    ubsequentroval

    chnical Di

    be require

    VERSI

    03 Oct

    COPY

    ntime hiera

    decision m

    odels.

    ich will faci

    inesses an

    s defined i

    shall be

    uding a ris

    ly motivate

    cipline Co

    to adhere

    Page2 of 1

    N 2

    ber 2012

    IGHT

    rchy

    aking

    litate like f

    d operatio

    AA GTS

    rocessed

    assessme

    the

    ncil minut

    to the

    5

    or

    s

    0

    s

    nt

    s

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    3/15

    A RD 20 21

    D

    Tim

    AvSySer

    Avsyspar

    (St

    Avcosys

    Tar

    CT

    CO

    1

    FINITI

    e Model

    ilability fortems inies

    ilability fortems inallel

    ndbys)

    ilability forposite

    tems

    get

    T

    CO

    EQUIP

    NS

    :

    :

    %

    :

    %

    :

    %%)

    : Tar

    a)

    b)

    : Couse

    Per

    CT

    : Cowa

    Per

    %

    CO

    PANY CON

    ENT PERF

    ystem avai

    ystem avai

    ystem avai

    et to be o

    Industry

    Equipme

    trollable Tid by the op

    entage Co

    = T100/T0

    trollable Ooperated

    entage Dir

    quipment

    = T300/T

    IDENTIAL

    ORMANCE

    lability = (

    lability = 1

    lability = (

    e of the fol

    enchmark

    nt namepla

    me: The peration.

    ntrollable

    0 x 100

    perating Tiithin the C

    ect Operat

    vailability

    100 x 100

    APPR

    METRICS

    Availabilit

    [(1-% Av

    Availabilit

    lowing in o

    (Anglo Am

    te/design.

    rcentage o

    ime over C

    me: Theontrollable

    ing time ov

    % Use of

    EQA x U

    VED

    A) x (% A

    ilability A)

    A x y %)

    der of pref

    erican agre

    f total cale

    alendar Ti

    ercentageTime.

    r Controlla

    Equipment

    A

    VERSI

    03 Oct

    COPY

    vailability

    x (1-% Ava

    (% Availa

    rence:

    ed modera

    dar time t

    e

    of time th

    ble Time,

    Availability

    Page3 of 1

    N 2

    ber 2012

    IGHT

    )

    ilability B)]

    bility B x z

    ted value)

    at is actua

    t equipme

    r

    5

    lly

    nt

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    4/15

    A RD 20 21

    D0

    D1

    D2

    D3

    Fail

    EP

    EQ

    UE

    EqFle

    L00

    L10

    L20

    1

    0

    0

    0

    0

    ure

    ipmentt

    0

    0

    0

    CO

    EQUIP

    : Doren

    : Unmaipla

    : Schmai

    : Opdo

    : Thefun

    : Effope

    Per

    EP

    : Equequ

    Per

    EQEQ

    : Ustim

    Per

    EQ

    : Groope

    : Losbut

    : Coups

    : Sta

    Stasec

    Sta

    PANY CON

    ENT PERF

    ntime: Doers the eq

    cheduledntenance.

    eduled Mntenance

    rationalntime.

    unexpecttions.

    ctive Prodrating time

    entage of

    = P200/T3

    ipment Avipment can

    entage Up

    = T200 /= (MTBS)

    of Equipthe equip

    entage Dir

    = T300 /

    uping of eqrations.

    Time: Timnot used.

    sequential:ream or d

    dby: Time

    dby is idion in their

    dby may n

    IDENTIAL

    ORMANCE

    ntime attripment in

    Maintenanork not in

    aintenanceork includ

    stops: O

    d loss of

    uction: ais used for

    Primary Pr

    0

    ailability:be produc

    time over

    100 x 100/(MTBS +

    ent Availent is use

    ect Operat

    T200 x 10

    uipment wi

    e during U

    : Impact onwnstream

    allocated t

    ntified asoperationa

    ot be used

    APPR

    METRICS

    ibutable toperable

    ce Downticluded in t

    Downtimd in the co

    perator/Op

    one or

    erformancprimary pr

    duction ov

    performaive.

    ontrollable

    TTS)

    bility: a pd when it is

    ing Time o

    th the sam

    time (T20

    equipmenstoppages.

    spare eq

    a requirel strategy a

    if the equi

    VED

    Maintenan

    me: Dowe confirm

    e: Downtfirmed we

    rationally

    ore of th

    indicatorduction/pu

    er Direct O

    ce indica

    time

    rformanceavailable.

    er Uptime

    character

    ) when the

    , section o

    ipment av

    ent for thnd long to

    ment is no

    VERSI

    03 Oct

    COPY

    ce and Op

    time ased weekly

    ime askly mainte

    induced

    equipme

    of how efrpose.

    perating Ti

    or of ho

    indicator

    istics cond

    machine

    r modules

    ilable for p

    e operatiohort term

    available.

    Page4 of 1

    N 2

    ber 2012

    IGHT

    rational th

    a resultmaintenan

    resultnance plan

    equipme

    t's intend

    ective dir

    e

    much ti

    f how mu

    cting simil

    as availabl

    s a result

    roduction.

    , activitylans.

    5

    at

    ofe

    of.

    nt

    d

    ct

    e

    h

    ar

    e,

    of

    or

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    5/15

    A RD 20 21

    L30

    N0

    N1

    N2

    MT

    MT

    OE

    OU

    P1

    P2

    1

    0

    0

    0

    0

    BS

    S

    E

    0

    0

    CO

    EQUIP

    : Delthe

    : Nopro

    : Nothe

    : Unconutili

    Onlhou

    : Me

    T20

    Wheve

    : Me

    (D0

    Whdo

    : Ovfoc

    The

    a)

    b)

    c)

    OE

    : Ovcal

    OE

    : Secper

    : Pripro

    PANY CON

    ENT PERF

    ys: All safequipment

    Controllauctive or c

    Scheduleproduction

    ontrollablerol of theies such a

    abnormalrs in durati

    n Time Be

    0 / Count(

    re Countnts contrib

    n Time To

    00)/ Count(

    re Countntime D00

    rall equips on how

    metrics ar

    Overall

    Performaproductitargeted

    Quality:achieved

    = OU x(Actual

    rall Utilisandar time i

    U = P200

    ondary/Noorming non

    ary Production/pur

    IDENTIAL

    ORMANCE

    ety, staff awas availa

    le time: Tould not b

    Time: Eqplan. (Only

    Time: Timoperationpower, w

    events orn and coul

    ween Sto

    000events

    (D000eveting to do

    Start:

    D000event

    (D000eve.

    ent effectiffectively e

    described

    tilisation -

    nce: Then rate atrate.

    The portioat an oper

    (ActualQuality)/(T

    ion: Thes utilised (

    T000 x 10

    -Productio-productio

    uction: Tose.

    APPR

    METRICS

    nd servicele but not

    otal Timeproductive

    ipment timapplicable

    e attributahat affectster, rail sy

    occurrencd not have

    s:

    )

    ts) is thentime D00

    s)

    ts) is the

    eness (Oquipment i

    below:

    U

    portion ofhich the o

    of the Oation as a

    roductionarget Quali

    ultimate pweating th

    n: Time tactivities.

    ime equi

    VED

    related delsed.

    quipment.

    e allocatedto non-full

    le to exte the wholtems, envir

    s and whibeen budg

    number;

    number of

    E) is a hiutilised.

    the OEEeration run

    EE Metricercentage

    Rate)/(Tary)

    rformanceasset).

    at equip

    ment is

    VERSI

    03 Oct

    COPY

    ays that o

    is not sch

    as not beicalendar o

    rnal factor operationonmental

    ich are greted for.

    f equipme

    events c

    rarchy of

    Metric res as a per

    representof its target

    et Produc

    indicator

    ent is op

    utilised

    Page5 of 1

    N 2

    ber 2012

    IGHT

    curred wh

    duled to

    g requirederations)

    beyond te.g. outsiisasters.

    ater than

    nt downti

    ntributing

    etrics whi

    resents tentage of

    the Qualed Quality.

    ion Rate)

    of how to

    rational b

    for prima

    5

    n

    e

    in

    ee

    4

    e

    to

    h

    eits

    ity

    x

    al

    ut

    ry

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    6/15

    5

    A RD 20 21

    PR

    Probuf

    Sy

    T0

    T1

    T2

    T3

    R

    .1 Pla

    Anproequ

    1

    ductioner

    tem

    0

    0

    0

    0

    QUIR

    nt and Eq

    Informatiogrammes fipment.

    CO

    EQUIP

    : Pro

    Pro

    Pro

    : A pmat

    In tbet

    : A swh

    In tcou

    sys

    : Cal

    Ann

    : Cofact

    Tot

    T10

    : Upt

    Co

    T20

    : Direith

    Pri

    T30

    MENT

    uipment

    Manageor capturin

    PANY CON

    ENT PERF

    uction Rat

    uction Ma

    uction ma

    ile or storaerial handli

    his documeen produ

    et of interle in betwe

    his documpled in su

    em is affec

    ndar Time

    ualised = 2

    trollable Tiors under t

    l Schedule

    0 = T000

    me: Equip

    trollable Ti

    0 = T100

    ct Operatier performi

    ary Produ

    0 = P100+

    equirem

    ent Systg, validati

    IDENTIAL

    ORMANCE

    e: rate of

    erial / Prim

    erial / P20

    ge locationg process

    nt a buffection syste

    cting or ien Product

    ent, a sysh a man

    ted.

    : The total

    4 x 365 =

    me: Availae control

    d Time

    N100 N

    ent time a

    e Equip

    D000

    g Time: Tig Primary

    tion + Sec

    200 = T20

    ents

    m is requg and re

    APPR

    METRICS

    aterial mo

    ary Produc

    0

    for bulk.

    r will be dms of at le

    terdependion buffers.

    tem is deer that w

    ossible ho

    760 (non l

    le equipmf the opera

    nschedule

    00

    vailable for

    ment Dow

    me duringor Second

    ondary Pro

    0 L000

    ired, withorting on

    VED

    ement per

    ion Time

    aterials, f

    fined as ast 12 hour

    ent entitie

    ined as een one is

    urs availab

    ap year)

    nt time atttion that im

    Time - Un

    production

    time

    which thery producti

    uction = U

    the capacihe perfor

    VERSI

    03 Oct

    COPY

    productive

    orming par

    productio.

    forming

    quipmentaffected t

    le.

    ributable tpacts prod

    controllabl

    activities.

    equipmention .

    ptime Lo

    ity to runance of a

    Page6 of 1

    N 2

    ber 2012

    IGHT

    time unit

    t of the b

    time buff

    n integrat

    or activitiehe comple

    any internction.

    Time

    is operatin

    t Time

    the requirll producti

    5

    lk

    er

    d

    s)te

    al

    g,

    dn

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    7/15

    5

    5

    5

    A RD 20 21

    .2 Sy

    a)

    b)

    c)

    .2.1 Set

    a)

    b)

    c)

    d)

    e)

    Se

    .2.2 Dat

    a)

    b)

    1

    tem and

    An Ente

    informatiAn autoreports.

    Informatiformally

    ting Target

    Calculat

    To calcu

    1. Pr

    2. Pr

    Calculatdividing t

    P200 =

    Then %

    Calculat

    DetermiProducti

    % Effecti

    Calculat(EQAs).

    % Syste

    Calculat

    % Use oSystem

    OEE tar

    OEE

    Appendix

    a Capturin

    Daily / SPIMS, M

    Producti

    CO

    EQUIP

    Procedur

    prise Reso

    on for repoated repor

    on Managcontrolled.

    :

    Required

    late the req

    duction rat

    duction rat

    the requirhe Product

    T / PR

    verall Utili

    the % Eff

    e what pen Rate.

    ve Product

    System a

    Availabili

    % Use of

    f Equipmequipment

    ets:

    = % Ovx (Act

    D for an ex

    hift reportsIMS, MES,

    n log: Veri

    PANY CON

    ENT PERF

    l Requir

    urce Plann

    rting purpoting progra

    ment Cont

    % Overall

    uired % Ov

    e Target (P

    e (PR)

    ed Primaryion Target

    sation as p

    ctive Prod

    rcentage o

    ion = Prima

    ailability,

    ty (SEA) =

    Equipment

    t Availabilivailability

    rall Utilisatial Quality)/

    ample.

    of all equipBatch, Sc

    fication of

    IDENTIAL

    ORMANCE

    ments

    ing system

    se.m is requir

    ol procedu

    tilisation

    erall Utilisa

    T)

    Productioith the Pr

    er definitio

    ction

    f time the

    ry Producti

    y modellin

    % EQA1 x

    Availability

    ty = (% Ov* % Contro

    on x (Actu(Target Qu

    ment: genda, Prosc

    onsolidate

    APPR

    METRICS

    (ERP) is r

    d to gener

    res are req

    tion the foll

    Time (P2duction R

    = P200/T

    equipment

    on/Direct

    the indivi

    % EQA2 x

    erall Utilisallable Time

    l Productiality)

    rated mann etc.)

    data for a

    VED

    quired to u

    te the req

    ired to en

    owing is re

    0) to achite

    00

    will be pr

    perating Ti

    ual equip

    tion) / (%

    n Rate)/(T

    ally or thr

    ll equipme

    VERSI

    03 Oct

    COPY

    pload all th

    ired mana

    ure that ch

    quired:

    ve produc

    ducing at

    me

    ent availa

    ffective Pr

    arget Prod

    ugh syste

    t, machine

    Page7 of 1

    N 2

    ber 2012

    IGHT

    e relevant

    gement

    anges are

    ion target

    its Target

    ilities

    oduction *

    ction Rate

    s (LIMS,

    ry, plant an

    5

    y

    d

    %

    )

    d

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    8/15

    5

    5

    A RD 20 21

    c)

    d)

    e)

    .2.3 Re

    Fro

    .3 Pe

    An

    Per

    Per

    1

    fleets ofand Qua

    Time sh

    equipmeCalculatiequipmestops allconsequsystem.

    Verified

    orting

    m the Data

    ple Requ

    administrat

    sonnel trai

    sonnel trai

    CO

    EQUIP

    equipmentlity measur

    ll be acco

    nt/plant atng conseqnt, and whiproduction,ential downSee Appe

    ata loade

    warehous

    irements

    or is requir

    ed to main

    ed to gen

    PANY CON

    ENT PERF

    (Time alloces)

    nted for ac

    ll times.ential dow

    ch equipm0% has ntime is alldix E for e

    in the ER

    reports to

    d to maint

    tain the inf

    rate the re

    IDENTIAL

    ORMANCE

    ation, Dow

    cording to t

    time: Dent it has aeffect oncated accample)

    /Database

    be generat

    in the Dat

    rmation lo

    uired repo

    APPR

    METRICS

    time Code

    he time mo

    ine the %effect onroduction.rdingly to t

    for reporti

    ed to visua

    base.

    ded into D

    rts.

    VED

    allocation,

    del for all p

    ffect equiphen realisi

    By using te other eq

    g.

    lly display

    atabase.

    VERSI

    03 Oct

    COPY

    Production

    roduction

    ment has oing downtihe % effectuipment wi

    erformanc

    Page8 of 1

    N 2

    ber 2012

    IGHT

    statistics

    n othere - 100%thehin the

    .

    5

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    9/15

    A RD 20 21

    APPENDI

    AA RD 20_2

    AA GTS 2

    APPENDI

    Issue 0

    Version 1

    Version 2

    1

    A: REFE

    11, Equipmen

    B: RECO

    CO

    EQUIP

    ENCED D

    t Performanc

    : A

    RD OF AM

    : New d

    : June

    Chang

    Chang

    IncludInclud

    Define

    Updat

    Define

    Updat

    : Augus

    Under

    Chang

    Definit

    Definit

    Definit

    Correchang

    Docu2012)

    PANY CON

    ENT PERF

    OCUMEN

    Metrics

    sset Manag

    ENDMENT

    ocument (

    012,

    ed Total Ti

    ed % Equi

    d % Effectd a 24 ho

    % Controll

    d the defin

    d MTBS an

    d Appendi

    t 2012.

    Aim, chan

    e referenc

    ion for L30

    ion of N20

    ion include

    ted definitied Operati

    ent Numb

    IDENTIAL

    ORMANCE

    S

    ement

    S

    .F. Stones

    me to Cale

    ment Utili

    ive Producr rule for U

    able Oper

    ition for Ta

    d MTTS

    ces

    ed Busine

    document

    expande

    simplified

    d for PR

    n of T200,nal to Equi

    r amende

    APPR

    METRICS

    reet, Nove

    ndar Time

    ation to %

    ion into calncontrollab

    ting Time

    rget

    s Unit to

    s to Requir

    on

    roduction

    Changedpment.

    to reflect

    VED

    ber 2010

    Use of Equ

    culating %le time

    roup

    ements Do

    rate

    vailable to

    overning

    VERSI

    03 Oct

    COPY

    ipment Ava

    Overall Util

    cuments

    Controllab

    A GTS (S

    Page9 of 1

    N 2

    ber 2012

    IGHT

    ilability

    isation

    le and

    ptember

    5

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    10/15

    A RD 20 21

    APPENDI

    1

    C: CALC

    CO

    EQUIP

    LATION

    PANY CON

    ENT PERF

    XAMPLE

    IDENTIAL

    ORMANCE

    APPR

    METRICS

    VED

    VERSI

    03 Oct

    COPY

    Page10 of

    N 2

    ber 2012

    IGHT

    15

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    11/15

    A RD 20 21

    APPENDI

    Performa

    Targets.x

    1

    D: TARG

    ce

    lsx

    CO

    EQUIP

    T SETTIN

    PANY CON

    ENT PERF

    G

    IDENTIAL

    ORMANCE

    APPR

    METRICS

    VED

    VERSI

    03 Oct

    COPY

    Page11 of

    N 2

    ber 2012

    IGHT

    15

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    12/15

    A RD 20 21

    APPENDI

    1

    E: CALC

    CO

    EQUIP

    LATING

    PANY CON

    ENT PERF

    ONSEQU

    IDENTIAL

    ORMANCE

    NTIAL DO

    APPR

    METRICS

    WN TIME

    VED

    VERSI

    03 Oct

    COPY

    Page12 of

    N 2

    ber 2012

    IGHT

    15

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    13/15

    A RD 20 21

    APPENDI

    1

    F: TIME

    CO

    EQUIP

    LLOCATI

    PANY CON

    ENT PERF

    N DESCI

    IDENTIAL

    ORMANCE

    ION TREE

    APPR

    METRICS

    VED

    VERSI

    03 Oct

    COPY

    Page13 of

    N 2

    ber 2012

    IGHT

    15

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    14/15

    A RD 20 21

    APPENDI

    Non-Cont

    N

    U

    Ocu

    Equipme

    U

    S

    O

    Lost Tim

    C

    1

    G: DOW

    rollable Ti

    ot schedul

    PublicNon properatio

    ncontrolla

    nly eventsuld not hader this se

    Externaetc.

    Environexcessi

    Labour:

    Non Scsuch as

    Marketconditio

    t Downti

    nschedule

    Equipmemonthly,

    cheduled

    Equipmemaintena

    perational

    Accideexcludindocume

    Blocka

    feeders, Diesel /

    being o

    Tyres /

    Groundreplace

    :

    onsequent

    Upstrea

    experie

    CO

    EQUIP

    TIME DE

    e:

    ed to prod

    oliday:Nduction sns do not

    ble events

    or abnorme been buction.

    l Utilities:

    mental:Ie rain that

    Impact as

    eduled Hvoting day

    Conditions.

    e:

    d Mainten

    nt Downtimannual mai

    aintenan

    nt Downtimnce, sched

    Stops (Op

    t / Damag equipmnt.

    e / Stuck

    screens oAir / Waterable du

    Ropes / C

    Engagingents i.e.

    ial:

    m or dow

    cing Down

    PANY CON

    ENT PERF

    CRIPTION

    uce:

    tional holiift:Shift d

    perate a 7-

    (Force Ma

    l occurrengeted for,

    Impact due

    pact due tcauses flo

    a result co

    liday:Los.

    :Loss of p

    nce:

    e related tntenance s

    e:

    e related tuled in the

    erator ind

    e: All dont that for

    Accretio

    stuck equier: Internalto running

    ains:All d

    Tools (Gill-, bucket

    nstream: I

    time.

    IDENTIAL

    ORMANCE

    ay definedefined as aday week

    jeure):

    es which aor exceeds

    to outside

    abnormalding, earth

    ntry wide i

    s of produ

    roduction ti

    repair worchedule (p

    work thatERP.

    ced):

    ntime asms part o

    :All down

    pment.controllabout of thes

    owntime re

    T):Exclu, chute-, s

    Impact du

    APPR

    METRICS

    as a non-non-workir a 24-hou

    re greater tthe budge

    utilities suc

    environmequakes, et

    ndustrial a

    tion time d

    me incurre

    k that doesogrammed

    orms part

    a resultProductio

    ime as a r

    le downtime.

    lated to tyr

    ing work rreen liners

    to other

    VED

    orking dayg shift by tday.

    han 24 houed time / p

    h as power

    tal occurr.

    tion.

    e to additi

    as a resu

    not form pin the ER

    f the week

    f damage, downtim

    sult of blo

    associat

    s, ropes or

    lated to s.

    quipment,

    VERSI

    03 Oct

    COPY

    by the opehe operatio

    rs in duratieriod may

    , water, rail

    nces such

    nal nation

    lt of market

    art of the w).

    ly/monthly/

    abuse oras speci

    ked chute

    d with eq

    chain failu

    heduled m

    modules

    Page14 of

    N 2

    ber 2012

    IGHT

    ration.n where

    n ande booked

    systems,

    as

    l holidays,

    eekly,

    nnual

    accidents,ied in thi

    , crushers,

    ipment not

    res.

    aintenanc

    r section/s

    15

  • 8/12/2019 AA RD 20211 - Equipment Performance Metrics

    15/15

    A RD 20 21

    S

    D

    Direct Op

    S

    P

    1

    andby:

    Spare eexcess

    elays:

    OperatioperatioFloccul

    Operatisuch asoperatio

    Staff Rshift cha

    No Ope Environ

    as dust,

    Serviceservices

    Safety:

    Unallocrecorde

    erating Ti

    econdary/

    Equipm

    rimary pro

    Equipm

    CO

    EQUIP

    quipment tapacity, w

    onal Connal consunt.

    onal Delablasting, hns taking >

    lated: Denge, etc.

    rator / Supmental:Lstagnant

    Delays:P, such as s

    Lost time d

    ated:Lost.

    e:

    on produ

    nt is runni

    duction:

    nt utilised

    PANY CON

    ENT PERF

    ats not reich is imm

    sumables:mables n

    s: Delaysousekeepi10 minute

    lays experi

    ervisor:Ast productiater, rain,

    roduction durvey, vent

    ue to safet

    time, whic

    ction:

    g/operatio

    for primary

    IDENTIAL

    ORMANCE

    quired at aediately av

    Internalt being

    experiencg, moves i.

    enced du

    y absenteon due toist, ventil

    elays expilation, con

    inspectio

    cannot b

    nal, but per

    production

    APPR

    METRICS

    point in tiilable for u

    controllablvailable,

    ed due tot includes

    to meetin

    ism that amanageabltion, etc.

    rienced dutruction,..

    s and safe

    classified

    forming no

    .

    VED

    e due to rse.

    e stoppai.e. Reag

    necessarytoppages

    gs, travelli

    fects produe environm

    to the intc.

    y related i

    or for whe

    -productio

    VERSI

    03 Oct

    COPY

    dundancy,

    es assocnts, Mag

    productioorming pa

    ng, breaks

    ction.ental cond

    tallation of

    tervention

    n no reaso

    n activities.

    Page15 of

    N 2

    ber 2012

    IGHT

    back-up or

    iated withetite, and

    activities,t of normal

    , transport,

    tions, such

    or lack of,

    .

    has been

    15