PASSAGE PLANNINGABIDJAN - LOME
BERTH TO BERTH
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 2 of 6
PASSAGE PLAN APPRAISAL
Have navigation charts been selected from chart catalogue, including: large scale charts far coastal waters appropriate scale charts far ocean passages planning charts routing, climatic, pilot and Ioad line zone charts
Have publications been selected, including: Sailing Directions and pilot books light lists radio signals guides to port entry tide tables and tidal stream atlas
Have all navigation charts and publications been corrected up to date, including: the ordering of new charts/publications, if necessary notices to mariners local area warnings NAVAREA navigational warnings
Have the following been considered? ship’s departure and arrival draughts together with any restrictions on under keel clearance due to squat ship’s cargo and any special cargo stowage/carriage restrictions if there are any special ship operational requirements far the passage
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 3 of 6
Have the following been checked? planning charts and publications far advice and recommendations on route to be taken climatological information for weather characteristics of the area navigation charts and publications far landfall features navigation charts and publications far Ships’ Routeing Schemes, Ship Reporting Systems and Vessel Traffic Services (VTS)
Has weather routeing been considered for passage?
Have the following preparations been made for port arrival? navigation charts and publications studied far pilotage requirements Ship-to-Shore Master/Pilot Exchange form prepared (see annex A1) Pilot Card updated (see annex A3) part guides studied far port information including arrival/berthing restrictions
Other checks
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 4 of 6
F-IMS 10-11 PASSAGE PLAN APPRAISALTO BE FILED ON BOARD
RETENTION PERIOD: 12 MTHS
VOYAGE NR: 04/10 FROM : ABIDJAN
DATE OF DEPARTURE 30.04.2010
DATE OF COMPILATION 29.04.2010
CARGOES: GASOILTO: LOME
COMPILER’S NAME AND SIGNATURES:
COMPILER INFOS
RANK: 2/0 OFFICER NAME DONTU ANDREI ALEXANDRU
SIGNATURE
MASTER SIGNATURE
TOTAL MILES SEAPASSAGE: 371 Nm
TOTAL MILES FROM BERTH TO SEA : 3 Nm
TOTAL MILES FROM SEA TO BERTH: 2.1 Nm
MARPOL AREA:
LOAD LINE AREA: SUMMER ZONE
DRAUGHTS (METERS) TIDAL INFOS (IF RELEV. - IN MTRS) WEATHER FORECAST VHF CHANNELS
DEPT. MAX: 10.00m
TRANSIT MAX: 10.00m
ARRIVAL MAX: 10.00m
FWA: 294mm
SQUAT: 1.09m
UKC MIN. NAVIG.: >30m
UKC MIN. PORT: 3.9m
AIR DRAFT: 38.9m
DEPT. PORT ARRIVAL PORT 1 2 3 DEPT. PORT ARRIVAL. PORT
TIME HL / LL TIME HL / LLTIME:
STATION:
WIND DIR.:
WIND FOR.:
SEA/SWELL:
VISIBILITY:
NOTES:
10.00
LES 121
S/SW
2/4
GOOD
PILOTS: 16, 12
TUGS:
PORT CONTROL: 16, 12
BERTH:
OTHERS:
PILOTS: 16, 12, 14
TUGS:
PORT CONTROL: 16,12,
14
SEE
TIDE
TABLES
CHARTS SEQUENCE:3103, 3101, 3100,1383, 1384, 1380
CONTINGENCY PLAN :
Abort Point: Lat: 06°08´11 N Long: 001°17´92 W
Contingency anchorageArea 0.6 Nm east of the counter-breakwater
CONSULTED PUBBLICATIONS
ADMIRALTY SAILING DIRECTIONS: 1 ADMIRALTY TIDE TABLES VOL 2 ADMIRALTY LIST OF RADIO SIGNALS 286(3) ADMIRALITY TIDAL STREAM ATLAS
ADMIRALTY LIST OF LIGHTS VOL D PORTOLANI
FARI E FANALI TAVOLE DI MAREA THE MARINER’S HANDBOOK ADMIRALTY DISTANCE TABLES
CHART NR. 5500 BROWNS NAUTICAL ALMANAC GUIDE TO PORT ENTRY
CHART & PUBLICATION CORRECTED
UP NTM _____ 17/10
OTHER:
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 5 of 6
Signature
Chief Officer:
Signature
Third Officer:
Signature
Chief Officer Sovran: N/A
PASSAGE NOTES : DEPARTURE ABIDJAN:Within 12 hours prior to departure the tests prescribed by SOLAS ch. V, Reg. 26 must be carried out.Depending of the pilot boarding time, the O.O.W. should make all checks and tests according to check lists no. 4 andprepare 'Shore to Ship' / 'Ship to Shore' / 'Pilot Card' and 'Steering' information cards.Tidal Streams: During High Water tidal streams at the entrance to Vridi Canal can reach 6 kts. Vessels may only enter or leave when streams are under 2 kts.DENSITY: Varies from 1025 in January to 1000 in November.
Charts: BA 3101, 3103TIME: UTCVridi Canal entrance power cables overhead clearance: min. 25.7m (at HW)ARRIVAL LOME:Within 12 hours prior to arrival the tests prescribed by SOLAS ch. V, Reg. 26 must be carried out.Depending of the pilot boarding time, the O.O.W. should make all checks and tests according to check lists no. 4 andprepare 'Shore to Ship' / 'Ship to Shore' / 'Pilot Card' and 'Steering' information cards.2 Hours before arrival call Lome Port Control in vhf ch. 16, 14, 12 and update ETAAPPROACHES: By night, the approach to the port is assisted by the following four lights:Lome Light: In position Lat. 06°08' N, Long. 001°15' E, on top of the big water tower in the village between Lome City and the harbour. Baguida Light: In position Lat. 06°09.5' N, Long. 01°19.5' E, occ. White and red. Light 2.5 secs occ. 0.5 secs period 3 secs vis. 17 nautical miles.The red light sector covers the breakwater as well as the old Lome Wharf in position Lat. 06° 07' N, Long. 001°13.5' E.Lome Port Entrance: On the head of the main breakwater a red tower is situated in position Lat. 06° 08' N, Long. 001°17.5' E. . On the head of the counter-breakwater a green tower is situated in position Lat. 06°08.2' N, Long. 001°17.4' E.Tidal range: 0.90 – 1.50 m.Nature of bottom: sandRestrictions: berthing and unberthing at any stage of the tide; berthing during daylight hours only, unberthing anytime.Pilots are compulsory for all ships of more than 300 g.r.t.ANCHORAGES: Vessels waiting for Pilot or berth should anchor approximately 0.5 – 1.0 nautical miles south to SSW of the main breakwater, red sector of Baguida light in 15m, where good holding ground (sand) is obtained. TANKER FACILITIES:Societe Togolaise de Stockage Lome:Max. size: LOA 250 m.Dirty ballast: capacity 4000 tons. Discharge rate 800 t.p.h.Shore gangway: availableCurrent: noneDENSITY: 1025 Charts: BA 1380
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 6 of 6
TIME: UTC
CONTINGENCY PLAN
01.BROKEN TOWING LINE:USE ENGINE / RUDDER TO STOP SWINGING;DROP ANCHOR IF IS NECESSARY / POSSIBLE;REPLACE THE TOWING LINE;
02.MAIN ENGINE FAILURE:USE TUG TO REACH CONTINGENCY ANCHORAGE;DROP ANCHOR;
03. GENERATOR FAILURE:START EMERGENCY GENERATOR;STOP MAIN ENGINE;USE TUG TO REACH CONTINGENCY ANCHORAGEDROP ANCHOR
04. STEERING GEAR FAILURE:STOP MAIN ENGINE;USE EMERGENCY STEERING GEAR;IF IS NECESSARY USE TUG TO REACH CONTINGENCY ANCHORAGE;DROP ANCHOR
Signatures : OOW ______________________________________ Master ______________________________________